Skip to main content

Segment II Portfolio - BAC

Page 1

VV

PORTFOLIO SEGMENT II

JENNA-LYN CROTEAU BACHELOR OF ARCHITECTURE SUMMER 2020


3


RESUME

JENNA-LYN CROTEAU

SKILLS & INTERESTS

EXPERIENCE

Drawing and drafting: Plan/ Section/ Elevation/ Axonometric

Modeling: concept, site, and scaled models using chipboard, foam board, bristol, basswood, corrugated board, plexi, concrete, etc.

Tools: 3D printing, laser cutting

Adobe Photoshop Adobe Illustrator Adobe InDesign Lumion Chief Architect Revit AutoCAD SketchUp Rhino Grasshopper

MEMBERSHIP & CERTIFICATIONS OSHA 10hr Certification AIAS

2019-2020 CannonDesign/ Architectural Designer Work with senior architects on various advanced program studies for both higher-ed and health care projects. Assist in production of drawing sets, diagrams, presentations, & 3D renders. 2019-2019 Mount Vernon Group Architects/ Interior Architectal Designer Collaborated with senior architects on various educational projects. Developed multiple sets of high-quality construction details and documents. Created high-quality renderings for client presentations using Lumion 3D Rendering Software. 2017-2018 Bala Consulting Engineers/ Intern/ Admin- Receptionist Delivered high-quality documents, and became a go-to person for fast and accurate document completion. Assit with answevring phones, greeting visitors, mail services, kitchen and supply maintaining, and other admin duties. 2016-2017 Wolf in Sheep Design/ Interior Design Intern Sourced materials from vendors based on the requests of project managers . Collaborated with project managers on 2-3 projects at a time. Created client-facing presentations on furnishing options for each project. 2015-2017 Design Group 47/ Kitchen & Bath Designer Managed a book of business ranging from 1-3 clients at a time. Consulted with clients to better understand their design preferences. Planned, designed, and revised layouts based on the clients’ needs. 2013- PRESENT Croteau.co/ Self- Employed Plan, design, and deliver full construction documents for new residential construction, additions, and fire-damaged homes. Execute design revisions, manage client expectations, budgets, and goals. Manage a book of business ranging from 2-5 clients . Build a network to create new client opportunities. Started refinishing furniture then transitioned to architecture in 2016.

EDUCATION 2014- PRESENT

Boston Architectural College/ Bachelor of Architecture Canidate

2012-2014

North Shore Community College/ Liberal Arts


REFLECTION Since my last portfolio, there has been a lot of growth, both academically and professionally. It is not easy for a student and future architect, such as myself, to find a job in the architectural industry when she is only in her early years of architectural study. I frequently run into a common roadblock; namely, most employers will not entertain the idea of hiring a second-year architecture student - rather, they prefer students who can claim to have five or more years of architectural study completed. Nevertheless, I came across a recruiting agency that contracts temporary positions at local firms outside of the city, which helped me land my first jobs. Although these roles may not have been what I was hoping for in terms of long-term work, it was fantastic having the opportunity to get my foot in the door and gain some valuable experience in the field. In these roles I was in charge of developing multiple sets of project specifications for various ongoing projects with a team of architects. In addition, I collaborated with senior architects on small-scale commercial and non-profit projects, executed various office-related tasks using Microsoft and other applications, and assisted with a range of duties including research and administration. After these temporary positions, I landed a few exciting yet very different jobs, with very different responsibilities. I learned how to manage a book of business ranging from 1-3 clients at a time, and I consulted with clients to better understand their design preferences. I planned, designed, and revised layouts based on the clients’ needs, created client-facing presentations on various design options for each project, and learned how to source materials from vendors based on the requests of project managers. Additionally, I collaborated with project managers on 2-3 projects at a time and gained a more thorough understanding of the production side of design, engineering, and architecture. I was able to produce high-quality documents and became a go-to person for fast and accurate document completion. While working in firms, I was also working part-time, creating a foundation for my own business. The idea for starting my own company arose from my desire to find a solution to being less marketable to employers than other future architects who have completed more than two years of study. For the architect in training, so to speak, I believe that it is fundamental to her mastery of the discipline that she experience work in the field as early as possible, regardless of whether or not she has finished five or more years of study. My opinion is based on the belief that the talent of young, advanced architecture students should not suffer overlooking by potential employers or even the general public. The ability to work for myself has challenged me immensely, yet has taught me some of the most essential lessons: communication, listening, responsibility, self-motivation, time management, and execution. This portfolio showcases the level of work that exceptional underclassmen are capable of producing. The design process includes research, analysis, and integration of knowledge into the creative process to satisfy the client’s needs. Concept sketches, drawings, and models are provided to showcase my unique creative processes; I believe this is essential to one’s appreciation and understanding of business and the final product. For myself, my next steps are passing segment 2 portfolio, taking degree project 1 & 2, and graduating with my Bachelor of Architecture Degree. Following that, I would like to study and sit for my licensure so that my goals to be an architect and own my own firm may become a reality.

Jenna-Lyn Croteau

5


CONTENTS

8

18

28

ARCH 2

ARCH 3

ARCH 4

APPLE CIDER PRODUCTION FACILITY

CONTINGENT BOUNDARIES BOSTON HARBOR ISLANDS

AFFORDABLE HOUSING DEVELOPMENT

BUILDING TYPE

BUILDING TYPE

BUILDING TYPE

TECTONICS

SITE WORK

INTEGRATIVE

PROJECT

PROJECT

PROJECT

BRIGHAMS CIRCLE ROXBURY, MA

GRAPE ISLAND BOSTON, MA

DUDLEY SQUARE ROXBURY, MA

LOCATION

LOCATION

LOCATION


38

44

56

62

BUILING SYSTEMS 1

BUILDING SYSTEMS 2

STRUCTURES 1 & 2

PROGRAM & CODES

UNITE D’HABITATION, MUSEM, & JARDIN DES VESTIGES

6- STORY COMMERCIAL OFFICE

S1 BOW STRING TRUSS SYSTEM S2 MID-RISE OFFICE BUILDING

MIXED USE DEVELOPMENT

BUILDING TYPE

BUILDING TYPE

BUILDING TYPE

THE BULLITT CENTER

STRUCTURAL SYSTEMS ANALYSIS

PUBLIC LIBRARY

PROJECT

PROJECT

PROJECT

1501 E. MADISON ST. SEATTLE, WA

IN-CLASS CONCEPT STUDIES

FORBES PARK CHELSEA, MA

LOCATION

LOCATION

LOCATION

BUILDING TYPE

CITY CLIMATES PROJECT PROJECT

MARSEILLE, FRANCE ANALYSIS LOCATION

7


ARCH 2


DESIGN STATEMENT The main goals for this project was to understand how to employ analysis and abstraction to generate architectural relationships. This project uses architecture and its tectonic language as an active participant in human experience thorughout the site and environment. My design intent was to frame the process of cider making by creating architectural moments throughout the design where one could stop and and let the building tell its own story. The idea was to form an inner core, represented indoors, outdoors, or both, and zones that highlight connections between above and below. These connections were designed using short sets of stairs or ramps, nothing too steep to allow an inhabitant to flow effortlessly thoughout the facility.

9


ARCH 2 : TECTONICS APPLE CIDER PRODUCTION FACILITY

OBJECTIVES »

BUILDING TYPE

BRIGHAMS CIRCLE ROXBURY, MA LOCATION

SITE & CONTEXT

•

Understand how to employ analysis and abstraction to generate architectural relationships.

•

Understand how architectural relationships can unify disparate ideas and realize inherent design opportunities within to create a design argument or thesis.

•

Understand how architecture and its tectonic language can be an active participant in human experience, its site and environment.

•

Understand how to implement representation as a tool for analysis, discovery and for defining a body of ideas.

COMMUNITY & TRANSPORTATION

DISTRICTS

The site is located near Brigham Circle in Roxbury, Massachusetts, at a highly active location that attracts many commuters and residents. Due to its proximity to major transportation, residential communities, and sites such as hospitals, schools, and farmer’s markets, this location is ideal for amenities such as an apple cider production facility.

SITE

GROCERY STORE SITE P

KEVIN FITZGERALD PARK NORTH

NORTH


CONCEPT MODELS

HISTORY Years ago, the area served as a home to the McCarthy Quarry. The quarry provided puddingstone, which was first used in foundations since it was softer than granite, making it easier to cut. To negotiate the slope of the Calumet St. site, I knew I wanted to designed a plinth made of puddingstone servicing as the foundation and connector for the new cider facility.

SITE CONCEPT 1

ZONE 1

ZONE 2

CORE

ZONE 3

CORE

DESIGN STRATEGY

SITE CONCEPT 2

CORE

After further analyzing the sloped site, I decided to divide it into three specific zones. As an inhabitant, each zone would serve a different purpose. The idea was to form an inner core, represented indoors, outdoors, or both, and zones that highlight connections between above and below. These ideas can be visualized in both the concept models above and within the skethces to the right. SITE CONCEPT 3 Photo of Puddingstone by https://roxxbost.wordpress.com/puddingstone-pics/

CORE

11


PROGRAMMING To further develop the design, I added a program of a 3000 sqft apple orchard and a maker space of 2000 sqft to test developing schemes on the given site. Designing grids by the specific placement of trees & structural columns will define spatial relationships and create thresholds between different parameters, including the bustling sidewalk and the slope of the site. I have designed the program to respond to the process of making cider. When an inhabitant enters the facility, they would be able to follow the production step by step. CIDER PRODUCTION DIAGRAM

PROGAMMING DIAGRAMS

SITE CONCEPTS

DESIGN DEVELOPMENT To advance the idea of three zones translated throughout the entire site - I continued to sketch more iterations to explore all design opportunities. I asked myself, what would the site be like with one building that served every purpose? Should I place the building on the lower, more narrow part of the site or higher? Should the building be located close to the street or situated to the rear? Where should trees be placed?


DESIGN DEVELOPMENT

KEY MOMENTS

13


TECTONIC STUDY MODEL


FINAL ITERATION

FINAL DESIGN The final iteration incorporated my original idea of allowing people to move effortlessly throughout the space. My vision was based on a conception of transition and movement as a threshold, allowing effortless flow within the building and allowing users to experience these thresholds through my construction. A puddingstone plinth foundation connected two separate buildings. The larger space in the center may be used to house the orchard, which requires direct sunlight, and would allow the sun to reach the trees throughout the day. It may also be utilized as a perfect space for outdoor seasonal markets, which also require full sunlight. If used in this way, the trees, too, would be able to be reached by the sun throughout the day. The street edge of the site would experience sunlight all morning and through the afternoon, while the separation would provide sunlight in the evening as the sun sets.

FINAL ITERATION MODEL

15


17


ARCH 3


DESIGN STATEMENT This studio focused on site work and had no determined design limit or boundary. However, there were two requirements, the site had to be a Boston Harbor Island, and the program must be recreational. For my project, I chose Grape Island, located in the Hingham Bay area of Boston Harbor. This studio explores the transitional boundaries of geography and explores how one engages with physical borders such as land/ water, artificial/ natural, exterior/ interior, private/ public, and more. It also explores temporal, seasonal, and social dynamics that extend one’s understanding of place.

19


ARCH 3 : SITE WORK CONTINGENT BOUNDARIES BOSTON HARBOR ISLANDS

OBJECTIVES »

BUILDING TYPE

GRAPE ISLAND BOSTON, MA LOCATION

SITE & CONTEXT Accessible by the Boston Harbor Ferry System, Grape Island, 54 acres during high tide and 101 acres during low tide, is an island in the Boston Harbor that offers trails, rocky beaches, and campsites. Grape Island is composed of two drumlins, one reaching 70’ above sea level and the other at 30’, both drumlins are connected by a marshy lowland where inhabitant can dig for clams. Grape Island contains two freshwater springs, one on the north side of the western drumlin underneath a large boulder that faces Peddock’s Island, and another located behind the marsh situated in the marshy lowland between the two drumlins.

•

To understand fundamental principles, technical skills, and problem-solving approaches of design through scales of building and site.

•

To effectively communicate ideas of temporality and processes into visualizations that drive that project by program, user experience, and design language.

•

To develop a methodological strategy for constructing an idea based on experiential and investigative analysis.

PROPOSED FERRY ROUTE

SUN PATH

PREVAILING WINDS


EXISTING CONDITIONS

HISTORY Grape Island was farmed and grazed for three hundred years until about the 1940s. Since the abandonment of agricultural use, the natural succession of vegetation has created a wooded and shrubby landscape. Over time vegetation on the island has changed in response to the climate and rising sea levels. In 1775, Grape Island, although never hosted any military fortifications, was a battle site over hay during the American Revolution, this was known as the “Battle of Grape Island.”

30’

Bayberry

Birch-Aspen Grove

70’ Slate Outcrop “Steamers”-Blue Mussels Stone Foundation

CURRENT SEA LEVEL

DESIGN STRATEGY

EXISTING WALKING DISTANCES DIAGRAM PREDICTED SEA LEVEL RISE - 50 YEARS

My design strategy is to transform Grape Island into an educational and engaging urban hydroponics farm for visitors to explore and interact with their contingent boundaries the island has to offer and unify nature with the built environment. The infrastructure on the island will serve as a community resource and reestablish the tradition of local organic farming that has dissipated over time. While sea-levels rise, the idea is that visitors would learn to use the hydroponic system to grow food such as vegetables and herbs to promote long term food security and resiliency. The site will also promote well-being by providing spaces for hiking, lounging, and viewing.

21


DESIGN INTENT The design intent is to generate a new presence and purpose of the island while enhancing its resiliency over time. The design strategy of using compression and release, wrap, and intersect, will be applied to different scenarios throughout the site to achieve the recreational transformation of the island.

CONCEPT SKETCHES

DESALINATION HYDROPONICS DIAGRAM

The process of hydroponics and desalination is to be translated into the design of the building and site. So the more the visitor explores and navigates the site they understand and learn about the farming, hydroponics, and desalination process.


PROGRAM EXPERIENCE Since Grape Island is particularly small, one of my main ideas was to give the illusion of it being quite large. I wanted each space and activity to feel isolated and to conduct its own experience. By doing so, the designed environment forces users to explore certain boundaries and transitions in order to explore the entire site further and discover/ interact with the resourceful conveniences the island has to offer.

23


I applied the predicted sea level rise diagram as my base drawing to futher investigate the organization of the island. I studied the nodes and paths that existed on the site to understand that main axis and from there divided the site into 3 zones. I looked at what each of those 3 zones would be and what program and experience would happen there.


I designed a suspended bridge above the water that would be a direct route for visitors to move from the entrance plaza where ferry drops you off to the urban farming facility on the northern part of the island.

25


27


ARCH 4


DESIGN STATEMENT Boston is amidst a serious housing crisis. The mayor had identified that the city must build 53,000 units by 2030 to meet the demand. Simultaneously, the City itself is in its third demographic revolution. The city’s makeup is changing drastically from when its housing stock was constructed, and varying significantly from the demographics of the greater New England region and the country as a whole. This demographic shift is placing immense stress on low-income residents. This studio investigates a network of responses to the urban housing crisis in Roxbury, one of the most at-risk neighborhoods in Boston. After critical site and demographic analysis, I designed an urban, mixed-use development that responds to my research, focusing on strategies that make a housing development affordable through construction methods and materials, systems, plan layouts and efficient uses of space.

