MENG JUNG HO Master of Architecture II
“
2018-2023
Southern California Institute of Architecture
[ STATEMENT ] Meng-Jung Ho is currently earned the Master of Architecture II degree at the Southern California Institute of Architecture. Previously, she received a Bachelor of Architecture degree with honors from Feng Chia University. Shortly after, she worked as a project designer in the CHL Architect & Associate, a prestigious architectural firm in Taipei, Taiwan, and was primarily involved in residential housing and office buildings. As she constantly inputs time and energy into the discipline, she realized that the world ‘architecture’ has a much broader definition than she thought several years ago. It can be anything instead of the containers accommodating the flows of social actions. Thus, she has forayed into anthropology and visual arts, which is outside the field of architecture, to explore possibilities of architectural design.
Mixed Used Tower Course/ DS 3GAX Revit Folly Instructor/ Andrea Cardioli Partner/ Wei-Chieh Wang, Wan-Yu Chen, Diba Ghazia, Lexin Liu
4
5
Mixed Used Tower Design Summer 2023 . Midterm Submission Package . Group B . WWJDL Hotel Wan-Yu Chen . Diba Ghazia . Meng-Jung Ho . Wei-Chieh Wang . Lexin Liu
2 A 301
www.WWJDL.com
E
Group B
Wan-Yu Chen
D
Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu
C No.
Description
Date
1 A 301
B
A
WWJDL Hotel 2
3
4
5
Basement P1
Parking Schedule Family and Type Parking Space - ADA rotate: 9' x 1 18' (5' Aisle) Parking Space rotate: 9' x 18' - 90 20 deg Parking Space: 9' x 18' - 90 deg 22
Count
Project Number Date Drawn By Checked By
1
Basement P1 1/8" = 1'-0"
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A100
1/8" = 1'-0"
8/3/2023 5:44:16 PM
1
www.WWJDL.com
2 A 301
E
Group B
D
Store 1-3
Office 1-6 Bathroom
Bathroom
1-7
1-8
Wan-Yu Chen Diba Ghazia Lobby
Meng-Jung Ho
1-4
Stock Room
Wei-Chieh Wang
1-5
Lexin Liu
C No.
1 A 301
Store
Description
Date
Store
1-1
1-2
B
A
Level
Name
Area
Level 1 Level 1 Level 1 Level 1 Level 1
Store Store Store Lobby Stock Room Office Bathroom Bathroom
710 SF 1178 SF 695 SF 2436 SF 74 SF
1-1 1-2 1-3 1-4 1-5
149 SF 32 SF 44 SF 5319 SF
1-6 1-7 1-8
Level 1 Level 1 Level 1
Room Legend
Number
1
2
3
120' - 0"
4
5
WWJDL Hotel
Bathroom
Level 1
Lobby Office Stock Room Store
Project Number Date Drawn By
2
Level 1 1/8" = 1'-0"
Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A101
1/8" = 1'-0"
8/3/2023 5:44:23 PM
1F Room Schedule
www.WWJDL.com 2 A 301
E
Group B
16' - 0"
D
Cafe 2-5
Wan-Yu Chen
20' - 0"
Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu
C F-2
1 A 301
Supplies Room Gathering Space
No.
2-6
Description
Date
2-1
20' - 0"
Gym 2-4
B
Linen Room 2-2 Bathroom 20' - 0"
2-3
20' - 0"
F-2
A 2F Room Schedule
Level 2 Level 2 Level 2 Level 2 Level 2 Level 2
Name Gathering Space Linen Room Bathroom Gym Cafe Supplies Room
Area
Number
2
3
4
5
Room Legend
1080 SF
2-1
Bathroom
339 SF
2-2
Cafe
456 SF 1461 SF 3893 SF 233 SF
2-3 2-4 2-5 2-6
7462 SF
WWJDL Hotel Level 2
Gathering Space Gym 3
Level 2 1/8" = 1'-0"
Linen Room Supplies Room
Project Number Date Drawn By Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A102
1/8" = 1'-0"
8/3/2023 5:44:32 PM
Level
1
www.WWJDL.com 2 A 301
E
Green House
Group B
3-3
D Theater
Wan-Yu Chen
3-4
Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu
C 1
Supplies Room
A 301
3-5
No.
Description
Date
B
Conference Room
Conference Room
3-1
3-2
A
Room Legend
3F Room Schedule
Level 3 Level 3 Level 3 Level 3 Level 3
Name
Area
Conference 809 SF Room Conference 703 SF Room Green 545 SF House Theater 1042 SF Supplies 298 SF Room 3395 SF
1
Number 3-1
2
3
4
5
WWJDL Hotel
Conference Room Green House
3-2
Level 3
Supplies Room
3-3
Theater
3-4 3-5
Project Number Level 3 4 1/8" = 1'-0"
Date Drawn By Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A103
1/8" = 1'-0"
8/3/2023 5:44:41 PM
Level
www.WWJDL.com 2 A 301
E
Standard Room
Standard Room
Standard Room
Standard Room
4-6
4-7
4-8
4-9
Pool 4-11
Group B D Wan-Yu Chen Diba Ghazia Meng-Jung Ho
Game Room 4-13
Wei-Chieh Wang Lexin Liu
C 1 A 301
Supplies Room
No.
