Skip to main content

Portfolio Juan Bravo-Ferrer

Page 1

PORTFOLIO Juan Bravo-Ferrer Architect


Education

Contents

1990-2004 Lycée Français de Madrid Baccalauréat

2018

PROFESSIONAL WORK EXAMPLES

Universidad Europea de Madrid

Degree in architecture

Studio Seilern Architects House in Connecticut, US

Architecture PLB Barn Close, London

Professional experience 2022-2023 Studio Seilern Architects

Collab Advisor

Part 2 Architectural Assistant

2022

Architecture PLB

Wilson Mason LLP Estudio Andrada

Estudio Álvarez-Sala

Estudio Álvarez-Sala

Estudio Andrada

VISUALIZATIONS

Madrid

Part 2 Architectural Assistant

Freelance collaboration

Image production

Wilson Mason LLP

Skills

Image production

Software Revit Autocad / Microstation 3ds Max / Maxscript / Sketch Up Photoshop / Illustrator / Indesign / Premiere

Languages Spanish French English

Competition Mahou la Latina, Madrid

Madrid

Part 2 Architectural Assistant

2017

Refurbishment of building in Castellana 44, Madrid

London

Part 2 Architectural Assistant

2014-2017 Estudio Álvarez-Sala

University Alfonso XIII Campus, Cartagena

London

3D/2D Modeller Technician

2019-2020 Wilson Mason LLP

QMUL Charterhouse Square, London

London

Part 2 Architectural Assistant

2020-2022 Collab Advisor

Building Standards

London

Native C2 - Bilingual C2 - Advanced

Aditional Information 2023 ARB Registered


Studio Seilern Architects Studio Seilern Architects, residential House in Connecticut , London 2022-2023, Studio Seilern Architects Participation: -Project development -Plans, images, details -Design workshops -Suppliers contact High end residence being developped in Connecticut. The main house features a long exterior lounge and dining are with a fireplace, flanked by a long pool looking out into the sunset. Behind this area is a strip of subterranean guest areas, each with a courtyard out back. The entrance leads us to the two-story segment of the house, which features the Master Bedroom with a wide opening up to a view of the Atlantic Ocean. These areas circumscribe art gallery with a beautifully planted open space.


GL

Architecture PLB

GL

150

BARN CLOSE ROAD Bracknell, UK April 2022, Architecture PLB - Detail drawing - Accomodation design

116

9 102.5

150

9

140

21 9

25 12.5

25 12 .5

12.5 12.5

12 .5

12 .5 9mm OSB Board to timber frame Subcontractor info Mineral Wool Insulation. To Spec ref: F30/150

Velux Insulation Frame BDX to manufacturer info

Insulation to timber frame Subcontractor info

Smart Ply to timber frame Subcontractor info

Facing Brickwork. To Spec ref: F10/110

Velux EDN Front Edge 2x12.5mm Plasterboard to Spec ref: K10/170

Plasterboard lining

Timber battens

Concealed Weep Vent to spec ref: F30/132

Plywood Sheating

Sand Cement Render. To Spec ref: M20/160

Aluminium gutters to Spec ref: R10/311

Thermal Block. To Spec ref: F10/390

Perimeter insulation

MDF Skirting to Spec Ref: P20/110

Below DPC Block work. To Spec ref: F10/355

75mm Screed to Spec ref: M10/130 150mm Below Screed Insulation to Spec ref:M10/290

75

24 dwelling project Near London.

Ground Floor Level Varies refer to GA Sections & Elevations

75

10

+900 from FFL Varies refer to GA Sections & Elevations

The project responds to the north London’s climate emergency declaration and the current energy crisis, creating low-carbon, certified Passivhaus housing. Through their high thermal performance, efficient mechanical systems and photovoltaic electrical energy generation, the new homes will significantly lower occupants’ energy consumption and costs.

