PORTFOLIO Juan Bravo-Ferrer Architect
Education
Contents
1990-2004 Lycée Français de Madrid Baccalauréat
2018
PROFESSIONAL WORK EXAMPLES
Universidad Europea de Madrid
Degree in architecture
Studio Seilern Architects House in Connecticut, US
Architecture PLB Barn Close, London
Professional experience 2022-2023 Studio Seilern Architects
Collab Advisor
Part 2 Architectural Assistant
2022
Architecture PLB
Wilson Mason LLP Estudio Andrada
Estudio Álvarez-Sala
Estudio Álvarez-Sala
Estudio Andrada
VISUALIZATIONS
Madrid
Part 2 Architectural Assistant
Freelance collaboration
Image production
Wilson Mason LLP
Skills
Image production
Software Revit Autocad / Microstation 3ds Max / Maxscript / Sketch Up Photoshop / Illustrator / Indesign / Premiere
Languages Spanish French English
Competition Mahou la Latina, Madrid
Madrid
Part 2 Architectural Assistant
2017
Refurbishment of building in Castellana 44, Madrid
London
Part 2 Architectural Assistant
2014-2017 Estudio Álvarez-Sala
University Alfonso XIII Campus, Cartagena
London
3D/2D Modeller Technician
2019-2020 Wilson Mason LLP
QMUL Charterhouse Square, London
London
Part 2 Architectural Assistant
2020-2022 Collab Advisor
Building Standards
London
Native C2 - Bilingual C2 - Advanced
Aditional Information 2023 ARB Registered
Studio Seilern Architects Studio Seilern Architects, residential House in Connecticut , London 2022-2023, Studio Seilern Architects Participation: -Project development -Plans, images, details -Design workshops -Suppliers contact High end residence being developped in Connecticut. The main house features a long exterior lounge and dining are with a fireplace, flanked by a long pool looking out into the sunset. Behind this area is a strip of subterranean guest areas, each with a courtyard out back. The entrance leads us to the two-story segment of the house, which features the Master Bedroom with a wide opening up to a view of the Atlantic Ocean. These areas circumscribe art gallery with a beautifully planted open space.
GL
Architecture PLB
GL
150
BARN CLOSE ROAD Bracknell, UK April 2022, Architecture PLB - Detail drawing - Accomodation design
116
9 102.5
150
9
140
21 9
25 12.5
25 12 .5
12.5 12.5
12 .5
12 .5 9mm OSB Board to timber frame Subcontractor info Mineral Wool Insulation. To Spec ref: F30/150
Velux Insulation Frame BDX to manufacturer info
Insulation to timber frame Subcontractor info
Smart Ply to timber frame Subcontractor info
Facing Brickwork. To Spec ref: F10/110
Velux EDN Front Edge 2x12.5mm Plasterboard to Spec ref: K10/170
Plasterboard lining
Timber battens
Concealed Weep Vent to spec ref: F30/132
Plywood Sheating
Sand Cement Render. To Spec ref: M20/160
Aluminium gutters to Spec ref: R10/311
Thermal Block. To Spec ref: F10/390
Perimeter insulation
MDF Skirting to Spec Ref: P20/110
Below DPC Block work. To Spec ref: F10/355
75mm Screed to Spec ref: M10/130 150mm Below Screed Insulation to Spec ref:M10/290
75
24 dwelling project Near London.
Ground Floor Level Varies refer to GA Sections & Elevations
75
10
+900 from FFL Varies refer to GA Sections & Elevations
The project responds to the north London’s climate emergency declaration and the current energy crisis, creating low-carbon, certified Passivhaus housing. Through their high thermal performance, efficient mechanical systems and photovoltaic electrical energy generation, the new homes will significantly lower occupants’ energy consumption and costs.
