HOUSE ANNOR FACELIFT

professional 4

JITTERBUGZ PUB & LOUNGE

professional 8

ARTIST HOUSE

academic 12

SOCIAL HOUSING

personal 16

MICROHOME

competition 20


HOUSE ANNOR FACELIFT professional

4 professional project


Interesting project which introduced a new challenge of designing a courtyard that accentuates the approach and also to successfully develop a facelift for the house. The clients wanted to add an entrance that would awe the visitors and give their new home a new face. The courtyard was conceptualised to have earth elements in an elegant and tranquil spacial organisation. This was to create interest and focus on the eye reducing the whole sense of mass, and leading you to the front entry.


440

6 professional project

GL INE

Bou n conto dary wall m urs. Main ax heig h tena nce t 1.8m to free to ne step wit h ighb our

7

EXIS TING

BOU

NDA RY

WAL

L

GL INE

VERANDAH

ERF 81

FIRE INSTALLATION • THE FIRE INSTALLATIONS COMPLY WITH THE DETAILED REQUIREMENTS OF SANS 1040-W. • THE SUPPLY OF WATER IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-W AND SUBJECT OF A RATIONAL DESIGN.

ENERGY EFFICIENCY IN BUILDINGS • THE BUILDING IS SO DESIGNED THAT ORIENTATION AND SHADING ARE IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 204 • EXTERNAL WALLS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-XA • FENESTRATION IS IN ACCORDANCE WITH SANS 10400-XA • ROOF ASSEMBLY CONSTRUCTION IS IN ACCORDANCE WITH SANS 10400-XA • FOORS WITH IN-SLAB HEATING IS IN ACCORDANCE WITH SANS 10400-XA. • SERVICES THAT USE ENERGY OR CONTROL THE USE OF ENERGY IS IN ACCORANCE WITH SANS 204. • HOT WATER SYTEMS IS IN ACCORDANCE WITH SANS 10400-XA • ALL FENESTRATION, AIR FILTRATION WILL BE IN ACCORDANCE WITH SANS 613. • BUILDING WITH FENESTRATION REA EXCEEDING 15 % OF THE NETT FLOOR AREA PER STOREY, SHALL COMPLY WITH SAS 204. • MIDSTREAM - ZONE 1 • JOHANNESBURG - ZONE 1 • PRETORIA - ZONE 2

Bou n conto dary wall m urs. Main ax heig h tena nce t 1.8m to free to ne step wit h ighb our

REV DATE DESCRIPTION

SIGNATURE OWNER

CONTRACTOR

EXIST. ENTERTAINMENT TILES ROOM

200 0

220

7 0

3423

115

2709

WHB

220

DRESS

15

TILES

14

MAIN BEDRM

BEDRM 2

11

6770

9

EXISTING

UP

WC BATH/SHR BIC

BATH TILES

220 1476

WHB

LINTEL/ BEAM OVER AS PER ENG WHB

BALCONY

1 : 100

LINTEL/ BEAM OVER AS PER ENG

TILES

1000m high balustrade with 100mm openings. according to SANS 10400:M 5753 220

4978

AREA SCHEDULE

BIC

TILES

10

TILES

BIC

2628

4449

16

2129

TILES

BATH

900 220

3987 12911

220

3066

220

8340

PYJAMA LOUNGE

FIRST FLOOR PLAN

COPYRIGHT NOTICE

BIC

12

4941

3499

220

220

220

115 1735

TILES

5927

13

6790

S 20 56 200

BATH BIC

PROPOSED NEW RENOVATIONS 814 X6 THE HILLS ESTATE FOR MR & MRS ANNOR

6543

2014

200 SE 0mm RV ITU DE

SHR WC

1692

220909

7273

100mm DIA SVP IN DUCT IN BIC w 300x300mm ACCESS HATCH

220

220

BATH/SHR

3017

EXISTING DECK

NEW POOL SECTION DETAIL

ARCHITECT

WHB TILES

4287

555

1 : 100

FLOORS

SPACE HEATING • THE PROVISION OF SPACE HEATING IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-V

BATH

TILES

NORTH

GROUND FLOOR PLAN

FOUNDATIONS • A GEOTECHNICAL INVESTIGATION IN ACCORDANCE WITH THE RULES IS TO BE CARRIED OUT AND IN ACCORDANCE WITH SANS 10400-B AND THE DETAILED REQUIREMENTS OF SANS 10400-H. • A COMPETENT PERSON (CIVIL ENGINEERING) IN RESPECT OF DEEP FOOTINGS, SOIL RAFTS, COMPACTION OF IN-SITU SOIL OR SUBSURFANCE DRAINAGE TO BE APPOINTED. • A COMPETENT PERSON (GEOTECHNICAL) IN RESPECT OF GEOTECHNICAL SOLUTIONS OR SOIL IMPROVEMENTS THAT ARE REQUIRED TO BE APPOINTED.

• THE FIRE PROTECTION MEASURES PROVIDED ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-T AND SUBJECT OF A RATIONAL DESIGN OR RATIONAL ASSESSMENT.

ENGINEER

BEDRM 3

220

7230

BY SPECIALIST FITTED WITH SAFETY NET ACC. TO SANS: D; WATER TO DISCHARGE INTO 6000

3000

NEW SWIMMING

NEW POOL SECTION DETAIL

GR EE NA RE A

FIRE PROTECTION

• THE EXCAVATIONS RELATING TO A BUILDING IS LESS THAN 3.0m DEEP AND IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-G.

WALLS

115 1692 220

220

EXISTING VERANDA

NEW PAVING REUSED FROM ENTRANCE PAVERS

1

NEW WAL 1.2M C L L TO C SEE D EAR V OMP ET AIL U PA RK B LY W OUN ITH DA R HOA Y GUID ELIN ES

4120

4507

EXIS TING

EXISTING JACCUZI

4978

EXCAVATIONS

• THE STRUCTURAL STRENGTH AND STABILITY OF A WALL IS IN ACCORDANCE WITH SANS 10400-B AND SANS 10400-T AND DETAILED REQUIREMENTS OF SANS 10400-K. • THE ROOF FIXING IS IN ACCORDANCE WITH SANS 10400-B AND DETAILED REQUIREMENTS OF SANS 10400-K. • THE WATER PENETRATION THROUGH A WALL IS IN ACCORDANCE WITH THE DETAILED REQIREMENTS OF SANS 10400-K.

6367 220

BIC

220

LINE OF WINE CELLAR WALL

REMOVE COLUMN AND STABALISE BEAM

220

DISABILITIES

TILES

ERF 81

3200

AS BUILT EXTENSION

4287

GR EE NA RE A

STORMWATER DISPOSAL • THE MEANS FOR THE CONTROL OF DISPOSAL OF STORMWATER IS IN ACCORDANC WITH THE DETAILED REQUIREMENTS OF SANS 10400-R AND SUBJECT OF A RATIONAL DESIGN.

• THE MEANS FOR PROVIDING FACILITIES FOR PERSONS WITH DISABILITIES IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-S AND THE SUBJECT OF A RATIONAL DESIGN.

