Commercial Remodel - Panera Bread Mesquite, TX

Page 1

Bakery-Cafe:

GENERAL NOTES: B. C.

A201

D. E.

24

F. G. H. I. J.

1.01 1.02

AREA OUT OF SCOPE 10/4/2018 6:31:27 PM

1.03 1.06 9

22

A201 1.07

A410

1.10 1.03

1.06

1.14

14 1.18 1.19 1.20

1.03

A411

A410

1.14

1.22

10

1.14

A200

1.02

22

1.23

THIS DOCUMENT IS RELEASED FOR PURPOSE OF INTERIM REVIEW, IT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, OR PERMIT PURPOSES

Project Title:

DESIGN DEVELOPMENT SET

1.14

1.19

1.18

22

V.I.F.

1.01

5' - 9"

EXISTING FIXED SEATING, REFER TO FURNITURE PLAN. ORDERING KIOSK TABLE, REFER TO CASEWORK SHOP DRAWINGS, CONTRACTOR TO RUN POWER CONCEALED IN LEG CHASE. INSTALL NEW CASEWORK PANELS AT EXISTING CASEWORK. GRAB & GO BEVERAGE COOLER AND CASEWORK. REFER TO EQUIPMENT PLAN & SHOP DRAWINGS. G4 TRASH AND BUSSING STATION. REFER TO CASEWORK SHOP DRAWINGS. G4 COLD BEVERAGE STATION. REINSTALL ALL EXISTING EQUIPMENT TO EXISTING LOCATIONS. INSTALL NEW MILLWORK SCREENS. SEE INTERIOR ELEVATIONS AND MILLWORK SHOP DRAWINGS. INSTALL NEW G3 RAPID PICKUP SHELVING INSTALL NEW G3 MONITOR BOX TRIM. INSTALL NEW EXPO WINDOW MILLWORK AT EXISTING OPENING. REFER INTERIOR ELEVATIONS. NEW CONCRETE SLAB AT ELECTRICAL CONDUIT TRENCHES. CONTRACTOR TO DOWEL NEW SLAB INTO EXISTING PER STL 23/A500 APPLY 3M WINDOW VINYL TO 5'-0" A.F.F. @ NEW PARTITION.

1.01

1.22

A410

Professional Seal:

2

1.14

18641 LBJ FREEWAY MESQUITE, TX 75150

A410

Bakery Cafe: #819

A410

A411

SYSTEM: G4 (ARIA) Project Team:

KEYED NOTES

11

6

#819

G.C. TO PROVIDE BLOCKING FOR SUPPORT OF RESTROOM ACCESSORIES AS RECOMMENDED BY MANUFACTURER. SEE INTERIOR ELEVATIONS. EXISTING OCCUPANCY LOAD SIGN TO REMIAN G.C. SHALL SUPPLY AND INSTALL RECESSED FIRE EXTINGUISHERS AS REQUIRED BY LOCAL CODES. LOCATION PER LOCAL CODES. (EXISTING) REFERENCE THE FOLLOWING SHEETS: G011 GENERAL NOTES, SYMBOLS, AND LEGENDS AND G021 ACCESSIBILITY GUIDELINES. ALL DIMENSIONS NOTED ARE FROM FACE OF DRYWALL TO FACE OF DRYWALL. BOOTH/BANQUETTE SEATING SUPPLIED BY FURNITURE SUPPLIER, INSTALLED BY G.C. ELECTRICAL EQUIPMENT BY G.C. SEE ELECTRICAL DRAWINGS. PLUMBING EQUIPMENT BY G.C. SEE PLUMBING DRAWINGS. LAP TILE AT OUTSIDE CORNERS, TURN CUT TILE EDGE TOWARD GROUT, ALL EXPOSED EDGES TO BE FACTORY FINISHED. G.C. TO VERIFY CONDITION OF ALL EXISTING DOOR HARDWARE AND CONFIRM IF REPLACEMENT IS REQUIRED.

6500 Chippewa Street Suite 200 St. Louis, MO 63109 Phone: 314.843.4320 - www.core-eng.com

A.

1.01

A411 1.20 1.01

21

1.14

6' - 0"

A410

V.I.F.

23

5' - 0"

5' - 0"

1.14

21

5' - 4 9/16"

1.01

1.14

A410

1.01

1.01

V.I.F.

6' - 0"

1.14

Consultant Copyright Placeholder

A411

22

1.01

23 A411 1.10

4' - 4"

13 8' - 5 7/8"

No.

Description

Date

1.07

ALIGN

ALIGN

24

1.23

10 A400

A200

FLOOR PLAN DIMENSIONS & KEYED NOTES Project Number:

Sheet Number:

PNB.23745.0001 Drawn By:

J.ANDREWS PB 2018.08

Checked By:

24 FLOOR PLAN - DIMENSIONS & KEYED NOTES 1/4" = 1'-0"

K.SABOL

A101

Issue Date:

DM:

CPM:

10/02/2018

CH

KP


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Commercial Remodel - Panera Bread Mesquite, TX by Julian Andrews - Issuu