MAGOK WATERFRONT: DEPURATING ARTIFICIAL WATERLILLIES LANDSCAPE

Page 1

CONCEPT 는모댏 MAGOK WATERFRONT Beginning of the 21st century has already indicated the tremendous levels of change in urban Korea. Development with many external cultural influences has accelerated to the levels unseen before. This raises a number of interrelated questions, such as: How are urban parks in Korea changing? What are the sustainable paths towards the development of an urban leisure space in Seoul: mixed use or urban disorder? How can we identify and manifest Korean values into an urban waterfront? What is the formation and attitude of a urban wetland? How an urban wetland can become a park? Our proposal is to form a territory of co-existence between nature and artificiality. From its largest context as the first site of the Han River Renaissance Project to its desires to transform the area of Magok, a strong identity strategy is proposed through water-scapes, transport structures and building types. Underlying the strategy and form throughout the site is the development of eco-formations. These creations of land manipulation both consider the requirements of promoting a waterfront ecology with leisure and park amenities. They perform environmentally through water terracing and an informality of leisure space through a substantial wetlands network. With so much transport and services infrastructures currently being implemented into the site, we looked to take a direct and pragmatic approach to utilizing the given networks. We acknowledge and highlight the importance of local, national and international transport links as fundamental in the design of such a strategic urban structure.


마스터 플랜 섹션 MASTERPLAN SECTIONS

section 1

section 2

section 3

section 4

section 5

section 6

규모 scale_1:1000

규모 scale_1:2000


CS

1 2 3 4 5

물의 치료 WATER TREATMENT ENVIRONMENTAL MANAGEMENT DISSOLVED OXYGEN

The treatment of the water is carried out in three levels: - Previous Treatment of waters of the 3 smaller creeks to its opening in basin superior - Reed beds (reed beds) in the two basins like treatment of support for the improvement of the quality of its waters - Purification in each cell All the proposed treatments share the fact of being based on systems of beds of macrophyte beds or vegetal filters. The previous and precise treatments work by means of a system of vertical circulation (vertical flow) whereas the surrounding reed beds do it by means of horizontal circulation (horizontal flow).

VEGETATION STRATEGY

First it consists of primary treatment (gravel filter) that retains the solid matters in suspension in the water (Suspended Solids separation), secondary treatment by means of a system of lagooning separated in diverse channels and slope pools established with reed beds that makes circulate the water slowly and create the necessary conditions so that bacteria eliminate the dissolved organic matter.

Ideally the lakes would require the dissolved oxygen level within the impoundment to be maintained at or above 5mg/l in all places and at all times. The 100%ile dissolved oxygen standard would be maintained using water mixing system comprising: - A main network of 50mm diameter. R13 self-sinking armoured rubber pipes. - Webbing of 14mm dia. armoured rubber pipe. - Four compressor stations containing a total of 32 Rietschle DLR100 Zephyr compressors. - Over 300 diffuser heads incorporating unique patented airflow regulators ensuring even release of air from each diffuser irrespective of water depth and distance from a compressor house. - If it becomes necessary to add oxygen to the water an oxygenation barge capable of injecting 400Kg oxygen per hour from an on-board 5 Tonne capacity liquid oxygen storage vessel can be used. WATER QUALITY MONITORING A comprehensive water quality-monitoring programme will be set in place. It consists of 24/7 electronic data acquisition for dissolved oxygen, pH, temperature, conductivity and turbidity at 15 minutes intervals from several monitoring stations. Data will be telemetered to the Magok Harbour Authority office on an hourly basis. The water quality-monitoring deals with conventional laboratory analysis of water nutrients, algal chlorophyll, hardness, some metals and BOD on a monthly basis. E.coli and Faecal streptococci enumeration could be undertaken at 8 sites twice weekly in summer and weekly in winter to inform water recreation users.

Oxygen recovers airing by gravity with small water jumps. The tertiary treatment is partly made through consumption of Nitrogen and Phosphorus in the pool of final storage (floating plants in small masses) that can perform as swimming pool and by the spill of this water in natural substrate by means of irrigation. The solar radiation also enables the disappearance of bacteria in the storage pools. The second, planted on gravel substrate in the edges of basins, makes a secondary and tertiary treatment when penetrating and freely leave the water in these reed beds.

