Project Title: SUGAR HILL LIBRARY Project Location: 1941 AMSTERDAM AVENUE Borough: Manhattan Sponsor Agency: New York Public Library

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

SHEET INDEX

10003

T000 - TITLE SHEET DESIGNER

G001 - GENERAL NOTES, SYMBOLS, & ABBREVIATIONS G002 - ACCESSIBILITY DIAGRAMS G003 - CODE COMPLIANCE & LIFE SAFETY

JOSHUA RENNER E-mail:

Z001 - ZONING DESIGN CONSULTANT

A000 - PROGRAM A001 - SITE PLAN A002 - SOUTHEAST ISOMETRIC A003 - NORTHWEST ISOMETRIC

MCVOY ARCHITECTS CHRIS MCVOY E-mail:

A100 - CELLAR FLOOR PLAN A101 - FIRST FLOOR PLAN A102 - SECOND FLOOR PLAN A103 - THIRD FLOOR PLAN A104 - FOURTH FLOOR PLAN A105 - FIFTH FLOOR PLAN A106 - SIXTH FLOOR PLAN A107 - ROOF PLAN A151 - FIRST FLOOR FRAMING PLAN A152 - SECOND FLOOR FRAMING PLAN A153 - THIRD FLOOR FRAMING PLAN A154 - FOURTH FLOOR FRAMING PLAN A155 - FIFTH FLOOR FRAMING PLAN A156 - SIXTH FLOOR FRAMING PLAN A157 - ROOF FRAMING PLAN

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION

A200 - CELLAR REFLECTED CEILING PLAN A201 - FIRST FLOOR REFLECTED CEILING PLAN A202 - SECOND FLOOR REFLECTED CEILING PLAN A203 - THIRD & FOURTH FLOOR REFLECTED CEILING PLANS A204 - FIFTH & SIXTH FLOOR REFLECTED CEILING PLANS

E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

A300 - EXTERIOR EAST ELEVATIONS A301 - EXTERIOR SOUTH ELEVATION A302 - EXTERIOR WEST ELEVATIONS A303 - EXTERIOR NORTH ELEVATIONS

E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT

A400 - BUILDING SECTION A A401 - ADDITIONAL BUILDING SECTIONS A500 - EXTERIOR WALL SECTIONS

ARUP CHRIS POLLOCK E-mail:

EN001 - ENERGY & SUSTAINABILITY M001 - MECHANICAL L001 - LIGHTING SCHEDULE & NOTES AC001 - ACOUSTICS

15

15

7th

St.

St.

St.

St.

Bethune Gardens Housing

# NO.

Av be Ed g

r. v. D Ri

Project

rle m

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

Ha

15

5th

St.

Drawing Title

Polo Grounds Towers

TITLE SHEET

St. da m

Av

e.

DOB NOW Job #

Seal

St N icho las A

ve.

ter

3 rd

St.

Am s

15

4th

DATE:

ec

ve. holas A St Nic

P.S. 028 Wright Brothers 15

DESCRIPTION:

om

m

St.

ste rda

5th

Am

15

6th

Av e.

15

e.

Bro

ad w

ay

15

8th

9th

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A N/A JOSH

T000


NOTES

SYMBOLS AND ABBREVIATIONS

GENERAL NOTES:

WORK NOTES

1.PROPOSED WORK DOES NOT REQUIRE A CHANGE IN USE OR OCCUPANCY FOR THE BUILDING. 2.ALL DESIGNS AND CONSTRUCTION SHALL COMPLY WITH THE RULES AND REGULATIONS OF THE NYC DEPARTMENT OF BUILDINGS, STATE AND FEDERAL GOVERNMENT AGENCIES HAVING JURISDICTION AND OF THE ADMINISTRATIVE CODE OF THE CITY OF NEW YORK. 3.CONTRACTOR TO FOLLOW BUILDING'S CONSTRUCTION RULES AND REGULATIONS. 4.ALL NOISE MAKING WORK TO OCCUR DURING WORKING HOURS AS STIPULATED BY THE BUILDING CODE OF NEW YORK CITY. 5.ALL AFTER HOURS WORK MUST BE COORDINATED WITH BUILDING MANAGEMENT. SUCH WORK MAY REQUIRE THE PRESENCE OF A BUILDING ENGINEER. SUCH BUILDING ENGINEERS TIME SHALL BE CHARGED TO THE CONTRACTOR/TENANT AT THE BUILDING STANDARD OVERTIME. 6.A LIST OF GENERAL CONTRACTOR'S PERSONNEL AND SUBCONTRACTOR'S MAIN CONTACT WITH EMERGENCY PHONE NUMBERS MUST BE SUBMITTED TO THE COMMISSIONER PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OPERATIONS. 7.A LIST OF GENERAL CONTRACTOR'S PERSONNEL AND SUBCONTRACTOR'S MAIN CONTACT WITH EMERGENCY PHONE NUMBERS IS REQUIRED PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OPERATIONS. 8.CERTIFICATE OF INSURANCE FOR THE GENERAL CONTRACTOR AND ALL THEIR SUBCONTRACTORS AND VENDORS ARE REQUIRED PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OPERATIONS. 9.ACCESS TO THE MAIN, TELEPHONE, ELECTRICAL, HVAC CLOSETS/ROOMS MUST BE COORDINATED WITH THE BUILDING MANAGEMENT. 10.CONTRACTOR(S) TO TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE PUBLIC AND WORKMEN ON SITE TO PREVENT ACCIDENTS OR INJURY IN COMPLIANCE WITH OSHA AND NYC BUILDING CODE. 11.SEAL ALL EXISTING AND NEW PENETRATIONS IN HORIZONTAL AND VERTICAL FIRE ASSEMBLIES AS PER NYC BUILDING CODE AND WITH APPROVED PENETRATION AND JOINT SYSTEMS/MATERIALS. 12.REPORT ANY DAMAGED EXISTING DAMAGED FIRE RATED WALL AND SLAB SYSTEMS TO BUILDING ENGINEER AND RESTORE SUCH DAMAGE WITH MATCHING OR COMPATIBLE ASSEMBLIES TO MAINTAIN FIRE RESISTANCE RATING AS APPROVED BY THE BUILDING MANAGEMENT. 13.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO CONSTRUCTION AND SHALL REPORT ANY ERRORS, DISCREPANCIES, OR OMISSIONS TO THE COMMISSIONER PRIOR TO PROCEEDING WITH THE WORK. 14.REFER TO STRUCTURAL DRAWINGS (PART OF THE CONSTRUCTION DOCUMENTS) FOR STRUCTURAL WORK. 15.REFER TO MEP, FA & SP DRAWINGS (PART OF THE CONSTRUCTION DOCUMENTS) FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION WORK. REFER TO ARCHITECTURAL DRAWINGS FOR PRECISE DEVICE AND EQUIPMENT COLORS AND LOCATIONS. 16.REFER TO THE 8.5"X11" SPECIFICATIONS BOOKLET (PART OF THE CONSTRUCTION DOCUMENTS) FOR SPECIFICATIONS. 17.IF ANY NOTES OR REQUIREMENTS ON THIS SHEET CONFLICT WITH THE REQUIREMENTS DESCRIBED IN THE 'GENERAL CONDITIONS' & 'ADDENDUM TO THE GENERAL CONDITIONS' IN THE SPECIFICATIONS BOOK, THE NOTES & REQUIREMENTS LISTED IN THE SPECIFICATIONS BOOK GOVERN. 18.A SITE WALK-THROUGH WITH CONTRACTOR AND COMMISSIONER IS REQUIRED PRIOR TO THE COMMENCEMENT OF ANY DEMOLITION OR CONSTRUCTION WORK. 19.CONSTRUCTION STAGING AREA LOCATION IN THE BUILDING TO BE COORDINATED WITH & APPROVED BY THE COMMISSIONER. 20.WHERE MANUFACTURER OR PRODUCT IS LISTED ON DRAWINGS INFORMATION IS TO BE CONSIDERED 'BASE OF DESIGN'. FOR ADDITIONAL AND OR EQUAL MANUFACTURERS/PRODUCTS SEE SPECIFICATIONS. 21.THE BUILDING WILL BE VACATED AND NOT BE OCCUPIED BY OWNER OR THE PUBLIC DURING CONSTRUCTION. 22.ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE NEW YORK CITY BUILDING CODE, FIRE DEPARTMENT RULES AND REGULATIONS, UTILITY COMPANY REQUIREMENTS, AND THE BEST TRADE PRACTICES. 23.BEFORE COMMENCING WORK, THE CONTRACTOR SHALL FILE ALL REQUIRED INSURANCE CERTIFICATES WITH THE DEPARTMENT OF BUILDINGS, OBTAIN ALL REQUIRED PERMITS, AND PAY ALL FEES REQUIRED BY GOVERNING NEW YORK CITY AGENCIES. 24.MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT REQUIRED FOR PROPER CONSTRUCTION OF ANY PART OF THE WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED IN THE DRAWINGS. 25.THE CONTRACTOR SHALL COORDINATE ALL WORK PROCEDURES WITH THE STIPULATIONS OF LOCAL AUTHORITIES, BUILDING MANAGEMENT OR BOARD OF DIRECTORS. 26.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL CONDITIONS AND MATERIALS WITHIN THE PROPOSED CONSTRUCTION AREA. THE CONTRACTOR SHALL DESIGN AND INSTALL ADEQUATE SHORING AND BRACING FOR ALL STRUCTURAL OR REMOVAL TASKS. THE CONTRACTOR SHALL HAVE SOLE RESPONSIBILITY FOR ANY DAMAGE OR INJURIES CAUSED BY OR DURING THE EXECUTION OF THE WORK. 27.THE CONTRACTOR SHALL LAYOUT THEIR OWN WORK, AND SHALL PROVIDE ALL DIMENSIONS REQUIRED FOR OTHER TRADES: PLUMBING, ELECTRICAL, ETC. 28.PLUMBING WORK SHALL BE PERFORMED BY PERSONS LICENSED IN THEIR TRADES, WHO SHALL ARRANGE FOR AND OBTAIN THROUGH THE DEPARTMENT OF BUILDINGS ALL REQUIRED PERMITS, INSPECTIONS AND REQUIRED SIGN OFFS. 29.ELECTRICAL WORK SHALL BE PERFORMED BY PERSONS LICENSED IN THEIR TRADES, WHO SHALL ARRANGE FOR AND OBTAIN THROUGH THE BUREAU OF ELECTRICAL CONTROL ALL REQUIRED PERMITS, INSPECTIONS AND REQUIRED SIGN OFFS. 30.THE CONTRACTOR SHALL DO ALL CUTTING, PATCHING, REPAIRING AS REQUIRED TO PERFORM ALL OF THE WORK INDICATED ON THE DRAWINGS, AND ALL OTHER WORK THAT MAY BE REQUIRED TO COMPLETE THE JOB. 31.ALL PIPING AND WIRING SHALL BE REMOVED TO A POINT OF CONCEALMENT AND SHALL BE PROPERLY CAPPED OR PLUGGED.

1.WORK FOR THIS PROJECT SHALL BE CARRIED OUT IN ACCORDANCE WITH STATE AND LOCAL CODES AND REQUIREMENTS OR ANY OTHER AGENCY HAVING JURISDICTION. IN ALL CASES THE MORE RESTRICTIVE LIMITATION OF ANY APPLICABLE REQUIREMENTS SHALL BE FOLLOWED. ALL MATERIALS, APPLIANCES AND METHODS OF CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK CITY BUILDING CODE AND ALL OTHER APPLICABLE AUTHORITIES. 2.PERMITS, INSPECTION AND CERTIFICATES REQUIRED BY WORK SHALL BE OBTAINED, KEPT CURRENT AND PAID FOR BY THE CONTRACTOR. 3.CONTRACTOR SHALL COOPERATE AND COORDINATE WITH ALL OTHER TRADES, THE COMMISSIONER, IN EXECUTING THE WORK DESCRIBED IN THESE CONTRACT DOCUMENTS. 4.METHODS AND SCHEDULES FOR THE DELIVERY, TRANSPORTATION, AND STORAGE OF MATERIAL THROUGH THE BUILDING MUST BE COORDINATED AND APPROVED BY THE BUILDING MANAGEMENT, IN COORDINATION WITH THE CONTRACTOR. CONTRACTOR TO USE ELEVATOR DESIGNATED BY THE BUILDING MANAGEMENT. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF THE DESIGNATED ELEVATOR. ALL MATERIAL DELIVERIES AND ELEVATOR SCHEDULE SHALL BE COORDINATED AND APPROVED BY THE BUILDING MANAGEMENT. 5.ACCESS BY THE CONTRACTOR AND WORKERS EMPLOYED BY THE CONTRACTORS TO ALL SPACES WITHIN THE BUILDING EXCEPT THOSE SPECIFICALLY AFFECTED BY THE WORK OF THE PROJECT SHALL BE PROHIBITED UNLESS SPECIFICALLY AUTHORIZED BY THE BUILDING MANAGEMENT. 6.THE CONTRACTOR SHALL PROVIDE SAFE, FREE AND EASY ACCESS AT ALL TIMES TO ALL EXITS, WALKS AND STAIRS IN AND AROUND THE BUILDING. 7.DEMOLITION AND REMOVAL SHALL PROCEED IN AN ORDERLY MANNER AVOIDING DISTURBANCES TO THE OPERATIONS OF ADJACENT FACILITIES. ALL DEBRIS AND REFUSE TO BE REMOVED FROM SITE AS REQUIRED AND PROPERLY DISPOSED OF OFF THE PROPERTY. SUBMIT MANIFESTS AS REQUIRED. 8.FIRES FOR BURNING RUBBISH AND DEBRIS ARE FORBIDDEN. 9.ANY EXISTING BUILDING ELEMENTS, EQUIPMENT OR OTHER PROPERTY DAMAGED IN THE SEQUENCE OF WORK SHALL BE REPAIRED OR REPLACED AT NO COST TO THE CITY OF NEW YORK TO MATCH ORIGINAL CONDITION. 10.THE CONTRACTOR WILL NOT LEAVE BUILDING, OR PORTION THEREOF, OPEN TO WEATHER, OR INADEQUATELY PROTECTED. THE CONTRACTOR WILL NEVER PERMIT RAIN OR SNOW TO LEAK INTO BUILDING INTERIOR. THE CONTRACTOR WILL PLACE TEMPORARY MEMBRANE COMPLETELY SEALED BEFORE ANY RAIN OR SNOW BEGINS. ANY DAMAGE CAUSED BY CONTRACTOR'S WORK SHALL BE REPAIRED AND RESTORED TO ITS ORIGINAL CONDITION AT CONTRACTOR'S OWN EXPENSE. 11.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION SAFETY AND SHALL HOLD THE THE CITY OF NEW YORK, COMMISSIONER AND THEIR ASSIGNED REPRESENTATIVE HARMLESS FROM LITIGATION AND OTHER LEGAL CLAIMS ARISING OUT OF HIS FAILURE TO PERFORM THIS WORK. 12.IN THE COURSE OF EXECUTING THE SPECIFIED SCOPE OF WORK, ALL AND ANY TEMPORARY PROTECTION WHICH IS REQUIRED TO PROPERLY AND ADEQUATELY PROTECT EXISTING CONDITIONS, ADJACENT PROPERTIES, INTERIOR SPACES. IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS INCLUDED IN THE WORK OF THIS CONTRACT. NOTIFICATION OF ANY BREACH OF THE PROTECTION MUST BE REMEDIED IMMEDIATELY. 13.LIFE SAFETY SYSTEMS MUST REMAIN INTACT AND PROTECTED FROM FALSE TRIGGERING DURING CONSTRUCTION. SPRINKLER SYSTEMS AND FIRE ALARM SYSTEMS MUST BE RESTORED TO FULL ACTIVE OPERATION AT THE END OF EACH WORKING DAY.