4-12
Description
Date
Janitor Shower Room
4-10
4-14 Massage Room 4-15
B Manicure Room 4-16 Sauna Room Standard Room
Standard Room
Standard Room
Standard Room
Standard Room
4-1
4-2
4-3
4-4
4-5
4-17
A 4F Room Schedule Name
Area
Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4 Level 4
Standard Room Standard Room Standard Room Standard Room Standard Room Standard Room Standard Room Standard Room Standard Room Janitor Pool Supplies Room Game Room Shower Room Massage Room Manicure Room Sauna Room
546 SF 549 SF 549 SF 549 SF 546 SF 546 SF 549 SF 549 SF 546 SF 156 SF 559 SF 298 SF 547 SF 251 SF 150 SF 276 SF 211 SF 7376 SF
Number 4-1 4-2 4-3 4-4 4-5 4-6 4-7 4-8 4-9 4-10 4-11 4-12 4-13 4-14 4-15 4-16 4-17
2
3
4
5
WWJDL Hotel
Game Room Janitor
Level 4
Manicure Room Massage Room
5
Level 4 1/8" = 1'-0"
Pool
Project Number
Sauna Room
Date
Shower Room
Drawn By
Standard Room
Checked By
Supplies Room Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A104
1/8" = 1'-0"
8/3/2023 5:44:48 PM
Level
1
Room Legend
www.WWJDL.com 2 A 301
E
Standard Room
Standard Room
Standard Room
Standard Room
5-6
5-7
5-8
5-9
Group B D Wan-Yu Chen Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu Pop-up Shop
C
Pop-up Shop
5-12
5-13
1 A 301
Supplies Room
No.
5-11
Description
Date
B
Relaxation Area 5-10 Standard Room
Standard Room
Standard Room
Standard Room
Deluxe Room
5-1
5-2
5-3
5-4
5-5
Room Legend
5F Room Schedule
Level 5 Level 5 Level 5 Level 5 Level 5 Level 5 Level 5 Level 5 Level 5 Level 5 Level 5 Level 5 Level 5
Name Standard Room Standard Room Standard Room Standard Room Deluxe Room Standard Room Standard Room Standard Room Standard Room Relaxation Area Supplies Room Pop-up Shop Pop-up Shop
Area
Number
429 SF
5-1
433 SF
5-2
433 SF
5-3
433 SF
5-4
695 SF
5-5
429 SF
5-6
433 SF
5-7
433 SF
5-8
429 SF
5-9
727 SF
5-10
298 SF
5-11
242 SF
5-12
288 SF
5-13
5701 SF
Deluxe Room
A
Pop-up Shop 1
2
3
4
5
WWJDL Hotel
Relaxation Area Standard Room
Level 5
Supplies Room
Project Number Date 6
Level 5 1/8" = 1'-0"
Drawn By Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A105
1/8" = 1'-0"
8/3/2023 5:44:54 PM
Level
5
4
3
2
1
Level 6 70' - 0"
Level 5 60' - 0" www.WWJDL.com
Level 4 50' - 0"
Level 3 30' - 0"
Level 2 20' - 0"
Group B
Wan-Yu Chen
Level 1 0' - 0"
Diba Ghazia Meng-Jung Ho Wei-Chieh Wang
1
North Elevation 1/8" = 1'-0"
Lexin Liu
1
2
3
4
5 No.
Description
Date
Level 6 70' - 0"
Level 5 60' - 0"
Level 4 50' - 0"
Level 3 30' - 0"
Level 2 20' - 0"
WWJDL Hotel
Level 1 0' - 0"
Project Number Date Drawn By Checked By
2
South Elevation 1/8" = 1'-0" Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A 201
1/8" = 1'-0"
8/3/2023 5:45:54 PM
North and South Elevations
A
B
C
D
E
Level 6 70' - 0"
Level 5 60' - 0"
www.WWJDL.com
Level 4 50' - 0"
Level 3 30' - 0"
Level 2 20' - 0"
Group B
Wan-Yu Chen Diba Ghazia
Level 1 0' - 0"
Meng-Jung Ho Wei-Chieh Wang
3
Lexin Liu
East Elevation 1/8" = 1'-0"
E
D
C
B
No.
A
Description
Date
Level 6 70' - 0"
Level 5 60' - 0"
Level 4 50' - 0"
Level 3 30' - 0"
WWJDL Hotel
Level 2 20' - 0"
Project Number Date Level 1 0' - 0"
Drawn By Checked By
4
West Elevation 1/8" = 1'-0"
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A 202
1/8" = 1'-0"
8/3/2023 5:46:36 PM
East and West Elevations
5
2 A 301
4
3
2
1 Level 6 70' - 0"
Level 5 60' - 0"
Level 4 50' - 0"
www.WWJDL.com
Level 3 30' - 0"
Level 2 20' - 0"
Group B Level 1 0' - 0"
Wan-Yu Chen Diba Ghazia Meng-Jung Ho Basement -18' - 0"
Wei-Chieh Wang Lexin Liu
1
Section 1 1/8" = 1'-0"
A
B
1 A 301
C
D
E Level 6 70' - 0"
No.
Description
Date
Level 5 60' - 0"
Level 4 50' - 0"
Level 3 30' - 0"
Level 2 20' - 0"
WWJDL Hotel Sections Project Number Date Drawn By Checked By Basement -18' - 0"
2
Section 2 1/8" = 1'-0"
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A 301
1/8" = 1'-0"
8/3/2023 5:47:23 PM
Level 1 0' - 0"
www.WWJDL.com
Group B
Wan-Yu Chen Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu
No.
