Skip to main content

Juan Juan Yin | Waterloo Architecture Portfolio 2023 Q4

Page 1

Selected works 2021 - 2023

Juan Juan Yin

Univeristy of Waterloo

P O R T F O L I O


Hi! My name is Rui Juan Yin (or alternatively Juan Juan Yin) and I am currently a third year architecture student at the University of Waterloo. My interests lie in designing architecture that inspire both the people and its surrounding environment. Design should be something that creates possibilities for connections, innovation, and the future; it should be attentive to details, and respond to its program accordingly. I find joy in designing these specific instances in time within each of my projects. I hope to continue discovering what architecture means to me while contributing to the success of your firm. Thank you!

yinjuanjuann@gmail.com (604) 603-6567

2


0 0

EDUCATION

C V

2020 - Present

Cambridge, ON Summer 2018

Cambridge, ON

EXPERIENCE

May - Aug 2023

Vancouver, BC Sep - Dec 2022

Vancouver, BC Jan - April 2022

Vancouver, BC May-Sep 2021

Cambridge, ON

AWARDS

2020

Coquitlam, BC 2020

Coquitlam, BC 2018

Coquitlam, BC SKILLS

Digital Revit Lumion Rhino 7 Vray Grasshopper Enscape Sketchup Photoshop Illustrator InDesign Microsoft suite

UNIVERSITY OF WATERLOO SCHOOL OF ARCHITECTURE Bachelors of Architectural Studies, Co-op UNIVERSITY OF BRITISH COLUMBIA UBC SALA Landscape and Urbanism Summer Course

SLA (STEPHANE LARYOE ARCHITECTS) Student Intern PERKINS&WILL Student Intern STUDIOHUB ARCHITECTS Student Intern UNIVERSITY OF WATERLOO ORIENTATION LEADER Media Guru

BC ACHIEVEMENT SCHOLARSHIP Graduates with top academic achievement in BC DISTRICT/AUTHORITY SCHOLARSHIP Top 5,500 graduates within district TOP STUDENT IN DRAFTING Faculty award Analogue Laser cutting Model Making Hand sketching Hand drafting Gauche & Acrylic Watercolour Resin casting

3


studioHuB architects April 20, 2022 Subject: Letter of recommendation for Juan Juan Yin

To whom it may concern, It is with pleasure that I offer this letter of recommendation on behalf of Juan Juan Yin. Juan Juan was an outstanding student during her co-op placement from January through April 2022, possibly one of the best we have had here in our studio. During this time, we were working in person in our studio. During her 4-month term in our studio, Juan Juan was involved in several projects, most notably: •

•

•

•

UBC Macmillan lecture theatre renovation: working under direct supervision of one of the partners, and in collaboration with one of our intern architects, Juan Juan worked on the design and building permit drawings for a 100-seat lecture theatre at UBC. She visited the site, attended client meetings, and produced both renderings as well as technical drawings. UBC Ike Barber Learning Centre furniture concepts: For the large entry level space at one of the main campus libraries at UBC, Juan Juan worked with one of the partners on multiple design options for the space, using moveable furniture solutions. The work included stakeholder engagement, site visits, as well as multiple client presentations. New school feasibility studies: For a large public school district, Juan Juan assisted one of the partners in the preparation of high level concepts and test fits for new schools as well as school additions for several secondary schools. Using both 2D and 3D presentation styles, she produced clear and attractive drawings to be used in the feasibility reports, as well as attended site visits and client meetings. Website redesign and updates: Working alongside all 3 partners, Juan Juan assisted in updates to our website, by creating new project profiles, as well as updating existing information.

Juan Juan is an extremely fast learner and picks up on the needs of the project in an organic way. During her time here, she learned how to use Revit on technical drawings, as well as on early stage concept design. She has a very pleasant demeanor and fits well into the team. She is thorough and able to manage her time well, even when working on multiple projects at the same time. Although this was her first co-op placement, she performed at an equal or higher level than some of her 4th year fellow students. Juan Juan would be a great asset to any firm. If you have any further questions, I would be happy to give a verbal reference over the phone in addition to this letter. Sincerely,

