II
A special Thank You, to all of my studio professors and mentors at both The University of Calgary and The University of Oklahoma, for pushing me to my limits and inspiring me to explore new ideas and techniques.
III
CONTENTS
1 2 3 4 5 6 IV
THE SUPERLOOP
9-19
WALDHAUS STUDIO
20-29
THE SHARD
30-37
MARTIAN LAB
38-45
528 NW 115TH
46-53
ILIAD & ODYSSEY
54-62
KAMYAR MOVAFFAGH Phone: 405.537.2608 e-mail: movaffaghk@gmail.com EDUCATION Master of Architecture Cont. University of Oklahoma, Norman, OK
2018 - 2020
Master of Architecture University of Calgary, Alberta, Canada
2016 - 2018
Bachelor of Science in Architecture and Biomimicry University of Oklahoma, Norman, OK
2010 - 2015
College of Architecture
School of Architecture
College of Architecture & College of Arts and Sciences RELATIVE WORK EXPERIENCE Design Professional II
Feb. 2022 - Present
Co-Owner and Designer
July 2020 - Present
FSB Architects + Engineers, Oklahoma City, OK Led an office space project for United Airlines and a hangar project for AAR, from schematic design through construction administration; drafted construction documentation on medium to large scale projects for American Airlines, Airbus, Tesla, and Will Rogers World Airport; earned Honourable Mention award in the Skyrise 2022 IMPACT international design competition. NOVA HOMES, LLC, Oklahoma City, OK Design development, construction documentation, construction administration, project management. 2 homes designed, built, and sold thus far with 3rd under construction, to be completed by end of 2024. Graduate Assistant
Aug. 2018 - May 2019
Summer Research Assistant
May 2017 - Aug. 2017
University of Oklahoma, Norman, OK Assisted Professor of Architecture, Dr. Lee Fithian, with teaching and grading course materials.
Laboratory for Integrative Design, University of Calgary, Alberta, Canada One of the few selected students dedicated to Robotic & Digital Fabrication and Algorithmic Design. PROFESSIONAL SKILLS
Modeling Rendering Graphic Other
Revit, Rhinoceros 3D, Grasshopper, Maya, Sketch-Up, Autodesk Recap Lumion, V-Ray Adobe Photoshop, InDesign, Illustrator Residential Construction, Microsoft Office Suites, 3D Printing, Digital Fabrication, Physical Architectural Modeling, Video Animation
AWARDS Honourable Mention – Skyrise 2022 IMPACT Design Competition In-State Scholarship and GA position for one year of study at OU OU President’s Honor Roll OU Dean’s Honor Roll
Spring 2022 Fall 2018 Fall 2015 Spring 2015
LANGUAGES English – Fluent Farsi – Fluent
V
1
1
THE SUPERLOOP CALGARY, AB CANADA RAMSAY DISTRICT
WHAT’S THE NEXT BIG LEAP?
2
THE SUPER L
P
GREATER SITE PLAN
DISTRICT RELATION TO DOWNTOWN A 32,000 SQ-FT Multi-Residential Housing, located on 11 ST SE in the Ramsay district of Calgary, Alberta. This is a very unique site in that it has residential, commercial, and retail zonings all mixed together without any sort of physical boundaries. Train tracks run through the north east edge of the site and the Crossroads Farmers Market is located at the very south east edge. After noticing a disturbance of noise from the train tracks to the residential zone on the west side of 11 ST, it became clear that new the housing unit would have to address that issue in its design. Can the form of a building be used as a way to manipulate and deflect sound?
IMMEDIATE SITE PLAN
5
SOFT SYSTEMS: “A SYSTEM IS ‘SOFT’ WHEN IT IS FLEXIBLE, ADAPTABLE, AND EVOLVING THROUGH A NETWORK OF ACTIVE INFORMATION OR FEEDBACK LOOPS.” - SANFORD KWINTER
PART 1
SITE AND NOISE ANALYSIS
PART 2
UNIT STUDIES ON SOUND DISPERSION
6
PART 2 CONT. PROGRAM LAYOUT
The idea was that convex surfaces would be the most effective form to disperse noise from the nearby train. A curved floor plan also allowed for sunlight to transition through each section of the unit as the day progresses. Thus the kitchen was placed in the east and the living room was placed in the west with the dining room placed in between. The bedrooms were positioned in the back in order to be isolated from the train and nearby traffic noise. This style of program layout made each room independent of one another, making modularity and limited customization possible. Owners can choose from the program catalogue based on their needs, and each module is then inserted into the structure based on a few rule sets.
ORIGINAL PARTI DIAGRAM
P R O G R A M C A T A L O G U E
P R O G R A M C A T A L O G U E
INSERTION DIAGRAM
ENTRY WAY
VARIATION SCENARIO
DINING
KITCHEN
LIVING ROOM 1
LIVING ROOM 2
MASTER BATH & CLOSET + MINI STUDY
MASTER BEDROOM
PART 3
AGGREGATION OF UNITS P O S S I B L E S C E N A R I O S
7
BEDROOM 1
BEDROOM 2
AXONOMETRIC PROJECTION OF STRUCTURE
MODULAR STRUCTURAL ASSEMBLY
Each of the unit’s components are divided into equally sized prefabricated modules and inserted into the structure at the site. The steal framing of the structure itself can also be assembled from prefabricated modular components and welded together at the site. The diagram to the left explains 5 different types of joints that can be used for various parts of the framing. The stacked concrete stairwells and elevator shafts on each side of the building serve as the core of the structure. While the reinforced concrete floor plates extend outwards to serve as a secondary structure in conjunction with the stacked vertical frames, and further supported by the lateral and cross bracings. The final key component of the structure are the C shaped steal beams that are welded underneath the lateral and cross bracings. This piece acts as an adapter for the T-Beams attached to the top of every module of the units.
NW SECTION
8
DININ
TC
HE
BED
The south loops are larger and can have up to 3 bedrooms and 3 bathrooms per unit, and also with the capacity to have a formal and family living room, a dining room, and a full-sized kitchen. A maximum of 2200 FT2.