WATERFALL

DEBRIS/LITTER MANAGEMENT Debris deposited in the area each year by the Magok river and the main basins can be collected and disposed of on a daily basis. Waste would be removed from the water using a purpose-made vessel, a floating bulldozer called a Waterwitch, which has a one tonne scoop lifting capacity. Land-based teams would then collect debris from areas inaccessible to the waterwitch. The collected debris can be separated wherever possible for recycling purposes. Of this litter and debris, clean and bulky timber can be used as fuel for a Biomass Boiler at the Harbour.

WATER MANAGEMENT MAGOK AERATION LAYOUT SYSTEM

WATER-WORK DATA


물 관리 GENERAL WATER STRATEGY

The improvement of environmental conditions is essential for the implantation of the project. The colonization of the shores of tributary of Han River and the recreational and sporting use of its waters entails the need for a comprehensive treatment for them to adjust the quality to its use. The strategy of generating landscape part of a unit, an octagonal cell, organized to purify water to be used in its interior. The amount of specific treated water drained towards the basins contributes to the improvement of environmental water surface and therefore the Han River. The urban fabric resulting that forms the shores of the river is the result of the addition of these cellular units differentiated by the programme, weaving a body through an infrastructure catchments, treatment and draining of water and other infrastructure in overlaying uses, etc. The very logic of the movement of water by gravity originates or staged terraced topographies in cellular and global scale.

The strategy of water recycling on global scale: - Optimal water treatment for bath - Optimal water treatment for irrigation - Optimal water treatment for its reusability in construction like water supply of cisterns of WC, washing and dish washing machines, etc - Gray water purification of the new houses with as opposed to basins - Improvement of the quality of the water of basins for recreational use (navigation) - Treatment of the water of run-off of the hill of the east - Purification of activated mud of the plant of preexisting water purification.

규모 scale_1:15.000

지형전략 TOPOGRAPHY STRATEGY

에너지 전략

물의 전략

ENERGY STRATEGY

50m 17layers

470.000m3

WATER STRATEGY

400Kw

average annual wind velocity 2,2 m/s

500-1.000mm 300-500mm 200-300mm 100-300mm

405.000m3

50-100mm

0-50mm

BUILDING

25.000m3

2

ROOF LAKE 20.000m3

5

GROUNDFLOOR INDOOR LAKE 1 2 3 4 5 6

225.000m3

7 8 9

교통 시스템 다이어그램 TRANSPORT SYSTEM DIAGRAM

Rain flows Slopes create roof lakes Water is filtered and collected in a tank Tank water for domestic use Extra water is collected through inner cells Connection to general cell’s pipe Transfer extra water for natural drainage Water is transfered to South lake Extra water is tranfered to Han river if flooded

1

2

75.000m2

625.000m3 >70m

규모 scale_1:10.000

규모 scale_1:10.000

3

1.200Kw

4

5

9

8

7

6

TRANSPORT STRUCTURES In principle the urban structures respond systematically to the main transport stations linking Seoul city centre and both Gimpo and Incheon international airports. From these main attractors, a network is formed as a body conditioned to the specific site and local commerce. Roads Along with the current large scale transport infrastructure being undertaken, we look to the condition of the Olympic Expressway with the site as key to establishing a strong riverfront presence. Without disturbing the flow of the expressway, we look to create direct visual access to the Han River. By creating a road intersection from the Expressway to the western edge of the site, we propose reconfiguring Olympic Expressway underground to allow for visual and pedestrian access directly to the river’s edge. There is a hierarchy of roads implemented within the site and link to existing infrastructure surrounding the site. The included on the road plan areas which should provide pedestrian priority/traffic. The way in which we deal with these boundaries and edges will be the key to the success of the scheme. In addition the internal road subsystem encourages slow-speed streets. The roads that meet water will become ‘Jetty Settlements’; suspended pier/jettylike road structures that tread lightly over the lily pads and enable programme to spread over the water. PARKING CAR - CYCLE INTERCHANGE CYCLE PARKING (ARRIVING) CYCLE PARKING (LEAVING) FERRY STOP PEDESTRIAN POINT BUS STOP CYCLE CIRCUIT

