
1 minute read
Upper Control Arm Installation
1. Grease the outer surface of the Ez Lube Bushings.
2. Hold UCA in place with 0.76" washers closest to the shock tower. Insert the.mounting bolts from the outside of shock tower. Add Loctite to the UCA mounting bolts. Torque to 122ft-lbs (Factory specs)

Shock Tower
3. Reinstall shock assembly, torque lower mounting bolt to 66 ft-lbs (Factory specs) and torque upper mounting nuts to 50ft-lbs (Factory specs).
4. Put ball joint stud through the spindle. Install nut using a 3/8 openend wrench on the stud to keep it from spinning, then use a torque wrench and Torque nut to 60ft-lbs.
5. Connect the tie rod and torque the nut to 76ft-lbs (Factory Specs)
6. Reconnect the sway bar link, torque to 55ft-lbs (Factory specs)
7.Reconnect the caliber.
8. Check torque of ball joint bolts. (Torque to 13ft-lbs.)