Annerieke van Hoek, Partner, Architect AIBC

studioHuB architects 1725 West 3rd Avenue, Vancouver, BC V6J 1K7

4

Phone: 604.738.0201

Email: sayhello@studiohub.ca

studiohub.ca


Date: 1.16.2023

Juan Juan Yin

Re: Letter of Recommendation—Juan Juan Yin

To Whom It May Concern, Juan Juan joined our studio in September 2022 as an intern until December 2022. During that time she was involved with some project work and an annual firmwide award program. I help oversee our studio’s award submissions and worked with the production team we had assembled to help prepare our submissions. Juan Juan was part of this graphics and drawing team and was selected for her attention to detail, compelling drawing and graphics style, and her ability to work quickly and efficiently—juggling a variety of tasks concurrently. Our studio submitted a number of projects for awards and we had a group of four individuals delivering the drawings and graphics. This production team managed the assigned tasks amongst themselves and had to communicate with the project teams for which they were preparing materials, our design director, the other production team members, and myself. Juan Juan work was excellent and her friendly, approachable manner made her easy to work with. A project manager with whom she worked added that she, “was very responsive and proactive—proposing different ideas.” Juan Juan has my recommendation.

Sincerely,

Babak Manavi Marketing Coordinator Perkins&Will

1220 Homer Street Vancouver, BC V6B 2Y5 www.perkinswill.com

5


Stephane Laroye Architect Inc. 215 – 35 West 5th Avenue Vancouver, BC V5Y 1H4 O: 604-558-6955

23 August 2023 Re: Reference for Juan Juan Yin To whom it may concern, Juan Juan Yin was employed in our firm for a Coop Term from May through August 2023. She was invaluable on the following projects: -

Third Avenue, Squamish, BC – conceptual design Metro Vancouver South Surrey Works Yard, Surrey, BC – schematic design site planning The Albion Infill, Old Town, Victoria, BC – conceptual design Surrey Multi-Family, Surrey, BC - schematic design site planning

Juan Juan also assisted us greatly with our Instagram posts by choosing and preparing the graphics. Juan Juan’s attention to detail and keen interest in learning ensured she fit in well with our team during her work term. She enjoyed going to site and watching one of our mass timber projects progress, and listening to the intense discussions within the office about Contract Administration, contracts, fee proposals and project budgets – learning by osmosis! If you have any questions or concerns, please do not hesitate to contact me anytime. Respectfully, Stephane Laroye Architect Inc. Per:

Stephane Laroye Architect AIBC MRAIC MCIP RPP LEED AP SPECA Principal

6


7


0 0

8

C O N T E N T S

pg. 10

WORK SAMPLES 2021-2023

pg. 18

RE-CONFIGURE 2A Design Studio

pg. 26

CONNECTION 2B Design Studio

pg. 36

GROUND UP 3A Design Studio Featured in: Commuting Communities Exhibition


01

0 2

0 3

9


0 0

10

W O R K

S A M P L E S


t/o UPPER TIER SLAB

-737

t/o MIDDLE TIER SLAB

-1474

t/o LOWER TIER SLAB

+/- 737

+/- 737

0

GWB Pony Wall, Typ.

1 A201

SECTION THROUGH TIERS 1 : 50

3 +/- 9042

Suspended Steel Stud GWB Ceiling u/s EXISTING DECKING

+/- 843

3818

2975

Projector Alcove

u/s EXISTING TYP BEAM

11

Sim.

Motorized Projector Screen Provided by UBC, Contractor to Provide Structural Backing at Ceiling

5655

4084

F2

Whiteboard by UBC, Typ. t/o UPPER TIER SLAB

+/- 737

P1

t/o MIDDLE TIER SLAB

-1474

F1

152

+/- 737

-737

383

Built-Up Upstand to U/S of Whiteboard

914

0

4236

+/- 2975

+/- 5292

A702

t/o LOWER TIER SLAB

12 A702

Sim.

