Bakery-Cafe:
GENERAL NOTES:
4.23
F. G. H. I. J. K. L. M. N. 4.23
O. P.
4.21
4.20
KEYED NOTES
4.07
4.01
10/4/2018 6:32:03 PM
4.02 4.03 4.07 4.08 4.20
4.08
11' - 11 1/2" B.O. ACT
4.21 11' - 11 1/2"
4.01
SYSTEM: G4 (ARIA) Project Team:
6500 Chippewa Street Suite 200 St. Louis, MO 63109 Phone: 314.843.4320 - www.core-eng.com
D. E.
4.23
B.O. ACT
4.24
4.20
Professional Seal:
EXISTING SUSPENDED CEILING GRID TO REMAIN. CLEAN, REPAIR AND REPLACE ANY DAMAGED TILES. PROCOAT EXISTING GRID & ACT THROUGHOUT DINING ROOM. SEE FINISH SCHEDULE FOR SPEC. INSTALL NEW WALL SCONCE. CENTER ABOVE LAVATORY. SEE RESTROOM ELEVATIONS. INSTALL NEW LIGHT FIXTURE PROVIDE POWER AS REQUIRED. INSTALL FLOOR LAMP AS INDICATED. EXISTING GYP BOARD CEILING TO BE PAINTED PXXX. CONTRACTOR TO PROVIDE NEW/RELOCATED ELECTRICAL CONNECTION FOR NEW SIGN. SIGN VENDOR TO INSTALL NEW INTERNALLY ILLUMINATED SIGN. REFER TO SHOP DRAWINGS FOR ADDITIONAL INFORMATION. SIGN VENDOR TO INSTALL NEW AWNING FABRIC ON EXISTING AWNING FRAME. FABRIC: SUNRBRELLA UNITY LEAF SIGN VENDOR TO INSTALL NEW AWNING FRAME IN KIND WITH EXISTING FABRIC: SUNBRELLA UNITY LEAF.
THIS DOCUMENT IS RELEASED FOR PURPOSE OF INTERIM REVIEW, IT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, OR PERMIT PURPOSES
Project Title:
4.21
4.01
10' - 11 1/2"
4.24
B.O. ACT
DESIGN DEVELOPMENT SET
10' - 11" B.O. GYP.
4.23 4.01
11' - 11 1/2" B.O. ACT
GP26
GP26
4.03
4.03
EQ.
EQ.
4.03
18641 LBJ FREEWAY MESQUITE, TX 75150
B. C.
4.01
#819
G.C. SHALL CONFIRM ALL CEILING HEIGHTS. NOTIFY OWNER/ARCHITECT IF SPECIFIED HEIGHTS CANNOT BE ACHIEVED. SEE ELECTRICAL DRAWINGS FOR POWER & CIRCUIT. TRACK SPECIFICATION AS INDICATED ON FIXTURE SCHEDULE ONE 20 AMP CIRCUIT REQUIRED FOR EACH 20 FT. SECTION OF TRACK. LENGTH OF TRACK AS INDICATED BY (X') ON PLAN. ALL FIXTURES TO BE CENTERED IN 2X2 CEILING TILE (U.N.O.). ALL FIXTURES TO BE PROVIDED BY, RECEIVED, STORED & INSTALLED BY ELECTRICAL CONTRACTOR. (6) WEEK LEAD TIME ON THE ACOUSTICAL CEILING TILES & CEILING GRID. ALL FIXTURES TO BE OBTAINED THROUGH NATIONAL ACCOUNT FROM APPROVED PANERA, LLC VENDOR. SEE FINISH SCHEDULE FOR ACOUSTICAL CEILING TILE SPECIFICATIONS (ACT). ELECTRICAL CONTRACTOR SHALL SUPPLY 10% ADDITIONAL SPARE, OF ALL LAMP TYPES. TO BE LEFT AT JOB SITE AT END OF JOB. MECHANICAL SYSTEM DIFFUSERS NOT SHOWN THIS SHEET & SHALL BE COORDINATED BY G.C PRIOR TO CONSTRUCTION. SEE MECHANICAL SHEETS FOR LOCATIONS. G.C. TO SUPPLY (1) UNOPENED CASE OF EACH TYPE OF CEILING TILE USED. WHERE APPLICABLE, PENDANTS SHALL BE CENTERED OVER TABLES. WHERE APPLICABLE, PANERA VENDOR TO EXTEND SPEAKER SYSTEM INTO EXPANSION AREA; CONNECT INTO EXISTING SYSTEM. MAIN DINING AREA TO BE EXPOSED STRUCTURE TO BE PAINTED P155. ALL EXPOSED DUCTWORK TO BE PAINTED TO MATCH EXPOSED STRUCTURE. ALL LIGHTING CONDUIT TO BE RIGID, PAINTED TO MATCH EXPOSED STRUCTURE. G.C. TO PLACE BOTTOM OF TRACK AT TRACK LIGHTING AT 11'-0" A.F.F. TYPICAL AT EXPOSED CEILING TO DECK.
Bakery Cafe: #819
A.
6' - 2"
4.03
4.03
Consultant Copyright Placeholder
4.03
GP26 GP27
GP27
4.02
GP27
4.08 4.23
9' - 6"
RCP LEGEND 4.08
No.
Description
Date
ACT 3 - (BACK OF HOUSE) 4.02
ACT1, ACT2 - (FRONT OF HOUSE) CENTER RECESSED LIGHT FIXTURES WITHIN CEILING TILE 4.23
4.23
HATCH DENOTES DRYWALL CEILING/BULKHEAD
DENOTES TRANSITION BETWEEN ACT1 & ACT2
REFLECTED CEILING PLAN Project Number:
Sheet Number:
PNB.23745.0001 Drawn By:
J.ANDREWS PB 2018.08
Checked By:
24 REFLECTED CEILING PLAN 1/4" = 1'-0"
K.SABOL
A130
Issue Date:
DM:
CPM:
10/02/2018
CH
KP