Description
Date
WWJDL Hotel
3
Section Perspective
Project Number Date Drawn By Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A 302
8/3/2023 5:50:51 PM
Section Perspective
Pop-up Shop
Standard Room www.WWJDL.com
Pool
Game Room Standard Room
Group B
Wan-Yu Chen Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu
Green House Theater Indoor Garden
No.
Description
Date
Cafe
Linen Room Gym
WWJDL Hotel 30
Lobby '-
0"
61
'-
23
'
/32
"
5" 5 2 /3
0" ' 30 " 2 3 9/ 1 -0
27
9
'-
10
"
3
2'
0
1 5 " '23 9 / 251
Store
Project Number Date Drawn By Checked By
5
Exploded ISO
Scale
2023001 27, July, 2023 Group B Checker
A 303
8/3/2023 5:51:08 PM
Exploded Iso
www.WWJDL.com
Group B
Wan-Yu Chen
Wall
Diba Ghazia Meng-Jung Ho
Plaster
Wei-Chieh Wang Insulation
Lexin Liu
2"*2" Profile
Technowood ALU Profile
0' - 1 1/2"
No.
Description
Date
0' - 4"
0' - 2"
3' - 5"
Solid Wood Finish
3' - 10"
Technowood ALU Profile 2"*2" Profile Insulation
Wall
Technowood ALU Profile
3' - 10"
Plaster
WWJDL Hotel Facade Details
2"*2" Profile
Slab
Wall
Project Number Date Drawn By Checked By
Scale
2023001 27, July, 2023 Group B Checker
A 304
8/3/2023 6:10:29 PM
Plaster
3' - 5"
Insulation
15' - 0"
15' - 0"
10' - 0"
10' - 0"
5' - 0"
5' - 0"
6' - 0 1/2"
6' - 0 1/2"
www.WWJDL.com
7' - 6" A.F.F.
1' - 10"
Finish_Marble
GWB on Mtl. Stud
7' - 0"
3' - 0"
Group B
Wan-Yu Chen Diba Ghazia
Wei-Chieh Wang
21' - 1 1/2"
22' 1/2" 22'-- 11 11 1/2"
Meng-Jung Ho
Finish_Carpet
Lexin Liu
GWB on Mtl. Stud 8' - 0" A.F.F. No.
Description
Date
11' 10" 11' -- 10"
11' - 10"
GWB on Mtl. Stud
Finish_Granite Tile
8' - 6" A.F.F.
WWJDL Hotel
Project Number Date 1
Level 4 Floor Plan Detail 1/2" = 1'-0"
2
Level 4 Ceiling Detail 1/2" = 1'-0"
Drawn By Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A 305
1/2" = 1'-0"
8/3/2023 5:51:10 PM
Hotel Room Detail
60' - 4" 29' - 11 27/32" 5' - 0"
18' - 11 27/32"
6' - 11 5/32"
14' - 6"
8' - 11"
7' - 6"
6' - 0"
30' - 4"
www.WWJDL.com
10' - 0"
B
5' - 0"
19' - 0"
36' - 6"
6' - 0"
Group B
11' - 6"
11' - 6"
A Wan-Yu Chen Diba Ghazia
3
4
5
Meng-Jung Ho Wei-Chieh Wang
1
Lexin Liu
Level 5 Floor Plan Detail 3/16" = 1'-0"
60' - 4" 29' - 11 27/32" 5' - 0"
18' - 11 27/32"
6' - 11 5/32"
14' - 6"
8' - 11"
No.
Description
Date
3' - 1"
2' - 11"
3' - 8"
10' - 5"
11' - 10"
6' - 11"
11' - 0"
5' - 6"
9' - 11"
6' - 2"
19' - 0"
3' - 11 5/32"
8' - 0"
6' - 2"
10' - 8 31/32"
2' - 2"
3' - 4"
7' - 0"
5' - 6"
3' - 4"
10' - 0"
3' - 4"
B
7' - 0"
7' - 6"
4' - 9"
6' - 0"
30' - 4"
11' - 6"
11' - 6"
WWJDL Hotel
3' - 6"
11' - 6"
A
Recessed Light -10"
3
Level 5 Ceiling Detail 2 3/16" = 1'-0"
4
5
Recessed Light - 1'-5"
Relaxation Area+Deluxe Room Detail 2023001
Project Number
Recessed Linear Light-2'x2'
Date
Wall-Mounted Light
Drawn By Checked By
Scale
27, July, 2023 Group B Checker
A 307
3/16" = 1'-0"
8/3/2023 5:51:15 PM
3' - 6"
www.WWJDL.com
Group B
Wan-Yu Chen Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu
1
3D View 1
4
3D View 2
No.
Description
Date
WWJDL Hotel
Project Number Date Drawn By 3
3D View 3
2
3D View 4
Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A 401
8/3/2023 5:53:32 PM
3D Views
www.WWJDL.com
Group B
Wan-Yu Chen Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu
No.
Description
Date
WWJDL Hotel
Project Number Date Drawn By Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A 402
8/3/2023 5:53:32 PM
Renders
www.WWJDL.com
Group B
Wan-Yu Chen Diba Ghazia Meng-Jung Ho Wei-Chieh Wang Lexin Liu
No.