BA TH
FAMLY LIVING
FO
RM
MAS
H TC KI
R TE AS D M BE
2
AND
H BAT
EN
TER
DIN
IN
G
DR
OO
M
FAMLY LIVING
WAY TRY ENPATIO
2
DR
OM
M1
RM
ENTRY WAY
BE
DR
AL
LIV
ING
OO
M1
R TE AS D M BE
WAY RY
EN
BAT
150 FT
H
BAT
H
EN
TER
CH
KIT
MAS
TER
CH
ENT
OM
OO
FO
KIT
LIVING ROOM
RO
AND ELL IR W TOR STA VA ELE
1
ING
MAS
ENTRANCE
RO BED
LIV
NG
EN
BE
LIVING ROOM
BE
AL
R TE ING AS D IN M BE D
CH
OM
ENTRY WAY
NI
R TE AS D M BE
RO
KIT
G
ELL R IR W STA EVATO EL
DI
All units also come with a BE DR OO balcony space regarldless M PATIO M1 2 ROO ENTRANCE BED of size. DININ
N
HE
BE
R TE AS D M BE
M2
OO
PATIO ENTRANCE
BE
DR
OO
M
1
OO
M
1
ST AIR EL WE EV LL AT AN OR D
ST AIR EL WE EV LL AT AN OR D
ENTRY WAY
FAMLY LIVING
ENTRY WAY
200 FT
BA TH
NE SECTION
TR YW AY
R TE AS D M BE
DR
TC
KI
EN
K
DR
MA
ST
ER
FAMLY LIVING
9
1
OM
RO
BED
MAL
FOR
G
LIVIN
1 OM
RO
BED
MAL
FOR
G
LIVIN
EN
OM
G RO
DININ
BE
H
EN
TR YW AY
PATIO ENTRANCE
2 LIVING EN ROOM ROOM D CH BE IT
CH
LIVING ROOM
OM
G RO
DININ
BAT
M
TER
O
KIT
O
H
R
MAS
D
LI VI NG W AY
BAT
BE
ILY
TER
RT Y
CE
EN
EN
RAN
CH
FA M
ENT
H BAT
M
G
TER
TH BA
LIVIN
MAS
ER
T AS
M
E AST
ED RB
BEDROOM 1 P ATIO
NG
MAL
NI
FOR
K
MAS
DINING
EN
H ITC
The South Loops are larger and can have up too three All units with a balcony space regardless of size, and every loop bedrooms andcome three quadrant hasand access to their own green rooftop. Part of the rooftop is bathrooms peralso unit, also paved and shaded for patio tables and chairs, and the other half functions with the capacity to have two living a dining, as a rooms, green-roof. There is also a communal courtyard on the ground floor. and a full sized kitchen. A maxi-mum of 2200 ft2.
KIT
R
G
TE
N
DI
AS
M AS BE TE D R
M
AS BE TE DIN D R IN
TER
M
AY E YW NC RT RA EN NT E IO T PA
KI
MAS
BA TH
BEDROOM 1
ER
L
ST
ILY
M FA
G
G
N IVI
MA
ING
FORMAL LIV
capacity for up to two bed The north loops have the capacity for up to 2 bedrooms and 2 bathrooms, rooms and 2 bathrooms, with with a formal and family living, dining room, and a full-sized kitchen per unit. a formal and family living, 2 dining room, and of a full sized A maximum 1800 FT . kitchen per unit. A maximum of 1800 ft2.
N. ELEVATION
S. ELEVATION
E. ELEVATION
W. ELEVATION
10
Because this building is modular and all of the units are customizable, the exterior will not always look the same as if it were a full house. It could have many different possibilities based on the occupants’ needs. Here are a few possible scenarios from two different perspectives of what that might look like over time.
Conclusion: Designing a modular building can be approached easily during the conceptual phase, but the underlying values must stay true from the beginning. If later on, other design elements and features are added that undermine the initial concept, then things can get pretty complicated, but can also result in something very interesting if the complications are worked through. One must learn to define and study all of the various systems and ecosystems that can be found at a site and use that knowledge to drive the design forward. Instead of having a preconceived idea in mind, it’s important to make sure that the design is suited for the site and become one with it, not as a separate entity causing disturbance to various systems.
2
WALDHAUS STUDIO MOORE/NORMAN, OK USA COTE COMPETITION
12
WALDHAUS STUDIO
This project was submitted to the COTE Top 10 Student Competition. The project is designed based on the ten sustainability measures of COTE. These measures are Design for INTEGRATION, COMMUNITY, ECOLOGY, WATER, ECONOMY, ENERGY, WELLNESS, RESOURCES, CHANGE, and DISCOVERY. This project has some main considerations based on the location of the site and regional context. The first one is stacking the masses and having a minimal footprint on the site. This method allows for a storm shelter to be embedded into the ground and for the entire building to be raised off of the flood plain. The second one is minimized wall heights n downward facing slopes. The third is having sloped and flat roofs to break up the massing. The fourth is optimized fenestration with a large south facing inset window in the primary space for optimal solar gain in winter and minimal solar gain in summer.
DESIGN APPROACH & 10 COTE MEASURES DESIGN FOR INTEGRATION
DESIGN FOR COMMUNITY
DESIGN FOR DISCOVERY
DESIGN FOR ECOLOGY
DESIGN FOR CHANGE
innovative
optimal feNestration
DESIGN FOR WATER
DESIGN FOR RESOURCES small footprint
panoramic views
DESIGN FOR ECONOMY
DESIGN FOR WELLNESS DESIGN FOR ENERGY
LESS POLLUTION
SAVES TIME
PREFABRICATION
SAVES RESOURCES
PRECISION CONSTRUCTION
COMPLEX STRUCTURE
LESS WASTE ON SITE
QUALITY CONTROL
15
DESIGN FOR COMMUNITY
N
A school of design that focuses on energy efficiency and resiliency while pushing further the envelope of steel and concrete design and modern architecture. The site is designed with multiple nature paths that can be used by the entire nearby community for biking, running, walking, etc. Extending the path over the creek and to the nearby apartment complex. And further extending another path all the way to the adjacent street to the west to provide an additional access to the greater community approaching from the west.
DESIGN PRINCIPLES
Stepped floors to reduce cut/fill and to elevate the entire building off of the flood plain.
Wall heights minimized on downward facing slopes.
MINIMAL FOOTPRINT + EMBEDDED STORM SHELTER
MINIMIZED WALL HEIGHTS
Large south facing inset windows in primary spaces provide optimal solar gain in winter and minimal solar gain in summer. OPTIMIZED FENESTRATION
Stepped and sliced roofs to break up massing.