29


ARCH 4 : INTEGRATIVE AFFORDABLE HOUSING DEVELOPMENT

OBJECTIVES »

BUILDING TYPE

DUDLEY SQUARE ROXBURY, MA LOCATION

ZONING

•

Identify the Problem

•

Examine the Context

•

Build a Concept

•

Reinforce Concept with Architectural Detail

AVAILABLE SITE OPTIONS

SUN PATH

ZONE

Duddley SquareSquare EDA Dudley EDA

DIMENSIONAL REGULATIONS

Dimensional Regulations MAX. building HEIGHT: 55’ FAR: 2 MAX Building Height: 55’ MIN. LOT SIZE: None FAR: 2 OPEN SPACE: None MIN. USABLE MIN Lot Size: MIN. LOT WIDTH: None None MIN. LOT FRONTAGE: NONENone MIN Lot Width: MIN. FRONT YARD:None MIN Lot Frontage: None MIN. SIDE YARD: None Open Space: None MIN Usable MIN. REARFront YARD: 20Yard:None MIN MIN Side Yard: None USE REGULATIONS MIN Rear Yard: 20’

#1

#2 PREVAILING WINDS

Use Regulations ZONE

Zone Duddley Square EDA Dubley PDA Permitted Square EDA PDA Permitted

#3


SITE & CONTEXT In this project, we were given the option to choose from three different sites. I chose site option 1, which currently serves as a parking lot and home of the Haley House Cafe. The Haley House Cafe is an essential place within the Roxbury community. The Cafe supports the physical, economic, and social well-being of the city, one meal at a time. My idea was to design a housing development that would align with the mission of the Haley House Cafe to promote community and positive interaction amongst residents and neighbors.

EXISTING SITE CONDITIONS

MURAL INSIDE HALEY HOUSE CAFE

31


DESIGN DEVELOPMENT CONCEPT DIAGRAMS


CIRCULATION FROM STREET EDGE

DESIGN STRATEGY Inspired by the barcelona grid. I wanted to explore various ways a block could be divided to expose the interior courtyards by folding, and shifting opposite edges. Areas of compression and expansion in both section and plan view by lifting specific volumes to create more private intimate spaces, but not feel so confined to one area. Orient building massings to help direct people into the site and place covered areas near sidewalk to provide shelter during storms and bad weather. Pedestrain circulation is important. Provide access to cafe. Opportunity to create small courtyard/ private space away from street. PROPOSED SITE - GROUND LEVEL PLAN

33


PROPOSED BUUILDING PERSPECTIVES

PROPOSED BUUILDING PLANS

FIRST LEVEL FLOOR PLAN

SECOND LEVEL FLOOR PLAN

THIRD LEVEL FLOOR PLAN

FOURTH LEVEL FLOOR PLAN


PROPOSED SITE SECTION SUN ANGLES DIAGRAM

PROPOSED SITE SECTION STREET VIEW

35


DIAGRAM

FRAMING DIAGRAM

PROPOSED CROSS LAMINATED TIMBER (CLT) ASSEMBLY DIAGRAM

PROPOSED STRUCTURE ASSEMBLY


UNIT FLOOR PLANS

PUBLIC SPACE

EXTERIOR MONTAGE RENDER

PRIVATE SPACE

37


BUILDING SYSTEMS

SUSTAINABLE


DESIGN STATEMENT This course introduces environmental factors and passive design strategies in order to design sustainably with climate. Topics include energy, passive heating and cooling, daylighting, indoor air quality, and psychometrics. Coursework includes both the qualitative and quantitative analysis through the use of various performance assessment tools. For my project I was assigned a Climate Zone from the Koppen-Geiger Climate Classification map. I then chose a city, Marseille, France, to research the city’s climate through cultural, technical, social, historical, and ecological lenses. I used weather data to understand climatic conditions, develop representation that meaningfully explains the energetic phenomena of the city and how humans have historically and contemporarily adapted to that climate.

39


ICELAND

RUSSIA

MARSEILLE, FRANCE UNITED STATES OF AMERICA

AFRICA

15

10

5

AVG RAINFALL DAYS

DECEMBER

NOVEMBER

OCTOBER

SEPTEMBER

AUGUST

JULY

JUNE

MAY

APRIL

MARCH

0 FEBRUARY

CSB/CSA CSB/CSA PROVENCE-ALPES-CÔTE D’AZUR, FRANCE PROVENCE-ALPES-CÔTE D’AZUR, FRANCE LATITUDE: 43°17’47”N LATITUDE: 43°17’47”N LONGITUDE: 5°22’12”E LONGITUDE: 5°22’12”E

20

Marseille is the second largest city in France after Paris. It Marseille is the second largest city in France after Paris. It is located on the South is located on the South Coast of France and was the most Coast of France and was the most important trade center in the region Provenceimportant trade center in the region Provence-Alpes-Cote Alpes-Cote d’Azur. Marseille served as the main trade Port of the French Empire. d’Azur. Marseille served as the main trade Port of the French Being in the South of France has a Mediterranean climate with mild and humid winters Empire. Being in the South of France has a Mediterranean and warm to hot, dry summers. climate with mild and humid winters and warm to hot, dry summers.

JANUARY

MARSEILLE MARSEILLE

ANNUAL AVG. PRECIPITATION ANNUAL AVG. PRECIPITATION

PRECIPITATION

N ^

SUN CHART WITH SOLAR RADIATION

SUN CHART WITH SOLAR RADIATION

PREVAILING WIND ROSE

PREVAILING WIND ROSE

JANUARY - DECEMBER

ANNUAL AVG. TEMPERATURE & ANNUAL AVG. TEMPERATURE & HUMIDITY HUMIDITY

WEST

EAST

WIND SPEED (MPH) MAX 25 20 AVG 15 10 MIN 5

50 45 40 35 30 25 20 15 10 5

0% AVG 100%

WARM/HOT> 75° (SHADE NEEDED)

COOL/COLD< 68° (SUN NEEDED)

N ^

COMFORT > 68° (SHADE HELPS)

3%/ 10

days yr

10.0 MILES MAXIMUM RECORDED

0.3 MILES ON FEBRUARY 16, 1958

MAX 20%

10% 20%

JANUARY - DECEMBER

AVERAGE VISIBILITY

0%/ 0

days yr

AVERAGE WIND SPEED

17.1 KNOTS MAXIMUM RECORDED

55.0 KNOTS ON JANUARY 11, 1987

MIN AVG

10%

24% 88 /

days yr

AVERAGE PRECIPITATION AMOUNT

0.05 INCHES MAXIMUM RECORDED

7.97 INCHES ON AUGUST 26, 1983

AVG HIGH TEMPERATURE

1%/ 2

days yr

AVG LOW TEMPERATURE

COMFORT ZONE

AVERAGE SNOW DEPTH

4.9 INCHES MAXIMUM RECORDED

42.5 INCHES ON APRIL 7, 2002


0Ć&#x161;ĆŤĆŹĆ&#x17E;ƢƼƼĆ&#x17E; 'Ć&#x17E;ĆŚĆ¨Ć ĆŤĆ&#x161;ƊƥƢĆ&#x153;ĆŹ

3ĆŤĆ&#x17E;ĆŻĆ&#x161;ĆĽĆ&#x17E;Ƨƭ /ƨĆ&#x153;Ć&#x161;ĆĽ :ƢƧĆ? ƢƧ Ć­ĆĄĆ&#x17E; 0Ć&#x17E;Ć?Ć&#x17E;Ć­Ć&#x17E;ĆŤĆŤĆ&#x161;ƢƧĆ&#x17E;Ć&#x161;Ƨ

MARSEILLE DEMOGRAPHICS

0Ć&#x161;ĆŤĆŹĆ&#x17E;ƢƼƼĆ&#x17E; 'Ć&#x17E;ĆŚĆ¨Ć ĆŤĆ&#x161;ƊƥƢĆ&#x153;ĆŹ

Marseille is the second largest city in France and has served as a main gateway into France as a port city. It was revealed that marseillelargest transformed into cosmopolitan pot with as a Marseille is the second city in aFrance andmelting has served many immigrants. The 20th into century in particular saw many largeItwaves ofrevealed immigration. As well main gateway France as a port city. was marseille Marseille is the second largest city in France and has served as a main gateway intothat France as as demographic changes,into Marseille also experienced melting a major heat wave backmany in 2003,immigrants. killing an transformed a cosmopolitan pot with a port city. It was revealed that marseille transformed into a cosmopolitan melting pot with estimated amount of 14,000 people within 3 summer months. In 2014, Marseilles population 20th The century in particular many large of immigration. manyThe immigrants. 20th century in particularsaw saw many large waveswaves of immigration. As well was estimated at 855,000 and is preparing for renewedMarseille population also growthexperienced over the next a major As well as demographic changes, as demographic changes, Marseille also experienced a major heat wave back in 2003, killing an decade.heat wave back in 2003, killing an estimated amount of 14,000 estimated amount of 14,000 people within 3 summer months. In 2014, Marseilles population people at within 3 and summer months. In 2014, Marseilles population was estimated 855,000 is preparing for renewed population growth over the next was estimated at 855,000 and is preparing for renewed population decade. growth over the next decade.

PREVALENT LOCAL WIND IN THE MEDETERRAINEAN

3ĆŤĆ&#x17E;ĆŻĆ&#x161;ĆĽĆ&#x17E;Ƨƭ /ƨĆ&#x153;Ć&#x161;ĆĽ :ƢƧĆ? ƢƧ Ć­ĆĄĆ&#x17E; 0Ć&#x17E;Ć?Ć&#x17E;Ć­Ć&#x17E;ĆŤĆŤĆ&#x161;ƢƧĆ&#x17E;Ć&#x161;Ƨ

0Ć&#x161;ĆŤĆŹĆ&#x17E;ƢƼƼĆ&#x17E; 3ƨƊƎƼĆ&#x161;ƭƢƨƧ &ƨƌƊĆ&#x161;ƍƢƏƨƧ

MARSEILLE POPULATION COMPARISON 0Ć&#x161;ĆŤĆŹĆ&#x17E;ƢƼƼĆ&#x17E; 3ƨƊƎƼĆ&#x161;ƭƢƨƧ &ƨƌƊĆ&#x161;ƍƢƏƨƧ Ć&#x20AC; ſſſ ſſſ

0Ć&#x161;ĆŤĆŹĆ&#x17E;ƢƼƼĆ&#x17E; Ć&#x2021;Ć&#x201E;Ĺż Ć&#x2020;Ć Ć&#x2026;

Ć&#x20AC; ſſſ ſſſ Ć&#x2021;ſſ ſſſ

0Ć&#x161;ĆŤĆŹĆ&#x17E;ƢƼƼĆ&#x17E; Ć&#x2021;Ć&#x201E;Ĺż Ć&#x2020;Ć Ć&#x2026;

Ć&#x2021;ſſ ſſſ Ć&#x2026;ſſ ſſſ

/ƲƨƧ Ć&#x192;Ć&#x2021;Ć&#x192; Ć&#x201A;Ć&#x192;Ć&#x192;

Ć&#x2026;ſſ ſſſ Ć&#x192;ſſ ſſſ

1ƢĆ&#x153;Ć&#x17E; /ƲƨƧ Ć&#x201A;Ć&#x192;Ć&#x201A; Ć&#x201A;ĹżĆ&#x192; Ć&#x192;Ć&#x2021;Ć&#x192; Ć&#x201A;Ć&#x192;Ć&#x192;

Ć&#x192;ſſ ſſſ Ć ĹżĹż ſſſ

ĆŹĆŽĆŚĆŚĆ&#x17E;ĆŤ Ć&#x161;ƧĆ? ưƢƧƭĆ&#x17E;ĆŤ

ƤĆ&#x161;Ć­Ć&#x161;Ć&#x203A;Ć&#x161;ƭƢĆ&#x153; ưƢƧĆ?ĆŹ ƤĆ&#x161;Ć­Ć&#x161;Ć&#x203A;Ć&#x161;ƭƢĆ&#x153; ưƢƧĆ?ĆŹ

&ƼƢƌĆ&#x161;Ć­Ć&#x17E; Ĺť $ĆŤĆ&#x153;ƥƢƭĆ&#x17E;Ć&#x153;Ć­ĆŽĆŤĆ&#x17E;

Ć&#x161;ƎƭƎƌƧ Ć&#x161;ƧĆ? ưƢƧƭĆ&#x17E;ĆŤ Ć&#x161;ƎƭƎƌƧ Ć&#x161;ƧĆ? ưƢƧƭĆ&#x17E;ĆŤ

ĆŹĆŠĆŤĆ˘Ć§Ć Ć&#x161;ƧĆ? ĆŹĆŽĆŚĆŚĆ&#x17E;ĆŤ ĆŹĆŠĆŤĆ˘Ć§Ć Ć&#x161;ƧĆ? ĆŹĆŽĆŚĆŚĆ&#x17E;ĆŤ

ĆŚĆ&#x161;ƍƏƢĆ&#x17E;ĆĽĆĽĆ&#x17E; ĆŚĆ&#x161;ƍƏƢĆ&#x17E;ĆĽĆĽĆ&#x17E;

CLIMATE & ARCHITECTURE

&ƼƢƌĆ&#x161;Ć­Ć&#x17E; Ĺť $ĆŤĆ&#x153;ƥƢƭĆ&#x17E;Ć&#x153;Ć­ĆŽĆŤĆ&#x17E;

1ƢĆ&#x153;Ć&#x17E; Ć&#x201A;Ć&#x192;Ć&#x201A; Ć&#x201A;ĹżĆ&#x192;

Ĺż Ć ĹżĹż ſſſ Ĺż

ĆŹĆŽĆŚĆŚĆ&#x17E;ĆŤ Ć&#x161;ƧĆ? ưƢƧƭĆ&#x17E;ĆŤ

Ć ĹżĹżĹż Ć ĹżĹżĹż

Ć ĹżĹżĆ&#x201E; Ć ĹżĹżĆ&#x201E;

Ć ĹżĆ&#x20AC;Ĺż Ć ĹżĆ&#x20AC;Ĺż

0Ć&#x161;ĆŤĆŹĆ&#x17E;ƢƼƼĆ&#x17E; 3ƨƊƎƼĆ&#x161;ƭƢƨƧ Ĺť /Íçà 6Ć&#x153;Ć&#x161;ĆĽĆ&#x17E; 7ƢƌĆ&#x17E;ƼƢƧĆ&#x17E; MARSEILLE POPULATION & LONG SCALE TIMELINE 0Ć&#x161;ĆŤĆŹĆ&#x17E;ƢƼƼĆ&#x17E; 3ƨƊƎƼĆ&#x161;ƭƢƨƧ Ĺť /Íçà 6Ć&#x153;Ć&#x161;ĆĽĆ&#x17E; 7ƢƌĆ&#x17E;ƼƢƧĆ&#x17E;

41


0ĆŽ&(0 Ć ĹżĆ&#x20AC;Ć&#x201A;

8ƧƢƭĆ&#x17E; Ć?Ĺ?+Ć&#x161;Ć&#x203A;ƢƭĆ&#x161;ƭƢƨƧ Ć&#x20AC;Ć&#x2C6;Ć&#x192;Ć&#x2020; UNITE Dâ&#x20AC;&#x2122;HABITATION 1947 7KH SODQQLQJ RI WKH DSDUWPHQWV LQ /H &RUEXVLHUĹ?V 8QLWÂŤ GĹ?+DELWDWLRQV LQ

