Skip to main content

PROFILE JPS (1)

Page 1

COMPANY PROFILE

PHUC SANG MINH GAS ENGINEERING CO., LTD WWW.JPSGAS.COM.VN


Contents Message from the Director

Business Scope Typical Projects

Gas Equipment

Our People

Partner - Customer

3

Message from the Director

4

Dear our esteemed partners and customers!

10

Firstly, Phuc Sang Minh Gas Engineering Co., Ltd would like to send respectful greetings and profound thanks to our partners, customers who have concerned, co-operated and contributed to the development of our company in recent years.

18

Phuc Sang Minh company (abbreviated as JPS), established in 2007, is a business operating in the field of trading equipment & services of Gas industry.

24

With intensive experience in developing and providing specialized services of machinery and electrical automation... we will continue to generate success to our customers and help them be stronger.

26

Presently, the company has become the strategic partner deploying solutions for typical customers using our products and services such as Petro Vietnam Gas Joint Stock Corporation (PVGAS), Sapurakencana TL Offshore SDN BHD, Petro Vietnam Technical Services Corporation (PTSC), Petro Vietnam Low Pressure Gas Distribution JSC (PVGAS D), PTSC Mechanical & Construction (PTSC MC), Vietnam Japan Gas (VJG), Posco SS Vina, China Steel Sumikin Viet Nam JSC (CSVC), Linde Gas Viet Nam, Air water plant & engineering,... along with the outstanding projects with large scale at national level as construction and installation of Thai Binh – Ham Rong Gas Distribution & Gathering System Project – Phase 1, Ca Mau Gas Processing Plant, gas metering station for Tien Hai – Thai Binh Low Pressure Gas Distribution System Project, … Currently, we are the official distributor of a number of famous gas equipment manufacturers in the world reaching high standard of EU-G7 such as: Elster Instromet (Germany), Seitron (Italy), Detcon (USA), Simtronic (Norway), Honeywell (USA), Oldham (France), FMC (USA), Gorter control (England), RMG (Germany),… Our company always fully satisfies customer’s demands by providing the devices with preeminent, safe and economical technical features. In order to ensure the sustainability of the device compared to the lifespan of the project. Phuc Sang Minh Gas Engineering Co., Ltd is always aware that customer demand is the primary goal with the motto of “Quality, Reliability, Heartiness”. We always consider customers to be the focus of orientation and development of the company.

Special thanks!

2

3


Business Scope HSE Engineering, Procurement, Construction, Installation, Maintenance - Underground pipeline - Processing Plant Pipeline - Pressure reducing Unit/ CNG station - Metering Skid

HSE Targets • • • • • •

Zero Fatality Zero Loss Time Injuries (LTI) Zero Major Fire Incident Zero Un-permitted Discharges Zero Environmental Pollution Zero Violations Against Government Regulations

- Safety, Fire and Gas system

HSE Policies

- Control System - Gas Equipment - LPG System

• • • • • •

Quality, Health, Safety, Environmental and Security (QHSES) Drug, Alcohol, and Substance Abuse Stop Work That Is Unsafe Smoking Personal Protective Equipment (PPE) Desciplinary Action

HSE Procedures • •

4

HSE Management Procedures, Project HSE, Emergency Response & Preparedness Plan HSE inspection, Audit and Report

5


QA

Engineering Capability QC

QA/QC Procedures for Underground Pipeline:

QA/QC Procedures for Process Skids:

• • • • •

• •

Project Management Procedures Pre-installation Survey Procedures Trenching and Backfilling Procedures Fabrication Work Installation Work

Project Management Procedures Manuals

QA/QC Procedures for Process Piping Plant: • •

Project Management Procedures Construction Procedures Mechanical Work Electrical Work NDT Work

JPS has a team of engineers, designers, project managers with extensive experience together with many industrial applications and we strive to provide services with high quality and support customers with the best manner.