SLOPED AND FLAT ROOFS
NATURALLY LIT PANORAMIC VIEWS
16
GALLERY WALL SECTION A7
Absorption Coefficient via Checkered Configuration 500 Hz: .252 αn 1000 Hz: .492 αn 2000 Hz: .515 αn
NRC: .3 LIGHTWEIGHT CONCRETE ACOUSTICAL PANELS
17
PHYSICAL SECTION MODEL
PARKING
SHELTER KITCH STUDIO
GALLERY
B2 & B1
G & L1
DROP-OFF
LOBBY BALCONY
L2
VERTICAL CIRCULATION
1. MAIN ENTRY/LOBBY 2. CONFERENCE ROOM 3. KITCHENETTE 4. GALLERY 5. STORM SHELTER/STUDIO 6. STUDIO SPACE 7. PARKING
2
1
7
3
4 5
18
6
SECTION 7
DESIGN FOR WATER An intricate rainwater harvesting pavilion is positioned in the middle of the site with a 3,600-gallon cistern below grade. Rain water is collected and is pumped back to the building’s utility room to be distributed for greywater and landscaping usage. SECTION D
19
DESIGN FOR ENERGY
Integration of PV panels on the slopped rooftop of the gallery, tilted southwards to produce electricity and store them in 4 TESLA Powerwall batteries located in the utility rooms of the gallery and the storm shelter. The storm shelter has its own independent HVAC and backup electricity systems so that it is not dependent on the main supplies in case of a total loss of power during severe weather. DESIGN FOR ECOLOGY
Approximately 55% of the footprint is recovered by green roofs planted with native grasses. Removal of invasive species like Poison Ivy from the north of the site while leaving the back (south) of the site as is. Creating a gradient canopy from north to south starting with native grasses, then small shrubs and bushes, then short and young trees, and finally the existing mature trees towards the very back (south) of the site.
STRUCTURAL SYSTEM W18X119
50 18X
W
W W 18 X50 0
W 18
L2
X50
W 12X5
0
W
12
X15 W18X119
W6 X15
W18X119
119
8X
W1
W18X119
(S
W18X119
W18X119
W18X119
0
X5
50 18X
W
X5
12
W
50 18X
P
LO
(S
W18X119
P
LO
50
X 12 W W 12X50 (SLOPED)
D)
0
2X5
W1
W18X119
W18X119
PE
W
(
X 12
ED
119
8X
W1
L6 CONFERENCE +13’
5
LO (S
50
SL
)
ED
15
6X
W
X1 W6
0 X5 12
W
1
)
OP
W W18X11 9
15
0
5 2X
) ED
15
W
W
P
LO
(S
119
18X
6X
0
X5
12
) ED
119
8X
W1
W
LO
(S
119 18X WW 18X119
15
W
9
8X W1
119
8X
W1
6X
0
X5
12
W18X11
119
)
D PE
(S
19
8X1
W1
W
)
D
PE
W18X119
6X
W
19
8X1
W1
ROOF +25’
W6
W18X119
119
X W18
LO
119
8X W1
119
X 18
L5 LOBBY/ENTRY 0’-0”
W
L4 KITCHENETTE -12’
W 18
X50
G
TIN OO
F
W
L2 FO
OTIN G
50 18X
50 18X
W W 18 X50
W 12
W 18 X50 X50 0 X5 18 W
W 18
L3 GALLERY -14’
X50
L1 FO
OTIN G
CON C FOR RETE PIE RS BURR CANTIL EVEL IED 1 0-12’ B ELOW GRA DE
PRECAST BEARING WALLS
20
L2 STORM SHELTER -22’
L1 STUDIO SPACE -26’
DESIGN FOR WELLNESS The Waldhaus, following the footsteps of the Bauhaus in Dessau, is intentionally designed to have bright white interior spaces that exude openness, minimalism, and precision to create a sensation of cleanliness and health for its inhabitants with ample amounts of natural light from the south facing panoramic windows. DESIGN FOR INTEGRATION Minimal footprint with embedded storm shelter. Tiered floor plan approach to reduce cut and fill into the site and to elevate majority of the building off the floodplain. The main approach to the building is positioned on the far north edge of the site on a built-up plateau to have the most optimal views of the tree line and to have minimal disturbance to the rest of the site from construction vehicles. Glazed elevation facing the south for maximum solar heat gain in the winter. DESIGN FOR CHANGE The expansion of the pathway across the creek and to 36th Ave NW will not only give greater access to the community, but in the near future, the city of Norman plans to expand its bike lane northwards towards Moore. 36th Ave NW being one of those expansions. DESIGN FOR RESOURCES Primary materials are steel and concrete, both of which have local factories with a 10 mile radius from the site. All concrete walls of the building are designed to be prefabricated off site and assembled on site. Prefabrication saves time, resources, produces less waste, and allows for complex and precise structures.
21
3
THE SHARD NORMAN, OK USA UNIVERSITY OF OKLAHOMA BUS STOP
22
THE SHARD
S JENKINS AVE
ASP AVE
This area is one of the two main bus stops on campus, the other being east of Jenkins Ave near the Duck Pond. The existing bus stops at this location are rather small and don’t provide enough shelter for more than a dozen students during extreme weather like cold and rain. Furthermore, they lack to provide an experience. Not to mention they are directly across the stadium and are rather unpleasant to look at.
ELM AVE
The purpose of The Shard was to create an element that experiments with Form, Shadows, and Pathways; and also serves as a place of play and gathering during the rush hours of the day when people are waiting for the bus. Both the top and bottom levels were designed to be maze like and playful.
W. lindsey ST
25
PART 1 SOLID
ORDER , PATH , & PROCESS Physical models are such an important process for designers and architects. In the case of this particular model, instead of going straight from a digital model to physical using a laser cutter, CNC, or 3D printing like usual, a more traditional method of model making was taken using a chisel, hammer, and band saw.
26
PART 2 SKIN
2.0
3.0
4.0
1.1
2.1
3.1
4.1
1.2
2.2
3.2
4.2
ORDER
PHYSICAL MODEL
PROCESS
1.0
27
28
“
In order to give meaning to the world, one has to feel oneself involved in what he frames. This attitude requires concentration, a discipline of mind, sensitivity, and a sense of geometry.