8ƧƢƭĆ&#x17E; Ć?Ĺ?+Ć&#x161;Ć&#x203A;ƢƭĆ&#x161;ƭƢƨƧ Ć&#x20AC;Ć&#x2C6;Ć&#x192;Ć&#x2020; 8ƧƢƭĆ&#x17E; Ć?Ĺ?+Ć&#x161;Ć&#x203A;ƢƭĆ&#x161;ƭƢƨƧ Ć&#x20AC;Ć&#x2C6;Ć&#x192;Ć&#x2020; 0DUVHLOOH )UDQFH ZDV GHVLJQHG ZLWK ZLQGRZV RQ ERWK VLGHV FUHDWLQJ D EHQHĆ&#x201C;FLDO

The planning Both of the in Le Corbusierâ&#x20AC;&#x2122;s UnitĂŠ cross-ventilation. longapartments sides of the building face east and west 1945 so, in hot weather, 7KH SODQQLQJ RI WKH DSDUWPHQWV LQ /H &RUEXVLHUĹ?V 8QLWÂŤ GĹ?+DELWDWLRQV LQ 7KH SODQQLQJ RI WKH DSDUWPHQWV LQ /H &RUEXVLHUĹ?V 8QLWÂŤ GĹ?+DELWDWLRQV LQ dâ&#x20AC;&#x2122;Habitations in Marseille, France was designed with windows on the inhabitant has advantage of a land breeze in the mornings and a sea-breeze in the 0DUVHLOOH )UDQFH ZDV GHVLJQHG ZLWK ZLQGRZV RQ ERWK VLGHV FUHDWLQJ D EHQHĆ&#x201C;FLDO 0DUVHLOOH )UDQFH ZDV GHVLJQHG ZLWK ZLQGRZV RQ ERWK VLGHV FUHDWLQJ D EHQHĆ&#x201C;FLDO both sides creating aare beneficial cross-ventilation. Both long sides afternoon. The apartments intentionally designed using an interlocking system cross-ventilation. Both long sides of building face east west weather, cross-ventilation. Both long sidesand ofthe thewest building face eastand and westso, so,in inhot hotinhabitant weather, of theeach building face east so, inahot weather, the where prefabricated apartment was placed into reinforced concrete frame.inTo the has of land in mornings aasea-breeze theinhabitant inhabitant hasadvantage advantage ofaabreeze landbreeze breeze inthe themornings morningsand and sea-breeze inthe the has advantage of a land in the and a sea-breeze in DOORZ VDLG YHQWLODWLRQ WKH URRP OHIW DURXQG WKH Ĺ´DWV ZHUH XWLOL]HG IRU VRXQG LQVXODWLRQ afternoon. The apartments are intentionally designed using an interlocking system afternoon. The apartments are intentionally designed using an interlocking system the afternoon. The apartments are intentionally designed using an DQG DLU Ĺ´RZ 9HQWV ZHUH SODFHG LQ ZDOOV WR GUDZ LQ KHDW DQG UHPRYH WKH H[LVWLQJ VWDOH DLU where apartment was whereeach eachprefabricated prefabricated apartment wasplaced placedinto intoaareinforced reinforcedconcrete concreteframe. frame.To To interlocking system where shown in the diagram to the right. each prefabricated apartment was placed DOORZ VDLG YHQWLODWLRQ WKH URRP OHIW DURXQG WKH Ĺ´DWV ZHUH XWLOL]HG IRU VRXQG LQVXODWLRQ DOORZ VDLG YHQWLODWLRQ WKH URRP OHIW DURXQG WKH Ĺ´DWV ZHUH XWLOL]HG IRU VRXQG LQVXODWLRQ into a reinforced concrete frame. To allow said ventilation, the room left DQG DLU Ĺ´RZ 9HQWV ZHUH SODFHG LQ ZDOOV WR GUDZ LQ KHDW DQG UHPRYH WKH H[LVWLQJ VWDOH DLU DQG DLU Ĺ´RZ 9HQWV ZHUH SODFHG LQ ZDOOV WR GUDZ LQ KHDW DQG UHPRYH WKH H[LVWLQJ VWDOH DLU around the flats were utilized for sound insulation and air flow. Vents shown in to right. shownplaced inthe thediagram diagram tothe the were in walls toright. draw in heat and remove the existing stale air 9(17,/$7,21 681 62/67,&( 3$77(51 shown in the diagram to the right. ĆŹĆŽĆŚĆŚĆ&#x17E;ĆŤ ƧƨƨƧ 681 62/67,&( 3$77(51 681 62/67,&( 3$77(51

9(17,/$7,21 9(17,/$7,21

ĆŹĆŽĆŚĆŚĆ&#x17E;ĆŤ ƧƨƨƧ ĆŹĆŽĆŚĆŚĆ&#x17E;ĆŤ ƧƨƨƧ

French architect Rudy 2013 Ruccioti envisioned wind-cutting concrete lace over the expansive volume of the cultural institution. It 0ĆŽ&(0 Ć ĹżĆ&#x20AC;Ć&#x201A; MUCEM 0ĆŽ&(0 Ć ĹżĆ&#x20AC;Ć&#x201A; served to demateralize light and allow air to prevade the space. The 384 panels of concrete lace lets the smell of iodine in,

whileFrench acting as architect a wind Ruccioti barrier. French envisioned wind-cutting concrete lace volume of cultural institution. Rudy Ruccioti envisioned concrete lace over the Frencharchitect architectRudy Rudy Ruccioti envisioned wind-cutting concretewind-cutting laceover overthe theexpansive expansive volume ofthe the cultural institution.ItIt served to light to the 384 concrete the of expansive volume ofallow the air cultural institution. It served toof and allow air served todemateralize demateralize lightand and allow air toprevade prevade thespace. space.The The 384panels panels ofdemateralize concretelace lacelets letslight thesmell smell ofiodine iodinein, in, while acting as barrier. prevade the space. The 384 panels of concrete lace lets the smell of iodine in, while whileto acting asaawind wind barrier. acting as a wind barrier. 08&(0 0$7(5,$/ &2//$*( 08&(0 0$7(5,$/ &2//$*( 08&(0 0$7(5,$/ &2//$*( CONCRETE LACE

CONCRETE AIR CONCRETE LACE LACE WIND AIR AIR WIND WIND LIGHT

ưƢƧƭĆ&#x17E;ĆŤ ƧƨƨƧ

LIGHT LIGHT

ưƢƧƭĆ&#x17E;ĆŤ ƧƨƨƧ ưƢƧƭĆ&#x17E;ĆŤ ƧƨƨƧ :,1' ',5(&7,21 ',$*5$0

681 3$7+ ',$*5$0

:,1' ',5(&7,21 ',$*5$0 :,1' ',5(&7,21 ',$*5$0

81,7 /$<287 &5266 9(17,/$7,21

6ƢƭĆ&#x17E;

ưƢƧĆ?

681 3$7+ ',$*5$0 681 3$7+ ',$*5$0

6ƎƧƍƢƏĆ&#x17E;

'Ć&#x161;Ć˛ĆĽĆ˘Ć ĆĄĆ­ 6ƎƧƏĆ&#x17E;Ć­ 6ƎƧƍƢƏĆ&#x17E; 6ƎƧƍƢƏĆ&#x17E; 'Ć&#x161;Ć˛ĆĽĆ˘Ć ĆĄĆ­ 'Ć&#x161;Ć˛ĆĽĆ˘Ć ĆĄĆ­ 6ƎƧƏĆ&#x17E;Ć­ 6ƎƧƏĆ&#x17E;Ć­

6ƢƭĆ&#x17E; 6ƢƭĆ&#x17E; ưƢƧĆ? ưƢƧĆ?

81,7 /$<287 &5266 9(17,/$7,21 81,7 /$<287 &5266 9(17,/$7,21

A

B

A A

B B

OLD PORT

OLD OLD PORT PORT

681 3$7+ ',$*5$0

(1(5*(7,& ',$*5$0

681 3$7+ ',$*5$0 681 3$7+ ',$*5$0

(1(5*(7,& ',$*5$0 (1(5*(7,& ',$*5$0

1257+

1257+ 1257+

6ƎƧ 5ƢƏĆ&#x17E; 'Ć&#x161;Ć˛ĆĽĆ˘Ć ĆĄĆ­ 6ƎƧƏĆ&#x17E;Ć­ 6ƎƧ 5ƢƏĆ&#x17E; 6ƎƧ 5ƢƏĆ&#x17E; 'Ć&#x161;Ć˛ĆĽĆ˘Ć ĆĄĆ­ 'Ć&#x161;Ć˛ĆĽĆ˘Ć ĆĄĆ­ 6ƎƧƏĆ&#x17E;Ć­ 6ƎƧƏĆ&#x17E;Ć­

N

NN

OLD PORT

OLD OLD PORT PORT

N

NN


/H 0XVÂŤH GĹ?+LVWRLUH GH 0DUVHLOOH DW WKH

JARDIN DES VESTIGES 1967 -$5',1 '(6 9(67,*(6

The Jardin des Vestiges is an archaeological site in Marseille housing the remains of this 7KH -DUGLQ GHV 9HVWLJHV LV DQ DUFKDHRORJLFDO VLWH LQ 0DUVHLOOH KRXVLQJ WKH UHPDLQV RI WKLV FLW\Ĺ?V DQFLHQW *UHHN DQG 5RPDQ cityâ&#x20AC;&#x2122;s ancient Greek and Roman port. Discovered during building works carried out in the SRUW 'LVFRYHUHG GXULQJ EXLOGLQJ ZRUNV FDUULHG RXW LQ WKH Ĺ?V WKH UXLQV RI -DUGLQ GHV 9HVWLJHV KDYH EHHQ H[FDYDWHG DQG 1960â&#x20AC;&#x2122;s, thesections ruins of ofwalls, Jardin been excavated and include of large sections include large gatesdes and Vestiges the remnantshave of warehouses and the general infrastructure the old port. The of walls, gates and the remnants of warehouses and the general infrastructure of the old JDUGHQ QRZ KRXVHV /H 0XVÂŤH GĹ?+LVWRLUH GH 0DUVHLOOH :KLOH VWLOO VHUYLQJ DV D JDUGHQ WKH VLWH QHHGV VXQOLJKW DV ZHOO DV D port. The garden houses Le garden MusĂŠe dâ&#x20AC;&#x2122;Histoire de Marseille. While still serving as a well ventilated space tonow achieve the desired effect. garden, the site needs sunlight, as well as, a well ventilated space to achieve the desired garden effect.

:,1' ',5(&7,21 ',$*5$0

ưƢƧĆ? ĆŹĆĄĆ&#x161;Ć?ƨư ƏƢƭĆ&#x17E;

681 3$7+ ',$*5$0

6,7( /$<287 681 ',$*5$0

9LHZV RI WKH ([FKDQJH 'LVWULFW EHIRUH WKH FRPSOHWLRQ RI WKH H[FDYDWLRQV RI WKH -DUGLQ GHV 9HVWLJHV

ƏƎƧƍƢƏĆ&#x17E; Ć?Ć&#x161;Ć˛ĆĽĆ˘Ć ĆĄĆ­ ƏƎƧƏĆ&#x17E;Ć­

Ć&#x161;ĆŚ

ƧƨƨƧ

ĆŚĆŽĆŹĆ&#x17E;ĆŽĆŚ ƢƧƭĆ&#x17E;ƍƢƨƍ à çĆ? ĆĽĆ&#x17E;ĆŻĆ&#x17E;ĆĽ ĆŚĆŽĆŹĆ&#x17E;ĆŽĆŚ ƢƧƭĆ&#x17E;ƍƢƨƍ Ć&#x20AC;ĆŹĆ­ ĆĽĆ&#x17E;ĆŻĆ&#x17E;ĆĽ ĆŠĆŚ

$OO 6XQ 3DWK 'LDJUDP LQIRUPDWLRQ LV FXUUHQWO\ IURP 6HSWHPEHU 5HFRUGV

43

KWWS YLVLWH PDUVHLOOH IU SURPHQDGHBKLVWRULTXH YXHVBGHBOBDQFLHQBTXDUWLHUBGHBODBERXUVH SKS


BUILDING SYSTEMS 2

INTEGRATED


PROJECT STATEMENT Just east of downtown Seattle, is home to The Bullitt Center, a six story commercial office building that sits on an oddly shaped site, wedged between E. Madison Street and E. Pike Street. The Bullitt Center is located in Seattles central business district betwwen Capitol Hill and downtown in a mixed-used neighborhood surrounded by shops, restaurants, parks, hospitals, and schools. Chosen for its visibility and accessibility, the site prior to the Bullitt Center stood a 3,317 sqft, 1-story, wood and brick building, leaving the remaining 6,750 sqft a beaten-up asphalt parking lot.

Jenna-Lyn Croteau & Jodie Janas

45


THE BULLITT CENTER OVERVIEW THE PROJECT TEAM Project Manager // PAE Consulting Engineers Architect // the miller Hull Partnership llp Contractor // Schuchart Tenent improvement // foushee E. PIK ES TR EE T

Water systems engineer // 2020 Engineering Lighting Design // Luma Lighting Design Landscape // Berger Partnership Structural Engineer // DCI Engineers

15TH AVE

Solar Installation // Northwest Wind and Solar

E

Solar engineering and commissioning // Solar Design Associates

.M

Building Enclosure and Performance Testing // RDH Developer // Point 32 building operations // unico Properties THE BUILDING

A

D

IS

O

N

S

TR

E

E

T

typical seattle office building // 60 eui eui of leed platinum office building // 32 eui bullitt center designed eui // 16 eui bullitt center eui when fully tenanted // 12 eui bullitt center actual eui 1 year // 9.4 400 ft geothermal wells // 26 solar panels // 575 rain water cistern // 56,000 gallon installed generating capacity // 244kw kilowatt- hours generated in 2014 // 243,671kw kilowatt-hours used in 2014 // 152,878kw toxic chemicals avoided // 362 walkscore // 98/100

ELEVATION 418’

ELEVATION 392’

The topography at the Buillett Center site drops in elevation from east to west along pike street which allows the Bullitt Center to have two entrances at two different levels, the ground level and the 2nd level.

ELEVATION 343’

SITE SECTION


PROGRAM

15TH AVE

SITE & CONTEXT

4 1 3

5

2

MCGILVRA PLACE

1ST FLOOR PLAN

15TH AVE

COMMERCIAL

E. PIKE STREET

NORTH

6

2

7 1

SITE PLAN

CONSTRUCTED GREYWATER WETLAND

2ND FLOOR PLAN

GREEN ROOF

STREETSCAPE

GREYWATER INFILTRATION

OFFICE

E.

STAIRCASE

ON

IS

D MA

1

ET

RE

ST

RAIN GARDEN

NORTH

NET-ZERO WATER & ECOLOGICAL FLOW DIAGRAM

11

8

The Mcgilvra Plaza was designed to create separation between the busy street edge and the building. It was also designed as a landscape system to collect greywater runoff from the Bullitt Centerâ&#x20AC;&#x2122;s roof and other existing surrounding hardscapes. This system filters and distributes the runoff throughout the interior and exterior of the building.