  

Drawing Software: AutoCad, Cadworx Plant

Mechanical value Autodesk Inventor

Project Management Software: MS Project Office

Civil Software: SAP2000 Mechanical & Piping Software: PDMS, Ceacar II, Autocad

Engineering Design Capabilities This is to confirm that the Quality Management System of

Processing Plant

Electrical/ Automatic System

has been adequately implemented and maintained in accordance with the standard

Mechanical/ Piping

Safety, Fire and Gas System

for the following scope:

Metering, CNG Station

Underground Pipeline

PHUC SANG MINH GAS ENGINEERING CO., LTD Site 1: A19 My My Villa, Nguyen Hoang Street, An Phu Ward, District 2, Ho Chi Minh City, Viet Nam Site 2: 1st Floor, No.3 Street 43, An Phu-My My Villa, Hamlet 5, An Phu Ward, Dist 02, Ho Chi Minh City, Vietnam

ISO 9001:2015 Design, Supply, Installation & Maintenance for: - Oil & Gas System for Industrial & Building. - Process skid for oil & gas (Metering, Filter, PRU, MRS...). (A19 My My Villa, Nguyen Hoang Street, An Phu Ward, District 2, Ho Chi Minh City, Viet Nam) Registration Number: Date of certificate issue: Initial certification date: Date of certificate expiration:

VN.0006.1 26.06.2017 03.06.2014 03.06.2020

InterConformity GmbH, Rupert-Mayer-Str. 44, 81379 München, Germany - European Union

www.jas-anz.org/register F202/2

6

7


Construction Capabilities

WORK SHOP

Installation

Location: Long Thanh Province Area: 2000 m2 Facilities: 2 x 5 Tons Cranes 1 Blasting Room

Manpower  

Elco Meter

Highly skilled and trained workforce, experienced team of supervisors and managers. In compliance with international standards and requirements.

Polyurethane Foam Spray Equipment

Tig welding machine

Electric generator

Pre-commissioning

Machinery and Equipment  

Advanced and superior in-house fabrication tools and facilities. Equipment control to reduce risks, minimize failures and leverage productivity.

Subcontractors  Network of experienced and reliable construction subcontractors locally

HDT Desiccant Type Dryer

and regionally.  Subcontractor control to ensure and high-quality project requirements.

Techcal Recorders

Air Compressor

High Pressure Air Pump

Maintenance

Co-operation  Sustainable partnerships with various organizations and institutes worldwide.  Collaborative arrangements in production management, operation control and investment. Calibration Equipment

8

Dead Weight Tester

Leak Test - Pipe

Calibration Kits Gas Detector

9


Typical Projects With more than 10 years of development, JPS has implemented projects throughout the country. We are proud to introduce a number of outstanding projects with large scale having been trusted and appreciated by customers as follows:

THAI BINH – HAM RONG GAS DISTRIBUTION & GATHERING SYSTEM PROJECT – PHASE 1 Description : Installation of first 5 km of near shore pipeline section (From LFS KP 18.226) Commisioning and Precommission. Client : SAPURAKENCANA TL OFFSHORE SDN BHD Categories: Nearshore pipeline/ Offshore approached services Location : Thai Binh Year : 2015

10

11


Typical Projects

Tien Hai – Thai Binh Low Pressure Gas Distribution System Project Description : 11 no. of Custody transfer Metering Skid with 20 feet Container (2”, 3” #150 Turbine meter) 10 no. of Pressure Reducing Unit with 20-feet Container (1000 Sm3/h, 3500 Sm3/h) Metering Skid in CNG mother station (8” #300 Turbine meter) Shut down valve 10” #300 CCTV, ICSS and Fire & Gas system Client : Petro Vietnam Gas Joint Stock Corporation - Petro Vietnam Gas Project Management Company Categories : MRS/ PRU/ CCTV/ ICSS/ Fire & Gas System Location : Thai Binh Year : 2015

12

13


Typical Projects

Natural Gas Receiving System For CSVC Cold Rolled Coil Complex

Thai Binh – Ham Rong Gas Distribution & Gathering System Project – Phase 1 Description : Gas metering Skid - 3 metering run configuration consists of three (3) units of 8” ANSI 300#RF Q.Sonic plus Ultrasonic Flow meter Combine with Control Panel and Analyser System (2 x Gas Chormatograph) Client : Petro Vietnam Technical Services Corporation (PTSC) Categories: MRS/ Analyser System/ Control Panel Location : Thai Binh Year : 2014

Description : 2 metering run of 6” 300# Turbine Meter, 6” Pipeline (Length: 1.050 meters) Client : China Steel Sumikin Viet Nam JSC Categories : MRS/ Underground pipeline/ Control and F&G system Location : My Xuan IA2 Zone, Ba Ria - Vung Tau Year : 2012

