Skip to main content

Jen Hocke Architecture Portfolio

Page 1

HOCKE JEN

ARCHITECTURE PORTFOLIO


SEABOARD STATION_DOWNTOWN RALEIGH, NC HUNTER STREET STATION_APEX, NC PATTERSON PLACE APARTMENTS_DURHAM, NC LAKESIDE PAVILLION_LAKESIDE, MT DUKE MAKER SPACE_DURHAM, NC TINY HOUSE_AUSTIN, TX RANGEVIEW PARK PICNIC SHELTER_JACKSON HOLE, WY PHOTOGRAPHY & WOODWORKING


PROFESSIONAL WORK 2017-2021

LOCATION: NORTH CAROLINA


SEABOARD STATION RALEIGH, NC project size: 405,000 sf residential 105,000 sf hotel 45,000 sf retail 640 parking spaces TYPE II over TYPE I concrete


THE BUILDING  



 

 









HOTEL

 











 











 























 

 

 



 

 



 

 

  









   



 







  







   

    

ROOF TOP BAR





RESIDENCE

 

HOTEL 7TH FLOOR & RESIDENTIAL 6TH FLOOR PLAN   

SITE OVERVIEW

THE BUILDING

VISION STATEMENT

CREATING AN INVITING STREETSCAPE

THE BUILDING

QUESTIONS

ALTERNATES

CONCLUSION

 

 



 





  













  

 









   





  













 





 



 



 

 













 







 

 

  

HOTEL







 













RESIDENCE

TYPICAL HOTEL & RESIDENTIAL FLOOR PLAN

THE BUILDING

  

SITE OVERVIEW

VISION STATEMENT

CREATING AN INVITING STREETSCAPE

THE BUILDING

QUESTIONS

ALLTERNATES

CONCLUSION



  











PEDESTRIAN ENTRY VEHICULAR ENTRY

RETAIL 

HOTEL ENTRANCE CLOSEUP

RETAIL







   

  







 

 



SHARED AMENITY

 

 

 

 



 

 



 

 





 

 

 



 



  





      





                

 





 

 

       

 

    







 

  

 







 

   

 



HOTEL

 

VISION STATEMENT



HOTEL & RESIDENTIAL 1ST FLOOR PLAN  

THE BUILDING

  

CREATING AN INVITING STREETSCAPE

THE BUILDING



 

  



(BELOW) SITE OVERVIEW



RESIDENCE



QUESTIONS



ALTERNATES





CONCLUSION





 

  

PARKING 

  

 



  

 

 

  











PEDESTRIAN ENTRY VEHICULAR ENTRY



   

 

 



 

 





 

 

 



 





 

 





  



 



  

       



 

 

 







                 

 

 



 



       



 

    

  

 





 

  

 













 

HOTEL

 

 



 

 



 

 





 



 SITE OVERVIEW VISION STATEMENT

CREATING AN INVITING STREETSCAPE

THE BUILDING



 





LOWER LOBBY FLOOR PLAN

THE BUILDING 



  



  

  

QUESTIONS

ALTERNATES

CONCLUSION  







 

  







PARKING 











  

  

  

 





  

 

  

 



   



 

 





 

 



 

 

 

 

 



 

 



      



 







 

  

  

 

               



 







 



 

       

 

    

 



 

  









 

   

 



 



NORTH ELEVATION VIEW





SITE OVERVIEW

VISION STATEMENT

  

THE BUILDING



CREATING AN INVITING STREETSCAPE



 

  

  

LOWER PARKING FLOOR PLAN   

  

QUESTIONS

ALTERNATES 

CONCLUSION  






Seaboard Station is one of many up and coming developments that will transform the Northern approach into Downtown Raleigh. The master plan consists of multiple phases and I have worked on the first phase that is split into two parcels. This is Parcel A, which features 96 apartments, 150 hotel rooms, multiple square-feet of retail and restaurant space, a pool/courtyard area, fitness center, apartment amenities and 236 sub-surface parking spaces.

EARLY SEABOARD STATION SITE PHASING PLAN

Personal Contribution: Collaboration on design and material choices, overall floor plan development and documentation, unit plan design, development and documentation, drafting and documenting elevations, sections, and details, compiling and printing sets throughout each submission.


HUNTER STREET STATION APEX, NC project size: 28,000 sf 1st floor retail/ 2nd floor office TYPE IIB steel framed

STREET SECTION


SHAFT

ELEV. STAIR DN

STAIR DN

DN

SHAFT

SECOND FLOOR 8 A5.01 PUMP/RISER ROOM

OFFICE LOBBY UP

Parapet 34' - 0" S6Ua

─ PHENOLIC PANEL ON CLIP ON ─ AIRSPACE ON ─ RIGID INSULATION TO ACHIEVE R7.5 MIN. ON ─ WEATHER RESISTANT BARRIER ON ─ EXTERIOR SHEATHING ON ─ METAL STUD FRAMING W/BATT INSULATION TO ACHIEVE R-13 MIN.