TRANSPORT INTERCHANGE: CAR - CYCLE - BUS

BUS CIRCUIT

규모 scale_1:15.000 규모 scale_1:10.000

Cycle network A integrated, comprehensive cycle network is proposed throughout the site. The main circuit follows the shoreline of the two lakes linking all programs. Secondary paths branch off to connect directly to strategic links within each zone. These consider the other transport links in which generous, traffic-free pathways will encourage cycling as the most efficient method of accessing the site. The network program is designed to provide experience through different landscapes and programs. With the water terracing and earth forming, there will be gentle gradients along with varying ecologies from cycling through wetlands to connections with urban train hubs to direct link to bordering street network. In penetrating the site, it will be encouraged to use cycling as the most efficient method. A proposal for a cycle rental network of ‘pay as you go’ is implemented in strategic locations. This system is seen as both for leisure use and for those working in the site and surrounding areas. A strategic framework will be developed along with any development guidelines produced for the site.


마스터 플랜 MASTERPLAN


물 정화 시스템 WATER PURIFICATION SYSTEM

규모 scale_1:200

규모 scale_1:500


프로그램 PROGRAM MAGOK WATERFRONT - COSTING

예산 MAGOK WATERFRONT - COSTING

EXTRA PROGRAM FOR LOWER WATERS LEVELS TERRACES 600m2

BAR 5.000m2

TERRACES 600m2

TERRACES 600m2

Construction type

Construction Outline

Project Design Contract (Zones A, B, C)

Waterfront (along Han River)

viewpoints; promenades

(zone A)

drainage infrastructure parking facilities

BASEBALL 600m2

TERRACE 5.000m2

Park

soft landscaping

(zones A,B & C)

promenade and pedestrian walks surface water treatment and purification terracing cycle network sports facilities

BASEBALL 600m2

BASKETBALL 600m2

TERRACE 12.000m2

Harbour Facilities

floating docks, drainage infrastructure

(zones B & C)

promenade and pedestrian walks Internal roads & parking facilities marina facilities; yacht club

AQUARIUM 28.000m2

Floodgates Facilities

실외 OUTDOOR PROGRAM

SHOPING 20.000m2 CONVENTION CENTER 20.000m2 INFRASTRUCTURE 10.000m2

(at Olympic expressway & Yangcheon-gil road)

SKATE 600m2

Proposed Idea Zone (Zones D,E)

Olympic expressway crossings

sports facilities

(zone D)

internal roads & parking facilities road interchange infrastructure

TOWER HOUSING 1.500m2 OFFICE 1.500m2 HOTEL 1.500m2

Yangcheon-gil crossings

road interchange infrastructure

(zone D)

soft landscaping

Ex-Pump station facilities

Infrastructural facilities: substations, waste incinerator, heat fusion generators

(zone E)

LEISURE BARS&RESTAURANTS 15.000m2

AQUARIUM 30.000m2

TRADITIONAL MARKET 10.000m2

SHOPING 50.000m2

BARS 20.000m2 TERRACES 30.000m2

SPORTS

Waterfront Park Harbour Facilities Floodgate Facilities Olympic expressway crossings Yangcheon-gil crossings Ex-Pump station facilities

₩3,016,170,000 ₩40,718,295,000 ₩22,118,580,000 ₩17,091,630,000

INFRASTRUCTURE 8.000m2

₩6,032,340,000 ₩9,551,205,000

vegetation, plantings, trees, etc.

$20,000,000.00 $5,000,000.00 $5,000,000.00

₩20,107,800,000 ₩5,026,950,000

visually integrated terracing

$5,000,000.00 $1,000,000.00 $15,000,000.00 $1,000,000.00

₩5,026,950,000 ₩1,005,390,000 ₩15,080,850,000 ₩1,005,390,000

$10,000,000.00

₩10,053,900,000

$7,000,000.00

₩7,037,730,000

$800,000.00 $1,000,000.00 $4,000,000.00

₩804,312,000 ₩1,005,390,000 ₩4,021,560,000

$3,000,000.00 $1,000,000.00

₩3,016,170,000 ₩1,005,390,000

Total

₩97,824,447,000

SHOPING 4.000m2

Facilities 4 Floodgate floodgate facilities

CINEMA 8.000m2

7 ex-pump station fac.

