Skip to main content

John Holland ESG Report 2025

Page 1

ESG Report 2025


Acknowledgement of Country John Holland acknowledges the Traditional Owners and Custodians of the lands and waters within Australia and recognises the important connection to Country that Aboriginal and Torres Strait Islander peoples have. We offer our respects to Elders of the many nations and lands both past and present and to all knowledge holders. We recognise that the lands on which we work always was and always is Aboriginal and Torres Strait Islander land. We extend that acknowledgement and respect to other lands on which we work including to Aotearoa New Zealand and to all Māori people.

About this report

Beyond this report, John Holland reports on ESG performance in the following ways:

This is John Holland’s third Environmental, Social, and Governance (ESG) report.

- Modern Slavery Statement - Financial Report - Regulatory Reporting: ʽ Australian Sustainability Reporting Standards AASB S2 Climate-related disclosures

This report outlines our ESG strategy and performance. The reporting period covered by this report is 1 January 2024 to 31 December 2025. This report has been prepared for the same consolidated reporting group as the Group’s Consolidated Financial Statements. For the purposes of this ESG Report, information collected from all entities has been consolidated and presented at the John Holland Group level. No adjustments have been made to reflect minority interests. Material topics have been identified and defined at the John Holland Group level and apply consistently across all reporting entities and John Holland-controlled joint ventures covered by this report.

ʽ

Workplace Gender Equality Agency (WGEA) Gender Equality Reporting under the Workplace Gender Equality Act 2012 (the Act)

ʽ

Greenhouse gas (GHG) emissions and net energy consumption to the Clean Energy Regulator under the National Greenhouse and Energy Reporting (NGER) scheme

Publications which can be found on our website.

Terms used in this report

The reporting entities and John Holland-controlled joint ventures included in this report are:

The term “ESG” refers to management of material environmental, social, and governance risks and opportunities to improve John Holland operations, attract and maintain skilled and diverse workforce, and create better outcomes for clients and communities.

- CCCI Australia Pty Ltd - John Holland Holdings Pty Ltd - John Holland Group Pty Ltd - John Holland Pty Ltd - John Holland Queensland Pty Ltd

John Holland’s business activities include construction projects to build assets as well as asset operations and maintenance activities. In this report, the term “projects” is used broadly and encompasses asset construction, operations and maintenance activities.

In this report, the terms “John Holland”, “we” and “our” are used to refer collectively to these reporting entities. This report has been prepared in accordance with the Global Reporting Initiatives (GRI) Standards framework. The Chief Executive Officer (CEO) approved this report on 24/09/2026.

Front cover photo: Arden Station, Metro Tunnel, Victoria

For questions about this report, please contact us.


OVERVIEW

Contents CEO message

2

About John Holland

4

John Holland in numbers Our projects and offices

4 5

Our approach to ESG

6

The John Holland Sustainability Framework ESG Strategy development & target setting Materiality assessment

6 7 8

Leadership and strategy

10

Business integrity and resilience Innovation and delivery efficiency and adaptability

10 13

Built and natural environment

15

Climate mitigation and adaptation Resource management Environmental resilience

15 20 22

Our people

25

Inclusive workplace 25 Learning and development 32 Health 33

Our community and partners

36

Social impact Supply chain resilience

36 40

Appendices 42

Click here to download the Data Book which provides John Holland's performance in environmental, social and governance impacts for the years 2021-2025.

ESG REPORT 2025

1


OVERVIEW

CEO message I am pleased to present the John Holland 2024 – 2025 ESG Report, the first report since my appointment as Chief Executive Officer in October 2025.

Looking back on our ESG achievements over the past two years, I am impressed with what everyone at John Holland has delivered. This report reflects not only on our progress against our commitments, but the character of our people – their innovation, passion and determination to ensure our projects leave a lasting impact on Australia. At our organisation, we look at ESG through two lenses. On the one hand, we know we have a significant role to play in ensuring our projects have a positive impact on the environment and local communities. On the other, focusing on ESG benefits for our organisation. This approach allows us to create long-term value - optimising our operations, supporting the cost-efficiency of our projects, ensuring we have a diverse and innovative workforce, and that we always act in an ethical and transparent manner. This approach aligns with our new company strategy, Focus 2027. The strategy is anchored by four key pillars: smart solutions, operational excellence, balanced business and achieving together. ESG contributes to Focus 2027, helping set us up for long-term success.

2

JOHN HOLLAND

Our approach to ESG Our ESG approach has been guided by our Sustainability Framework since 2019. We focused on four key areas − leadership and strategy, built environment, our people, and community and partners. At the end of 2025, we began the process of updating our approach and developing a new ESG Strategy. We have completed a materiality assessment where we gathered input from our clients, partners and key business leaders. Over the course of 2026, we will finalise development of our ESG strategy to account for changes in our operating landscape and business direction, with consideration of feedback from our people. We have taken our time to complete this process. In the last ESG report, we focused on delivering against three priority areas: smart technology and engineering solutions, climate change mitigation and adaptation, and employee experience. The recent materiality assessment confirmed that, driven by growing regulatory requirements and increasing physical risk exposure, climate change adaptation and mitigation and GHG emissions are highly material for our business. In the social dimension, employee health, safety and wellbeing stood out as the highest priority, reflecting

the importance to John Holland to build and maintain a strong culture of safety. Smart engineering and innovation were also identified as strategically material, underpinning John Holland’s identity. As a large employer and infrastructure builder operating within communities, social impact and local community engagement are key to the success of our operations. Owing to the nature of public infrastructure projects, data protection and cyber security emerged as a high-risk area.

Our achievements in the past two years We have done a significant amount of work in the area of climate change adaptation and mitigation. Our emissions have reduced steadily over the past two years, aided by a deliberate focus on electrifying our fleet, plant and equipment, and transitioning to alternative fuels across our projects. Reducing emissions in construction is a challenging task. These results, therefore, are a testament to the way our teams transform the way we work. Nowhere is that more evident than in our work for Melbourne Water, where John Holland designed and constructed a duplicate sewer tunnel beneath the Yarra River, from Spotswood to Port Melbourne. The project achieved the first independently verified net-


OVERVIEW

zero carbon infrastructure project in Australia, setting a new benchmark for the water industry and advancing both John Holland’s and Melbourne Water’s net-zero strategies. Our work on Sydney Metro Waterloo Station further demonstrates what embedding sustainability from the outset can achieve. By integrating low-carbon materials, active transport facilities, water-sensitive urban design, and low-Volatile Organic Compound (VOC) finishes across design and construction, we delivered a station that achieved a 6-Star Green Star Design and AsBuilt rating. Innovation is also shaping how we think about materials and waste. On the M7-M12 Integration project, our team pioneered an Australianfirst initiative to address the growing problem of solar panel waste, transforming end-of-life panels into a usable construction resource by incorporating recycled solar panel glass into asphalt. The innovation brought to this project demonstrates the mindset we bring to every project. Our commitment to the natural environment extends beyond carbon. At the Upper South Creek project, our restoration efforts are forecast to deliver a 64.4% net ecological gain (as measured by the Biodiversity Assessment Method), reflecting significant improvements to

aquatic and riparian habitat across Wianamatta-South Creek, Cosgrove Creek, Oaky Creek, and the Nepean River. The return of the billabong to its natural condition has revitalised local ecosystems, supporting native flora and fauna, as well as traditional food sources valued by the Dharug community. Our inclusion commitments are equally important to who we are. We’ve maintained our WGEA Employer of Choice Citation achievement and concluded our 2021-2025 Gender Equality Strategic Plan with a future plan in development. In 2025, John Holland was announced as a Gold Tier recipient of the Australian Workplace Equality Index, recognising our excellence in LGBTQ+ workplace inclusion. Women comprised 49% of our 2025 graduate intake, up from 20% in 2018, a shift that reflects years of sustained effort to build a workforce that represents the communities we serve.. Our relationship with First Nations businesses and communities continues to grow in both scale and depth. In 2024, we spent over $160 million with First Nations businesses and social enterprises across 85 projects and 234 suppliers. In 2025, that figure rose to $202 million — an increase of $42 million — spanning 226 suppliers and 78 projects. These numbers represent economic

opportunity, self-determination, and the kind of long-term partnerships that create lasting change.

What’s next Our future focus is on driving a stable, predictable and profitable business together. We will aim for a balanced business, operational excellence, lean on our strong engineering fundamentals, and achieve our goal as one team. We look forward to launching our ESG strategy in 2026. All of our achievements are worth celebrating. The capability and commitment that exists within our organisation is impressive, and the work captured in this report gives me every confidence that John Holland will continue to lead, innovate and transform lives.

Nick Miller Chief Executive Officer

ESG REPORT 2025

3


OVERVIEW

About John Holland At John Holland, our purpose is simple: we transform lives with everything we do.

From humble beginnings over 75 years ago, we are proud to be one of Australia’s leading building, infrastructure, rail and transport companies. We’re incredibly proud of our history in Australia – but it’s what we’re delivering for the future that drives our teams each and every day. Our diverse experience and expertise enable us to create innovative and enduring solutions for our customers. Working across multiple sectors means we’re up for any challenge. We’ve delivered some of Australia’s largest and most complex infrastructure projects, including the Metro Tunnel in Melbourne. We continue to work on landmark projects such as Sydney Metro and the Kidston Pumped Storage Hydro Project in Queensland – a world-first in renewable energy, converting a disused gold mine into a hydroelectric power generation facility. Our work also spans significant water, property, and urban renewal projects. You’ll even see us operating buses, trains, and trams. The recognition and awards we have received are listed on our website.

Our structure John Holland operates as a corporate group and CCCI Australia Pty Ltd is the Australian parent company. CCCI Australia Pty Ltd is a subsidiary of China Communications Construction Company Limited (CCCC), which is dual listed on the Hong Kong (1800.HK) and Shanghai Stock Exchanges (601800SH). CCCC is one of the world’s largest infrastructure construction companies.

John Holland in numbers Number of employees

5,753 New work won

$13.1 billion Number of projects

85

in 2024

78

in 2025

$202 million

spent with First Nations businesses and Social Enterprises

99.3%

of our spend has been with 7,442 Australian Suppliers

Data as at 31 December 2025

4

JOHN HOLLAND


OVERVIEW

Our projects and offices Number of projects in 2024: 85 Number of projects in 2025: 78

Infrastructure

Rail & transport

Building & development

- Airports - Ports and marine - Roads and bridges - Tunnelling - Water and wastewater - Power and energy transmission - Pumped hydro

- Design and construction - Delivery of key rail services - Systems engineering delivery and integration - Operations and maintenance

- Education and research - Health and aged care - Justice and corrections - Sports, tourism and culture - Future cities - Property development

Number of projects per region in 2025

14 Queensland

8 Western Australia

26

5

2

South Australia

21

New South Wales

Australian Capital Territory

2

Victoria

New Zealand

Our offices Corporate Head Office (Melbourne) Wurundjeri Country Level 9, 180 Flinders Street, Melbourne 3000, Victoria

Sydney Regional Office Gadigal Country Level 3, 65 Pirrama Road, Pyrmont 2009, New South Wales

Brisbane Regional Office

Spotswood (Rail and transport)

Turrbal and Jagera Country Level 11, 100 Skyring Terrace, Newstead 4006, Queensland

Wurundjeri Country 1 McLister Street, Spotswood 3015, Victoria

Perth Regional Office Noongar Country Level 8, Commercial Tower 3, 10 Telethon Avenue, Perth 6000, Western Australia

Adelaide Regional Office Kaurna Country Suite 702, Level 7, 80 Flinders Street, Adelaide 5000, South Australia

New Zealand Regional Office Level 2, 56 Parnell Road, Parnell, Auckland 1052 Aotearoa New Zealand

ESG REPORT 2025

5


OVERVIEW

Our approach to ESG As one of Australia’s largest and most prominent construction and infrastructure companies, our impact on the environment and society is extensive. We want to use our influence to deliver lasting benefits for our customers, people, communities, and the environment.

The John Holland Sustainability Framework The John Holland Sustainability Framework reflects our holistic approach to sustainability, guides our efforts and encompasses action on issues relevant to our people, community, customers, supply chain, and the environment.

Climate Mitigation and Adaptation Resource Management Environmental Resilience

BUILT AND NATURAL ENVIRONMENT

Future-focused

Customer Experience Social Impact Supply Chain Resilience

OUR COMMUNITY AND PARTNERS

OUR PEOPLE

Sustainability Framework

Empowering

Inclusive Workplace

Caring

Learning and Development Health

LEADERSHIP AND STRATEGY

Business Integrity and Resilience

Imaginative

Delivery Efficiency and Adaptability Innovation

6

JOHN HOLLAND


OVERVIEW

Our Sustainability Framework is made up of four pillars:

Leadership and strategy

Built and natural environment

Our people

Our community and partners

To drive a more sustainable industry by showing leadership and encouraging innovation in all areas.

To enhance infrastructure in a way that is sensitive to local communities and environments.

To encourage the know-how and creativity of our people and empower them to thrive.

To build strong and rewarding relationships with our communities and suppliers.

ESG Strategy development For 2026, we are developing a new ESG Strategy that will allow us to update our Sustainability Framework with a refreshed approach to ESG risk and opportunity management, position ourselves for future market conditions, and drive a stable, predictable and profitable business together. This strategy will guide our future projects and reporting.

ESG REPORT 2025

7


OVERVIEW

Materiality assessment We regularly complete materiality assessments to identify and prioritise relevant ESG issues. In 2025, we completed an independent double materiality assessment. We engaged 31 stakeholders across internal and external groups through interviews and workshops to understand our progress against areas of focus and emerging priorities. Stakeholders we engaged included capital providers, suppliers, customers and industry bodies, in addition to speaking to our internal stakeholders. We considered 20 key material topics from two lenses: - Impact materiality: evaluating the effects John Holland has on the economy, environment, and people - Financial materiality: evaluating the sustainabilityrelated risks and opportunities that may affect the company’s financial performance

Driven by growing regulatory requirements and increasing physical risk exposure, climate change adaptation and mitigation and GHG emissions are highly material for our business. In the social dimension, employee health, safety and wellbeing stood out as the highest priority, reflecting the importance to John Holland to build and maintain a strong safety culture . As a large employer and infrastructure builder operating within communities, social impact and local community engagement are both material from an impact and a financial perspective to John Holland. Strong community collaboration is integral to project delivery and underpins our operations. Owing to the nature of public infrastructure projects, data protection and cyber security emerged as a highrisk area. Smart engineering and innovation were also identified as strategically material, underpinning John Holland’s identity.

The assessment specified seven highly material topics guiding our ESG Strategy development and helping to set our FY26 targets.

