JAMES KRICK ARCHITECTURAL P O R T F O L I O
www.mksdarchitects.com
www.des-ae.com
www.smithgroup.com
www.perkinseastman.com
Special thanks and acknowledgement to all previous employers mentioned above. Further appreciation to each individual team of coworkers, consultants, and clients, that showed continued dedication to the profession, and betterment of the built environment. I could not have asked for a greater experience during my time spent in Allentown, San Francisco, and Charlotte.
2
TABLE OF CONTENT SENIOR LIVING
WORKPLACE GILEAD SCIENCE, INC. - NEW OFFICE BUILDING 309
4
THE FORUM AT RANCHO SAN ANTONIO - MEMORY CARE
28
GILEAD SCIENCE, INC. - PARKING GARAGE 309
6
THE VILLAGE AT PROVIDENCE POINT - IL BUILDING
32
2747 PARK BLVD
8
COVIA - LOS GATOS MEADOWS
34
ROCHE PHARMACEUTICALS - NEW OFFICE BUILDING 730
12
JOHN KNOX VILLAGE
38
TD BANK CHARLOTTE
14
CIVIC SUNNYVALE - FIRE STATION No. 5
SPORTS & ENTERTAINMENT 16
TEXAS MOTOR SPEEDWAY
HEALTHCARE
40
RESIDENTIAL
VALLEY CHILDREN’S HOSPITAL - MEDICAL OFFICE BUILDING
20
BRISTOL TOWERS 2
42
VETERANS AFFAIRS ROLLA - OUTPATIENT CLINIC
26
THE FORUM AT RANCHO SAN ANTONIO - VILLAS
46
THE VILLAGE AT PROVIDENCE POINT - COTTAGES
50
KUPLEN RESIDENCE - EXTERIOR RENOVATION STUDIES
53
3
GILEAD: NEW OFFICE BUILDING 309 PROJECT INFO Location: Foster City, CA Building Floor Area: 314,524 sf Building Type: I-B Use and Occupancy: Business (B) Work Phases: 50% SD - 25% CA Role: Architectural Drafter
4
GILEAD: NEW OFFICE BUILDING 309
5
5
GILEAD: PARKING GARAGE 309 PROJECT INFO Location: Foster City, CA Building Floor Area: 498,149 sf Building Type: II-A Use and Occupancy: Storage (S-2) Work Phases: DD - 25% CA Role: Architectural Drafter
6
GILEAD: PARKING GARAGE 309
7
7
2747 PARK BLVD PROJECT INFO Location: Palo Alto, CA Building Floor Area: 33,323 sf Building Type: I-B Use and Occupancy: Office (B) Work Phases: 50% SD - 50% DD Role: Architectural Drafter
8
2747 PARK BLVD
9
9
2747 PARK BLVD
10
2747 PARK BLVD
11
11
ROCHE: NEW OFFICE BUILDING 730 PROJECT INFO Location: Pleasanton, CA Building Floor Area: 70,700 sf Building Type: II-B Use and Occupancy: Office (B) Work Phases: DD - 25% CA Role: Architectural Drafter
12
ROCHE: NEW OFFICE BUILDING 730
13
13
ROCHE: NEW OFFICE BUILDING 730
14
ROCHE: NEW OFFICE BUILDING 730
15
15
TD BANK CHARLOTTE SLIDE TITLE PROJECT INFO Location: Charlotte, NC Building Floor Area: 51,450 sf Building Type: I-B Use & Occupancy: Business (B) Work Phases: CD - CA Role: Project Architect
8th Floor North Lounge
43
16
TD BANK CHARLOTTE SLIDE TITLE
17
SUNNYVALE FIRE STATION NO.5 PROJECT INFO Location: Sunnyvale, CA Building Floor Area: 25,071 sf Building Type: V-B Use and Occupancy: Mixed Use (B) Work Phases: 75% SD - 100% CD Role: Architectural Drafter
18
SUNNYVALE FIRE STATION NO.5
19
19
SUNNYVALE FIRE STATION NO.5
20
SUNNYVALE FIRE STATION NO.5
21
21
VALLEY CHILDRENS: MOB PROJECT INFO Location: Bakersfield, CA Modesto, CA Building Floor Area: 51,622 sf Building Type: II-B Use and Occupancy: Office (B) Work Phases: 75% SD - 50% CA Role: Job Captain
22
VALLEY CHILDRENS: MOB
23
23
VALLEY CHILDRENS: MOB
24
VALLEY CHILDRENS: MOB
25
25
VA ROLLA - OUTPATIENT CLINIC SLIDE TITLE PROJECT INFO Location: Rolla, MO Building Floor Area: 75,900 sf Building Type: II-B Use & Occupancy: Business (B) Work Phases: DD - CA Role: Project Architect; Sustatinability Lead
26
VA ROLLA - OUTPATIENT CLINIC SLIDE TITLE
27
27
THE FORUM AT RANCHO SAN ANTONIO PROJECT INFO Location: Cupertino, CA Building Floor Area: 27,693 sf Building Type: V-A Use & Occupancy: Residential (R2.1) Work Phases: 50% SD - 100% DD Role: Job Captain
28
THE FORUM SENIOR LIVING - MEMORY CARE
29
29
THE FORUM SENIOR LIVING - MEMORY CARE
30
THE FORUM SENIOR LIVING - MEMORY CARE
31
31
THE VILLAGE AT PROVIDENCE POINT INDEPENDENT LIVING BUILDING