150
2x12.5mm Plasterboard to Spec ref: K10/170 Smart Ply by timber frame Subcontractor info External Landscape
Insulation to timber frame Subcontractor info 9mm OSB Board to timber frame Subcontractor info Mineral Wool Insulation. To Spec ref: J42/110
Below DPC Insulation
Aluminium RWP to Spec ref: R10/370 Facing Brickwork. To Spec ref: F10/110
Sealing compound
Below Ground Blockwork: F10/355
Cavity Wall Ties. To Spec ref: F30/215
Cordek below slab to SE documentation
Blinding below Cordek to SE documentation
102.5
150
9
219
25 12.5
12.5 12.5
Mineral Wool Insulation. To Spec ref: J42/110
info
Mineral Wool Insulation. To Spec Ref: F30/150
140
9
150
102.5
6
Facing Brickwork. To Spec ref: F10/110 PPL Aluminium Drip Flashing to spec ref: H72/470
25
GL
25
1313
86
9 25
145
15 0 9 Parapet Level - Varies refer to GA Sections & Elevations
200
Aluminium Capping to to Spec Ref: H72/470
150mm (min)
9mm OSB Board to timber frame Subcontractor info
subcontractor info
18
Top of Roof Structure Low Point - Varies refer to GA Sections & Elevations
Insulation to timber frame Subcontractor info 2x12.5mm Plasterboard to Spec ref: K10/170
MDF Skirting to Spec Ref: P20/110
30
Roof Level - Varies refer to GA Sections & Elevations
Perimeter insulation
Top of Flat Roof Structure
254
200
10mm Floor Finish. Varies refer to Floor Finishes
Flat Roof Structure to Specialist Design
Ground Floor - Varies refer to GA Sections & Elevations
18
Top of Roof Structure hight point - Varies refer to GA Sections & Elevations
12.5
75mm Screed to Spec ref: M10/130
150mm Below Screed Insulation to Spec ref:M10/290
254
Flat Roof Joist by Specialist timbre frame Subcontractor
Cedral Slates H61/105
12.5
9mm OSB Board to timber frame Subcontractor info
Insulation to timber frame Subcontractor info
Substructure to SE documentation
12.5
25
9mm OSB Board to timber frame Subcontractor info
Ceiling Height +2.400 m
Mineral Wool Insulation. To Spec ref: J42/110 Facing Brickwork. To Spec ref: F10/110
Counter battens
Timber Battens
12.5mm Plasterboard to Spec ref: K10/216 subcontractor info
Insulation to timber frame Subcontractor info
Timber frame Subcontractor to set out timber frame to allow/compensate for expected settlement (3 -11mm
subcontractor info
Cordek below slab to SE documentation
info
25
2x12.5mm Plasterboards K10/170 Smart Ply to timber frame Subcontractor info
12.5
To provide minimum 150mm clear void for service distribution to Spec ref: K10/216
Ceiling Height +2.400 m info
9mm OSB Board to timber frame Subcontractor info To provide minimum 150mm clear void for service distribution to Spec ref: K10/216
Sealant joint to lining Subcontractor Blinding below Cordek to SE documentation
12 0 9 21 9
12 .5 25
12 .5 12 .5
Architecture PLB GEORGE GREEN´S SCHOOL Isle of Dogs, London, UK June, July 2022 - Design process participation - Visualizations - Drawings production
Collab Advisor Collab Advisor, Building Standards 2021,Collab Advisor Participation: -Standards Design -Plans -3D Modelling -Detail drawings -CAD Management -Programming efficiency tool in 3DS Max with Maxscript Collab Advisor develops a web-based standards and design management platform that provides the information needed by project to build efficiently maintaning consistency and quality set out in the global standards. I’ve been developping a Script for the last 5 months that sets the time of a specific task in the company from a few hours to a few seconds.
Wilson Mason Architects Wilson Mason, refurbishment REFURBISHMENT CHARTERHOUSE SQUARE CAMPUS , London 2019-2020, Wilson Mason Participation: -Project development -Plans -Images -Detail drawings The project forms part of the Building Research Facilities for the Future proframme at Barts and The London Scool of Medicine and Dentistry. It aims to improve and re-purpose a number of locations across the Charterhouse Square campus to both increase and better provide spaces for the purposes of research. With limited scope for increasing building footprint on the campus, the project is focused on spaces within the existing building stock that could be better utilised with upgrade of building fabric, services and fittings, re-planning or rationalisation of accomodation. Works are proposed in 5 buildings, The William Harvey Heart Centre, The Wolfson Institute of Preventive Medicine, The John Vane Science Centre, The Joseph Rotblat Building and Dawson Hall.