• THE PROVISION OF SANITARY FACILITIES IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-F.

• ALL SUSPENDED FLOORS ARE IN ACCORDANCE WITH SANS 10400-B AND SANS 10400-T AND SANS 10082 AND DETAILED REQUIREMENTS OF SANS 10400-J. • SLABS SUPPORTED ON THE GROUND ARE IN ACCORDANCE WITH SANS 10400-B, SANS 10400-H, DETAILED REQUIREMENTS OF SANS 10400-J AND A COMPETENT PERSON (CIVIL ENGINEERING) IS TO BE APPOINTED IN RESPECT OF THE SLABS OR FILLS.

EXISTING BEDROOM

L

TILES

S 20 56 200

200 SE 0mm RV ITU DE

DRAINAGE • THE DESIGN OF THE DRAINAGE SYSTEM IS IN ACCORDACE WITH THE DETAILED REQUIREMENTS OF SANS 10400-P AND SUBJECT OF A RATIONAL DESIGN OR RATIONAL ASSESSMENT (OR BOTH) AND SUBJECT OF AN AGREEMENT CERTIFICATE.

• THE TYPE OF FIXING OF GLAZING IS IN ACCORDANCE WITH SANS 10400-B AND DETAILED REQUIREMENTS OF SANS 10400-N. • THE SELECTION OF THE GLAZING IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-N.

WAL

8

NDA RY

7

LIN E

• THE LIGHTING IN A HABITABLE ROOM, BATHROO, SHOWER ROOM AND ROOM CONTAINING A TOILET PAN COMPILED WITH THE REQUIREMENTS OF SANS 10400-T AND THE DETAILED REQUIREMENTS OF SANS 10400O. • THE VENTILATION IS IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-T AND IN ACCORDANCE WITH THE DETAILED REQUIREMNETS OF SANS 10400-O AND IS SUBJECT OF A RATIONAL DESIGN.

GLAZING

BOU

6

7900

5

DIN G

LIGHTING AND VENTILATION

WC

3000

LOUNGE TILES

4

BUIL

SITE OPERATIONS

• STAIRWAYS ARE IN ACCORDANCE WITH SANS 10400=-B AND SANS 1040-T AND THE DETAILED REQUIREMENTS OF SANS 10400-M • WALLS, SCREENS, RAILING OR BALUSTRADES TO SUCH STAIRWAYS ARE IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-B AND SANS 10400-T AND SANS 10400-K AND SANS 10400-T.

RE

GL INE

3

RE

3m BUIL DIN

2

3m

PUBLIC SAFETY • A CHANGE IN LEVEL, THE DESIGN OF RAMPS AND DRIVEWAYS, OR ACCESS TO SWIMMING POOLS AND SWIMMING BATHS IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-D.

•ROOF COVERINGS AND WATERPROOFING SYSTEMS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS10400-L •FLAT ROOFS AND RELATED GUTTERS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L •THE ROOF ASSEMBLY AND CEILING ASSEMBLY IN ADDITION TO COMPLYING WITH THE REQUIREMENTSOF SANS 10400-C IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L AND THE ROOF ASSEMBLY IS SUPPORTED ON WALLS THAT COMPLY WITH THE REQUIREMENTS OF SANS 10400-K AND IN ACCORDNACE WITH SANS 10400-B AND SANS 10400-L. •GUTTERS AND DOWNPILED, IF ANY, ARE SIZED INACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-R. •THE FIRE RESISTENACE AND COMBUSTIBILITY OF THE ROOF ASSEMBLY OR ANY CEILING ASSEMBLY ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L AND SANS 10400-T.

BIC

10

TILES

LIN E

220

WAL

L

11

EXISTING VERANDA

1100

1

4841

SITI

2045

12

9

220 DIN G

600

13

VERANDAH

BUIL

ANTE R/S

14

CORRECT HEIGHTS OF CELLAR RISERS

STUDY

NEW PO

220

220

15

DINING

3m

300

2950

16

TILES

2960 300 0

EXISTING DOOR

1100

9563

3695 2980

RE

NEW PL

1550

TILES

GUEST RM

UP

RE

RE

POND ON NEW CONC. DETAIL PUSTAIRCASE MP OF S 20 56 300

9 RE

PATIO ROOF REMOVED BREAKFAST NOOK

115

L WAL NDA RY

POSITION OF POOL PUMP SCREENED FROM GREEN AREA

EXIS TING

BOU

SLIDING STACKING ALUMINIUM DOORS

16077

1 2 3 4 5 6 7 8

PEBBLES

PATIO ROOF REMOVED

1371

SHR

UP

STRUCTURAL DESIGN • THE STRUCTURAL SYSTEM OF THE BUILDING TO COMPLY WITH THE DETAILED REQUIREMENTS OF PART H, J, K, L, M, N OF SANS 10400.

STAIRWAYS

2045

TILES

VERANDAH

OUTD OOR SNUG

PRE-C AREA CONC. AST BENC / EVALAST H

ALL LANDSCAPING TO BE DONE IN ACCORDANCE WITH THE INDIGENOUS LANDSCAPING POLICY AS DESCRIBED IN THE ARCHITECTURAL GUIDELINES

PEBBLES

2534

220 1231115

1737

ERF 814

UP

NORTH

NEW SC WALL REEN TO BE AND ALL P&P

1900

TILES

GULLEY

BOU

NEW SE GATE LF CLOSIN FO AND PA R TRAILE G R RKING

1400

KITCHEN

WHB

3 00

1400

TILES

ST O R MW ER AT

6

UP

5014

400

SCULLERY

3 4 5 6

5

100mm DIA SVP IN DUCT IN BIC w 300x300mm ACCESS HATCH

PREP

RE

1 2

IE

PATIO ROOF REMOVED

4321

3018

TILES

WASH TROUGH

GULLEY

IE

1 : 200

2730

3150

S 20 56 300

220 ZINK WM

IE

SITE PLAN

4978 UP

15 23

SLAB OVER

115

SELF CLOSING

220 GATE

200

PANTRY

WC

1 : 25

2950 CONCRETE STEPPING NEW CONC. STAIRCASE DETAIL STONES

340MM HIGH PLANTER BOX

GULLEY

NDA RY

ENTRANCE GATE DETAIL 8

SELF CLOSING GATE

GL INE 3m BUIL DIN

3 ERF 81 7 3201

Bou n conto dary w urs. all ma x Main tena height 1 nc e .8 free m to s te to n eigh p with bou r

