
1 minute read
e Bridge
Figure 23 Crosssection(Willemink)Image 89; Cross section (willemink, 2023)
Table 4 MCA dam with bridgeTable 7; MCA dam with bridge (willemink, 2023)
Advertisement
Table 8; MCA dike (willemink, 2023) Table 2 MCA dike


Table 3 MCAsluiceTable 9; MCA Sluice (willemink, 2023)

In our masterplan we would like to use a bridge for the tra c which drives from the existing main road. e bridge should have good aesthetics so that it ts the scenery of the park. Round shapes are made well for the people in Vietnam and this is the reason why we Bridge have chosen for these kind of shapes. In our masterplan we would like to usea bridge for thetrafficwhichdrives from the existingmain road. Thebridge shouldhave good aesthetics so thatit fits the scenery of the park. Round shapes are madewell for the peoplein Vietnam andthisis the reason why wehavechosen for these kind ofshapes.

Figure 25 Bridge crosssection (Willemink)Image 90; Bridge cross section (willemink, 2023) Bridgeshould be lighted

Figure 24 Rainbowbridge (vietnamnet.vn,2018)Image 91; Bridge cross section (willemink, 2023)

Figure 30 Colored lights (Willemink)Image 97; Colored lights (Willemink, 2023)



Figure 29 Bridge crosssection (Willemink)Image 95; Bridge cross section (willemink, 2023) Figure 31Maximum heigth (esvshop.nl, 2018)Image 93; Maximum height (esvshop.nl, 2018)

4,2 metres
Figure 28 Bridgelength section (Willemink)Image 96; Bridge length section (willemink, 2023)
Figure 27 Bridge crosssection (Willemink)Image 94; Bridge cross section (Willemink, 2023) Figure 26 Drainage pits (Willemink)Image 92; Drainage pits (willemink, 2023)