Impact materiality

John Holland Materiality Assessment Impact material

Double material

Modern slavery & human rights

Greenhouse gas emissions

Biodiversity impact

Climate change adaptation & mitigation

Employee wages & benefits

Cyber security & data protection

Resource use

Smart engineering & innovation

First Nations relations

Employee health, safety & wellbeing Social impact Local community impact

Immaterial

Financially material

Waste management

Employee diversity & inclusion

Asset ratings & certifications

Environmental compliance Employee training & education Procurement practices & supply chain resilience Stakeholder engagement & management Business integrity & resilience Financial materiality

8

JOHN HOLLAND


OVERVIEW

Stakeholder engagement Ongoing formal and informal stakeholder engagement is part of our everyday work. We ensure stakeholder priorities are accounted for when we make decisions about our business and projects.

Stakeholder group

Method of engagement

Government and regulators

Government - Meetings at project sites for visits and to celebrate and recognise milestones - Participation in Government sponsored and designed consultative processes Regulators - Regular meetings and the provision of information as required by the regulator - Participation either directly or through industry associations with consultative processes including seminars and industry outreach by the relevant regulator

Customers

- Regular meetings, including regular project-based engagement and meetings outside of project engagement. Annual customer survey to track customer satisfaction and sentiment - Attendance and participation at customer-initiated engagement events - Sponsorship of boardroom lunches, conferences, awards events with customers

Employees

- Face to face events including all staff briefings, morning teas with the John Holland executive, business unit “Town Halls” - All staff communications via email and intranet - Leader specific communication resources to effectively cascade information across the business - Annual staff survey and response action plan - Company intranet and staff magazine published 2 times a year

Subcontractors and supply chain

- Quarterly meeting with critical suppliers - Meetings with other suppliers as required

Joint Venture partners

- Regular meetings and engagement as part of project delivery and tender submissions

Communities

- Project based community engagement with project notifications of works and impacts, face to face meetings, Town Halls and drop ins across impacted communities. Information and resources available via project websites - Engagement with local councils, business and community groups, members of parliament - Support and collaboration with groups to engage with targeted groups or communities

First Nations

- Project based engagement with Traditional Owners as part of project delivery - Memberships and engagement with First Nations procurement bodies across Australia - Sponsorships of First Nations community events and organisations - Engagement with First Nations employees with a dedicated First Nations staff group called the “Yarning Circle” - Engagement of First Nations employees, community and supplier through the delivery of the John Holland Reconciliation Action Plan

Financiers and insurers

- Regular meetings and information provided as required

Industry bodies

- Regular attendance and participation at events including awards, boardroom lunches, presentations, symposiums and conferences - Participation in policy committees and meetings between leaders of John Holland and industry association CEOs and leaders - John Holland is a member of the Board of the Australian Contractors Association and a member of the Australian Industry Group

ESG REPORT 2025

9


LEADERSHIP & STRATEGY

Leadership and strategy Good corporate governance underpins the resilience and integrity of our business. We are committed to the highest standards of ethics, accountability and transparency in all that we do. Through this approach, we strive to deliver positive outcomes for our people, our customers and the communities and environments in which we operate.

Business integrity and resilience Our governance The composition of our Board and Executive Leadership Team in 2026 is set out below1.

The John Holland Group Board of Directors Junwu Zhang

Jinsong (Jason) Tang

Xiaojun Peng

Glenn Palin

Martin Monro

Nick Miller

Darryn Ray

Chun Pong (Eddie) Leung

Ross Taylor

Non-Executive Director

Non-executive Director

Non-executive Director

Non-executive Director

Non-executive Director

Executive Director

Executive Director

Executive Director

Non-Executive Director

Appointed 29 Apr 2025

Appointed 20 Apr 2015

Appointed 29 May 2025

Appointed 30 Apr 2009

Appointed 26 Mar 2026

Appointed 26 Mar 2026

Appointed 7 Nov 2012

Appointed 20 Apr 2015

Appointed 26 Mar 2026

Board Committees Governance, Compliance and Audit Committee

Risk Committee

Strategy and Budget Committee

Health, Safety and Environment Remuneration and Nominations Committee Committee

Chief Executive Officer Nick Miller, Chief Executive Officer (CEO) Appointed 15 Oct 2025

Executive Leadership Team David Lehmann

Darryn Ray

Sarah Elliott

Martin Webster

Michael Marix-Evans

Steve Butcher

Chief Operating Officer (COO)

Chief Financial Officer (CFO)

Chief People Officer (CPO)

Chief Commercial Officer (CCO)

Chief Engineer (CE)

Managing Director, Rail & Transport

Andy Hunter

Joe Kokai

William Smith

Johanna Hall

Struan Collins

Executive General Manager, Infrastructure

Executive General Manager, Building

Executive Project Director, Major and Strategic Projects

Group General Manager, CEO’s Office

Regional General Manager, Western Australia

1 Two of the Board Directors joined in 2025 and three joined in 2026. Several ELT roles have been appointed in 2025 and 2026. Directors and ELT members who were not in roles for the full period covered by this report are not responsible for decisions or outcomes that took place before their appointment occurred.

10

JOHN HOLLAND


LEADERSHIP & STRATEGY

ESG governance and risk management One of the Board’s specific responsibilities includes approving John Holland’s incoming ESG Strategy, including our existing Net Zero Transition Plan, policies and performance. The Board is also responsible for ensuring that ESG issues are integrated into strategic planning and our risk framework. A mapping exercise was undertaken to ensure all elements of ESG (together with their associated risks) are under the oversight of the relevant Board Committees. The Board is responsible for the governance and oversight of climate-related risks and opportunities (CRROs), including John Holland’s strategic approach, risk management, and performance against its strategy, goals, and targets. The Risk Committee supports the Board’s task of monitoring the performance of the Group by overseeing the framework for, and reporting of, risks. This includes both enterprise and project delivery risks. The Risk Committee has an established Charter approved by the Board, which includes a responsibility for overseeing and reviewing climate-related risks and opportunities in alignment with Australian Sustainability Reporting Standard (ASRS) S2 standard. The identification and management of all risks and opportunities, including ESG and climate related risks, is performed in accordance with John Holland Group’s Risk Management Policy and Risk Management Manual (RMM), which is compliant with the AS/NZS ISO 31000:2018 Risk Management standard.

During 2025, John Holland refreshed its risk management framework and process to provide greater focus to the identification, assessment and management of climate-related risks. Specifically, during the period we incorporated both a quantitative climate risk assessment and a scenario analysis process to support the ongoing commitment to climate resilience.

Sustainable finance At John Holland, sustainable finance plays a critical role in supporting our transition to ESG‑oriented business practices. Since 2021, we have maintained a $1.5 billion sustainability‑linked bonding facility incorporating sustainability‑linked Key Performance Indicators (KPIs). The facility supports the delivery of projects by prioritising sustainability outcomes, including resource efficiency and social procurement, and contributes to John Holland’s transition toward a net zero future and the achievement of our ESG objectives. We have successfully completed the first term of the facility and are currently in the second term, which incorporates a new set of sustainability‑linked KPIs to further strengthen performance and accountability. All sustainability KPIs related to the second term were achieved in 2024 and 2025.

Ethics and compliance Our commitment to ethics and compliance is underpinned by a range of policies that set out our internal standards for best-practice conduct. The John Holland Code of Business Conduct

The John Holland Code of Business Conduct (the Code) sets the standard for our commitment to be an ethical business. The Code ensures that we always comply with the law and uphold proper and ethical business practice. The Code applies to all employees, consultants, and contractors. The Code is available here.

The John Holland Whistleblower Standard

We want everyone to feel safe and empowered to speak up if they become aware of unethical or unlawful conduct in our business dealings. The John Holland Whistleblower Standard explains how to report wrongdoing, how we deal with reports and, what protections are available to those who speak up. The Whistleblower Standard is available here.

Anti-corruption and anticompetitive measure

John Holland’s Code of Business Conduct is explicit on avoiding conflicts between personal and business interests. All conflicts must be disclosed to managers and are recorded on a conflicts of interest register maintained by the Company Secretary.

Supplier Code of Conduct

Our suppliers must comply with our Supplier Code of Conduct which sets out our expectations and standards of behaviour expected from all of our suppliers. The Supplier Code of Conduct is available here.

ESG REPORT 2025

11


LEADERSHIP & STRATEGY

Cyber security We take seriously our responsibility to safeguard the data entrusted to us by our people, our customers and our stakeholders. We continually improve the monitoring and detection of cyber threats, and improve our processes.

We review information security objectives, risk assessments and assurance activities on a routine basis to ensure ongoing alignment with regulatory requirements, client expectations and evolving threat conditions.

John Holland manages cybersecurity and data protection through a formal Information Security Management System (ISMS) that governs how information and technology risks are identified, controlled, monitored and continually improved across the organisation, including corporate and project environments.

Cybersecurity and privacy incidents are managed through a formal incident management process, with defined escalation and reporting requirements to support accountability, learning and continuous improvement.

Our cybersecurity program is structured around ISO/IEC 27001:2022. It is supplemented by the National Institute of Standards and Technology Cybersecurity Framework standard and the Australian Signals Directorate “Essential Eight”, to provide both governance and technical control coverage.

CASE STUDY

CASE STUDY

From audit to action: embedding ISO/IEC 27001 as a living security framework

Building security from the ground up: embedding cybersecurity awareness across the workforce

John Holland achieved and maintained ISO/IEC 27001 certification in 2024-2025, strengthening ISMS governance routines, improving audit evidence quality, and building processes to translate findings into tracked corrective actions. This marked a deliberate shift from treating compliance as a periodic exercise to embedding security requirements into everyday policies, processes and decision-making across both corporate and project environments.

John Holland’s Security Culture Program continued to evolve in 2024–25, with our team applying targeted awareness activities in a project-based environment, using phishing simulations to identify higher-risk behaviours, and deploying tailored follow-up training to address specific risk patterns rather than relying on generic campaigns.

The certification gives government and critical infrastructure clients confidence that security risks are managed to an internationally recognised standard, while improving governance consistency across John Holland’s diverse operating environment. Achieving and sustaining this maturity in a projectbased organisation requires continuous effort. We know that security practices must evolve alongside emerging risks from growing data volumes, complex supply chains and new technologies - maintaining this certification represents an ongoing commitment to vigilance rather than a finished endpoint. For our team at John Holland, ISO/IEC 27001 is not a destination but a foundation for sustained adaptation in a constantly changing threat landscape.

12

The effectiveness of our cybersecurity and data protection approach is assessed through internal and external assurance activities to support continual improvement.

JOHN HOLLAND

The program improved employee understanding of individual responsibilities for protecting customer and project information, and drove greater consistency in how risks and incidents were identified and escalated - reducing response times and improving reporting quality. It also strengthened alignment between policy, governance and day-to-day behaviours, helping ensure documented controls translated into actual practice. Embedding consistent security behaviours across a geographically dispersed, project-based workforce requires ongoing reinforcement, as employees move between projects with varying client requirements and risk profiles. We recognise that cultural maturity may vary by role and environment, and awareness activities - while effective in reducing risk - are a complement to, not a substitute for, strong technical controls and structured governance.


LEADERSHIP & STRATEGY

Innovation and delivery efficiency and adaptability Innovation is a key part of John Holland’s identity. Our people are engaged and driven to deliver large, complex and innovative projects. Smart engineering and technological solutions allow us to improve design outcomes and productivity and reduce the resources we use. Innovation is embedded within our culture, with our teams always seeking to develop innovative solutions for our clients. Since every project requires us to take a bespoke approach to innovation, our work in this area is best demonstrated by case studies included in this section as well as throughout this report. As part of our ESG Strategy we are working on determining KPIs and ways of tracking innovation implementation across projects. CASE STUDY

Innovative surveying and monitoring of the Incremental Launch Bridges (ILB) at Elizabeth Drive Connection As part of John Holland’s M7-M12 Integration project, the project team and Lynton Surveys delivered a specialist surveying solution for the construction of two Incremental Launch Bridges (ILBs) over the M7 Motorway near Elizabeth Drive. Unlike traditional fixed-form bridge construction, ILB segments move after launch and can deviate due to launch forces, steel stress relief, and curvature-induced deflections, requiring adaptive, real-time solutions. The team implemented a suite of project-specific innovations including recalculating barrier and twin rail positions post-launch, translating radial 3D reinforcement layouts into 2D fabrication areas on site, and validating segment shrinkage through in-situ monitoring. A key technical enabler was the use of the 3D Helmert transformation tool in 12d Model, applying a precise 7-parameter transformation to align final bridge element positions back into the casting bed coordinate system. Repeatable workflows and early design calculations decreased material waste, labour hours, and contractor rework, while ensuring the bridge weekly construction cycle was consistently achieved. Constructing two ILBs over one of Sydney’s busiest motorways presented significant technical and logistical complexity, with launches taking place over live traffic and many bridge features cast in a static position yet intended to land in an entirely different orientation after launch. However, the team’s engineering solutions eliminated the need for cranage over live traffic and ensured all major works were carried out in protected on-site areas, significantly reducing disruption to the public and surrounding community.

An aerial photograph of the Incremental Launch bridges stretching over the M7 Motorway

Close up of Launch bridges

ESG REPORT 2025

13


LEADERSHIP & STRATEGY

CASE STUDY

Implementing a new load control assistant system On the West Gate Tunnel Project, our team faced the complex task of installing a lightweight cladding system on tunnel vent stacks, where each panel is positioned at a different angle across a steel diagrid structure. To manage the high risks associated with this work, the team deployed LuCA, a proprietary system by Roborigger that attaches to the crane hook and enables 360-degree rotation of a load on the horizontal axis via remote control. This solution removed workers from the line of fire by eliminating the need for chain blocks and tag lines to adjust panel positioning, while still supporting the rigger and dogman in maintaining precise load control. LuCA’s ease of deployment, manufacturersupported training, and loss of time connectivity for data collection and analysis further strengthened the team’s ability to deliver the works safely and efficiently. The work was conducted directly adjacent to live, high-volume traffic on the West Gate Freeway, where the complex angular geometry of the cladding panels and the entanglement risk posed by tag lines within the diagrid structure created a high-risk environment demanding an innovative and reliable solution. The use of LuCA significantly reduced the number of personnel required near live loads and provided greater certainty of load control in varying wind conditions, directly addressing one of the project’s most critical safety considerations. This approach materially lowered the risk of entanglement within the diagrid structure and enhanced the safety of lifting operations throughout the cladding installation program.

14

JOHN HOLLAND

LuCA in operation on West Gate Tunnel Project


BUILT & NATURAL ENVIRONMENT

Built and natural environment In project planning and development, some of our most important decisions relate to how we engage with resources and the natural environment, including mitigating and adapting to the challenges of climate change. We look for solutions to limit the use of energy and water, minimise waste and GHG emissions, and manage the materials we use

Climate mitigation and adaptation Climate change poses a significant threat to the way we work, and it’s a responsibility of everyone at John Holland to work towards mitigating and adapting to it.