2 A201

SECTION THROUGH STAIRS 1 : 50

1

Existing ACT Ceiling u/s EXISTING DECKING

2975

u/s EXISTING TYP BEAM

+/- 843

3818

617

11


Avenue C V6J 1K7 01

Number of Seats

Overall View

UBC IKBLC 1961 E Mall, Vancouver, BC V6T 1Z1 PROJECT No.:

12

2203

SCALE: 1 : 200

DATE ISSUED: 2022-04-13 10:19:55 AM

studioHuB architects

1725 W Third Avenue Vancouver, BC V6J 1K7 T: 604.738.0201


studioHuB architects 13


LANE

SLOW

JOYCE STREET

SLOW

14


0

1/2"

1"

2"

15


0 600

00

ZONING SUMMARY

60

PID 008-900-299, 011-239-247 + 011-239-310

CIVIC ADDRESS: 17536, 17554 + 17566 96TH AVENUE, SURREY, BC ZONING: CD (BASED ON RM-135) FULL SITE AREA (PHASE 1+2): 8.15 ACRE (32,981.88SM) SITE AREA (PHASE 1): 3.49 ACRE (14,123.53SM) (REFER TO APLIN MARTIN STUDY DATED 21 APRIL 2023) PERMITTED LOT COVERAGE: 33% PROPOSED LOT COVERAGE: 40% PERMITTED FAR: 2.5 PROPOSED FAR: 2.1 PERMITTED AREA: 35,303SM (380,000SF) PROPOSED GFA: 29,655SM (319,200SF) PERMITTED HEIGHT: N/A PROPOSED HEIGHT: 20M

PARKING REQUIREMENTS

UNIT TYPE SUMMARY UNIT TYPE 1 BEDROOM 2 BEDROOM 3 BEDROOM TOTAL

+/- 160 UNITS +/- 80 UNITS +/- 80 UNITS 320 UNITS

LOT COVERAGE

AMENITY REQUIREMENTS

PARKING REQUIREMENTS 1.3 STALL PER 1 BEDROOM OR STUDIO UNIT 1.5 STALLS PER 2 BEDROOM OR MORE UNIT TOTAL REQUIRED:

= 208 STALLS = 240 STALLS = 448 STALLS

OUTDOOR AMENITY REQUIREMENTS 3.0SM PER UNIT = 320 TOTAL # OF PROPOSED UNITS TOTAL REQUIRED: = 960SM

VISITOR PARKING REQUIRMENTS 0.2 PER UNIT

= 90 STALLS

TOTAL PARKING REQUIRED PARKING REQUIRED VISITOR PARKING TOTAL REQUIRED

OUTDOOR AMENITY PROPOSED LANDSCAPE AREA TOTAL PROPOSED:

= 448 STALLS = 90 STALLS = 538 STALLS

ACCESSIBLE PARKING REQUIRMENTS 2% OF TOTAL PARKING REQUIRED

= 11 STALLS

MAXIMUM COVERAGE 33% PROPOSED COVERAGE SITE AREA (PHASE 1) COVERAGE TOTAL

= 14,121SM (152 000SF) = 5,729SM (61 670SF) = 40%

Stephane Laroye Architect Inc. 200 - 19 East 5th Avenue Vancouver, BC V5T 1G7 o: 604-558-6955 e: info@slaarchitect.com slaarchitect.com

REMNANT SITE AREA 12,900 SF

PHASE 2 SEAL

= 960SM = 960SM

INDOOR AMENITY REQUIREMENTS 3.0SM PER UNIT = 320 TOTAL # OF PROPOSED UNITS TOTAL REQUIRED: = 960SM INDOOR AMENITY PROPOSED INDOOR AMENITY CLUBHOUSE TOTAL PROPOSED:

TERASEN GAS S.R.W.

= 80SM = 400SM = 480SM

BC HYDRO S.R.W.

15240

BICYCLE PARKING REQUIREMENT 1.2 PER UNIT = 384 STALLS 6 VISITOR STALLS = 6 STALLS TOTAL REQUIRED: = 390 STALLS

15240

BALCONIES MINIMUM 5% OF THE UNIT AREA OR 4.6 SQ.M. PER UNIT, WHICH EVER IS GREATER

BICYCLE REQUIREMENTS

PRE-APPLICATION - 20230721

LEGAL ADDRESS:

1 No.

ISSUED FOR PRE-APP Description

20230721 Date

45720

45720

OUTDOOR AMENITY/ PLAYGROUND 7.5 M LANDSCAPE BUFFER PROJECT

PHASE 1

SURREY MULTI-FAMILY PROJECT 17536, 17554 & 17566 96th AVE

FUTURE ROAD EXTENSION

90M ENTRY

PROPERTY LINE

H/C

176 ST (HIGHWAY 15)

VISITOR PARKING

PROPOSED DEDICATION

CLUBHOUSE AMENITY

7.5 M LANDSCAPE BUFFER

H/C

SETBACK (6M)