LINE OF N EW

2&3

PEBBLES

IE

IE

100

EXIS TING

3000

440

DIN GL INE

0° .0 90

IE

75

25X100 VERTICAL SLATS MILD STEEL RHS

VERTICAL SLATS RHS

GULLEY

50

100 100 100 75 100 75 50 50 50 50 50 50 50 50 50 50 50 50 50

2700 B ou 2 n conto dary wa ll urs. Main max heig tena ht 1.8 nc e free m to ste to ne p ighb with o ur

ERF 814 X6

IE

75

.5 23 15

BUIL

3000

4

50

1599

3m

1 : 100

NORTH

3

1 : 50

EXISTING ENTRANCE

WINE CELLAR FLOOR PLAN

50

3m BUIL DIN

8. GARDEN GATE DOUBLE FLOOR TO CEILING HEIGHT @ 2.4m

EXISTING OUTBUILDING

10184

8

E

600

7

3m B UILD ING LIN

• ALL WORK TO COMPLY WITH THE NATIONAL BUILDING REGULATIONS (SANS 10400). • QUALITY OF ALL MATERIALS AND WORKMANSHIP TO COMPLY WITH RELEVANT SANS SPECIFICATIONS. • ALL STRUCTURAL WORK TO BE DESIGN BY PROF. ENGINEER. • ALL ELECTRICAL AND PLUMBING WORK TO BE CARRIED OUT BY REGISTERED ARTISANS. • CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS AND DIMENSIONS ON SITE AND TO CHECK SAME AGAINST THE DRAWINGS BEFORE PUTTING ANY WORK IN HAND. • CONTRACTOR IS RESPONSIBLE FOR SETTING OUT OF BUILDINGS. • THIS DRAWING IS UNDER NO CIRCUMSTANCES TO BE SCALED. ONLY FIGURE DIMENSIONS TO BE USED. IF DIMENSIONS ARE MISSING, CONTACT ARCHITECT. • A MINIMUM OF 50 % BY VOLUME OF ANNUAL AVERAGE HOT WATER HEATING REQUIREMENT SHALL BE PROVIDED BY MEANS OTHER THAN ELECTRICAL RESISTANCE HEATING. SOLAR WATER HEATING SYSTEMS AS PER SANS 1307 AND SANS 10106. THE INSTALLATION OF SOLAR WATER HEATING SYSYTEMS AS PER SANS 10254. • ALL OPENINGS EXCEEDING 2.4m SPAN TO BE SPANNED BY PRECAST CONCRETE LINTELS, OR SOLID CONCRETE BEAM TO PR. ENGINEER SPECIFICATIONS. • THE ARCHITECT CANNOT BE HELD RESPONSIBLE FOR ANY DELAY OF PLAN APPROVAL, DUE TO ADMINISTRATIVE PROBLEMS BEYOND HIS CONTROL. • THE OWNER TO INFORM ALL APPOINTED PROFESIONALS WHEN WORK IS DUE TO START ON SITE AND IF ANY CHANGES ARE MADE AS TO HOW THE FUNCTIONAL REGULATIONS ARE TO BE SATIFIED, OR ANY CHANGES IN THE APPOINTMENT OF COMPETENT PERSONS ARE MADE BEFORE THE COMPLETION OF THE BUILDING; AND EXTENT THE ABOVE APPOINTMENT TO MEET THE REQUIREMENTS OF REGULATIONS A19(8) AND A19(9) WHERE APPLICABLE.

4782

6

220 1592 220

5

4533

4

NGL

6158

3

1200

9

200 80

9494

2

ERF 81

10

TILES

Bou n conto dary wa ll urs. Main max heig tena h nce t 1.8m free to to ne step w it ighb our h

Bou n conto dary w urs. all ma x Main tena height 1 nc e .8 free m to s te to n eigh p with bou r

11

1800

12

WINE CELLAR

1

1760

STEEL FRAME DOOR WITH NUTEC SLATTED GATES

13

2005

EXISTING BAR COUNTER

EXISTING

EXISTING ENTRANCE

15 24 .5

900

1725

900

3m BUIL DIN

4905

440

440

ROOFS

GENERAL NOTES :

7

AREA

GROUND FLOOR

176 m2

FIRST FLOOR

159 m2

OUTBUILDING

150 m2

VERANDAHS

91 m2

TOTAL AREA.

576 m2

COVERAGE (%)

34 %

SITE AREA

1004m2

NEW

AREA

AS BUILT PATIO EXTENSION

21 m2

EXISTING VERANDAHS

91 m2

REMOVED VERANDAHS

33.5 m2

EXISTING VERANDAHS LEFT

57.5 m2

NEW SLAB

26.2 m2

NEW TOTAL VERANDA AREA.

83.7 m2

AREA

NEW TOTAL GROUND FLOOR

197 m2

FIRST FLOOR

159 m2

OUTBUILDING VERANDAHS

150 m2 83.7 m2

NEW TOTAL AREA.

589.7 m2

COVERAGE (%) NEW COVERAGE (%)

34 % (78.6 +280.7 m2 ) /1004m2

This drawing is copyright. You may use, display, print and reproduce this drawing only for use on the project as described in the title block of this drawing. This drawing stays the property of STUDIOUS ARCHITECTS CC and no parts of this drawing may be reproduced for any other reason as discribed above without the prior written permission of the copyright owner. Such permission, if granted, is subject to a fee depending on the nature of the use. All rights in terms of Section 12 (7) of the South African Copyright Act Requests and inquiries regarding reproduction should be addressed to the Copyright Owner.

ALL RIGHTS RESERVED STUDIOUS ARCHITECTS CC reserves the right to revise this drawing as it sees fit. You are encourage to contact the author of this drawing to check if this represents the latest revisions.

DISCLAIMER NOTE In no event shall STUDIOUS ARCHITECTS CC be liable to any one for special, collateral, incidental, or consequencial damages in connection with or arising out of the use of this drawing. This drawing is intended as a general referance source, accuracy, currency, completeness and relevance for your purpose, and you should obtain any appropriate profesional advise relevant to the particular circumstances to this project. You are encourage to contact the author of this drawing if you have any questions regarding information here on.

Derick Britz 082 415 9981 Pr Arch 6678 Gauteng P.O. Box 9329 Centurion 0046 Tel: 012 - 663 3371 Fax: 086 590 5805

DWG TITLE:PLANS DATE: 11 NOVEMBER 2020

DRAWN BY: NLL

DESIGN BY: DB

SHEET SIZE:

DWG NUMBER: S 20 56 100

REVISION :

= 35.7%

NEW FAR:

58.73%

NEW FF/GF CALCULATED FROM EXISTING 56.6% INCLUDED DOUBLE VOLUME OF STAIR

A1


ROOFS

GENERAL NOTES : CHIMNEY TO BE ACCORDING TO NBR PART V

109

5440

PLASTER & PAINT

PLASTER & PAINT PAINT C

PAINT B

FIRST FLOOR PLAN

FIRST FLOOR PLAN

2720

WINE CELLAR FLOOR PLAN

2720

NGL

MAX 850 FFL > NGL GROUND FLOOR PLAN

PAINT C

0

BRICKS TO MATCH EXISTING

5600

200

WINE CELLAR FLOOR PLAN

-2400

CHIMNEY TO BE ACCORDING TO NBR PART V

STRUCTURAL DESIGN • THE STRUCTURAL SYSTEM OF THE BUILDING TO COMPLY WITH THE DETAILED REQUIREMENTS OF PART H, J, K, L, M, N OF SANS 10400.