When and where possible, we look to reduce GHG emissions associated with the construction of our projects − everything from the energy used in project development, to limiting embodied carbon associated with the materials we use. We are proud of the innovative solutions our teams have implemented.

Climate Strategy 2022-2025 We have implemented the John Holland Climate Strategy 20222025. This program of work included multiple key priority initiatives. Our Strategy recognised the benefits of being a diverse business, with a mix of sectors, geographies and roles along the value chain, to help us manage shifts in the nature of work, driven by climate change.

We know our teams can offer flexibility in service delivery, project planning and resource allocation to manage these emerging physical and transitional climate impacts within existing operational frameworks. We are continuing to align with the latest climate policies and market requirements, supported by capability development. At the time of writing this report , the John Holland ESG Strategy was in preparation and due to be launched in 2026, inclusive of specifying our priorities in climate mitigation and adaptation.

ESG REPORT 2025

15


BUILT & NATURAL ENVIRONMENT

Net Zero Target John Holland has committed to achieve Net Zero carbon emissions (Scope 1 and 2) by 2045. This will be achieved through the implementation of carbon reduction initiatives across five core themes as seen in the diagram on the right. Using a set of realistic Carbon Reduction Initiatives for Scope 1 and 2 emissions, John Holland established a Net Zero Pathway and Net Zero Target in line with the goals of the Paris Agreement, to maintain global warming to below 1.5º C. John Holland continually monitors our Net Zero progress and can confirm that our emissions to date are reducing and are aligned to our net zero trajectory to reach Net Zero carbon emissions (Scope 1 and 2) by 2045. Our emissions reductions are being achieved via the implementation of initiatives including recent achievements in biodiesel blends use, with a 500% increase in the last two years. It now makes up 20% of our fuel.

Climate governance Board of Directors oversight with support from Board Committees including Board Health, Safety, Environment and Sustainability Committee and Board Risk Committee.

Strategic Delivery Health, Sustainability and Climate team responsible for strategy delivery of 2022-2025 Climate Strategy

Climate Policy

Net Zero Transition

Climate Systems

Climate Training

Commitment to leaving a positive legacy for communities and environments in which we work and operate, that safeguards our climate for future generations

Developed Net Zero Pathway with Transition Plan to achieve Net Zero by 2045

Continue to embed climate management, including climate risk and opportunities, throughout our Integrated Management System (IMS)

Board Education and Training

A John Holland Carbon Working Group was established in 2022 to support John Holland’s Net Zero Pathway and Transition Plan development, and to also support the development of a carbon accounting solution.

Climate risk and opportunity management We have an enterprise-wide approach to climate risk and opportunity management. Many of our teams are also assessing project-level climate risks and opportunities in line with Australian standards and contractual requirements. We have worked on standardising our processes to apply them across our business. Climate-related risks and opportunities are recorded in John Holland’s Risk System. All risks, including climaterelated, are prioritised based on the risk tolerance set by the Board Risk Subcommittee. Risks that exceed the Board’s tolerance levels are added to the Company’s Enterprise Risk Register.

16

Carbon Working Group established and responsible for carbon accounting approach and Net Zero Transition

JOHN HOLLAND

Developed Climate Training for all employees (launched in 2024)

Climate risk and opportunities identification and monitoring Risk Management Policy Specifies approach to climate risk and opportunity identification and monitoring Risk Management Manual (RMM) and Risk Management Framework (RMF) Climate risk integrated with the RMM and RMF for a holistic approach aligned to other functional areas with climate risks addressed relative to other critical business risks. Climate Policy and Sustainability Management Manual (SMM) Describes how climate-related risks and opportunities (CRRO) are addressed at the company, including the use of scenario analysis and climate futures in assessment


BUILT & NATURAL ENVIRONMENT

Climate risks and opportunities are evaluated against the company’s risk criteria for likelihood and consequence, using John Holland’s Enterprise, Business Unit and Project Likelihood Matrix. Climate-related risks are prioritised alongside traditional operational and financial risks integrated into the company’s consolidated risk register, ensuring climaterelated considerations are embedded within financial planning, operational decision-making and strategic scenario analysis. Climate resilience assessment In 2025, we completed a climate resilience assessment including identification and qualitative assessment of physical and transitional Climate Related Risks and Opportunities (CRROs), followed by quantitative assessment of CRROs that have the most potential impact on the business. The assessment evaluated the resilience of John Holland’s value chain to climate impacts. Climate scenarios chosen Time horizons

Low emissions scenario – 1.5ºC Moderate emissions scenario - 2.5-3 ºC High emission scenario - 4ºC Short, medium, long-term impacts

Greenhouse gas emissions John Holland reports Scope 1 and Scope 2 GHG emissions to meet its obligations under the National Greenhouse and Energy Reporting (NGER) Scheme and the Corporations Act 2001, including climate-related financial disclosures. Emissions are calculated in accordance with the NGER (Measurement) Determination 2008 for Australian operations and Measuring Emissions Guide for New Zealand operations. Emission factors from these regulatory sources are reviewed annually and maintained within John Holland’s reporting systems to ensure the most current factors are applied. Greenhouse gas emissions for FY24 and FY25 can be found in the Data Book published on our website. Emissions reduction We continue to reduce our emissions. Our teams have implemented carbon reduction initiatives across projects, aided by electrification of our fleet, plant and equipment, the purchase of renewable electricity and use of alternative fuels. Collaboration with our industry, partners, peers and community is essential to our success. Through our membership of the Australian Construction Association, we are contributing to the decarbonisation of the infrastructure sector and delivery of Australia’s Net Zero target.

John Holland has identified CRROs that could significantly impact the organisation’s cash flows. Those risks are heat-related productivity loss, wet-weather impact on productivity, and carbon pricing impacts on the supply chain.

ESG REPORT 2025

17


BUILT & NATURAL ENVIRONMENT

CASE STUDY

Building the Melbourne Metro with less cement When challenged by the Melbourne Metro Rail Authority to reduce Portland Cement Content (PCC) during the Metro Tunnel Project’s tender phase, Cross Yarra Partnership2 Design & Construction (CYP D&C) committed to a 44% reduction target. To achieve this, CYP D&C developed a strategic mix-by-mix approach, targeting higher reductions where feasible:

Interactive outdoor hoarding located at Scienceworks working as a moving and engaging live exhibition for the museum.

CASE STUDY

Delivering Australia’s First Net-Zero Carbon Infrastructure Project John Holland designed and constructed a duplicate sewer tunnel for Melbourne Water, running beneath the Yarra River from Spotswood to Port Melbourne, across two constrained and sensitive sites: Melbourne’s Scienceworks museum and Westgate Park. From the outset, the project set an ambitious vision to be the most sustainable construction project possible, pursuing independently verified carbon neutrality alongside significant social and community outcomes.

“ The project achieved the first independently verified net-zero carbon infrastructure project in Australia, setting a new benchmark for the water industry and advancing both John Holland’s and Melbourne Water’s net-zero strategies.” Beyond environmental performance, the project reached gender parity within the John Holland project team, delivered award-winning social impact and employment opportunities, and achieved 95% community satisfaction through genuine collaboration with local communities. Delivering these outcomes required careful coordination across two high-profile, sensitive locations - a working museum visited by over 500,000 people annually and an urban state park - where construction activity had to minimise disruption while maintaining ambition across every dimension of sustainability and social value. Despite the challenges, the project outcomes collectively established a replicable model for sustainable infrastructure delivery, demonstrating that net-zero carbon construction is achievable on projects of all scales while simultaneously generating meaningful social value. The project’s recognition as an industry first positions John Holland as a leader in sustainable construction and strengthens its credentials in pursuing future work aligned with net-zero commitments across the water and infrastructure sectors.

18

JOHN HOLLAND

- Up to 71% for piling mixes - 30% in shotcrete - 50 to 59% for precast tunnel segments - Mix of 25%, 50%, 65% for slab pours This offset elements where reductions were limited, substituting Portland Cement with flyash and blast furnace slag, two low-carbon industrial byproducts.

“ Across more than 752,000 m³ of concrete poured to date, CYP D&C has achieved a 51.7% project-wide PCC reduction, significantly exceeding the original target and avoiding approximately 161,507 tonnes of CO₂-e in upfront embodied carbon.” The challenge lay in the complexity of managing diverse concrete specifications across a major tunnelling project, without compromising structural performance or workability. This outcome represents one of the project’s most material sustainability achievements, directly addressing the carbon intensity of cement manufacturing at scale.

2 Members include: Lendlease, John Holland, Bouygues Construction, John Laing, and Capella Capital


BUILT & NATURAL ENVIRONMENT

CASE STUDY

Using renewable energy on-site for Light Rail Stage 2A As part of its commitment to reducing emissions and improving sustainability outcomes, Canberra Metro Construction (CMC) has implemented an innovative renewable energy solution at one of its Light Rail Stage 2A construction sites in Canberra. When a grid connection was not feasible at Traction Power Substation 6 (TPS6), the team installed two Australian-made Solarsheds in November 2025 as a clean alternative to diesel generators. Each unit combines roofmounted solar panels, integrated battery storage and a smart energy management system, providing a reliable source of renewable power for the site. The initiative complements CMC’s broader renewable energy strategy, which already includes grid-connected renewable electricity across its primary waterfront and bus stop compounds. One of the key challenges was identifying an off-grid solution capable of reliably powering day-to-day site operations, including the site office and lunchroom, without compromising energy security. Through the integration of battery storage and intelligent load management technology, the Solarsheds provide a dependable power supply while overcoming the limitations often associated with standalone solar systems. Beyond supporting site operations, the initiative demonstrates how practical, scalable renewable energy solutions can be successfully deployed across construction environments where traditional grid connections are unavailable or impractical.

Solarsheds in operation on site at Canberra Light Rail Stage 2A

“ The Solarsheds fully eliminated diesel generation at TPS6, saving more than 3,700 litres of diesel and avoiding 10 tonnes of CO₂-e within just two months - a strong early result in reducing Scope 1 emissions. The initiative demonstrates that portable, off-grid renewable solutions are a practical and effective alternative to diesel even on constrained satellite sites”.

CASE STUDY

Using renewable fuels to reduce emissions At John Holland, the adoption of renewable fuels in the form of biodiesel blends (B5, B7, B10, B20 and B50) has increased significantly over the past two years. This growth has been primarily driven by our commitment to ESG, our Sustainability‑Linked Loan KPIs and project‑level sustainability contract requirements. We established a national Framework Agreement with a commercial bulk fuel distributor to drive increased biodiesel uptake across our projects. Our team has achieved a year‑on‑year increase in biodiesel blend usage over the past five years. In 2024, we achieved a 529% increase in our biodiesel blends usage compared to 2023 and continued to grow our use by a further 15% in 2025. Our Sydney Metro West - Eastern Tunnelling Package project in NSW, is a great example using 1.1 million litres of B5, in 2025 alone.

Biodiesel blends usage on John Holland Projects (kL) 6,000 4,830.96

5,000 4,179.72 4,000 3,000 2,000 1,000 0

664.23 97.33 2022

2023

2024

2025

ESG REPORT 2025

19


BUILT & NATURAL ENVIRONMENT

Resource management Our teams have always sought to find efficiencies in water, energy, materials use and waste management. We have an established process for resource use and waste management on our projects.

John Holland Integrated Management System Embeds ESG requirements across project planning, design, procurement, construction and handover

Sustainability Framework Identifies key sustainability elements that should be considered during the decisionmaking process

Project set-up Accountabilities and performance targets set through the Sustainability3 or Environmental Management Plan, and project governance agreements

Project delivery Identification and implementation of ESG initiatives and innovation opportunities

Project ESG outcomes monitoring Monitored through defined data capture, reporting and reviews

Data capture and maintenance Over the past couple of years, we worked on standardising data capture and maintenance across our projects to accurately track our performance. In 2025, we launched comprehensive NGER and sustainability data training to support our people responsible for managing data. The training strengthens understanding of reporting obligations and provides practical guidance on data capture, review and reporting to promote accuracy, consistency and compliance. The mandatory energy, materials, water and waste data is consolidated into a centralised, certified dataset. Our approach is that the data quality is verified and assured through a review process to confirm completeness and accuracy. The verified dataset will underpin internal, external, and regulatory reporting while providing data subsets for project-level client reporting and sustainability ratings.

3 Only on projects with contractual sustainability requirements.

20

JOHN HOLLAND

Complete Waterloo Metro Station

CASE STUDY

Delivering Sydney Metro with sustainability in mind Waterloo Station on Sydney Metro’s City and Southwest Line is a landmark infrastructure project −a four-level, architectdesigned station extending 25 meters underground, equivalent in scale to a 60-storey building on its side. John Holland delivered the station with sustainability embedded across design and construction, achieving a 6-Star Green Star Design & As-Built rating through initiatives spanning low-carbon materials, active transport facilities, water-sensitive urban design, and low- Volatile Organic Compounds (VOC) finishes.

“The results were substantial: - a 45% reduction in Portland Cement content - 98% diversion of non-hazardous construction waste from landfill - 19% reduction in predicted operational energy - 25% reduction in potable water consumption - 26% reduction in lifecycle GHG emissions” The project also connects seamlessly with the Waterloo Metro Quarter, a mixed-use community precinct developed by John Holland and Mirvac, amplifying its broader urban sustainability contribution. The absence of established benchmarks for underground station sustainability in the Australian market created difficulty, requiring the team to develop a custom Green Star tool with limited prior implementation − demanding close collaboration with assessors and a willingness to pioneer new approaches without the benefit of comparable local precedents.


BUILT & NATURAL ENVIRONMENT

Recycled solar panel glass

CASE STUDY

Replacing diesel with Hydrotreated Vegetable Oil (HVO) John Holland’s Upper South Creek Advanced Water Recycling Centre project conducted NSW’s first trial of Hydrotreated Vegetable Oil (HVO), a renewable diesel alternative, to address the energy-intensive nature of water treatment infrastructure construction.

Realigned Wallgrove Road, completed using recycled solar panel glass

CASE STUDY

Australian first: using recycled solar panel glass in asphalt John Holland’s M7-M12 Integration project pioneered an Australian-first initiative to address the increasing problem caused by solar panel waste, transforming end-of-life panels into a construction resource. In collaboration with PV Industries and Fulton Hogan, the team developed a process where crushed, discarded solar panel glass becomes a direct replacement for quarried sand in asphalt production. With Australia projected to generate one million tonnes of solar panel waste by 2035, this innovation offers a scalable solution that meets safety and performance standards, while diverting waste from landfill. Further, the process resulted in reduced water usage compared to other recycled glass sources that have to be washed.