28-104.8.4 TENANT PROTECTION PLAN: CONSTRUCTION DOCUMENTS FOR ALTERATIONS OF BUILDINGS IN WHICH ANY DWELLING UNIT WILL BE OCCUPIED DURING CONSTRUCTION SHALL INCLUDE A TENANT PROTECTION PLAN. SUCH PLAN SHALL CONTAIN A STATEMENT THAT THE BUILDING CONTAINS DWELLING UNITS THAT WILL BE OCCUPIED DURING CONSTRUCTION AND SHALL INDICATE IN SUFFICIENT DETAIL THE SPECIFIC UNITS THAT ARE OR MAY BE OCCUPIED DURING CONSTRUCTION, THE MEANS AND METHODS TO BE EMPLOYED TO SAFEGUARD THE SAFETY AND HEALTH OF THE OCCUPANTS, INCLUDING, WHERE APPLICABLE, DETAILS SUCH AS TEMPORARY FIRE-RATED ASSEMBLIES, OPENING PROTECTIVES, OR DUST CONTAINMENT PROCEDURES. THE ELEMENTS OF THE TENANT PROTECTION PLAN MAY VARY DEPENDING ON THE NATURE AND SCOPE OF THE WORK BUT AT A MINIMUM SHALL MAKE DETAILS AND SPECIFIC PROVISIONS FOR: 1.EGRESS. AT ALL TIMES IN THE COURSE OF CONSTRUCTION, PROVISION SHALL BE MADE FOR ADEQUATE EGRESS AS REQUIRED BY THIS CODE, AND THE TENANT PROTECTION PLAN SHALL IDENTIFY THE EGRESS THAT WILL BE PROVIDED. REQUIRED EGRESS SHALL NOT BE OBSTRUCTED AT ANY TIME EXCEPT WHERE APPROVED BY THE COMMISSIONER. 2.FIRE SAFETY. ALL NECESSARY LAWS AND CONTROLS, INCLUDING THOSE WITH RESPECT TO OCCUPIED DWELLINGS, AS WELL AS ADDITIONAL SAFETY MEASURES NECESSITATED BY THE CONSTRUCTION SHALL BE STRICTLY OBSERVED. 3.HEALTH REQUIREMENTS. SPECIFICATION OF METHODS TO BE USED FOR CONTROL OF DUST, DISPOSAL OF CONSTRUCTION DEBRIS, PEST CONTROL, AND MAINTENANCE OF SANITARY FACILITIES, AND LIMITATION OF NOISE TO ACCEPTABLE LEVELS SHALL BE INCLUDED. 3.1.THERE SHALL BE INCLUDED A STATEMENT OF COMPLIANCE WITH APPLICABLE PROVISIONS OF LAW RELATING TO LEAD AND ASBESTOS. 4.COMPLIANCE WITH HOUSING STANDARDS. THE REQUIREMENTS OF THE NEW YORK CITY HOUSING MAINTENANCE CODE, AND, WHERE APPLICABLE, THE NEW YORK STATE MULTIPLE DWELLING LAW SHALL BE STRICTLY OBSERVED. 5.STRUCTURAL SAFETY. NO STRUCTURAL WORK SHALL BE DONE THAT MAY ENDANGER THE OCCUPANTS. 6.NOISE RESTRICTIONS. WHERE HOURS OF THE DAY OR THE DAYS OF THE WEEK IN WHICH CONSTRUCTION WORK MY BE UNDERTAKEN ARE LIMITED PURSUANT TO THE NEW YORK CITY NOISE CONTROL CODE, SUCH LIMITATIONS SHALL BE STATED. SAFETY NOTES: 1.WORK SHALL BE CONFINED TO THE PROJECT SITE, AND WILL NOT CREATE DUST, DIRT, OR OTHER INCONVENIENCES TO ADJACENT PROPERTIES. 2.CONSTRUCTION WORK SHALL NOT BLOCK HALLWAYS, STAIRS, OR OTHER MEANS OF EGRESS OF THE BUILDING. CONTRACTOR SHALL REVIEW AND OBTAIN BUILDING MANAGEMENT APPROVAL FOR THE LOCATION AND ASSEMBLY TYPE AND FINISH OF ANY TEMPORARY PARTITIONS IN PUBLIC AREAS OF THE BUILDING. 3.CONSTRUCTION OPERATIONS SHALL BE CONFINED TO NORMAL WORKING HOURS; AS ALLOWED BY BUILDING MANAGEMENT MONDAY TO FRIDAY, EXCEPT LEGAL HOLIDAYS. EXCEPTION: LOUD WORK OR OTHER WORK THAT MAY DISTURB ADJACENT TENANTS MUST BE COMPLETED AFTER HOURS AND COORDINATED WITH BUILDING MANAGEMENT. 4.THE SITE SHALL BE LEFT BROOM CLEAN AT THE END OF EACH WORKING DAY. 5.ALL WORK SHALL COMPLY WITH THE RULES AND REGULATIONS OF THE CITY OF NEW YORK AND ALL OTHER AUTHORITIES HAVING JURISDICTION. 6.CONTRACTOR TO COORDINATE CONSTRUCTION SEQUENCE AND WORK SCHEDULE WITH BUILDING MANAGEMENT TO MINIMIZE DISRUPTION OF ONGOING BUILDING FUNCTIONS. 7.ENSURE ALL EGRESS WAYS TO REMAIN OPEN AND UNOBSTRUCTED AT ALL TIMES DURING DEMOLITION AND CONSTRUCTION. 8.CONTRACTOR TO PROVIDE ADEQUATE SEPARATION/ PARTITIONING BETWEEN AREA OF WORK & ADJACENT AREAS TO PREVENT ACCESS TO THE WORK AREA BY NON-AUTHORIZED PERSONNEL. APPLICABLE STANDARDS: 1.GENERAL APPLICABILITY OF STANDARDS: GENERAL ACCEPTED STANDARDS OF THE CONSTRUCTION INDUSTRY ARE HEREBY MADE A PART OF THE SPECIFICATIONS BY REFERENCE. 2.REFERENCE STANDARDS: APPLICABLE TRADE REFERENCE STANDARDS (REFERENCED DIRECTLY IN SPECIFICATIONS OR BY GOVERNING REGULATIONS) HAVE PRECEDENCE OVER NON-REFERENCED STANDARDS WHICH ARE RECOGNIZED IN INDUSTRY FOR APPLICABILITY TO WORK. PROVIDE COPIES OF APPLICABLE STANDARDS AS REQUIRED BY THE CITY OF NEW YORK.

TEMPORARY FACILITIES: 1.SCAFFOLDING, HOISTS, DUMPSTERS, CHUTES: ALL SCAFFOLDING AND PLANKING, SWING STAGING OR PIPE SCAFFOLDING REQUIRED FOR THIS WORK SHALL BE THE RESPONSIBILITY OF CONTRACTOR (UNLESS WITHIN THE SCOPE OF A SPECIFIC SUBCONTRACTOR) AND IS CONSIDERED A PART OF THE WORK. THE CONTRACTOR SHALL INCLUDE ALL NECESSARY EQUIPMENT IN HIS WORK. ALL EQUIPMENT SHALL BE APPROVED FOR USE BY THE CITY OF NEW YORK AND ALL APPLICABLE AUTHORITIES. 2.THE CONTRACTOR SHALL PROVIDE (OR REQUIRE SUBCONTRACTORS TO PROVIDE) ALL NECESSARY PERMITS RELATED TO SCAFFOLDING, DUMPSTERS, HOISTS, AND CHUTES AND PAY FOR PRIOR TO WORK BEGINNING. 3.THE CONTRACTOR SHALL PROVIDE CONTINUOUS ACCESS TO THE WORK FOR THE COMMISSIONER SO THAT HE MAY REVIEW IT ANY TIME AT NO ADDITIONAL COST TO THE OWNER. PROTECTION: 1.BUILDING WALLS SHALL BE PROTECTED ADEQUATELY (WITH TARPS OR OTHER SUITABLE MATERIAL) FROM SOIL, STAINS, OR SPILLS AT ALL HOISTING POINTS. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING DAMAGE FROM ANY OPERATION UNDER THIS CONTRACT. ANY SUCH DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE TO THE TENANT'S AND BUILDING MANAGEMENT'S SATISFACTION OR BE RESTORED TO THE ORIGINAL CONDITION. 2.THE CONTRACTOR TO PROVIDE BARRICADES, RETAINING ROPES, SAFETY ELEMENTS (ACTIVE/PASSIVE) AND ANY APPROPRIATE SIGNAGE REQUIRED BY OSHA/NSC AND/OR THE CITY OF NEW YORK/COMMISSIONER. CLEANING UP: 1. THE CONTRACTOR SHALL REMOVE ALL DEBRIS AS REQUIRED TO MAINTAIN A SAFE AND ORDERLY WORK AREA. RUBBISH SHALL NOT BE ALLOWED TO ACCUMULATE WASTE. THE CONTRACTOR SHALL SUPPLY HIS OWN CONTAINER FOR RUBBISH REMOVAL. LOCATION SHALL BE AS APPROVED BY THE CITY OF NEW YORK BEFORE PLACEMENT. THE CONTRACTOR SHALL PRESENT, IN WRITING, MANNER IN WHICH DEBRIS WILL BE REMOVED FROM BUILDING. THE CONTRACTOR WILL OBTAIN AND PAY FOR ANY AND ALL NECESSARY PERMITS RELATED TO CONTAINERS, CHUTES AND SITE PROTECTION OR AS OTHERWISE REQUIRED BY JOB CONDITIONS. SPECIAL INSPECTIONS: NEW YORK CITY BUILDING CODE. § 27-157 PLANS REQUIRED: WHENEVER EQUIPMENT, MATERIALS, ASSEMBLIES, FORMS, OR METHODS OF CONSTRUCTION ARE SUBJECT TO "SPECIAL INSPECTION", AS PROVIDED IN SECTIONS 27-131 AND 27-135 OF THIS SUBCHAPTER, ALL SUCH EQUIPMENT, MATERIALS, ASSEMBLIES, FORMS, OR METHODS OF CONSTRUCTION SHALL BE LISTED ON THE TITLE SHEET OF THE PLANS, OR THE SHEET IMMEDIATELY FOLLOWING AS SUBJECT TO "SPECIAL INSPECTION" IN ACCORDANCE WITH CODE REQUIREMENTS. 1. INSPECTION OF SELECTED MATERIALS, EQUIPMENT, INSTALLATION, FABRICATION, ERECTION OR PLACEMENT OF COMPONENTS AND CONNECTIONS MADE DURING THE PROGRESS OF THE WORK TO ENSURE COMPLIANCE WITH THE CONTRACT DOCUMENTS AND PROVISIONS OF THE NEW YORK CITY CONSTRUCTION CODES, SHALL BE MADE BY A SPECIAL INSPECTOR. THE CITY OF NEW YORK WILL RETAIN THE SERVICES OF THE SPECIAL INSPECTOR AND BEAR THE COSTS FOR THE PERFORMANCE OF SPECIAL INSPECTIONS IN COMPLIANCE WITH NYC CONSTRUCTION CODES REQUIREMENTS OR AS ADDITIONALLY MAY BE CALLED FOR IN THE PROJECT SPECIFICATIONS, EXCEPT AS NOTED BELOW FOR FORM TR-3: TECHNICAL REPORT FOR CONCRETE DESIGN MIX. THE SPECIAL INSPECTOR SHALL BE AN ENTITY COMPLIANT WITH THE REQUIREMENTS OF THE NEW YORK CITY CONSTRUCTION CODES. 2. FORM TR3: TECHNICAL REPORT CONCRETE DESIGN MIX: THE CONTRACTOR SHALL BE RESPONSIBLE FOR, AND BEAR ALL COSTS ASSOCIATED WITH THE FILING AND SECURING OF APPROVALS, IF ANY, FOR FORM TR3: TECHNICAL REPORT CONCRETE DESIGN MIX, INCLUDING, BUT NOT LIMITED TO, ENGAGING THE SERVICES OF A NEW YORK CITY LICENSED CONCRETE TESTING LAB FOR THE REVIEW AND APPROVAL OF CONCRETE DESIGN MIX, TESTING, SIGNATURES AND PROFESSIONAL SEALS, ETC., COMPLIANT WITH NYC DEPARTMENT OF BUILDINGS REQUIREMENTS, FOR EACH CONCRETE DESIGN MIX. 3.THE CONTRACTOR SHALL NOTIFY THE RELEVANT SPECIAL INSPECTOR IN WRITING AT LEAST 72 HOURS BEFORE THE COMMENCEMENT OF ANY WORK REQUIRING SPECIAL INSPECTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR, AND BEAR RELATED COSTS TO ASSURE THAT ALL CONSTRUCTION OR WORK SHALL REMAIN ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES UNTIL THE REQUIRED INSPECTION IS COMPLETED. 4.INSPECTIONS AND TESTS PERFORMED UNDER "SPECIAL INSPECTION" SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO COMPLY WITH THE CONTRACT DOCUMENTS, AND THAT THERE IS NO WARRANTY GIVEN TO THE CONTRACTOR BY THE CITY OF NEW YORK IN CONNECTION WITH SUCH INSPECTIONS AND TESTS OR CERTIFICATIONS MADE UNDER "SPECIAL INSPECTIONS". 5.THE CONTRACTOR MUST COORDINATE WITH THE RESIDENT ENGINEER OR DDC PROJECT MANAGER TO PROVIDE ACCESS AND SCHEDULE THE WORK FOR INSPECTION BY THE SPECIAL INSPECTOR. MECHANICAL NOTES: 1.ALL HANGERS VISIBLE FROM OCCUPIABLE SPACE MUST BE STRAIGHT AND PLUMB. 2.ALL WORK TO BE IN CONFORMANCE WITH ARCHITECTURAL DRAWINGS (PLANS, RCP'S, ELEVATIONS AND DETAILS). ELECTRICAL/FIRE ALARM/SECURITY/TEL-DATA/AUDIO-VISUAL NOTES: 1.ALL ELECTRICAL WORK TO BE COMPLETED IN ACCORDANCE WITH APPLICABLE STANDARDS AND CODES. 2.CONTRACTOR TO NOTIFY COMMISSIONER IF NEW CIRCUITS ARE REQUIRED TO ACCOMPLISH SCOPE INDICATED. 3.ANY UPGRADING OF CIRCUITS SHALL UTILIZE ARC-FAULT TYPE CIRCUIT BREAKERS. 4.ALL GROUNDED WALL OUTLETS TO BE ORIENTED WITH GROUND PRONG DOWN. 5.SEE ENGINEERING DRAWINGS AND SPECS FOR DEVICE SPECIFICATIONS. REFER TO "A" SERIES ARCHITECTURAL DRAWINGS FOR DEVICE LOCATIONS. SYMBOLS AND TYPICAL MOUNTING HEIGHTS (G101). 6.SEE G101 FOR SYMBOLS KEY AND TYPICAL DEVICE MOUNTING HEIGHTS. 7.SEE A201 1ST FLOOR REFLECTED CEILING PLAN FOR CEILING MOUNTED DEVICE LOCATIONS AND WIRE ROUTING. 8.SEE ARCHITECTURAL INTERIOR ELEVATIONS FOR WALL MOUNTED DEVICE LOCATIONS. VERIFY IN FIELD WITH COMMISSIONER PRIOR TO INSTALLATION. 9.SEE COORDINATED DEVICE, FURNITURE, AND EQUIPMENT PLANS FOR FLOOR AND WALL MOUNTED DEVICE LOCATIONS. VERIFY IN FIELD WITH COMMISSIONER PRIOR TO INSTALLATION. 10.ALL WIRING THAT IS NOT CONCEALED FROM VIEW MUST BE ROUTED IN CONDUIT AND ROUTED PER COMMISSIONER'S SPECIFIED ROUTING. CM/CONTRACTOR TO REQUEST FROM COMMISSIONER ROUTING FOR ANY LOCATION WHERE ROUTING MUST BE EXPOSED BUT IS NOT SPECIFIED. 11.ALL GROUPED OUTLETS, SWITCHES ETC. TO BE COMBINED INTO MULTI-GANG BOXES WITH MULTI-GANG FACE PLATES. ALL OUTLETS, SWITCHES, ETC TO BE COMMERCIAL GRADE DECORA DEVICES. ALL FACE PLATES TO BE DECORA DESIGNER FACE PLATES. FACE PLATES ON WHITE PAINTED WALLS TO BE WHITE, FACE PLATES ON COLOR PAINTED OR GRAPHICS WALLS TO BE DARK GRAY (PROVIDE SAMPLES FOR COMMISSIONER). 12.ALL WORK TO BE IN CONFORMANCE WITH ARCHITECTURAL DRAWINGS (PLANS, RCP'S, ELEVATIONS AND DETAILS).