1 : 50

NGL NGL MIN 150mm BELOW FFL

-2400

0

NGL

NGL

NEW POOL SECTION DETAIL

GROUND FLOOR PLAN

FFL

WINE CELLAR FLOOR PLAN

GROUND FLOOR PLAN

6000

25X100 VERTICAL SLATS MILD STEEL RHS

FFL

0

0 200

-2400

3746

PLASTER & PAINT PAINT B

ALTERNATIVELY, PROVIDE POOL WITH SAFETY NET BY SPECIALIST. POOL BY SPECIALIST NBR/SABS 1390 (DISCHARGE NOT ALLOW INTO MUNICIPAL SEWER SYSTEM) BUILT IN FIBRE GLASS TO SPECIFICATION OF POOL SPECIALIST

PLASTER & PAINT

COPING TILES

0 40

PLASTER & PAINT PAINT B

NGL

WPH

GUTTERS WITH RWDP

GUTTERS WITH RWDP

2182

5440

WATER LEVEL

200

WPH

WINDOW REMOVED

195

0 WINDOW REMOVED

DECK

149

CHROMADECK CLIPLOCK 700 DARK DOLPHIN ROOF SHEETIING

PROVIDE 1200mm HIGH SECURITY FENCING WITH MAX 100mm OPENINGS WITH SELFCLOSING GATE & LATCH AS SECURTIY FOR CHILDREN FFL

2382

GROUND FLOOR PLAN

465 149

CHROMADECK CLIPLOCK 700 DARK DOLPHIN ROOF SHEETIING

• ALL WORK TO COMPLY WITH THE NATIONAL BUILDING REGULATIONS (SANS 10400). • QUALITY OF ALL MATERIALS AND WORKMANSHIP TO COMPLY WITH RELEVANT SANS SPECIFICATIONS. • ALL STRUCTURAL WORK TO BE DESIGN BY PROF. ENGINEER. • ALL ELECTRICAL AND PLUMBING WORK TO BE CARRIED OUT BY REGISTERED ARTISANS. • CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS AND DIMENSIONS ON SITE AND TO CHECK SAME AGAINST THE DRAWINGS BEFORE PUTTING ANY WORK IN HAND. • CONTRACTOR IS RESPONSIBLE FOR SETTING OUT OF BUILDINGS. • THIS DRAWING IS UNDER NO CIRCUMSTANCES TO BE SCALED. ONLY FIGURE DIMENSIONS TO BE USED. IF DIMENSIONS ARE MISSING, CONTACT ARCHITECT. • A MINIMUM OF 50 % BY VOLUME OF ANNUAL AVERAGE HOT WATER HEATING REQUIREMENT SHALL BE PROVIDED BY MEANS OTHER THAN ELECTRICAL RESISTANCE HEATING. SOLAR WATER HEATING SYSTEMS AS PER SANS 1307 AND SANS 10106. THE INSTALLATION OF SOLAR WATER HEATING SYSYTEMS AS PER SANS 10254. • ALL OPENINGS EXCEEDING 2.4m SPAN TO BE SPANNED BY PRECAST CONCRETE LINTELS, OR SOLID CONCRETE BEAM TO PR. ENGINEER SPECIFICATIONS. • THE ARCHITECT CANNOT BE HELD RESPONSIBLE FOR ANY DELAY OF PLAN APPROVAL, DUE TO ADMINISTRATIVE PROBLEMS BEYOND HIS CONTROL. • THE OWNER TO INFORM ALL APPOINTED PROFESIONALS WHEN WORK IS DUE TO START ON SITE AND IF ANY CHANGES ARE MADE AS TO HOW THE FUNCTIONAL REGULATIONS ARE TO BE SATIFIED, OR ANY CHANGES IN THE APPOINTMENT OF COMPETENT PERSONS ARE MADE BEFORE THE COMPLETION OF THE BUILDING; AND EXTENT THE ABOVE APPOINTMENT TO MEET THE REQUIREMENTS OF REGULATIONS A19(8) AND A19(9) WHERE APPLICABLE.

DISABILITIES

EXCAVATIONS

1 : 100

FIRE PROTECTION

• THE EXCAVATIONS RELATING TO A BUILDING IS LESS THAN 3.0m DEEP AND IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-G.

CHROMADECK CLIPLOCK 700 DARK DOLPHIN ROOF SHEETIING

• THE FIRE PROTECTION MEASURES PROVIDED ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-T AND SUBJECT OF A RATIONAL DESIGN OR RATIONAL ASSESSMENT.

FOUNDATIONS WINDOW REMOVED

WPH

WPH

GUTTERS WITH RWDP

5440

5440

PLASTER & PAINT

40

PAINT B

PLASTER & PAINT

1M HIGH BALUSTRADE WITH MAX 100 mm OPENINGS

2720

2720

FFL

ELEVATION

0

MAX 850 FFL > NGL

NGL MIN 150mm FFL

BELOW E CELLAR FLOOR PLAN

SCALE 1:50

WINE CELLAR FLOOR PLAN

40

3500 MAX

3500MAX

MAX

MAX

40

-2400

PLAN

40 x 40 mm STEEL COLUMN

SCALE 1:50

THE HILLS GREEN AREA WALL

WINDOW REMOVED

PLASTER & PAINT

WPH

SECTION SCALE 1:50

WALLS

• THE STRUCTURAL STRENGTH AND STABILITY OF A WALL IS IN ACCORDANCE WITH SANS 10400-B AND SANS 10400-T AND DETAILED REQUIREMENTS OF SANS 10400-K. • THE ROOF FIXING IS IN ACCORDANCE WITH SANS 10400-B AND DETAILED REQUIREMENTS OF SANS 10400-K. • THE WATER PENETRATION THROUGH A WALL IS IN ACCORDANCE WITH THE DETAILED REQIREMENTS OF SANS 10400-K.

STAIRWAYS • STAIRWAYS ARE IN ACCORDANCE WITH SANS 10400=-B AND SANS 1040-T AND THE DETAILED REQUIREMENTS OF SANS 10400-M • WALLS, SCREENS, RAILING OR BALUSTRADES TO SUCH STAIRWAYS ARE IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-B AND SANS 10400-T AND SANS 10400-K AND SANS 10400-T.

• THE TYPE OF FIXING OF GLAZING IS IN ACCORDANCE WITH SANS 10400-B AND DETAILED REQUIREMENTS OF SANS 10400-N. • THE SELECTION OF THE GLAZING IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-N.