“ The initiative successfully repurposed 400 solar panels, laying 240 tonnes of sustainable asphalt mix containing six tonnes of crushed solar panel glass. This resulted in a 12.5% reduction in GHG emissions and significant reduction in water use compared to traditional crushed recycled glass-based asphalt, and eliminating reliance on virgin quarried materials.”

The trial replaced 1,762 litres of conventional diesel with 100% HVO in two generators, powering EV chargers, site sheds and ablution blocks, and requiring no engine modifications or special maintenance.

“ The initiative consumed 1,762 litres of HVO and reduced 5.6 tonnes of CO2-e emissions, achieving a 95% reduction compared to the equivalent volume of mineral diesel. The trial demonstrated HVO’s viability as a like-for-like diesel replacement and provided John Holland with critical operational data and lessons for future deployment.” The success established a replicable model for decarbonising construction activities across large-scale infrastructure. Overcoming unreliable HVO supply chains in Australia caused delays during the trial, though these logistical barriers are anticipated to ease with growing market demand and expanded regional refining capacity.

Delivery of HVO

The primary challenge was proving that crushed solar panel glass could meet the rigorous safety, durability and performance standards required for road construction materials. However, now approved as a Transport for NSW product, the solution has established a replicable model for infrastructure projects across NSW and globally, demonstrating how circular economy principles can be embedded into large-scale construction.

ESG REPORT 2025

21


BUILT & NATURAL ENVIRONMENT

Sustainability ratings and awards

Two of our projects received a 6 Star Green Star rating:

Sustainability ratings and awards for our projects help us demonstrate our commitment to delivering assets for our clients that are sustainable and resilient. We are proud that many of our infrastructure, rail, building and major projects received industry leading scores in sustainability ratings from the Infrastructure Sustainability Council (ISC) and the Green Building Council of Australia (GBCA).

- Waterloo Station, 6 Star Green Star using Sydney Metro custom tool (2025) - CYP Stations, 6 Star Green Star using Melbourne Metro Rail Authority custom tool (2025): Arden, Parkville, State Library, Town Hall, and Anzac

In the past two years, we received 20 certified sustainability ratings across 14 projects – 14 Infrastructure Sustainability ratings and 6 Green Star ratings. The following projects received a Leading As Built IS rating: - More Trains More Services Stage 2 - North Package - Melbourne Metro Rail Infrastructure Alliance - Transport Access Program 3 – Redfern Station Upgrade - Bruce Highway - Cairns Southern Access Corridor Stage 3: Edmonton to Gordonvale.

In the past two years, we also received several awards, including: - 2025 Australian Water Association - Infrastructure Project Innovation Award for the Hobsons Bay Main Duplication Project, Victoria - 2025 Banksia National Built Environment and Infrastructure Award for the Hobsons Bay Main Duplication Project, Vic - NSW Banksia Award - Circular Economy for the M7/M12 Integration Project - Solar Panel Glass Sand in Asphalt The full list of project ratings is included in Appendix D, with all sustainability awards included in Appendix F.

Environmental resilience Environmental resilience is part of every project’s planning and execution. We aim to manage nature impacts to avoid and minimise impacts.

Plan, Do, Check, Act Environmental management at John Holland is achieved through several specific actions that fall under our Plan, Do, Check, Act process. PLAN

DO

Assess sensitive or protected habitats to minimise impacts and define the legal requirements needed to protect nature during the project.

Develop a Construction Environmental Management Plan (CEMP) and associated Sub-Plans. The CEMP defines the mitigations and actions that are required to be completed by the project team to manage environmental impacts and comply with legislation.

Implementation of mitigations and actions during delivery

CHECK Regular inspections and audits of implemented mitigation measures ACT Corrective actions raised and completed to drive continuous improvement

22

JOHN HOLLAND


BUILT & NATURAL ENVIRONMENT

The John Holland Environmental Management System

AS/NZS ISO 14001 Environment Management System

The John Holland Environmental Management System (EMS) is a structured approach to managing and mitigating impacts to the surrounding environment. During the reporting period, 231 Environmental Governance Audits were completed on projects implementing John Holland’s EMS. The average Audit Result for these audits was 94.1%, showing a very high level of compliance. Reported incidents and fines During the 2024-2025 calendar years we didn’t report any significant4 environmental events. During this period, 602 Report Only (i.e. not John Holland-related) events, 811 low impact events and 6 moderate severity events were recorded. No significant fines or non-monetary sanctions have been received by John Holland during 2024 and 2025 calendar years. List of sites operated by John Holland in, or adjacent to, protected areas and areas of high ecological value is included in Appendix G.

JHG Environment Policy Global Mandatory Requirements (GMR) GMR 9 Environmental Management JHG Environment Management Manual (EMM) JHG Environment Management System procedures, guidelines, forms and appendices Environmental Management Plan (EMP) Environmental Management Subplans Task Risk Assessments (TRAs)

Inspection and Test (ITPs)

Site Environmental Plans (SEPs)

CASE STUDY

Restoring Coastal Wetlands The Next Rail Alliance supports Transport for NSW on the More Trains, More Services program and focuses on delivering greater capacity, reliability and connectivity for customers on the T4 Line, South Coast Line and T8 Line. Many of these projects required vegetation clearing for construction activities and trigger Transport’s offsetting requirements. After negotiations with Bayside Council, the team set on an impactful solution: restoring Sydney Freshwater Wetlands and Swamp Oak Floodplain Forest, including both endangered ecological communities under state and federal legislation that exist at a fraction of their pre-settlement extent. The offset plan committed to planting and maintaining 1,750 tube stocks and 24 canopy specimens of appropriate native species to restore critical coastal wetland ecosystems. The program met the client’s offset program at no additional cost while contributing multiple environmental and community benefits beyond standard offsetting approaches: - Restored endangered ecological communities - Expanded native wildlife corridors - Enhanced topsoil conservation through high-density planting - Improved water quality through natural filtration of urban contaminants - Provided superior habitat for local fauna compared to street trees - Facilitated carbon sequestration in bottom sediments; and - Improved recreational amenity within parkland areas. The challenge involved navigating the asset operator’s preference against onsite offsetting due to maintenance concerns, geographic limitations to the immediate council area, and Bayside Council’s resource constraints that required coordinated effort across Next Rail’s environment and community teams and the client to secure approval.

4 In this context, John Holland defines “significant environmental events” as being over $10,000.

ESG REPORT 2025

23


BUILT & NATURAL ENVIRONMENT

CASE STUDY

Restoring biodiversity at the Upper South Creek Project The Upper South Creek Project undertook extensive restoration of the riparian area adjacent to WianamattaSouth Creek, revegetating approximately 57,000m² of corridor through a combination of direct planting and hydroseeding, installing over 304,843 native plants. Erosion control measures including coir logs, jute mesh and reshaped creek banks were deployed at key locations to stabilise disturbed areas and improve water movement. More than 890m³ of timber from trees felled within the project alignment was repurposed as habitat logs within the riparian zone, diverting material from landfill. The project also reconnected an on-site billabong by removing an artificial bund wall, returning it to its natural state and supporting Western Sydney’s green spine.

“ Restoration efforts are forecast to deliver a 64.4% net ecological gain as measured by the Biodiversity Assessment Method, reflecting significant improvements to aquatic and riparian habitat across Wianamatta-South Creek, Cosgrove Creek, Oaky Creek, and the Nepean River. The return of the billabong to its natural condition has revitalised local ecosystems, supporting native flora and fauna, as well as traditional food sources valued by the Dharug community.” Balancing the scale and urgency of construction impacts against the need for ecologically and culturally sensitive restoration was challenging, particularly along highly eroded creek sections where conventional engineering solutions were reconsidered in favour of approaches guided by Traditional Custodian Knowledge. Engagement with the Aboriginal Stakeholder Advisory Group shaped a less invasive approach to creek bank stabilisation, replacing earlier plans for regrading with native planting methods that better respect the integrity of the waterway.

Aerial view of Upper South Creek area

24

JOHN HOLLAND


OUR PEOPLE

Our people We put a lot of effort into creating an environment where our employees thrive and feel safe, appreciated, and belong. Their health, safety and wellbeing, training and education opportunities form part of their overall employee experience. Our people are foundational to our success.

Inclusive workplace Inclusion, diversity and equity are fundamental to our culture and business strategy. Our employees should reflect the diversity of the communities we work in. We know we can deliver better if our people feel safe, respected, equal and included at John Holland. We have built great foundations in this area, made encouraging progress towards the targets we set ourselves, and have firm plans to improve our performance.

Key highlights John Holland was announced as a Gold Tier Australian Workplace Equality Index (AWEI) recipient in May 2025, recognising excellence in LGBTQ+ workplace inclusion.

The proportion of women employed at John Holland grew from 21.7% in 2021 to 26.5% in December 2025.

We concluded our 2024-2025 Innovate Reconciliation Action Plan with majority of our deliverables achieved and others we will continue to advance.

92 employees have utilised the Multicultural Leave Exchange since its introduction in 2022.

We continued the progress our 20212025 Gender Equality Strategic Plan and produced a summary report at the end of this plan. This aligns with our continued achievement of being a Workplace Gender Equality Agency (WGEA) Employer of Choice Citation holder.

The organisational gender pay gap (mean total remuneration) reduced from 31.3% (20212022) to 25.1% (2024-2025), a 6.2% point decrease.

Women comprised 49% of the 2025 graduate intake, up from 20% in 2018.

ESG REPORT 2025

25


OUR PEOPLE

Employees by gender in 2025

Employees by region 2025

0.01% 0.01% 0.03% 0.03%

6.4% 6.4% 0.7% 0.7%

0.47% 0.47%

3.2% 3.2% 6.4% 6.4%

26.47% 26.47%

40.1% 40.1% 29.6% 29.6% 73.10% 73.10%

19.2% 19.2% Men Men

Women Women

Preferred Preferred not say not toto say

Non-binary Non-binary

Not specified Not specified

Inclusion Strategic Plan 2023-2025 We released our Inclusion Strategic Plan in mid-2023, aligned to the wider organisational strategy and guided and supported by the Social Impact Strategic Roadmap 2023-2025. The plan focused on removing barriers and establishing clear accountabilities for everyone to enable John Holland to be more inclusive, diverse and equitable, as well as an industry leader. Four areas of focus

Attraction and recruitment

Psychological and physical safety and respect

NSW NSW

QLD QLD

VIC VIC

SASA

WA WA

ACT ACT

NZNZ

Our team was very pleased with the plan’s outcomes across five success measures, where we either maintained or exceeded our targets: - Internal inclusion index +1% each year5 - 2% reduction of our gender pay gap - Baseline Flex Engagement Score in 2024 and +1% improvement - Maintain WGEA Employer of Choice for Gender Equality - Achieved gold status in the Australian Workplace Equality Index (AWEI) for LGBTQ+ inclusion - Meeting Innovate Reconciliation Action Plan (RAP) - Growing diverse representation across gender, First Nations, disability or neurodiversity Activities undertaken across John Holland − including the recognition of dates of significance, policy releases like our Sex Discrimination and Sexual Harassment Policy, the embedding of practices through frameworks like WGEA, AWEI and RAP, and increasing diversity − are all contributors to this success. Not one specific thing has had an impact, rather, a collection of Inclusion, Diversity and Equity efforts across the business has seen these results remain high. Employee Resource Groups

Flexibility

Employee experience and manager capability

The plan recognised the instrumental role that our Employee Resource Groups (ERGs) play in working towards our inclusion, diversity and equity goals. Our ERGs − Pride, GROW, Celebrate Women, and Ability @ John Holland − remain proactive in promoting a diverse, equitable and inclusive workplace, developing and delivering an annual plan focused on their specific diversity focus. We have continued to strengthen our Employee Resource Group governance, supported by a dedicated Executive Sponsor for each group.

5 The mechanism for measurement is from Your Say Survey where participants are asked questions to understand sentiment and calculate our Internal Inclusion Index.

26

JOHN HOLLAND


OUR PEOPLE

CASE STUDY

Leading in LGBTQ+ inclusion The Australian Workplace Equality Index (AWEI) is used as an external benchmark for LGBTQ+ inclusion practices and employee experience in workplaces across Australia. As part of our Inclusion Strategy, we had already achieved Bronze in the AWEI and set our sights on achieving Silver. In 2024, we learnt that we had in fact reached this result and should stretch ourselves to achieve Gold. In May 2025, this was confirmed and John Holland was announced as a Gold Tier AWEI recipient. We remain one of only a few in our industry to participate in the AWEI, and score so highly. Our actions Using the AWEI as baseline roadmap, the focus areas set and agreed by the Pride Network and Inclusion, Diversity and Equity (ID&E) team were storytelling, training and awareness, active allyship, and collaboration with other ERGs. - Storytelling: Bi-monthly newsletter Polari, featuring Member profiles and celebrating Days of Significance with personal stories - Training & awareness: Update of the mandatory LGBTQ+ Inclusion e-Learning module, ongoing investment in LGBTQ+ Awareness and Empowering Allies endorsed trainers, direct project engagement and State-Based training sessions delivered

- Active Allyship: An Ally Webinar and development and release of an “Allyship Ladder” resource, outlining how individuals can move from passive to active allyship - ERG collaboration: The Pride Network actively collaborates with other internal ERGs, providing support and guidance, and co-facilitating joint events such as Lesbian Visibility Week with the Celebrate Women’s Network We shared our knowledge externally, including at the Property Council of Australia’s NSW Precincts and Social Infrastructure Committee, Victorian Precincts Committee and Victorian Diversity, Equity and Inclusion Committee, and presented at the Pride in Practice Conference on Moving from Bronze to Gold: The Journey and Lessons Learnt, Melbourne Build on Beyond the Buzzword: Making Diversity Everyone’s Responsibility, as well as How Leaders, Allies & Organisations Can Support LGBTQIA+ Colleagues.

ESG REPORT 2025

27


OUR PEOPLE

Establishing governance structures to drive change

Industry collaboration

To help drive our organisation towards our goals, we established an accountability and partnering model inclusive of:

Our team continues to maintain memberships to peak bodies and organisations focused on diversity and inclusion.

- Executive Leadership Team (ELT) - Employee Resource Groups (ERGs) - Reconciliation Advisory and Action Committee (RAAC) - Social Impact team members

These include Diversity Council of Australia, Pride in Diversity, National Association of Women in Construction (NAWIC), and Australian Disability Network.