AB ABS ABV AC ACT A/C AD ADJ ADJT AFF AGG ALUM ALT AP APX ARCH ASC ASPH AUT AV AVG

Anchor Bolt Absorption Above Acoustical Acoustical tile Air Conditioning Area Drain & Access Door Adjacent Adjustable Above Finish Floor Aggregate Aluminum Alternate Access Panel Approximately Architect -ural Above Suspended Ceiling Asphalt -ic Automatic Audio-Visual Average

BOC BD BEL BTN BIT BLDG BLK BLKG BLKD BM BOT BO BPL BRG BSMT BS BUR BW

Bottom of Curb Board Below Between Bituminous Building Block Blocking Blackened Beam Bottom Bottom of Bearing Plate Bearing Basement Both Sides Built Up Roofing Both Ways

CAB CB CD CEM CER CG CH CIP CJ CK CLG CLO CLR CLS CMT CMU COL CONC CONF CONN CONST CONT COMP CORR CT CTR CTSK CM

Cabinet Catch Basin Core Drill Cement Ceramic Corner Guard Ceiling Height Cast In Place Control Joint Caulk -ing Ceiling Closet Clear -ance Closure Ceramic Mosaic Tile Concrete Masonry Unit Column Concrete Conference Connection Construction Continuous Compress -ion -ed Corridor Ceramic Tile Center Countersunk Construction Manager

DBL DEP DTL DEMO DF DIAG DIAM DIFF DIM DIR DIS DIST DN DO DP DPR DR DS DSP DWG DWR DOB DOCS

Double Depressed Detail Demolished, Demolition Drinking Fountain Diagonal Diameter Difference Dimension Director Dispenser Distance Down Door Opening Damper Damp-proofing Door Downspout Dry Standpipe Drawing Drawer Department of Buildings Documents

E EA EB EC EF EJ EL ELEC ELEV EMER ENCL ENT EP EPOXY EQ EQP ERF EU EWC EXTG EXH EXP EXPO EXT

East Each Expansion Bolt Empty Conduit Each Face Expansion Joint Elevation Electrical Elevator Emergency Enclose -ure Entrance Electrical Panel-board Epoxy Industrial flooring Equal Equipment Epoxy Resinous Flooring Exit Units Electrical Water Cooler Existing Exhaust Expansion Exposed Exterior

FA FACP FB FBO FD FE FF FEC FFE FFL FGL FIN FH FHC FHS

Fire Alarm Fire Alarm Control Panel Fire Brick Furnished By Others Floor Drain Fire Extinguisher Finished Floor Fire Extinguisher Cabinet Finished Floor Elevation Finished Floor Line Fiberglass Finish -ed Fire Hose Fire Hose Cabinet Fire Hose Station

FL FLG FLUOR FLX FND FOB FS

Floor -ing Flashing Fluorescent Flexible Foundation Face Of Building Floor Sink

GA GALV GAR GB GD GL GND GR GT GYP GWB GWT

Gage Galvanized Garbage Grab Bar Grade, Grading Glass, Glassing Ground Grade Grout Gypsum Gypsum Wall Board Glazed Wall Tile

HB HC HCAP HDG HDR HDWD HDW HM HOR HP HR HT HTG HVAC HWH

Hose Bid Hollow Core Handicap -ped Hot Dipped Galvanized Header Hardwood Hardware Hollow Metal Horizontal High Point Handrail Height Heating Heating, Ventilation & AirConditioning Hot Water Heater

ID INCL INSUL INT INV

Inside Diameter Include -d -ing Insulation Interior Invert

JAN JC JT

Janitor Janitor's Closet Joint

KIT KO

Kitchen Knockout

L LAB LAD LAM LAV LBL LG LP LT LVR LW

Length Laboratory Ladder Laminate Lavatory Label Large Low Point Light Louver Lightweight

MACH MAS MATL MAX MECH MED MEJ MEMB MGR MTL MFR MH MIN MIR MISC MLD MO MOD MRB MT MUL

Machine Masonry Material Maximum Mechanical Medium Masonry Expansion Joint Membrane Manager Metal Manufacture -r Man Hole Minimum Mirror Miscellaneous Molding Masonry Opening Modular Marble Mount -ed, -ing Mullion

N NIC NO NOM NTS

North Not In Contract Number Nominal Not To Scale

OA OBS OC OD OFF OH OPG OP OCC

Overall Obscure On Center Outside Diameter Office Overhead Opening Operable Occupant -cy

P PAR PART PB PRCST PED PFB PFN PL PLAM PLAS PLAT PLBG PNL PNT PR PRESS PRF PROD PROJ PT PTD PTN PTR PV PVC

People Parallel Partial Closure Panic Bar Precast Pedestal Prefabricated Prefinished Plate Plastic Laminated Plaster Platform Plumbing Panel Paint Pair Pressure Preformed Product Projection Point Painted Partition Paper Towel Receptacle Pave -d, -ing Polyvinyl Chloride

PROJECT INFORMATION PVMT PWD

Pavement Plywood

QT

Quarry Tile

R R AND S RA RAD RC RD RE-BAR REC REF REFR REG REINF REM REQ'D RES RET REV RFG RFH RFL RH RL RM RO ROW RUB RVS RWC S SC SCH SCN SD SEC SECT SERV SF SFP SGFT SH SHR SHT SHTHG SHO SIM SKL SL SND SNR SNT SP SPEC SPK SPR SQ SS STA STD STL STRUCT SURF SUSP SV SYM SYN SYST T TB T&B TC TEL TEMP TER

Riser Rod and Shelf Return Air Radious Reinforced Concrete Roof Drain Steel Reinforced Bar Recycled Reference Refrigerator Register Reinforce -d, -ing Remove Required Resilient Return Revision -s, Revised Roofing Roof Hatch Reflect -ed, -ive, -or Right Hand Rail -ing Room Rough Opening Right Of Way Rubber Reverse -side Rain Water Conductor South Solid Core Schedule Screen -ing Soap Dispenser Security Section Service Square Foot -feet Spray-On Fireproofing Structural Glazed Facing Tile Shelf, Shelving Shower Sheet Sheathing Shore -d Similar Skylight Slab Sanitary Napkin Dispenser Sanitary Napkin Receptacle Sealant Soundproof Specification Speaker Sprinkler Square Stainless Steel Station Standard Steel Structure/Structural Surface Suspended Sheet Vinyl Symmetry -ical Synthetic System

T&G THK THR TP TPD TR TO TOF TOS TSTL TV TYP

Treat Towel Bar Top & Bottom Top of Curb Telephone Temporary Telecommunications Equipment Room Terrazo Top of Finished Floor Telecommunications Service Entrance Room Tongue & Groove Thick -ness Thresholds Top of Pavement Toilet Paper Dispenser Treaded Top of Top of Foundation Top of Slab Top of Steel Television Typical

UC UNO UR

Undercut Unless Noted Otherwise Urinal

VP VCT VERT VEST VIF VWB VWC VWM

Vapor Barrier Vinyl Composition Tile Vertical Vestibule Verify in Field Vinyl Wall Base Vinyl Wall Covering Verify With Manufacturer

W W/ WAP WC WD WG WH WDW WM WO W/O WP WR WS WSCT WT WTW WWB WWF

West With Wireless Access Point Water Closet Wood Wired Glass Wall Hung Window Wire Mesh Window Opening Without Waterproof -ing Water Resistant Waterstop Wainscot Weight Wall to Wall Wood Wall Base Welded Wire Fabric

TERR TFF TSER

PROJECT ADDRESS: 1941 AMSTERDAM AVENUE, NEW YORK, NY 10032 LEGAL DESCRIPTION: BLOCK: 2107 LOT: 59 NUMBER OF STORIES: 6 ZONE:RESIDENTIAL & COMMERCIAL ZONING MAP: 30C USE AND OCCUPANCY CLASSIFICATION: R7-2; C2-4 OVERLAY CONSTRUCTION CLASSIFICATION: IV-B (NON-COMBUSTIBLE) STRUCTURAL CATEGORY: IV BLDG HEIGHT: MAXIMUM 135'-0" LOT AREA REGULATIONS: LOT AREA: 88,666 SF EXISTING BUILDING AREA: 150,236 SF EXISTING BUILDINGS: 1

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

PROJECT DIRECTORY CLIENT/AGENCY: NEW YORK PUBLIC LIBRARY 476 FIFTH AVENUE, NEW YORK CITY, NEW YORK, U.S. T 718.391.1234 TENANT/USER: NEW YORK PUBLIC LIBRARY - SUGAR HILL BRANCH

E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR E-mail:

DESIGNER: JOSHUA RENNER STRUCTURAL ENGINEERS: ARUP

STRUCTURAL ENGINEER ARUP KION

MEP+FP ENGINEERS: ARUP

E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

APPLICABLE CODES ARCHITECTURAL WORK FILED IN COMPLIANCE IMTH 1968 NYC BUILDING CODE PER 2014 NYC AC SECTION 28-101.4.3 ACCESSIBILITY PER 2014 NYC BUILDING COOE CHAPTER 11 & ICC A117.1-2009 PER 2014 NYC AC SECTION 28-101.4.J 2014 NYC PLUMBING CODE (IPC 2003) 2014 NYC MECHANICAL CODE(IMC2003) 2011 NYC ELECTRICAL CODE (NEC 2008)

# NO.

DESCRIPTION:

DATE:

2014 NYC FIRE CODE (NFPA 5000) 2016 NYC ENERGY CONSERVATION CODE

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

GENERAL NOTES DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A N/A JOSH

G001


PULL SIDE

PUSH SIDE

PULL SIDE

12" MIN *

PUSH SIDE

22" MIN

PULL SIDE

NOTE: Y=54" MIN IF DOOR HAS CLOSER

7 G002

SLIDING AND FOLDING DOORS

6

LATCH SIDE APPROACH-

G002

SCALE: NTS

SWINGING DOOR

G002

SCALE: NTS

HINGE SIDE

HINGE SIDE APPROACH-

SWINGING DOOR

5

SWINGING DOOR

4 G002

SCALE: NTS

G002

SCALE: NTS

NOTE: * IF DOOR HAS BOTH A CLOSER AND A LATCH ** IF DOOR HAS BOTH A CLOSER AND A APPROACH- LATCH

NOTE: X = 12" MIN IF DOOR HAS BOTH A CLOSER AND A LATCH

FRONT APPROACH-

FRONT APPROACH-

SWINGING DOOR

3

48 MIN 18" MIN, 24" PREFERRED

NOTE: X = 36" MIN. IF Y = 60" X = 42" MIN. IF Y = 54"

NOTE: Y = 48" MIN

LATCH SIDE APPROACH-

60" MIN

Y X

IF DOOR HAS CLOSER AND A LATCH

FRONT APPROACH-

42" **

Y

24" MIN

42" MIN

48" MIN

Y

48" MIN

X

PUSH SIDE

X

24" MIN

SWINGING DOOR

2 G002

SCALE: NTS

1 G002

SCALE: NTS

32" MIN

SWINGING DOOR SCALE: NTS

54" MIN

CLIENT/OWNER/TENANT

48" MIN 42" MIN

NOT TO EXCEED FOUNTAIN DEPTH

NEW YORK NY E-mail:

24" MIN

24" MAX

48" MIN

30" MIN

17"-19"

NEW YORK PUBLIC LIBRARIES 42" MIN

30" MIN

10003

DESIGNER JOSHUA RENNER

24" MAX

14 G002

CLEAR FLOOR SPACE

32" MIN

13 G002

SCALE: NTS

BUILT-IN FOUNTAIN OR COOLER

12 G002

SCALE: NTS

32" MIN

E-mail:

CLEAR DOORWAY WIDTH

CLEAR DOORWAY WIDTH

SLIDING DOOR

HINGED DOOR

11 G002

SCALE: NTS

MAXIMUM DOORWAY DEPTH

10 G002

SCALE: NTS

SLIDING AND FOLDING DOORS

9 G002

SCALE: NTS

DESIGN CONSULTANT

LATCH SIDE APPROACH-

SLIDE SIDE APPROACH8 G002

SCALE: NTS

SLIDING AND FOLDING DOORS

MCVOY ARCHITECTS CHRIS MCVOY

SCALE: NTS

E-mail:

NOMINAL DIAM.