REV DATE DESCRIPTION

SIGNATURE

1 : 50

PLASTER & PAINT PAINT C

PAINT B

ENERGY EFFICIENCY IN BUILDINGS • THE BUILDING IS SO DESIGNED THAT ORIENTATION AND SHADING ARE IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 204 • EXTERNAL WALLS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-XA • FENESTRATION IS IN ACCORDANCE WITH SANS 10400-XA • ROOF ASSEMBLY CONSTRUCTION IS IN ACCORDANCE WITH SANS 10400-XA • FOORS WITH IN-SLAB HEATING IS IN ACCORDANCE WITH SANS 10400-XA. • SERVICES THAT USE ENERGY OR CONTROL THE USE OF ENERGY IS IN ACCORANCE WITH SANS 204. • HOT WATER SYTEMS IS IN ACCORDANCE WITH SANS 10400-XA • ALL FENESTRATION, AIR FILTRATION WILL BE IN ACCORDANCE WITH SANS 613. • BUILDING WITH FENESTRATION REA EXCEEDING 15 % OF THE NETT FLOOR AREA PER STOREY, SHALL COMPLY WITH SAS 204. • MIDSTREAM - ZONE 1 • JOHANNESBURG - ZONE 1 • PRETORIA - ZONE 2

GLAZING

CHIMNEY TO BE ACCORDING TO NBR PART V

1 : 100

NGL

STEEL COLUMN

GROUND FLOOR PLAN

FFL

NEW POOL

EAST ELEVATION

NGL

NGL

FFL

PAINT B

GROUND FLOOR PLAN

0 NGL

NGL

PLASTER & PAINT

PAINT C

FIRE INSTALLATION • THE FIRE INSTALLATIONS COMPLY WITH THE DETAILED REQUIREMENTS OF SANS 1040-W. • THE SUPPLY OF WATER IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-W AND SUBJECT OF A RATIONAL DESIGN.

• ALL SUSPENDED FLOORS ARE IN ACCORDANCE WITH SANS 10400-B AND SANS 10400-T AND SANS 10082 AND DETAILED REQUIREMENTS OF SANS 10400-J. • SLABS SUPPORTED ON THE GROUND ARE IN ACCORDANCE WITH SANS 10400-B, SANS 10400-H, DETAILED REQUIREMENTS OF SANS 10400-J AND A COMPETENT PERSON (CIVIL ENGINEERING) IS TO BE APPOINTED IN RESPECT OF THE SLABS OR FILLS.

1200

FIRST FLOOR PLAN

ROOF AND SUPPORTING COLUMNS REMOVED

PLASTER & PAINT

• THE PROVISION OF SPACE HEATING IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-V

FLOORS

EXISTING OUTBUILDING/GARAGE

PAINT C

FIRST FLOOR PLAN

SPACE HEATING

• A GEOTECHNICAL INVESTIGATION IN ACCORDANCE WITH THE RULES IS TO BE CARRIED OUT AND IN ACCORDANCE WITH SANS 10400-B AND THE DETAILED REQUIREMENTS OF SANS 10400-H. • A COMPETENT PERSON (CIVIL ENGINEERING) IN RESPECT OF DEEP FOOTINGS, SOIL RAFTS, COMPACTION OF IN-SITU SOIL OR SUBSURFANCE DRAINAGE TO BE APPOINTED. • A COMPETENT PERSON (GEOTECHNICAL) IN RESPECT OF GEOTECHNICAL SOLUTIONS OR SOIL IMPROVEMENTS THAT ARE REQUIRED TO BE APPOINTED.

CLEARVU ECONOMESH PANEL FENCING 1,2M HIGH TO SUPPLIERS DETAIL

DRAINAGE • THE DESIGN OF THE DRAINAGE SYSTEM IS IN ACCORDACE WITH THE DETAILED REQUIREMENTS OF SANS 10400-P AND SUBJECT OF A RATIONAL DESIGN OR RATIONAL ASSESSMENT (OR BOTH) AND SUBJECT OF AN AGREEMENT CERTIFICATE.

• THE MEANS FOR PROVIDING FACILITIES FOR PERSONS WITH DISABILITIES IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-S AND THE SUBJECT OF A RATIONAL DESIGN.

• THE PROVISION OF SANITARY FACILITIES IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-F.

NORTH ELEVATION

• THE LIGHTING IN A HABITABLE ROOM, BATHROO, SHOWER ROOM AND ROOM CONTAINING A TOILET PAN COMPILED WITH THE REQUIREMENTS OF SANS 10400-T AND THE DETAILED REQUIREMENTS OF SANS 10400O. • THE VENTILATION IS IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-T AND IN ACCORDANCE WITH THE DETAILED REQUIREMNETS OF SANS 10400-O AND IS SUBJECT OF A RATIONAL DESIGN.

• THE MEANS FOR THE CONTROL OF DISPOSAL OF STORMWATER IS IN ACCORDANC WITH THE DETAILED REQUIREMENTS OF SANS 10400-R AND SUBJECT OF A RATIONAL DESIGN.

SITE OPERATIONS

-2400

LIGHTING AND VENTILATION

STORMWATER DISPOSAL

PUBLIC SAFETY • A CHANGE IN LEVEL, THE DESIGN OF RAMPS AND DRIVEWAYS, OR ACCESS TO SWIMMING POOLS AND SWIMMING BATHS IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-D.

WINE CELLAR FLOOR PLAN

•ROOF COVERINGS AND WATERPROOFING SYSTEMS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS10400-L •FLAT ROOFS AND RELATED GUTTERS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L •THE ROOF ASSEMBLY AND CEILING ASSEMBLY IN ADDITION TO COMPLYING WITH THE REQUIREMENTSOF SANS 10400-C IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L AND THE ROOF ASSEMBLY IS SUPPORTED ON WALLS THAT COMPLY WITH THE REQUIREMENTS OF SANS 10400-K AND IN ACCORDNACE WITH SANS 10400-B AND SANS 10400-L. •GUTTERS AND DOWNPILED, IF ANY, ARE SIZED INACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-R. •THE FIRE RESISTENACE AND COMBUSTIBILITY OF THE ROOF ASSEMBLY OR ANY CEILING ASSEMBLY ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L AND SANS 10400-T.