Most notably, we established our Inclusion Advisory Group, bringing together a coalition of representatives from our ELT, projects, ERGs and People team to collaborate, accelerate our progress and help deliver on our aspiration. The Advisory Group meets bi-monthly to discuss the key themes of embedding inclusion, building greater workforce diversity, delivering equitable processes, and elevating and influencing change within our industry. Diversity and inclusion dates of significance Celebration of specific diversity and inclusion days ensures visibility for key groups and causes identified in our plan. We release a Significant Dates Calendar annually, with eight enterprise-wide dates identified, promoted and celebrated across the business: - International Women’s Day - International Day Against Homophobia, Transphobia, Intersexphobia and Biphobia (IDAHOBIT) - National Reconciliation Week - NAIDOC Week - Wear It Purple Day - RUOK? Day - Indigenous Business Month - International Day of People with Disabilities We create and distribute a dedicated event project pack, outlining details of the date, annual theme, John Hollandwide activities, suggestions for activation, and additional resources to draw on. Projects are supported with check in calls prior to the event from our ID&E team to maximise efforts and support projects run activities. Multicultural leave John Holland acknowledges the diversity of its people and understands that celebrating holidays means different things to different people. Our Multicultural Leave Exchange (MLE) allows employees to request that any existing public holiday is substituted for a religious or culturally significant day that is important to them. Our dates of significance calendar also include many different religious and culturally significant dates, supporting leaders to understand the diversity of our employee base. 92 employees have utilised the Multicultural Leave Exchange since it was introduced in 2022.

Our employees benefit from all the associated benefits of these memberships, including access to evidence-based, best-practice resources, webinars and training. Awards and recognition During 2024 and 2025, John Holland received multiple national and state based awards recognising its leadership in diversity, equity and inclusion. This included organisational awards for workplace inclusion, flexible work and multicultural participation, as well as individual recognition for employees advancing gender equality, allyship and inclusive project delivery. In addition, several John Holland projects and initiatives were recognised as finalists across industry awards, reflecting continued momentum and external validation of the company’s inclusion strategy. The full list of awards is in Appendix F. Our future plans The Inclusion Strategic Plan ended in December 2025. At the time of the report writing, consultation and development for the next iteration is occurring with key stakeholders across the business, ensuring alignment with the overarching business strategy and other relevant key documents. In the next iteration, identification and further refinement of the ways of working, partnering models, accountabilities and success measures that will be implemented by the business in 2026-2028 will be included to ensure John Holland continues to meet its inclusion objectives and commitments. Further resources, guidelines and policies will be developed to enable all employees across John Holland to bring our inclusive culture to life, including a dedicated Employee Reference Group Playbook, launch of an Inclusion Impact Tracker, and diversity procurement advice. The alignment of the Inclusion Strategic Plan leverages actions and deliverables mentioned in other documented strategies and actions, including WGEA citation and Gender Equality Strategic Plan, as well as our next RAP and AWEI annual response.

Gender Equality Strategic Plan 2021-2025 John Holland’s Gender Equality Strategic Plan (2021–2025) set out clear targets to improve gender representation, leadership participation, pay equity, and flexible working across the organisation. Over the life of the plan, measurable progress has been achieved against several core indicators, while also generating important learnings to inform future targets. Since launching the Gender Equality Strategic Plan, John Holland has implemented a comprehensive suite of initiatives spanning leadership capability, workforce practices, talent pipelines, pay equity, and culture.

28

JOHN HOLLAND


OUR PEOPLE

Key initiatives Embedding the 40/40/20 framework across recruitment, promotion, development and succession processes.

Delivering targeted programs such as Women’s Mentoring, Women in Leadership programs, and partnerships supporting early‑career and school engagement.

Delivering organisation‑wide leadership training on inclusion, bias awareness, workplace behaviour and flexible working, with thousands of employees completing mandatory learning programs.

Ongoing support of our dedicated Employee Reference Group Celebrate Women Network, to build awareness, capability and connection across the business.

Introducing dashboards and tracking tools to improve transparency and accountability for gender equality outcomes.

Conducting annual gender pay gap analysis and reporting outcomes to senior leadership and the Board, with corrective actions implemented where required.

Strengthening flexible working practices through policy, leader training and project‑based initiatives, including the Flex from the Start evaluation.

Remained compliant with the WGEA Act 2012 including all reporting obligations and engagement with employees, shareholders, and employee organisations.

Enhancing parental leave provisions, resulting in a significant increase in men taking primary carer leave.

Since 2023, we’ve produced an annual Employer Statement outlining initiatives and practices over the previous 12 months to support the continued embedding of gender equality.

Progress to date The proportion of women employed at John Holland increased from 21.7% in 2021 to 26.5% in December 2025, reflecting sustained year‑on‑year improvement.

The organisational gender pay gap (mean total remuneration) reduced from 31.3% to 25.1%, exceeding the plan’s reduction target through a 6.2 percentage point improvement.

Representation of women in non‑staff roles more than doubled since 2022, increasing from 3% to 7.3%, demonstrating progress in traditionally under‑represented roles.

Women comprised 49% of the 2025 graduate intake, up from 20% in 2018, strengthening the long‑term talent pipeline.

While the aspirational target of 40% women in staff roles was not achieved, progress trends and supporting initiatives demonstrate momentum and provide a stronger evidence base for setting realistic, phased targets in the next strategy cycle. Key actions The strategy focused on embedding gender equality into core business systems and leadership behaviours, rather than standalone initiatives. Actions were deliberately aligned to workforce planning, talent processes, policy frameworks and project delivery requirements.

This included: - Applying a consistent gender lens to recruitment, promotions, restructures and talent reviews - Challenging bias through capability building and data‑led decision‑making - Embedding gender considerations into tenders and project mobilisation - Strengthening governance through regular reporting to the Executive Leadership Team and Board - Actively sharing learnings across the business and industry to extend impact beyond John Holland

ESG REPORT 2025

29


OUR PEOPLE

CASE STUDY

Gender pay gap reductions Recognising that large aspirational targets alone were not driving sufficient traction, John Holland refined its approach to gender equality by introducing smaller, incremental targets alongside its longer-term goals. In 2023, a target was set to reduce the Mean Total Remuneration gender pay gap by 2%, supported by complementary targets to grow women’s representation in staff roles to 40% by 2025, increase women in senior leadership, and embed the 40/40/20 framework across recruitment shortlists, development opportunities and succession planning. These targets were actively monitored and used to mobilise teams around specific initiatives, reinforcing gender equality as a measurable priority rather than an abstract aspiration. As a project-based business, workforce composition fluctuates significantly with project wins, regional activity levels and business cycles, all of which directly affect gender representation measures and made consistent progress difficult to sustain.

“ Despite these challenges, the 2023 gender pay gap target was significantly exceeded, with the Mean Total Remuneration gap closing by 6.1%. Women’s representation in staff roles grew from 30.2% in December 2021 to 31.7% by December 2025, while enterprisewide representation increased from 21.7% to 26.5%, reflecting broader progress across the organisation.”

2021-2022

2022-2023

2023-2024

2024-2025

% pt change to gap since 21-22

Total remuneration mean

31.3%

30.2%

27.7%

25.1%

6.2% ↓

Base salary mean

17.7%

16.4%

16.2%

15%

2.1%↓

Total remuneration median

37.0%

35.8%

32.8%

28.4%

8.6%↓

Base salary median

16.7%

17.0%

16.0%

14%

2.7%↓

All employees

30

Implementing the 40/40/20 framework also required sustained education and communication across the business, with uptake strengthening gradually over time through consistent reinforcement rather than immediate adoption. Organisational restructures during the reporting period further affected outcomes, underscoring the importance of targets that are responsive to organisational context.

JOHN HOLLAND


OUR PEOPLE

Future plans and targets As the current strategy cycle concludes, John Holland is progressing the development of a new Gender Equality Strategic Plan, aligned to the actions outlined in our WGEA Gender Equality Citation application. This next plan will be informed by lessons learned, dedicated consultation, workforce data, employee insights, and evolving legislative and industry expectations. Future priorities include: - Setting clear, realistic targets to increase representation of women in targeted job roles where they remain underrepresented - Continuing to reduce the organisational gender pay gap - Building leadership accountability and capability to sustain progress in meeting targets, challenging bias and rolemodelling inclusive behaviours - Maintaining transparent reporting and industry engagement to support long‑term, sustainable change - Enhance the workplace experience through updated policies, with a strong focus on carer roles and flexible working - Strengthen board engagement in overseeing and evaluating gender equality outcomes across the six WGEA gender equality indicators

CASE STUDY

Women in Construction Industry Innovation Program John Holland played an active role in the NSW Government’s Women in Construction (WIC) Program, securing three grants through the Industry Innovation Program to deliver initiatives targeting flexibility, earlycareer pipeline development and workforce wellbeing. These included: - Flex from the Start, which trialled flexible work arrangements across live NSW infrastructure projects supported by independent academic evaluation - Female Constructors of the Future, a STEM-based program engaging primary-aged children to challenge gender stereotypes around construction careers - See Them Thrive, a publicly accessible health and wellbeing platform combining digital resources, webinars and in-person activities John Holland also hosted and funded Women in Construction Project Officers across several NSW projects through the Infrastructure Skills Legacy Program, supporting attraction, retention, subcontractor capability building, and school engagement at a project level. Flexible work trials demonstrated positive impacts on wellbeing and workforce diversity with no adverse effect on productivity, while Women in Construction participation targets were exceeded on key projects including Sydney Children’s Hospital. The See Them Thrive platform reached more than 16,000 people across multiple NSW projects, far exceeding initial access targets and creating a publicly available resource library of over 250 tools. While sustaining momentum across all projects proved challenging, with the strongest outcomes dependent on dedicated funded roles and consistent leadership commitment, learnings were embedded into tender responses and internal guidance, with resources centralised to support replication nationally.

ESG REPORT 2025

31


OUR PEOPLE

Learning and development John Holland is committed to building people’s skills and knowledge for career development to increase morale and productivity, meet the standards expected by our stakeholders, and to maintain a culture of innovation and improvement.

Career Builder

Training Academy

In 2023, we launched our capability framework, Career Builder. The tool gives our people a view of where they can take their professional careers at John Holland and what capabilities they need to succeed.

In 2024, we launched the John Holland Training Academy to provide high-quality, scalable and cost-efficient training services tailored to the unique needs of our employees and projects. The Academy is designed to ensure our workforce is equipped with the skills and knowledge required to succeed in their roles.

Career Builder has continued to be embedded across the organisation, with a focus on strengthening its application within teams and projects. Pathways have been refined in consultation with Business Units to ensure alignment with evolving role requirements and business needs. It has also been embedded into position description templates, supporting greater consistency in role design and capability expectations across the organisation. We also focused on ensuring our people are effectively utilising the tool for career development and planning. We are piloting an approach to support more systematic selfassessment of capabilities, enabling employees to better identify strengths, development areas and potential career pathways within John Holland.

32

JOHN HOLLAND

At the heart of the Academy is the Training Academy Hub, which offers a consistent and streamlined approach to training management. This centralised platform consolidates all training information, tools and resources into one convenient location, ensuring uniformity in training across all regions, locations, Business Units and projects.

As part of the Training Academy’s initiatives, we developed an online project-based competency matrix. This tool lists all qualifications, Statements of Attainment, highrisk work licences, inductions, and Verification of Competencies (VOCs) required for mobile plant and equipment, as well as other mandated industryrelated competencies. It provides clear guidance on the minimum mandatory requirements for workforce roles and specific work activities to ensure compliance with state and federal legislation, as well as John Holland’s standards. This initiative enhances clarity and consistency in defining the skills and certifications required for every role on a John Holland project.


OUR PEOPLE

Health The health of our people is and always will be at the core of what we do. Our teams’ work is grounded in robust processes and systems. We continue to implement improvements and technological updates to keep our people safe, both physically and mentally, and align our training to the latest standards.

John Holland Work Health, Safety and Rehabilitation Management System The Work Health Safety & Rehabilitation (WHS&R) Management System provides a structured, organisationwide framework to manage work health, safety and rehabilitation across all operations. It is embedded within the Integrated Management System and aligned to ISO 45001, with risk management integrated through a formal Safety, Quality and Environment framework based on ISO 31000 principles.

PLAN

Executive leadership sets direction and governance in health, safety and wellbeing management, while workplace managers are accountable for risk implementation and performance. We have defined responsibilities across project development, engineering and supervision, and workers and subcontractors. Designated Work Groups (DWGs) and elected Health and Safety Representatives (HSRs) provide formal channels for workers to express health, safety and wellbeing concerns. Project Health and Safety Committees (HSCo) meet monthly to review WHS performance, Health and Safety Management Arrangements (HSMA) effectiveness, and emerging wellbeing needs. Bi-annual HSMA reviews and continuous worker feedback ensure ongoing improvement and alignment with legislative requirements. The system requires active worker participation, including input into process development, daily engagement through Start Cards, consultation through Health and Safety Committees, toolbox meetings and pre-starts, and an ability to raise risks and stop work where unsafe.

Health performance results The number of our high-consequence work-related injuries has increased in the past two years after remaining consistent over the past three years. Our workrelated recordable injury rate has been steady in recent years. In 2025, we had one work-related fatality – we are unable to comment on the matter as investigations are ongoing.

Establish legal obligations and WHS objectives Conduct SQE Pre-Contracts Risk Review (tender phase) to identify nonstandard risks early

DO

CHECK

ACT

The system applies to all projects, workplaces and activities across the full lifecycle. Its core approach includes an integrated risk-based system.

Health, safety, and wellbeing governance

Identify hazards, risks and stakeholder requirements

Implement controls through a layered risk management model Monitor performance via inspections, audits and reporting Implement corrective actions Update risk controls following incidents, audits and change Capture lessons learned and drive improvement across project

We pride ourselves on a strong health and safety culture, and we acknowledge our performance results in health and safety require renewed emphasis to improve results and ensure a safe and reliable working environment.

Wellbeing The nature of our sector often exposes employees to mental health challenges, exacerbated by irregular working hours that make forming meaningful connections difficult. Early intervention and proactive, continuous support reinforces our commitment to caring for people beyond traditional lag safety indicators.

“ 309 workers accessed EAP services, representing an annual utilisation rate of 5.50%, above the Gryphon corporate client average and an increase from the previous reporting period. This reflects effective promotion, reduced stigma, and early helpseeking behaviour across the organisation. Services were delivered through a flexible mix of face-to-face and telehealth, ensuring accessibility across geographically diverse projects and work arrangements.”

ESG REPORT 2025

33


OUR PEOPLE

Key highlights Health checks enable early identification of cardiovascular risk factors such as nutrition, exercise, sleep and cholesterol, informing future targeted wellbeing priorities.

Skin cancer screening for early detection given the outdoor nature of our work.

Preventative and early intervention physiotherapy services, offering workers timely access to physiotherapy support to address minor musculoskeletal issues before escalation.

Mental health and wellbeing support, including onsite EAP counsellors, wellbeing and mental health toolboxes, promotion of Employee Assistance Program (EAP) services, and engagement with external wellbeing providers such as MATES in Construction, Beyond Blue, RUOK.