Turnkey of Natural Gas Supply System For Steel Plant Project Description :

VJG Factory Pipeline Description : Underground Gas Pipeline System(H2, O2, N2) 10”, 8”, 2-1/2” Pipeline (Length: 2500 meters) 8” Pipeline (Length: 3.267 meters) 8” Pipeline (Length: 2.575 meters) Client : Viet Nam Japan Gas JSC Categories : Underground Pipeline Location : My Xuan, Ba Ria - Vung Tau Year : 2012

14

6” Pipeline (Length: 2600 meters) 2 metering run of 6” 300# Turbine Meter Client : POSCO-VIETNAM CO., LTD Categories : MRS/ Underground Pipeline/ F&G system Location : Phu My 2 IZ, Ba Ria - Vung Tau Year : 2008

15


CAROUSEL SYSTEM – CAMBODIA • 4 LPG TANK 50 tons/tank • 12 LPG cylinders refilling /minute • Automated gas refilling system • System for automated of cleaning cylinder Desciption: Supplying LPG tank and automatic refilling system for LPG cylinders Client: DARA T.C. ANGKOR GROUP LTD Location: No. 103R Sangkat Toul Songkia, Khan Rusey Kep, Phnom Penh, Cambodia. Year : 2017

16

17


Intermalt Viet Nam LTD. Desciption: Gas Metering Skid 2 runs meter TRZ 3” 300#, Honeywell RTU and Flow computer 10” SCH40 concrete coating, length 2.2Km 8” SCH40 3PE coating, length 3.3 Km Client: PVGas D Categories: max flow 2500 Sm3/h Location: Cai Mep Industrial – Tan Thanh, Ba Ria – Vung Tau Year: 2017

Nhon Trach 2 Power Plant Gas Distribution Chain Project Description : 2 metering run of 10” 300#RF Q.sonic-4C, Control Panel and Analyser System (1 x GC) Client : Petro Vietnam Gas JSC Corporation Petro Vietnam Gas Project Management Company Categories : MRS Location : Nhon Trach, Dong Nai Year : 2010

18

19


Posco SS Vina Project

Global Aluminium Plant

Description : 8” Pipeline (Length: 1.834 meters) 2 metering run of 6” 300# Turbine Meter Client : POSCO SS VINA CO., LTD Categories : MRS/underground pipeline/ F&G system Location : Phu My IZ1, Ba Ria - Vung Tau Year : 2013

Description: 2 x PRU ( Capacity : 2000 Sm3/hr) 1 x PRU ( Capacity : 11000 Sm3/hr ) Client: Global Aluminum Vietnam Co., Ltd Categories: PRU/ Processing plant pipeline Location: My Xuan A – Vung Tau Province Year: 2016

Air Water Plant Description : Processing Plant Pipeline: 6” Oxygen, 1” for Argon/Nitrogen Underground pipeline, ½” – 14” gas pipeline system in plant Client : AIR WATER PLANT & ENGINEERING INC Categories : Processing plant pipeline Location : My Xuan, Ba Ria - Vung Tau Year : 2013

Hoa Phat Steel Pipe Co., Ltd Description: PRU ( Capacity : 800 Sm3/hr ) Client: HOA PHAT Group Categories: PRU/ Processing plant pipeline Location: Hung Yen Province Year: 2016

Nghi Son Refinery

Bot Giat Net Plant

Description : Piping Spool and Fabrication Service at

Description: PRU ( Capacity : 500 m3/hr )

Vung Tau (25.000 no. of ID, 12.000 m2 of painting area) Client : PTSC Mechanical & Construction Co., Ltd Categories : Pipeline Location : Vung Tau

Client: Bot Giat Net Joint Stock Company Categories: PRU/ Processing plant pipeline Location: Long Thanh – Dong Nai Province Year: 2014

Year : 2014

20

21


Loading Arm Lexington Presidence

LNG / CRYOGENIC

Description: Supply gas system for 1.350

FMC Technologies LNG Arms

apartments.

• Liquid Arm

Client: Novaland Group

• Vapor return arm (optional)

Categories : LPG System

• Equipped with shut-off valves and draining

Location: District 2, HCMC

points to limit drained volume at disconnection

Year : 2015

operation.