48" MIN

39"-41"

ARUP NEIL MUIR

36" MAX SPOUT

CLEAR FLOOR SPACE

MEP ENGINEER

E-mail:

STRUCTURAL ENGINEER 8" MIN

60" MIN

ARUP KION

6" MAX

E-mail:

8" MIN KNEE CLEARANCE 17" MIN DEPTH

CLEAR FLOOR

SIZE AND SPACING OF

G002

EQUIPMENT PERMITTED IN SHADED AREA

6" MAX TOE CLEARANCE

NOTE: PROVIDE PLYWD BACKING AT ALL HANDRAIL MOUNT LOCATIONS.

21

36" MIN

TOILET PAPER

7"-9"

E-mail:

17"-19"

12" 12" MIN MIN

18" MIN

36" MAX

16-18"

27" MIN

42" MIN

42" MIN

9" MIN

12" MAX

18" MIN

34" MAX

29" MIN

19" MAX

27" MIN

9"MIN.

30" MIN

MIN

54" MIN

33"-36"

17"

39"-41"

RICE + LIPKA ARCHITECTS ASTRID LIPKA

56" MIN

MAX

NOTE: PROVIDE PWD BACKING AT ALL GRAB BARS TO PROVIDE SECURE ANCHORING

33"-36"

NOTE: PROVIDE PWD BACKING AT ALL GRAB BARS TO PROVIDE SECURE ANCHORING

40" MAX TO REFLECTIVE SURFACE

MIN

DOCUMENTATION CONSULTANT

1 1/2"

17"-19"

1 1/4 - 1 1/2"

HANDRAILS AND GRAB BARS

20 G002

SCALE: NTS

SPACE AT LAVATORIES

LAVATORY CLEARANCES

19 G002

SCALE: NTS

SIDE WALL OF STANDARD TOILET STALL

18 G002

SCALE: NTS

REAR WALL OF 17 G002

SCALE: NTS

SPOUT HEIGHT

CLEAR FLOOR SPACE

STANDARD TOILET STALL

16 G002

SCALE: NTS

AT WATER CLOSET

15 G002

SCALE: NTS

LIGHTING CONSULTANT

AND KNEE CLEARANCE

ARUP STEPHANIE HILLEGAS

SCALE: NTS

E-mail: 36"

ANY AMT. IF MOUNTED 27" OR LOWER AS LONG AS THERE IS 36" MIN CLR. WIDTH

36"

CONTROL WALL

SEAT WALL

3"MAX

G002

GRAB BARS AND SEAT

26 G002

SCALE: NTS

SIZE, CLEARANCE AND SEAT

25 G002

SCALE: NTS

WALKING PARALLEL TO WALL

24 G002

SCALE: NTS

GRATINGS ORIENTATION

23 G002

SCALE: NTS

GRATINGS

ENTRY

3

2

S

B

15"

35"

48"

1

4

1

SCALE: NTS

CONTROL BUTTON DIAMETER

7

8

5

6

1

2

S

B

ALIGN

DOOR CLOSED

60"

6

WIDTH & ACCEPT. NOSINGS

DOOR OPEN

# NO.

DESCRIPTION:

DATE:

48"

8

5

48" MAX SIDE APPROACH

7

48" MAX FRONT APPROACH

FLOOR

2

G002

3/4"

MAIN

* DIAGRAMS BASED ON: BUILDING CODE OF THE CITY OF NEW YORK LOCAL LAW 58 /87 ANSI A117.1-2009

22

SCALE: NTS

NUMERAL HEIGHT 5/8"

SCALE: NTS

27

USABLE TREAD

1/4" MAX

G002

CONTROLS AND HANDSHOWER

PROTRUDING OBJECTS

SHOWER COMPARTMENT

SHOWER COMPARTMENT

1/4"-1/2"

28

FLUSH RISER

86" UNO

1 1/2"MAX

7" MAX

80" MIN

RADIUS

15"MAX

SHOWER COMPARTMENT

E-mail:

1 1/2" MAX

MAX 48"

36"

11" MIN

1/2"

HIGHER THAN 27"

17"-19"

33"-36"

SIDE WALL

48" MAX

38" MIN

CONTROL WALL

ARUP CHRIS POLLOCK

PREDOMINANT DIRECTION OF TRAFFIC LONG DIMENSION PERPENDICULAR TO ROUTE OF TRAVEL

2 1/2" MAX 15-16"

18"

18"

3"-6"

15"MAX

4" MAX

4"MAX BACK WALL

NOTE: PROVIDE PWD BACKING AT ALL GRAB BAR & BENCH LOCATIONS TO PROVIDE SECURE ANCHORING

18"MIN

NOTE: PROVIDE PWD BACKING AT ALL GRAB BAR & BENCH LOCATIONS TO PROVIDE SECURE ANCHORING

ACOUSTICS/SOUNDMASKING CONSULTANT

EMERGENCY ALARM EMERGENCY STOP

OCTAGON SYMBOL SHALL BE RAISED BUT THE "X" IS NOT

HIGH AND LOW 34 G002

BEVELED CHANGES IN LEVEL SCALE: NTS

33 G002

VERTICAL CHANGES IN LEVEL SCALE: NTS

32 G002

SIDE REACH LIMITS SCALE: NTS

31 G002

CAR CONTROL HEIGHT SCALE: NTS

30 G002

CAR CONTROL PANEL DETAIL SCALE: NTS

HOISTWAY AND 29 G002

ELEVATOR ENTRANCES SCALE: NTS

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

ACCESSIBILITY DIAGRAMS DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A N.T.S. N/A JOSH

G002


UP

128' T

HE D

NOL IAGA

MEAS

UREM

E

E

TANC

E DIS

F TH NT O

ED SERV

XITS

HE E

BY T

FE +10 A.F.F.

TRAVEL DISTANCE = 151'-0"

24 1'

FE +10 A.F.F.

AX

AG AN

DI

DN

AG O

NA

OL EA M

O AG

L

EN M T

128' T

H

GANO E DIA

TH T OF EMEN

RVED E SE

ITS E EX

H BY T

ASUR

L ME

RE

M

TANC

E DIS

SU

2'

DI

DN 7' M

DI OF

21

AX

UP

29

E TH

L

NA

UP

E TH

CLIENT/OWNER/TENANT

AN ST

DI

DN

UP

CE

UP

DN

NEW YORK PUBLIC LIBRARIES

RV

SE

TRAVEL DISTANCE = 122'-6"

ED

NEW YORK NY E-mail:

BY E

M

ISTA

S

IT

AX

10003

EL D

EX

DESIGNER

NCE

2' 21

O

AG

DI

TRAV

TH

L

NA

'-0"

= 123

JOSHUA RENNER E-mail:

UP

DESIGN CONSULTANT

DN

MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

DN

N

E-mail:

MEP ENGINEER

1

SCALE

CELLAR LIFE SAFETY

2

3/64" = 1'-0"

SCALE

LEVEL 1 LIFE SAFETY

3/64" = 1'-0"

3

ARUP NEIL MUIR

SCALE

LEVEL 2 LIFE SAFETY

3/64" = 1'-0"

E-mail:

STRUCTURAL ENGINEER ARUP KION

AX 'M 174

UP

L ME

ASUR

F TH

E DIS

TAN

Y TH

E EX

ITS

L NA GO

UP

DN

DN

TRAVEL DISTANCE = 111'-0"

12

E 8' TH

ANO DIAG

TO EMEN

CE S

DB ERVE

UP

ITS E EX

Y TH

E 8' TH

12

DIA

ASUR

L ME

ANO DIAG

AL

ON

IAG

D AX

'M

174

DN

AX

1

TRAVEL DISTANCE = 99'-0"

DN

UP

N

M 74'

TRAVEL DISTANCE = 99'-0"

UP

TRAVEL DISTANCE = 111'-0"

ENT REM EASU

OL M

IAGA

HE D

128' T

TRAVEL DISTANCE = 99'-0"

UP

DN

DN

XITS

EE Y TH

ED

F TH

TO EMEN

ED B SERV NCE ISTA

UP

HE

OF T

ANCE DIST

ED B SERV

AL

128' T

N GO

DIA

RVED

E SE

N

IAGA

HE D

AX

'M 174

TRAVEL DISTANCE = 99'-0"

TRAVEL DISTANCE = 99'-0"

DN

UP

ENT

UREM

EAS OL M

OF T

TANC E DIS

E-mail:

LIGHTING CONSULTANT

XITS

B

EE Y TH

ARUP STEPHANIE HILLEGAS

H

E-mail:

AL

DIA

N GO

ACOUSTICS/SOUNDMASKING CONSULTANT

TRAVEL DISTANCE = 99'-0"

ARUP CHRIS POLLOCK

DN

E-mail:

4

SCALE

LEVEL 3 LIFE SAFETY

3/64" = 1'-0"

CODE KEY

5

SCALE

LEVEL 4 LIFE SAFETY

3/64" = 1'-0"

6

LEVEL 5 LIFE SAFETY

SCALE 3/64" = 1'-0"

7

LEVEL 6 LIFE SAFETY

SCALE 3/64" = 1'-0"

OCCUPANCY LOAD & EGRESS ANALYSIS

CALCULATED AREA FOR OCC LOAD

FLOOR

OCCUPANCY GROUP

AREA IN SF

OCC LOAD/SF

TOTAL OCCUPANTS

CELLAR NON-SIMULTANEOUS OCC OR UNOCCUPIED

DATA CENTER

S

14,271

MP

3

CAFE

A-2

1,106

15

74

COMMUNITY ROOM

A-3

798

15

54

GALLERY

A-3

2,227

30

75

INFORMAL READING ROOM

B

2,649

50

53

GRAND READING ROOM

B

2,614

50

53

OFFICES

B

4,295

100

43

AUDITORIUM

A-3

2,671

MP

144

RECEPTION

B

1,119

MP

20

CHILDREN'S AREA

B

798

50

16

BOOK STACKS

B

4,404

100

44

MEETING ROOM 1

B

484

15

32

MEETING ROOM 2

B

463

15

31

LARGE MEETING ROOM

B

918

15

62

B

3,923

100

40

B

3,880

100

39

FIRST FLOOR

PATH OF TRAVEL 2-HR FIRE RATED PARTITION 2-HR RATED SHUTTER ILLUMINATED EXIT SIGN ILLUMINATED EXIT SIGN W/ DIRECTIONAL ARROW

# NO.

DESCRIPTION:

DATE:

SECOND FLOOR

CODE ANALYSIS CONSTRUCTION

TYPE IV CLASS 1

OCCUPANCY CLASSIFICATION BUSINESS GROUP B (BC 304.1)

THIRD FLOOR BOOK STACKS FOURTH FLOOR TAPES/VHS

B

3,880

100

39

B

3,880

50

78

SIXTH FLOOR GRAND COMPUTER ROOM

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

CODE COMPLIANCE & LIFE SAFETY DOB NOW Job #

FIFTH FLOOR CDS

Project

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A As indicated N/A JOSH

G003


SITE INFORMATION

LOT COVERAGE AND COMPLIANCE

PROJECT ADDRESS:

LOT AREA REGULATIONS:

1941 AMSTERDAM AVENUE, NEW YORK, NY 10032

LOT AREA: 88,666 SF EXISTING BUILDING AREA: 150,236 SF EXISTING BUILDINGS: 1 PROPOSED BUILDING AREA: 55,792 PROPOSED BUILDING FOOTPRINT: 17,479

LEGAL DESCRIPTION: BLOCK: 2107 LOT: 59 NUMBER OF STORIES: 6 ZONE:RESIDENTIAL & COMMERCIAL ZONING MAP: 30C USE AND OCCUPANCY CLASSIFICATION: R7-2; C2-4 OVERLAY CONSTRUCTION CLASSIFICATION: IV-B (NON-COMBUSTIBLE) STRUCTURAL CATEGORY: IV

ALLOWABLE BLDG. ENVELOPE

MAXIMUM LOT COVERAGE: 65% EXISTING LOT COVERAGE: 10% NEW LOT COVERAGE: 28%

ROOF

PROPERTY LINE

EXISTING FAR: 1.7 MAX FAR: 4.8 PROPOSED FAR: 2.4

PROPOSED BLDG. ENVELOPE

PROPERTY LINE

LVL 6

MAXIMUM HEIGHT: 105' PROPOSED BUILDING HEIGHT: 90'

SKY EXPOSURE PLANE = 2.7 : 1 ( ZR 23–641) LVL 5

CLIENT/OWNER/TENANT R7-2 MAX HEIGHT: 105' - 0"

NEW YORK PUBLIC LIBRARIES

LVL 3

REQ'D SKY EXPOSURE START HEIGHT: 60' - 0"

SITE LOCATION

PROPOSED BUILDING HEIGHT: 90' - 0"

LVL 4

LVL 2

NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

EXTG. BLDG. 01 DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT

LVL 1

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

155TH ST. PEDESTRIAN PATH

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

1

SCALE

ZONING MAP

N.T.S.

