01 REBIRTH OF 'JI GANG' [Individual Work]
JINAN HISTORICAL TIMELINE ANALYSIS FIRST TO OPEN A COMMERCIAL PORT Jinan Was The First City In M a i n l a n d C h i n a To O p e n A Commercial Port, And Is One Of The Most Prosperous Cities In The Interior Of The Country
LOCATION
1921
JI NAN
JINAN IRON AND STEEL WORKS
+
SITE
INDUSTRIAL LOCATION DEVELOPMENT Jinan's Industrial Development Broke Through After The Reform And Opening Up, And Spread Out From The City Centre, But The City's Green Space Was Squeezed As A Result, And The Government Reintroduced The Policy Of Restoring The City's Green Space After 2020.
INDUSTRIAL START-UP PHASE
SHAN DONG
S TA RT I N G P O I N T FOR INDUSTRIAL DEVELOPMENT Jinan Was Well Connected By Both Water And Road, And With The Establishment Of The Railway, Industry In Jinan Began To Develop
0510 20 30 40KM
COMMERCIAL PORT OPENING PHASE
Project Type: Post-Industrial Site Sustainable Regeneration Project Location: Jinan Iron & Steel Site Heritage, Jinan, Shandong, China
JiNan Steel And Iron Group Is One Of China's Top Ten Steel Groups. However, Due To The Huge Environmental Pollution It Has Caused To The City In Recent Years As Well As The Government's Industrial Transformation Policy, It Was Officially Shut Down And Relocated In 2017. I Would Like To Use The Old Site Of Jisteel's Factory Located In The Urban Area Of Jinan City To Conduct A Research And Design On The Industrial Transformation And Rebirth Of Steel Industry Type Factory.
1927-1957
2006
Jinan Iron And Steel Works Was Officially Established And Put Into Production In 1956 As Part Of China's Great Iron And Steelmaking Campaign.
HIGH-SPEED DEVELOPMENT STAGE
CITY WATER CITY ROAD CITY GREEN SPACE PROTECTION OF INDUSTRIAL SITES ABANDONED INDUSTRIAL SITE
ANALYSIS OF INDUSTRIAL DEVELOPMENT IN JI'NAN JINAN INDUSTRY SHARE
.5 30
46 .2 %
4% .2 67
1% .5 50
2016
NUMBER OF INDUSTRIAL ENTERPRISES IN JINAN
AGRICULTURE INDUSTRIES TERTIARY SECTOR OF INDUSTRY
4000 3500 3000 2500 2000 1500 1000 500 0
2006
CITYWIDE NUMBER NUMBER OF URBAN AREAS NUMBER OF SUBURBAN COUNTIES
JINAN IRON STEEL INDUSTRY DECLINE
2006 2006 2006 2006
GROSS URBAN PRODUCT
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Year
GROSS URBAN INDUSTRIAL PRODUCT
ANALYSIS OF THE DEVELOPMENT OF 'JI GANG'
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Year
115 MILLION TONNES PROFIT TAX 31.6 BILLION YUAN IN SIXTY YEARS
HISTORICAL DEVELOPMENT OF 'JI GANG' FACTORY
12.12MILLION TONNES
TEN MILLION TONNES PRODUCTION CELEBRATION 5MILLION TONNES FIRST CAPACITY BREAKTHROUGH CELEBRATION STOP PRODUCTION AND GO OUT
1957
1978-2006
After 2006, The Output Value Of Jinan Iron And Steel Declined Year After Year, Coupled With His Location In The Centre Of The City, Bringing Great Environmental Pollution, In 2017 Jinan Iron And Steel Works Officially Shut Down The Fire And Stopped Work
I N D U S T R I A L T R A N S F O R M AT I O N AND GREEN CITY POLICY PROPOSALS
2017-2020
In The Process Of Industrial Transformation In Jinan, The Jinan Municipal Government Has Also Proposed A Planning Programme To Build A Forest City, With More Industrial Sites Being Transformed Into Forest Parks.