- Henri Cartier-Bresson
Our public spaces must not be solely of function but also inspiration and an invitation to become part of a community. As human beings, we do not exist to be bored and isolated. The traditional bus stop at this location fails to stimulate our senses in a fulfilling way and encourage connection between community members. The trade-off to our fast-paced tech world is that we lack the patience to enjoy simply existing. By intentionally incorporating playful design, skyward lines, and peek-a-boo moments into this structure, we create a space that beckons the child in all of us to come out and play.
29
”
4
MARTIAN LAB MARS
30
MARTIAN LAB
EFFICIENCY OF DOMES Reason 1 that domes are efficient is because the ambient airflow inside a dome is continuous, with no stagnant corners, requiring less energy to circulate air and maintain even temperatures. About 30% less energy than conventional buildings. Less surface area makes these buildings less susceptible to temperature changes, and thus inexpensive to heat and cool as compared to rectangular homes. The aerodynamic exterior means cold and warm air flows around the structure instead of forcing its way into the interior.
CORRECT TRILATERATION
INCORRECT TRILATERATION
PLATEAU’S LAWS
Plateau’s laws describe the structure of soap films. These laws were formulated in the 19th C. by Belgian physicist Joseph Plateau from his experimental observations. Many patterns in nature are based on foams obeying these laws. The 1st law states that soap films are made of entire smooth surfaces and the mean curvature of a portion of soap film is constant on any point on the same piece of soap film. The 2nd law states that soap films always meet in threes along an edge and they do so at an angle of across 120°. And the 3rd law states that these edges meet in fours at a vertex, and they do so at a solid angle of across 109.47° (the tetrahedral angle). Any configuration other than those of Plateau’s Laws are unstable an the film will quickly tend to rearrange itself to conform to these laws or burst.
1st
2nd
3rd
BUBBLE STUDIES
Reason 2 being the high volume-to-surface area ratio, requiring less building materials to enclose more space. The sphere has 30% less surface area per volume enclosed than any other shape. The geodesic dome combines the inherent stability of triangles with the advantageous volume -to-surface-area ratio of a sphere. The larger the dome, the more efficient it becomes.
INITIAL CONCEPTUAL STRUCTURE W/O THE USE OF GRASSHOPPER
The geodesic dome is the lightest, strongest, and most cost-effective structure ever devised. It is able to cover more space without internal supports than any other enclosure, which makes them perfect for building enclosures on other terrestrial planets. Combining multiple geodesic domes of various sizes becomes very complicated to design manually without the use of advanced mathematics. That’s where Grasshopper comes into play. Setting up a proper grasshopper script allows for limitless possibilities on size and number of domes to merge together like bubbles using simple algorithms. Below is sections of the script put together to computationally design the geodesic portion of the structure. The garage, entry room, air lock, and interior partition walls were designed manually and attached later. RADIUS OF SPHERES
FINAL FORM ISO-SURFACE --> POLYGONAL MESH ALGORITHM
MESH REFINEMENT
HALLWAY
2ND MESH REFINEMENT
FRAME OUTPUT
GLASS OUTPUT
SECTION B
34
FRONT ELEVATION
RIGHT ELEVATION
REAR ELEVATION
LEFT ELEVATION
35
SECTION A
36
AXONOMETRIC PROJECTION OF STRUCTURE
Triangles are the strongest geometry because they have fixed angles. Apply pressure to one edge of a triangle, and that force is evenly distributed to the other two side. Combine spheres and triangles, and you get geodesic spheres; a very durable and economical 3-dimensional structure. It becomes proportionally lighter and stronger the larger it is. The geodesic dome is a breakthrough in shelter, not only in terms of cost-effectiveness, but also in ease of construction and energy efficiency. The cascading distribution of pressure between the triangles is how geodesic domes efficiently distribute stress along the entire structure, much like the shell of an egg. And it just so happens that pentagons and hexagons can be neatly divided into triangles, the foundation of geodesic domes, so they are also exceedingly strong.
37
5
528 NW 115TH OKLAHOMA CITY, OK USA UNDER CONSTRUCTION (EST. FALL 2021)
38
528 NW 115TH
This house is my first real built project as an Architectural Designer. I bought the land in early 2020 and by the end of August had drawn up all the plans, construction documents, and renders. By September I acquired all the building permits from the City of Oklahoma City and hired a contractor, and by mid October we broke ground. I partnered with my brother and together we are self-funding this project. Located in the Chisholm Creek Neighborhood in NW OKC with just over 1690 SQ-FT and an oversized attached garage. The program was to have 3 good sized bedrooms, 2 baths, a living, kitchen, and dining, plus a study. To do this, an open floor plan for the living, kitchen, and dining was absolutely necessary in order to create openness and conserve space. This house is projected to be complete and ready for sale by Fall of 2021, and our next house is going to be built in Midwest City near Pecan Grove Park, about 10 minutes away from Tinker Air Force Base. �� ��
��
��
��
�� �� ��
��
��
KM DESIGNS™
KM DESIGNS™
��
��
���
��
��
��
��
�� �� ��
��
�� ���
�� ��
��� ���
��� ��
��
��
�� ��
��
��
��
��
�� ��
�� ��
�� ���
��
�� ��
��
��
��
W HEFNER RD��
��
��
BR OA DW AY
N WESTERN AVE
CHISHOLM CREEK
EX T
NW 122ND ST
41
�� ��
�� ��
���
��
��
���
���
��
��
��
��
��
���
���
� �
� �
��
��
��
� �
���
��
��� � �
��
��
��
� �
��
�
� �
�
�� ��
�
��
��
��
���
�
��
��
�� ��
��
���
�
���
��
���
�
� �
��
��
KM DESIGNS™
”’”
�� ��
� �
� �
�
���� �
�
�
�
��
�����°�
KM DESIGNS™
42
�
� ��
��
�
��
�
��
��
��
���
� �
��
��
��
��
��
��
��
��
�
KM DESIGNS™
WINDOW HEAD DETAIL
43
����� �����
�� � ��
�����
�����
�����
���� �����
�������
���
� ��
����
� �� �
��
����
� � ��
����
����
� ���
����
����
�����
����
�����
����
����
�����
����
����� ������
����
�����
����
�����
�����
���� ����� ���� �����
�����
����
����
����
�����
����� ����� ����
�����
����
�����
����� �����
� �� ��
����
������
�� � �
�����
����
�����
����
������
������ �����
” ’
KM DESIGNS™
44
”
R E D N E R V S R E A L I T Y
45
6
ILIAD & ODYSSEY
THE GALACTIC FRONTIER
46
THE ILIAD - STEALTH BOMBER
1.