150

2x12.5mm Plasterboard to Spec ref: K10/170 Smart Ply by timber frame Subcontractor info External Landscape

Insulation to timber frame Subcontractor info 9mm OSB Board to timber frame Subcontractor info Mineral Wool Insulation. To Spec ref: J42/110

Below DPC Insulation

Aluminium RWP to Spec ref: R10/370 Facing Brickwork. To Spec ref: F10/110

Sealing compound

Below Ground Blockwork: F10/355

Cavity Wall Ties. To Spec ref: F30/215

Cordek below slab to SE documentation

Blinding below Cordek to SE documentation

102.5

150

9

219

25 12.5

12.5 12.5

Mineral Wool Insulation. To Spec ref: J42/110

info

Mineral Wool Insulation. To Spec Ref: F30/150

140

9

150

102.5

6

Facing Brickwork. To Spec ref: F10/110 PPL Aluminium Drip Flashing to spec ref: H72/470

25

GL

25

1313

86

9 25

145

15 0 9 Parapet Level - Varies refer to GA Sections & Elevations

200

Aluminium Capping to to Spec Ref: H72/470

150mm (min)

9mm OSB Board to timber frame Subcontractor info

subcontractor info

18

Top of Roof Structure Low Point - Varies refer to GA Sections & Elevations

Insulation to timber frame Subcontractor info 2x12.5mm Plasterboard to Spec ref: K10/170

MDF Skirting to Spec Ref: P20/110

30

Roof Level - Varies refer to GA Sections & Elevations

Perimeter insulation

Top of Flat Roof Structure

254

200

10mm Floor Finish. Varies refer to Floor Finishes

Flat Roof Structure to Specialist Design

Ground Floor - Varies refer to GA Sections & Elevations

18

Top of Roof Structure hight point - Varies refer to GA Sections & Elevations

12.5

75mm Screed to Spec ref: M10/130

150mm Below Screed Insulation to Spec ref:M10/290

254

Flat Roof Joist by Specialist timbre frame Subcontractor

Cedral Slates H61/105

12.5

9mm OSB Board to timber frame Subcontractor info

Insulation to timber frame Subcontractor info

Substructure to SE documentation

12.5

25

9mm OSB Board to timber frame Subcontractor info

Ceiling Height +2.400 m

Mineral Wool Insulation. To Spec ref: J42/110 Facing Brickwork. To Spec ref: F10/110

Counter battens

Timber Battens

12.5mm Plasterboard to Spec ref: K10/216 subcontractor info

Insulation to timber frame Subcontractor info

Timber frame Subcontractor to set out timber frame to allow/compensate for expected settlement (3 -11mm

subcontractor info

Cordek below slab to SE documentation

info

25

2x12.5mm Plasterboards K10/170 Smart Ply to timber frame Subcontractor info

12.5

To provide minimum 150mm clear void for service distribution to Spec ref: K10/216

Ceiling Height +2.400 m info

9mm OSB Board to timber frame Subcontractor info To provide minimum 150mm clear void for service distribution to Spec ref: K10/216

Sealant joint to lining Subcontractor Blinding below Cordek to SE documentation

12 0 9 21 9

12 .5 25

12 .5 12 .5


Architecture PLB GEORGE GREEN´S SCHOOL Isle of Dogs, London, UK June, July 2022 - Design process participation - Visualizations - Drawings production


Collab Advisor Collab Advisor, Building Standards 2021,Collab Advisor Participation: -Standards Design -Plans -3D Modelling -Detail drawings -CAD Management -Programming efficiency tool in 3DS Max with Maxscript Collab Advisor develops a web-based standards and design management platform that provides the information needed by project to build efficiently maintaning consistency and quality set out in the global standards. I’ve been developping a Script for the last 5 months that sets the time of a specific task in the company from a few hours to a few seconds.


Wilson Mason Architects Wilson Mason, refurbishment REFURBISHMENT CHARTERHOUSE SQUARE CAMPUS , London 2019-2020, Wilson Mason Participation: -Project development -Plans -Images -Detail drawings The project forms part of the Building Research Facilities for the Future proframme at Barts and The London Scool of Medicine and Dentistry. It aims to improve and re-purpose a number of locations across the Charterhouse Square campus to both increase and better provide spaces for the purposes of research. With limited scope for increasing building footprint on the campus, the project is focused on spaces within the existing building stock that could be better utilised with upgrade of building fabric, services and fittings, re-planning or rationalisation of accomodation. Works are proposed in 5 buildings, The William Harvey Heart Centre, The Wolfson Institute of Preventive Medicine, The John Vane Science Centre, The Joseph Rotblat Building and Dawson Hall.