1/4:12 SLOPE

ELEV. UP

R13+7.5ci

4' - 0"

FULLY ADHERED 60 MIL TPO MEMBRANE OVER PROTECTION BOARD OVER RIGID INSULATION TO ACHIEVE R-30 MIN. OVER METAL DECK. RUN TPO UP PARAPET UNDER METAL COPING

SHAFT ABOVE

EAST ELEVATION

WEST ELEVATION

STAIR

RETAIL

SHAFT ABOVE RETAIL

RETAIL

RETAIL

RETAIL

RETAIL

RETAIL

112

110

108

106

104

102

100

1943 SF

1719 SF

1820 SF

1178 SF

1351 SF

1712 SF

1813 SF

2' - 9"

Roof Bearing 30' - 0"

UP

STAIR

GROUND FLOOR

STOREFRONT; SEE ELEVATIONS FOR TYPE

AWNING FABRICATED AS STOREFRONT SYSTEM

14' - 0"

2 A5.01

SIM

STOREFRONT; SEE ELEVATIONS FOR TYPE

FINISHED FLOOR OVER CONCRETE SLAB

CONCRETE OVER METAL DECKING, REFER TO STRUCTURAL DRAWINGS

9"

SOUTH ELEVATION S6Ua

R13+7.5ci

Second Floor 16' - 0"

─ PHENOLIC PANEL ON CLIP ON ─ AIRSPACE ON ─ RIGID INSULATION TO ACHIEVE R7.5 MIN. ON ─ WEATHER RESISTANT BARRIER ON ─ EXTERIOR SHEATHING ON ─ METAL STUD FRAMING W/BATT INSULATION TO ACHIEVE R-13 MIN.

S6Tb

PRE-FABRICATED SOLID CANOPY

16' - 0"

STOREFRONT; SEE ELEVATIONS FOR TYPE

FINISHED FLOOR OVER CONCRETE SLAB

STOREFRONT; SEE ELEVATIONS FOR TYPE

4 A5.01

INSULATION, 24" VERTICALLY, TYP.

First Floor 0' - 0" FOUNDATION DRAIN WRAPPED W/ GEOTEXTILE FABRIC

VAPOR BARRIER

FOUNDATION RE STRUCTURAL DRAWINGS

Hunter Street Station is an office/retail project located minutes away from Downtown Apex. Once built, this project will serve those who live in the surrounding houses, those in the office on the second floor, workers from the Town Hall across the street and whomever is walking by.

R13+7.5ci

─ BRICK VENEER ON ─ AIRSPACE ─ W/MASONRY TIES @ 24" ON CENTER HORIZ. AND VERT. ON ─ RIGID INSULATION TO ACHIEVE R-7.5 MIN. ON ─ WEATHER RESISTANT BARRIER ON ─ EXTERIOR SHEATHING ON ─ METAL STUD FRAMING W/BATT INSULATION TO ACHIEVE R-13 MIN.

SLAB ON GRADE OVER 10 MIL VAPOR BARRIER OVER CRUSHED GRAVEL BED

NORTH ELEVATION

NOTE: INTERIOR GWB AND INSULATION INSTALLATION PART OF FUTURE TENANT UPFIT ON GROUND FLOOR

WALL SECTION

Personal contribution: Develop multiple massing schemes in SketchUp, moving the design into Revit, deciding on colors and materials, drafting plans, elevations, sections, details, door and window schedules, rendering in Lumion, documenting entire set. Collaboration and managing coordination with the engineers, owner, and GC. Point person for CA work, responsible for responding to and logging RFI’s and submittals.


SITE

PATTERSON PLACE APARTMENTS DURHAM, NC project size: 345 units fitness/clubhouse/pool TYPE V construction


Patterson Place is a multifamily housing development in Durham, NC. Working on this project from SD to CA for my first project at Cline Design, was helpful in teaching me all that it takes to complete a project of this size. I learned more about local code, efficient design choices for multifamily housing, materials.

CLUBHOUSE SPACE

2 STORY WALK THROUGH

Personal contribution: Design collaboration for all buildings, site, and units, drafting and documenting plans, sections, elevations, details, structural details, researching materials, and logging RFI’s and submittals.


LAKESIDE PAVILLION SUMMER 2015 TEAM PROJECT

LOCATION: LAKESIDE, MT


The Lakeside Pavilion was designed and built to bring a small town together by hosting concerts, outdoor movies, and other community events. As a team, we met with the client to figure out exactly what his desires were for this project that was to be built behind the community town center. We had three weeks of in-studio collaboration and finalizing drawings and one week for the build. The stage is strategically set on the site at the bottom of a hill for complete viewing opportunities from multiple angles. My previous design build experience was beneficial for me to help lead during each phase of this project.

SITE

Personal Contribution: Research on local materials, overall design collaboration, assistance in designing structural details, and daily on site construction.