2.
3.
4. Repeat on all four sides.
6. Using creases, fold bottom point of model. Repeat on all four sides.
5. Make creases then open. Repeat on all four sides
7. Repeat on all four sides.
9. Repeat on all four sides.
8.
10. Twist down petals on all four sides to complete Lily
Side elevation enlarged to show detail.
11. Shape into a Fleur-de-lis. Rear petal: flat & upright Side petals: twist down
12. Fold side petals inwards and anlged down at a 35°. Peal open front petal.
13. Fold down front petal from its base.
14. Push sides inward to open cavity and tilt wings upward.
12m40 / 40’8” SIDE
FRONT
40m / 131’3” 7m8 / 25’7”
5m45 / 17’11”
30m65 / 100’7”
5m34 / 17’6” SECTION 6m65 / 21’10”
TOP
49
A design in the mind is merely half-designed; only in building and modifying physical models can ideas fully come to life. The refinement of a concept for both form and function takes place in tactile, explorative building, a process shaped as much by childlike curiosity as creative vision. This is true for the most mundane and the most abstract concepts alike. A perfect representation of the latter, the Iliad is inspired by the crisp lines and organic unfurling petals of an origami lily. It embodies a harmonious marriage of personal interest in aviation and passion for precision design, both of which are illuminated in this project in each of its iterations through origami as a dynamic model building technique.
50
THE ODYSSEY - STARSHIP
SUBJECT:
THE ODYSSEY STARSHIP
STARSHIP
SCALE:
DESIGNATION:
YEAR:
DESIGN:
1"/40M
2220
EXPLORER 001
WARP DRIVE
SECONDARY DECK
PREMIUM DECK
HANGER DECK
PRIMARY DECK
NEGATIVE ENERGY REACTOR
BRIDGE
90M
TURBOJET ENGINE CONFIGURATION
TOP 120m
360° 22M
94M
19.7M
13.7M
FRONT
16M
61
SIDE
39M
+ Expansion
All objects wrap spacetime. By just existing, you create an indent in the fabric of spacetime. The bigger the object, the bigger the indent. In 1994, Mexican physicist Miguel Alcubierre proposed a method of stretching space in a wave which would in theory cause the fabric of space ahead of a spacecraft to contract and the space behind it to expand pushing the ship forward at higher than light speed. The generated warp bubble would move spacetime around the spacecraft, effectively repositioning it without the spacecraft having to move with respect to its local frame of reference. Nothing locally exceeds the speed of light, but space can contract and expand at any speed. However, spacetime is incredibly stiff, so to create the expansion and contraction effect in a useful manner in order to reach interstellar destinations in reasonable time periods would require a lot of energy and would need negative matter to expand spacetime. We know negative matter exists, we just don’t know yet how to harvest it.
Contraction _
62
8
UNITED AIRLINES TECH-OPS RECRUITING CENTER HOUSTON, TX USA COMPLETED IN DEC. 2022
A 7,400 SQ-FT office space attached to the admin space of a 3 bay Boeing 777 hangar for United Airlines in Houston, at George Bush Intercontinental Airport. The shell of this space was completed a few years prior to start of this project. The intent was to design an office layout with 8 interview rooms, 2 hoteling offices, an office for the director of technical operations, an office for the VP of technical operations, a sound suppressed workshop with 20 work stations, and a waiting area. This new space is serving as the largest recruitment center for all of the technical operations for United Airlines. People from all over the region come to this office for interviews to become part of United Airline’s aircraft repair and maintenance crew at various bases across the country. Once they are interviewed, they demonstrate their technical skills such as drilling, fastening, and riveting inside the sound suppressed workshop and then they get graded on their skills. The two most important factors of this project were acoustics and security. Because this is an office space of the second floor with a 950 SQ-FT workshop in the middle of it, we needed to make sure sound from this room would not leak out to the surrounding offices and to the floor below. Furthermore, this space is attached to a secured hangar on airport property. All employees needed to scan their badge to come inside and all guests were to be escorted at all times by an employee. Since it is a recruitment center with non-employees coming in and out, it was critical to ensure the non-secured space would be separated from the secured side and that the paths of egress allowed everyone to escape in the case of an emergency.
55
Path of Egress ’-1 VP 0 ” Of X fice 17 ’-1 0”
Area For Future Additional Cubicles
Path of Egress
Interview 7 12’ X 12’
Existing Vendor Room Hoteling Office 12’ X 10’
Break Room 24’X 10’
Existing Stair Well
Path of Egress
Path of Egress
Existing Conf. Room
Existing ELEC. Room
Existing Conf. Room
≈’’
Existing Break Room / Lounge
Existing COMM Room
Path of Egress
Existing ODA File Room
Path of Egress
Existing Huddle Room
Path of Egress
Existing COMM Room
Existing Induction File Room
Existing Huddle Room
≈’’
Existing Huddle Room
Existing Induction File Room
LAYOUT VERSION 2
Existing Conf. Room
Existing Print Room Existing Huddle Room
Path of Egress
LAYOUT VERSION 1
Path of Egress
Existing Conf. Room
Path of Egres
TORC Admin 12’X 10’
Sound Suppressing Practical Room 4 Benches 20’ X 13'-10"
Path of Egres
TA/HR/TO Office 12’X 10’
Existing Women’s Restroom
Hoteling Office 12’ X 10’
Path of Egress Equipment Closet 10’X 10’
Existing Men’s Restroom
Area For Current Cubicles
Path of Egress
Unisex Restroom
Hoteling Office 12’ X 10’
Sound Suppressing Practical Room - 8 Benches 48’ X 20’
Existing Vendor Room
Existing Induction File Room
Interview 6 11’ - 4” X 10’
Sound Suppressing Practical Room - 8 Benches 31’-10” X 24’-6”
Hoteling Office 14’-8” X 10’
Interview 5 11’ - 4” X 10’
Open Waiting Area 12-15 Capacity 21’-9” X 12’-10”
Equipment Closet 15’ X 6’-8”
HR/TA Closet 15’ X 6’-8”
Interview 4 12’ X 12’
Conf. Room 8-12 Capacity 12’ X 25’ - 9”
Interview 8 10’ X 10” Path of Egres
Potential Furnished Seating Area 3 - 4 Cap.