PROPERTY LINE

ENTRY

m m 3 AX 13 M 13 5M 1

FUTURE DEVELOPMENT SITE

6000 mm

DRAWING

SITE PLAN

SLA inc. Copyright reserved. This design and drawing is the exclusive property of SLA inc. and cannot be used for any purpose without the written consent of the Architect. This drawing is not to be used for construction until issued for that purpose by the Architect. Prior to commencement of the work the contractor shall: verify all dimensions, datums and levels to identify any errors and omissions; ascertain any discrepancies between this drawing and the full contract documents; and, bring these items to the attention of the Architect for clarification.

1200 mm 7000 mm 1200 mm

RAMP DOWN

DRAWN

7500 mm

SETBACK (7.5M) PROPERTY LINE

CUL-DE-SAC

DATE

SLA

7500 mm

N

Issue Date

SCALE

REVIEWED

As indicated

SLA

Project Number

FUTURE DEVELOPMENT SITE 1

PROJECT NO

A1.00

SITE PLAN 1 : 600

REV

2023-07-21 4:06:50 PM C:\Users\juanj\Documents\17566 & 96th Ave_Opt2rvt_juanjuanF62CB.rvt

1

2 3

4

5 6

7

1

8

9 10

11

Stephane Laroye Architect Inc. 200 - 19 East 5th Avenue Vancouver, BC V5T 1G7 o: 604-558-6955 e: info@slaarchitect.com slaarchitect.com

A3.02

A2.01

7.5 M LANDSCAPE BUFFER

1

A

2 BEDROOM

3 BEDROOM

2 BEDROOM

1 BEDROOM1 BEDROOM 1 BEDROOM 1 BEDROOM

3 BEDROOM 3 BEDROOM

STAIR

3 BEDROOM

B C STAIR 1 BEDROOM

1 BEDROOM

3 BEDROOM

A3.02

SETBACK (6M)

SEAL

2 BEDROOM

COMMON AREA

2 BEDROOM

1 BEDROOM

1 BEDROOM

1 BEDROOM

1500 2500 x 5500

D

PROPERTY LINE

2 BEDROOM

2

CLUBHOUSE

1 BEDROOM

1 BEDROOM

1 BEDROOM

1 BEDROOM

PROPERTY LINE

2 BEDROOM

7.5 M LANDSCAPE BUFFER

1 BEDROOM

PRE-APPLICATION - 20230721

AMENITY ROOM 3 BEDROOM

2500 x 5500 1500

1 BEDROOM

1 BEDROOM

1 BEDROOM

1 BEDROOM

1 BEDROOM

1 BEDROOM

1 BEDROOM

1 BEDROOM

1 BEDROOM

2 BEDROOM

1 BEDROOM

1 BEDROOM

COMMON AREA

2 BEDROOM

STAIR

2 BEDROOM

2

A3.01

1 No.

ISSUED FOR PRE-APP Description

20230721 Date

PROJECT

STAIR

E

SURREY MULTI-FAMILY PROJECT 17536, 17554 & 17566 96th AVE

DRAWING

3 BEDROOM

3 BEDROOM

2 BEDROOM

1 BEDROOM

2 BEDROOM

AMENITY 1 BEDROOM ROOM

LEVEL 1 - PROPOSED SUBDIVISON PLAN

F G

PMT

15.0%

STAIR

SLA inc. Copyright reserved. This design and drawing is the exclusive property of SLA inc. and cannot be used for any purpose without the written consent of the Architect.

2 BEDROOM

2 BEDROOM

2 BEDROOM

2 BEDROOM

This drawing is not to be used for construction until issued for that purpose by the Architect.

3 BEDROOM

Prior to commencement of the work the contractor shall: verify all dimensions, datums and levels to identify any errors and omissions; ascertain any discrepancies between this drawing and the full contract documents; and, bring these items to the attention of the Architect for clarification.

