J.Nathan CMLI Professional Portfolio

Page 1

J U S T Y N N AT H A N CHARTERED LANDSCAPE ARCHITECT ND(Hort) BA(Hons) DipLA CMLI

PROFESSIONAL PORTFOLIO

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


1 2 3

CAPEL MANOR COLLEGE

National Dip. Horticulture and Garden Design

POST GRADUATE DEGREE | MAJOR DESIGN Battersea Power Station | INNOV8 SW8

PROFESSIONAL EXPERIENCE | ARUP 3.1 The Garden Bridge (2014) 3.2 High Speed 2 | Landscape Design Approach (2016) 3.3 FitzPark | Windmill Street Pop-up Park (2017) 3.4 Thames Tideway Tunnel | Blackfriars Pier (2017) 3.5 High Speed 2 | Phase 2b | LVIA + Design (Present)

4

EXTRA CURRICULAR Arup Connect Cultures Committee Member Leeds Beckett University Guest Lecturer Landscape Institute Landscape Ambassador

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


1

CAPEL MANOR COLLEGE NATIONAL DIP. HORTICULTURE AND GARDEN DESIGN

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


An intricate garden design and illustrative planting elevations created during my National Diploma at Capel Manor College, produced by hand using a selection of technical Isograph pens on trace. J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


2

POST GRADUATE DEGREE | MAJOR DESIGN BATTERSEA POWER STATION | INNOV8 SW8

JU J US ST TY YNNNNAT ATHHAANN| |PROFESSIONAL PROFESSIONALPORTFOLIO PORTFOLIO


INNOV8_SW8 A NEW ENERGY FOR LONDON

SEE: INNOV8_SW8 Battersea Power Station: DAS + Technical Strategy J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO

A FUSION OF LANDSCAPE ARCHITECTURE, ENGINEERING AND SCIENCE

BATTERSEA POWER STATION_MD1 FEASIBILITY STUDY


3

PROFESSIONAL EXPERIENCE ARUP, LONDON

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


3.1

ARUP THE GARDEN BRIDGE, LONDON

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


THE GARDEN BRIDGE | LONDON VIEW FRAMEWORK MANAGEMENT 10.0m

8.0m 6.0m 4.0m + 118.1 FFL

2.0m

rd eS ha ‘Th to vie w ed

Fr am

ew to ‘St Pa Framed vi

Sh ar d’ ‘T he to

North Bank Scale 1:250 @ A1

ra ul’s Cathed

l’

3 8.2

200

vie w

200

ed

COU VOL

Fr am

104.9 FFL

Framed view to ‘St Pa ul’s

8.2

Cathedral’

114.9 FFL

10.0m 8.0m 6.0m

10.0m

Fr a

104.9 FFL

ou se ’ tH

6.0m 113.1 FFL

er se

4.0m 2.0m

‘S

es tiv

om

‘R o

Ha ll’

113.1 FFL

Fr a

al

105.3 FFL

to

3

to

ya lF

8.2

8.2

vie w

vie w

m ed

114.9 FFL

+ 118.1 FFL

8.0m

+ 118.1FFL

m ed

4.0m 2.0m

Garden Bridge Scale 1:500 @ A1 105.3 FFL

South Bank Scale 1:250 @ A1

10.0m

8.0m NOTE: Profile at day one likely to change; awaiting actual tree heights information from Willerby 6.0m 4.0m + 118.1 FFL

Key:

2.0m 114.9 FFL

8.2

8.2

3

Western beds

Middle beds 104.9 FFL COU

VOL

200

200

Eastern beds

North Bank Tree profile day 1 Scale 1:250 @ A1

Tree profile in 50 years

The Garden Bridge was designed to create an inspiring new link in the heart of the city, a visionary unique destination and catalyst for regeneration. Working closely with Heathwick Studio and Dan Pearson Studio, Arup was leading on the landscape design co-ordinator, undertaking both the hard and soft detailed design. Arup were appointed as the lead consultant by the Garden Bridge Trust in 2012.