Existing ODA File Room
Existing ELEC. Room
Hoteling Office 14’-8” X 10’
Machine Area Interview 3 10’ X 10”
Interview 4 Interview 5 Interview 6 Interview 7 12’ X 12’ 11’ - 4” X 10’ 11’ - 4” X 10’ 12’ X 12’
Interview 3 10’ X 10”
Hoteling Office 14’-8” X 10’
Interview 1 10’ X 10’
Interview 2 10’ X 10’ Path of Egres
Existing ELEC. Room
Sound Suppressing Practical Room 4 Benches 12'-3" X 20'-4"
Existing COMM Room
Interview 2 10’ X 10’
Path of Egres
Open Waiting Area 12-15 Capacity 22’ X 22’
VP Office 12’ X 14’
17
HR/TA Closet 10’ - 9” X 6’
Interview 1 10’ X 10’
Existing ODA File Room
Path of Egress
Path of Egress
Existing Stair Well
Existing Stair Well
LAYOUT VERSION 3
LAYOUT VERSION 4
LAYOUT VERSION 5
FINAL LAYOUT
56
G
G
Tech 4933 IAH A
D/JAMB/SILL /4" GLZ
PLAN DETAIL - ACOUSTICAL JAMB
3/4"
8
WALL WITH 5/8" GYP BD
SCALE: 3" = 1'-0" A3*
STC 74 PARTITION PER B FLOOR PLAN & DETAIL 3/AE600 ALIGN
SCHEDULED DOOR AND FRAME
D5*
4" C-H CHANNEL STUDS 16" OC
NO. TAPE, BED, & SEAL FIRSTT.I.P. LAYER GYP BD
COLUMN FURRING DETAIL 1
7
TIP-22-144-IAH REVISION HISTORY:
SCALE: 3" = 1'-0"
EVERKEM SOUND SEALANT 90 (BOTH SIDES)
1 1/2"
HEAD DETAIL PER MANUFACTURER'S REQUIREMENTS
J1
38
1/2" RESILIENT CHANNEL 48" OC
SCHEDULED STC DOOR (OVERLY DOOR MODEL NO. 5592175 STC 55) ALL UNIT ASSEMBLY INCLUDING ALL HARDWARE AND ACCESSORIES BY OVERLY DOOR COMPANY
2 LAYERS 5/8" ACOUSTICAL GYP BD FASTENED TO RESILIENT CHANNEL - OFFSET 2ND LAYER OF GYP BD - DO NOT FASTEN GYP BD TO STUDS
DESCRIPTION
EXISTING COLUMN H
4'-4" TALL PONY WALL FOR AIR AND POWER SUPPLY LINES
EDULED FRAME
5/8" GYP
3-5/8" OFF-SET STUDS
FSB2022-058-00
CORR T278
6 1/4"
J1 2
3
PLAN PLAN DETAILDETAIL - ACOUSTICAL WALL 3 SCALE: 1 1/2" = 1'-0" ACOUSTICAL WALL 37
38
SCALE: 3" = 1'-0"
38
M
M
0
3"
6"
SCHEDULES & DETAILS
9"
1'
2'
4'
ISSUE DATE: 5
AUGUST 10, 2022
OCCUPANCY SHEETAREA NUMBER: SCHEDULE ROOM NAME
NUMBER
39
(none) T276 T277 T278 (none): 3
5 M
3
SHEET TITLE:
PRACTICAL ROOM 1 1/2" = 1'-0" T261
1/2" = 1'-0"
M
49 160
2
6" SOUND 1' SUPPRESSED 1'-6"
0
49 160
4
0
3" = 1'-0"
4
COLUMN FURRING DETAIL 2
6
39
3
1
JME
PROJECT NUMBER:
C4a
36
CAH
PROJECT MANAGER:
A
5/8" GYP
3-1/2" ACOUSTIC BATT INSULATION
35
KM
REVIEWED BY:
EDULED DOOR
1
KM
DRAWN BY:
PARTITION BEYOND
1" AIR GAP
END GYP BD @ ED PARTITION
DATE
SCHEDULED ACOUSTICAL DOOR FRAME DESIGNED BY:
7 3/4"
1/2" AIR GAP BETWEEN ACOUSTIC WALL AND PONY WALL
T SEALANT, H SIDES
1/2" RESILIENT CHANNEL @ 48" OC. (HORIZONTAL) MINERAL WOOL PER MANUFACTURER'S WRITTEN REQUIREMENTS
D4*
1" LINER PANEL
NER CHANNEL
6" STUD BOX HEADER (BOTH SIDES) HOUSTONSIDES) AIRPORT SYSTEM LOW EXPANSION FOAM FILL (BOTH
2 LAYERS OF 5/8" ACOUSTICAL GYP
2-3/4" ACOUSTIC BATT INSULATION
DATE:
3 5/8" CHANNEL (BOTH SIDES)
D4*
8" EXPANSION JOIN COVER TO CAP OFF 1" GAP BETWEEN PARTITIONS BASIS OF DESIGN SHALL BE: CONSTRUCTION SPECIALTIES MODEL: FWF-200M COLOR #232 WHITE
TOREFRONT
TITION TYPE FLOOR PLANS
RECOMMENDED:
39
J1
OCCUPANT OCCUPANT LOAD FACTOR LOAD
AE600 AREA
CORR CORR CORR
442 SF (none) 294 SF (none) 2,687 SF (none) 3,422 SF
5801 Bro Okla
0
B BUSINESS T261 SOUND SUPPRESSED 952 SF 1:100 10 PRACTICAL / 5 AVIONICS ROOM D T262 EQ CLOSET 107 SF 1:100 2 T263 INTERVIEW 1 132 SF 1:100 2 T264 INTERVIEW 21. ALIGN THIS FACE 139 SF OF1:100 THE NEW WALL WITH THE 2 T265 INTERVIEW 3 FACE OF THE128 SF 1:100 2 EXISTING WALL T266 INTERVIEW 4 126 SF 1:100 2 TYPE FIRE EXTINGUISHER2 T267 INTERVIEW 52. NEW MULTI-PURPOSE 124 SF 1:100 SEMI-RECESSED CABINET MOUNTED AT 48" AFF T268 INTERVIEW 6 126 SF 1:100 2 3 T269 INTERVIEW 73. 1" GAP BETWEEN 128 SF 1:100 2 PARTITIONS - SEE DETAIL T270 INTERVIEW ROOM 8/ 156 SF 1:100 2 3/AE600 HOTELING OFFICE 4. ELECTRICAL AND PLUMBING CHASE ATTACH T271 HOTELING OFFICE 157 SF 1:100 2 AND BRACE METAL STUDS TO DECK ABOVE GYP T272 DIRECTOR OFFICE 165 SF 1:100 2 BD TO 6" ABOVE CEILING T273 VP OFFICE 387 SF 1:100 4 T274 OPEN OFFICE 676 SF 1:100 (TYP) 7 5. METAL PANEL PARTITION D T275 OPEN WAITING AREA 507 SF 1:100 6 6. INSTALL SALVAGED B BUSINESS: 15 4,008 SF ACCESS CONTROL 49 COMPONENTS - INSTALL NEW ENTRY HARDWARE TOTAL: 18 7,430 SF 49 AND NEW EXIT PANIC HARDWARE ON NEW DOOR AND FRAME