6.5MILLION TONNES
FIRST OVERSEAS CO-OPERATION JI IRON AND STEEL BUILDS PLANT
2006(PEAK)
STOP PRODUCTION AND GO OUT
MILLION TONNES 1960
300,000 TONNES 1981
1991
IRON AND STEEL PRODUCTION
2003
2005
2007
2016
2017
2020-NOW
INDUSTRIAL TRANSFORMATION PHASE
10MILLION TONNES
1957
INDUSTRIAL TRANSFER STAGE
2004
ANALYSIS OF INDUSTRIAL DEVELOPMENT IN JI'NAN
GDP (Billion Yuan)
2.19% 7%
3.29%
AFTER CHINA'S REFORM AND OPENING UP, THE OUTPUT VALUE OF JINAN IRON AND S T E E L W O R K S TO O K O F F AND BROKE THROUGH AGAIN IN 2004, REACHING A HISTORICAL PEAK IN 2006.
REFORM AND OPENING-UP PERIOD
+ +
2023
CHINA'S GREAT LEAP FORWARD
1980
+Large Industry +Medium-Sized Industry Greenery
E S TA B L I S H M E N T OF JINAN IRON AND STEEL WORKS
DESIGN TRANSFORMATION CONCEPT
PRODUCTION PROCESS OF JIGANG
RENOVATION AREA AND ITS SURROUNDINGS THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
STEP1: RAW MATERIAL EXTRACTION
IRON ORE LIMESTONE
COAL MINE
STEP2: RAW MATERIAL SINTERING
STEP4 MAIN POLLUTANTS
COAL MINE STEP3: SMELTING IRON DUST SOX EMISSIONS STEP4: STEEL PRODUCTION
STEP5 MAIN POLLUTANTS
IRON ORE MINE MANUFACTURING AREA INDUSTRIAL REFINING AREA
DUST
COAL MINE
FACTORY BUILDING HISTORICAL BUILDING PRODUCTION FACILITY
LIVING AREA
DORMITORY BUILDINGS
THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
COAL MINE THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
STEP1 MAIN POLLUTANTS
GREEN AREA RAILWAY TRACK
STEP2 MAIN POLLUTANTS
INTERNAL ROADS EXTERNAL ROADS PIPELINES
DUST
SOLID POLLUTANT
STEP5: ROLLING STEEL
THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
COAL MINE
STEP3 MAIN POLLUTANTS THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
STEP1:TIDYING UP THE SITE
REMOVING HEAVY METAL CONTAMINATION FROM THE SITE
STEP2:DISMANTLING AND INTEGRATION
REMOVING HEAVY METAL CONTAMINATION FROM THE SITE
SOLID POLLUTANT
DUST
THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
NOX EMISSIONS
DUST
STEP3:CONVERSION BUILDINGS
ALTERATIONS TO BUILDINGS AND EQUIPMENT
COAL MINE THE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL WORKSTHE FORMER SITE OF JINAN IRON AND STEEL
SOX EMISSIONS
STEP4:TRANSFORMING THE LANDSCAPE CREATING LANDSCAPED EVENT VENUES
CHEMICAL CONTROL PHYSICAL CONTROL
ECOLOGICAL CONTROL
PROFILE STRATEGY VIEW PHYSICAL CONTROL
Heavily Polluted Area Moderately Polluted Area Lightly Polluted Area
CHEMICAL CONTROL
Heavily Polluted Area Heavily Polluted Area
Moderately Polluted Area PIPELINES
REMOVAL OF REDUNDANT BUILDINGS AND EQUIPMENT
PRODUCTION EQUIPMENTS HISTORICAL BUILDINGS
NEW CONSTRUCTION OFFICE BUILDINGS
RESIDENTIAL BUILDINGS
HISTORICAL BUILDING
RETENTION OF PLANT FRAME
MAIN LANDSCAPE NODES CONNECTION NODES
RETAINING A DISTINCTIVE LOOK GREEN BARRIER
CITY LEISURE LOUNGE
物理清理剖面 AGRICULTURE
AGRICULTURE
AGRICULTURE
AGRICULTURE
Gonorrhoea Waste Removal
Guest-Soil Method
ECOLOGICAL CONTROL Converted To Apical Clipping
Converted To Gas
Gonorrhoea
ESTABLISHMENT OF A NEW ROAD SYSTEM Pipeline Three-Dimensional Traffic
NEW FUNCTIONAL SECTIONS CONNECTED SPACE
SUSTAINABLE HIGH-TECH PARK Solar Energy
Wind Energy Solar Energy
Absorption Of Pollutants
Absorption Of Pollutants
Classification Of Roads
LANDSCAPE CONNECTING EXTERNAL PLACES
MASTER PLAN
N
③
⑦
⑧
NODE RENDERING
④
② A
A ⑥
A ①
⑤
B
B
Historical Experience Tour Gallery
⑪
⑩