2

SCALE

BULK & YARD REGULATIONS SECTION A

E-mail:

NTS

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

ALLOWABLE BLDG. ENVELOPE

SKY EXPOSURE PLANE = 2.7 : 1 ( ZR 23–641) PROPERTY LINE

PROPERTY LINE

ROOF

PROPOSED BLDG. ENVELOPE

LVL 6

LVL 5

LVL 3

LVL 2

LVL 1

AMSTERDAM AVE.

PROPOSED BUILDING HEIGHT: 90' - 0"

LVL 4

REQ'D SKY EXPOSURE START HEIGHT: 60' - 0"

EXTG. BLDG. 02

DESCRIPTION:

DATE:

R7-2 MAX HEIGHT: 105' - 0"

# NO.

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

ZONING DOB NOW Job #

ST. NICHOLAS AVE.

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

3

BULK & YARD REGULATIONS SECTION B

SCALE NTS

Sheet

N/A As indicated N/A JOSH

Z001


PROGRAM INDEX FLOOR

PROGRAM

ACCESS

CELLAR

DATA CENTER

PRIVATE

LEVEL 01

RECEPTION

PUBLIC

GRAND COMPUTER ROOM

LVL 06

CAFE - KITCHEN

PRIVATE

- DINING

PUBLIC SEMI-PUBLIC

COMMUNITY ROOM

CDS

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES

LVL 05

NEW YORK NY E-mail:

PUBLIC

GALLERY

DESIGNER

PUBLIC

INFORMAL READING

10003

JOSHUA RENNER E-mail:

PUBLIC

GRAND READING ROOM

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

PRIVATE

OFFICES

TAPES & VHS

E-mail:

LVL 04

- OPEN OFFICE

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

- MEETING ROOM

E-mail:

MEP ENGINEER

- BREAK ROOM

ARUP NEIL MUIR E-mail:

SEMI-PUBLIC

AUDITORIUM CHILDREN'S READING

PUBLIC

MEETING ROOMS

SEMI-PUBLIC

STRUCTURAL ENGINEER

BOOK STACKS

ARUP KION

LVL 03

E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

- LARGE MEETING ROOM

MEETING ROOMS

ACOUSTICS/SOUNDMASKING CONSULTANT

- TWO SMALL MEETING ROOMS

ARUP CHRIS POLLOCK

BOOK STACKS

BOOK STACKS 01

PUBLIC

LEVEL 03

BOOK STACKS 02

PUBLIC

LEVEL 04

TAPES/VHS

PUBLIC

LEVEL 05

CDS

PUBLIC

LEVEL 06

GRAND COMPUTER ROOM

PUBLIC

E-mail:

LVL 02

CHILDREN'S READING

GALLERY

LVL 01 GRAND READING ROOM

OFFICES

INFORMAL READING

CAFE

Level Cellar Cellar Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 2 Level 2 Level 2 Level 2 Level 2 Level 2 Level 3 Level 3 Level 4 Level 4 Level 5 Level 5 Level 6 Level 6

Room Schedule

Name

DATA CENTER ELECTRICAL CAFE COMMUNITY ROOM GALLERY INFORMAL READING GRAND READING ROOM OFFICES AUDITORIUM RECEPTION TECH ROOM CHILDREN'S READING BOOK STACKS MEETING ROOM 1 MEETING ROOM 2 LARGE MEETING ROOM ELECTRICAL BOOK STACKS 03 TECH ROOM ELECTRICAL TAPES/VHS CDS TECH ROOM GRAND COMPUTER ROOM ELECTRICAL

AUDITORIUM

Area

14158 SF 752 SF 1106 SF 798 SF 2227 SF 2649 SF 2607 SF 4295 SF 2656 SF 1119 SF 103 SF 791 SF 4404 SF 484 SF 463 SF 918 SF 103 SF 3923 SF 103 SF 103 SF 3880 SF 3878 SF 103 SF 3876 SF 103 SF

# NO.

COMMUNITY ROOM

Perimeter

DESCRIPTION:

DATE:

736' - 0 5/32" 109' - 8 25/32" 171' - 5 5/8" 112' - 11 23/32" 245' - 2 17/32" 214' - 9 11/16" 251' - 10 9/32" 453' - 4 5/32"

Project

213' - 8 11/16"

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

159' - 7 7/16"

CELLAR

41' - 6 25/32" 112' - 5 19/32" 477' - 7 1/16"

DATA CENTER

89' - 0 1/8"

Drawing Title

PROGRAM

86' - 10 1/8" 135' - 0 9/16" 41' - 6 25/32" 351' - 4 13/32"

DOB NOW Job #

41' - 6 25/32" 41' - 6 25/32" 350' - 10 15/32"

Seal

351' - 4 13/16" 41' - 6 25/32" 351' - 6 3/32" 41' - 6 25/32"

Date Scale Project No. Drawn By Checked By Drawing No.

1

AXONOMETRIC PROGRAM DIAGRAM

SCALE NTS

Sheet

N/A NTS N/A JOSH

A000


CLIENT/OWNER/TENANT

RAIN GARDEN W/ NEW PLANTINGS, WILD GRASSES AND DRAINAGE

NEW YORK PUBLIC LIBRARIES LOOSE GRAVEL DRAINAGE AND PATH

NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR REFLECTING POOL

E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

EXTERIOR GRAVEL SEATING AREA AND EXHIBITION SPACE

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

UP

E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

ø 30' - 0"

NEW TREES TO BE PLANTED

WILD GRASS LAWN

GEOTHERMAL WELLS @30' O/C

EXTG. PUBLIC PARK W/ PLAYGROUND AND BASKETBALL COURTS

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

SITE PLAN DOB NOW Job #

Seal

N

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/16" = 1'-0" N/A JOSH

A001


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

SOUTHEAST ISOMETRIC DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A N/A JOSH

A002


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

NORTHWEST ISOMETRIC DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A N/A JOSH

A003


6 17' - 10 1/4"

7 15' - 0"

8

9

15' - 0"

15' - 0"

10

11

15' - 0"

12

15' - 0"

15' - 0"

13 15' - 0"

14 15' - 0"

18' - 11 3/4"

A A400 E

30' - 7

19' - 11 1/4"

5

A500

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES

1/4"

UP

H

NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail: HP

27' - 8"

30' - 9"

26' - 5 1/4"

ELECTRICAL

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

002

E-mail: HP

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

HP

E-mail:

J

MEP ENGINEER ARUP NEIL MUIR HP

E-mail:

27' - 9"

UP

STRUCTURAL ENGINEER ARUP KION

HP

A

E-mail:

A401

B

29' - 4"

A401

LIGHTING CONSULTANT

HP

ARUP STEPHANIE HILLEGAS E-mail:

HP

13' - 9"

125' - 5 1/2"

K

ARUP CHRIS POLLOCK

DATA CENTER

94' - 8 1/2"

L

A401

E-mail:

001 HP

17' - 6"

C

ACOUSTICS/SOUNDMASKING CONSULTANT

HP

M

17' - 6"

HP

HP

RAISED METAL ACCESS FLOOR SHOWN HATCHED. ELECTRICAL AND COOLING PIPES TO BE PLACED BELOW.

N HP

17' - 6"

HP

HP

HP

HP

HP

A A500

HEAT PUMPS GEOTHERMAL SOURCED (TYP.)

# NO.

DESCRIPTION:

DATE:

O HEAT PUMPS FOR SERVER CABINET COOLING AND HEAT REDISTRIBUTION

38' - 3"

15

16

1 A301

____

111' - 2"

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

CELLAR PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A100


50' - 0" 47' - 4 3/4"

1

2 16' - 0"

2 A303

____

3

4

16' - 0"

16' - 0"

16' - 0"

A

EXTG BLDG

16' - 0"

B

CLIENT/OWNER/TENANT

158' - 4 3/4"

NEW YORK PUBLIC LIBRARIES

118' - 6 1/2"

C

5

6

7

8

40' - 0"

9

1 A303

____

10

11

12

13

NEW YORK NY E-mail:

14

10003

DESIGNER

16' - 0"

JOSHUA RENNER E-mail:

17' - 10 1/4"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

19' - 1 1/2"

D

MCVOY ARCHITECTS CHRIS MCVOY

A A400

OFFICES 16' - 0"

E-mail:

D A500

107

DOCUMENTATION CONSULTANT

TECH ROOM

UP

A500

H

16' - 0"

E-mail:

1"

E

E

RICE + LIPKA ARCHITECTS ASTRID LIPKA

29' - 1

108

MEP ENGINEER ARUP NEIL MUIR

DN

E-mail:

P

E-mail:

19' - 1

GRAND READING ROOM

27' - 8"

F

STRUCTURAL ENGINEER ARUP KION

0 1/4"

102

16' - 0"

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

Q

G

J

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

0 19' - 1

E-mail:

130' -

1/4"

DN

RECEPTION 100

1 A300

____

"

OPEN TO BELOW

11 1/2

27' - 9"

UP

R

B A500

A A401

B

K

1 A302

0 1/4" 19' - 1

A401

41' - 6 3/4"

____

13' - 9"

INFO. DESK GALLERY

S

103

INFORMAL READING

L

101 0 1/4" 19' - 1

AUDITORIUM 104 17' - 6"

75' - 6 1/2"

M

2 A300

____

2 A302

____

" 65' - 8

UP

# NO.

T

C A500

DESCRIPTION:

DATE:

0 19' - 1

UP

17' - 6"

1/4"

COMMUNITY ROOM

CAFE 106

105

N

U

"

17' - 9

17' - 6"

C A401

94' - 8"

100' - 8"

DESIGN CONSULTANT

A

17

A500

O

24' - 4

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

18

FIRST FLOOR PLAN

3/4"

DOB NOW Job #

Seal

38' - 3"

15

16

N 1 A301

____

110' - 9 1/2"

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A101


50' - 0"

1

2 16' - 0"

3

4

16' - 0"

16' - 0"

16' - 0"

A

EXTG BLDG

16' - 0"

42' - 6 1/2"

B

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES

17' - 10 1/2"

C

5

100' - 9 1/2"

6 15' - 0"

8

9

15' - 0"

10

15' - 0"

11

15' - 0"

15' - 0"

12

13

15' - 0"

15' - 0"

NEW YORK NY E-mail:

10003

DESIGNER

14

JOSHUA RENNER

15' - 0"

E-mail:

16' - 0"

17' - 10 1/4"

7

39' - 10 1/2"

MCVOY ARCHITECTS CHRIS MCVOY

D

E-mail:

A A400

A500

ELECTRICAL

19' - 5 3/4"

16' - 0"

27' - 7 3/4"

D

205

MEP ENGINEER

UP

A500

H

16' - 0"

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

E

E

DOCUMENTATION CONSULTANT

ARUP NEIL MUIR E-mail:

DN

STRUCTURAL ENGINEER

P

ARUP KION E-mail:

19' - 1

OPEN TO BELOW

27' - 8"

F

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

0 1/4"

16' - 0"

E-mail:

MEETING ROOM 1

Q

202

G

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

J

E-mail:

BOOK STACKS 200

DN

"

27' - 9"

UP

11 1/2

GREEN ROOF TO BE PLANTED WITH WILD GRASSES & DRAIN TOWARDS SCUPPER

130' -

0 1/4" 19' - 1

50' - 3"

R

B A500

A

MEETING ROOM 2

B

A401

203

A401

0 19' - 1 1/4"

K 13' - 9"

40' - 1 1/4"

S

37' - 9 1/2"

17' - 6"

1/4"

58' - 2

67' - 2 1/2"

T

LARGE MEETING ROOM

U

201 29' - 5"

"

17' - 9

A

17

A500

O

4' - 2"

38' - 3"

15

71' - 3"

16

111' - 6"

DATE:

0 1/4"

CHILDREN'S READING

N

DESCRIPTION:

204

17' - 6"

DN

# NO.

19' - 1

OPEN TO BELOW

A500

1/2"

M

C

17' - 6"

C A401

OPEN TO BELOW

0 19' - 1

L 94' - 9 1/2"

100' - 8"

DESIGN CONSULTANT

EXACT ROOFTOP SOLAR PANEL PLACEMENTS AND ALIGNMENT TO BE SPECIFIED BY SOLAR ENGINEER

24' - 2 28' - 4

1/2"

1/2"

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

18

SECOND FLOOR PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A102


140' - 10 1/4" 100' - 10 1/4"

5

6 17' - 10 1/4"

7 15' - 0"

8

40' - 0"

9

15' - 0"

15' - 0"

10

11

15' - 0"

15' - 0"

12

13

15' - 0"

15' - 0"

14 15' - 0" CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

DESIGNER

D A500

TECH ROOM

A

GREEN ROOF TO BE PLANTED WITH WILD GRASSES & DRAIN TOWARDS SCUPPERS

10003

JOSHUA RENNER

301

A400

E-mail:

1 29' - 1

E A500

DESIGN CONSULTANT

"

MCVOY ARCHITECTS CHRIS MCVOY

UP

E-mail:

H

DN DOCUMENTATION CONSULTANT

P

RICE + LIPKA ARCHITECTS ASTRID LIPKA

MEP ENGINEER

19' - 1

27' - 8"

E-mail:

0 1/4"

ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER

Q

ARUP KION

J

27' - 9"

300

ARUP STEPHANIE HILLEGAS

" 11 1/2 130' -

DN

LIGHTING CONSULTANT

0 1/4"

BOOK STACKS 03

19' - 1

UP

47' - 7 3/4"

E-mail:

E-mail:

R

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

A A401

B

E-mail:

A401

0 1/4" 19' - 1

K 13' - 9"