CHROMADECK CLIPLOCK 700 DARK DOLPHIN ROOF SHEETIING

PLASTER & PAINT PAINT B

WINDOW REMOVED

GUTTERS WITH RWDP

OWNER

WPH

5440

CONTRACTOR

5440

1M HIGH BALUSTRADE WITH MAX 100 mm OPENINGS

2720

ENGINEER

PLASTER & PAINT

FIRST FLOOR PLAN

647

PLASTER & PAINT PAINT A

FIRST FLOOR PLAN AS BUILT EXTENDED BALCONY LEVEL

2720

PAINT B

ARCHITECT

PAINT A EX. STACKED DOORS

AS BUILT. STACKED DOORS FFL

WINE CELLAR FLOOR NGL MIN PLAN 150mm -2400

FFL

498

0

NGL

175

GROUND FLOOR PLAN

NEW POOL

GROUND FLOOR PLAN 0

WINE CELLAR FLOOR PLAN

NGL

-2400

BELOW FFL

SOUTH ELEVATION

CHIMNEY TO BE ACCORDING TO NBR PART V

1 : 100

CHROMADECK CLIPLOCK 700 DARK DOLPHIN ROOF SHEETIING

WINDOW REMOVED

WPH

GUTTERS WITH RWDP

GUTTERS WITH RWDP

5440

GUTTERS WITH RWDP

PLASTER & PAINT

PLASTER & PAINT PAINT B

PAINT C

PLASTER & PAINT PAINT B

WPH

5440

PLASTER & PAINT PAINT A 1M HIGH BALUSTRADE WITH MAX 100 mm OPENINGS

FIRST FLOOR PLAN

NEW 30MM PLASTER BAND

2720

FIRST FLOOR PLAN

NEW CONC. SLAB

2720

PLASTER & PAINT PAINT C

FFL

GROUND FLOOR PLAN 0

NGL

MAX 850 FFL > NGL WINE CELLAR FLOOR PLAN -2400

WEST ELEVATION 1 : 100

BRICKS TO MATCH EXISTING FFL

PLASTER & PAINT PAINT B

PLASTER & PAINT PAINT A

FFL

GROUND FLOOR PLAN

FFL

0

NEW PAVING

NGL

WINE CELLAR FLOOR PLAN

NGL MIN 150mm BELOW FFL

-2400

PROPOSED NEW RENOVATIONS 814 X6 THE HILLS ESTATE FOR MR & MRS ANNOR COPYRIGHT NOTICE This drawing is copyright. You may use, display, print and reproduce this drawing only for use on the project as described in the title block of this drawing. This drawing stays the property of STUDIOUS ARCHITECTS CC and no parts of this drawing may be reproduced for any other reason as discribed above without the prior written permission of the copyright owner. Such permission, if granted, is subject to a fee depending on the nature of the use. All rights in terms of Section 12 (7) of the South African Copyright Act Requests and inquiries regarding reproduction should be addressed to the Copyright Owner.

ALL RIGHTS RESERVED STUDIOUS ARCHITECTS CC reserves the right to revise this drawing as it sees fit. You are encourage to contact the author of this drawing to check if this represents the latest revisions.

DISCLAIMER NOTE In no event shall STUDIOUS ARCHITECTS CC be liable to any one for special, collateral, incidental, or consequencial damages in connection with or arising out of the use of this drawing. This drawing is intended as a general referance source, accuracy, currency, completeness and relevance for your purpose, and you should obtain any appropriate profesional advise relevant to the particular circumstances to this project. You are encourage to contact the author of this drawing if you have any questions regarding information here on.

Derick Britz 082 415 9981 Pr Arch 6678 Gauteng P.O. Box 9329 Centurion 0046 Tel: 012 - 663 3371 Fax: 086 590 5805

DWG TITLE:ELEVATIONS & SECTION DETAILS DATE: 11 NOVEMBER 2020 DRAWN BY: NLL DESIGN BY: DB

SHEET SIZE:

DWG NUMBER: S 20 56 200

REVISION :

professional project

A1

7


JITTERBUGZ PUB & LOUNGE professional


A hands-on fast-paced interior design project that aimed to have a contemporary bespoke design, with a tight budget. As a portion of the shopping complex, the addditions to the project was the display wine cellar guarded by the custom-made booths.The restrooms (placed on ground floor and first floor) were part of the renovation.

professional project

9


ROOFS

GENERAL NOTES : • ALL WORK TO COMPLY WITH THE NATIONAL BUILDING REGULATIONS (SANS 10400). • QUALITY OF ALL MATERIALS AND WORKMANSHIP TO COMPLY WITH RELEVANT SANS SPECIFICATIONS. • ALL STRUCTURAL WORK TO BE DESIGN BY PROF. ENGINEER. • ALL ELECTRICAL AND PLUMBING WORK TO BE CARRIED OUT BY REGISTERED ARTISANS. • CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS AND DIMENSIONS ON SITE AND TO CHECK SAME AGAINST THE DRAWINGS BEFORE PUTTING ANY WORK IN HAND. • CONTRACTOR IS RESPONSIBLE FOR SETTING OUT OF BUILDINGS. • THIS DRAWING IS UNDER NO CIRCUMSTANCES TO BE SCALED. ONLY FIGURE DIMENSIONS TO BE USED. IF DIMENSIONS ARE MISSING, CONTACT ARCHITECT. • A MINIMUM OF 50 % BY VOLUME OF ANNUAL AVERAGE HOT WATER HEATING REQUIREMENT SHALL BE PROVIDED BY MEANS OTHER THAN ELECTRICAL RESISTANCE HEATING. SOLAR WATER HEATING SYSTEMS AS PER SANS 1307 AND SANS 10106. THE INSTALLATION OF SOLAR WATER HEATING SYSYTEMS AS PER SANS 10254. • ALL OPENINGS EXCEEDING 2.4m SPAN TO BE SPANNED BY PRECAST CONCRETE LINTELS, OR SOLID CONCRETE BEAM TO PR. ENGINEER SPECIFICATIONS. • THE ARCHITECT CANNOT BE HELD RESPONSIBLE FOR ANY DELAY OF PLAN APPROVAL, DUE TO ADMINISTRATIVE PROBLEMS BEYOND HIS CONTROL. • THE OWNER TO INFORM ALL APPOINTED PROFESIONALS WHEN WORK IS DUE TO START ON SITE AND IF ANY CHANGES ARE MADE AS TO HOW THE FUNCTIONAL REGULATIONS ARE TO BE SATIFIED, OR ANY CHANGES IN THE APPOINTMENT OF COMPETENT PERSONS ARE MADE BEFORE THE COMPLETION OF THE BUILDING; AND EXTENT THE ABOVE APPOINTMENT TO MEET THE REQUIREMENTS OF REGULATIONS A19(8) AND A19(9) WHERE APPLICABLE.

WHB

new door 1m

220

11SQM NEW TILES

WC

220 88

1750

NEW 220mm WALL FLOOR TO SOFFIT

1 : 25

SPACE HEATING • THE PROVISION OF SPACE HEATING IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-V

FIRE INSTALLATION • THE FIRE INSTALLATIONS COMPLY WITH THE DETAILED REQUIREMENTS OF SANS 1040-W. • THE SUPPLY OF WATER IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-W AND SUBJECT OF A RATIONAL DESIGN.

200

FLOORS • ALL SUSPENDED FLOORS ARE IN ACCORDANCE WITH SANS 10400-B AND SANS 10400-T AND SANS 10082 AND DETAILED REQUIREMENTS OF SANS 10400-J. • SLABS SUPPORTED ON THE GROUND ARE IN ACCORDANCE WITH SANS 10400-B, SANS 10400-H, DETAILED REQUIREMENTS OF SANS 10400-J AND A COMPETENT PERSON (CIVIL ENGINEERING) IS TO BE APPOINTED IN RESPECT OF THE SLABS OR FILLS.

110 W AL SCREEN

L

WALLS

• THE STRUCTURAL STRENGTH AND STABILITY OF A WALL IS IN ACCORDANCE WITH SANS 10400-B AND SANS 10400-T AND DETAILED REQUIREMENTS OF SANS 10400-K. • THE ROOF FIXING IS IN ACCORDANCE WITH SANS 10400-B AND DETAILED REQUIREMENTS OF SANS 10400-K. • THE WATER PENETRATION THROUGH A WALL IS IN ACCORDANCE WITH THE DETAILED REQIREMENTS OF SANS 10400-K.