CONVENTION CENTER 3.000m2

BARS&RESTAURANTS 17.000m2 AUDITORIUM 12.000m2 MUSEUM 24.000m2

B

17%

42% C

23%

D

Possibilities are corporate office development, restaurants, retail department stores and small business shop owners. The development stripes are also ‘local gateways’ which allow permeability into the site with continuity of green stripes located intermittently. The importance of these stripes is they assist in creating local users and tourist for activating the landscape and water-scapes.

스포츠 회로 SPORT CIRCUIT

TRADITIONAL MARKET SHOPING SHOPPINGMALL MALL

BASKETBALL 1.125m2 SKATE 2.400m2

BASEBALL 1.800m2

HOT SPRINGS 4.000m2

TERRACES

ICE HOCKEY 700m2

OLD PLUMP STATION

SPORTS

UNDERWATER HOCKEY

GAYANG SUBSTATION

SWIMINGPOOL open.close 5.000m2

WATER GAMES

FISHING

YATCH MARINA

HARBOUR

KAYAKING 4.000m2 WINDSURFING 4.000m2

RELAX

ZEN BIOTOPES 5.000m2

CHILDREN POOL 200m2

KAYAKING 200m2 WINDSURFING 200m2

BOAT REPAIRING

VIEWPOINT

NATURE 규모 scale_1:5.000

METRO STATION

HISTORIC POINTS

PARKING

SECONDARY pedestrian entrance pedestrian entrance

PEDESTRIAN CIRCUIT

MUSEUM

FERRY ROUTE MAIN pedestrian entrance

BIKE RENTING STATIONS BIKE CONNECTION

ZEN GARDEN FERRY STATION

ECOSYSTEM 20.000m2

FLOODGATE

SWIMMING POOL 200m1

CYCLE CIRCUIT

SPA 5.000m2 FERRY STATION 3.000m2

E

BARS

ICEHOCKEY 2.000m2

INFRAESTRUCTURE 4.000m2

B

From the larger Magok Development site and the new transport link at 905 Station along subway line 9, these areas allow for the city to infiltrate into the site. Taking strategic moves from the proposed Exhibition facilities complex to the edge of the infrastructural facilities of zone E, a series of development stripes are allocated. Without prescriptive intervention, we would formulate a design guide where mid-rise development with emphasis on retail and commercial sits adjacent to transport hubs.

CHILDREN POOL 4.000m2

HISTORY/CULTURE

AUDITORIUMS 19.000m2

based upon exchange rate on May 2008

A

RESTAURANTS

NATURE

CINEMA 8.000m2

₩97,824,447,000

Mid-rise + Mid-dense Commercial/Cultural/Leisure

관심사 INTERESTS (WEEKEND CIRCUIT)

UNDERWATER HOCKEY 500m2

SHOPING 4.000m2

The vision for the jetties is one of diversity where more independent development would be encouraged to create a visual tapestry of buildings and amenity uses. The goal is that they begin to develop their own characteristics and identity in reflecting all which comes with inhabitation.

vegetation, plantings, trees, etc.

6 yangcheon-gil crossing

FISHING 4.000m2

BARS&RESTAURANTS 12.000m2

Utilizing the lake, these proposed jetties form a series of ‘water plots’ for residential development and amenity use. Similar to marina type living, these floating jetties consider the joy of living near water.

5 olympic expressway crossing

SKATE 10.000m2

AQUATIC SPORTS CONVENTION CENTER 500m2

Variable rise + Low-dense Leisure/Marinas/Restaurants

3 harbour facilities

₩5,831,262,000 ₩4,021,560,000 ₩5,026,950,000

Located next the Han River these form a strong presence along the riverfront. Composing itself next to Mt. Gung and the existing high-rise apartment blocks, the gateway settlement consists of mixed use towers which act as a ‘gateway’ marker into the site. Along with possible residential accommodation, the adjacent Barrage and recreational facilities creates a vibrant ensemble for the riverfront. Jetty Structures