Description
Date
WWJDL Hotel
Project Number Date Drawn By Checked By
Scale
2023001 27, July, 2023 Group B Andrea Cadioli
A 403
8/3/2023 5:53:33 PM
Renders
SYN-Biotech World Headquarters Course/ AS3222 Design Development and Documentation Instructor/ Zach Burns, Herwig Baumgartner Partner/ XinYuan Yue, Yiyu Zhoug, Hanna Park, Jenny Cook, Jila Mendoza, Jiangyao Shen, Sijia Li, Wei-Chieh Wang
To achieve the goal of carbon neutrality by 2050. Company Bio, founded by the United Nations, aims to simulate a fungus that can find food in the shortest path between two points to collect excess carboon from the natural environment. The design method is chunk interation. Committed to promoting the integratioon of various functional blocks to connect human space and non-human space without barriers. The substantial spaces are mainly laboratories, research centers and exhibition hall, while void spaces are large
6
gathering spacess and main eexperimenttal arreas. We investigates issues related to the implementation of design: technology, the use of materials, systems integration, and the archetypal analytical strategies of force, order and character.
7
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
float es to ases. float es to ases.
c and and c and and
8
9
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
N
SITE The site of the project is located in the city of El Segundo of Los Angeles County. Situated south of LAX airport and just inland of the Pacific coast. The area of the lot that our studio will work on is approximately 185,00sf, at the corner of Nash St. and E. Grand Ave.
10
11
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
8th Floor Plan Scale: 3/125” = 1’-0”
12
13
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
N
SECTION AA'
A
A’
+196.85 ft +179.13 ft
+147.64 ft
+105.97 ft
+87.43 ft
0.00 ft
-32.80 ft
14
15
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
N
EAST EVELATION
A
A’
+196.85 ft +179.13 ft
+147.64 ft
+105.97 ft
+87.43 ft
0.00 ft
-32.80 ft
16
17
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
STRUCTURAL SYSTEM
Excavation
Raft Foundation
Soldier Pile
Lagging Wall
15 cm PC Footing and
Concrete Core
60*200 cm Tie Beam
50 cm RC Footing
Steel Truss
18
Steel I-Beam
80*200 cm Tie Beam
80*80 cm
60*80 cm
Concrete Column
Concrete Beam
15 cm Concrete Wall
Floor Decking
Chord: Steel I-Beem
Web: Steel I-Beam
Steel I-Beam
20cm Composite
100*30*1.9*3.6cm
60*20*1.0*1.5cm
60*20*1.0*1.5cm
Floor Decking
19
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
Chunk B
Chunk C
Chunk A
Chunk A
20
Chunk B
Chunk C
21
Southern California Institute of Architecture
Stone Sheet Panel Facade
Stone Sheet A Panel Facade
Wall Detail A1
Wall Detail A1
B
Meng-Jung Ho | SYN-Biotech World Headquarters
Stone Sheet B A Panel Facade
Wall Detail A2
Wall Detail A2
Skylight Ceiling
Skylight Ceiling
Skylight Ceiling
Glass Curtain Wall System
C B
C
Wall Detail B1
Wall Detail B1
Wall Detail B1
Wall Detail B2
Wall Detail B2
Wall Detail B2
Wall Detail B3
Wall Detail B3
Wall Detail B3
Wall Detail C1
Wall Detail C1
Wall Detail C1
Wall Detail C2
Wall Detail C2
Wall Detail C2
Glass Curtain Wall System
Wall Detail A3
Wall Detail A3
Wall Detail A3
Honeycomb Stone Panel
Honeycomb Stone Panel
Honeycomb Stone Panel
Aluminum Tube
Aluminum Tube
Aluminum Tube
Chunk A
22
A
Wall Detail A1
Wall Detail A2
Glass Curtain Wall System
C
Chunk A
Wall Detail C3
Chunk A
Chunk B
Chunk B
Chunk B
Chunk C
Chunk C
Wall Detail C3
Wall Detail C3
Chunk C
23
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
Corner Detail A1-1
USG Grid Load Transform Bracket
Sealant and Backer Rod
Hanger Wire 1.2m x 2.4m Stone Panel 4mm Vapor Barrier 3/8” Exterior Sheathing Metal Stud 16” O.C. Pressed Steel Ceiling Section USG Drywall Suspension System Steel Beam
Interlocking Channel Attachment #10 (5mm) Tek Screws Shim
6” x 8” Steel Tube
A1 Exterior Wall Detail Scale: 1/2” = 1’-0”
24
A1-1 Corner Detail Scale: 2” = 1’-0”
25
Southern California Institute of Architecture
Bracket Anchored in Front of Slab
Bracket Anchored in Front of Slab
Corner Detail A2-1
Corner Detail A2-1
Steel Beam
Steel Truss
26
Meng-Jung Ho | SYN-Biotech World Headquarters
Hanger Wire
Hanger Wire
Air Duct System
Air Duct System
USG Grid Load Transform Bracket
USG Grid Load Transform Bracket
Pressed Steel Ceiling Section
Pressed Steel Ceiling Section
USG Drywall Suspension System
USG Drywall Suspension System
Aluminum Exterior Closure
Aluminum Exterior Closure
Rigid Foam Insulation
Rigid Foam Insulation
Aluminum Angled Tube
Aluminum Angled Tube
5/16” Weep Hole
5/16” Weep Hole
Pressure Plate with Isolator
Pressure Plate with Isolator
Gasket Shear Block attach to Horizontal
Gasket Shear Block attach to Horizontal
Horizontal
Horizontal
1” Vision Glass on Setting Block
1” Vision Glass on Setting Block
A2-1 Corner Detail
A2-1 Corner Detail
Steel Beam
Steel Truss
A2 Exterior Wall Detail
A2 Exterior Wall Detail
Scale: 1/2” = 1’-0”
Scale: 1/2” = 1’-0”
Scale: 2” = 1’-0”
Scale: 2” = 1’-0”
27
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