10

3RD-6TH FLOOR PLAN

1

COMMERCIAL TENANT

2

LOBBY

3

KITCHEN

4

MECHANICAL

5

ELECTRICAL

6

MEETING ROOM

7

GARAGE

8

OFFICE TENENT

9

GREEN ROOF

10

TERRACE

11

SUN ROOM

47


PERFORMANCE SYSTEMS THE BULLET CENTER MIMICS A NATURAL ECOSYSTEM BY USING ENERGY AND WATER AVAILABLE ON THE SITE. WITH A FOOTPRINT THAT COVERS ABOUT 98% OF THE SITE BOTH SUSTAINABILITY AND DESIGN AESTHETICS WERE TAKEN INTO CONSIDERATION WHEN PLANNING THE PERFORMANCE GOALS OF THE STRUCTURE. THE BULLITT CENTER USES HIGH PERFORMANCE STRATEGIES SUCH AS:

HEATING AND COOLING FRESH AIR 1. 26-400â&#x20AC;&#x2122; DEEP, CLOSED LOOP GEO THERMAL WELLS // PROVIDE HEAT SOURCE FOR PUMPS AND HELP TO HEAT AND COOL THE BUILDING. 2. VENTILATION SYSTEM WITH HEAT RECOVERY //

8

CONTROLS FRESH AIR VENTILATION TO MAINTAIN LOW CO2 LEVELS. 3. LOW- VELOCITY CEILING FANS FOR SUMMER MONTHS THERMAL COMFORT. 4. RADIANT IN FLOOR HEATING AND COOLING PIPES //

2

STABILIZE INDOOR TEMPERATURES.

3

ENVELOPE 5. AUTOMATICALLY ACTUATED WINDOWS PROVIDE FRESH AIR AND VENTILATION BASED ON INDOOR AND OUTDOOR TEMPERATURES.

5

6. TRIPLE GLAZED CURTAINWALL // U-VALUE=0.25;SHGC=0.43;VISIBLE LIGHT TRANSMITANCE= 0.53, TYP. 7. HIGH PERFORMANCE WALLS WITH U-VALUE=0.046

6

ENERGY PRODUCTION

4

8. 14,303 SQFT, 242KW PV ARRAYSOLAR PANELS SUPPLY

10

100% OF THE BULLITT CENTERS ENERGY. * PREDICTED 230,000KWHR/YEAR.

7

WATER CONSERVATION 9. 50,000 GALLON CISTERN STORES RAIN COLLECTED ON THE ROOF FOR PLUMBING, IRRAGATION AND DRINKING. 10. COMPOSTING TOILETS REDUCE DAILY WATER USE. 11. STORM WATER AND EXCESS ON-SITE WATER WILL BE FILTERED THROUGH AN ENGINEERED INFILTRATION TRENCH.

9

11

1


STRUCTURAL SYSTEM MATERIALS

HEAVY TIMBER support gravity load, three-inch-thick concrete floors and the six-inch-thick wood substructure. To qualify as “heavy timber,” the beams were required to have a minimum thickness of six inches (measured in any direction) and columns were required to have a minimum dimension of eight inches. Both must retain their structural supportive capabilities in a fire for at least one hour. the project relied on glued-laminated timbers (also known as glu-lams) made by Calvert Glulams in Vancouver, wa. Wood functions well for vertical loading, and is quite ductile in the case of earthquakes. Steel is still an optimum material for carrying horizontal loads in the case of high wind or earthquakes. A steel core with cross-tension members helps the Bullitt Center bring horizontal loading to the ground. Using wood sequesters carbon for the life of the building, with 545 metric tons of carbon locked away in the Bullitt Center for the next 250 years. One challenge involved finding methods that take into account the shrinkage and distortions of wood over time, especially at the places where beams and columns meet.

STEEL for lateral support The team created special steel connectors—called buckets— that secure the horizontal beams to the vertical columns and transfer the weight from one to the other. the system allowed for each beam to be lifted by crane and easily placed into the connectors without any temporary shoring or scaffolding before it gets fastened by the framers.

CONCRETE Huge carbon emitter limited use at bottom of building to support building loads, hold back earth, and retain water.

HEAVY TIMBER

STEEL

Glulams were used for all the beams and columns. all lumber members were dried and sealed with a wax-based finish in order to prevent moisture to be absorbed by the wood. The product is comprised of many layers of timber, bonded together with durable CONCRETE

moisture resistant, structural adhesives. In the construction of the bullitt center there was approximately 119,000 ft of boards used. The framing connects back to the internal steel structure bracing for lateral stability. The load is transfered laterally from the beams then down through the columns.

WOOD FRAMING

DIAGONAL BRACING

49


STRUCTURAL SYSTEM DIAGONAL BRACING SEISMIC FORCE

INERTIA FORCE

UNIFORM LOAD ACCELERATION FORCE

MOMENT DIAGRAM

SHEAR DIAGRAM

LATERAL FORCE

GRAVITY LOAD TRANSFER

GRAVITY LOAD TRANSFER

WIND PRESSURE //


BUILDING ENVELOPE WALL ASSEMBLIES

EXTERIOR WALL ASSEMBLY METAL PANEL AT LEVEL 5 The above-grade walls are constructed of standard metal stud construction. The thermal performance of steel stud walls are sub-optimal. The non-combustable requirement for the construction type created fewer options for lightweight, flexible, and replaceable wall systems. The stud walls contain exterior mineral wool semi-rigid insulation that goes over a fluid-applied, vapor permeable, air and weather barrier. This building was one of the first installations of a thermal clip system for the exterior cladding support. The spacers are made of fiberglass to reduce thermal bridging through the exterior insulation. Since the stud cavity insulation and exterior insulation is constructed as a curtain wall balloontype framing the performance of the wall system exceeds R-25.

EXTERIOR WALL ASSEMBLY CURTAIN WALL SYSTEM

METAL WALL PANEL MINERAL WOOL FIBERGLASS THERMAL SPACER STEEL FRAME AIR & VAPOR BARRIER HORIZONTAL SUPPORT

WALL DETAIL

BATT INSULATION DRY WALL

The curtain wall system was manufactured by a German company called Schuco and Goldfinch Brothers. This building is extremely insulated measuring 2” thick and weighing 468 pounds. The mullion mitigates thermal bridging and rests the glass on a foam extrusion between it and the aluminum. While the exterior pressure fully seals the glazing unit and a caulked 4” wide “Schuco Flap” wraps around the entire exterior window frame in order to prevent cold air from leaking. These design moves create a super tight seal. The curtain wall system unit also opens straight outward so the straight motion puts and even amount of pressure on the entire gasket and window assembly to help the system last longer. A digital controller operates this window opening system to properly adjust to interior as well as exterior conditions. These following design moves result in a U-value of .17 and a condensation rating of 86.

WALL DETAIL 51


CLIMATE CONTROL PASSIVE SYSTEMS

CURTAIN WALL ORIENTATION //

MAXIMIZE DAYLIGHT

THERMAL ENVELOPE //

26.6 R-VALUE WALL PANELING

OPTIMIZATION FOR VENTILATION //

OPERABLE WINDOWS

The curtain wall system placement is optimized for both daylight and cross ventilation. As a result of the system’s triple pane construction on low E-coatings the windows obtained U-value is .17. This gives the curtain wall system an R-value of 26.6. The combination resulted in an overall R-value of 10 for the enclosure. This surpasses Seattle’s energy code requirement of 7.2 and more strength than Ashrae’s requirement of 4.9. The Miller-Hull team estimates that the buildings envelope efficiencies contributed to an energy cost reduction of 3% verses a typical office building.

This building employs a number of common passive strategies such as light, cool, and heat. Some of these include daylighting and natural ventilation. The building and its tenants practice behavioral strategies to further reduce energy consumption. This includes the “irresistible stair” which helps to reduce elevator use. The fully-conditioned spaces during the cooler morning hours adopt an office dress code that includes shorts in the summer time.


CLIMATE CONTROL SOLAR ENERGY

HOW BIG OF A ROOF IS NEEDED AT THE BULLITT CENTER

The building contains 575 PV panels at 425 watts per panel that are mounted on the roof. These were manufactured by Sunpower Corporation of San Jose. The benefit to the low-slope array is that it is positioned to focus on summer energy collection when there are long days that mostly contain overhead sun at the latitude. Even thought these panels are operating at less than optimum output due to their low angle relative to the sun more of the highly efficient modules are able to fit within the available area so that maximum amount of energy possible for the site can be produced. The roof that is under the solar array is white. This helps to reduce the cooling load by about 15%. This does not include the solar PV shading. Since the panels are shading the roof itself doubles the lifespan of the roof.

On the roof of the building there are about 13,400 square feet of solar collection area and the photovoltaic arrayâ&#x20AC;&#x2122;s DC (direct current) rating is 244.38KW. There are 19 string inverters located under the array in the designed mechanical area along with an AC combining panel board, a utility required disconnect, and the other required building fire safety systems. The solar array is designed by Solar Design Associates of Harvard, MA and installed by Northwest Wind and Solar of Seattle. 53


CLIMATE CONTROL GEOTHERMAL HEATING AND COOLING The building is heated and cooled by a dense system of veins. This is also known as hydronic radiant tubing that coils a few inches beneath the concrete overlay of each floor. This was formerly known as “cross-linked polyethylene”. These tubes are commonly called PEX. Inside the tubes is a special mix of water and glycol run quickly, warming or cooling the concrete slab, which efficiently radiates into the occupied spaces. The source of the heat for the radiant system actually starts 400 feet below the building, where 26 geothermal wells are 400 feet below the building. This ground-source heat pump uses a closed-loop tube containing a mixture of water and glycol that receives and gives off heat quickly to the surrounding soil and groundwater, which remains at a constant temperature of 53 degrees F. When heating the building, the glycol mixture absorbs the ground’s warmth, before it is pumped back up and run through heat pumps in the mechanical room that warm 53° F fluid into 90° F fluid. In the winter, the system removes heat from the ground. In the summer, the system can be run in reverse, restoring this heat back into the ground. In this sense, the ground is used as a battery for heat. The geothermal well field is under the west side of the building, in an area with a constant lens of groundwater moving slowly toward Puget Sound. As a result, any heat pollution from the wells dissipate within approximately 12 inches. Since the Living Building Challenge requires all of the energy used in the building has to be generated onsite, it was critical to use an energy efficient heating and cooling system. While electric resistance heating is the cheapest and most direct way to heat a building with electricity, it is incredibly inefficient. The hydronic system uses relatively little electricity which is consumed mostly to run a compressor to exchange heat from one place to another with amazing efficiency.

4 Images by Robert Pena - Living Proof the Builit Center


LIGHTING Daylight illuminates the interior of the Bullitt Center for 90% of the time without the need for electric lighting. By keeping electrical lighting at a minimum to reduce energy use was a design driver throughout the process. The lighting design incorporates simple lighting controls such as manual dimming, occupancy sensors, photocells, and plain old wall switches. Some areas of the building have an occupancy sensor which turns the lights on and off. In other areas the occupant switches the lights on and an auto control system will turn them off. The circulation spaces use carefully placed wall washing light fixtures that dim to 50% after a programmed time. Then they turn off after another set time which guides people with areas of strong vertical illumination. The lighting in the stair area is monitored by an occupancy sensor. This allows the lighting to follow the person as they move up and down the stairs turning off the fixtures when the stair is unoccupied. Tenant spaces will use task lighting to augment the daylight to keep the lighting power densities very low with minimal need for ambient lighting. Occupancy sensor power strips are located at each desk to keep lights and computers off when the desk in unoccupied. Simple systems like this and green switches are used to turn off power to the floor at night to help eliminate phantom load of systems that typically run all night. Occupancy sensors turn off emergency lights after hours and all external building entries have motion sensors so when there is no foot traffic the building can fall truly dark. The core building control system is a Digital Addressable Lighting Interface also known as DALI. This allows flexible control of individual fixtures and modularity in the future expansion of the system. The lighting design was by Luma Lighting Design of Portland, Oregon. The use of electricity is carefully monitored and controlled throughout the building through a circuit level monitoring system designed by the electrical engineers at PAE. This system will verify tenant energy use. Each tenant will have an overall energy budget incorporated into their lease.

3 Images by Robert Pena - Living Proof the Builit Center

55


STRUCTURES 1&2


DESIGN STATEMENT Structures 1 helped develop an understanding of the science and art of structural design by applying essential formulas and graphical techniques in order to find form and forces for long span suspension, arch, shell, truss, and cable-stayed structures of my own design. Through these exercises, I developed a working familiarity with the fundamentals of statics and the concept of funicular form. The course also provided an introduction to formulas and graphical techniques to analyze bending, shear and moment of beams, columns and slabs. In Structures 2, I develop an understanding of the manner in which buildings carry load. The course investigated the behaviors of structures through the analysis of material systems, sub-systems, and elements. I analyzed torsional stresses, dead, live, wind, and seismic loads in order to understand the behavior of a variety of structural systems for my own building.

57


Bridge width (b) = 15 Ft

Truss panel size (s) = 20 Ft

Joint load (P) = Total load x b x s/2 = 330 x 15 x 20/2 = 49,500 Lb

1

Reactions:

BOW STRING BRIDGE

Members forces D

C1 Cos 30 = T1

B

G

20.00

20.00

20.00

20.00

20.00

T2= T1 = 214,341 Lb

20.00

120.00

P

P

P

P

R2

C1 Cos 30 = C2 Cos 18-T4 Cos30 P 247,500xCos 30 = C2 Cos 18 - T4 Cos30 Eq-1 0.951 C2-0.866T4=214,341

Wt of bridge deck,assumed = 200 PSF Self Wt of structure,assumed = 40 PSF

T3 = C1 Sin 30 - C2 Sin 18-T4 Sin30

Total Load per area = 240+90=330 PSF G 120.00

P

R2

(

& /E

%

& 6LQ 7 & 6LQ

B

A

%

' & 7 7 7 &RV & &RV

7 &RV &RV 7 /E

6LQ 7 6LQ

)

7 /E

E

C1= 123,750/ Sin 30= 247,500 Lb

E

F

18°

B

A

7 &RV &RV 7 /E

F E Multipy Eq-2 X (0.866/0.5)

E

F

C 18°

30°

30°

B

P

F

*

3

'

0.535 C2+0.866 T4=128,601 T4= 5,876 Lb

C2= 230,782 Lb

7 /E

B

-Lyn Croteau - Structures 1 - SP16 - Final

)

30°

30°

30°

49,500 = 247,500 xsin30 - 0.309 C2-0.50 T4 Eq-2 0.309 C2+0.50 T4=74,250

7 /E

7 7 7 &RV & &RV

C

T3= P = 49,500 Lb

T3 = C1 Sin 30 - C2 Sin 18-T4 Sin30

R1=123,750

(

& /E

C1 Cos 30 = C2 Cos 18-T4 Cos30 P 247,500xCos 30 = C2 Cos 18 - T4 Cos30 Eq-1 E0.951 C2-0.866T4=214,341

A

%

6LQ & 6LQ

B

330 x 15 x 20/2 = 49,500T2= Lb T1 = 214,341 Lb

B

3 7 6LQ 7 & 6LQ

Â&#x192;

Truss panel size (s) = 20 Ft

0 Lb

&

R1=123,750

T1= 247,500 Cos 30 = 214,341 Lb

Â&#x192;

C1 Cos 30 = T1

SF

s30

& &RV & &RV

Osman & Jenna-Lyn Croteau - &RV Structures & &RV 1 - SP16 - Final

30°

Members forces

Live Load = 90 PSF C1 Sin 30 =R1

F F

0.535 C2+0.866 T4=128,601

& /E

R1 = R2 = 5P/2 =5x49,500/2 =123,750 Lb

%

C2= 230,782 Lb T4= 5,876 Lb 7 & 6LQ 3 7 6LQ

Â&#x192;

Reactions: P P

C & 6LQ 7 & 6LQ B 6LQ 7 6LQ

6LQ & 6LQ

Truss panel size (s) = 20 Ft

20.00 20.00 Joint load (P) = Total load x b x s/2 = 330 x 15 x 20/2 = 49,500 LbYara

20.00

& /E

F A 7 /E E Multipy Eq-2 X (0.866/0.5)

49,500 = 247,500 xsin30 - 0.309 C2-0.50 T4 Eq-2 0.309 C2+0.50 T4=74,250

Total Dead load = 200+40= PSF

0.00

F

T3= P = 49,500 Lb

Live Load = 90 PSF

Bridge width (b) = 15 Ft

&RV & &RV

E

30°

Dead Load:

& &RV & &RV

18°

P

Loading:

D

R1=123,750

T1= 247,500 Cos 30 = 214,341 Lb F

E

C1= 123,750/ Sin 30= 247,500 Lb

30°

C

E

R1

A

C1 Sin 30 =R1

B

20.00

30°

lations

By Jenna-Lyn Croteau & Yara Osman

A

B

R1 = R2 = 5P/2 =5x49,500/2 =123,750 Lb

Â&#x192;

STRUCTURES

4

*

Yara Osman & Jenna-Lyn Croteau - Struc 3


PRECEDENT STDIES

PLAN

nal

5

SIDE ELEVATION

FRONT ELEVATION

59


STRUCTURES 2

MID-RISE OFFICE BUILDING

FOOTING & PILE CAPS PLAN VIEW

The building design made up for the purpose of this project consists of developing a complete structural system. The construction type is TYPE I-B--Fire Resistive Non-Combustible which is commonly found in mid-rise office & Group R buildings. The building also features a 33’x7’ atruim that passes through Level 2-Level 8 and could be viewed from Level 1.