4
ARCHITEC
SHEET KEYNOTES
D
CONFIRM LOCATION OF SADDLE FASTENERS & STC ACOUSTICS BELOW THRESHOLD 38 1
L
GROUND FLOOR LIFE SAFETY PLAN
3
D
OVERLY SUPER "H" AUTOMATIC DOOR BOTTOM
TRAVEL DISTANCE = 173'
SCHEDULED 1/4" CARPET TILE
26'-2 1/2"
10'-2 3/4"
3'-4"
14'-2 1/4"
11
INTERVIEW 4 * T266 A3
EQ
INTERVIEW 4 T266
11
INTERVIEW 5 * T267
EQ
INTERVIEW 5 T267
A3
11
INTERVIEW 6 * T268 A3
EQ
EQ
T269
11
7
IF102
CORR T278
GG
INTERVIEW 7 T269 WAITING * OPEN A3 AREA T275
38
STAIR T1 T240
36
37
37
SECOND FLOOR SECOND FLOOR SAFETY AND PLAN OCCUPANCY PLAN 1 LIFE SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
EQ
2
C:\Users\kxm\Documents\05800_Arch_22_kmovaffagh.rvt
1
T265
11
INTERVIEW 3 UP T265
T261B
F
1'-7"
T266 11 38 INTERVIEW 4 * T266 A3
CORR T276
* A3
11 4
AE103
RECOMME
DIRECTOR OFFICE T272
* A3
HOU
HOTELING OFFICE T271
* SIM A3 T271 6 AE600 * INTERVIEW A3 11 ROOM 8 / HOTELING OFFICE * J1 T270 A3 T270
* D4
6'-0" CLR
C4a
H B
T.I.P. NO.
REVISION H
7 AE600 B
G
RECOM
2
UP
CORR 6 T277
* A3
T267
11
INTERVIEW 5 * T267 A3
F
8 * D4
F
7
0
T268 11 39 INTERVIEW 6 * T268 A3
IF102
OPEN WAITING AREA T275
1
20'-8 1/2"
T269 11 STAIR T1 INTERVIEW 7 T240 * T269 A3 KEY PLAN
4'
T.I.P. N DESIGNED
N
8'
16'
REVISI DRAWN BY
1/8" = 1'-0"
DN
REVIEWED
PROJECT M
A
F
PROJECT N
FSB2022
39
49 160
EQ
38
39
2
LIFE SAFETY AND OCCUPANCY PLAN 2
39
T100 2
F
F B
38
38
AE103
* A3
T272
1'-3" C6a
FF 36
C4a
J1
7 B = 300FT SYSTEM * T273WITH SPRINKLER A3
OPEN OFFICE T274
C6a
8 AE600
* A3
3 AE600
5
SIM
7 MAX TRAVEL DISTANCE AE600
3
8
H.2
VP OFFICE T273
6 AE600
1
39
AE103
11
4
* D4
DN
F
35
SIM 3 AE600
SOUND SUPPRESSED PRACTICAL / AVIONICS ROOM 38 T261
G
2 OPEN WAITING AREA T275
IBC BUSINESS AREAS
3
T264
* D5
8'-4 1/4"
7 AE600
49 STAIR T1 160 T240
INTERVIEW 7 T269
V.I.F.
24'-7" 10'-7"
T261A
* A3
11'-4 1/2"
T270
11 T263
INTERVIEW 2 T264
3
* A3
INTERVIEW ROOM 8 / HOTELING OFFICE * T270 J1 A3
1
COMM T242 2
1'-3"
* A3
INTERVIEW 1 T263 * A3
J C
OCCUPANCY LEGEND
T276
* A3
* A3
1
docu
CONST
MULTI-PURPOSE TYPE FIRE EXTINGUISHER - SEMI-RECESSED CABINET MOUNTED AT 48" AFF 15'-2"
14'-2 1/4"
* A3
CORR T278
DN
1 AE103 6 INTERVIEW T268
A1
EQ CLOSET T262
13'-4"
1'-3" T268
T278 H
10'-1"
8'-4 1/4" CLR
20'-8 1/2"
* A3
* A3
HH HOTELING OFFICE T271
3'-4"
9
21'-8"
T267
INTERVIEW 1 ROOM 8 / HOTELING OFFICE T270
8/10/2022 4:18:15 PM
8/10/2022 4:18:15 PM C:\Users\kxm\Documents\05800_Arch_22_kmovaffagh.rvt C:\Users\kxm\Documents\05800_Arch_22_kmovaffagh.rvt
CORR T277
T266
11
CLR HOTELING OFFICE T271
8
* A3
12'-6 3/4"
10
T262
T271
6'-0" C4a
DIRECTOR OFFICE T272
10'-2 3/4"
8'-4"
10'-3 1/2"
T261INTERVIEW 3 T265
F
CORR T277
* A3
T265
5'-0"
8/10/2022 6:17:34 PM
SOUND SUPPRESSED PRACTICAL / AVIONICS 11 ROOM
AE103
DIRECTOR 6 OFFICE AE600 T272
* D4
H.2 H.2
* A3
26'-2 1/2"
1 11 4
SIM
* D4
2 1'-7"
T272
CORR T276
4
* A3
SIM 7 AE600
J1
7
3'-4"
PROGR
EXIT COMPONENT LOAD EXIT COMPONENT CAPACITY
1'-7 1/4"
23'-4"
CLR
T261B
T273
3 AE600
C6a
8 AE600
* A3
C OPEN OFFICE VP OFFICE T274 T273
C4a
C6a
AE103
8
5
CORR T276
6 AE600
3
1
1'-3" * D4
VP OFFICE T273
5'-0"
CORR T278
11
AE103
10'-3 1/2"
G
13'-4"
TRAVEL DISTANCE = 152'
B
3 INTERVIEW 2 AE600 T264
43'-6 3/4"
COMM T242 SOUND SUPPRESSED PRACTICAL / AVIONICS ROOM T261
H
SIM
* D5
8'-4"
CORR T278
INTERVIEW 3 T265
3
* A3 T264 OPEN OFFICE T274
11'-4 1/2"
H.2
3
H.2
J J
T263
INTERVIEW 2 T264
21'-8"
V.I.F.