4% 5% 3% 6%

WATER GAMES

EXHIBITION 45.000m2

High rise + High dense Housing/Hotel/Services

₩5,026,950,000

$5,000,000.00

2 park

BASKETBALL 8.000m2

BARS&RESTAURANTS 12.000m2

Vertical Formations frontage along Han River

Development Stripes

LEISURE

CONVENTION CENTER 50.000m2

$6,000,000.00 $9,500,000.00

1 waterfront

BASEBALL 15.000m2

SHOPING 4.000m2

KRW ₩1,005,390,000 ₩1,005,390,000 ₩1,005,390,000

Remarks

TOTAL $102,300,000

RESTAURANTS 15.000m2 CONVENTION CENTER 10.000m2

Han river barrage control, lock, fish pass and sluices + pump station Yangcheon-gil water gate, lock, fish pass and sluices

Building Types

Estimated Construction Expenses USD $1,000,000.00 $1,000,000.00 $1,000,000.00

SPORTS

TERRACES 600m2

RESTAURANT 5.000m2

Classification

WATER SPORTS

실내 INDOOR PROGRAM

AQUARIUM

WET ECOSISTEM

규모 scale_1:10.000


규모

scale_1:2000


BUILDING STRATEGY

BARRAGE HAN RIVER - MAGOK RESERVOIR

3 detail

Internal road - bascule bridges locks

Masterplan Zones Zone A: Barrage Zone B: Reservoir Zone C: Lake Park Zone D: Infrastructure facilities Zone E: Cultural and residential program

structure

A

1

The internal road is a surface transport road consisting of two lane each sense. The 2 bascule bridges, one for each lock, allow traffic across the road when the locks are closed. They weight approximately 80 tonnes and use a counterweight to save energy during operations

2

Locks - sluices - pump - fish pass

locks - boat gates B

D

sluices

The foodgate consists of 2 locks on the Barrage; 3 sluices gates, the pump station and one fish pass. A. LOCKS Each lock is 40 meter long, one have an entrance of 8 meters wide and the other 10.50 meters wide. B. SLUICES There are 3 sluice gates that control the level of water in the Waterfront Magok. Each sluice is 9 meter wide. The sluice operation helps protect Magok Waterfront from flooding. When Han river is higher than Magok reservoir, the sluices close to prevent riverwater entering the fresh water of Magok reservoir. When the Han river is lower than the Magok reservoir the sluice gates open to maintain a preferred level of water in the reservoir. C. PUMP STATION The pump station has been relocated on the Barrage. Nearby 400.000 liters of water per second can flow through each sluice gate. D. FISH PASS It allows acuatic fauna to flow in/out the Magok Waterfront.

fish pass

outer skin

B

E

C

A

1

B

C

pump station

glass facade

D

C

2

3 3

INNER FLOODGATE SOUTH BASIN - MAGOK RESERVOIR

1

The main road is a surface transport road consisting of 3 lanes each sense. One bascule bridge, one for each lock, allows traffic across the road when the lock is closed. It weights approximately 80 tonnes and also uses a counterweight to save energy during operations.

2

Over the subterranean express way, there are 2 parking zones (3 stories each). It allows adequate inner communication along the barrage embankment.

4

Yangcheon-gil road - bascule bridge

4

Parking

Olympic expressway The express way is a subterranean infrastructure. It contains 3 lanes for private cars and one lane for public transport in each sense

.

locks - sluices - fish pass The foodgate consists of 2 locks on the Barrage; sluices gates, the pump station and fish pass. A. LOCK The lock is 40 meter long, 10.50 meters wide. B. SLUICES There are 2 sluice gates that control the level of water in the Waterfront Magok. Each sluice is 9 meter wide. They control the water pass from south basin to Magok reservoir (approx. +1.00 meter difference). In addition, the sluice operation helps protect Magok Waterfront from flooding. C. FISH PASS It allows acuatic fauna to flow in/out within the Magok Waterfront.

3

Sluice ramp & gate - pump station

VERTICAL FORMATIONS

Sluice Ramp and Gate. The boat gate’s contension walls and sluice-fish pass ramp is made with reinforce concrete. The pump station has been relocated on the Inner Barrage. Nearby 400.000 liters of water per second can flow through each sluice gate.

tower

bascule bridge grid shell

1

C

fish pass

A

locks - boat gate

+

2

B

flats 1280sqm hotel 1600

program

offices 2000

sluices pump station

green buffers

ramp ground level

3 gate

underground car park


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.