Seasonal and targeted wellbeing campaigns, including injury prevention toolbox series, winter readiness initiatives, extended break shutdown campaigns and desk based wellbeing programs

“ Increased utilisation of these services [preventative and early intervention] has coincided with improved wellbeing outcomes and periods of reduced or zero reportable injuries.”

34

JOHN HOLLAND

CASE STUDY

Working to remove culture barriers and mental health stigma on the Sydney Metro West – Eastern Tunnelling Package Recognising the compounding wellbeing challenges of demanding work conditions, long hours and hazardous substance exposure early in the project, the Sydney Metro West Eastern Tunnelling Package team adopted a proactive and integrated approach to worker wellbeing that went well beyond compliance-driven measures. The team implemented a suite of targeted initiatives, including: - A bespoke health monitoring system designed to identify issues early and build trust in safety processes - Embedded mental health support services tailored to individual worker needs - Partnerships with external health professionals to deliver coordinated care - Integrated injury management and rehabilitation pathways - Targeted support addressing contributing factors such as financial stress, substance use, housing insecurity, and domestic challenges In parallel, the WHS team leveraged strengthened silica exposure regulations introduced in September 2024 as an opportunity to significantly enhance health surveillance standards, including using high-resolution computed tomography in silica health surveillance, a formal update to John Holland’s national health surveillance procedures, and adoption of enhanced health monitoring standards across major infrastructure projects. Together, these initiatives represent a deliberate shift from reactive safety management toward a preventative, culturally embedded wellbeing framework where mental health is treated with equal importance to physical safety.

“ A total of 152 workers actively accessed wellbeing support services, representing a 17% utilisation rate - a substantial outcome in an industry where mental health is chronically underreported and stigmatised”. Key indicators of cultural shift include: - Almost 25% of cases referred by supervisors, reflecting strong frontline engagement and the effectiveness of leadership training - Workers increasingly viewing wellbeing as a shared responsibility rather than an individual issue Mental health stigma remains a persistent barrier in construction environments, and sustaining program momentum requires continuous reinforcement and leadership visibility, with a real risk of regression once initial initiatives become embedded in routine operations. However, this holistic model represents a shift from reactive safety management toward a preventative, culturally embedded wellbeing framework where mental health is treated with equal importance to physical safety.


OUR PEOPLE

CASE STUDY

Introducing targeted wellbeing initiatives The Gold Coast Light Rail (GCLR) project team implemented a suite of targeted wellbeing initiatives designed to address the unique needs of a predominantly blue-collar workforce, with a focus on accessibility, inclusivity and practical engagement. Key initiatives included:

Top: ETP workers during a visit from Brad Thorn, Australia and New Zealand rugby union coach Bottom: ETP workers at the Sydney Metro West tunnel site

- Neurodiversity-inclusive Mental Health First Aid (MHFA) training co-facilitated with adapted delivery methods to accommodate different learning styles, including participants on the spectrum and those with learning difficulties - Domestic and Family Violence awareness toolbox talks delivered in partnership with Harness Men Co, providing practical education on recognising and responding to domestic and family violence - Wellbeing Champion Program embedded within the GCLR network, with monthly meetings to plan and deliver ongoing initiatives including running clubs, walking groups, team sports, and broader health awareness campaigns Together, these programs reflect a deliberate effort to move beyond traditional safety compliance and embed a culture of connection, resilience and shared responsibility for wellbeing across the workforce. The initiatives resulted in broad workforce engagement, positive inclusion outcomes and strengthened team culture and morale, with monthly programming ensuring sustained impact rather than one-off activations. The primary challenge was navigating varied levels of readiness across the workforce to engage with sensitive topics, while ensuring all messaging remained practical, relevant and accessible for a diverse and predominantly blue-collar workforce. However, the practical and peerled nature of the programs proved particularly effective in reaching workers who may not typically engage with formal wellbeing support.

ESG REPORT 2025

35


OUR COMMUNITY & PARTNERS

Our community and partners Our approach to community and stakeholder engagement is built around long-term relationships and collaboration, addressing community needs and creating lasting change. We aim to actively involve communities in decision-making so that our projects contribute to current and future local needs.

Social impact John Holland delivers large scale, nation shaping infrastructure projects across transport, major civil works and social infrastructure, contributing significant social value to national and local economies. We apply an enterprisewide framework to manage social impact outcomes, embedding social impact from project tender to delivery via governance, relationship management and strategic procurement. Social impact is integrated into core business systems such as supply chain procurement, workforce planning and community engagement, ensuring outcomes are consistently planned, delivered and tracked as part of standard operations. Our projects support local economies through the engagement of local suppliers, including Aboriginal and Torres Strait Islander businesses, social enterprises and disability enterprises. These engagements create employment opportunities and contribute to income generation and capability development for small and medium enterprises within project regions, stimulating regional supply chains. Employment and inclusion initiatives delivered through subcontractors and supply chain partners can contribute to indirect savings for governments and communities. Outcomes such as increased access to sustained employment increase financial independence, decrease justice system interactions and other social service costs, generating economic value beyond the project while being enabled through its commercial activities.

36

JOHN HOLLAND

Other examples of how we deliver social impact include: - On several Victorian level crossing removal projects, engagement of Ability Works, a social and disability enterprise, supported inclusive design reviews informed by the lived experience of people with disability - Engaging NLA Trucking, a 100% Aboriginal owned, female-led trucking and plant hire business founded in 2016 by Ngarrindjeri woman Nicole Appleton. Starting as a single truck operation, NLA has grown into a large scale construction logistics provider delivering trucking, haulage and plant hire services while embedding strong social outcomes, including employment pathways for First Nations people and women - Several projects deliver complementary community initiatives alongside infrastructure delivery. For example, the M7–M12 Integration project partnered with Ronald McDonald House Charities Greater Western Sydney, undertaking fundraising activities to support families with seriously ill children We are aware that our projects can also create adverse effects, such as temporary disruption to local businesses and communities, including: - reduced access - increased noise - traffic congestion - changes to local trading conditions


OUR COMMUNITY & PARTNERS

Uneven distribution of economic benefits can occur where projects are highly specialised or capital intensive, with some local suppliers or workers unable to participate due to capability, accreditation or scale requirements. Without targeted supplier development and workforce initiatives, indirect economic benefits may flow outside the immediate region and back to capital cities where items and labour can be successfully sourced. Small businesses, social and disability enterprises and First Nations suppliers experience income volatility where engagement is predominantly tied to individual projects. A lack of continuity across clients or uncertainty about future pipeline to be able to plan in advance can increase financial risk once contracts conclude. Social procurement, sustainability and other compliance and reporting requirements − while essential for accountability, − increase administrative effort, particularly for smaller subcontractors. This creates indirect cost pressures for businesses with limited administrative capacity.

Social impact governance In 2025, the Social Impact function was restructured into a centralised model led by the Head of Social Impact, with state-based Social Impact Managers, Senior Advisors and Advisors supporting projects nationally. This replaced the previous business unit-based structure maintaining alignment with state policies and has improved overall efficiency and effectiveness. At a project level, social impact outcomes are managed through project specific management plans aligned to contractual requirements, client expectations and local community and stakeholder needs. Project phase

Social impact action

Planning and tender phase

Social impact requirements are defined at tender and embedded into project delivery strategies, management plans and budgets.

Delivery and implementation

Supported by dedicated Social Impact subject matter experts and collaborating with commercial, procurement, Training Academy, Human Resources and community engagement teams.

Monitoring and reporting

Project level tracking of social procurement spend, workforce participation and supplier engagement, supported by Commercial, Strategic Procurement and Social Impact teams.

In 2024 we spent over $160m with certified First Nations Businesses and Social Enterprises across 85 projects and 234 suppliers. In 2025, our total spend with First Nations businesses and Social Enterprises was $202m, an increase of $42m. This spend was across 226 suppliers and 78 projects.

$150m

$204m $158m

$200m

$108m

Our social procurement spend is dependent on the number and scale of projects we are completing. We are proud that our portfolio of projects have provided the opportunity for the continuous growth of our investment into First Nations businesses.

$250m

$153m

We work with specialist industry providers to help us identify opportunities to work with suppliers who can add social and community benefits, such as employment for refugees, people with disability, veterans and the longterm unemployed, as well as Aboriginal and Torres Strait Islander people.

Social procurement spend in 2025 ($)

$111m

Spend on social enterprise and Indigenous businesses

$100m

$50m

0

2021

2022

2023

2024

2025

Social procurement spend represents spend on social enterprise and First Nations businesses

ESG REPORT 2025

37


OUR COMMUNITY & PARTNERS

First Nations engagement John Holland reached the end of its third Innovate Reconciliation Action Plan (2024–2025) in December 2025. While not all actions were fully completed within the original timeframe, significant progress was made across the RAP pillars of Relationships, Respect, Opportunities and Governance, and the organisation has remained an active participant in reconciliation. Key progress during the Innovate 24-25 RAP period included:

Pavitt Earthmoving Pipe & Civil

CASE STUDY

Pavitt Earthmoving Pipe & Civil – a certified First Nations-owned business based in Chevallum on Queensland’s Sunshine Coast. Pavitt Earthmoving Pipe & Civil, a certified First Nations-owned business from Queensland, was initially engaged in 2019 on the Sunshine Coast Airport Expansion Project (SCAEP) to provide small-scale waste removal services. Following their performance, John Holland expanded its engagement with Pavitt, with the company subsequently engaged on the Bruce Highway Maroochydore Interchange Project (BHMIP) to provide wet-hire plant services. This resulted in over $3 million of spend and supported ongoing local employment for machinery operators, including First Nations people. Pavitt was subsequently engaged on the Beerburrum to Nambour Rail Upgrade Stage 1 (B2N) project, where the team has expanded its role beyond plant and equipment hire to undertake bulk earthworks across the project. Pavitt has continued to grow its capability and perform to a high standard. To date, B2N spend with the business has exceeded $3.5 million, with further scope still to be delivered. The ongoing relationship demonstrates the value of developing long-term partnerships with First Nations businesses. The opportunities provided across successive projects have supported local employment and, together with Pavitt’s continued investment in its people, plant and business systems, have contributed to the company’s organic growth, increased capability and long-term sustainability. 38

JOHN HOLLAND

- Strengthened relationships with First Nations organisations and communities, supported by enterprise wide engagement activities and the establishment of a First Nations Employee Yarning Circle that meets every two months - Advanced cultural understanding, learning and respect through the launch of a phased Cultural Learning Plan, refreshed First Nations awareness training, and Cultural Protocols resource - Improved employment and supplier diversity outcomes, including increased First Nations workforce representation and significant procurement spend with First Nations businesses) (see Social Impact data sheets for specific spend amounts) - Maintained governance and accountability through the Reconciliation Advisory and Action Committee (RAAC) and ongoing reporting to Reconciliation Australia - Over 4% of those accepting a role in the 2026 Graduate program identified as First Nations people.. Utilising strategic tools, embedding inclusive practices and aligning our reconciliation efforts has seen this outcome possible Incomplete actions, such as engagement guidelines and elements of the First Nations recruitment and retention strategy, have been explicitly carried forward as priorities for 2026 and into the next RAP cycle. Overall, while the Innovate RAP formally concluded in 2025, reconciliation remains an active and ongoing commitment for John Holland, with learnings from the previous RAP directly shaping future strategy, governance and action.

Community engagement We are committed to delivering lasting benefits to the communities in which we operate. We understand that the work we do can impact people’s lives and our commitment to engaging with communities is part of who we are. We work to build strong relationships of trust and mutual understanding with communities. When we engage, we are committed to: - offering genuine opportunities to influence outcomes; - using inclusive, accessible and best practice engagement tools and methods; and - reporting back about how consultation has influenced our design or construction Community engagement plans are part of every one of our significant projects. Our teams engage with communities ahead, during and post project completion. We build community engagement programs specific to each of our projects and consider how we can leave positive impact and mitigate any adverse effects of our projects. We have continued our membership of Engage Australia during the reporting period, providing our community engagement team with access to industry-leading resources and best practice frameworks. This investment in professional development ensures our teams are equipped to deliver effective engagement with the communities they work within.


OUR COMMUNITY & PARTNERS

CASE STUDY

A cultural shift in reconciliation practice at John Holland In 2025, John Holland initiated a First Nations Strategic Impact Review in partnership with 15 Times Better, a First Nations-owned and led consultancy. This review marked a deliberate step by the business to mature its approach to engaging with Aboriginal and Torres Strait Islander peoples, communities and businesses. The review spans all areas of business activity through internal and external stakeholder consultations, with findings set to directly inform John Holland’s next Reconciliation Action Plan due in 2026. Alongside the review, the Reconciliation Advisory and Action Committee (RAAC) was restructured into two aligned groups focused on strategic leadership and delivery respectively, both including First Nations employees, to strengthen accountability and ensure RAP commitments are met within published timeframes. Complementing these governance changes, the John Holland Yarning Circle was launched in 2025 as a culturally safe space for Aboriginal and Torres Strait Islander employees to connect, share and actively shape organisational policies, practices and priorities.

The review has surfaced readiness and capability gaps across the business, including inconsistent cultural safety practices and limited shared understanding of what meaningful First Nations engagement looks like in practice. Capturing accurate and consistent data on First Nations engagement, particularly across community impact, remains a challenge and constrains the ability to measure progress and communicate impact with confidence. Building genuine trust with First Nations communities and employees is a long-term endeavour requiring deep listening, humility and co-design rather than imposition, and the review has reinforced that reconciliation cannot be treated as a compliance exercise. While strong progress has been made in First Nations supplier diversity, our focus is now shifting towards a more strategic approach to drive greater impact. Despite these challenges, the restructured RAAC has created clearer ownership of RAP actions and stronger cross-functional collaboration, while the Yarning Circle has become a valued platform for two-way cultural learning and employee connection. Together, these initiatives represent a shift toward embedding reconciliation as a strategic lever across the business.