2 INTERVIEW 1 T263 T261A
00 000
11
* A3
1
COMM T242 1
1
38
J.6
* A3
EQ CLOSET T262
G
T276
INTERVIEW 1 T263
1
T262
H
A
37
V.I.F.
* A3
* A3
V.I.F.
* A3
35
36
10'-1"
A1
EQ CLOSET T262
CORR T278
1
35
15'-8 1/2"
T278 H.2
15'-2"
C
EGRESS - EXIT ACCESS ALL DIMENSIONS ARE FROM FACE OF STUD TO ROOM 000FACE OFOCCUPANT STUD - OR LOAD FROM FACE OF EXISTING 39 IN WALL TO FACE OF STUD OCCUPANT LOAD ALONG EGRESS PATH 000
J
12'-6 3/4"
9
C
A
EXISTING 1-HOUR FIRE RATED PARTITION
GENERAL NOTES EGRESS - COMMON PATH
24'-7"
3'-4"
J.6
B
SCALE: NTS
1'-7 1/4" 23'-4" 10
J
DOORS T261A & T261B FRAME & THRESHOLD SECTION DETAIL
10'-7"
1
J
EXISTINGPARTITION PARTITIONSYSTEM - BASIS OF 11. DEMOUNTABLE DESIGN SHALL BE DIRTT CLASSIC GLASS WALL PARTITION SYSTEMSTANDARD OR APPROVED EQUAL
39
10'-1"
K
38
CONSU CONSTRUC
LIFE SAFETY LEGEND 10. INFILL OPENING TO MATCH EXISTING
6"
37
PROGRAM
10'-1"
36
D
15'-8 1/2"
35
7. WALL MOUNTED MONITOR - OFCI LOAD OCCUPANCY OCCUPANT FACTOR CLASSIFICATION LOAD AREA 0 4,008 SF @ 1:100 GSFWALL B BUSINESS ERECT PONY AFTER ACOUSTICAL WALL 49 7,849 SF 49 9. NEW DOOR AND FRAME
43'-6 3/4"
K
ARCHI
SCHEDULED 1/16" SOUND REDUCTION UNDERLAYMENT OCCUPANT LOAD
8. 1/2" AIR GAP BETWEEN PONY WALL AND EXISTING CONCRETE SLAB 3,841 SF <varies> (none) ACOUSTICAL WALL. SEE DETIAL 3/AE600
C
5801 O
CONSULTA
SCHEDULED 3/16" RUBBER TILE FINISH FLOORING
SCALE: 1/8" = 1'-0"
1/2"
L
2
39
PEMKO 6" SADDLE THRESHOLD SMOOTH SIDE UP (ALIGN SADDLE CENTER TO DOOR)
EQ
EQ
EQ
SCALE: 1/8" = 1'-0"
HANGAR
1
36
37
FLOOR PLAN
8
2
0
4'
4
938
SECOND FLOOR PLAN
3
8'
SHEET TIT
TECH. OPS
N 7
16' 1/8" = 1'-0" 5
DESIG ISSUE DAT
10
AUGUST DRAWN
SHEET NUM
39 6
REVIEW
KEY PLAN
A 5
4
1
ADMIN
1 AE103
39
3
EBU
SECOND AND OC
GROUND FLOOR GROUND FLOOR SAFETY PLAN PLAN 2 LIFE SCALE: 1/8" = 1'-0" 35
EQ
EBU
G-1
PROJE
PROJE
FSB2
HANGAR
ADMIN
TECH. OPS
SHEET
GROU PLAN
SCALE: 1/8" = 1'-0"
A
1
2
3
4
5
6
8
7
10
ISSUE
AUGU 9
3
57
4
KEY5 PLAN
SHEET
AE
58
Hangar 1-2 Paint Study - Elevations American Airlines - Maintenance Base, Tulsa OK - Paint Concept
2022.09.14
NTS
Hangar 1-2 Paint Study - Render American Airlines - Maintenance Base, Tulsa OK - Paint Concept
2022.09.14
NTS
59
PAGE 1
PAGE 2
Hangar 3-4 Paint Study - Elevations American Airlines - Maintenance Base, Tulsa OK - Paint Concept
2022.09.14
NTS
Hangar 3-4 Paint Study - Render American Airlines - Maintenance Base, Tulsa OK - Paint Concept
2022.09.14
NTS
60
PAGE 3
PAGE 4
Hangar 6 Paint Study - Elevations American Airlines - Maintenance Base, Tulsa OK - Paint Concept
2022.09.14
NTS
Hangar 6 Paint Study - Render American Airlines - Maintenance Base, Tulsa OK - Paint Concept
2022.09.14
NTS
61
PAGE 5
PAGE 6
Hangar 7 Paint Study - Elevations American Airlines - Maintenance Base, Tulsa OK - Paint Concept
2022.09.14
NTS
Hangar 7 Paint Study - Render American Airlines - Maintenance Base, Tulsa OK - Paint Concept
2022.09.14
NTS
62
PAGE 7
PAGE 8