⑫ LEGEND ① Historical Memory Box ② Blast Furnace ③ Converter ④ Car Parks ⑤ Core Plaza ⑥ Historical Museum ⑦ Pipeline Stadium ⑧ Chimney Climbing Course ⑨ The Forest Gallery ⑩ Energy Research Centre ⑪ Energy-Efficient Office Buildings ⑫ Residential Area
⑨
THE CORE PLAZA
DESIGN TRANSFORMATION CONCEPT PARK ROAD ANALYSIS
Main Roads Secondary Roads Internal Roads Air Sightseeing Path
FUNCTIONAL AREA ANALYSIS
After Re-Planning The Park Road, A ThreeDimensional Park Path Was Constructed Underground And In The Air, And The Air Trestle Was Transformed By Using The Original Pipeline.
Historic Learning Segment Industrial Exhibition Segment Community Life Segment Living Segment
PHASED PROGRAMME
Phase I(2025):Renovation Of Centre Nodes In Functional Subdivisions Phase II(2030):Secondary Nodes And Ancillary Site Improvements Phase III(2035):Formation Of Mature And Innovative Industrial Parks
Core Plaza Energy-Efficient Office Segment Natural Experience Segment
THE PIPE PLAYGROUND
SECTION VIEW
SECTION B-B:SUSTAINABLE AND LIVABLE OFFICE SPACE
SECTION A-A:STEREOSCOPIC TRAFFIC TOUR SYSTEM Chimney Viewing Tower
Steel&Iron Museum
Rainwater Harvesting Tanks
Solar Panel Corridor
Aerial Viewing Trail
Bioswale
Core Plaza
Hard Paving
2ND Avenue
Hard Paving Green
SECTION A-A Soft Paving
2ND Avenue
Hard Paving
Hard Paving
Green
2ND Avenue
Bioswale
SECTION A-A Hard Paving
Hard Paving
Bioswale
Hard Paving
AERIAL VIEW OF THE PARK
Pipeline Stadium Chimney Climbing Course
Steel&Iron Museum
Converter Tracks
Car Parks Energy Research Centre
Core Plaza Blast Furnace Historical Memory Box
Energy-Efficient Office Buildings The Forest Gallery
Residential Area
FACADE RENOVATION
ACTIVITY PLANNING
BUILDING FACADE MATERIALS
CORE PLAZA'S ACTIVITIES THROUGH THE SEASONS ENERGY
RECYCLE
PASSIVE DESIGN
EFFICIENT OFFICE BUILDING
STEEL&IRON MUSEUM
BIPV Glass Energy Savings Recycled Polycarbonate Material Recycling
Recycled Wood Steel Bars Reuse Of Wood In The Parkup Produced By JIGANG
Steel Plate Produced By JIGANG
MIX-USED BUILDING
PV Glass Produced From JIGANG'SRaw Materials
Recycled Brick Paving Material Recycling
BUILDING ELEVATIONS STEEL&IRON MUSEUM
Toughened Glass Produced From JIGANG'SRaw Materials
STEEL&IRON MUSEUM
STEEL&IRON MUSEUM
Core Plaza Promotes The Creation Of Interesting Civic Spaces And A Carefully Curated Public Realm Programme Encourages Participation, Creativity And Collaboration.the Square Has Been Designed To Be Flexible Enough To Support A Variety Of Events Throughout The Year, From Year-Round Fairs To Winter Bonfire Festivals, To Film Screenings And Fountain Music Festivals In The Spring And Summer, To Beer Festivals In The Autumn. AUTUMN FRUIT MARKET
SUMMER BEER & MUSIC FESTIVAL
MANGROVE PARKS
02 Emerald Necklace [Individual Work]
Project Type: Adaptive Sustainable Urban Design Project Location: Shenzhen Bay, Nanshan District Shenzhen, China
In The Late 1970s, In Order To Increase Exchanges With Hong Kong And Speed Up Economic Development, Shenzhen Carried Out A Small Amount Of Land Reclamation In Shekou Peninsula And Yantian District Near Hong Kong. Later, Qianhai Was Vigorously Developed And A Huge Land Reclamation Project Was Carried Out. Excessive Land Reclamation Has Exposed Shenzhen To The Risks Of Soil Erosion, Ecological Damage And Seawater Intrusion.
