One Point Lesson Title: Connecting a Finished Product Tank to Packaging Transfer Line
Originator/Date: J. Lierow 11/06/19
Category: Basic Knowledge / Improvement / Troubleshooting
Catalog Number: P-002
1. Attach a flow meter with arrow pointing in the direction of flow.
The flow meter should read: “Total 2 Batch.” 2. Hold the display button until meter reads, “0.00”
3. Connect a transfer hose from the flow meter to the INPUT on the red SEW Centrifugal Pump 5. Open the valve of the target tank in production.
4. Connect another transfer hose from the OUTPUT of the pump to the desired tank numbered metal pipe on the wall.
For Reference Only
6. Turn on the tank’s agitator.