125' - 9 1/2"

39' - 10"

S

L

17' - 6"

38' - 0 3/4"

0 1/4" 19' - 1

C A401

58' - 3 1/4"

M

T

C A500

17' - 6"

0 1/4"

19' - 1

39' - 8 1/2"

U

# NO.

DESCRIPTION:

DATE:

17' - 6"

29' - 3 1/2"

N 17' - 9

17 O

4' - 2"

38' - 3"

15

24' - 2

"

1/2"

28

/2" '-41

18 Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

71' - 1 1/2"

16

THIRD FLOOR PLAN

1 A301

____

DOB NOW Job #

ROOFTOP SOLAR PANEL PLACEMENTS AND ALIGNMENT TO BE SPECIFIED BY SOLAR ENGINEER

ROOFTOP SOLAR PANEL PLACEMENTS AND ALIGNMENT TO BE SPECIFIED BY SOLAR ENGINEER

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A103


158' - 6"

CLIENT/OWNER/TENANT

118' - 7 1/2"

5

6 17' - 10 1/4"

7 15' - 0"

8 15' - 0"

9 15' - 0"

NEW YORK PUBLIC LIBRARIES

39' - 10 1/2"

10

11

15' - 0"

15' - 0"

12

13

15' - 0"

15' - 0"

NEW YORK NY E-mail:

14 15' - 0"

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

D A500

ELECTRICAL

E-mail:

401 DOCUMENTATION CONSULTANT

30' - 4 1/4"

RICE + LIPKA ARCHITECTS ASTRID LIPKA

UP

E-mail:

MEP ENGINEER

DN

ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

A A400

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

47' - 7 3/4"

J

27' - 9"

30' - 0 1/2"

UP

DN

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

TAPES/VHS 400

A A401

K 150' - 9 3/4"

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

FOURTH FLOOR PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A104


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER

158' - 6" 118' - 7 1/2"

5

6 17' - 10 1/4"

7 15' - 0"

8 15' - 0"

39' - 10 1/2"

9 15' - 0"

E-mail:

10

11

15' - 0"

15' - 0"

12

13

15' - 0"

15' - 0"

DESIGN CONSULTANT

14

MCVOY ARCHITECTS CHRIS MCVOY

15' - 0"

E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail: D MEP ENGINEER

TECH ROOM

A500 A

ARUP NEIL MUIR

501

A400

UP

30' - 2 1/2"

E-mail:

STRUCTURAL ENGINEER ARUP KION

DN

E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

47' - 7 3/4"

J

29' - 9"

27' - 9"

UP

DN

CDS 500 A A401

K 150' - 9 3/4"

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

FIFTH FLOOR PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A105


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

158' - 6" 118' - 7 1/2"

5

6 17' - 10 1/4"

7 15' - 0"

8 15' - 0"

15' - 0"

DESIGNER

39' - 10 1/2"

9

10

11

15' - 0"

15' - 0"

12

13

15' - 0"

15' - 0"

10003

JOSHUA RENNER

14

E-mail:

15' - 0" DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

D A500

ELECTRICAL

A

E-mail:

601

A400

MEP ENGINEER

30' - 2 1/2"

UP

ARUP NEIL MUIR E-mail:

DN

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

47' - 7 3/4"

J

29' - 9"

27' - 9"

UP

DN

GRAND COMPUTER ROOM 600 A A401

K 150' - 9 3/4"

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

SIXTH FLOOR PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A106


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES

158' - 6" 118' - 7 1/2"

5

17' - 10 1/4"

6

15' - 0"

7

15' - 0"

8

15' - 0"

NEW YORK NY E-mail:

39' - 10 1/2"

9

15' - 0"

10

15' - 0"

11

15' - 0"

12

15' - 0"

13

15' - 0"

14

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

D A500

DOCUMENTATION CONSULTANT

A

RICE + LIPKA ARCHITECTS ASTRID LIPKA

A400

30' - 2 1/2"

E-mail:

DN

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT

J 47' - 7 3/4"

ARUP CHRIS POLLOCK

29' - 9"

27' - 9"

E-mail:

A A401 DN

K 150' - 9 3/4"

ROOFTOP SOLAR PANEL PLACEMENTS AND ALIGNMENT TO BE SPECIFIED BY SOLAR ENGINEER # NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

ROOF PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A107


1

2 EQ

48' - 0"

3

4

EQ

EQ

6 1/2"

1' - 1"

1"

EQ

A

EQ

B

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES

C

5

6

7

8

9

10

11

12

13

NEW YORK NY E-mail:

14

10003

EQ

DESIGNER

17' - 10 1/4"

CONCRETE SLAB ON GRADE

15' - 0"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

15' - 0"

JOSHUA RENNER E-mail:

DESIGN CONSULTANT

96' - 0"

MCVOY ARCHITECTS CHRIS MCVOY E-mail:

3.125x12

EQ

D

30' - 1

3.125x12

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

1/4"

E

E-mail:

UP

MEP ENGINEER

H

ARUP NEIL MUIR

DN

EQ

3.125x12

E-mail:

P

STRUCTURAL ENGINEER ARUP KION

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

E-mail:

EQ

5.125x20

5.125x20

3.125x12

EQ

27' - 8"

F

LIGHTING CONSULTANT

3.125x12

ARUP STEPHANIE HILLEGAS E-mail:

3.125x12

J

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

27' - 9"

OPEN TO BELOW

R

11 1/2"

" 99' - 3 EQ

CONCRETE SLAB ON GRADE

12' - 9 1/2"

K

DN

3.125x12

EQ

UP

S

5.125x24

5.125x24

5.125x24

5.125x24

17' - 6"

EQ

5.125x24

10x20

L

UP

T

DESCRIPTION:

DATE:

3.125x12

3.125x12

3.125x12

17' - 6"

EQ

3.125x12

2' - 4"

3.125x12

3.125x12

M

# NO.

3.125x12

10x20

U N

Project

17' - 9

3.125x12

3.125x12

3.125x12

3.125x12

3.125x12

"

17' - 6"

18 17

O

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

FIRST FLOOR FRAMING PLAN DOB NOW Job #

38' - 3"

1' - 0"

1' - 1"

G

Q

9' - 9" Seal

15

16

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSHUA

A151


1

2

3

4

48' - 0" EQ

EQ

EQ

EQ

A

B

EQ

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

C 2' - 7 3/4"

5

6 17' - 10 1/4"

7 15' - 0"

8 15' - 0"

9 15' - 0"

10 15' - 0"

11 15' - 0"

12 15' - 0"

13 15' - 0"

14 15' - 0"

10003

DESIGNER JOSHUA RENNER

19' - 0"

EQ

E-mail:

DESIGN CONSULTANT

3.125x12

3.125x12

3.125x12

3.125x12

E-mail:

EQ

3.125x12

96' - 0"

D

MCVOY ARCHITECTS CHRIS MCVOY

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

30' - 1

5.125x20

E-mail:

1/4"

E

MEP ENGINEER

UP

ARUP NEIL MUIR

H

DN

E-mail:

EQ

5.125x20

P F

STRUCTURAL ENGINEER ARUP KION E-mail:

3.125x12 5.125x20

LIGHTING CONSULTANT

EQ

EQ

27' - 8"

OPEN TO BELOW

ARUP STEPHANIE HILLEGAS

3.125x12

E-mail:

J

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

5.125x20

E-mail:

EQ

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

27' - 9"

R

x12

11 1/2"

" 99' - 3

EQ

5.125x20

3.125

x12 3.125

12' - 9 1/2"

K

DN 5.125x20

UP

S

3.125x6

17' - 6"

EQ

OPEN TO BELOW

5.125x20

L

# NO.

T

DESCRIPTION:

DATE:

3.125x6

M

OPEN TO BELOW 17' - 6"

EQ

3.125x12

3.125x12

3.125x12

-5' - 0"

3.125x12

N

3.125x6 3.125x12

10x20

U

" 17' - 9

17' - 6"

G

Q

17 10x20

O

3.125x6

DN

38' - 3"

15

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

18

SECOND FLOOR FRAMING PLAN DOB NOW Job #

Seal -1' - 6"

9' - 9"

16

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A152


5

6

7

8

9

10

11

12

13

14

120' - 0" 17' - 10 1/4"

EQ

EQ

EQ

EQ

19' - 0" EQ

EQ

EQ

EQ CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES

3.125x12

NEW YORK NY E-mail:

10003

DESIGNER

30' - 1

JOSHUA RENNER

5.125x20

E-mail:

1/4"

UP

H

DESIGN CONSULTANT

DN

MCVOY ARCHITECTS CHRIS MCVOY

0' - 0" AFF

E-mail:

5.125x20

P

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

5.125x20

10x20

10x20

10x20

10x20

10x20

10x20

10x20

E-mail:

EQ

27' - 8"

3.125x12

MEP ENGINEER ARUP NEIL MUIR

3.125x12

E-mail:

Q STRUCTURAL ENGINEER

J

ARUP KION

5.125x20

E-mail:

EQ LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

-0' - 1 3/8" AFF

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

27' - 9"

5.125x20

DN 5.125x20

UP

E-mail:

R

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

3.125x12

S

x20

13' - 9"

" 99' - 3 EQ

5.125

x20

5.125

5.125x20

K

E-mail:

8x24

8x24

8x24

8x24

3.125x12

17' - 6"

3.125x12

3.125x12

3.125x12

EQ

17' - 6"

T

STRUCTURAL MULLIONS DASHED IN

10x20

M

EQ

8x24

10x20

L

U

"

17' - 9

3.125x12

17' - 6"

3.125x12

N

3.125x12

10x20

# NO.

DESCRIPTION:

DATE:

18

17 10x20

O

Project

38' - 3"

15

16

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

THIRD FLOOR FRAMING PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A153


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

5

6

7

8

9

10

11

12

13

14

120' - 0" 17' - 10 1/4"

EQ

EQ

EQ

EQ

DESIGNER JOSHUA RENNER

19' - 0" EQ

EQ

EQ

10003

EQ

E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

3.125x12

E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA 5.125x20

UP

E-mail:

MEP ENGINEER ARUP NEIL MUIR

DN

E-mail:

5.125x20

STRUCTURAL ENGINEER ARUP KION 3.125x12 5.125x20

E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

3.125x12

E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT

J

ARUP CHRIS POLLOCK

5.125x20

E-mail:

K

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

5.125x20

DN 5.125x20

27' - 9"

UP

5.125x20

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

FOURTH FLOOR FRAMING PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A154


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER

5

6

7

8

9

10

11

12

13

14

120' - 0" 17' - 10 1/4"

EQ

EQ

EQ

EQ

E-mail:

19' - 0" EQ

EQ

EQ

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

EQ

E-mail:

DOCUMENTATION CONSULTANT

3.125x12

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

5.125x15

MEP ENGINEER ARUP NEIL MUIR

UP

E-mail:

DN

STRUCTURAL ENGINEER 5.125x15

ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

5.125x15

3.125x12

E-mail:

3.125x12 ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

J

5.125x15

K

5.125x15

5.125x15

5.125x15

5.125x15

5.125x15

5.125x15

5.125x15

5.125x15

DN 5.125x15

27' - 9"

UP

5.125x15

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

FIFTH FLOOR FRAMING PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A155


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER

5

6

7

8

9

10

11

12

13

14

JOSHUA RENNER E-mail:

120' - 0" 17' - 10 1/4"

EQ

EQ

EQ

EQ

19' - 0" EQ

EQ

EQ

EQ

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT 3.125x12

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail: 5.125x15

MEP ENGINEER ARUP NEIL MUIR

UP

E-mail: DN 5.125x15

STRUCTURAL ENGINEER ARUP KION E-mail:

5.125x15

3.125x12 LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

3.125x12

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

J

5.125x15

5.125x15

5.125x15

5.125x15

5.125x15

5.125x15

5.125x15

5.125x15

DN 5.125x15

27' - 9"

UP

K

E-mail:

5.125x15

5.125x15

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

SIXTH FLOOR FRAMING PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A156


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER

5

6

7

8

9

10

11

12

13

14

JOSHUA RENNER E-mail:

120' - 0" 17' - 10 1/4"

EQ

EQ

EQ

EQ

19' - 0" EQ

EQ

EQ

EQ

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

3.125x12

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail: 5.125x15 MEP ENGINEER ARUP NEIL MUIR

DN

E-mail: 5.125x15

STRUCTURAL ENGINEER ARUP KION E-mail:

5.125x15

3.125x12 LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

3.125x12

E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

J

5.125x15

5.125x15

5.125x15

5.125x15

E-mail:

5.125x15

5.125x15

5.125x15

5.125x15

27' - 9"

5.125x15

5.125x15

DN

K

5.125x15

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

ROOF FRAMING PLAN DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A157


5

6

7

8

9

1 A303

____

10

11

12

13

14

CLIENT/OWNER/TENANT D

NEW YORK PUBLIC LIBRARIES

A500

NEW YORK NY E-mail:

A

10003

A400 L01

E

L01

L01

L01

DESIGNER

A500

JOSHUA RENNER E-mail:

H

L01 L01

L01

L01

L01

L01

L01

L01

DESIGN CONSULTANT

L01

MCVOY ARCHITECTS CHRIS MCVOY

L01 L02

E-mail: L02 L02

L02

L02

L02

L01 L01

L01

L01

L01

L01

L01

L01

L01

L01

L01 L01

L01 L01

L01 L01

L02

L02

L02

L02

DOCUMENTATION CONSULTANT L02

RICE + LIPKA ARCHITECTS ASTRID LIPKA

L02

E-mail:

MEP ENGINEER ARUP NEIL MUIR

J

E-mail: L01

L01

L01

L01

L01

L01

L02

L02

L02

L02

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT

B

ARUP STEPHANIE HILLEGAS

A500 L01

L01

L01

A

L01

L01

L01

L02

L02

L02

L02

A401

E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

K

E-mail:

L

L02

L02

L02

L02

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L01

L02

L02

L02

L02

L02

L02

L02

L02

L02

L02

L02

L02

C A401

M

N

# NO.

L01

L01

L01

L01

L01

L01

L01

L01

L01

O

L02

L02

L02

L02

Project

B

15

DATE:

L01A A500

A401

DESCRIPTION:

16

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

1 A301

____

Drawing Title

CELLAR REFLECTED CEILING PLAN DOB NOW Job #

Seal

NOTES: 1. ALL CELLAR LIGHTS TO BE OCCUPANCY ACTIVATED.