LEVELS 1-2 PLAN VIEW

The structural system includes steel columns, girders, beams, trusses and spandrals as needed. Direct connections to the columns and bracing members designed to carry gravity loads.

W12X26 STRUCTURAL FRAMING (JOISTS)

33’ X 7’ ATRIUM

2 Hr. Exterior Walls* 2 Hr. Structural Frame 2 Hr. Ceiling/Floor Separation 1 Hr. Ceiling/ Roof Assembly LEVELS 3-8 PLAN VIEW


- Grid System: 12’X10’ - Location & Thickness of foundation wall: 12” - 3 1/4” Lightweight concrete topping slab on a 2” composite steel deck - Concrete piers supporting columns - Wall and column footings

SECTION 1

PLAN

SECTION 2

SECTION 3 ATRIUM

SECTION 1

SECTION 2

SECTION 3

61


PROGRAM & CODES

REVERE CHELSEA HIGHSCHOOL

CHELSEA

ELEMENTARY SCHOOLS COMPLEX

PROPOSED LIBRARY Forbes Park

CLARK MIDDLE SCHOOL

EXISTING CHELSEA PUBLIC LIBRARY 569 Broadway

PROPOSED BUS ROUTE EXTENSION EXISTING BUS ROUTE

WINTHROP


P

DESIGN STATEMENT Chelsea, Massachusetts is a dense and diverse urban community of 40,000 just north of Boston. Over the past few decades the city has grown and changed rigerously. As the city continues to develop and change services for the community must adapt and evolve as well. Located on an 18 acre waterfront site in Chelsea, Massachusetts, is a mixed-use, waterfront community. The area was previously used as an industrial complex, including an old printing factory. The idea is that Forbes Park will soon transform into 225 live/work loft residences and become home to a new sustainable Community Library.

63


0 CAPACITY GAP ANALYSIS

MISSION STATEMENT

LOCATION// The existing Chelsea Public Library is located at 569 Broadway, Chelsea, Massachusetts. Although the library is geographly located conveniently in the center of the city, it is not the most desirable or safest place for a Library. The area has a history of crime and poverty. The idea is to relocate the Public Library to a larger lot in a much quieter section of the city. By doing so, we hope to create a safer more enriching learning environment for all.

“The Public Library of the City of Chelsea is to be a community library whose circulating collections and public information services reflect the needs of a constituency and to make the availability of its collections and services attractive to all. It is a recognized responsibility and priority of the library to make its services available to prospective users of all ages and backgrounds. The library is the city’s principal organization for serving the adult as an individual by providing resources for continuing education, general and technical information, and cultural development. The library also serves these purposes for those of student age by acting as a supplement to the city’s public and private schools. The prevalence of preschool use of the library and the present recognition of its vital importance are also important factors in the planning of services and collection development.”

TRANSPORTATION// In the Broadway/Eastern Ave neighborhood, carpooling is still a popular way to get to and from work, 25.0% of commuters carpool here, which is more than in 98.3% of all U.S. neighborhoods. The neighborhood is walkable, however, by locating the proposed library away from the center of Chelsea, some residents would agree public transportation is necessary for easier accessibility. LIBRARY// Understanding that a majorority of the population are young working class individuals, we would like to explore opportunities to make the new Chelsea Public Library: - more welcoming and inviting. - Investigate the possibility of longer hours. - Better circulation & access - Community connections

23.3%

FAMILIES BELOW POVERY LEVEL

29.3%

19 YEARS AND UNDER

- A safe and pleasing environment - Host Community Event

Source: (Materials Selection Policy)

- Educate the public of library resources - Hub of community interaction - new technology - spaces of collabortaion - childcare - quite rooms - teen centers

35.9%

25-44 AGE GROUP

1 PRESCHOOL 4 ELEMENTARY SCHOOLS 3 MIDDLE SCHOOLS 1 HIGH SCHOOLS

FRANK “Evening/Afternoon Film Series”


LUIS RESIDENT ISABELLA “I would love to see an open concept space filled with natural light that is in compliance with the new social distance ordinances. But I’d like the space feel as if we weren’t restricted to areas with limited access - so it would need to be light and open. Maybe a sky light so the sunshine could fill the space. Natural wood tones with white walls and live plants to help clean the air.”

“Things I’d love to see that might encourage me to use the library more often: 1. Advance research computer rooms- with easy access to a lounge and outdoor areas. 2. Educational center- informing visitors about sustainability and systems used in the new library. 3. Daycare center.”

ERICA “More Printers”

CAMILA

MASTER’S CANDIDATE IN SUSTAINABLE INTERNATIONAL DEVELOPMENT ENROLLMENT COORDINATOR AT BIG BROTHERS BIG SISTERS OF MASS BAY BOARD MEMBER AT THE CHELSEA COMMUNITY SCHOOLS ADVISORY BOARD

“Things I’d love to see that might encourage me to use the library more often: 1. Bike Parking 2. Indoor courtyard with lots of natural lighting with a small cafe serving fair trade coffee, tea and homemade pastries. 3. Digital lab that offers community training hours Photoshop, Excel, Resume Building, Graphic Design”

SCOTT “Starbucks Cafe & Lounge”

ALEXANDRA “I’d love to see more soft seating in a library that doesn’t feel “sterile” or boxy. But also would love more sanitizing procedures! Touch less checkout would be wonderful. ”

65


PRECEDENT STUDIES

01 CHICAGO PUBLIC LIBRARY CHINATOWN BRANCH SOM ARCHITECT

24100 sqft SIZE

2015 YEAR

Chicago, IL LOCATION

Source: som.com

The Chinatown Branch Library serves as a new civic, educational, and social hub for Chicago’s Chinatown neighborhood, providing a much-needed public gathering place geared toward inclusive community activities and driven by technology-based learning. The library is designed to achieve LEED® Gold status. Sustainable design features include radiant cooling and heating, in-ground thermal storage tanks, a green roof and in-ground stormwater retention system, and natural daylighting technologies. A solar shading screen integrated into the building’s glass curtain wall reduces heat gain without compromising views out to the neighborhood, resulting in a building that consumes 30 percent less energy than a typical library while providing 70 percent vision glazing.


02 MORGAN LIBRARY & MUSEUM Renzo Piano Building Workshop ARCHITECT

Above Ground - 69,400 sqft Below Ground - 43,300 sqft SIZE

2002

The space was designed to create a welcoming entrance on Madison Avenue and improved internal circulation, including greater wheelchair accessibility. New and renovated galleries, for exhibitions, performances and rooms with greater capacity were also added. The new spaces were designed with lots of metal and glass and created beautiful naturally lit spaces within.

YEAR

New York, NY LOCATION Source: arcspace.com

03 CHICAGO PUBLIC LIBRARY CHINATOWN BRANCH SWBR Architects & Leo A. Daly Architects ARCHITECT

43,000 sqft SIZE

2007 YEAR

Rochester, NY

The library is designed to increase student gathering space and to provide a sustainable facility. Increasing space for students is achieved through the creation of a study café that is incorporated into the library’s study area, in additon, wireless access makes the study café a natural interaction hub for all. Sustainable design techniques and materials were considered throughout the entire design process and contributed toward LEED-NC Silver certification. Green features include the use of geothermal heat pumps, energy-efficient and natural lighting, high efficiency insulation practices, use of high efficiency plumbing fixtures, and drought-resistant landscaping. Temperature of the two-story, 43,000 square foot facility is regulated through geothermal methods. Water is either heated up or cooled off as it is pumped through varying depths of its many wells.

LOCATION Source: leoadaly.com, ifla.org

67


Wireless Communication Overlay District

FORBES PARK SITE

WCFOD

WIRELESS OVERLAY DISTRICT

Gerrish Avenue Smart Growth Overlay District Inset

Gerrish Avenue Smart Growth Overlay District

City of Chelsea

SGOD

Zoning Overlay Districts

0

62.5 125

250

375

ZONING & SITE ANALYSIS 0

LOCATION// Chelsea, MA SITE DETAILS// Mixed Use Development ZONING// Waterfront wirh Special Permits BUILDING CODES COMPLIANCE// A-1, A-3, B, M, S-1

0.25

0.5

Floodplain Overlay District

FOD

Inset

FLOODPLAIN OVERLAY DISTRICT

Sec. 34-27. - Specific districts. Waterfront (W) District. The purpose of the W district is to provide an area for uses which are water related and/or which benefit from proximity Wireless to the airport or the harbor, and to encourage public access to the Communication Overlay District waterfront. WCFOD (Ord. of 6-20-2005, § 2.1) WATERFRONT REGULATIONS Article 97 of the Massachusetts Constitution “The people shall have the right to clean air and water, freedom from excessive and unnecessary noise, and the natural, scenic, historic and aesthetic qualities of their environment”

Gerrish Avenue Smart Growth Overlay District Inset

Gerrish Avenue Smart Growth Overlay District

SGOD

Gerrish Avenue Smart Growth Overlay District

SGOD

0

62.5 125

250

0

62.5 125

Waterfront Industrial Overlay District

City of Chelsea City Zoning of Chelsea Overlay Districts

Gerrish Avenue Smart Growth Overlay District Inset

250

375

WIOD

WATERFRONT INDUSTRAIL OVERLAY DISTRICT

Feet 500

375

WIOD

Waterfront Industrial Overlay District

Zoning Overlay Districts

Floodplain Overlay District

FOD

Inset

Floodplain Overlay District

Clean Water Act “The objective of this Act is to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters.”

Inset

Prepared by: City of Chelsea GIS Specialist. Current through September 16, 2009. M\mapdocuments\planning maps\overlay_9_09.mxd

±

Feet 500

0

0.25

0.5

Area road and city boundary data supplied by MassGIS. Zoning overlays managed by City of Chelsea GIS Department. The zoning lines approximate. Please refer to documents on file in the City Clerk's office for exact location of boundaries. This map is a geographical representation of the City of Chelsea. It represents the Zoning Overlays as outlined in the Zoning Ordinance.

Miles 1

The City of Chelsea provides this data in good faith. Although efforts have been made to ensure that the data are accurate and reliable, errors and omissions are possible. The City, its agents or employees shall not be liable for damages, actual or consequential, including but not limited to profits, business interruption, loss of business information or any other loss.

FOD

Wireless Communication Overlay District Wireless WCFOD Communication Overlay District

Airport Related Overlay District

AROD

AIRPORT RELATED OVERLAY DISTRICT

WCFOD

0

±±

0.25 0

0.5 0.25

0.5

Prepared by: City of Chelsea GIS Specialist. Current through September 16, 2009. M\mapdocuments\planning maps\overlay_9_09.mxd Prepared by: of and Chelsea GIS Specialist. AreaCity road city boundary data supplied by MassGIS. Current through September 16,of 2009. Zoning overlays managed by City Chelsea GIS Department. maps\overlay_9_09.mxd The M\mapdocuments\planning zoning lines approximate. Please refer to documents on file in the City Clerk's office for exact location of boundaries. Area road and city boundary data supplied by MassGIS. Zoning managed by City of Chelsea representation of theGIS CityDepartment. of Chelsea. This map isoverlays a geographical The zoning approximate. referin tothe documents on file in It represents thelines Zoning Overlays Please as outlined Zoning Ordinance. the City Clerk's office for exact location of boundaries.

Miles 1 Miles 1

The City of Chelsea provides this data in good faith. representation of the Chelsea. This map is ahave geographical Although efforts been made to ensure that theCity dataofare accurate It represents the Zoning Overlays as outlined in the Zoning Ordinance. and reliable, errors and omissions are possible. The City, its agents or employees shall not be liable for damages, actual or consequential, The City of Chelsea provides this data in good faith. including but not limited to profits, business interruption, loss of Although efforts have been made to ensure that the data are accurate business information any other loss. and reliable, errorsorand omissions are possible. The City, its agents or employees shall not be liable for damages, actual or consequential, including but not limited to profits, business interruption, loss of business information or any other loss.

Prepa City of Curren M\map

±

Feet 500

Airport Related Overlay District

AROD

Forbes Park Site

Area r Zoning The zo the Ci

This m It repr

Miles 1

The C Althou and re or emp includ busin


SOLAR ENERGY

Most commonly used today, solar panels. Solar panels will be used to obtain energy from the sun and distribute it as solar power throughout the entire site.

WIND ENERGY

Wind will be used to generate energy through the use of wind mills placed on the site. WInd will also provide natural ventilation throughout the interior of the building, in order to save on cooling during Bostons warm summer season.

AMBIENT CONDITIONS

OPEN SPACE

RAIN COLLECTION

Rainwater harvesting systems will provide stored stormwater runoff which can be used for irrigation, flushing toilets, water features, as well as drinking fountains, if it is purified. This will help save costs and keep the costs to a minimum.

LOCAL MATERIALS

The most cost-effective steps toward a reduction in a buildingâ&#x20AC;&#x2122;s energy consumption usually occur during the design process. By sourcing local materials helps reduce the amount of emissions burned during construction process.