Sunrise View Description: Supply gas system for 650 apartments. Client: Novaland Group Categories: LPG system Location: District 7, HCM. Year: 2018

BALANCE SYSTEM AND PANTOGRAPH ARRANGEMENT Pantograph arrangement The pantograph arrangement is composed of two sheaves (style 40 & balancing sheave) and cables. These cables are strung around the sheaves to transmit the counterweights force to the outboard arm.

Happy Valley Description: Supply gas system for 485 apartments. Client: Phu My Hung Group Categories: LPG system Location: District 7, HCM. Year: 2016

22

6’’ & 12’’ ARM \ OUTBOARD CYLINDERS 7 OUTBOARD DRIVING SYSTEM The outboard drive includes a double acting cylinder. Connected directly to the rack hard of the rack gearing integral the balancing sheave installed on the rear of the inboard arm

23


Gas Equipment

FC1 - High performance flow computer • • • • • • • •

Quantometer • • • • • • •

Manufacture: Elster Flow ranges 1.6 –1600 m3/h Meter size: DN25 to DN 150 Meter body material: Aluminum Approvals: DVGW, ATEX, PED Applications: Natural gas, Air, Methane, Nitrogen, other non- corrosive gases Verticals: Heavy and Light Industry, Petrochemicals, Steel, Power, Minerals, Heating

Manufacturer: Elster Application: The Elster FC1 flow computer is designed for gas measurement applications and the corresponding calculation algorithms. A multi-stream functionality and advanced logging features with a wide range of security and communication features are available Enhanced data logging functionality Calculations according to AGA/ISO/API Ethernet: HTTP/FTP/MMS/Modbus protocols USB front panel interface EnSuite configuration software Full graphic display, touch screen

Volume conversion device - EK220 • • • • • • •

Turbine gas meter TRZ2 • • • • •

Manufacturer: Elster Meter types: G 65- 1000 Flow range: 5 - 1600 m3/h Diameters: DN 50* - 150 (2” - 6”) Pressure rates: PN10–100, ANSI150–600

Manufacturer: Elster Application: Volume conversion for billing purpose, Data logging for different application, monitoring of measurement values and standard function T, PT, PTZ volume conversion Conforms to Europe standard EN 12405 MID approval High accuracy Suitable for use in Zone 1 hazardous areas

Turbine gas meter SM-RI-X • • • • • •

Manufacturer: Elster Meter types: G 650 - 16000 Flow range:100 - 25000 m3/h Diameters: DN 200 - 600 (8” – 24”) Pressure rates: PN 10 – 100 or ANSI 150 – 600 Manual oil pump (standard for PN 25 - 100 and ANSI 300 - 600)

Ultrasonic meter Q-sonic plus • • • • • • •

24

Manufacturer: Elster 6-path reflective technology Sizes: DN100 – DN900 Flow rate: 13 – 11.500 m3/h Pressure ratings: ANSI class 150 to 900, PN on request No moving parts No pressure drop

Gas Chromatograph Encal 3000 • • • •

Manufacturer: Elster Application: Fiscal EnergyMeasurement, Gas quality control measurement C6+ application (3 min.) C9 application, (5 min.)

• • • • •

Interface with FC 2000 Repeatablitiy <0.01% Double block and bleed, stream select for 5 streams TCP/IP communication IP 66 outdoor housing

25


Gas Equipment S300 Hp Slam Shut Valve RMG-Pilot Type HON 650 • •

Country of Origin: Germany Technical: Material A-AL- Alloy, Spring Range HH-20 – 90 bar, Internal and External Fittings Stainless steel, English Certificate

RMG-Gas Pressure Regulator HON 512 • •

Country of Origin: Germany. Technical: Max. operating pressure PSmax 100 bar (could be less -acc. to the flange pressure class); outlet pressure anges Wd with pilot hon 650 (for outlet pressure control), accuracy class andclosing pressure category • Materials: A 352-LCC(QT) or equal, steel, alumnium, brass, aluminium alloy, steel, NBR, FKM, NBR.