9" 516 9" 5 16

5" 516

59 16 "

621"

5"

2x4 Ledger

5"

Ripped Cedar Decking

5" 516

9" 516

443"

Wood Turndown, See Dtl 2/A5.6

Joist Bracket, See Dtl 2/A5.1 Triple 2x12 Rim Joist 2x2 Bond Timber

NOSE DECKING DETAIL

NOSE DECKING DETAIL

Triple 2x10 Rim Joist

1

2x10 Deck Joist

Scale 3" = 1'-0"

1 A5.6 Custom 2x7 Turndown, See Dtl x/ax.x Vertical 2x4 Brace

THIS DRAWIN

Horizontal 2x4 Brace Double 2x7 Bottom Plate 5 4"

x 5 169 " Cedar Decking 8" Concrete Column Finish Grade

PRELIMINARY IDEA SKETCHES

FRONT STAGE SECTION


DUKE MAKER SPACE SPRING 2020 STUDIO INDIVIDUAL PROJECT

LOCATION: DURHAM, NC


SITE

Duke University Maker Space is a place for creative minds to be released, a space to get away from the business of the world and engage with the inner creativity using the art of craft and making. The Maker Space will be open to university researchers, students, and the public. With that in mind creating spaces for both users to work separately and together was important. This two story, 33,400 sf building contains a woodshop, studios, library, exhibit spaces, and a cafe. With gothic architecture and a recently built, modern designed fitness center across the street, this building could not be in competition with its surroundings. A simple yet meaningful form and minimal materials allow this building to blend in but not be hidden. People from all sides of the site can engage with this building without even going inside. Cutting through the center mass of the building allowed for the main pedestrian traffic, previously established, to not be interrupted.


SOUTH VIEW

MASSING SCHEME EXERCISE Throughout my analysis of the site at Duke University, I used our CNC’d site model to explore multiple massing options that worked best with the traffic flow and surrounding buildings. This site is heavily trafficked by students and visitors year round. At the south end of the site runs Towerview Road. Being in the center of campus, across the road from the site are multiple sport stadiums. Leading diagonally across the site from the stadiums, is Duke Chapel, another highly visited place. This diagonal route of circulation was the driving factor for the form of the building.

NORTH VIEW


1_WOOD SHOP/MAKER SPACE 2_ENTRY/LOBBY 3_LIBRARY 4_COMPUTER ROOM 5_CAFE 6_MECH/STORAGE 7_OFFICES 8_OUTDOOR WORK SPACE 9_STUDIOS 10_MAIN EXHIBIT GALLERY 11_COURTYARD BALCONY 12_OFFICES 13_STORAGE 14_BREAKROOM 15_FLEX STUDIO/GALLERY

west elevatio WEST ELEVATION

14

15

13

building section BUILDING SECTION_1

11 9

9

9 10

12

SECOND FLOOR 7 6

5 8

elevation_ SOUTHsouth ELEVATION

0

4

8

BUILDING SECTION_2 building section 1_

0

4

8

2 1

4 3

GROUND FLOOR


TINY HOUSE SPRING 2015 MULTIDISCIPLINARY TEAM

LOCATION: AUSTIN, TX


With my team of design and construction science students, we designed and built a modern tiny home for Community First Village in Austin, Tx. This home provides temporary relief for the homeless in the area while they grow and work towards getting off the streets. The removable deck gives the resident a permanent feeling as it hides the trailer hitch. The large window and sliding door allow for cross ventilation through the space. Maximizing usable space and creating efficient storage were key design elements for this home.

SITE

Personal Contribution: Lead architect and designer, lead buyer, budget manager, and weekly on site construction.


CONSTRUCTION PHOTOS

CONSTRUCTION PHOTOS

CONSTRUCTION PHOTOS

CONSTRUCTION PHOTOS


RANGEVIEW PARK PICNIC SHELTER FALL 2013 TEAM PROJECT

LOCATION: JACKSON HOLE, WY


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Rangeview Park

SITE

Inspired by tree canopies and the light designs made on the ground, the Rangeview Park picnic shelter is nestled in the center of a small neighborhood. Our goal was to provide temporary seating for families as they watch their kids play. Not only did I learn how to weld and other basic steel construction skills, I learned how to step into being a leader in the classroom and on site. The entirety of this program stirred my passion for architecture and construction. Personal Contribution: Site analysis, design, model making, presentation to the city, construction documentation, creating a material list and budget, buying materials, and on site construction.


Photography is a beautiful way to be able to express raw emotions and expressions of any subject that may not be able to be expressed with words. I love how it captures a moment and can be kept forever. It is a way that I can show others what I see through my eyes that they may not be able to see for themselves.


Woodworking is a hobby that I am slowly diving into and very much love. I enjoy the physicality of it and the freedom it offers. It feeds my hunger for creativity and problem solving. I love working with wood because of the way it can transform into so many different things.


JENHOCKE


Turn static files into dynamic content formats.

Create a flipbook