J,LLJJJ,.JJ_ vvUvUUvUv l J l f T TL OúCvUOvüu 11111 UüUv0UUOO 1111111 i oo-.;00Doo CDJ. 1 11i11 vuu0u0Ou0 111111111 O0ui...O1..,uOu
rrm
Slr.
bo.mary
Ne".cc,istt\ldton
""""
E , fr( flllTlit\lfC
OOAR1000
Ne> con,lrudioo
to- be ;prateckd
R •· h1m-tw• M o l < ; o o d " " ' .. da.sttr
NMII loose rurni.1.ure Conlroclor , u p p
00"'°9fd
Ntlll
at
toost fumitvre supply
f:¡: ,u
,e
ond
e<¡uipment dtcommissioriea emp!oytir's
OOOt1 r!lmO'l'tO Cll'9 .,filWlf YC;tiQII of I . 110'11 rtttv.7l 1' IJ!Qsonr}I alld retcilled NCGon o, f •DI rnodit 9(IOd mrd rénfor«d IN:11: ,ary, new n:iof 1ndu&ng C<r!mi:d Ol'KI, w o t b lO flooñ,9 l g bu1d usi a m il\Sllll na• d e m o l l'loot wrfoce.
'º
o
/
Asphall roof covering, spec J42/110 Existing roo! buildup
, . . . , _ _ _ _ . ' - , . - - - - - - -
1
New plosterboard bulkhead, refer to drowings A( 35) New AHU supported by rods conecled o new steel beoms
/1
New limber slrutlure lo supporl suspended ceiling, refer to SE informolion
Ploslerboord bul kheod suppor ed by timber frome to encase the lighting, refer to drowings A(35)
salid infill ,..,,,-New to covered skylights, J42/11 O
G.06o Surgicol Skills
New AHU supported by rods conected lo new steel beoms
New AHU supporled by rods conect ed lo new sleel beams Ll')
o .,., Ex:g parlition relained
Exg portilion retained G.09 Open pion office
/
ctural beo new AHU sleel beam E informoli
1 / E x i s l i n g struclural sleels
New ductwork under beams, refer to Services informalion
Coricrete Northlights canstruclion
New solid infill - - - - - - - - lo covered skylights, spec J42/110
New suspended ceiling lype C2, spec K40/111, refer to drowings A(35) G.05 Seminor Room
New sloped ploslerboord bulkheod to suit ceilng he¡ght, refer lo drowirigs A(35)
spec N10/240B
New FR secondory glozing_/ lo window nexl to fire scope roule, spec Ll0/581
req¡¡f' ts
to
o •
o JI
o
o
º-"
o _;
..
'
o'
º•
'
slopped plostert>oord bulkhead reatoined if feosible, rebuild' a:s required
& tin<¡
..+----+++++-+-1Gyi,from• 72 FrC 50 Chonnel suilobty filced to ffoof/ s o ffi t ot 600 mm centres
o n o
o'
o'o
o
o
i
" " - . 6 0 0 x 6 0 0 plo n, Minerot libre ceiing tegukzr lile os byoot drO'lll'ing refer to spee. K40
o
o
o
o
Steef oogte o r timber --...J ---!+H-t--t-iGypfmme botten suttobly fixed to soffit
o
il
600x-600 ploin, l.tinerol fibre ceiiing t uJor ti!e os loyout dfo.-ing refer to ,pee. K40
8PIJ2JO
Plosterboord 12 mm P l y 12.5 mm l"sulotion where ,equirtid
Mineral Fibre ceiling tile perimeter detail
Mineral Fibre ceiling tile upstand detall
SCALE
SCALE
1:S
o
º'
0
l:S
·e·
stud slritobly Gypfrome 70 S 50 fbced l o wtill 01 600 mm ctnlres
P1 Head SCALE
1 :2 sec:tion
..