GBR-Tree Profile 160115

10.0m 8.0m 6.0m

+ 118.1 FFL

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO South Bank

4.0m 2.0m 113.1 FFL

105.3 FFL


THE GARDEN BRIDGE | GARDEN BRIDGE TRUST MOCK-UP PLAN A0

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

1

8000mm 2

Extent of paving mock up in 13 Fitzroy Street. 8000mm x 4380mm

3

4

5

6

4380mm 7

8

9

100mm MINIMUM LENGTH FOR ALL CUT STONE

10

11

Extent of paving mock up in 13 Fitzroy Street. 8000mm x 4380mm 12

13

Balcony. 40-150mm split and sawn pebble mix set in mortar

14

Metal edge

Planting

French drain finished with pebbles

Porphyry pavers adjacent to banding to be cut at a minimum of 100mm along the shortest edge. Refer to drawing 92701

Pavers butt jointed

Metal edge

100mm x 200mm band of porphyry pavers adjacent to metal edge

Porphyry adjacent to metal edge to be minimum 100mm width

Secondary path paving. Sliced boulders and split pebbles laid on permeable mortar

15

FIGURED DIMENSIONS ONLY TO BE USED Safety, Health and Environmental Information

LOCATION PLAN Not to scale

Engineering Consultant

It is assumed that all works on this drawing will be carried out by a competent contractor working, where appropriate, to an approved method statement. Where applicable, significant residual risks are highlighted in the body of the drawing. Do not scale

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO

Client

Project Title

Garden Bridge

In addition to the hazards/risks normally associated with the types of work detailed on this drawing and noted in the designer risk assessments and health and safety plan, note the following:

Scale at A0 Role Suitability

A

20/02/15

Rev

Date

Issued for Marshall's comment Revision note

13 Fitzroy Street London W1T 4BQ T: +44 (0)20 7636 1531 F: +44 (0)20 7580 3924 www.arup.com

Drawing Title

Paving Mock Up Sketch Drawing 2

1:10 Landscape Architect For Information

Arup Job No

230838-00

Rev

A

Name

GBT-ARP-ZZ-03-SK-LD-92702 Š Arup


J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


THE GARDEN BRIDGE | PLANTING PLAN REVIEW

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


THE GARDEN BRIDGE | PLANTING PLAN REVIEW A1

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

1

2

NE-T-23

NE-T-011

NE-T-035

NE-T-034 NE-H-002

NE-T-013

NE-T-040 NE-T-015

NE-H-004

NE-T-033

NE-T-025

NE-T-019

NE-H-003

NE-T-012

NE-T-029

3

NE-T-044

NE-T-037

NE-T-016

SE-H-003

NE-T-009

NE-T-043

NE-T-049 NE-T-027

NE-T-001 NE-T-002

NE-T-003

NE-T-005

NE-T-006

NE-T-004

NE-T-007

NE-T-017

NE-H-005

NE-T-032

NE-T-022

NE-T-050

NE-T-020

NE-T-018

NE-T-026

NE-H-001

NW-T-031

NE-T-014 NW-T-017

NW-T-010 NW-T-003

NW-T-011

NE-T-041

NW-T-002

NW-T-022

NW-T-004

NW-T-030

NW-T-007 NW-T-006

NW-T-001

NW-H-004

SE-T-001

SE-T-002

SE-T-012

SE-T-009

NW-T-045

NW-T-038

SE-T-074

SE-T-003

SE-T-022

SE-T-020 SE-T-018

NW-T-053

SE-T-031

NW-T-034

NW-T-052

NW-T-055

SW-T-035

SW-T-022

SW-T-021

SW-T-044

NW-T-009

SW-T-007

SW-T-004 SW-T-001

NW-H-007

NW-T-013

NW-T-018

NW-T-044

SW-T-002

NW-T-041

NW-T-026

SW-T-005

SW-T-006

SW-T-010

SW-T-034

SW-T-020

SW-T-018

SW-T-017

SW-T-049

SW-T-058

SW-T-061

SW-T-036

SW-H-005

SW-T-059

SE-T-062

SE-T-073

SE-T-071

SE-T-067

SW-T-050

SW-T-063

SW-T-067

SE-T-075

SW-T-071 SW-T-072

SW-T-064

SW-H-007

SW-T-051

SW-T-047

SW-T-041 SW-T-019

SW-T-012

SW-T-057

SW-T-060

SW-T-069

SW-T-062

SW-H-009

SW-T-065

SW-T-037

SW-T-023

SW-T-076

SW-T-014

SW-T-078

SW-T-077

SW-H-008 SW-T-073

SW-T-027

SW-T-013

NW-T-035

SE-T-079 SE-T-080

SE-T-068 SE-T-059

SW-T-056

SW-T-043

SW-T-015

SW-T-011

SW-T-048

SE-T-078

SE-T-077

SE-T-066

SE-T-065

SE-T-054

SE-T-051 SE-T-058

SW-T-045

SE-T-061

SE-T-056

SE-T-045

SE-T-044 SE-T-042

SE-T-057

SW-T-016

NW-H-003 NW-H-005

SW-T-008 SW-T-009

SW-T-003

NW-T-025

SE-T-036

SE-T-055

SE-H-004

SE-T-049

SE-T-037

SW-T-039 SW-H-003

SW-H-002

NW-H-001

SE-T-039

SE-T-048

SE-T-032

SE-H-006

SE-T-053

SE-T-047

SE-T-029

SW-T-033

NW-T-057

SE-H-002

SE-T-033 SE-T-025

SE-T-052

SE-T-034

SE-T-019

NW-T-056

NW-T-054

SE-T-043

SE-T-040

SE-T-028

SE-T-024

SE-T-023

NW-T-049 NW-T-046

NW-T-040

SE-T-076

SE-T-072

SE-T-070

SE-T-010

NW-T-051

NW-T-037

SE-H-005

SE-T-063 SE-T-069

SE-T-035 SE-T-026

SE-T-083

SE-T-008

SE-T-064

SE-T-050

SE-T-015

SE-T-084

NW-H-008

NW-H-006

NW-T-033 NW-T-032

SE-T-007

SE-T-005 NE-T-047

NW-T-029

SE-T-011

SE-T-006

NW-T-042

SE-T-046

SE-T-38

SE-T-017

SE-T-014

SE-H-001

NE-T-045

NW-T-036

NW-T-039

NW-T-027

NW-H-002

NW-T-008

SE-T-013

SE-T-004

SE-T-060

SE-T-041

SE-T-030

SE-T-016

NE-T-055

NE-T-042

NE-T-038

NE-T-028

NW-T-028

NW-T-019 NW-T-005

NE-T-021

NE-T-054

NE-T-053

NE-T-052 NE-T-056

NE-T-031

NW-T-020

NE-T-051

NE-T-036

NE-T-030

NE-T-010

SE-T-027

SE-T-021

NE-T-048

NE-T-046

NE-T-008

SW-T-075

SW-T-031 SW-T-024 SW-T-026

SW-H-001

SW-T-074 SW-T-068

SW-T-030 SW-T-053

SW-T-028

SW-T-066

SW-H-006

SW-T-052

SW-T-070

SW-T-055

SW-H-004

4

5

6

+ 118.1 FFL

114.9 FFL

8.2

8.2

3

113.1 FFL

105.3 FFL

104.9 FFL

7

8

9

10

Engineering Consultant

Client

Project Title

Garden Bridge 11

Scale at A1

1:500

Role Suitability

13 Fitzroy Street London W1T 4BQ T: +44 (0)20 7636 1531 F: +44 (0)20 7580 3924 Rev

Do not scale

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO

Date

Revision Note

Drawing Title

Sketch Longitudinal Elevation

Arup Job No

Rev

Name

www.arup.com © Arup


THE GARDEN BRIDGE | PUBLIC CONSULTATION ELEVATION + PLANS

ELEVATION

PLAN

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


3.2

ARUP HIGH SPEED 2 | LANDSCAPE DESIGN APPROACH

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


HS2 LANDSCAPE DESIGN APPROACH July 2016

High Speed 2 (HS2) commissioned Arup to provide a highly visual document to establish the landscape design consistency and vision across all sections of the project. This document acts a a guide to professionals in the development of an integrated contextually driven landscape design that delivers on wider economic and growth targets as well as global challenges such as climate change, health and wellbeing. This document sets the standards promoting HS2’s vision ‘to be a catalyst for growth across Britain’. See: HS2 Landscape Design Approach J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO

HS2 | Landscape Design Approach


3.3

ARUP FitzPark, Windmill Street pop-up

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


FITZPARK, WINDMILL STREET | MASTERPLAN As part of an ‘Invest in Arup’ project ‘Streets for People’, Arup have worked in collaboration with the Fitzrovia Partnership to deliver a pop-up parklet on Windmill Street, situated in W1. The scheme was funded by the Fitzrovia Partnership BID in their vision to provide clean air and a healthier urban environment. The BID has been secured by CABB (Clean Air Better Business) from the Mayor’s Air Quality Fund. FitzPark was designed, engineered and planted by Arup, the space includes informal seating, cafe and work space clustered around seasonal planting which is maintained by the Fitzrovia Partnership. FitzPark aims to create more space for people, promote health and wellbeing, support local businesses as well as improving the look and feel of our city. The pop-up was monitored throughout it’s duration in order to understand the social value benefits of scheme.

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


41%

PRE PRE POST POST

USERS QUESTIONNAIRE

CALENDAR

19th July

Talking to people

WHEN?

29 people

BUSINESS OWNER QUESTIONNAIRE POST-INSTALLATION :

BUSINESS QUESTIONNAIRE

1. Do you use Fitzpark yourself? Yes

No

2. What impact has FitzPark had on your business? Positive

Negative

CALENDAR

BUSINESS QUESTIONNAIRE No impact

1. Do you use Fitzpark yourself? 3. In what way have you realized the impact? (e.g. well‐being of staff, increasing footfall..) No

Positive Yes

12.30 13:30

09:00 10:00

16.30 Windmill Street 17:30

Negative

No impact

No

3. In what way have you realized the impact? (e.g. well‐being of staff, increasing footfall..) 5. What would you change about Fitzpark to improve its impact on your business?

Loading bay

4. Do you support Fitzpark becoming permanent? 6. What customer feedback have you received, if any? Yes Positive

No

Negative

5. What would you change about Fitzpark to improve its impact on your business?

6. What customer feedback have you received, if any? Positive

Negative

29th August

9 owners

26% 41%

19% 4% 4%

Walking through only 0 - 5 min

7% 2%

23%

A well-being PRE PRE evaluation POST POST questionnaire was carried out in Windmill PRE Street in POST May 2017, before the parklet installation, and a total of 16 people were interviewed. These results were used as a benchmark for the subsequent survey in July 2017 when the parklet was installed. A total of 29 people were interviewed.

14

PRE

Positive impact on business

PARKLET SUPPORTERS Parklet

Windmill Street

WELL BEING SCORE

30% 100% 100% INCREASE OF

70% 70% 100%

26%

POST

INCREASE

26%

9

Charlotte Street

PARKLET SUPPORTERS Parklet

Windmill Street

100%

70%

68%

Walking through only

17% 9% 22%

0 - 5 min

45%

2 “Well-being is a positive psychological state in able to function effectively, or “flourish”. This de five sub-components of well-being: satisfaction, a relatedness and autonomy. The built and natural e an important and often overlooked role in people’ Kelly Watson - Unive

70%

For full results of the well-being questionnai Appendix November 2017

19%

45%

Smoking

Walking

5% Standing

Fitzpark | Monitoring Report Fitzpark | Monitoring Report

3% Reading

ANALYSIS:

Pre-installation, pedestrians that were not just passing between Tottenham Court Road and Charlotte Street (68%) tended to stand and ‘dwell’ for short periods of time (most commonly just 5 minutes) in front of businesses. There were no seating opportunities in Windmill Street. Post-installation, the percentage of pedestrians passing through dropped to 48% and instead 22% of people were now staying at the parklet for as much as 1520 minutes at a time. People were observed sitting at the parklet, either on benches or on the artificial grass surface, for extended periods of time and eating lunch, reading a book, or chatting/ meeting with other users. During the morning and afternoon Fitzpark was also popular for tea, coffee or cigarette breaks.