J,LLJJJ,.JJ_ vvUvUUvUv l J l f T TL OúCvUOvüu 11111 UüUv0UUOO 1111111 i oo-.;00Doo CDJ. 1 11i11 vuu0u0Ou0 111111111 O0ui...O1..,uOu

rrm

Slr.

bo.mary

Ne".cc,istt\ldton

""""

E , fr( flllTlit\lfC

OOAR1000

Ne> con,lrudioo

to- be ;prateckd

R •· h1m-tw• M o l < ; o o d " " ' .. da.sttr

NMII loose rurni.1.ure Conlroclor , u p p

00"'°9fd

Ntlll

at

toost fumitvre supply

f:¡: ,u

,e

ond

e<¡uipment dtcommissioriea emp!oytir's

OOOt1 r!lmO'l'tO Cll'9 .,filWlf YC;tiQII of I . 110'11 rtttv.7l 1' IJ!Qsonr}I alld retcilled NCGon o, f •DI rnodit 9(IOd mrd rénfor«d IN:11: ,ary, new n:iof 1ndu&ng C<r!mi:d Ol'KI, w o t b lO flooñ,9 l g bu1d usi a m il\Sllll na• d e m o l l'loot wrfoce.

'º

o

/

Asphall roof covering, spec J42/110 Existing roo! buildup

, . . . , _ _ _ _ . ' - , . - - - - - - -

1

New plosterboard bulkhead, refer to drowings A( 35) New AHU supported by rods conecled o new steel beoms

/1

New limber slrutlure lo supporl suspended ceiling, refer to SE informolion

Ploslerboord bul kheod suppor ed by timber frome to encase the lighting, refer to drowings A(35)

salid infill ,..,,,-New to covered skylights, J42/11 O

G.06o Surgicol Skills

New AHU supported by rods conected lo new steel beoms

New AHU supporled by rods conect ed lo new sleel beams Ll')

o .,., Ex:g parlition relained

Exg portilion retained G.09 Open pion office

/

ctural beo new AHU sleel beam E informoli

1 / E x i s l i n g struclural sleels

New ductwork under beams, refer to Services informalion

Coricrete Northlights canstruclion

New solid infill - - - - - - - - lo covered skylights, spec J42/110

New suspended ceiling lype C2, spec K40/111, refer to drowings A(35) G.05 Seminor Room

New sloped ploslerboord bulkheod to suit ceilng he¡ght, refer lo drowirigs A(35)

spec N10/240B

New FR secondory glozing_/ lo window nexl to fire scope roule, spec Ll0/581

req¡¡f' ts

to


o •

o JI

o

o

º-"

o _;

..

'

o'

º•

'

slopped plostert>oord bulkhead reatoined if feosible, rebuild' a:s required

& tin<¡

..+----+++++-+-1Gyi,from• 72 FrC 50 Chonnel suilobty filced to ffoof/ s o ffi t ot 600 mm centres

o n o

o'

o'o

o

o

i

" " - . 6 0 0 x 6 0 0 plo n, Minerot libre ceiing tegukzr lile os byoot drO'lll'ing refer to spee. K40

o

o

o

o

Steef oogte o r timber --...J ---!+H-t--t-iGypfmme botten suttobly fixed to soffit

o

il

600x-600 ploin, l.tinerol fibre ceiiing t uJor ti!e os loyout dfo.-ing refer to ,pee. K40

8PIJ2JO

Plosterboord 12 mm P l y 12.5 mm l"sulotion where ,equirtid

Mineral Fibre ceiling tile perimeter detail

Mineral Fibre ceiling tile upstand detall

SCALE

SCALE

1:S

o

º'

0

l:S

·e·

stud slritobly Gypfrome 70 S 50 fbced l o wtill 01 600 mm ctnlres

P1 Head SCALE

1 :2 sec:tion

..

3 - . - - - - - t t t t t - + - l n s t J k i t i o n wM'f'e rec¡t.ured

""'

1#-1---IPly

. .