PEDESTRAIN & VEHICULAR CIRCULATION

VIEWS

69


SECTION

COMMUNITY Based on many interviews, people would enjoy a visiting a library if there were.. - more bike storage - outdoor areas - cafes - new technology - community involvement - events - film festivals - markets UTILITIES - Structural System - Lighting - HVAC - Solar Energy - WInd Energy - Vernacular - Rain Collection DESIGN OPTIONS - Local Materials - Raw Materials - Recycled Materials

ACCESSIBLE BUILDING & SAFETY Proper accessibility, complying to specific codes and zoning of desired site. -Ramps// 1”-12” slope -Bathrooms// 5’-0” -Door Width// 3’-0”

1ST LEVEL PLAN

*Refer to AAB Rules and Regulations for more information regarding specific codes and regulations. ACCESSIBLE BUILDING The most cost-effective steps toward a reduction in a building’s energy consumption usually occur during the design process. By sourcing local materials helps reduce the amount of emissions burned during construction process. Total Library GSF 1st Floor 2nd Floor

6200 GSF 7000 GSF

2ND LEVEL PLAN


EXTERIOR PROGRAM The Forbes site allows for future non-water dependent uses. The newly proposed community library will enhance the surrounding communities and improve the underutilized properties along the waterfront corridor of Chelsea Creek by establishing a new reputation, beyond the traditional commercial and industrial uses that previously dominated the area.

SOLAR PANELS RESIDENTIAL LOFTS

WATER HARVEST

GREEN SPACE LIBRARY

WIND ENERGY

71


PROFESSIONAL DEVELOPMENT


74

82

88

PROJECT 1

PROJECT 2

PROJECT 3

URI AQUATIC CENTER PLANNING STUDY

FREELANCE FURNITURE RESTORATION & DESIGN

FREELANCE ARCHITECTURE

PROJECT

PROJECT

PROJECT

105 KEANEY ROAD, KINGSTON, RI 02881

BOSTON, MA 02113

NAHANT, MA 01908

LOCATION

LOCATION

LOCATION

CANNONDESIGN

SELF-EMPLOYED

SELF-EMPLOYED

EMPLOYER

EMPLOYER

EMPLOYER

73


Project 1 Tootell Aquatic Center Advanced Planning Study CannonDesign University of Rhode Island Aquatic Center Planning Study 105 Keaney Rd, Kingston, RI 02881 Architectural Designer

Design

OVERVIEW: The Tootell Aquatic Center was opened in 1970 and is the only pool on the campus of the University of Rhode Island in Kingston, RI. The facility is highly utilized year round and serves an extensive base of constituents including the general student body, faculty/staff, intercollegiate athletics, academic research departments, as well as the broader Kingston and Washington County community for learn-to swim programs, senior swim, camps, high schools, and physical therapy.

Unlike many projects, this study investigated several site options within the athletics precinct, each of which posed a number of unique challenges and solutions toward the university’s design drivers and goals. Throughout the study, the options were narrowed to four sites – three of which are additions on the east side of the Athletic Complex and one of which is the renovation of Tootell itself. This program’s unique feature is that this study, and therefore the program, is solely focused on aquatics. This aspect leads to a large amount of the program being located adjacent to one another, and specifically to the pool/deck. This has the implication of a large footprint in relation to the overall program area and was challenging to accommodate the full program within the spaces designated as available.

At the onset of the project the team was advised there were no specific, pre-determined sites to be considered, the only exception was the need to maintain the renovation of Tootell as an option. The team was tasked with investigating all areas within the Athletics precinct.

There were several aspects of this project that helped me grow as a designer. The ability to think critically about the various site options available, rather than just one, helped me work on my time management skills. Since deadlines were strict and involved may individuals, it was essential to stay on track. I was responsible for preparing existing conditions assessment diagrams and developing program component blocks used to test-fit the aquatic program on various sites. These diagrams helped the team, consutants, and clients and really pushed my abilities to jump between multiple programs like AutoCAD, Photoshop, Illustrator, and SketchUp while again staying conscious of my time to deliver the job on time.

Above: Pool Option C2 drawn in AutoCAD Left: Aerial view of The University of Rhode Island’s existng Athletic Complex, indicating various site options available.


Technical Skills - Option 3

Professional Development

Concept Sketch of Site Option 3 by Jenna. Juann, & Jean

Option 3 - Site Plan by Jenna (Architecture), Jean (Landscape), Evan (Landscape)

Mackal Addition (Options 3) - Engages with Mackal as a bookend to the Athletics-Recreation Complex to the north. The “public” facing entry animates the parking edge with welcoming arrival, adjacent drop off, service access, transit stop and bike lane along the south face. A north facing “campus” entry (connected to the south entry by a shared interior corridor) opens onto a newly proposed Athletics-Recreation plaza courtyard and enhanced quadrangle.

The proposed plaza courtyard strengthens the campus identity of the aquatic center with greater visibility and connection to the core campus. The proposed massing encourages visibility and transparency to the pools from the outside by introducing a glass facade to show case the activities inside. The building has two entrances from the quad and the parking that helps tie the building to the site.

Option 3 - SketchUp Render by Jenna (Initial Massing), Philip (Details and Final Render)


CARDIO & FITNESS

CORRIDOR

SPECTATOR SEATING

MACKAL TRACK SEATING

CORRIDOR

7’-10”

LOCKERS

POOL & DECK

From the start of the Advanced Planning study for the University of Rhode Island, I was responsible for drawing up the initial pool options in AutoCAD and preparing existing conditions assessment diagrams (plans and sections for a 112,000 GSF multi level sports facility). I helped develop program component blocks that were used convey options and to test-fit program on a variety of sites; and for assisting with the development of design concepts for both build new and renovation scenarios.

Option 3 - Section

Option 3 - Level 1 Plan

Option 3 - Level 2 Plan


Technical Skills - Option 4

Professional Development

SPECTATOR SEATING

CORRIDOR

LOBBY / LOUNGE VIEWING AREA 12’-0”

LOBBY / CORRIDOR

POOL & DECK

Since we already had the existing massing of the Athletic Complex, it was important to stitch together each indiviual building that made up the complex to understand how the new would fit together with the old. The university provided us with PDF’s of the individual building, Mackal, Keaney, Tootell and Ryan, which then I was responsible for importing those into AutoCAD and piecing them together, testfitting program on the various sites.

Option 4 - Section

Concept Sketch of Site Option 4 by Jenna. Juann, & Jean

Mackal Addition (Options 3) - Engages with Mackal as a bookend to the Athletics-Recreation Complex to the north. The “public” facing entry animates the parking edge with welcoming arrival, adjacent drop off, service access, transit stop and bike lane along the south face. A north facing “campus” entry (connected to the south entry by a shared interior corridor) opens onto a newly proposed Athletics-Recreation plaza courtyard and enhanced quadrangle.

Option 4 - Level 1 Plan

Option 4 - Level 2 Plan

Option 4 creates a large east facing plaza that engages the Elephant Walk and the proposed drop off. The plaza enlivens the Aquatics façade with outdoor activity and presents opportunities for public art or branding. Set within the existing Athletics-Recreation quadrangle and surrounded by landscape on three sides.

Option 4 - Site Plan by Jenna (Architecture), Jean (Landscape), Evan (Landscape)

Option 4 - SketchUp Render by Jenna (Initial Massing), Philip (Details and Final Render)


Technical Skills - Option 5

SPECTATOR SEATING

LOBBY / CORRIDOR

SUPPORT

POOL & DECK

After a few iterations, for each scheme, we started to intoduce sections to the clients in order to further analyze which components of the old would be perserved and which to be removed. It was also important for them to understand the connections between spaces vertically. My role was to clean up the original scans of the exisitng drawings in photoshop, then bring them into Illustrator where I conceptually drew up a section of our proposed scheme. I added color that easily corresponds with the plans and lables to make it easy to orient oneself.

Option 5 - Section

Concept Sketch of Site Option 5 by Jenna. Juann, & Jean

Tootell Addition (Option 5) – The Tootell addition is located at the north end of the existing Athletics-Recreation quadrangle, the proposed building engages with Keaney and Tootell to create a new face to the AthleticsRecreation Complex and define the adjacent reshaped quad open space. The identity of the aquatic center is strengthened with greater visibility and connection to the core campus. A shared “public” and “campus” entry is proposed on the south side of the aquatics center with a southeast facing plaza wrapping the entry corner and opening onto the newly enhanced quadrangle. Option 5 - Level 1 Plan

Option 5 - Level 2 Plan

The proposed building engages with Keaney and Tootell as a new face to the Athletic Complex and defines the adjacent reshaped quad open space. The identity of the aquatic center is strengthened with greater visibility and connection to the core campus by creating the main entrance in front of Keaney.

Option 5 - Site Plan by Jenna (Architecture), Jean (Landscape), Evan (Landscape)

Option 5 - SketchUp Render by Jenna (Initial Massing), Philip (Details and Final Render)


Technical Skills - Option 6

Professional Development

Since we already had the existing massing of the Athletic Complex, it was important to stitch together each indiviual building that made up the complex to understand how the new would fit together with the old. The university provided us with PDF’s of the individual building, Mackal, Keaney, Tootell and Ryan, which then I was responsible for importing those into AutoCAD and piecing them together, test-fitting program on the various sites.

Option 6 - Section of new entry

Tootell Renovation (Option 6) - A proposed entry plaza extends the arrival experience and activity of the center onto the quad east to Keaney Road and engages the adjacent Ryan Center drop off. Additionally, an improved service access and limited ADA parking is proposed on the west side along Tootell Road. The renovation option includes a new building entry to improve internal circulation and accessibility as well as provides an opportunity for new identity for the aquatic center.

Option 6 - SketchUp Render by Jenna (Initial Massing), Philip (Details and Final Render)

Option 6 - Site Plan by Jenna (Architecture), Jean (Landscape), Evan (Landscape)

This Option renovates the existing facility in varying capacities – some areas would undergo extensive changes and others might receive only minor cosmetic work. The overall strategy is to improve accessibility and increase the amount of space directly off the pool deck by “inserting floors” that better align with the deck elevation. The varying level changes posed a major concern for safety and accessibility.


CIRCULATION MAINTENANCE/ MECH NEW SECONDARY ENTRY

POOL & DECK

INFILL FLOOR TO NEW EL 111’-6”

POOL DECK SUPPORT

POOL MECH STOR-

LOCKERS

LOWER LOUNGE 111’-6”

MECH

POOL DECK SUPPORT

NEW ELEV.

GYM/ MULTI-PURPOSE

STORAGE & ELECTRICAL

CLASSROOMS OFFICE / ATH SPORTS MED SPECTATOR SEATING

INFILL FLOOR FOR LOCKERS NEW EL 110’-6”

NEW ELEVATOR

LOCKERS 106’-6”

POOL & DECK 111’-6”

ROOF HV/ RTU

LOWER LOUNGE POOL SUPPORT

POOL SUPPORT

NEW ELEV.

EXISTING EL 111’-6”

INFILL FLOOR TO NEW EL 111’-6”

DEMO FOR NEW ENTRY ABOVE

Level 1 Plan

CIRCULATION MAINTENANCE/ MECH POOL & DECK

ATH WEST GYM 121’-0”

NEW SECONDARY ENTRY NEW EL 116’-0”

POOL DECK SUPPORT LOCKERS GYM/ MULTI-PURPOSE CLASSROOMS OFFICE / ATH SPORTS MED

OPEN TO BELOW 111’-6”

MECH

SPECTATOR SEATING NEW ELEVATOR

OFFICES

NEW ELEV.

ROOF

121’-0”

HV/ RTU

MECH 118’-0”

DANCE 121’-0”

AN CENTER

OPEN TO POOL BELOW 111’-6” ATH SPORTS MED.

OFFICES

ATH ROWING 121’-0”

OPEN TO LOWER LOUNGE BELOW 110’-6”

KEANEY TOOTELL CONNECTOR

NEW ELEV.

OFFICES

MECH

CLASSROOM TO RYAN CENTER

ATH TRAINING 116’-0” NEW ENTRY

Level 2 Plan

HV 6 WOMEN’S LOCKERS

HV 7 WEST GYM

HV 8 WEST GYM

HV 9 POOL RETURN

HV 11 MEN’S LOCKERS RTU 1 ATH DEV CENTER

HV 12

HV 2 DANCE

HV 13 POOL RETURN

(ON ROOF ABOVE) RTU CREW

(NOTE: HV1,HV5,HV10,DO NOT EXIST)

HV 9 POOL RETURN

Option 6 - Proposed Plans

HV 11 MEN’S LOCKERS

HV 12

Roof Plan Option 6 - Existing Level Diagram


Collaboration

Professional Development

A lot of collaboration took place during this project both internally and externally. CannonDesign team members, who were both architects and engineers, came together to discuss design relating to the exisitng building and the various site options available. There was also collaboration with project consultants, such as VHB for matters pertaining to the landscape, and ELLANA, who was in charge of construction costs. Collectively as the team we developed a martix that identified and explored potential sites, listing a wide range of criteria for the team to weigh advantages and disadvantages. This was a great learning opportunity working together with other professionals all trying to reach and achieve the same goal. It taught me a lot about clear and effective communication, since errors in this domain may lead to changes in the project budget, timeline and much more.

The above diagram illustrates the initial phase as blue and the future phase as green for each option. The initial phase was used as the limit of work for cost estimating. CannonDesign, togther with VHB, decided what should be taken into consideration for Phase 1 and what should follow. The center spreadsheet and below indicate the programmatic needs for Aquatics Facility at the University of Rhode Island. These spreadsheets where important when designing the floor plans for each scheme as they help guide and influence design decisions.

Matrix used to identify sites by entire design team


CROTEAU

Project 2 Freelance Furniture Restoration & Design Self- Employed Alexa Curtis Studio Apartment Boston, MA 02113 Designer

The Client

OVERVIEW: Transform a small studio apartement under $1000 by restoring, repurposing, and refinishing gently used furniture. During this project I learned how to collaborate with other young entrepreneurs & small businesses to make a dream come true. I also learned about managing client expectations, budgets, and goals. Together Alexa and I picthed this project to the Boston Globe Magazine.

Alexa Curtis, who at the time was a young fashion blogger of A Life in the Fashion Lane, a platform for her to express her feelings around everything relating to teens, body image and mental health, had just moved into her first apartment in Boston, June 2016. When Alexa is not hard at work, she mediates frequently and makes time for hobbies like cooking, exercising, and spending time with friends to keep herself grounded.

Design I designed the space to function around the idea of flexibility. Since Alexaâ&#x20AC;&#x2122;s apartment was no more than 400 sqft, I was faced with the challenge of accomodating her enitre life into one small box.

Kitchen

24

Bedroom Kitchen

Studio Floor Plan

Bedroom

Above: Existing Conditions Photos Left: Instagram post by Alexa Curtis - showcasing featured Boston Globe Article

Bedroom


Technical Skills - Schematic Design

“my first apartment I’ve ever lived in alone. I paid a [bunch] of money upfront to keep the place, and decided to live on an air mattress until I got the time and energy to buy furniture. With my travel schedule, buying furniture seemed like the least important thing on my mind.”

To get an understanding of what Alexa was looking to achive, it was important for me to get into her head. I requested some inspiration photos of furniture and style that she was envisioning for her new place. From there I searched online for pieces that where in her budget that I could potentially refinish and reuse that fit her aesthetic. Another major challege I was faced with was communicating my ideas with someone not in the field of design. I created PDF’s to show options I came across to continue the conversation and ideas for each piece. From there we were able to make design decisions together to continue pushing the design process forward.