3 - . - - - - - t t t t t - + - l n s t J k i t i o n wM'f'e rec¡t.ured
""'
1#-1---IPly
. .
12 mm
o •
. o
o n o
o n o
.
Plostert>oaro 12.5 mm
.(I.
o -
O f
---t++++-1---,Gypfrome 70 S 50 •e• studs at 600 mm centres -:=:,,.:'----f-ttH--f,--llnsuloti-on
• " • •
,
lil 1il
o
$
o
o
o
o
o
o
o
o
o
o
o
o
'#mere required
-----,,-,,.-,Gypfro,.. 72 f ( C 50 Chonnel suitobly ftxed to fioo,/soffit ot 600 mm cet1itres
o
600x600 pklin, Mineral fibre ceiling teglAor tite os layout drowlng refer to spec. K40
"--.600x600 in, Mineral fibre ceiling tegulor tilt os layout ! h w j n g refer l o spe<:. K40
lndicotivt skirting
-- H+H-+------,Additionol
Mineral Fibre ceiling tile bulkhead detail
Curtain track detail
SCALE
SCALE
1:S
1:S
P1 Partition Abutment SCALE
1: 2 seetioo
Mhered Single ply roofing membrone
i
150mm lnsuloljon loid l o f o l s Ex.Sting
Poropet woll
Existing roo/ wílh Vopour control loyer
-----i
20mm lnsulotion loid to folls towor<ls droinoge choMel in woll
1 1 1 11
1============1Existing
hopper & l
downpipe retoíned l 1 1 1
- 1 t,_-J======================: (
1 1 1 1
Ploolerl>oord 12.5 mm
SCALE
&ísting Poropet woll
20mm lnsolotion lo d t o fo11s tow(lrds droino9e chonnel In woll
j<,;nijng mote,\QJ bullt fill lmere gap exceeds 5 mm
P1 Base
Adllered Single ply rooHng m.embrone
Mtfl 150mm lnsulotion oldi l o folls
Cypfrome 70 s 50 ·e· stud ot junction
Ply 12 mm
---1Gyproc
1 1
i 1
.
---{1.,,frome 70 s 50 · e · stud flXed : U,rough plosttrboord to $lud ot 600 mn'\ centres in 2 l i n H stoggered by JOO mm;
o'
)'o •
1
·e·
Gyi)frome 70 S SO sluds ot 600 mm centres
1:2 section
Estudio Andrada COMPETITION, finalist project REFURBISHMENT ALFONSO XIII CAMPUS , Cartagena 2017-2018, Estudio Andrada Participation: -Project development -Plans -Images
The project aims to preserve the glory of an old engine factory and update its current internal layout to accommodate new workplace and a library. All proposed internal spaces are designed to modern standards and will be overlooking onto the existing courtyard that is now sheltered, upgrading the existing relation in/out of the most precious part of the building.
1 1 1 1 1 1 ,
,
Estudio Alvarez Sala COMPETITION, winner project REFURBISHMENT CASTELLANA 44, Madrid 2015, Estudio Álvarez-Sala Participation: -Plans drawing -Image production
The refurbishment of a building in such a privileged place shouldn’t pretend to be a referencial object but to make part of the ledge of the Paseo de la Castellana. The proposal aims to maintain and enhance its distorded scale thanks to a new porous and permeable façade with diffused limits. The size of the exterior glasses is generated by a pattern of varying heights, making the façade to loose lightness, and gradually vertical dimension. The new front follows the same structural logic as the support system of the building, through cable-stayed elements and ponctually reaching the slab out.
Estudio Alvarez Sala COMPETITION MAHOU LATINA, Madrid 2016, Estudio Alvarez Sala Participation: -Project development -Plans drawing -Image production
A fluid space is proposed that generates events capable of capturing and enhancing the environment. The program is structured around a mobile and equipped structure that is housed in the central courtyard and becomes the epicenter of temporary events. The plants are connected in this way by means of changing spaces. The fluid counterpoint to the mobile structure appears with the staircase, which extends and connects all the floors in a dynamic and natural way. A journey through space and time.
Visualisations Participation: -Image production
Contact juanbravoferrer@gmail.com 07528085486