USER ACTIVITIES STUDY

https://www.arup.com/projects/fitzpark

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO

The results of the business questionnaire ide the businesses supported the parklet becomin installation, with just one business wanting t stay only if an additional parking space for d accommodated on the street.

Dwell time and locations - POST-INSTALLATION

15 - 30 min

13% Standing

26%

BUSINESS:

POST

BUSINESS OWNER QUESTIONNAIRE

Finally, a survey of the local businesses was conducted on Parklet supporters PARKLET PARKLET SUPPORTERS the 29th August 2017SUPPORTERS to gather feedback from business owners on the impact of the parklet on the street.

5 - 15 min

USER ACTIVITIES STUDY

Walking

26%26%

INCREASE

4%

TIME SPENT STUDY

TIME SPENT STUDY

68%

Tottenham Court Road

Charlotte Street

Loading bay

Windmill Street

15 - 30 min

INCREASE OF INCREASE INCREASE

USER STAY LOCATIONS STUDY

USER STAY LOCATIONS STUDY

5 - 15 min

30%

INCREASE INCREASEOF OF INCREASE OF

and refuge opportunities for London’s wildlife, the parklet was surveyed on five occasions from July to September 2017. During each visit records were taken of the different types of species feeding on or living in the planters.

Fitzpark | Monitoring Report

Dwell time and locations - PRE-INSTALLATION

WELL BEING SCORE

30% 30% To assess the success of the Fitzpark in providing feeding

PRE

Fitzpark | Monitoring Report

The results of the wellbeing2 evaluation que showed that before the installation, Windmil ed ‘self-reported well-being’ at 19%. After the installation, Windmill Street genera well-being at 60%. This equates to an increase of 41% in self-re well-being, compared to the benchmark. Also, before the installation, Windmill Stree well-being score of 4% for the people using After the installation, Windmill Street genera score of 30% for the people using the street. This equates to an increase of 26% for the w compared to the benchmark.

Well-being score

60%

4% November 2017

USERS:

Tottenham Court Road

Charlotte Street

Yes

2. What impact has FitzPark had on your business? 4. Do you support Fitzpark becoming permanent?

Tottenham Court Road

?

16 people

POST-INSTALLATION :

Taking pictures

POST

Tottenham Court Road

10th May

Data on how the space was used and by who was collected SELF REPORTED WELL BEINGfor before and after the installation. This was completed Self-reported well-being six weeks pre-installation and six weeks post-installation. Fitzpark was visited three times per week during sunny days, at threeWELL differentBEING times of SCORE day, recording videos from two WELL BEING SCORE pre-arranged positions and responding to people’s questions.

Charlotte Street

CALENDAR

Taking videos

PRE

USERS WELL-BEING QUESTIONNAIRE

PRE-INSTALLATION :

Going on site on a sunny day

41%

User questionnaire - PRE AND POST INSTALLATION

FITZPARK, WINDMILL STREET | MONITORING REPORT FINDINGS HOW?

INCREASE OF

19%

November 2017

15%

10%

22%

Smoking

Meeting

Eating 15


3.4

ARUP THAMES TIDEWAY TUNNEL | BLACKFRIARS PIER

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


Thames Tideway Tunnel appointed Arup to lead the enabling works at Blackfriars Pier prior to the commencement of the construction of the tunnel. Arup designed and engineered the new Blackfriars Pier, new lift and stairs and landscape scheme along the Thames Path. The landscape elements of the project included designing the landside access ramps and steps, fitting out of the brows which connect the access structures to the vessels and the design of the lift and surrounding public realm. Arup were contracted by Thames Tideway as the NEC Engineering and Construction Contract (ECC) supervisors, to oversee and and ensure the enabling works where constructed in accordance to the contract documents. J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


N N

Do not scale - if in doubt ask Status:

FOR CONSTRUCTION

Keyplan:

N

Blackfriars Pier Blackfriars Bridge Stairs and Lift Tattershall Castle

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown Copyright and Database Right 2015. All rights reserved Ordnance Survey licence number 100019345. This is a working draft plan which has been produced for the purpose of confidential discussions only. This plan must not be copied, distributed or shown to any third party without the express written permission of Thames Water Utilities Limited. The plan is subject to the outcome of the application for its approval further to the terms of the Development Consent Order.