Clip for Supporting Stone Sheet Panel 0.3” Stone Sheet Panel 1” Honeycomb Stone Panel 1” Vision Glass on Setting Block Reliance Glass Mullion
14” x 10” Aluminum Tube
Perimeters Column encased in prefabricated fibrous plaster column casing/fire proofing
0.7” Finished Floor 3.5” Thermal and Acoustic Insulation 3.5” Concrete Floor Slab 6.5” Underslab Thermal Insulation
0.8” Acoustic False Ceiling
A3 Exterior Wall Detail
28
29
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
6.5” Underslab Thermal Insulation Perimeters Column Encased in Prefabricated Fibrous Plaster Column Casing/fire Proofing
Concrete Panel Metal Decking Steel Beam
Hanger Wire 0.8” Acoustic False Ceiling
B1 Exterior Wall Detail
30
31
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
Opening Light with Clear Triple Opening Glazing: Light with Clear Triple Glazing: Low-iron Float Glass in Aluminium Low-ironFrame Float Glass in Aluminium Frame
Metal Decking
Metal Decking Steel Transform
Silicone Gasket Concrete Panel
Metal Decking
4mm Vapor Barrier
4mm Vapor Barrier
Honeycomb Stone Panel
Honeycomb Stone Panel
Waterproof
Waterproof
Aluminum Tube
Aluminum Tube
Steel Transform
Silicone Gasket
Concrete Panel
B2 Exterior Wall Detail B2 Exterior Wall Detail
32
Metal Decking
B3 Exterior Wall Detail B3 Exterior Wall Detail
33
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
4 mm Aluminium Parapet Coping on 40x40 mm Steel Tube Sealant Textile Polymer-modified Bituminous Sealant Layer min. 80 mm Mineral Wool Thermal Insulation to Falls 180 mm Substrate Layer with Subsurface Irrigation Filter Fleece and Root Barrierturf 40 mm Drainage Layer; Vapour Barrier 90 mm Extruded Polystyrene Insulation Hot-melt Bituminous Waterproof Board; 90 mm Reinforced Concrete Roof; 145 mm Extruded Polystyrene Insulation
600x200mm Steel I-beam with 30 mm Fire Proofing
1200x600x20mm Stone Panel 20x20 Steel Cladding Tie
2x Hot-melt Bituminous Waterproof Board 90 mm Reinforced Concrete Wall
90 mm Compressed Translucent Glass-fibre Insulation with Fibre-cement Composite Panel
C1 Exterior Wall Detail
34
35
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
1200x600x20 mm Stone Panel 20x20 Steel Cladding Tie 2x Hot-melt Bituminous Waterproof 90 mm Reinforced Concrete Wall
180 mm Substrate Layer with Subsurface Irrigation Filter Fleece and Root Barrier
Opening Light with Clear Triple Glazing
90 mm Compressed Translucent Glass-fibre Insulation with Fibre-cement composite panel
Vinyl Flooring with 90 mm Acoustic Rubber 18 mm Monolithic Screed
40 mm Drainage Layer; Vapour Barrier
Low-iron Float Glass in Aluminium Frame
90 mm Extruded Polystyrene Insulation Hot-melt Bituminous Waterproof Board
120x60x2 cm Stone Panel 20x20 Steel Cladding Tie
90 mm Reinforced Concrete Roof 145 mm Extruded Polystyrene Insulation
120x60x2 cm Stone Panel 20x20 steel Cladding Tie 145 mm Mineral-wool Insulation 600/200 mm Steel I-beam with 30 mm Fire Proofing
90 mm Reinforced Concrete Wall 2x Hot-melt Bituminous Waterproof Board 5 mm Powder-coated Sheet Aluminum Soffit
C2 Exterior Wall Detail
36
C3 Exterior Wall Detail
37
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
REFLECTED CEILING PLAN (RCP) Linear Pendant Ceiling Light Recessed Light Exit Sign - Ceiling Mounted Exit Sign - Wall Mounted Fire Sprinkler Linear Diffuser
Exit Sign-Ceiling Mounted Fire Sprinkler Distance between Sprinklers/ 14ft Radius of Water/ 12ft Exit Sign-Wall Mounted
Recessed Light
Linear Pendant Linear Diffuser
Linear Diffuser
38
Linear Pendant
Recessed Light
Exit Sign Ceiling Mounted
Fire Sprinkler
39
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
ENVIRONMENTAL SYSTEMS Summary
Strategy
The solar radiation diagram represents that the radiation is mainly exposed in the South of the building throughout the average day. Most of the direct radiation can be found on the roof. The secondary region that receives sunlight is the East side of the site. It allows natural daylight into the space to reduce electric lighting and save energy. However, it may also produce excessive heat gains and losses, which increase the air-conditioning cooling or heating load. To avoid these problems, we have to consider the combined effect of daylight and energy.
The Low-E Glazing allow enough daylight inside the building and also helps block infrared light from penetrating the glass from the outside. In addition, Low E helps keep the heating/ cooling energy.
Solar Radiation Diagram
40
Solar Radiation Diagram
Direct Sun Hour Diagram
Direct Sun Hour Diagram
41
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
ENVIRONMENTAL SYSTEMS Summary Average Wind Speed 4 m/s - 8 m/s The natural ventilation diagram shows that the prevailing wind comes from the West and WestSouth-West. This allows for naturally ventilated air to flow through the rooms. From the analysis, fenestration from the West and South elevation of the proposed design could be improved in order to benefit from the maximum natural ventilation possible. Also, the design could be structurally reinforced in preparation for the wind load applied during the windy season.