Option 3 - Site Plan by Jenna (Architecture), Jean (Landscape), Evan (Landscape)

Professional Development


Technical Skills

1

Island

I primarily used SketchUp for this entire design. It was quick and efficient as a design and communication tool. It was easy to jump back and forth between iterations by creating new schemes within SketchUp itself and was notably valuable when designing custom pieces of furniture that fit this specific design.

Iteration 1 - Top View in SketchUp

This was my first project where I had to write an invoice for more than one service and product. It certainly felt a bit tedious at first, but it was a good way to keep track of my spending and keeping the project on budget. As for the invoice software, I kept it simple and used Pages by Apple which allowed me to spend less time being an accountant persay and more time doing the work I love.

Perspective Section

Perspective Section

Iteration 2 - Top View in SketchUp

Perspective Section


The island, which in its original state was a media center, is solid wood and features closed storage in addition to available flex storage above. I kept its original casters for functionality, so that it can be easily moved if the client wants to entertain or workout in her kitchen area. The idea for the island was to be completely refinished in white with a stone top by Bostonean of Everett, MA.

RECYCLE. REFINISH. REUSE.

INVOICE 781.462.1733 design.re3@gmail.com recyclerefinishreuse.com @recyclerefinishreuse

ALEXA Date: 8/3/16 Project Title: STUDIO DESIGN/ FURNITURE RESTORATION Project Description: Refinish/ Restore to desired finish. The steps of this restoration can be described as follows: 1. Cleaning the wooden surfaces 2. Repairing the woodwork 3. Filling scratches, cracks, etc. 4. Prime the surfaces 5. Paint the surfaces 6. Finish

Project Start:

Project End:

Invoice Number: 1604 Description

Labor

Materials Cost

DESK

$ 112.00

3 CHAIR

$ 168.00

BED

$

84.00

BAR

$

77.00

ISLAND

$ 236.00

BEDDING

$

42.00

Furniture repair is labor intensive and time consuming. I take great

2 WIRE BASKETS

$

19.60

5 FRAMES

$

56.00

pride in what I do and work on only one job at a time. My goal is to refinish each unique piece to its very best. Thank you for finding us. We look

MIRROR

$

11.90

BLANKET

$

14.00

PILLOW

$

23.80

MATERIAL& HARDWARE

$ 100.00

forward to working with you. Cheers! Jenna-Lyn

Subtotal Tax

$

6.25% $ Total

$

944 59 1,003

Photo by Trenten Kelley

Counter Counter Options:

A

B

C

Wire Baskets White

Photo by Trenten Kelley

Collaboration Skills While working with Alexa to make her dream apartment a reality, I also learned how to work along with other companies to complete her vision. I worked with Bostonean of Everett MA to find the perfect piece of stone for the custom designed island. They gave me the piece of stone for free in exchange for referrals. I then worked with Room and Board, who helped me out by lending furniture to properly stage the house in preparation for the Boston Globe photoshoot we had coming up. I also contacted a local photographer, Trenten Kelly, who photographed the entire project for both his and my portfolio.


Technical Skills - Design Development

2

Frames 5 Frames - painted white

To make a photo collage wall, I purchased various used frames and painted them white. Perspective Bedroom Section

3

Perspective Bedroom

Desk 2 Wood Saddle Stools - black 1 Solid Wood Hope Chest Top - painted white


Professional Development

QR Code to Boston Globe Magazine Article

Photo by Trenten Kelley

Photo by Samara Vise for the Boston Globe

Photo by Trenten Kelley

Photo by Samara Vise for the Boston Globe

“Jenna has designed my dream apartment from scratch. I told her I had a budget of $1,000, because I wanted to be able to show teens that they, too, could design their dream place, so I didn’t want to go over $1k. I sent her my aesthetic in a few different emails, things like a gold pillow, lots of pineapples, a chalkboard, and quartz.”


CROTEAU

Project 3 Freelance Architecture

Design

Self- Employed Mastoras Project Residential Architecture Nahant, MA 01908 Architectual Designer

OVERVIEW: Full new construction. Demo existing single family, split level house located in Nahant, MA. Design new two story home with full foundation and two car garage. Home must encourage all available ocean views. Project involved: zoning, planning, design, construction documents, and construction administration. Inspiration Photo from Client

EXPERIENCE: Analyze and determine pre-existing building conditions. Work independently as a one person project team with minimal supervision until it was necessary.

Existing Conditions Photo

30

Being the first freelance project Iâ&#x20AC;&#x2122;ve worked on meant this project came with many learning curves. The Mastoras project improved my confidence while working with others in diverse groups, which can often be stressful due to deadlines. Throughout this project I developed a stronger ability to communicate verbally and thoroughly through plans, sections, elevations, and diagrams to execute client expectations. When I first met George, he described his vision for his new home as simple. At our kickoff meeting George expressed how he wanted everyroom to have a purpose - there would be no room that he didnt use daily. When he first sent over inspiration photos, he had his mind set on a traditional style home with stone - nothing too fancy. I tried to sway him in a more modern transitional direction from the start, but ultimately had to leave those decisions up to him; it is my job to navigate but not impose.


Technical Skills - Schematic Design

Professional Development

35 S pr ingvale Avenue Chelsea, ma 02150 617.823.1366 jennacroteau@gmail.com

40'-0" 12'-0"

40'-0"

14'-0" 6'-0"

7'-0"

14'-0"

7'-0"

9850MU

11'-4"

LIVING ROOM

MASTER BEDROOM

DECK

BEDROOM #2

10068

2'-6" 2'-6"

40'-0"

DN

68 26

4068

22'-9"

7'-8"

40'-0"

BATH

40'-0"

6460MU

5068

DINING

ADDITIONAL SERVICES • Additional services requested of the Architect that are not included in the basic contract will be agreed upon by the owner at an additional cost of $95.00 per hour before the service begins. These additional services may include such things as zoning hearing(s) for a variance, contractor bidding and negotiation meetings, historical research and meetings.

MUD ROOM

9850MU

14'-0"

14'-0"

UP

OFFICE

EXERCISE

18'-11"

BATH

BEDROOM #3

1'-0"

1'-0"

5'-0"

4068

9850MU

1'-0"

2068FX

6016FX 6068

9860MU

5'-6" 1'-6"

5'-6" 11'-0"

9850MU

2068FX

1'-0"

TIME FRAME ESTIMATE • Preliminary floor plan layouts along with exterior and interior model images. (Owner approval of preliminary plans required) Estimate: 2-3 weeks is the standard time frame for this phase • Completed set of architectural plans, energy audit, and structural calculations. Estimate: 3-4 weeks is the standard time frame for this phase • Total estimated time frame for a completed project is 5-7 weeks.

9850MU

2668

25'-0"

1110110MU 111068

FIELD INSPECTIONS AND CONTROLLED CONSTRUCTION AFFIDAVITS • Residential (3+) family buildings and commercial projects will require follow-up field inspections and signed affidavits to the building department. (2) Site visits and affidavits will be included with these projects. Any other additional visits will have to be agreed upon as part of an additional service.

14'-0"

6450MU

6460MU

COVERED PORTICO

KITCHEN

12'-0"

9850MU

9860MU

6'-0"

9840MU

16'-1"

6'-0"

12'-3"

14'-0"

25'-0"

CONSTRUCTION DOCUMENTS • Architectural plans and basic specifications will be provided for the above described project. • The architectural set of plans will comply with the standards set by the building code. • This basic set of architectural plans will provide the necessary information for the contractor to obtain a building permit and to build the above specified project. • “Rescheck” energy audit and any “simple beam” structural calculations will be included. • The basic architectural plans do not include any additional engineering services (i.e. – special structural conditions, mechanical plans or HVAC calculations, electrical plans, plumbing plans or site plans. Any additional engineering services will be coordinated by the architect and this additional service charge will be added and agreed upon by the owner and architect.

40'-0"

SCHEMATIC DESIGN • Building code and zoning law review and analysis. • Preliminary floor plan layouts along with exterior and interior model images. • Owner approval required.

6'-0"

SITE VISIT • Owner-Architect meeting at site to survey and list project needs. • Existing site survey and/or building measurements and photographs

6460MU

SCOPE OF SERVICE:

6'-0"

5 LINDA LANE, NAHANT, MA 01908

ARCHITECTURAL SERVICES FOR: NEW HOUSE DESIGN (APPROX. 3,200 SF) W/GARAGE

After my initial site visit to survey and list my client’s project expectations, I sent out a propoals documenting the scope of work. The proposal was to be signed and returned with a retainer fee before any work began. Throughout this project I learned that time is money and it is important to undestand and forsee how much time is needed and necessary for a job of such size. I really learned the business side of freelance architecture. I was definilty not as time-concious as I should have been throughout the project, spending ample time on small details; this was largely motivated by perfectionism, as I felt like my first job had to be completely flawless. I quickly learned that saying yes to everything a client requests is not always realistic when it comes to time restraints.

12'-0"

ADDRESS:

DATE: MARCH 10, 2017

6440MU

GEORGE MASTORAS

6440MU

PROPOSAL FOR ARCHITECTURAL SERVICES NAME:

2'-0" 1'-2"

4'-4"

4'-4" 12'-8"

9850MU

9860MU

14'-0"

2'-0" 1'-2"

5'-6"

5'-6" 11'-0"

12'-0"

14'-0"

40'-0"

1'-6"

40'-0"

ARCHITECTURAL FEES • Retainer (Starting Fee)………………………………………………………….…..$ 300.00

•

Preliminary schematic design phase………………….………………………..….$ 1,500.00

•

Construction documents phase………….………………………………………....$ 2,100.00 (4) Sets of architectural stamped (24” x 36”) drawings and PDF are included.

Total Fee for Project................................................................................................$ 3,900.00

Thank you for allowing us to meet with you and we look forward to working with you on this project. If you have any questions please don’t hesitate to contact us. Sincerely, Jenna-Lyn Croteau Architectural Designer Scott J. Golden Registered Architect

Iteration 1 ACCEPTED: Date

______________/__________/_______________

Print Name(s)

__________________________________________________________________

Signed

__________________________________________________________________

The first iteration consisted of a more coastal exterior as oppose to the more traditional style the client originally favored while still keeping true to the desired shape. The idea for the interior was to keep a continous line of site from the front door all the way through to the ocean veiws beyond.


Technical Skills Throughout the design process there were alot of conversations to be had. One major conversation regarded the staircase - namely, which staircase would provide the views the client was hoping to achieve while also keeping costs controlled. There was also a major conversation that revoloved around the kitchen layout. Many factors played a role when thinking about the kitchen design. We wanted the kitchen to be easily accessible from the garage, and we also wanted to utilize the existing patio to the left of and behind the garage by having a controlled entry allowing easy passage from the kitchen to the outdoors. To the left are kitchen iterations. Below are staircase iterations modeled in Chief Architect.


Professional Development

! "

! "

!"

#

, - .&)*+/

#$ % &'( &)*+


' &

! " ! ! # $ # # # %

% # # # ! #

# " # " ! $

# " #! '( ) '

-0 1 0 1 0 2 1 0 1 0 3 4 4 0 -0 2 4 0 3 3 5 50 4 50 1 - 6 5 0 4 0 2 4 7 4 . 0 / 0 5 3 0 1 1 0 1 0 3 4 3 5 0 8 0 1 " 0 3 0 9 5 3 8 6 5 0 4 ( 4 0 : 1 0 3 3 "1 0 3 3 1 1 1 0 5 1 0 ( 5 5 0 3 4 3 0 0 0 -0 0 0 0 0 0 1 5 4 5 0 0 :. / 0 0 ( 0 0 5 4 1 1 1 0 5 4

$ !

!"

#! '( ) '

' &

'

! " ! ! # $ # # # %

% # # # ! #

# " # " ! $ ' "

&

'#

# "

! " # # " ! $

#! '( ) '

#! '( ) '

'#

"

&

, - .&)*+/

#$ % &'( &)*+


Professional Development

*

" !

' *

' "

'

* &

'

* '

&

'

* , ' * &

'

+

!

'& , +

* '

'

+ ,

$ & '2*+ 4 ''2 *+ " 2 &' 5

&

&

*

' &

' '

' *

' & &

+

4 + #

, ' '

#

" *

!

'& '' ,

&

'& , "

'

"'

! " 3 "

"

#

"'

'&

* &

&

'

'

! ! # " ! $ , " " ! # $ # " !! " ! ## ! # # $ " ! " " ! " #

#

#! '( ) '

, - .&)*+/

#$ % &'( &)*+

* '

*

$ $

'

'+

'' &

! # 3 " # ! ( ! !

"

"

'( ! "

#

' 3 " ! # " ! # +( , $

+

" '& + , '

' &

&

'( ! "

#

+

,

'

!

* ,

*

'

$

"

"

# " 2 " "

%

' &

' &

!

+

! #

' + "

"

*

* '

" +

" &

!"

' '

&

"

'-.

01

" $ ! !

'/+ #

'/* #

&/& ' #

& * #

* & #


! & * &

'

' &

* &

'&

'

&

&

'

*

+

# $"

$ "

& ' , '

'& * , '

'+

"'&

'

''

+

! #

+

+

"'

' +

'+

"''

' & , + *

"'&

+ '

$

+

+

' '

''

"

'

"'

! #

4 #

* '' , &

$ ' & , ' *

''

"'

"'

$ "

'& , '

'

+

& '

'

+

+ &

* &

''

* &

'

'

*

$ " ' " " & " + " " * " " "' "'' "' "'&

3 ' ' ' ' & ' ' ' ' &

' ' ' ' ' ' ' '

# + & '' & + + + *' +

" & & &( & & ' &

(

, & & , & & &( , & & , '( & , '( , '( , & , + '' , , '( & , '( , '(

"

#! " " #! , 2 # " ## , 2 " "

, 2 " "

' " "

" "

" $ " ## , 2 # " ##

*

'

" , , + , , ' , ,& &( , , ' , ,&+ , , + , , + , ,* "

! " * ,' ,'' " "

, , " "

, ,&+ , , + " $ " "

# ! "

! ## ! # ' &( ' &( ' &( ' &( ' &( ' &( ' &( ' &( ' &( ' &( ' &(

#! '( ) ' $ ' & + * ' '' ' '& ' '+ '

3 ' ' ' ' ' ' ' ' '

' ' ' ' ' ' ' '

# *#! &+#! & + #! & + #! & + #! & #! & #! + + , + "! + '&#! *' + ! *'++ ! *'++ ! *'++ ! *' ! *' !

" &' '( &' '( &+ '+(' &+ '+(' &+ '+(' &+ '+(' &+ '+(' ' &( +( +( +( +( +( +(

" #! " (

&' & '( ,& '&(' & '( , ' '&(' + *( & *(' , &( + *( & *(' , &( + *( & *(' , &( *' *( & *(' ,* &( *' *( & *(' ,* &( , * , '( '+ '( ,'+ '( + '&(' + '( ,+& +(' '&(' + '( , + +(' '&(' + '( , + +(' '&(' + '( , + +(' *' *( + '( ,* &( *' *( + '( ,* &(

" #! # ! # # ! # # ! # # ! # # ! # # ! # # ! #

, " ## "$ ! # ( # ! # ! # ( ! # ( ! # ! # ( ! # ( ! # (

'

++

! ! # " ! $ , " " ! # $ # " !! " ! ## ! # # $ " ! " " ! " #

%

+

! # '& ,

"'

' '

' , '&

*

''

"

"'&

# $

% $

!"