 Proposed landscape levels

01 +104.68 TD

Proposed tree and planting. Refer to drawing; 307-DA-ARC-IR876-700203

BLACKFRIARS ROAD TOW +105.19

D 02

+104.71 TD

+104.71 TD

+104.70 TD

700410

4815

Western limit of Blackfriars Pier site area and landscape works

+104.66 TD

D 05

104.68TD

PAUL'S WALK

Channel drain to be retained Access Steps & Ramps Refer to drawing 307-DA-ARC-IR876-700101

Existing Purbeck paving feature. Retained and reinstated as necessary.

+104.64m TD

Subway access E58 +106.1

+104.72

Blackfriar's Station Bridge eastern edge (overhead)

19000

min width 3000mm

5260

Existing channel drain and exposed concrete edge. Retained and reinstated as necessary

PAUL'S WALK

Corduroy tactile paving to building regulations part M:2005. Refer to drawing 307-DA-ARC-BR016700415 and City of London street manual 3 Dimension: 600 x 400mm Colour: Blue grey and Brown buff mix

+104.72

Paving under stairs to be retained and reinstated as required

RIVER THAMES

Proposed landscape levels to Top of wall Yorkstone paving to match existing Thames Path. Laid in random pattern. Dimension: 600mm gauge, length varies (450, 600, 750, 1000mm mix).Colour: Blue grey and Brown buff mix. Refer to drawing 307-DA-ARC-BR016-700410 Granite paving slab laid single stringer course. Dimensions: 510 x 1000 x 75mm. Refer to drawing 307-DA-ARC-BR016-700410. Colour: Mild grey. Refer to drawing 307-DA-ARC-BR016-700410

700412

Existing party wall to be retained. Make good any damage

Proposed landscape levels to Tunnel Datum

Recessed manhole cover to align with paving and inline with adjacent paving pattern. Refer to drawing 307-DA-ARC-BR016-700415

Existing paving to be retained. Any damaged pavers to be reinstated as required

Existing party wall retained. Make good any damage Raised granite plante with anti-skate recess and LED lighting. Refer to drawing 307-DA-ARC-BR016-700414

Fixed Brow. Refer to drawing 307-DA-CVL-IR876-300111

Proposed planting. Refer to drawing; 307-DA-ARC-IR879-700203 for planting plan and 307-DA-ARC-BR016-700412 for build-up Wales & Wales Chico bench by Benchmark or equivalent. Materials: FSC Oak. Dimension: 2400mm long. Refer to drawing 307-DA-ARC-BR016-700410. Where possible, reuse and relocate existing bench. Condition to be accepted by Project Manager

Piled Bank Seat. Refer to drawing 307-DA-CVL-IR876-300112

Service access hatch

Revision History Iss

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards normally associated with the types of work detailed on this drawing, note the following risks and information:

Construction: Ci

Hazards from a small, constrained site, in very close proximity to the general public. Delivery, storage and handling of materials will present risks.

Cii

Installation of the access step and ramp foundations may require work in close proximity to live buried services. Appropriate method statements, Permits to Dig and surveys should be in place prior to commencement of works.

Ciii

Weak river wall promenade. Internal strengthening to services subway to be installed prior to new ramp and steps.

Environment: Ei

City of London School in close proximity to the works. Noise to be minimised in line with the Code of Construction Practice.

Eii

 1.

For General Notes refer to drawing 307-DG-GEN-ZZZZZ-000001 .

2.

This drawing should be read in a conjunction with: 307-DA-ARC-IR876-700004 307-DA-ARC-IR876-700101 307-DA-ARC-IR876-700102 307-DA-ARC-IR876-700103 307-DA-ARC-IR876-700203 307-DA-ARC-IR876-700204 307-DA-ARC-IR876-700205

Chkd

Appd

Date

JR

MB

MP

16/10/2015

01

Description

NT

MJ

CU

10/03/2016

N/A N/A

01

3.