Strategy
42
43
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) HVAC System
180*60cm Return Duct
180*60cm Ventilation Duct
180*60cm Supply Duct
Boiler Chiller
Chilled Water and Heating Hot Water to Air Handling Units 815*255*240cm Air Handling Unit
44
45
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) Plumbing System
Electricity and Telecom System
Electrical
Grey Water Discharge
Telecom From Utility
Black Water to Sewer
Potable Water Supply
Black Water Discharge
Main Electrical Room
Grey Water Tank Trickle Filter Setting Tank
From Utility
Reclaimed Water to Irrigation
46
47
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
EGRESS
Floor 10 (+ 4800) Area : 44,148 sqft. Occ. Group: B (Office) Occ. Load: 441 Exit: 2
Core 5
Floor 7 (+ 3300) Core 1
Area : 50,401 sqft. Occ. Group: B (Office) Occ. Load: 504 Exit: 2
Floor 6 (+ 2800) Area : 62,648 sqft. Occ. Group: A1(Assembly), B(Office), U(Utility) Occ. Load: 850 Exit: 2
Core 3
Floor 5 (+ 2300) Core 2
Area : 20,070 sqft. Occ. Group: B(Office), U(Utility) Occ. Load: 850 Exit: 2
Floor 4 (+ 1800) Area : 26,621 sqft. Occ. Group: B(Office) Occ. Load: 266 Exit: 2
Core 4
Floor 3 (+ 1300) Area: 6,863 sqft. Occ. Group: E(Educational) Occ. Load: 343 Area: 26,030 sqft. Occ. Group: B (Office) Occ. Load: 260
Area : 30,926 sqft. Occ. Group: E(Educational) Occ. Load: 1546 Exit: 2
Floor 3 Area: 5,429 sqft. Occ. Group: A3(Museum) Occ. Load: 362
Floor 2 (+ 800)
Area: 6,863 sqft. Occ. Group: E(Educational) Occ. Load: 343 Floor 5 Area: 3,766 sqft. Occ. Group: U(Utility) Occ. Load: 13
Floor 3 Area: 6,103 sqft. Occ. Group: B(Office) Occ. Load: 61
Area : 42,108 sqft. Occ. Group: B(Office) Occ. Load: 421 Exit: 2
Floor 1 (+ 0) Area : 32,893 sqft. Occ. Group: B(Office), E(Educational) Occ. Load: 603 Exit: 2 Floor Area in sqft. Per Occupant
Floor 1
48
Floor 3, 5
A1: 11gross B: 100gross E: 20net
A3: 15net U: 300gross
49
Southern California Institute of Architecture
Meng-Jung Ho | SYN-Biotech World Headquarters
ADA
Elevators (ADA Accessible)
ADA Toilet (A1)
50
ADA Elevator
A1
ADA Toilet Detail
A2
ADA Parking Lot Detail
Ramp for ADA and Parking Lot Entrance (A2)
51
DESIGN NO.
Southern California Institute of Architecture
UL U419
FIRE RATING: STC RATING: SOUND TEST: SYSTEM THICKNESS: LOCATION: FRAMING TYPE:
Fire Separation Occ. Groups: A3, B, E, U Stories: 12 Height: 197’ Construction Type: 1B per table 503 Sprinklered: Yes Fire Resistance per Table 601 Bearing Walls: Exterior 2hrs Bearing Walls: Interior 2hrs Non Bearing Walls: 0hrs Floor: 2hrs Roof:1hrs
Meng-Jung Ho | SYN-Biotech World Headquarters 2 HOURS 58 USG-161225 6-5/8" [168 MM] INTERIOR STEEL STUD (NONLOAD-BEARING)
6 5/8"
16" [406 mm]
16" [406 mm]
16" [406 mm]
[168 mm]
16" [406 mm]
2hrs Fire Separation Wall Assembly Gypsum Panels: Two Layers 5/8” Gypsum Panel Resilent Channel: 1/2” Resilent Channel Steel Studs: 3-5/8” Steel Studs Insulation: 3-1/2” Fiberglass Insulation Gypsum Panels: Two Layers 5/8” Gypsum Panel
ASSEMBLY REQUIREMENTS: GYPSUM PANELS: RESILIENT CHANNEL: STEEL STUDS: INSULATION: GYPSUM PANELS:
TWO LAYERS 5/8" [15.9 MM] SHEETROCK® GYPSUM PANEL (UL TYPE SCX) 1/2" [12.7 MM] RESILIENT CHANNEL, 25 GA. (0.018"), 24" [610 MM] O.C. 3-5/8" [92 MM] STEEL STUDS, EQ20 (0.018"), 16" [406 MM] O.C. 3-1/2" [89 MM] FIBERGLASS INSULATION TWO LAYERS 5/8" [15.9 MM] SHEETROCK® GYPSUM PANEL (UL TYPE SCX)