RESIDENTIAL AREA
WATERFRONT PARK CONTAINER PIER
MUSEUM
SLR+HIGH TIDE:2050
SLR+1.276m
SLR+HIGH TIDE:2065 SLR+1.894m
SLR+HIGH TIDE:2080
SLR+2.582m
SLR+HIGH TIDE:2100
MANGROVE PARKS
WATERFRONT PARK
NANSHAN PARK
SLR+3.259m
km² 50
47.6
45
RESIDENTIAL AREA
40
INDUSTRIAL AREA
34.44
35 SHEKOU CBD
2100
29.64
30 25
INUNDATED AREA 9764.6hm²
20
CONTAINER PIER
15 10 5
61%LOSS
7.79
0 1979-1989
CONTAINER PIER
2000-2009
1990-1999
2010-2020
CONSTRUCTION LAND AREA
LAND RECLAMATION AREA INSHENZHEN
Shenzhen
Shenzhen Bay
Guangdong
From Year 1979 to 2009
Before 1979
In 1979, Shenzhen Was Established To Carry Out A Small Amount Of Land Reclamation In Shekou Peninsula And Yantian District Near Hong Kong.
Bao'an County Was Established In 331 Ad. The Residents Here Make A Living By Fishing And Sailing And Seldom Cultivate.
COASTLINE BEFORE 1979
COASTLINE IN 2005
COASTLINE IN 2010
Since Year 2010
In the Future
In Recent Years, In Order To Drive Faster Economic Development, The Rate Of Land Reclamation In Shenzhen Has Reached The Highest In History. The Establishment Of Coastal Ports, Docks, Cbd And High-End Residential Areas Also Faces More Natural Risks.
In The Future, If We Continue This High-Speed Land Reclamation Project Without Paying Attention To Ecological Restoration, The Bay Will Become Smaller, The Tidal Capacity Will Be Reduced, The Bay Siltation Will Accelerate, And The Seawater Quality Will Deteriorate. At That Time, It Will Face Serious Coastal Ecological Deterioration And The Risk Of Seawater Intrusion.
COASTLINE IN 2020
RESIDENTIAL AREA DESIGN LANGUAGE PROTOTYPES
RAINWATER COLLECTION
RAINWATER FOR FOUNTAIN
THE CONTINUOUS EMBANKMENT SYSTEM WILL PENETRATE DEEP INTO THE OPEN SPACE OF THE RESIDENTIAL AREA, TRANSFORMING THE OTHERWISE FLAT AND FEATURELESS PUBLIC SPACE INTO A FLOOD CONTROL LANDSCAPE WITH RAINWATER MANAGEMENT AND RECREATION, SOCIAL SERVICES AND SCIENCE EDUCATION.