CASE STUDY

Gold Coast Light Rail Stage 3 Community Engagement Gold Coast Light Rail Stage 3 delivered a 6.7-kilometre southern extension of the Gold Coast tram network across a highly trafficked brownfield corridor, encompassing eight new stations with a diverse mix of stakeholders including over 700 businesses and 17,000 residential dwellings. The team deployed a multi-channel engagement approach spanning works notifications, newsletters, social media, an interactive digital map, face-to-face interactions, and innovative techniques such as VR school programs and a detailed 3D model. A dedicated Business Engagement Team, including a respected local Business Engagement Advisor, was established alongside a bespoke Business Engagement Plan to proactively support businesses throughout delivery. The overarching engagement program delivered more than 14,000 engagement activities, with over 60% undertaken proactively to anticipate and address stakeholder concerns. This included approximately 7,500 high-value direct engagements during construction and reached more than 557,000 stakeholders, helping build understanding, minimise impacts, and strengthen community confidence throughout delivery. The Love Your Local campaign directly supported more than 300 businesses, helping stimulate the local and visitor economy. More than 32 local events were supported throughout the campaign, including 19 bespoke events. However, delivery within a live, high-volume traffic environment created persistent disruptions to both traffic flow and local businesses, placing sustained pressure on the engagement team to manage community expectations in real time. Compounding this, project delivery challenges and extreme weather events extended the construction timeline, amplifying disruption to residents and businesses and requiring continuous adaptation of the engagement strategy to maintain community confidence throughout. Despite these challenges, the project delivered a benchmark standard of community and business engagement, demonstrating that major infrastructure can be delivered in complex urban environments while meaningfully supporting and sustaining the communities it serves.

ESG REPORT 2025

39


OUR COMMUNITY & PARTNERS

CASE STUDY

CareerSeekers Partnership John Holland has maintained a corporate partnership with CareerSeekers for six years, providing 12week supported employment internships to undergraduates and skilled professionals from refugee and asylum seeker backgrounds across offices and projects nationally. Over this period, 156 internship opportunities have been delivered, with the program offering an efficient pathway to meet multiple contractual and policy requirements, including Graduate, Priority Job Seeker, Building Equality Policy, and Women in Non-Traditional Roles targets, and often through a single engagement. Importantly, the program has provided opportunity to people who have been excluded from employment due to their lack of local job networks.

The availability of internship placements is influenced by project pipelines, workforce demand, and the capacity of teams to provide structured supervision, with periods of reduced activity creating constraints even where commitment to the partnership remains strong. The 12-week model is an effective entry pathway and supports a transition into long-term employment. Demand for placements has consistently exceeded our initial commitments, and management feedback points to the partnership as transformative, introducing fresh perspectives, strong performance, and a source of untapped talent that has proven resilient across project conditions.

“ During 2024 and 2025, John Holland delivered 44 internships, with CareerSeekers alumni representing 7.1% of the 2024 graduate intake and 4.4% of the 2025 intake. More than 87% of CareerSeekers interns have gone on to secure professional employment, including 68% at John Holland.” Partnership year Year 4: July 2023 - June 2024 Year 5: July 2024 - June 2025 Total for second partnership agreement to date Total interns for 2020-2025

No. of Internships 30 22

CareerSeekers participants meet and greet with Executive Leadership Team members Sarah Elliott and Johanna Hall, and with other John Holland managers in the business in Pyrmont office

52 156

Supply chain resilience Our supply chain is extensive as we procure products and services from around the world to complete our projects. We have established an enterprise-wide approach to social impact that is responsive to local needs and priorities, and promote sustainable procurement with First Nations and social enterprises: - The social impact dashboard and supporting systems enable us to carry out consistent, organisation wide measurement and reporting - Project‑based social impact data has been aggregated to create a baseline, providing clear visibility of performance and outcomes across the enterprise These updates support the Social Impact Strategic Plan and complement the Inclusion Strategic Plan, allowing us to track progress towards positive community outcomes.

In 2024 – 2025, we engaged Purpose Bureau to monitor and report on 5,500 suppliers from an ESG perspective, including modern slavery 6. Overall, most John Holland operations and suppliers are based in Australia. These operations and supply chains are generally considered to be low risk for modern slavery. All international suppliers are considered medium to high risk, with modern slavery screening used for all those suppliers.

99.38%

0.62%

Low modern slavery risk

Medium to high modern slavery risk

Australian suppliers in 2025

6 At the time of this report publication, John Holland’s Modern Slavery Statement has not yet been published

40

JOHN HOLLAND

International suppliers in 2025


OUR COMMUNITY & PARTNERS

CASE STUDY

Using procurement to drive circular, low-carbon infrastructure The North West Treatment Hub7 (NWTH) - a major five-year program to upgrade Water Resource Recovery Facilities to treat 45 megalitres of wastewater per day - developed a dedicated Supply Chain Sustainability Specification (SCSS) to integrate sustainability criteria into tendering and contract management from the outset. The specification drove sector-leading outcomes across carbon reduction, circular economy innovation, and supply chain capability uplift through a range of targeted initiatives, including: - Australia-first adoption of Sense600 steel manufactured from 100% scrap steel using Electric Arc Furnace technology, reducing embodied carbon by up to 39% compared with standard 500N reinforcing steel. - Sustainable fuel transitions including trials of Hydrotreated Vegetable Oil (HVO) and large-scale use of biodiesel (B5) - Low-carbon concrete with supplementary cement material (SCM) replacement rates tracking above 50% - Circular economy materials innovation including recycled glass fines in sand blends - Digital sustainability reporting through Project Pack Web (PPW), enabling realtime performance tracking across all subcontractors - Sustainability-weighted tender evaluations allocating 3-15% of vendor scoring to sustainability performance, incentivising higher standards across the supply chain. Collectively, the program established a replicable model for embedding sustainability into supply chain management at scale, positioning the project as a benchmark for the water infrastructure sector. Varied supplier readiness, challenges in verifying international vendors, inconsistent data quality, and limited market availability of low-carbon materials presented ongoing obstacles - reinforcing the importance of early engagement, clear expectations, and sustained capacity building across the supply chain.

CASE STUDY

Ability Works’ inclusive design service harnesses the lived experience of diverse individuals, to improve infrastructure accessibility for everyone.

Inclusive Design in Action During the reporting period, John Holland worked with certified disability and social enterprise, Ability Works, who primarily employ people with disability, whose unique team and skillsets enable them to deliver inventive solutions for their customers. Their inclusive design service harnesses the lived experience of diverse individuals, to improve accessibility and experience of infrastructure, facilities, and services. Infrastructure design for commuters with complex support needs is often driven by accessibility code requirements that do not fully reflect the real-world experiences of all community members, often leaving gaps in usability. The project team recognised that without direct input from people with lived experience of disability, design decisions risked missing practical improvements that would improve how all people navigate the station. Following an on-site assessment, Ability Works, with the project team identified a range of tangible design improvements, including enhanced wayfinding, additional braille signage and audible accessibility features. Inclusion of these features extended well beyond minimum compliance standards and will be carried forward into future infrastucture projects. The partnership also delivered a broader cultural shift, with the project team gaining a deeper understanding of barriers people with disability face on public transport every day, reinforcing that inclusion requires designing systems and spaces that enable everyone to participate and thrive.

7 Delivered by Sydney Water in partnership with John Holland, KBR, and Stantec

ESG REPORT 2025

41


APPENDICES

Appendices Appendix A 2024 Targets and progress Material priority

Smart engineering and technology solutions

Climate mitigation and adaptation

Employee Experience

2024 Targets8

2024 and 2025 Progress

Continue to deliver on our Digital Transformation Strategy to improve productivity, health and sustainability outcomes on our projects

We have embedded Digital Engineering across multiple tenders and projects, improving productivity through better coordination, automation, and data-driven decision-making. We have also strengthened digital delivery practices such as model use, reporting and information management, supporting safer delivery and improved lifecycle outcomes.

Continue to invest in our digital capabilities including AI, robotics, digital engineering, GIS and modernisation of our systems and processes

We have built a centralised Digital Engineering team and capability, implemented and managed 25+ engineering systems, and modernised digital tools and processes across projects. We have also established early foundations for AI, GIS integration and advanced analytics through system integration and industry partnerships.

Implement our Innovation Roadmap

We have defined and progressed key innovation initiatives such as the Digital Design Management System (DDMS), AI-enabled data models, and structured digital delivery approaches. We have also initiated pilot projects and partnerships with industry, vendors and universities to embed innovation into real project delivery.

Deliver a Net Zero target, pathway and a transition plan

We have committed to achieve Net Zero carbon emissions (Scope 1 and 2) by 2045. This will be achieved through the implementation of carbon reduction initiatives across five core themes.

Embed climate governance processes, including commitments, accountabilities and approaches to addressing climate risks and opportunities

We have embedded climate governance processes to deliver on our climate strategy and net zero target.

Launch climate training for all employees

Climate Training was launched across the business in 2024.

Increase the internal Inclusion Index by 1.5% annually

The mechanism for measurement is from Your Say Survey. These results are used to understand sentiment to inclusion through our Internal Inclusion Index (a set of questions include WGEA Employer of Choice employee experience questions). The baseline inclusion index in 2023 from Your Say was 83.3, in 2024 this measure increased to 84.2 and in November 2025 our Index result was 80% (note questions that make up this the index increased).

Achieve silver status in the Australian Workplace Equality Index for LGBTI+ inclusion

In May 2025 it was confirmed that John Holland announced as Gold Teir AWEI recipient. We remain one of only a few in our industry to even participate in the AWEI, let alone score so highly.

Achieve Innovate Reconciliation Action Plan completion

John Holland reached the end of its third Innovate Reconciliation Action Plan (2024–2025) in December 2025. While not all actions were fully completed within the original timeframe, significant progress was made across the RAP pillars of Relationships, Respect, Opportunities and Governance, and the organisation has remained an active participant in reconciliation.

Reduce the overall companywide gender pay gap by 1% by 2025

Over the course of the reporting period John Holland’s overall submission group which consists of 4 ABN companies has continued to decrease its gender pay gap for both Total Remuneration Mean and Median calculation. The target specifically was to lower the Gender Pay Gap Total Remuneration Mean by 2% points. In this same period we lowered the gap by 6.2% pts since the 21-22 reporting period.

Maintain WGEA Employer of Choice for Gender Equality

John Holland has participated in this program since 2022 and obtained the Employer of Choice in 2023, for a period of three years ending in December 2025. We are one of only a few organisations in our industry to receive this acknowledgement.

8 As reported in the ESG Report 2023

42

JOHN HOLLAND


APPENDICES

Appendix B List of abbreviations AI

Artificial Intelligence

ID&E

Inclusion, Diversity and Equity

ASRS

Australian Sustainability Reporting Standard

ILB

Incremental Launch Bridge

AWEI

Australian Workplace Equality Index

IMS

Integrated Management System

B2N

Beerburrum to Nambour Rail Upgrade Stage 1 project

ISC

Infrastructure Sustainability Council

ISMS

CCO

Chief Commercial Officer

Information Security Management System

CE

Chief Engineer

KPIs

Key Performance Indicators

CEMP

Construction Environmental Management Plan

MHFA

Mental Health First Aid

MLE

Multicultural Leave Exchange

CEO

Chief Executive Officer

NAWIC

CFO

Chief Financial Officer

National Association of Women in Construction

CMC

Canberra Metro Construction

NGER

National Greenhouse and Energy Reporting

COO

Chief Operating Officer

NPS

Net Promoter Score

CPO

Chief People Officer

NWTH

North West Treatment Hub

CCCC

China Communications Construction Company Limited

PCC

Portland Cement Content

CRRO

Climate-related risks and opportunities

PPW

Project Pack Web

CYP D&C

Cross Yarra Partnership

RAAC

Reconciliation Advisory and Action Committee

DWGs

Designated Work Groups

RAP

Reconciliation Action Plan

EAP

Employee Assistance Program

RMF

Risk Management Framework

EMS

Environmental Management System

RMM

Risk Management Manual

ELT

Executive Leadership Team

SCM

Supplementary cement material

ERG

Employee Resource Group

SCSS

Supply Chain Sustainability Specification

ESG

Environmental, Social, Governance

SMM

Sustainability Management Manual

ETP

Eastern Tunnelling Package

tCO2-e

EV

Electric vehicle

GBCA

Green Building Council of Australia

Tonnes of Carbon dioxide equivalentStandard unit of measurement for greenhouse gas emissions

GCLR

Gold Coast Light Rail

TPS6

Traction Power Substation 6

GHG emissions

Greenhouse Gas emissions

WIC

Women in Construction

WGEA

Workplace Gender Equality Agency

GRI

Global Reporting Initiative Standards

WHS

Work, Health and Safety

HSCo

Health, Sustainability and Climate Committee

WHS&R

Workplace Health Safety & Rehabilitation

VOC

Volatile Organic Compound

HSE

Health, Safety and Environment

VOCs

Verification of Competencies

HSMA

Health and Safety Management Arrangements

VR

Virtual Reality

HVO

Hydrotreated Vegetable Oil

IDAHOBIT

International Day Against Homophobia, Transphobia, Intersexphobia and Biphobia

ESG REPORT 2025

43


APPENDICES

Appendix C Programs for upgrading employee skills and transition assistance programs Health, Safety, and Environment (HSE) - Applying SQE Risk Management - Black Dog “Managing for Team Well Being” Training - Foundations of HSE - GMRs trainings - Health and Safety Management Arrangement (HSMA) Training - Health, Safety, Environment, Sustainability & Quality Induction - Introduction to Mental Health at John Holland - NGER and Sustainability Data - SQE Risk Management Essentials Procedural Awareness & High-Risk Activities - Alcohol and Other Drugs Procedural Awareness - Asbestos Awareness - Awareness Overhead & Underground Services - Barricading and Signage Procedural Awareness - Confined Space Entry Training - Excavation and Trenching Procedural Awareness - Grid Mesh Awareness Training - Health and Safety Committee Training - Heavy Vehicle Awareness - Isolation - Isolation Permit Holder Training - Isolation Permit Worker Training - Isolation Procedural Awareness - Lift Operations - Lift Operations - Lift Designer Training (Level 2) - Lifting Operations - Procedure Familiarisation Training - Personal Protective Equipment - Plant and Equipment Procedural Awareness - Respirable Crystalline Silica (RCS) Training - Safe Driving Awareness - Spotter Duties Awareness - Subcontractor Safety Management Training - Temporary Works Awareness & Procedural Training - Temporary Works Coordinator Training Class

44

JOHN HOLLAND

- Work at Heights Procedural Awareness - Workplace Hazard Identification Systems and IT Applications - Aconex Overview & Introduction - An Introduction to Soteria - Cyber Security (new module released every quarter) - Get to Know John Holland IT - Navigating the IMS - International Logistic Fundamentals - Microsoft Suite - PDF XChange Editor - Power BI - Project Pack Web (PPW) Quality - Cementitious Structural Grout Testing - Concrete Batch Fundamentals Inspections and Assurance - Concrete Slump Testing for Engineers - Earthworks Compaction Fundamentals - Lead Auditor in Quality Management Systems - Non-Conformance Costing - Passive Fire Fundamentals - Fire Penetrations - Trafalgar Fire - Quality Induction - Structural Steel Welding Awareness Technical Training Process Inductions - Community & Stakeholder Engagement - Construction Management - Design Management - Digital Engineering - Earned Value Management - Estimating and Cost Planning - Head Contract Management - Introduction to Temporary Works Management - People - Planning and Programming - Precontracts Governance - Procurement and Subcontract Management - Project Cost and Revenue Management