GENERAL WALL NOTES: 1. REFER TO APPLICABLE CODES REQUIREMENTS TO ENSURE COMPLIANCE PRIOR TO CONSTRUCTION. 2. FOR THE MOST UP-TO-DATE DETAILS, INCLUDING CONSTRUCTION VARIATIONS, REFER TO THE PUBLISH 3. WHERE DESIGN NO. INDICATES “PER”, THE FIRE RATING IS BASED ON LABORATORY TEST DATA OF THE SIMILARLY CONSTRUCTED ASSEMBLIES. 4. STUD SIZES AND INSULATION THICKNESS ARE MINIMUM UNLESS OTHERWISE STATED IN THE PUBLISHE 5. STUD AND FASTENER SPACINGS ARE MAXIMUM UNLESS OTHERWISE STATED IN THE PUBLISHED ASSEM 6. PANEL ORIENTATION SHALL BE AS SPECIFIED IN THE PUBLISHED DESIGN. 7. FIRE-RATINGS ARE FROM BOTH SIDES UNLESS OTHERWISE STATED. 8. FIRE-RATINGS ARE MAINTAINED WITH ONE OR MORE OF THE FOLLOWING MODIFICATIONS: INCREASE S INCREASE STUD MATERIAL THICKNESS, DECREASE STUD SPACING, DECREASE FASTENER SPACING, IN INSULATION THICKNESS UP TO CAVITY DEPTH. 9. WHERE ACOUSTICAL PERFORMANCE IS PROVIDED IN AN ESTIMATED RANGE, THE VALUES ARE BASED O LABORATORY TEST DATA OF SIMILARLY CONSTRUCTED ASSEMBLIES. 10. SOUND-RATINGS ARE MAINTAINED WITH ONE OR MORE OF THE FOLLOWING MODIFICATIONS: INCREASE DECREASE STUD MATERIAL THICKNESS, INCREASE STUD SPACING, INCREASE FASTENER SPACING, INC INSULATION THICKNESS UP TO CAVITY DEPTH. MODIFICATIONS MUST NOT EXCEED LIMITATIONS OF FIR
1hr Fire Separation
Office (B)
Office (B) USG Corporation 550 West Adams Street Chicago, IL 60661 USA www.USG.com T. 800-USG4YOU
DISCLAIMER: THE USG PRODUCT INFORMATION CONTAINTED HEREIN ARE INTENDED FOR USE AS PRODUCT REFERENCE MATERIAL BY ARCHITECTS, ENGINEERS, AND OTHER DESIGN PROFESSIONALS, CONTRACTORS, BUILDING CODE OFFICIALS, OR OTHER COMPETENT CONSTRUCTION INDUSTRY TRADE PROFESSIONALS HAVING AN INTEREST IN THE SELECTION, SPECIFICATION, AND USE OF PRODUCTS MANUFACTURED BY THE SUBSIDIARIES OF USG CORPORATION. THE DRAWINGS ARE INTENDED SOLELY AS TECHNICAL SUPPORT INCIDENT TO THE SALE AND USE OF USG PRODUCTS AND NOT INTENDED TO BE A SUBSTITUTE FOR THE DESIGN REVIEW AND APPROVAL OF THE LICENSED DESIGN PROFESSIONALS FOR THE PROJECT. THESE MATERIALS MAY BE PRINTED AND/OR TRANSFERRED ELECTRONICALLY SOLELY AS NEEDED BY THE USER. BECAUSE CAD ELECTRONIC FILES AND BIM (BUILDING INFORMATION MODELING) FILES CAN BE MODIFIED BY OTHER PARTIES, WITHOUT NOTICE OR INDCATION OF SUCH MODIFICATIONS, MODIFCATION OF USG PRODUCT CAD DRAWINGS IS THE SOLE RESPONSIBILITY OF THE DESIGN PROFESSIONAL.
UL U419 Utility (U)
ISSUE RECORD: Revision Date
SHEET INFORMATION:
SN-P-2-1
10/05/2021 11:50:59 PM
Museum (A3)
2hrs Fire Separation
Library (A3)
Education (A3)
No Fire Separation Required
52
53
PARABIOSIS Course/ VS 2GBX Generative Morphologies Instructor/ Damjan Jovanovic Partner/ Wei-Hung Chen, Wen-Yu Chen
54
As time moved on, human civilization’s environment changed tremendously with their technology. Global warming and extreme climate make people put in all their effort to save their asses by developing AI technology.
earth, which ultimately turned it into a harsh environment that humans can’t survive. Because of reconstructing the environment, AI becomes the character to maintain the livable environment and climate suitable for humans to live.
2066 is the age of super-intelligent android (AI). Billions of machines span the world. Super-intelligent androids develop their mind and dominate the world. Since superior to humans in almost every aspect, AI brings enormous breakthroughs in technology and fixes most of the problems created by humans, such as the people’s damage to mother
In the end, it becomes a world of humans, and the androids’(AI) coexisted . Human’s commensalism relationship with their intellectually superior masters goes on for several generations.
55
Southern California Institute of Architecture
Meng-Jung Ho | Parabiosis
2044 Human civilization’s environment changed tremendously with their technology.
56
57
Southern California Institute of Architecture
2044 Earth became icy. The pollutants scattered around the world by the tsunami freeze with the seawater.
58
Meng-Jung Ho | Parabiosis
2044 Ninety-seven percent of the Earth's land has been severely polluted, and only a few lucky survivors have left the planet. People have also broken down all barriers and united in this disaster.
59
Southern California Institute of Architecture
Meng-Jung Ho | Parabiosis
2066 In the future, new beings will emerge from existing artificial intelligence systems. They will think 10,000 times faster than we do and they will regard us as we now regard plants.
60
61
Southern California Institute of Architecture
Meng-Jung Ho | Parabiosis
2066 Violent machine takeover of the planet imagined by science fiction.
62
63
Southern California Institute of Architecture
2066 These hyper intelligent beings will be as dependent on the health of the planet as we are.
64
Meng-Jung Ho | Parabiosis
2066 A new age of human-nonhuman interdependence and cooperation will arise, and we will be partners in this project.
65
Southern California Institute of Architecture
Meng-Jung Ho | Parabiosis
2066 After years of observation and monitoring, all data indicates suitable for human habitation.
66
67
M(O)CKED Course/ VS 2GAX Visual Studies Instructor/ William Virgil Partner/ Zarina Farmer-George
“We Wear the Mask” is a lyrical poem by Paul Laurence Dunbar, about the lives of African Americans after the Civil War. The poet explains how the people had to pretend that everything is better and the mental torture they went through. The popularity of the poem lies in the fact that it reflects the miserable plight of African Americans forced to hide their painful realities and frustrations under the mask of happiness and contentment. In the poem, the mask is a metaphor for human duplicity and concealment. There is a suggestion
68
that the mask’s role in human life is inevitable. The mask is referred to as “this debt we pay to human guile,” indicating that the mask is inextricably connected to—and perhaps a product of—the human capacity for deceit and duplicity. The poet illustrates the effect of suffering endured by black people due to their race. As a result, they are compelled to learn the art of fake happiness. Not only did this art saves them from racial discrimination, but it also enables them to keep their real pain hidden from the world.
69
Southern California Institute of Architecture
Meng-Jung Ho | M(o)cked
MASKED The masks we wear are a form of protection. We wear them to protect, not only ourselves, but people around us from our burdens. The helmet-style mask signifies the barrier of protection that we use in this manner. The helmet is made of two layers, a thinner under layer that is fragile to the dangers of the outside world. The thicker outer layer is a pretty flowery layer, meant to cover and protect the thinner layer of the mask. The mask we wear is easy for the eyes to digest; it's pretty and inviting. The snakes on the mask represent the intrusive thoughts we have sometimes, slithering to the back of our heads. The snakes are also a representation of other people's thought about us, infiltrating our minds. The hand on the mask, although pretty and decorative, is there to maintain silence among the mask-wearer. It's there as a preventative measure, to make sure the maskwearer's real feelings aren't accidentally spilled.
70
71
VI(O)lET FEEL'DS Course/ VS 2GAX Visual Studies Instructor/ Kumaran Parthiban Partner/ Zarina Farmer-George
Terraforming or terraformation is the hypothetical process of deliberately modifying the atmosphere, temperature, surface topography, or ecology of a planet, moon, or other body to be similar to the environment of Earth to make it habitable by Earth-like life. As the final terrain to endure at the end of a lengthy journey, the beautifully familiar Violet Feel’ds tantalizes the exhausted and desperate hero with the feeling of comfort and delicious serenity. Before they prepare to meet with their most ferocious and vicious match, they lay their head on a
72
sturdy crystal and fall into a nap on the tall soft grasses. But horror soon arises as giant, jewelryadorned hands break open the sky and whisk them above taking them to meet their fate and fulfill their prophecy... (If only the hero would’ve noticed the giant broken pieces of armor laying about).
73
Southern California Institute of Architecture
Meng-Jung Ho | Vi(o)let Feel’ds
TERRAIN Landscape with hairy texture which provides a soft and calm atmosphere.
74
75
Southern California Institute of Architecture
Meng-Jung Ho | Vi(o)let Feel’ds
TERRAFORM Our hero reaches Violet Fee’ds as the final terrain to endure at the end of a lengthy journey.
76
77
Southern California Institute of Architecture
SOFT LANDSCAPE PERSPECTIVE Tantalized by the soft and comfortable landscape, the exhausted and desperate hero prepares to meet their most vicious match by laying their head on a sturdy crystal and falling into a nap nestled in the tall soft grasses.
78
Meng-Jung Ho | Vi(o)let Feel’ds
SOFT LANDSCAPE PERSPECTIVE Horror soon arises as giant, jewelry-adorned hands break open the sky and whisk them above taking them to meet their fate and fulfill their prophecy.
79
(O)VERLAID Course/ VS 2GAX Visual Studies Instructor/ Rachael McCall Partner/ Zarina Farmer-George
Challenging the smooth slickness of spline and polygon modeling of the 1990s and early 2000s, this project will operate within the current post-digital context, investigating ideas of precise and intentional unruliness, mixing rustication and delicacy, and how formal legibility is affected by layering, filtering, rips, wrinkles, peeling, and fuzz.
layered semi-opaque synthetic materials, murky reflections, and bundles of particles. At the same time, “overlaid” and “masked”, bring up issues of politics, postprocessing and applying filters to images and ideas.
It seems everything we do at the moment is overlaid, filtered and masked - once, twice or in many ways. Formally and texturally, “overlaid” elicits thoughts of many layers of fine detailed mesh, multi-
80
81
Southern California Institute of Architecture
Meng-Jung Ho | (O)verlaid
FLOWS WITH FRICTION Friction is anything, large or small, that disrupts or slows the flow of landscape energy.
FLUID LAYER The Friction Disappears represents the effortless flow of pictures and information in our landscape, where unrelated or contradictory ideas overlap one another.
82
83
Southern California Institute of Architecture
BLURRED LANDSCAPE Different layer blur the line between fantasy and reality.
84
Meng-Jung Ho | (O)verlaid
HAZY LAYER Reduction in the difference in lightness between landscape and object itself.
85
MENG JUNG HO jsmengho@gmail.com
”