This drawing communicates design intent only

4.

Contractor to confirm there is minimum 3000mm clearance between Planters and ramps/steps, prior to commencing works

5.

Hard landscape to Paul's walk / Thames Path to be a continuation of existing pattern All natural stone paving to be laid in accordance with BS7533-10

6.

For hardworks specification refer to drawing 307-DA-ARC-BR016-700200

IR876 - BLACKFRIARS MILLENNIUM PIER (PROPOSED)

7.

For laying out of paving, refer to drawing; 307-DA-ARC-BR016-700415

Thames Tideway Tunnel

Maintenance: Mi

307-DA-ARC-BR016-700202 307-DA-ARC-BR016-700203 307-DA-ARC-BR016-700410 307-DA-ARC-BR016-700411 307-DA-ARC-BR016-700412 307-DA-ARC-BR016-700414 307-DA-ARC-BR016-700415

Dsgnr

00

Location Code:

N/A

OS Reference:

Security Reference:

TQ3180

UBR

Sub Process:

WASTE

Drawn By:

ZR

Location:

CITY OF LONDON - BLABF BLACKFRIARS BRIDGE FS Site Name:

Project Name:

Mii It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an accepted method statement Refer to drawing 307-DA-GEN-IR876-000001 for Obstructions Map Plan.

Contract Name:

CAT3 - BOAT RELOCATIONS Drawing Title:

Proposed Blackfriars Pier Landscaping & Fixed Structures. General Arrangement Drawing No.:

307-DA-ARC-IR876-700100 c Thames Water Utilities Ltd 2015

Scale:

1:100

Sheet Size:

A1

Rev:

01


Do not scale - if in doubt ask Status:

FOR CONSTRUCTION

Keyplan:

N

Blackfriars Pier Blackfriars Bridge Stairs and Lift Tattershall Castle

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown Copyright and Database Right 2015. All rights reserved Ordnance Survey licence number 100019345. This is a working draft plan which has been produced for the purpose of confidential discussions only. This plan must not be copied, distributed or shown to any third party without the express written permission of Thames Water Utilities Limited. The plan is subject to the outcome of the application for its approval further to the terms of the Development Consent Order.

 1.

Refer to drawing 307-DG-GEN-ZZZZZ-000001 for general notes.

2.

This drawing should be read in a conjunction with: 307-DA-ARC-IR876-700100 307-DA-ARC-IR876-700102 307-DA-ARC-IR876-700103 307-DA-ARC-IR876-700104 307-DA-CVL-IR876-300110

3.

This element of the Works has been developed to Developed Design or Detailed Design stage. The Contractor is required to develop this to Construction Design stage in accordance with Section 1.4 of the Specification.

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards normally associated with the types of work detailed on this drawing, note the following risks and information:

Construction: Ci

Hazards from a small, constrained site, in very close proximity to the general public. Delivery, storage and handling of materials will present risks.

Cii

Installation of the access step and ramp foundations may require work in close proximity to live buried services. Appropriate method statements, Permits to Dig and surveys should be in place prior to commencement of works.

Ciii

Weak river wall promenade. Internal strengthening to services subway to be installed prior to new ramp and steps.

Environment: Ei

City of London School in close proximity to the works. Noise to be minimised in line with the Code of Construction Practice.