STAIRWAYS • STAIRWAYS ARE IN ACCORDANCE WITH SANS 10400=-B AND SANS 1040-T AND THE DETAILED REQUIREMENTS OF SANS 10400-M • WALLS, SCREENS, RAILING OR BALUSTRADES TO SUCH STAIRWAYS ARE IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-B AND SANS 10400-T AND SANS 10400-K AND SANS 10400-T.

ENERGY EFFICIENCY IN BUILDINGS • THE BUILDING IS SO DESIGNED THAT ORIENTATION AND SHADING ARE IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 204 • EXTERNAL WALLS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-XA • FENESTRATION IS IN ACCORDANCE WITH SANS 10400-XA • ROOF ASSEMBLY CONSTRUCTION IS IN ACCORDANCE WITH SANS 10400-XA • FOORS WITH IN-SLAB HEATING IS IN ACCORDANCE WITH SANS 10400-XA. • SERVICES THAT USE ENERGY OR CONTROL THE USE OF ENERGY IS IN ACCORANCE WITH SANS 204. • HOT WATER SYTEMS IS IN ACCORDANCE WITH SANS 10400-XA • ALL FENESTRATION, AIR FILTRATION WILL BE IN ACCORDANCE WITH SANS 613. • BUILDING WITH FENESTRATION REA EXCEEDING 15 % OF THE NETT FLOOR AREA PER STOREY, SHALL COMPLY WITH SAS 204. • MIDSTREAM - ZONE 1 • JOHANNESBURG - ZONE 1 • PRETORIA - ZONE 2

• THE TYPE OF FIXING OF GLAZING IS IN ACCORDANCE WITH SANS 10400-B AND DETAILED REQUIREMENTS OF SANS 10400-N. • THE SELECTION OF THE GLAZING IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-N.

ELECTRICAL LEGEND Flourescent Light

5W

Waterproof Downlight 5 W

S

1288

SLIDING SECURITY GATE

SERIE S1

Stove point

Light Point

5W

Single Plug Switch - 255 ht

Wall Light - Up/Down 7 W

Double Plug Switch - 255 ht

External Wall Light

7W

Single Plug Point above counter

Internal Wall Light

7W

Double Plug Point above counter

Floor Light

5W

Waterproof Plug Point

Pendant Light

7W

Ceiling plug point for garage door

SE RIE S2

RECEPTION

110

Single Light Switch

Telephone point

Double Light Switch

TV

Television point

Triple Light Switch

Int

Intercom point

2 B

2 Way Light Switch Door Bell Switch Thermostat Switch Dimmer Light Switch

CONTRACTOR

ENGINEER

ARCHITECT

PROPOSED RENOVATIONS TO INTERIOR OF STAND 2292 FOR JAN LOCK DEVELOPMENTS COPYRIGHT NOTICE This drawing is copyright. You may use, display, print and reproduce this drawing only for use on the project as described in the title block of this drawing. This drawing stays the property of STUDIOUS ARCHITECTS CC and no parts of this drawing may be reproduced for any other reason as discribed above without the prior written permission of the copyright owner. Such permission, if granted, is subject to a fee depending on the nature of the use.

Requests and inquiries regarding reproduction should be addressed to the Copyright Owner.

1236

ALL RIGHTS RESERVED

220

220

SIGNATURE OWNER

All rights in terms of Section 12 (7) of the South African Copyright Act

1126

1236

2 x 200 litre Geysers

Double Light Switch

Louds Speaker point

D

1020

200

Distribution Board

G

Intelligent point

Door Bell

REV DATE DESCRIPTION

Decorative Flourescent38 W

5W

T

1065

38 W

Eye ball downlight

Tel

bell

1790

1263

NEW 110 mm WALL @ 1.1m HIGH FROM GF LEVEL

1750 1098

1200

Downlight

EXISTING BAR TO BE DEMOLISHED

560

• THE FIRE PROTECTION MEASURES PROVIDED ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-T AND SUBJECT OF A RATIONAL DESIGN OR RATIONAL ASSESSMENT.

• A GEOTECHNICAL INVESTIGATION IN ACCORDANCE WITH THE RULES IS TO BE CARRIED OUT AND IN ACCORDANCE WITH SANS 10400-B AND THE DETAILED REQUIREMENTS OF SANS 10400-H. • A COMPETENT PERSON (CIVIL ENGINEERING) IN RESPECT OF DEEP FOOTINGS, SOIL RAFTS, COMPACTION OF IN-SITU SOIL OR SUBSURFANCE DRAINAGE TO BE APPOINTED. • A COMPETENT PERSON (GEOTECHNICAL) IN RESPECT OF GEOTECHNICAL SOLUTIONS OR SOIL IMPROVEMENTS THAT ARE REQUIRED TO BE APPOINTED.

UNISEX TOILETS

THS

NOTE: BOOTH FLOOR TO BE ELEVATED @ 170mm FROM GROUND FLOOR

DISABILITIES

FIRE PROTECTION

• THE EXCAVATIONS RELATING TO A BUILDING IS LESS THAN 3.0m DEEP AND IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-G.

LS

4139

STORMWATER DISPOSAL • THE MEANS FOR THE CONTROL OF DISPOSAL OF STORMWATER IS IN ACCORDANC WITH THE DETAILED REQUIREMENTS OF SANS 10400-R AND SUBJECT OF A RATIONAL DESIGN.

GLAZING

1750 Wine Storage

110 2179

11055

WHB

DRAINAGE • THE DESIGN OF THE DRAINAGE SYSTEM IS IN ACCORDACE WITH THE DETAILED REQUIREMENTS OF SANS 10400-P AND SUBJECT OF A RATIONAL DESIGN OR RATIONAL ASSESSMENT (OR BOTH) AND SUBJECT OF AN AGREEMENT CERTIFICATE.

EXCAVATIONS

220

110

NEW CEILING @ 2.7m FROM GROUND FLOOR LEVEL

Wine Storage

WATER POINT FROM EXISTING POINT IN BAR

10861 4727

WHB

• THE LIGHTING IN A HABITABLE ROOM, BATHROO, SHOWER ROOM AND ROOM CONTAINING A TOILET PAN COMPILED WITH THE REQUIREMENTS OF SANS 10400-T AND THE DETAILED REQUIREMENTS OF SANS 10400O. • THE VENTILATION IS IN ACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-T AND IN ACCORDANCE WITH THE DETAILED REQUIREMNETS OF SANS 10400-O AND IS SUBJECT OF A RATIONAL DESIGN.

FOUNDATIONS

UNISEX WC

1835

LIGHTING AND VENTILATION

• THE MEANS FOR PROVIDING FACILITIES FOR PERSONS WITH DISABILITIES IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-S AND THE SUBJECT OF A RATIONAL DESIGN.

• THE PROVISION OF SANITARY FACILITIES IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-F.