Location: Annapolis, MD Building Floor Area: 559,167 sf Building Type: I-A;V-A; Use & Occupancy: Residential (R-2) Work Phases: DD - CA Role: Project Architect; Sustatinability Lead
32
THE VILLAGE AT PROVIDENCE POINT
33
COVIA: LOS GATOS MEADOWS PROJECT INFO Location: Los Gatos, CA Building Floor Area: 426,967 sf Building Type: I-A Use & Occupancy: Residential (R2.1) Work Phases: Pre-Design - Planning Role: Job Captain
34
COVIA: LOS GATOS MEADOWS
35
35
COVIA: LOS GATOS MEADOWS
36
COVIA: LOS GATOS MEADOWS
37
37
JOHN KNOX VILLAGE PROJECT INFO Location: Pompano Beach, FL Building Floor Area: N/A Building Type: N/A Use & Occupancy: Residential (R-2) Work Phases: Schematic Design Role: Architectural Renderer
38
JOHN KNOX VILLAGE
39
39
TEXAS MOTOR SPEEDWAY CONCOURSE & GRANDSTAND RENOVATIONS PROJECT INFO Location: Fort Worth, TX Building Floor Area: N/A Building Type: N/A Use & Occupancy: N/A Work Phases: SD - CA Role: Project Architect
40
TEXAS MOTOR SPEEDWAY
41
BRISTOL 2 TOWERS PROJECT INFO Location: Alabang, Philippines Building Floor Area: 66,360 sf Building Type: -Use & Occupancy: Residential Work Phases: Pre-Design - 50% SD Role: Designer
42
BRISTOL 2 TOWERS
43
43
BRISTOL 2 TOWERS
44
BRISTOL 2 TOWERS
45
45
THE FORUM AT RANCHO SAN ANTONIO VILLAS PROJECT INFO Location: Cupertino, CA Building Floor Area: Varied sf Building Type: V-A Use & Occupancy: Residential (R2.1) Work Phases: 50% SD - 100% DD Role: Job Captain
46
THE FORUM SENIOR LIVING - VILLAS
47
THE FORUM SENIOR LIVING - VILLAS
48
THE FORUM SENIOR LIVING - VILLAS
49
THE VILLAGE AT PROVIDENCE POINT - COTTAGES PROJECT INFO Location: Annapolis, MD Building Floor Area: 1,600 sf - 2,100 sf Building Type: V-A Use & Occupancy: Residential (R2) Work Phases: DD - 100% CD Role: Project Architect; Sustainability Lead
50
TVPP - COTTAGES
51
TVPP - COTTAGES SLIDE TITLE
NO.
3 A301
07-FC-04
07-VENT-01
DATE
REVISION
RS-ASH-01
08-VENT-02
6" / 12"
10" / 12"
PEAK OF ROOF - CAMBRIDGE 21' - 2 1/2"
EWS-VSD-01 07-GUTR-01
07-GUTR-01
07-FC-03
07-FC-03
T.O. PLATE 9' - 6"
07-FCP-02
EWS-VSD-01 07-FCP-02 07-DNSP-01
W5
05-HR-02
W5
W5
05-HR-02
W5
EWS-BRK-01
3 A401
EWS-BRK-01
LEVEL 1 0' - 0"
07-DNSP-01
4
EWS-VSD-01
07-DNSP-01
I certify that these documents were prepared or approved by me, and that I am a duly licensed architect under the laws of the State of Maryland, license number 21215, expiration date 8/1/2024. SEAL
CAMBRIDGE - EAST ELEVATION 1/4" = 1'-0"
2 A302
1 A302 PEAK OF ROOF - CAMBRIDGE 21' - 2 1/2"
10" / 12"
KEY PLAN
RS-ASH-01
RS-ASH-01 520 West Sixth Street Charlotte, NC 28202 T. +1 704 940 0501 F. +1 704 362 4602
L2 EWS-SHK-01
T.O. PLATE 9' - 6"
Owner: THE VILLAGE AT PROVIDENCE POINT 5275 Westview Drive, Suite 110 Frederick, MD 21703 Owner's Representative: ARCH CONSULTANTS LTD 300 Knightsbridge Pkwy, Suite 340 Lincolnshire, IL 60069
07-GUTR-01 EWS-HSD-01
W5
07-DNSP-01
EWS-VSD-01
W5
6' - 6"
2 A601 3 A401
EWS-BRK-01
Construction Manager
HOWARD SHOCKEY & SONS, INC 1057 Martinsburg Pike Winchester, VA 22603
EWS-BRK-01
Environmental: LEVEL 1 0' - 0"
WETLANDS STUDIES AND SOLUTIONS, INC. 5300 Wellington Branch Drive, Suite 100 Gainsville, VA 20155 Civil:
JOHNSON BERNAT ASSOCIATES, INC. 205 North Frederick Ave, Suite 100 Gaithersburg, MD 20877
2
Landscape:
CAMBRIDGE - WEST ELEVATION
MAHAN RYKIEL ASSOCIATES, INC. Whitehall Mill 3300 Clipper Mill Road, Suite 200 Baltimore, MD 21211
1/4" = 1'-0"
Structural:
MORABITO CONSULTANTS, INC. 952 Ridgebrook Road, Suite 1700 Sparks, MD 21152 Mechanical, Electrical & Plumbing:
52
4 A301 PEAK OF ROOF - CAMBRIDGE
VETERAN DESIGN & CONSTRUCTION, INC. 5523 Research Park Drive, Suite 110 Baltimore MD 21228
1 A303
Low Voltage: PEAK OF ROOF - CAMBRIDGE
CONVERGENT TECHNOLOGIES DESIGN GROUP 6501 York Road
KUPLEN RENOVATION STUDIES EXTERIOR UPDATES PROJECT INFO Location: Allentown, PA Building Floor Area: N/A Building Type: V-A Use & Occupancy: Residential (R2) Work Phases: SD Role: Architectural Designer
53