N

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A200


1

2

2 A303

____

3

4

A

L05

L05

P01

L05

B A A400 L05

L05

L05

L05

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES

W01

W01

C

NEW YORK NY E-mail:

W01

5 L05

L05

6

7

8

1 A303

9

10

____

11

12

13

14

10003

DESIGNER JOSHUA RENNER

L05

E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

D W01

D

L05

W01

W01

W01

E-mail:

A500

P01 L05

W01

L05 W01

W01

DOCUMENTATION CONSULTANT

L05

W01

RICE + LIPKA ARCHITECTS ASTRID LIPKA

W01

E

E-mail:

A500

E

L04

L04 MEP ENGINEER

H L05

L05

L05

L05

L05 L05

F L05

L05

L05

L05

L05

L05

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

T01

L04

L04

L04

L04

L04

ARUP NEIL MUIR E-mail:

P

W01 L04

W01

L04

D01

D01

D01

D01

L04

W01

STRUCTURAL ENGINEER ARUP KION

L04

L05

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

D01

D01

D01

D01

J

E-mail: A01

A01

L04

G

L04

A01

D01

D01

D01

D01

E-mail:

Q

A01

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

A01

E-mail: L05

L05

L05

L05

L05

L05

L05

L05

L05

L05

A01 D01

D01

D01

D01

A01

1 A300

____

L05

L05

L05

L05

L05

L05

L05

L05B A500

L05

L05

A01 D01

D01

D01

D01

R A

A01

A401

B A401

K

1 A302

D01

D01

D01

D01

A01

____

A01 L03

D01

D01

D01

D01

S

A01

L03 A01 L03

L

D01

D01

D01

D01

A01

L03 A01

C

L03

A401

D02 D02

D02 D02 L05

D02 D02

D02 D02 L05

D02 D02

D02 D02 L05

D02 D02

D02 D02

L03

D02

L05

2 A300

____

L03 L03

L05

L05

L03

L03

L03

L05

A01 C

L05

L04

L04

N

L04

L04

L05

L05

L05

L05

L05

L05

L04

L04

L05

P01

D01

DATE:

A01

L04

L04

A01 D01

P02 P03

P02

L04

D01

P03 L04

L04

L04

L04

L04

L04

D01

D01

U

A01

P03

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

A01 A01

L04

L04

P03

P03

Drawing Title

18 P03

O

DESCRIPTION:

D01

D01

L04

L04

L04

# NO.

A01

A01 L05

T

D01

D01

D01

A500 D01

D01

P02 L05

2 A302

____

L03

L05

L04 L05

A01

D02

M L05

D01

D01

D01

D01

A A500

P03

P03

FIRST FLOOR REFLECTED CEILING PLAN

17 DOB NOW Job #

Seal

15

16

1 A301

____

N

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A201


5

6

7

8

9

10

11

12

13

14

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

D A500

W01

W01

W01

W01

W01

DESIGNER

A W01

A400

W01

W01

JOSHUA RENNER

L07 W01

E

E-mail:

A500 L06

L06

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

H

L06

L06

L06

L06

E-mail:

L07

P

P01

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

L04

L07 P01

DOCUMENTATION CONSULTANT

L04

P01

MEP ENGINEER ARUP NEIL MUIR

L04

L07

E-mail:

L04

Q

P05 L07

J W02

W02

W02

D03 D03 D03 W02

W02

W02

W02

W02

D03 D03 D03 D03

W02

W02

W02

W02

W02

W02

D03 D03 D03 D03

W02

W02

W02

E-mail:

D03 D03 D03 D03 D03 D03 W02

LIGHTING CONSULTANT

L04

W02

W02

ARUP KION

L04

D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 W02

STRUCTURAL ENGINEER

L04

ARUP STEPHANIE HILLEGAS

L04 W02

W02 D03

D03

K

D03

W02

D03 D03 D03

D03 D03 D03

D03 D03 D03

W02 D03 D03

D03 D03 D03 D03

W02

D03 D03

W02

D03 D03 D03 D03

W02

D03 D03

D03 D03

D03 D03

D03 D03

D03 D03

W02

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03

W02

D03 D03 D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03

W02

W02

D03 D03 D03 D03

D03 D03 D03 D03

W02

W02

D03 D03 D03 D03

W02

D03 D03

W02

B

W02

D03 D03 D03 D03

W02 W02 W02 A500 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 W02

W02

W02

D03 D03 D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03

P05

A

L04

L08

L08

L08

L08

L08

L08

L08

D03 D03 D03 D03

L04 D03 D03

E-mail:

L04

L08

L08

L08

L08

L08

L08

L08

L08

L08

L08

L08

L08

S

L04

L03

L

ARUP CHRIS POLLOCK

D03 D03

L03 L08

ACOUSTICS/SOUNDMASKING CONSULTANT

A401

D03 D03 D03 D03 D03 D03

R

L04

W02

E-mail:

L04

L03 L04

L03 C

L03

A401 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 D02 L05

L05

L05

L04

L04

L03 L08

L05

L08

L08

L08

A500

L03

M

C

L08

L08

L08

L04

L08

L04

L03 L05

L05

L05

T

P05

L04

L05

L03

L08

L08

L08

L08 L04

L05

L05

L05

L05

L04

N

P04

L04 L05

L05

L05

L05

L04

L04

L04 P04

L04

L04

L04

L04

P04

L05

L05

L05

L04

L04

O

# NO.

DESCRIPTION:

DATE:

L04 L04

L04

L04

L04

18

P04 L05

U

P04

L04 P04

L04

A A500

17 Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

B

15

A401

16

Drawing Title

SECOND FLOOR REFLECTED CEILING PLAN DOB NOW Job #

Seal

N

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A202


5

6

7

8

9

10

11

12

13

D

A

W01

A500

A400

14

W01

W01

W01

W01

W01

W01

W01 W01

E

L07

A500 L06

L06

L06

L06

L06

L06

L07

CLIENT/OWNER/TENANT

L07

NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

L07 DESIGNER JOSHUA RENNER

L07

J

E-mail: D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03 D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03

D03 D03 D03 D03

D03 D03

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 W02 W02 D03 D03 W02 W02 D03 D03 W02 W02 D03 D03 W02 W02 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 W02 W02 W02 W02 W02 W02 W02 W02 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 W02 W02 W02 W02 W02 W02 W02 W02 W02 W02 W02 W02 W02 W02 W02 W02 D03 D03 D03 D03

D03 D03

W02

D03 D03

D03 D03 D03 D03

D03 D03 D03 D03 D03

K

W02

W02

D03 D03 D03 D03

D03 D03

D03 D03

D03 D03

W02

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03

D03 D03

D03 D03

W02

W02

W02

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03

D03 D03

D03 D03

W02

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03

D03 D03

D03 D03

W02

W02

W02

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03

D03 D03

D03 D03

W02

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

W02

D03 D03

D03 D03

D03 D03

W02

W02

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03

D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

D03 D03 D03 D03

DOCUMENTATION CONSULTANT

W02

D03 D03 D03 D03

D03 D03

E-mail:

RICE + LIPKA ARCHITECTS ASTRID LIPKA

A

D03 D03

A401

E-mail:

D03 D03 MEP ENGINEER D03 D03

ARUP NEIL MUIR E-mail:

N STRUCTURAL ENGINEER ARUP KION E-mail:

1

SCALE

THIRD FLOOR REFLECTED CEILING PLAN

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

1/8" = 1'-0"

E-mail:

5

6

7

8

9

10

11

12

13

14

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

D A500

W01

W01

W01

W01

W01

A A400

W01

W01

W01

L07 W01

L06

L06

L06

L06

L06

L06

L07

L07

L07 # NO.

DESCRIPTION:

DATE:

L07

J W01

W01

W01

W01

W01

W01

W01

W01

W01

A01 L07

A01

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07 Project

A01 A01

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

A L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

A401

L07

Drawing Title

THIRD & FOURTH FLOOR REFLECTED CEILING PLANS

K

DOB NOW Job #

Seal

N

Date Scale Project No. Drawn By Checked By Drawing No.

2

FOURTH FLOOR REFLECTED CEILING PLAN

SCALE 1/8" = 1'-0"

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A203


5

6

7

8

9

10

11

12

13

14

D A500

W01

W01

W01

W01

W01

A A400

W01

W01

W01

L07 W01

L06

L06

L06

L06

L06

L06

L07

CLIENT/OWNER/TENANT L07

NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

L07 DESIGNER JOSHUA RENNER L07

J W01

W01

W01

W01

W01

W01

W01

W01

E-mail: W01 DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

A01 L07

A01

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

A01 A01

A L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

L07

E-mail:

A401

L07

MEP ENGINEER ARUP NEIL MUIR

K

E-mail:

N STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT

1

ARUP STEPHANIE HILLEGAS

SCALE

Level 5

1/8" = 1'-0"

E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT

5

6

7

8

9

10

11

12

13

ARUP CHRIS POLLOCK

14

E-mail:

D A500 A A400

# NO.

DESCRIPTION:

DATE:

J

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

A A401

Drawing Title

FIFTH & SIXTH FLOOR REFLECTED CEILING PLANS

K

DOB NOW Job #

Seal

N

Date Scale Project No. Drawn By Checked By Drawing No.

2

Level 6

SCALE 1/8" = 1'-0"

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A204


U

T

S

R

Q

P

Level 7 88' - 0"

Level 6 68' - 0"

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES

Level 5 56' - 0"

NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER

Level 4 44' - 0"

E-mail:

DESIGN CONSULTANT

C

MCVOY ARCHITECTS CHRIS MCVOY

A500

E-mail:

Level 3 32' - 0" L Roof 30' - 0"

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

Level 2 20' - 0"

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER

Level 1 8' - 0"

ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS

Cellar -4' - 0"

E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

1

SCALE

East

1/8" = 1'-0"

O

N

M

C A401

L

K

A A401

Level 3 32' - 0" L Roof 30' - 0" # NO.

DESCRIPTION:

DATE:

Level 2 20' - 0"

Level 1 8' - 0"

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

EAST ELEVATIONS DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

2

Courtyard East

SCALE 1/8" = 1'-0"

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A300


CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

1

2

3

4 15 5

6

7

16

8

9

10

A

11

A400

12

13

DOCUMENTATION CONSULTANT

14

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

Level 7 88' - 0"

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

Level 6 68' - 0"

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

Level 5 56' - 0"

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

Level 4 44' - 0"

B A401 E A500

B A500

Level 3 32' - 0" L Roof 30' - 0"

A A500

Level 2 20' - 0"

Level 1 8' - 0" # NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

SOUTH ELEVATION DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A301


A A401

A

B

C

D

E

D

H

F

GJ

K

L

M

N

O

A500

Level 7 88' - 0"

CLIENT/OWNER/TENANT

Level 6 68' - 0"

NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER

Level 5 56' - 0"

JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

Level 4 44' - 0"

E-mail:

C A401

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

Level 3 32' - 0" L Roof 30' - 0"

MEP ENGINEER ARUP NEIL MUIR E-mail:

Level 2 20' - 0"

STRUCTURAL ENGINEER ARUP KION E-mail:

Level 1 8' - 0"

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

1

SCALE

West

1/8" = 1'-0"

R

S

T

U

C A500 # NO.

DESCRIPTION:

DATE:

Level 3 32' - 0" L Roof 30' - 0"

Level 2 20' - 0" Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

Level 1 8' - 0"

Drawing Title

WEST ELEVATIONS DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

2

Courtyard West

SCALE 1/8" = 1'-0"

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A302


14

13

12

A

11

A400

10

9

8

16

7

6

15 5 4

3

2

1

Level 7 88' - 0"

Level 6 68' - 0"

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER

Level 5 56' - 0"

JOSHUA RENNER E-mail:

DESIGN CONSULTANT B A401

MCVOY ARCHITECTS CHRIS MCVOY

Level 4 44' - 0"

E-mail:

E DOCUMENTATION CONSULTANT

A500

Level 3 32' - 0"

B A500

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

L Roof 30' - 0"

MEP ENGINEER

A

ARUP NEIL MUIR

A500

E-mail:

Level 2 20' - 0"

STRUCTURAL ENGINEER ARUP KION E-mail:

Level 1 8' - 0"

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

1

SCALE

North Courtyard

1/8" = 1'-0"

4

3

2

1 # NO.

Level 2 20' - 0"

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Level 1 8' - 0"

Drawing Title

NORTH ELEVATIONS DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

2

North Street Facing

SCALE 1/8" = 1'-0"

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A303


A A401

O

N

M

L

K

JG

F

H

E

D

C

Level 7 88' - 0"

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

Level 6 68' - 0"

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR E-mail:

Level 5 56' - 0"

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT

EXTG. BLDG.

ARUP STEPHANIE HILLEGAS E-mail:

Level 4 44' - 0"

ACOUSTICS/SOUNDMASKING CONSULTANT C

ARUP CHRIS POLLOCK

A401

E-mail:

Level 3 32' - 0" L Roof 30' - 0"

Level 2 20' - 0"

Level 1 8' - 0" # NO.

