J O H N A R
P R E S T O N C H I
3323 NE 70th Avenue
T
W E S T F A L L E C T
Portland, Oregon 97213
503 (274-9450)
RESUME OF PROFESSIONAL QUALIFICATUIONS:
REGISTRATION Architect; Sate of Arizona – 1986, Registration No. 20165 EDUCATION Arizona State University - College of Architecture, Tempe, Arizona Bachelor of Architecture University of Arizona - College of Liberal Arts and Sciences, Tucson, Arizona Bachelor of Arts in Anthropology EXPERIENCE Dull Olson Weekes Architects – Portland Oregon (11/97 – 11/2010) Responsibilities included cost estimating, Schematic design through Contract Administration, consultant coordination, Owner/Architect meeting preparation and presentation, project closeout and the use of AutoCAD.
Project Manager for additions and alterations for the Tigard/Tualatin School District, West Linn School District, Salem Keiser School District and Beaverton School District. Project Manager for the Redmond Police Station in Redmond, Oregon. Cost: $1.4 million Project Manager for the Center for Design and Technology Building for the Bend School District. Cost: $5 million Project Manager for the Doc Harris Stadium for the Camas School District Cost: $6.8 million Project Manager for the Portland Golf Club
The Orcutt / Winslow Partnership – Phoenix , Arizona (6/93 – 4/97) Project Manager for additions and alterations to buildings for the Baltz and Washington School Districts. Responsibilities included cost estimating, schematic design through contract administration, consultant coordination, Owner/Architect meeting preparation and coordination, project closeout and the use of Archicad. Page 1