10.0%

2 BEDROOM

DRAWN

DATE

SLA

H

N

SETBACK (7.5M)

1

1 A2.01

A3.01

PROPERTY LINE

Issue Date

SCALE

REVIEWED

1 : 200

SLA

Project Number

PROJECT NO

A1.02 REV

2023-07-21 4:06:51 PM C:\Users\juanj\Documents\17566 & 96th Ave_Opt2rvt_juanjuanF62CB.rvt

16


Existing Office - Option 1

PROS: - Biggest parking area CONS: - Requires rear yard setback variance - Removes mature trees

80H2020

10 7500 7.50 m

Plan 1378

7500 7.50 m

FSR: 0.67 Lot cover: 43%

7500 7.50 m

3D - EXISTING BUILDING OPTION 1

4

D

9

Plan 1378

Plan 1378

EXISTING 1 - GROUND FLOOR 1 : 500

8

SEAL

Progress Plot - 2023 06 14

144th Street

FSR: 0.07 1

Stephane Laroye Architect Inc. 200 - 19 East 5th Avenue Vancouver, BC V5T 1G7 o: 604-558-6955 e: info@slaarchitect.com slaarchitect.com

7500 7.50 m

Plan 1378

Existing Office - Option 2 PROS: - Keeps mature trees - Maintains 7.5m rear yard setback - Possibly most cost-efficient - All buildings connected via walkway

No.

Description

Date

CONS: - Reduced parking area

PROJECT

80H2020

10

South Fraser Works Yard Surrey, BC

7500 7.50 m

Plan 1378

7500 7.50 m

FSR: 0.62 Lot cover: 40% 144th Street

D

9

Plan 1378

Plan 1378

DRAWING

Renderings - Existing Building

SLA inc.

FSR: 0.09 7500 7.50 m

8 Plan 1378

2

3D - EXISTING BUILDING OPTION 2

5

EXISTING 2 - GROUND FLOOR 1 : 500

7500 7.50 m

Copyright reserved. This design and drawing is the exclusive property of SLA inc. and cannot be used for any purpose without the written consent of the Architect. This drawing is not to be used for construction until issued for that purpose by the Architect. Prior to commencement of the work the contractor shall: verify all dimensions, datums and levels to identify any errors and omissions; ascertain any discrepancies between this drawing and the full contract documents; and, bring these items to the attention of the Architect for clarification.

DRAWN

DATE

SLA

2023 06 14

SCALE

REVIEWED

1 : 500

SLA

2314

PROJECT NO

A0.06 REV

2023-06-20 10:20:24 AM C:\Users\juanj\Documents\2314_SFWY_juanjuanF62CB.rvt

17


0 1

18

R E - C O N F I G U R E


19


Site Context

Site Masterplan Scale: 1:1000

Re-Configure is an adaptive re-use project using the post-war style Alexandrian apartments on 53 Water Street, Kitchener, Ontario. Each unit has been discreetly designed to be adaptable to the daily life of its inhabitants and is highly customizable depending on their needs and reconfigurable depending on the time of day. At the end of each floor at the end of the hall lies a public gym whose program can be customized using partition screens stored in storage space outlining the auditorium. Each floor plays with the dichotomies between public and private, shared and personal. Each unit is highly personal, but as they emerge from their units the programs of the floor plate become more and more public, starting from the drop-down tables lining the hallways to the auditorium at the ends of each floor.

Supervised by Rick Haldenby 2A Design Studio Programs used: Rhino 7, Enscape, Adobe Illustrator, Adobe Photoshop

20


Experiential Render - Public Gym 21


A

an

4

5

A

Floor 1 Plan 3

10m

0

22

1

2

3

4

5

10m

2 1 0

Floor 1 Plan

3

4

5

A

10m

A


A

lan

3 2 1 0

Floor 2 Plan

4

5

A

10m

A

4

5

A

Floor 2 Plan 3

10m

0

1

2

3

4

5

10m

23


1. 2.

1.

3.

4.

5.

6. 4.

5.

Axonometric Diagram Axonometric Diagram - Different room Scale: 1:100 configurations

24


2.

3.

6.