DESCRIPTION:

DATE:

Cellar -4' - 0"

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

SECTION A DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A 3/16" = 1'-0" N/A JOSH

A400


1

2

3

4 5

6

7

8

9

10

A

11

A400

12

13

14

Level 7 88' - 0"

Level 6 68' - 0" CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

Level 5 56' - 0"

10003

DESIGNER JOSHUA RENNER E-mail:

Level 4 44' - 0"

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

E

E-mail:

A500

DOCUMENTATION CONSULTANT

Level 3 32' - 0" L Roof 30' - 0"

B A500

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR

Level 2 20' - 0"

E-mail:

STRUCTURAL ENGINEER ARUP KION

Level 1 8' - 0"

E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

Cellar -4' - 0"

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

A

SCALE

Longitudinal Section

1/8" = 1'-0"

O

N

M

L

K

12

11

A A400

10

9

8

16

B A401

15

C A401

# NO.

Level 3 32' - 0" L Roof 30' - 0"

Level 3 32' - 0" L Roof 30' - 0"

DESCRIPTION:

DATE:

A A500

Level 2 20' - 0"

Level 2 20' - 0"

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

Level 1 8' - 0"

Level 1 8' - 0"

Drawing Title

ADDITIONAL SECTIONS Cellar -4' - 0"

Cellar -4' - 0"

DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

B

Auditorium Section

SCALE 1/8" = 1'-0"

C

Atrium Section

SCALE 1/8" = 1'-0"

Sheet

N/A 1/8" = 1'-0" N/A JOSH

A401


O CONTINUOUS COPING

RAISED ROOFTOP ACCESS PAVERS

H

FILTER FABRIC 3" CHANNEL GLASS 1" AIR GAP 5" MINERAL WOOL INSULATION AIR-VAPOR BARRIER

8" MINERAL WOOL INSULATION

RAISED ROOFTOP ACCESS PAVERS

DRAINAGE MAT

FILTER FABRIC

AIR-VAPOR BARRIER

8" MINERAL WOOL INSULATION

5/8" GYP BOARD

DRAINAGE MAT

CONTINUOUS COPING

7-PLY CLT

CONTINUOUS COPING

AIR-VAPOR BARRIER

5-PLY CLT

7-PLY CLT

SUSPENDED PERFORATED WOOD ACOUSTIC CEILING

FILTER FABRIC

DOUBLE CHANNEL GLASS WALL SYSTEM

5/8" GYP BOARD

5/8" GYP BOARD

RAISED ROOFTOP ACCESS PAVERS 8" MINERAL WOOL INSULATION DRAINAGE MAT

TRANSLUCENT INSULATION

AIR-VAPOR BARRIER 5/8" GYP BOARD

INSULATED EXPANSION GAP

7-PLY CLT

DOUBLE PANE WINDOW-WALL

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

10" CONCRETE CELLAR WALL

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY

5" MINERAL WOOL INSULATION

E-mail:

AIR-VAPOR BARRIER

DOCUMENTATION CONSULTANT

3" CONCRETE RADIANT FLOORING SLAB

POURED CONC PAVEMENT

3" CONCRETE RADIANT FLOORING SLAB

DOUBLE PANE CURTAIN WALL

7-PLY CLT

GRAVEL SUBSTRATE

RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

7-PLY CLT MEP ENGINEER

3" DIA DRAINAGE PIPE ALUMINUM SOFFIT TO MATCH CURTAIN WALL MULLIONS

3" CHANNEL GLASS

ARUP NEIL MUIR

1" AIR GAP

E-mail:

5" MINERAL WOOL INSULATION

STRUCTURAL ENGINEER ARUP KION

AIR-VAPOR BARRIER

E-mail:

5/8" GYP BOARD 5-PLY CLT

ARUP STEPHANIE HILLEGAS

SCALE

WALL SECTION A

1/2" = 1'-0"

K

E-mail:

A

6" CONCRETE RADIANT FLOORING SLAB

POURED CONC PAVEMENT

A401

ACOUSTICS/SOUNDMASKING CONSULTANT

AIR-VAPOR BARRIER

GRAVEL SUBSTRATE

ARUP CHRIS POLLOCK

DOUBLE PANE WINDOW WALL

8" MINERAL WOOL INSULATION

E-mail:

4" GRAVEL SUBSTRATE

SOIL

4' - 3 1/2"

A

LIGHTING CONSULTANT

3" CONCRETE RADIANT FLOORING SLAB 7-PLY CLT

DOUBLE PANE PVP LAMINATE EMBEDED CURTAIN WALL.

C

SCALE

WALL SECTION C

1/2" = 1'-0"

ALUMINUM SOFFIT TO MATCH CURTAIN WALL MULLIONS CONTINUOUS COPING

RAISED ROOF-TOP ACCESS PAVERS FILTER FABRIC STRUCTURAL BEAM TO REMAIN EXPOSED AND BE PRESSURE TREATED

8" MINERAL WOOL INSULATION DRAINAGE MAT

WOODEN SOFFIT

WOODEN CLAPBOARD SIDING PEA GRAVEL

1" AIR GAP

DRAIN ROCK TRENCH

8" MINERAL WOOL INSULATION AIR-VAPOR BARRIER

PERFORATED RAIN GARDEN DRAIN

AIR-VAPOR BARRIER 5/8" GYP BOARD

10" CONCRETE BEARING WALL

7-PLY CLT

5" MINERAL WOOL INSULATION

DOUBLE PANE CURTAIN WALL

AIR-VAPOR BARRIER

# NO.

RAISED ACCESS FLOOR

5" MINERAL WOOL INSULATION

3" CONCRETE RADIANT FLOORING SLAB

AIR-VAPOR BARRIER

DATE:

6" CONCRETE RADIANT FLOORING SLAB AIR-VAPOR BARRIER 8" MINERAL WOOL INSULATION 4" GRAVEL SUBSTRATE

Project

10" CONCRETE CELLAR WALL

10" CONCRETE CELLAR WALL

DESCRIPTION:

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

CONTINUOUS FLASHING AT GROUND

Drawing Title

7-PLY CLT

WALL SECTIONS

3" CONCRETE RADIANT FLOORING SLAB POURED CONC PAVEMENT

DOB NOW Job #

7-PLY CLT

GRAVEL SUBSTRATE Seal

3" DIA DRAINAGE PIPE

Date Scale Project No. Drawn By Checked By Drawing No.

B

WALL SECTION B

SCALE 1/2" = 1'-0"

D

WALL SECTION D

SCALE 1/2" = 1'-0"

E

WALL SECTION E

SCALE 1/2" = 1'-0"

Sheet

N/A 1/2" = 1'-0" N/A JOSH

A500


GREEN ROOFS TO MITIGATE URBAN HEAT ISLAND EFFECT AND REDUCE WATER RUN-OFF

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER

PHOTOVOLTAIC PANELS EMBEDDED IN GLASS CURTAIN WALL PANEL LAMINATE FOR ADDITIONAL SOLAR ENERGY GENERATION

ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

SOLAR PANELS ON SELECT ROOFS FOR SOLAR ENERGY GENERATION

RADIANT HEATING SLAB

EXCESS HEAT FROM DATA SERVERS SIPHONED VIA HEAT PUMP AND DISTRIBUTED THROUGHOUT THE BUILDING

# NO.

DESCRIPTION:

DATE:

Project

GEOTHERMAL WELLS FOR RENEWABLE HEATING AND COOLING OFFSETS

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

ENERGY & SUSTAINABILITY DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A N/A JOSH

EN001


5

6

7

8

9

10

11

12

13

14

1

2

3

4

A A400

A HP

SA

B

SA

SA

H

C D

5

SA

J

SA

RADIANT FLOORING SHOWN HATCHED

HP

SA

HP

6

7

8

9

10

11

12

13

14

LAV

LAV

LAV

SA RA

SA

RA

RA

SA

SA

SA

10003

DESIGNER

2" 12"x1

JOSHUA RENNER

Q

E-mail:

SA

J

RA

RA

G

HP

NEW YORK NY E-mail:

P

SA

RADIANT FLOORING SHOWN HATCHED

M

NEW YORK PUBLIC LIBRARIES

SA

SA

18"x12"

CLIENT/OWNER/TENANT 12"x12"

H

F

HP

LAV

18"x12"

HP

WC

A400

SA

L

SA

E

HP

SA

K

LAV

SA

HP

WC

A

SA

12"x12"

AHU

12"x12"

HP

EA

HP

HP SA

SA

SA

SA

SA

SA

SA

SA

18"x12"

HP

HP HP

O

R

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA

S

HEAT PUMP SOURCED FROM SERVERS BLW SUBFLOOR

E-mail: SA

L

16

SA

15

E-mail:

SA

K

HEAT PUMP GEOTHERMAL SOURCED (TYP.)

SA

HP

12"x12"

HP

HP

MCVOY ARCHITECTS CHRIS MCVOY

18"x12" SA

N

DESIGN CONSULTANT

MEP ENGINEER

1/16" = 1'-0"

M

SA

CELLAR MECHANICAL PLAN

SA

1

ARUP NEIL MUIR

T

SCALE

E-mail:

2"

12"x1

RA

SA

SA

N

SA

6

7

8

9

10

11

12

13

SA

SA

SA

SA

18

17

O

14

ARUP KION E-mail:

12"x12"

5

STRUCTURAL ENGINEER

U

RA

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

15

16 ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK

A A400

E-mail:

H

P 3

SCALE

FLOOR 01 MECHANICAL PLAN

1/16" = 1'-0"

Q

J

OA RADIANT FLOORING SHOWN HATCHED SA

R

RA

5

K

6

7

8

9

10

11

12

13

14

SA

RA

S L

SA

A

T

M

RA

A400 SA

# NO.

RA

U

N

DESCRIPTION:

DATE:

SA

RA

17

O

18

SA

J

RA RADIANT FLOORING SHOWN HATCHED

15

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

16 SERVERS TYP.

K

AHU HP

Drawing Title

EA

HP

MECHANICAL DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

(TYP.)

2

FLOOR 02 MECHANICAL PLAN

SCALE 1/16" = 1'-0"

4

FLOORS 3-6 TYP MECHANICAL PLAN

SCALE 1/16" = 1'-0"

5

MECHANICAL RISER DIAGRAM

SCALE N.T.S.

Sheet

N/A As indicated N/A JOSH

M001


CHANNEL GLASS RAINSCREEN COVERS PORTIONS OF THE WINDOW DIFFUSING THE DIRECT SUNLIGHT

ELEVATED RIBBON WINDOWS CREATE CLERESTORY

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

EXAMPLE ANNUAL SUNLIGHT EXPOSURE ISOMETRIC FOR GALLERY

NTS

EXAMPLE DAYLIGHT AUTONOMY ISOMETRIC FOR GALLERY

NTS

ANNUAL SUNLIGHT EXPOSURE CHART

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

SUNLIGHT EXPOSURE ISOMETRIC FOR 11:30AM ON 01/26

NTS

SUNLIGHT EXPOSURE ISOMETRIC FOR 11:30AM ON 06/26

NTS

SUNLIGHT EXPOSURE ISOMETRIC FOR 11:30AM ON 10/03

ABBREVIATED LUMINAIRE SCHEDULE Room Gallery Gallery

A01 D01

TAG

TYPE NAME TRACK LIGHT RECESSED PUCK DOWNLIGHT

24 48

COUNT

Manufacturer Coronet

NTS

LUMINAIRE SCHEDULE

20 W 15 W

Wattage

Zone 01 Zone 02

Lighting Zone

A01 D01 D02 D03 L01 L02 L03 L04 L05 L06 L07 L08 L09 P01 P02 P03 P04 P05 T01 W01 W02

TAG

TYPE NAME TRACK LIGHT RECESSED PUCK DOWNLIGHT SPOTLIGHT/DOWNLIGHT DIRECT LIGHT - BOOKSHELVES LINEAR PENDANT LIGHT 27W RECTANGULAR DOWNLIGHT LINEAR STRIP LIGHT RECESSED LOUVRE LIGHT LINEAR PENDANT LIGHT 47W RECTANGULAR DOWNLIGHT LINEAR PENDANT LIGHT LINEAR STRIP LIGHT LINEAR DIRECT LIGHT PENDANT BARRISOL LOVEGROVE PENDANT ART GLASS PENDANT LIGHT PENDANT LIGHT HOLLY PENDANT LIGHT INDIRECT PENDANT LIGHT TABLE LAMP SCONCE UPLIGHT DIRECT PUCK LIGHT

32 48 18 487 110 40 21 73 67 30 94 32 71 6 3 8 6 3 48 78 92

COUNT

COMMENTS

Manufacturer Coronet

BOOKSHELF INTEGRATED DIRECT LIGHT AIMED AT SHELVING

FARO Barcelona

TO RUN PARALLEL TO BEAM & REMAIN FLUSH WITH BEAM EDGES

EAE Barrisol

TO BE CENTERED OVER CONFERENCE TABLES READING ROOM TABLE-INTEGRATED LAMP FOOT PATH LIGHT EMBEDDED IN BOOKSHELF UNITS

Abstracta Lumenwerx

20 W 15 W 40 W

Wattage

150 W 18 W 32 W 64 W 150 W 18 W 64 W 64 W 48 W 9W 60 W 18 W 9W 100 W 100 W 5W

# NO.

DESCRIPTION:

DATE:

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032 Drawing Title

LIGHTING SCHEDULE & NOTES DOB NOW Job #

Seal

Date Scale Project No. Drawn By Checked By Drawing No.

Sheet

N/A N/A JOSH

L001


REVERBERATION CHARTS & CALCULATIONS

NOISE REDUCTION CHARTS & CALCULATIONS

CLIENT/OWNER/TENANT NEW YORK PUBLIC LIBRARIES NEW YORK NY E-mail:

10003

DESIGNER JOSHUA RENNER E-mail:

DESIGN CONSULTANT MCVOY ARCHITECTS CHRIS MCVOY E-mail:

DOCUMENTATION CONSULTANT RICE + LIPKA ARCHITECTS ASTRID LIPKA E-mail:

MEP ENGINEER ARUP NEIL MUIR E-mail:

STRUCTURAL ENGINEER ARUP KION E-mail:

LIGHTING CONSULTANT ARUP STEPHANIE HILLEGAS E-mail:

ACOUSTICS/SOUNDMASKING CONSULTANT ARUP CHRIS POLLOCK E-mail:

# NO.

DESCRIPTION:

DATE:

MATERIAL SCHEDULE TYPE

MATERIAL/ASSEMBLY

INTERIOR WRAP

DETAIL REFERENCE B | A401

CONCRETE PERFORATED ACOUSTIC WOODEN PANELING NON-PERFORATED ACOUSTIC WOODEN PANELING

Project

New York Public Library - Sugar Hill Branch 1941 Amsterdam Ave New York, NY 10032

UPHOLSTERY GLASS SOLID TIMBER EXT WALL ASSEMBLY

SECOND FLOOR EXT

E | A500

ACOUSTICS

CHANNEL GLASS RAIN SCREEN 1" AIR GAP 5" MINERAL WOOL 5/8" GYP BOARD

DOB NOW Job #

1" ACOUSTIC INSULATION

Date Scale Project No. Drawn By Checked By

PERFORATED ACOUSTIC WOODEN PANELING

Drawing No.

5 PLY CLT

INT

Drawing Title

Seal

Sheet

N/A N/A JOSH

AC001