SPORTS GROUNDS GREEN ROOFS
NORMAL VIEW
RAINWATER FOR IRRIGATION
100''SLR
CENTRE WETLAND
20''SLR
GROUNDWATER
10''SLR
RAINWATER STORAGE
BUFFER SLOPES
AFTER RAIN
RESIDENTIAL AREA PROFILE
ACTIVITY SPACE FOR THE ELDERLY
GRID SOFT GROUND
100''SLR+1%STORM
20''SLR+1%STORM
+3.30M +0.00M
+0.675M MANGROVE WETLAND ISLAND
BUFFERED GRASS SLOPES
50''SLR+1%STORM
+3.30M
RECREATION AREA
MANGROVE ISLANDS
+1.875M SUNKEN PLAZA
WALKWAY
ACTIVITY SPACE FOR CHILDREN
AERIAL VIEW
⑧ ⑥ ⑦ ⑨
④ ④ ② ③ ①
⑤ ① Floating Mangrove Islands ② Coastal Walkway ③ Senior Activity Venue ④ Permeable Grid Green ⑤ Children's Activity Venue ⑥ Mangrove Ecological Science Venue ⑦ Ecological Wetland Pond ⑧ Sports Grounds ⑨ Green Roofs
MARINA SPACE
CULTURAL AND ART AREA SHEN ZHEN MUSEUM TEMPORARY FUNCTIONAL DESIGN OF FLOATING ISLANDS
IN CONJUNCTION WITH THE SITE BEING A CULTURAL AND ARTISTIC FUNCTION AREA, I HAVE LINKED THE INTERNAL FLOATING ISLANDS INTO A FLOATING ART AND CULTURAL BAZAAR TO MEET THE DIVERSE NEEDS OF VISITORS IN TERMS OF CULTURE, ART, MUSIC AND THE OUTDOORS
MANGROVE ISLAND BAZAAR
ART EXHIBITION
CULTURAL BAZAAR
MUSIC PARTY
CAMPING
MUSEUM AREA PROFILE
100''SLR+1%STORM
+5.50M
50''SLR+1%STORM
+3.30M
+1.875M
+1.50M +0.00M
MANGROVE WETLAND ISLAND
20''SLR+1%STORM+0.675
WATERFRONT PLAZA
WATERFRONT PATHWAY
CULTURE LEISURE PARK
MARINA SPACE
⑦ ④ ③
⑥
⑤
②
①
① Floating Art Bazaar Island ② Sunken wetland plaza ③ Walking paths ④ The Platform ⑤ Stepped landscape pool ⑥ Greenland Park ⑦ Marine Ecology Museum
ART ISLAND BAZAAR
PORT AREA DESIGN LANGUAGE PROTOTYPES
FLOOD PREVENTION MODULE
SHENZHEN DA CHAN BAY IS ONE OF THE IMPORTANT PORTS IN THE GREATER BAY AREA, WITH ABUNDANT RESOURCES OF ABANDONED CONTAINERS.
WE HAVE TRANSFORMED THESE BASIC MODULES INTO KIOSKS AND OTHER FACILITIES TO PROTECT AGAINST SEAWATER INTRUSION AND TO COLLECT SEAWATER.
50''SLR+1.875 10''SLR+0.650
MONOBLOCK
STACKING BLOCKS
50+SLR FLOODED AREAS FOR LANDSCAPE PAVILION SPACE
100+SLR FLOODED AREAS FOR SEA VIEW SPACE
DOCK AREA PROFILE
Pavillion
Skateboarding U-Hill
Sea View Pavilion
Marine Ecology Museum
Skateboard Wall
Skateboarding Slope
Skateboarding Terrain
Skateboard U-Pool
CUT MONOBLOCKS NON-FLOODED AREAS FOR MARINE SCIENCE SPACE
Scince Space
WATERFRONT WALKWAY +6.00 +4.00
100''SLR+1%STORM+3.320
+1.875
+2.00
50''SLR+1%STORM
0.00
+0.70
20''SLR+1%STORM+0.675
PROTECTED ISLANDS
FISHING ISLANDS
CONTAINER SEA VIEW PAVILION
SKATEBOARD VENUE
⑩ FISHING ISLANDS
⑨ ⑧ ⑦
⑥
⑤
④
③
②
①
① External Protection For Floating Islands ② Internal Fishing Islands ③ Senior Activity Venue ④ Container Kiosk ⑤ Container Sea View Kiosk ⑥ Mangrove Ecological ⑦ Fitness Venues ⑧ Children's Playgrounds ⑨ Ball Game Courts ⑩ Skateboard Venue
SKATEBOARD VENUE
"Riverfront Haven" is a seasonally landscaped park that provides an excellent venue for University Town students, villagers and neighbouring residents, especially in different seasons, creating sustainable landscapes based on tidal flooding and flowering periods.Our Design Concept Aims To Create A Pleasant Place For Urban Residents To Relax And Socialise While Working To Restore And Enhance The Ecological Environment Along The River.