25


0 2

26

C O N N E C T I O N


27


Mountain Park Apartments

Access

Mountain Park Ave

Sherman

Concession Street

Replanted native plants Walking path/trail

Site Plan

Site Masterplan Scale: 1:1000

Connection focuses on re-connecting both community to each other and built form back to nature. Through the use of a community based kitchen in tandem with a community farm, food is used as a medium to facilitate conversation between people. The building establishes its relationship with nature through architectural tectonics, where the roof and truss systems aim to mimic complex interlacing of branches and canopies. Curtain wall facades and windows are oriented for either full glimpses of trees/greenery, or present enough permeability for nature to establish its presence to the user within the building through “nature moments.” The kitchen is a prime example of where this happens, where a clerestory surrounds the 3-sides of the room to allow view of trees beyond while dining and preparing food. At the centre of the building is a central tree visible on all sides of the building as the main feature tying all areas of the building together. A market is located on the north-east side of the building, selling local artist wares to extra groceries. This market has a direct view into the greenhouse, which is attached to the eastern side.

Supervised by Rick Haldenby 2B Studio Programs used: Revit, Rhino 7, Enscape, Adobe Illustrator, Adobe Photoshop

28


Experiential Render 29


Exploded Axonometric 30


Greenhouse and marketplace

View inside greenhouse

Dining/Community Kitchen

Market hall facing West

31 Market Hall facing East


Harsher afternoon sun

Harsher afternoon sun

32


The design of the market hall roof allows sky visibility when facing east, while west-side sky views are blocked. This is used as both a daylighting solution and as an experiential moment.

The design of the market hall roof allows sky visibility when facing east, while west-side sky views are blocked. This is used as both a daylighting solution and as an experiential moment.

Weaker morning sun

Weaker morning sun

Platform offset from ground allows seating that overlooks the planting fields

Platform offset from ground allows seating that overlooks the planting fields

33


0 3

34

G R O U N D

U P


35


Existing stone clad houses that will be demolished under the new proposed intensification plan.

Materials extracted.

Stone needs to be cleaned for reuse.

Stone has been reused. Ideally this becomes the end of the material life cycle as the building use can be continuously re-purposed to different programs. Site Plan

Site Masterplan Scale: 1:1000

Ground-up is a mid-rise residential complex that aims to foster a sense of community among marginalized communities by providing residents and surrounding neighborhoods access to resources and opportunities that they would otherwise be deprived of, such as food, education/mentorship, housing security and childcare. This initiative offers social housing for a period of 0.5 to 1 year, and short term transitional housing. Promoting community-serving spaces breaks prejudices and barriers that exist between marginalized individuals and the rest of society through increased interaction. This is accomplished by engaging the community and marginalized communities in a different narrative and fostering an environment that views these individuals as active participants rather than passive recipients, thereby creating a greater sense of belonging. The four building masses split by two main axes connect the proposed transit terminal and river edges to the community. The angles of the buildings create a sense of direction, while the stepped entrances along those angles provide opportunities for users to branch off from the main pathways into separate program areas.

Supervised by David Fortin 3A Studio Programs used: Revit, Lumion, Adobe Illustrator, Adobe Photoshop

36


1. Gym

6. 2.

2. Counseling office

3.

1.

3.

3. Adult education centre 4. Study rooms 5. Computer room 6. Stone-paved street (slows down vehicles for friendlier pedestrian experience)

5. 4.

Ground Floor Plan

De Baed

De Baed

W/D W/D W/D W/D W/D W/D W/D

W/D W/D W/D W/D W/D W/D W/D W/D W/D

W/D W/D

2Br Unit

Social

1Br Unit

Transitional

Studio

Transitional 37


15.

14.

1. 3.

2.

6. 8. 7.

38

5. 9.


1. Grocery 14.

2. Cafe 3. Social Housing Units 4. Shared Kitchen 5. Community Centre 6. Transitional Housing Units 15.

7. Library 8. Central Courtyard 9. Kindergarten 10. Daycare play space 11. Outdoor field

13.

12. Boardwalk 13. New Transit Terminal 4.

10.

11.

12.

39


View into cafeteria

Social housing shared kitchen

40


Looking towards daycare from community centre

View towards library and transitional housing

41


T H A N K

Y O U

yinjuanjuann@gmail.com (604) 603-6567


Turn static files into dynamic content formats.

Create a flipbook
Juan Juan Yin | Waterloo Architecture Portfolio 2023 Q4 by Juan Juan Yin - Issuu