"'

"'

!

,

' '

"'

, - .&)*+/

#$ % &'( &)*+

! #

&


Professional Development

% "7

; < " " 7 =% >) ; " %! *? ; %

; < %% " 7 =% ') ; " %! *? ; %

; 7 $ >? ; " %! *? ; %

@ % %; %=-" ; *!'A) ; *!&>) " @% " 7 = ="-B &))) ; -% % "7 "-% = "-" $

@% % ";"% "- = @$" " 7 = % ;;"=" %=" = "-" $= %" ,"=( ( " B - -"= " 7 , B %C$" % % 7" %% " 7 ;% " % "% @ 7 % 6 '?)) " .&D B - % 7- / >E ," 7 % ;" ! A 2 A *) , ; $ -" ; -" 7 6 '?)) " .&D B/ * - $=- -%% ,%%- -, 6'A & $ % - % " % -% ( " % &2

" ; " -% " - @ -% - - ; 7% ; -%% @% , ! '!DE " @ - - 77% %

- &96)E = " 7" B ; -% = %=-" 7 ;-% # " -

* ; $ -" ; -" 7 %" ; =%,% -

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

"- " *&E ; % = %

*

* +

* +

* +

* +

* +

'

+

$

$ 3 ! ! # "

* +

'&

'&

'+

" '

*

*

* +

'+

& &

& '( # 2 ! # 2 & 4 & 4 ' " ! !2

# ( + 6 $ # $ # " $ # & '2*+ 4 ''2 *+ " 2 &' 5 $ ! " " # ! " $ 7 # #

'

' +

!"

'

* '

' '

$ # & '( # 2 ! # 2 & 4 & 4 ' " ! !2

# ( + 6 $ # $ # $ '2*+ 4 ''2 *+ " 2 &' 5 $ ! " " # ! " $ 7 # #

'' &

'

" 4 ' " ! !2 ( 6

! "#

4

! " 3 "

"

#

&

&

*

! ! # " ! $ , " " ! # $ # " !! " ! ## ! # # $ " ! " " ! " #

, - .&)*+/

#$ % &'( &)*+

, #

" $ # ! " " # "

"

'+

4 2 2 # ! " $ " " 2 2!2

! ! " !

! "

! $ " " $ " ! !

'

*

In order to get a final polished drawing for the contractor to be able to start building I had to collaborate with many engineers, primarily structural to get the foundations right. Since this was my first project coordinating these efforts on my own it took a few trial and error rounds of drawings and many meetings for me to be brought up to speed on how residential foundations work. Working on my own with the engineers was a huge learning experience since it was almost like a crash course in engineering.

'

! !2 # $ ! ! " 4 6' 2 2 2

" #! '( ) '


'2*+ 4 ''2 *+ $ "

7 # 7# ''2 *+ " ' 3 "2 8 ' 2!2 (#3 # $ ! #

4 ' # 8 ' 2!2 4 ! 7 # # # ! "

" !

4 # 7 # # # 3 "

#

$ '2*+ 4 ''2 *+ " 2 &' 5 $ ! " " # ! " $ 7 # #

7# ''2 *+ 8 # 2

$ & 4 ' 4 ' ! # 8 ' 2!2 4 ! 7 # # # ! "

" !

4 ! # 8 ' 2!2

& 4 ! 7 # #

" $ # & 4 '

# ! "

#! '( ) '

!"

4 2 2 " ! 7 # # 8 ' 2!2 # 2 7 # # & 4 2 2 " ! $ ( +1 $ !

' 7 # 7# ''2 *+ " 8 ' 2!2 # 2 # !#2 ' 3 "2

# " " $ & '2*+ 4 ''2 *+ " 2 &' 5 $ 7 # # # 3 "

!

; ," 7 $,@% * -$ ' -$ 7 % & # " - ;-% 6 ; & .;3 D+? 6 % * '/ ' " @% , 7" % 6 ; & .;3 D+? 6 % * '/ > @% , 6 9 .;3 &D)) @%--% / ? $ % - % " % -%

$@ % % % # " - - ",,% < 7 @ $@ % # " - $ % % -"-" = -%% @ " 7" 7 < = # " - @ B ; = - $=-" * 7% % ; 6 '!>E - J 7 B $@6; & @ - - " %- % 6 $ % -% % " - - B %G-% " % - " 7 * 6 *!&E B .= G %G-% " 7 %/ & ; 6 ?!DE B .= G %G-% " 7 %/ " -% " ;" " * 7% % 6 *!&E 7 @ ! %" ; =% = % - % % & @ - , %- % 6 $ % -% % " - 7 @

= - =- - " % &?) % ;6 % " 7 = "-%=-$ -B % - ; *? ;"@% 7 %" ; =% ; % ?!DE %G-% " 7 % = G B ; " 7 % - @% ; -% % "- 7 "F% ,%- ; " .-B "= /

& '( # 2 ! # 2 & 4 & 4 ' " ! !2

# ( + 6 $ # $ # $ '2*+ 4 ''2 *+ " 2 &' 5 $ ! " " # ! " $ 7 # #

* % ; ;" 7 - @% ; -% % $ " 7 - % & ;-% = -"% 6 ; & .," ;3 D+? 6 % * '/ ' ; %B % - @% " % "- ,%- ; " 7 > ; % % - @% " % "- = -" $ $ ;;" - " % - - $ *E = -" $ $ " = $-% - " 7% % " $ -" * & 2 > %G-% " *' @ -- K *) "7"

& & 2 A %G-% " *I @ -- K ' A EF" B -%,E ' ; % $ % -% =% ') @ - > =%" " 7! ; >I @ - ? = - % =%" " 7 ') @ - @ "% " - & ," B @ "% , " % ; " $ -" 7 * $@ % 7 F% 7 7 ;" % ! % &D $6; =- ," & -%, % % 7 %C9 % - *DE @ % ;

7# ''2 *+ 8 # 2

'2*+ 4 ''2 *+ $ "

, - .&)*+/

#$ % &'( &)*+

, #

" # ! " " # " (

" ! " 3 "

"

#

#

#! '( ) '


Professional Development

4 ' # 8 ' 2!2 4 ! 7 # # # ! "

" !

%%

%% " ## # 3 "2 # ! # # !#2

$ 4 '

#! '( ) '

! 2 "

! ! " # " 2

" #

&

$ #

'2*+ 4 ''2 *+ $ " 7 # 7# ''2 *+ " ' 3 "2 8 ' 2!2 (#3 # $ ! #

4 ! # 8 ' 2!2

4 2 2 " ! 7 # # 8 ' 2!2 # 2 7 # #

'2*+ 4 ''2 *+ $ " 7 # 7# ''2 *+ " 8 ' 2!2 # 2 # !#2 ' 3 "2 " ! # $

& 4 2 2 " ! $ ( +1 $ ! $

$ ! !2 # $ " 4 2 2 # # $ & 4 ' 2 2 " ! $ #

$ #

# " " $ & '2*+ 4 ''2 *+ " 2 &' 5 $

& '( # 2 ! # 2 & 4 & 4 ' " ! !2

# ( + 6 $ # $ # " $ # & '2*+ 4 ''2 *+ " 2 &' 5 $ ! " " # ! " $ 7 # #

'

"

, $ " " # #

7 # # # 3 " 7# ''2 *+ 8 # 2

$ # &

4 ' " ! !2 2 6

! "#

4

! !2 # $ 4 6' 2 2 2 # ! ! "

! ## # ! # #! '( ) '

# " # " ! $

$ & '2*+ 4 ''2 *+ " 2 &' 5 $

'#

!"

! 2 4 # "# 8 ' 2!2 '( $/ ' $ # 2 # # &2 # 2 # " " # "

" ! # $

! 2 #

"

%%

%% " ## # 3 "2 # ! # # !#2

# # 2+ ! # 2 !

'#

"

! " ! ! # $ # # # %

% # # # ! #

'

! " # # " ! $

4 2 2 # ! $ " " 2 8 2!2

# #

, #

" $ # ! " " # "

"

, - .&)*+/

#$ % &'( &)*+


During the construction phase of the project we had weekly progress meetings on site with my self, the owner and the contractor. These meetings were run by me, we would go through the meeting minutes and field report from the week before that I prepared and distributed prior to the meeting, then that was followed by a site walkthrough led by the contractor. Since the visits happened weekly I got to witness a large majority of the construction process from site excavating to finishing the interior. This was a huge learning experience because i was finally able to see first hand many of the details I was constantly drawing but didnâ&#x20AC;&#x2122;t fully understand. This in return helped me with reviewing submittals and responding to a few rfis that came in since I had a better picture of how all the building elements came together as one.


Professional Development

Project during demo

Project Rendering Montage

Project during construction

Project completed


... more projects Freelance Architecture

Overview: Similar to the previous project, these architectural projects also involved: zoning, planning, design, construction documents, and construction administration. EXPERIENCE: Analyze and determine pre-existing building conditions. Work independently as a one person project team with minimal supervision until it was necessary.

S T AIR S T O B AS E ME NT MUDR OOM

R E AR DE C K

R E AR DE C K

R E AR S T AIR S

LAUNDR Y

B E DR OOM 12'-3" X 10'-8"

R E AR DE C K

R E AR S T AIR S

LAUNDR Y

C LOS E T

12'-3" X 5'

C LOS E T

MAS T E R B AT H

B E DR OOM 12'-3" X 10'-8"

R E AR S T AIR S

LAUNDR Y

C LOS E T 6'-1" X 5'

K IT C HE N

K IT C HE N B AS E ME NT LIV ING AR E A 628 S Q.F T .

K IT C HE N

13'-1" X 11"-2"

13'-1" X 11"-2"

13'-1" X 11"-2" B E DR OOM 13'-7" X 11"-3"

B E DR OOM 13'-7" X 11"-3"

MAS T E R B E DR OOM 13'-7" X 11"-7"

C LOS E T

B AT H

C LOS E T

12'-3" X 14'

12'-3" X 14'

F R ONT S T AIR S

MAS T E R B AT H

LIV ING R OOM MAS T E R B E DR OOM

5' X 9'

13' X 10'-7"

B AS E ME NT

B AS E ME NT (LIV ING AR E A) UT ILIT Y

F IR S T F LOOR UNIT

-628 S F -558 S F

9'-3" X 13'-2"

LIV ING R OOM

LIV ING R OOM

S T AIR S T O 2ND & 3R D UNIT

12'-3" X 13'-8"

C LOS E T

B AT H

9'-3" X 13'-2"

B E DR OOM 12'-3" X 10'-11"

UT ILIT Y AR E A 558 S Q.F T .

Self- Employed Evans Project Residential Architecture 58-60 Copeland Street, Roxbury, MA 02119 Architectual Designer C LOS E T

C LOS E T

B AT H 9'-3" X 13'-2"

C LOS E T

S E C OND F LOOR UNIT

F R ONT S T AIR S

MAS T E R B AT H

MAS T E R B E DR OOM

5' X 9'

13' X 10'-7"

C LOS E T

T HIR D F LOOR UNIT

UNIT 1 (LIV ING AR E A) C OMMON AR E A

-1126 S F -128 S F

UNIT 1 (LIV ING AR E A) C OMMON AR E A

-1148 S F -110 S F

(HE AT E D LIV ING AR E A) B AC K DE C K F R ONT P OR C H

-1254 S F -175 S F -50 S F

(HE AT E D LIV ING AR E A) B AC K DE C K F R ONT P OR C H

-1258 S F -175 S F -0 S F

Description: Interior & Exterior 3D Model w/ renderings, Floor Plans, (3-units) UNIT 1 (LIV ING AR E A) C OMMON AR E A

-1148 S F -110 S F

(HE AT E D LIV ING AR E A) B AC K DE C K F R ONT P OR C H

-1258 S F -175 S F -0 S F

Self- Employed Zizza Project Residential Architecture 32 Birchbrook Avenue, Saugus, MA 01906 Architectual Designer

Description: Interior fit-out laundry and office


Professional Development

5632MU

2840DH

10'-0" 2832DH

2618SC

14'-0"

14'-2"

2832DH

2618SC

OFFICE

11'-4" S

6'-2"

2618SC

RADON METER

BATH

2668

4068

6'-5"

S 2668

FAMILY ROOM

2618SC

13'-9"

CRAFTS

17'-7"

STORAGE UNDER STAIRCASE

FAMILY ROOM

2660

4'-10"

2660

MECHANICAL ROOM & STORAGE

21'-6" PLAY AREA STAIRS TO LEVEL BELOW

2668

3'-5"

2868

4'-2"

2668

2618SC

UP

10'-10"

10'-5"

Self- Employed Dealy Project Residential Architecture 4 Mariano Drive, Reading, MA 01867 Architectual Designer

2668

6'-6"

2668

4'-0"

THEATRE ROOM 11'-2"

9'-8"

13'-8"

PLUMBING SYSTEMS LOCATION

BATH

2660

5068

WORKSHOP 8'-2"

17'-1"

GYM

47'-0"

12'-6"

21'-1"

15'-10"

12'-1"

14'-10"

2860

2660

GYM

EXPOSED BEAMS

PLUMBING CLEANOUT LOCATION

Description: interior fit-out basement and attic

21032DH

ATTIC FLOOR PLAN SCALE: 1/8" = 1'-0" CONTRACTOR NOTE: SMOKE AND CARBON MONOXIDE DETECTORS ARE TO BE INSTALLED ACCORDING TO THE CURRENT MASSACHUSETTS BUILDING CODE AND LOCAL FIRE DEPARTMENT REGULATIONS

Before

After

Self- Employed Gargiulo Project Residential Architecture 133 Hobart Drive, Danvers, MA 01923 Architectual Designer

Description: interior fit-out basement and attic

Self- Employed Babcox Project Residential Architecture 23 Thelma Road, Framingham, MA 01702 Architectual Designer Description: Rear Additon and first floor reconfiguration w/ new staircase to second level


Self- Employed Rocha Project Residential Architecture 11 Landry Road, Medford, MA 02155 Architectual Designer Description: Rear Basement Addition In-Law Apartment w/ full kitchen & bath

Self- Employed Sarcia Project Residential Architecture 7 Parker Drive, North Reading, MA 01864 Architectual Designer

Description: First floor remodel & addition, second floor addition w/ master suit & 2 bedrooms

Self- Employed McSheehy Project Residential Architecture 28 Fowler Avenue, Revere, MA 02151 Architectual Designer Description: New garage w/ 2 bedroom addition


Professional Development

Self- Employed Connors Project Residential Architecture 52 Richard Circle, Woburn, MA 01801 Architectual Designer Description: Basement interior fit-out

Self- Employed Gao Project Residential Architecture 43 Ackers Avenue, Brookline, MA 02445 Architectual Designer

Description: Interior Renovation

Self- Employed Zizza Playroom Project Residential Architecture 32 Birchbrook Avenue, Saugus, MA 01906 Architectual Designer Description: enclose playroom by adding new wall , add storage and craft area


Turn static files into dynamic content formats.

Create a flipbook
Segment II Portfolio - BAC by Jenna-lyn Croteau - Issuu