1 minute read

Conductor Control System

Control Schematic

The Hardware

Advertisement

• A 300 x 300 MCC is required for the Conductor Control.

• Optional encoders in each mechanism to give exact positioning control.

• A local single phase supply for each motor up to 2.2kW.

• Requires an RJ45 & a 2 core YY 0.75mm cable between mechanisms. Cables can be daisy chained between each banner, with cables fitting within the same containment.

• An RJ45 & a 12 core YY 0.75mm cable from the MCC to the plug-in point for the tablet.

• E-Stops operate on a RJ45 daisy chain around the building. Can be integrated with other stage engineering packages.

Installation

• J&C Joel can install the Conductor Control or can provide mechanical and electrical drawings to aid your installation.

at two options; 0.18kW motor and a 0.37kW motor from NORD. These will have encoders, therefore positioning can be achieved.

This article is from: