From SARS CoV-1 2003 to SARS CoV-2 2019 Healthcare Leadership Strategy for a Better Future HVAC System Assessment & Performance

HVAC System Assessment • Create strategic Master Plan for flexible HVAC systems » Analyze risks and develop contingency plans for action » Full utilization of installed technology and equipment capability (capacity) » Utilization of auxiliary and supplemental systems and equipment (fixed and mobile) to satisfy new conditions during pandemic/surge/emergency operations » Installation of response-specific systems (negative pressure suites, UVGI systems, etc.) » Document present-state and future-state operational plans, including procedures for pandemic/surge/emergency responses » Document present-state and future-state equipment parameters (air volumes, pressure relationships, damper positions, control sequences, physical barriers (temporary ICRA partitions, etc.)).

JPT Architects, P.C.

www.JPTarchs.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
From SARS CoV-1 2003 to SARS CoV-2 2019: Part 7, HVAC System Utilization & Examination by JPT Architects - Issuu