- Quality Management - Risk Management - Testing and Commissioning Management - Traffic Engineering External qualifications and upskilling This is dependent on what the projects can deliver, however these are the qualifications past apprentices and trainees have done. - Certificate II in Civil Construction - Certificate II in Rail Infrastructure - Certificate III in Accounts Administration - Certificate III in Automotive Electrical Technology - Certificate III in Business - Certificate III in Business Administration - Certificate III in Carpentry - Certificate III in Civil Construction - Certificate III in Electrotechnology Electrician - Certificate III in ESI - Rail Traction - Certificate III in Mobile Plant Technology - Certificate III in Rail Infrastructure - Certificate III in Supply Chain Operations - Certificate III in Surveying and Spatial Information Services - Certificate Ill in Civil Construction - Certificate IV in Building and Construction - Certificate IV in Building Project Support - Certificate IV in Civil Construction - Certificate IV in Human Resource Management - Certificate IV in Information Technology - Certificate IV in Leadership and Management - Certificate IV in Marketing and Communication - Certificate IV in Project Management Practice - Certificate IV in Training and Assessment - Certificate IV in Work Health and Safety - Diploma of Civil Construction Management


APPENDICES

- Diploma of Leadership and Management - Diploma of Project Management - Diploma of Work Health and Safety Mentoring Programs - Women’s Mentoring Program - John Holland Mentoring Program Leadership and Development - Future Leaders Program - Stepping Up Preparing to Lead Program - Women in Leadership Program - Essential Leadership Program

Inclusion, Diversity, and Equity (facilitated training and eLearning) - LGBTQ+ Inclusion Considerations for HR and Recruitment - Hidden Disabilities Sunflower Training - Introduction to Breaking Bias - Breaking Bias Training - Introduction to LGBTQ+ Inclusion - LGBTQ+ Awareness Training - Introduction to First Nations Cultures - Working Flexibly Training (Managers) - Workplace Behaviour Training - Code of Conduct Business - Family and Domestic Violence Awareness Training

Health Management - Airborne Contaminants - Compressed Air and Hyperbaric - Conditions - Cold Working Conditions - Emergency Evacuation and Response training - Fatigue Risk management - Hand arm and whole body vibration - Heat Stress Risk Management - Hot Working Conditions - Ionising radiations - Laser Safety - MEWP - Noise - Occupational Hygiene Risk Management

Appendix D Project ratings and certifications Location

IS Rating Tool

Certified Score

Certified Rating

Year Certified

More Trains More Services Stage 2 - North Package

NSW

v1.2 As Built

87.25

Leading

2025

CYP Melbourne Metro Tunnel Project Tunnels and Stations PPP

VIC

v1.2 Design

103.33

Leading

2025

Gold Coast Light Rail Stage 3

QLD

v1.2 Design

75.43

Leading

2025

Melbourne Metro Rail Infrastructure Alliance

VIC

v1.2 As Built

92.59

Leading

2025

Sydney Gateway Stages 1 & 3

NSW

v1.2 As Built

63.00

Excellent

2025

M1 Extension: Black Hill to Tomago

NSW

v1.2 Design

83.70

Leading

2025

Bruce Highway - Cairns Southern Access Corridor Stage 3: Edmonton to Gordonvale

QLD

v1.2 Design

66.00

Excellent

2024

Transport Access Program 3 – Redfern Station Upgrade

NSW

v1.2 As Built

81.26

Leading

2024

Bruce Highway - Cairns Southern Access Corridor Stage 3: Edmonton to Gordonvale

QLD

v1.2 As Built

75.85

Leading

2024

Botany Rail Duplication

NSW

v1.2 Design

55.00

Excellent

2024

Botany Rail Duplication

NSW

v1.2 As Built

70.24

Excellent

2024

Chisholm Road Prison Project

VIC

v2.0 As Built

45.60

Silver

2024

ARTC Narrabri - North Star (Inland Rail N2NS) Package A

NSW

v1.2 As Built

58.00

Excellent

2024

Bruce Highway Interchange Upgrades – Maroochydore Rd & Mons Rd

QLD

v1.2 As Built

62.41

Excellent

2024

Project Name

ESG REPORT 2025

45


APPENDICES

Appendix E Material topic definitions

46

Key Topic

Definition

Greenhouse gas (GHG) emissions

Management/oversight, tracking, and reduction of scope 1-3 GHG emissions (scope 1 covers the company's on-site and direct emissions from owned or controlled sources; scope 2 covers the company's indirect emissions associated with purchase of electricity, steam, heating and cooling; scope 3 includes all other indirect emissions that occur in a company's value chain such as shipping and distribution, business travel, and employee commuting, among other sources).

Climate change adaptation & mitigation

Formalised processes to integrate climate-related risks and opportunities into the company's overall strategy, approach to enterprise risk management and related oversight, monitoring, and assessment mechanisms. Ultimately, this is to enhance the company's ability to manage and adapt to evolving physical and transition risks and opportunities associated with climate change, including development of a net zero pathway and associated strategies.

Cyber security & data protection

Practices and oversight mechanisms in place to protect the Company's networks and data from criminal use and unauthorised access.

Smart engineering & innovation

The Company's exposure and management of innovation and opportunities. The amount of money, time, and resources invested into developing products, new business and other practices that support the Company's strategic and sustainability goals.

Employee health, safety & wellbeing

The company's oversight, management and transparent reporting of employees’ health and safety with the goal of providing an overall incidentfree workplace that promotes employee wellbeing and health.

Social impact

Practices to mitigate negative or maximise positive effects that the Company’s operations, projects, and business relationships have on people and communities. This includes impacts on local employment, community wellbeing, economic development, cultural heritage, human rights, and access to essential services.

Local community impact

Also inclusive of volunteerism and community engagement efforts to strengthen local communities, support overall culture and empower employees to support causes important to them and/or the organisation. Includes efforts related to the prioritisation of hiring locally, including any applicable policies, to support local communities' and their economies.

Employee diversity & inclusion

The company’s diversity, equity and inclusion performance, programs, efforts, initiatives, and ability to track & report improvement overtime, all of which support an inclusive, diverse, and equitable organisation.

Environmental compliance

Fulfilment of regulatory requirements in the area of environmental management. The ability to address incidents and adapt to the constantly evolving environmental regulations across geographies where its operations are located.

JOHN HOLLAND


APPENDICES

Key Topic

Definition

Employee training & education

Company-sponsored support and guidance provided to employees to advance their careers and drive internal mobility in the form of education, training, and mentoring.

Procurement practices and supply chain resilience

Efforts to monitor, assess, and proactively mitigate risks stemming from inadequate supplier diversification such that the company can remain resilient in the event of acute supply chain disruptions. Efforts related to the prioritisation of local and global suppliers, including any applicable policies, to support local communities' and their economies, as well as choosing suppliers with environmental and social practices that support the Company's own goals and targets.

Stakeholder engagement & management

The frequency, focus, and efficacy of company stakeholder engagement programs pre, during, and post project development.

Business integrity & resilience

Oversight of adherence to ethical principles and transparent practices in all aspects of corporate conduct. It includes honesty, accountability, anticorruption measures, fair dealing, and compliance with legal and regulatory obligations. Formalised in the Code of Business Conduct, Whistleblower Policy, Anti-Bribery and Corruption Standards, Legal Compliance Framework and transparently reporting economic contributions.

Modern slavery & human rights

The company's efforts to ensure the company and all of its suppliers are complying with its own standards, as well as all regulations, including those related to human rights and modern slavery risks across the company's supply chain, also relates to ensuring fair pay (living wage), preventing discrimination, fostering employee relations and ensuring fair labour conditions.

Biodiversity impact

The Company's efforts to protect and restore the land on which it derives value, inclusive of pre-project planning and ongoing management during project development.

Employee wages & benefits

The company's approach, procedures and policies to ensure fair working conditions, wages and employee benefits, for the purposes of meeting regulatory requirements, motivating and retaining staff and employees.

First Nations relations

Formalised processes to recognise, engage and partner with Aboriginal and Torres Strait Islander peoples in two way partnerships and communications.

Resource use

The operational impact and management of energy use, water, materials, and other resources that the Company owns, utilises within its operations, and indirectly influences in its value chain.

ESG REPORT 2025

47


APPENDICES

Appendix F List of infrastructure sustainability awards - 2025 Australian Water Association - Infrastructure Project Innovation Award - Hobsons Bay Main Duplication Project, Vic - 2025 Banksia National Built Environment and Infrastructure Award - Hobsons Bay Main Duplication Project, Vic - NSW Circular Economy Award M7/M12 Integration Project - Solar Panel Glass Sand in Asphalt - Infrastructure Sustainability Awards 2024 - Sustainability Leadership – Outstanding Achievement - Infrastructure Sustainability Awards 2024 - Sustainability Leadership – Excellence in Economics - Infrastructure Sustainability Awards 2024 - Sustainability Leadership – Excellence in Social List of diversity, inclusion and equity awards - 2025 Australasian Rail Industry Award winners; Employee Engagement Excellence Award: Next Rail Team for its Flex from the Start initiative “Flex9”, which improved work life balance, attraction and retention. - Winner of the Best Workplace Flexibility Program at the Australian HR Awards 2025 - The M7-M12 Late-Start program, which has helped women and carers join the industry by offering a second pre-start time of 8.45am to allow them to fulfil their personal responsibilities. - Corporate Business Excellence Medal – 2024 from Multicultural NSW, recognising outstanding achievement in promoting diversity, inclusion and social harmony, particularly through employment pathways for refugees and asylum seekers.

48

JOHN HOLLAND

- Award for Diversity, Equity and Inclusion (>250 employees) – 2024 by Property Council of Australia for Organisation wide inclusion strategy, flexible work practices, social procurement and gender equality leadership. - Diversity and Inclusion Champion – 2025 from Multicultural Queensland Awards, for outstanding contribution to inclusive employment and multicultural participation. - Finalist: NAWIC Crystal Vision Awards – 2024 Next Rail – retention of women and flexible work initiatives and M7–M12 Integration Project – Female Constructors of the Future program. - 2024 Social Traders Game Changer Awards, “S” in the ESG Frontrunner awards - Winner for Victoria & Tasmania, Hobsons Bay Main Sewer Duplication project. - Individual employees have received external recognition for leadership and commitment to gender equality, inclusion, and diversity, including Kate Hogan (Social Procurement Manager– Building VIC/TAS/SA) being recognised in the Property Council Victoria 2025 Diversity, Equity and Inclusion Award and women and male allies across NAWIC State Chapter awards for their efforts in driving greater diversity and inclusion at John Holland.


APPENDICES

Appendix G List of operational sites owned, leased, managed in, or adjacent to, protected areas and areas of high biodiversity value. [180] Western Highway Realignment - Anthony’s Cutting (2024) [7002] Canberra Metro Construction [7019] Sydney Program Alliance [702001] RIC Project Wide [7025OG] Delivering for Customers (D4C) [7027] Upper South Creek Advanced Water Recycling Centre (AWRC) [7028] Upper South Creek Advanced Water Recycling Centre (Pipelines) [7030U] Sydney Gateway - Stage 1 &3 [7031U] North West Treatment Hub (NTH) Growth Works [7032] Belmont Desalination Plant Phase 2 [7033] PLR Stage 2 Enabling Works [7035U] M1 Pacific Motorway Extension to Raymond Terrace Black Hill to Tomago

[7121] Hobsons Bay Main Yarra Crossing Duplication

[7632] ARTC Narrabri - North Star (Inland Rail N2NS) Package A

[7122U] Resource Recovery & Re-Use Complex

[7635] Digital Systems Trackside Package

[7216] QUU Southern Treatment Plants (STP) Capital Works Program

[7640] NZ Rail Services

[7217] Edmonton to Gordonvale [7219] Bruce Highway Maroochydore to Mons (M2M) [7220] Papakura to Pukekohe Rail Electrification Project [7224] B2N Rail Project Upgrade [7225] Lake MacDonald Dam Improvement Project [7227] Draper WTP [7228] Cairns Rainfall and Flooding Reconstruction Works - Palmerston Highway - FREW (Early Works) [7502] Cherry Creek Youth Justice Project [7510] Chisholm Road Prison Project [7515] Southern Queensland Correctional Precinct - Stage 2 [7522] Waterfront Brisbane

[704501PW] M7 M12 - Integration Project Wide

[7526] Forensic Mental Health Expansion Project

[7050PW] Torrens to Darlington Project Wide

[7527] Ballarat Base Hospital Redevelopment - Stage 2 (Central Energy Plant)

[7110] West Gate Tunnel Project [7111K] NWPA Keon Parade [7111L] NWPA Melton Line Upgrade [7111-PAK] NWPA Pakenham [7111R] NWPA Melton LXs [7111T] NWPA Tram Maintenance Facility [7111W] NWPA Webster LXs [7114] Murray Bridge Wastewater Treatment Plant Relocation [7117] Melbourne Water and Sewerage Program [7120U] SA Water Major Framework Capital Delivery - Water South

[7530] Shoalhaven Hospital Redevelopment [7534] Queensland Train Manufacturing Program Manufacturing Facility (QTMP) [7536] New Toowoomba Hospital [7618] WA Rail Services [7621] PTA Track Maintenance Services Urban Rail Network

[7642] Botany Rail Duplication [7644U] Metro Tunnel Rail Network Alliance [7647] BHP Rail - 290 MTPA Nelson Point [7663] WA Rail Signalling Minor Works [7666] MTMS Stage 3A - Package C [7667] P2P - OLE & Foundation Work [7670] Sunshine Systems Alliance [7672A] ARTC Gap Bridge Replacement [7674] PTA RRP Management Services Framework Agreement [7675] RCU Executing Signalling Works [7676] Wiri EMU Depot Stabling Yard Extension [7678] Moorebank Intermodal - Main Works Contract [7682] PTA - RRP Work Package 1 Armadale Line [7684U] Canberra Light Rail Stage 2A [7686] ARTC Inland Rail Beveridge to Albury (B2A) Tranche 2 [7688-R] I2S - Illabo - Stockinbingal (ILPL) [7691] Drury Rail Stations Project (DRS) Drury Station Build (MWD2) & Paerata Station Build (MWP2) [7700] Beveridge Intermodal Precinct – Stage 1

[7624] REFCL - Bush Fire Mitigation Project Stage 1 [7625] More Trains More Services [7630] Melbourne Metro Rail Project - Tunnels & Stations PPP - Asset Management Services

ESG REPORT 2025


johnholland.com.au


Turn static files into dynamic content formats.

Create a flipbook
John Holland ESG Report 2025 by johnholland. - Issuu