03 Riverfront Haven [Individual Work] Project Type: Seasonal Landscape Park Design Project Location: Guangzhou University Town, Guangzhou, Guangdong, China PUBLIC ECOLOGICAL PARK DESIGN
LOCATION
SITE CONDITIONS
DEMAND FOR MASS EVENTS
Guangzhou University Town Mapping
Guangdong
Guangzhou
University Town
Dance
Play
Organise Events
Take Photos
Exercise
Rest
Take A Walk
Sightseeing
Chat
SITE PHOTOS Waste Resource
Children's games
SEASONAL CLIMATE CHANGE Abandoned Dock
Niceview Across The River
Fish And Birds
Variation Of Water Level
Average Tempurature
3.20 3.15 3.10 3.05 3.00 2.95
Water Pollution Sui Shek Urban Village
School Dormitory Area
Riverbank eco-damage
SITE
Soil Pollution
2.90 2.85
1
Sand Content/Wind Direction/Rainfall Days
Functional Gap
Flat Homes
No Access To Coast
Dilapidated Trestles
SITE FLORA AND FAUNA ANALYSIS Flying Catch Area For Wading Birds
1
2
3
4
5
6
Foraging Area Flying Catch Area Foraging Area For Wading Birds For Wading Birds For Wading Birds
Wading Arboreal Area
Shurbs
Aquatic Plants
GREEN AREA PEARL RIVER (GUANGDONG)
SCHOOL DORMITORY AREA SUI SHEK URBAN VILLAGE FLAT HOMES
Water Depth 1.0M-2.0M
Water Depth 1.0M-0.2M
Shallow Deep Water Water Travelling Bird Feeding Area
Water Depth 0.2M-0.0M
Water Depth 1.0M-0.2M
Shallow Water Swimming Birds Nesting Acticity Area
Shoal Area
7
8
PLANT CONFIGURATION STRATEGY
Trees
BUILDING
2
3 4 5
1
6 7 8 9 10 11 12
Functional Gap
2 3 4
5 6 7 8 9 10 11 12
Humanity Water Pollution
Economic
Sediment Concentration
Agriculture
Average Wind Speed 2m/s
Cluttered Field
MAIN ROAD
Grid/30mm
3.25
Average Rainfall Grid/4℃
Water Level Change(m)
Ecological Issue
Nearshore Area
Land Area Travelling Bird Activity Area
9
10
11
12
Soil Pollution
Ecology
MASTER PLAN
DESIGN STRATEGY Lanscape Construction
1LEGEND
① Migratory Bird Reserve ② Parking Lot ③ Market Area ④ Event Square ⑤ Event Grass Slope ⑥ Riverbank Corridor ⑦ Elastic Landscape Area ⑧ Cultural Research District ⑨ Parking Lot
NODE DIAGRAM
HYDROPHILIC PLATFORM SECTION Ecological Riverbank
Adaptation To Local Condition
Composite Tourism
Work Naturally
Regulate Climate And Conserve Water
Native Plant
Multiple Routes
Elastic Landscape Level Period
Air Purification
Biofriendly
Natural Science
Elastic Landscape Wet Season
Improve The Soil
Corridor
Event Square
Grass Slope
Parking lot
Trail
Market Area
PARK SECTION
Sustainable Development
Ecological Plank Road