Gorter-Gas Pressure Regulator Type R100S • • • • • •

Pilot operated, standard version (fail close design) Max. inlet pressure: 250 bar Outlet pressure range: 1 - 60 bar Connections: Flanges Class 150 – 1500 Size: 1’’ to 16’’ Body material: Cast Steel

• • • • • • •

High Pressure Over Pressure Slam Shut Nominal Diameter ¾’’ & 1’’ Temperature range: -20°C to +70°C External or internal impulse Adjustable trip-off pressure gives a wide range of set points, Visual indicator Applications: LPG tank installations, LPG networks

Service Regulator J125 • • • • •

Manufacturer: Elster Sizes: ¾”, 1”, 1 ½”, 2” Max inlet pressure: 8.6 Bar (125 psig) Max outlet Pressure: 140mbar (64”wg) (for size ¾” and 1”); 350 mbar (for size 1 ½” and 2”) Option: Relief valve, over/under pressure slam shut, pressure test nipple

High pressure regulator - Axial flow valve Series 300/600 • • • • • •

Manufacturer: Elster Application: Industrial, distribution, transsission Sizes: DN 50 – DN 300 Inlet pressure range: 1.5 bar to 100 bar Outlet pressure range: 10 mbar to 41 bar Option: Flow control, relief valve

Gorter-Safety Shut Off Valve Type HSV086 • • • • • •

26

Indirect operation Max. inlet pressure: 250 bar OPCO range: 3 - 95 bar UPCO range: 0,7 - 10 bar Connections: Flanges Class 150-1500 Size: 1’’ to 16’’ Body material: Cast Steel

Regulator P200 • • • • •

Direct Operated – 14” Diaphragm, Commercial, Industrial Max inlet: 150 psi Oulet range: 2” WC to 10 psi Max flow: 30.000 scfh Cv 20.0 Port sizes inches: 1 ¼. 1 ½, 2, Flange

27


Gas Equipment Regulator P38 • • • • •

Direct Operated – Instrument supply, Final stage Max inlet: 400 psi Outlet range: 0 based to 125 psi Max flow: 15.000 scfh Cv 1.10 Port sizes inches: 3/8, ½, ¾, 1

Regulator P51 • • •

Style: Regulator, Filter Regulator, Filter, Filter Reg w/ Autodrain, Filter w/Autodrain Sizes: ¼ NPT, 3/8 NPT Ranges: 0 – 30 psig, 0 – 60 psig, 0 – 100 psig, 2 – 150 psig

Regulator P627 • • • • •

Direct Operated – Fram Tap, City Gate, Gas Gathering Max inlet: 2.000 psi Outlet range: 5 to 500 psi Max flow: 172.000 scfh Cv 5.30 Port sizes inches: ¾, 1, 2, Socket, Flanged

Gas detector Beagle GPL • • • • •

28

Manufacturer: Seitron Power supply: 230V ~- 15/+ 10% 50Hz Alarm threshold: 10% L.I.E Output (relay): 5(2)A @ 250v ~ SPDT Protection grade: IP42

Model

Itrans

FP-524 D

IR 700

GD10P

Oldham/China

Detcon/USA

Detcon/USA

Simtronic/ Norway

Brand

Sensor Typee

Catalytic, Infrared, Electrochemical Dual sensing

Matched-pair catalytic bead

Continuous diffusion/adsorption Non-dispersive Infrared Optical (NDIR) Combustible Gas, Sub-miniature plug-in field replaceable"

IR-absorption, dual wavelength, dual path, Solid state IR sources (SimSource™)

Sensor Life

Maximum 3 years

3 to 5 years

5 years

15 years

Case Material

Aluminium, 316 SS

Aluminium, 316 SS

Aluminium, 316 SS

316 SS

Gas detected

Combustible Gases, Toxic, oxygen

Combustible Gases

Methane, Hexane, Ethane, Ethylene,Propane, Gasoline Vapor, Butane, Diesel Fuel Vapor, Pentane, Jet Fuel Vapor

Hydrocarbons

Accuracy

±3% 0-50% LEL ±5% 50-100% LEL

±3% 0-50% LEL ±5% 50-100% LEL

±3% 0-50% LEL ±5% 50-100% LEL

±3% FS between 0-50 % reading ±5% FS between 50-100 % reading

Response time

T50: <15 seconds T90: <35 seconds

T50 <10 seconds; T90 <30 seconds

T50 < 6 seconds, T90 < 10 seconds

T20 = 1 sec. (0.3 sec) T50 = 2.5 sec. (0.7 sec) T90 = 6 sec. (1 .6 sec)