12 mm

o •

. o

o n o

o n o

.

Plostert>oaro 12.5 mm

.(I.

o -

O f

---t++++-1---,Gypfrome 70 S 50 •e• studs at 600 mm centres -:=:,,.:'----f-ttH--f,--llnsuloti-on

• " • •

,

lil 1il

o

$

o

o

o

o

o

o

o

o

o

o

o

o

'#mere required

-----,,-,,.-,Gypfro,.. 72 f ( C 50 Chonnel suitobly ftxed to fioo,/soffit ot 600 mm cet1itres

o

600x600 pklin, Mineral fibre ceiling teglAor tite os layout drowlng refer to spec. K40

"--.600x600 in, Mineral fibre ceiling tegulor tilt os layout ! h w j n g refer l o spe<:. K40

lndicotivt skirting

-- H+H-+------,Additionol

Mineral Fibre ceiling tile bulkhead detail

Curtain track detail

SCALE

SCALE

1:S

1:S

P1 Partition Abutment SCALE

1: 2 seetioo

Mhered Single ply roofing membrone

i

150mm lnsuloljon loid l o f o l s Ex.Sting

Poropet woll

Existing roo/ wílh Vopour control loyer

-----i

20mm lnsulotion loid to folls towor<ls droinoge choMel in woll

1 1 1 11

1============1Existing

hopper & l

downpipe retoíned l 1 1 1

- 1 t,_-J======================: (

1 1 1 1

Ploolerl>oord 12.5 mm

SCALE

&ísting Poropet woll

20mm lnsolotion lo d t o fo11s tow(lrds droino9e chonnel In woll

j<,;nijng mote,\QJ bullt fill lmere gap exceeds 5 mm

P1 Base

Adllered Single ply rooHng m.embrone

Mtfl 150mm lnsulotion oldi l o folls

Cypfrome 70 s 50 ·e· stud ot junction

Ply 12 mm

---1Gyproc

1 1

i 1

.

---{1.,,frome 70 s 50 · e · stud flXed : U,rough plosttrboord to $lud ot 600 mn'\ centres in 2 l i n H stoggered by JOO mm;

o'

)'o •

1

·e·

Gyi)frome 70 S SO sluds ot 600 mm centres

1:2 section


Estudio Andrada COMPETITION, finalist project REFURBISHMENT ALFONSO XIII CAMPUS , Cartagena 2017-2018, Estudio Andrada Participation: -Project development -Plans -Images

The project aims to preserve the glory of an old engine factory and update its current internal layout to accommodate new workplace and a library. All proposed internal spaces are designed to modern standards and will be overlooking onto the existing courtyard that is now sheltered, upgrading the existing relation in/out of the most precious part of the building.


1 1 1 1 1 1 ,

,


Estudio Alvarez Sala COMPETITION, winner project REFURBISHMENT CASTELLANA 44, Madrid 2015, Estudio Álvarez-Sala Participation: -Plans drawing -Image production

The refurbishment of a building in such a privileged place shouldn’t pretend to be a referencial object but to make part of the ledge of the Paseo de la Castellana. The proposal aims to maintain and enhance its distorded scale thanks to a new porous and permeable façade with diffused limits. The size of the exterior glasses is generated by a pattern of varying heights, making the façade to loose lightness, and gradually vertical dimension. The new front follows the same structural logic as the support system of the building, through cable-stayed elements and ponctually reaching the slab out.


Estudio Alvarez Sala COMPETITION MAHOU LATINA, Madrid 2016, Estudio Alvarez Sala Participation: -Project development -Plans drawing -Image production

A fluid space is proposed that generates events capable of capturing and enhancing the environment. The program is structured around a mobile and equipped structure that is housed in the central courtyard and becomes the epicenter of temporary events. The plants are connected in this way by means of changing spaces. The fluid counterpoint to the mobile structure appears with the staircase, which extends and connects all the floors in a dynamic and natural way. A journey through space and time.


Visualisations Participation: -Image production


Contact juanbravoferrer@gmail.com 07528085486


Turn static files into dynamic content formats.

Create a flipbook
Portfolio Juan Bravo-Ferrer by Juan Bravo-Ferrer - Issuu