Eii

Maintenance: Mi

Mii It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an accepted method statement Refer to drawing 307-DA-GEN-IR876-000001 for Obstructions Map Plan. Revision History Iss

Description

00

Dsgnr

Chkd

Appd

Date

JR

MB

MP

16/10/2015

N/A N/A

Location Code:

N/A

OS Reference:

Security Reference:

TQ3180

UBR

Sub Process:

Drawn By:

ZR

WASTE

Location:

CITY OF LONDON - BLABF BLACKFRIARS BRIDGE FS Site Name:

IR876 - BLACKFRIARS MILLENNIUM PIER (PROPOSED)

Project Name:

Thames Tideway Tunnel Contract Name:

CAT3 - BOAT RELOCATIONS Drawing Title:

Proposed Blackfriars Pier Access Ramp and Steps. Sections. Sheet 1 of 2 Drawing No.:

307-DA-ARC-IR876-700101 c Thames Water Utilities Ltd 2015

Scale:

1:50

Sheet Size:

A1

Rev:

00


ECC SPECIALIST LANDSCAPE SUPERVISOR WITNESS MATERIAL TESTS

INSPECTING WORKS AT KEY WORK STAGES

CHECK + SIGN OFF MATERIALS

OVERSEE TREE INSTALLATION

RAISE EARLY DEFECTS WITH CONTRACTOR

INSPECT SOFT MAINTENANCE

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


3.5

ARUP HIGH SPEED 2 | PHASE 2B | LVIA LEAD + DESIGN [CONFIDENTIAL]

JU J US ST TY YNNNNAT ATHHAANN| |PROFESSIONAL PROFESSIONALPORTFOLIO PORTFOLIO



HIGH SPEED 2 | PHASE 2B | LANDMARK STUDY SKETCHES Elland Road Stadium - LUFC

Grade II - Alf Cooke Printworks

Art Deco - Tetley Art Gallery

Leeds EfW

Grade II* - Tower Works Chimneys

Bridgewater Place Grade II* - St Batholomews Church

Echo Central

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO

DWP - Quarry House


Aladerun and Michael Martin, through interview, images and audio. The event will be followed by an open discussion with drinks and nibbles.

4

EXTRA CURRICULAR

Date: Monday 23 October

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


ARUP CONNECT CULTURES COMMITTEE Arup Connect Cultures | Events + Marketing

Leeds Beckett University | Guest Lecturer

Landscape Institute | Landscape Ambassador

I am a key member of the Arup Connect Cultures Committee, which is the cultural, religious and ethic diversity strand in the Arup UKMEA’s family of diversity networks. The aim of the network is to foster an inclusive and equal opportunity work environment that respects employees individual differences and values.

At present, I am a guest lecturer and external student adviser for final year undergraduate and MA landscape architecture students at the Leeds School of Architecture within Leeds Beckett University.

As part of the Landscape Institutes Landscape Ambassador Programme, I currently meet secondary school students to explain what our profession is, the type of work we undertake and the wider challanges we currently face, including global warming, increased housing demand within our cities and the demand for additional green space and public realm.

Arup Black History Month:

Celebrating Black Architects ExhibitionMeet the Architects ROSH HASHANAH

An inspirational exhibition that celebrates black architects. Curated by Simone de Gale, the exhibition showcases the successes of a number of black architects, including Yemi Aladerun and Michael Martin, through interview, images and audio. The event will be followed by an open discussion with drinks and nibbles.

‫ראש השנה‬

P�ea�� ���� y��r��l� t� � ��ea� P�ea�� ���� y��r��l� t� � ��ea� We welcome your input and if you have an event you would like to suggest for this, or if you would like to join Connect Cultures, please email us at ConnectCultures@arup.com.

Date: Monday 23 October Time: 17.30 –21.30 Venue: Atrium, 8 Fitzroy Street Contact – Justyn Nathan / Mina Prince

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO

Black History Month 2017

P�ea�� ���� y��r��l� t� � ��ea� EDI We welcome your input and if you have an event you would like to suggest for this, or if you would like to join Connect Cultures, please email us at ConnectCultures@arup.com.

We welcome your input and if you have an event you would like to suggest for this, or if you would like to join Connect Cultures, please email us at ConnectCultures@arup.com.

H�p�� C��is�ma� Happy Chinese New Year of the Rooster

Please help yourself to a treat


J U S T Y N N AT H A N CHARTERED LANDSCAPE ARCHITECT ND(Hort) BA(Hons) DipLA CMLI

PROFESSIONAL PORTFOLIO

justyn.nathan@hotmail.com 07769 943266

J U S T Y N N AT H A N | PROFESSIONAL PORTFOLIO


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.