<5% per year

≤2% per 2 years

Zero Drift Calibration

Non-intrusive Calibration

Manual

Automatic

Factory set, no field recalibration

OutPuts

4-20 mA HART, RS-485, Relay (optional)

"Linear 4-20 mA DC HART (optional)"

"Linear 4-20 mA DC RS-485 MODBUS-RTU"

"Linear 4-20 mA DC HART "

Electrical Classification

NRTL/c and CSA: Class I, Div 1, Groups B, C, D AEx d IIB + H2 T5; Class I, Div 2, Groups A, B, C, D AEx d IIB + H2 T5 ATEX and IEC: II 2G - Ex d IIB + H2 T5; II 3G - Ex nA II T5

Explosion proof: Class I, Division 1, Groups B, C, D (Tamb = -40°C to +75°C); Class I, Zone 1, Group IIB+H2

Explosion proof CSA and US (NRTL) Class I, Division 1, Groups B, C, D (Tamb = -40°C to +75°C) Class I, Zone 1, Group IIB+H2 ATEX EEx d IIB+H2 T4 (Tamb = -40°C to +75°C)

Main compartment EExd I IC T6 Terminal comp. EExe

Safety Approvals

NRTL/c and CSA ATEX and IEC

CSA/NRTL (US OSHA Certified)

CSA ATEX CE Marking SIL2 Certified to IEC 61508

ATEX: 07ATEX1 438 CSA: 1 773527 (1 00% LEL Methane) IECEx: NEM 07.0006 INMETRO: AEX-1 1 698 MED: B-5901 ABS: # 04-LD444057-PDA SIL Qualified for SIL2 and SIL3 systems

Ingress Protection

NEMA 4X, IP66

NEMA 4X, IP66

NEMA 4X, IP66

IP66/IP67 DIN 40050

Warranty

2 years on electronics3 years on infrared sensors (CO2 and LEL) 2 years on catalytic (LEL), CO and H2S sensors

"Sensor: 2 year warranty Transmitter: 2 year warranty"

Plug-in detector - 5 year pro-rated Transmitter - 2 Years

5 years full warranty on complete instrument 15 years warranty on the IR-sources

Indicator

LED display

LED display

LED display

No display for standard model

Cable requirements

3 wire or 4 wire

3-wire shielded cable

3-wire shielded cable/ 2-wire twisted-pair shielded cable specifically for use with RS-485 installations

3 wires

6.4 Lbs (2.9kg)

6 lbs; 2.72kg (w/ aluminum j-box) 9 lbs; 4.08kg (w/ stainless steel j-box)

2 lbs; 0.907kg (sensor only) 6 lbs; 2.72kg (w/aluminum j-box) 9 lbs; 4.08kg (w/stainless steel j-box)

6.4 Lbs (2.9kg)

Weight

29


Fire and Gas System

Pressure Transmitter Temperature Transmiter

Gauge Horn SEIKEN GAS DETECTOR SYSTEM

Beacon Shutdown valve

30

31


Our People

Organization General Director

Training Certificates ď&#x192;&#x2DC; ď&#x192;&#x2DC;

Ultrasonic Flow meter, Chromatagraph & Flow computer. CADWorx Plant Professional.

Economic & Bidding Dept.

HR Dept.

Office Dept.

Material & Equipment Dept.

Accounting & Financial Dept.

Commercial Dept.

Engineering Manager

Project Manager

Design

Fabrication

32

Engineering & Project Center

HSE/QA/ QC Dept.

Planning & Investment Dept.

Operation Manager

Superintendent

Logistic

33


Typical Partners - Customers In the process of construction and development, JPS has cooperated with many foreign and domestic organizations and businesses in various fields, as well as has won the trust, the companion of the traditional customers, which contributed largely to the success of JPS nowadays. We would like to thank and introduce a number of typical and traditional partners, customers.

Our partners

34

Our clients

35


PHUC SANG MINH GAS ENGINEERING CO., LTD (JPS) Address: First Floor, No 3, Road 43, An Phu-My My Zone, Hamlet 5, An Phu Ward, Dist 2, HCMC, VN Tell: (84) 28 62778184/ 8 37471469 Hotline: (84) 94 8808839 Fax: (84) 28 62810960 E-mail: info@jpsgas.com.vn


Turn static files into dynamic content formats.

Create a flipbook