WHB

Strip Light in side of bulkhead

B OO

220

SITE OPERATIONS

Track Light

E WIN

10 professional project

DISABLED WC

A

1313

LOUNGE PLAN AND ELECTRICAL LAYOUT 1 : 25

• A CHANGE IN LEVEL, THE DESIGN OF RAMPS AND DRIVEWAYS, OR ACCESS TO SWIMMING POOLS AND SWIMMING BATHS IS IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-D.

982

995

UP

DOWNLIGHTS FIT TO NEW CEILING AND SPACED AT GIVEN PARAMETERS.

1377

• THE STRUCTURAL SYSTEM OF THE BUILDING TO COMPLY WITH THE DETAILED REQUIREMENTS OF PART H, J, K, L, M, N OF SANS 10400.

new door 1m

NEW TILES

644

STRUCTURAL DESIGN

WC

D02

CONNECT TO NEAREST EXISTING SWITCH

1020

574

1928

NEW 110mm WALL TO BE PLASTER & PAINT w TOTAL HEIGHT OF 2.1m

619

73SQM

NEW 110 mm WALL @ 1.2m HIGH FROM GF LEVEL

220

87 220

11SQM NEW TILES

110

600

1020

813

NEW 110mm WALL TO BE PLASTER & PAINT w TOTAL HEIGHT OF 2.1m

960

1276

VERTICALTIMBER CLADDING

2000

87

PUBLIC SAFETY

WINE

2000

88

NEW TILES

632

NEW 110 mm WALL @ 1.2m HIGH FROM GF LEVEL

255

813

WC

OPEN SPACE DINING 255

NEW TILES

110

UP

110

WASTE PIPE FOR FUTURE USE

6 SEATER BOOTH

MALE WC

NEW TILES

1750

1020

NOTE: BOOTH FLOOR TO BE ELEVATED @ 170mm FROM GROUND FLOOR

220

NEW 220mm WALL FLOOR TO SOFFIT

F/MALE WC

110

WHB

2023

110

NEW 110mm WALL TO BE PLASTER & PAINT w TOTAL HEIGHT OF 2.1m

WHB

55

1729

1223

110

1600

1835

900

2127

1200

1927

UNISEX WC

CONNECT TO NEAREST EXISTING SWITCH

WC

4214

NEW 110mm WALL TO BE PLASTER & PAINT w TOTAL HEIGHT OF 2.1m

110

•ROOF COVERINGS AND WATERPROOFING SYSTEMS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS10400-L •FLAT ROOFS AND RELATED GUTTERS ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L •THE ROOF ASSEMBLY AND CEILING ASSEMBLY IN ADDITION TO COMPLYING WITH THE REQUIREMENTSOF SANS 10400-C IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L AND THE ROOF ASSEMBLY IS SUPPORTED ON WALLS THAT COMPLY WITH THE REQUIREMENTS OF SANS 10400-K AND IN ACCORDNACE WITH SANS 10400-B AND SANS 10400-L. •GUTTERS AND DOWNPILED, IF ANY, ARE SIZED INACCORDANCE WITH THE REQUIREMENTS OF SANS 10400-R. •THE FIRE RESISTENACE AND COMBUSTIBILITY OF THE ROOF ASSEMBLY OR ANY CEILING ASSEMBLY ARE IN ACCORDANCE WITH THE DETAILED REQUIREMENTS OF SANS 10400-L AND SANS 10400-T.

STUDIOUS ARCHITECTS CC reserves the right to revise this drawing as it sees fit. You are encourage to contact the author of this drawing to check if this represents the latest revisions.

DISCLAIMER NOTE In no event shall STUDIOUS ARCHITECTS CC be liable to any one for special, collateral, incidental, or consequencial damages in connection with or arising out of the use of this drawing. This drawing is intended as a general referance source, accuracy, currency, completeness and relevance for your purpose, and you should obtain any appropriate profesional advise relevant to the particular circumstances to this project. You are encourage to contact the author of this drawing if you have any questions regarding information here on.

Derick Britz 082 415 9981 Pr Arch 6678 Gauteng P.O. Box 9329 Centurion 0046 Tel: 012 - 663 3371 Fax: 086 590 5805

DWG TITLE:DETAILED PLAN DATE: 07 SEPTEMBER 2020

DRAWN BY: NLL

DESIGN BY: DB

SHEET SIZE:

DWG NUMBER: S 20 44 102

REVISION :

A1


professional project

11


ARTIST HOUSE academic


The design resolves around a chosen South African artist, Mbongeni Buthelezi’s art style. The art style which portrays the mould between his urban and rural upbringings or daily woes. The resident included a studio space. As a whole it was to be designed in an architectural style that speaks to the artist or resembles his art style. The proposed home needed to be experienced and responsive for him. It further needed to be flexible, entertaining and allowed a working space.

academic project 13


14 academic project


The requirements or factors of the design approach was simply to integrate the house to the outdoor space: the courtyard which connected the living space, art studio and bedroom quarters played a great role in accentuating the flexibility of the design aim. Not only it integrates the three blocks but proposes future private or intimate art exbibitions, therefore utilizing more space for the occasions like the spacial organisation of an art exhibition. The rammed earth walls are the hierarchy of the design depicting the homesteadand upbringings and reinforces the idea of the dominating mass viewed in plan. The floor plan was in a sense of a timeline resembling the length of periods spent in different environments and how they eventually in his art subject matter. the bedroom quarters is the lonegest showing his time spent in the rural area. The kitchen side is the time spent in the urban area and eventually when the two merge they become one long block emphasis on his art subject matter.

academic project 15


SOCIAL HOUSING personal

16 personal project


In a densely populated urban development that exhibits a multitude of social groups and urban conditions into a vibrant cultural district today. With the constant fluctuation; people moving in and out , as well as the business enterprises. From the neighbourhoods development to Juta Street and intertwining of informal markets and shops around and in-between. Considering the great contribution of these developments to socio-economic issues we face in the country, there are still many unused structures populating the area. With that in thought we look at one of the buildings, 155 Smit Street. “Once derelict building now converted into modern, up-scaled apartments will face its third round of intervention. Being in on of the city’s social link and neighbouring Juta Street hosting the most innovative set pf programmes which play an integral role in the envisaged intervention or project. The project was aimed at redefining this iconic building into something that will drive the inner-city rejuvenation for years to come. With the existing structure, redevloping it into a social housing component with intcorporating an activated streetscape containing retail and social programmes on ground level.

personal project 17


18 personal project


personal project 19


MICROHOME competition

20 personal project


FIN .

PS. The main idea of my portfolio is to showcase a quick view of my selected projects. If it intrigues additional explanation or information about myself or any project, please don’t hesitate to contact me. Thank you.


phone: +27 79 308 9192 e-mail: kabelorapudi@gmail.com linkedin: za.linkedin.com/n/kabelorapudi instagram: kbrapudi


Turn static files into dynamic content formats.

Create a flipbook
Professional Portfolio 2020 by Kabelo Rapudi - Issuu