Skip to main content

Landscape, Architecture and Urban Design Portfolio

Page 1

JAVIER ORTIZ

LANDSCAPE | ARCHITECTURE | URBAN DESIGN


TABLE OF CONTENTS Chicago Calumet Region - Equitable Water Future Addressing social and environmental justice 4 - 17

Reclaim the Air - Air Pollution Environmental Justice in Newark, NJ 18 - 33

OASIS ULI Hines Design Competition 34 - 57

ISD Solar Decathlon Build Competition 58 - 73


Here is a trace overlay on a cad drawing. It shows a concept for the client. The client requested a modern look and feel with low maintenance. This illustration show the design process I have and how I approached project while I worked at NWLD.

This perspective show the modern idea proposed to the client. It has hedges that create large a small spaces for the family and kids to use.

This cad drawing show what the proposed front yard would look like. The client want to have a defined edge and a walk way, so we designed a step stone walk way with box woods along the fence.

NWLD-DESIGN & BUILD COASTAL VIEW

Boundless Brooklyn

Addressing Affordable Housing in NYC 74 - 85

What is the future of environmental and socially sustainable domestic spaces that adress senior isolation in urban contexs?

Art as Sanctuary

Sustainable Rest Area 86 - 93

Residential Landscape

Designing an outdoor living space 94 - 97


Regional Design Studio // Fall 2020 Chicago Calumet Region - Equitable Water Future

Addressing social and environmental issues to create an equitable community that connects to

C3 - Chicago Calumet Connections Project team: Javier Ortiz, Matthew Torchalski, Rita Ling, Anran Li


o Chicago


Revised Communities and Railway System Di

Flooding susceptibility map

Illinois sewer system map

Illinois wetness index map

Urban imperviousness map

Calumet region currently suffers from high flood risk, due to urban imperviousness and low slope topography in this area, which mos

Hydraulic flooding occasionally happens around the Grand Calumet River because the river is engineeringly controlled, and combined

slope of the land. Aside from the high flood risk, community residents of the Chicago - Calumet region also face health problems bec sites.


Analysis + Context

iagram

Railway station with 0.5 mile buffer

Concentration of neighborhood with 0.5

Existing forest trail Railway system Proposed secondary connection Proposed secondary connection

stly occurs in the neighborhoods. Urban flooding in neighborhoods is caused by overland flooding, seepage, and sewer backups.

d sewer overflows can cause overbank flooding during the rainy season. Some flooding also happens in parks, mainly due to the low

cause of the land conditions. These land conditions consist of hazardous waste sites, brownfields, closed landfills, and superfund


1909 Plan of Chicago, emphasizing boulevards as essential network of the park system. Here, we extend Stony Island Avenue in Jackson Park. Note Torrence Avenue corridor was to be a large park/preserve.

Source: burnhamplan100.lib.uchicago.edu

Stony Island Avenue

Torrence Avenue

More recently, theChicago, Chicagoemphasizing Sustainable Urban Infrastructure guidelines andofComplete 1909 Plan of boulevards as essential network the park Streets system.program of Chicago Department of T Here we extend Stony Island Avenue running south to the Calumet from the future Obama surrounding neighborhoods. Example above is a rendering of 111th Street in Pullman, Cottage Grove to Doty. Library in Jackson Park. Note Torrence Avenue corridor was to be a large park/preserve. Source: burnhamplan100.lib.uchicago.edu Source: www.chicagocompletestreets.org


Analysis + Context running south to the Calumet from the future Obama Library

Chicago boulevards system/ Complete streets planning efforts

e

More recently, thethe Chicago Sustainable Urban Infrastructure guidelines as and Completeinfrastructure Streets program of Transportation supports redevelopment of streets, avenues, and boulevards green-blue that promote healthy Chicago Department of Transportation supports the redevelopment of streets, avenues, and boulevards as green-blue infrastructure that promote healthy surrounding neighborhoods. Example above is a rendering of 111th Street in Pullman, Cottage Grove to Doty. Source: www.chicagocompletestreets.org


Calumet region has potential to regenerate biodiversity and become an environmentally equitable place. With this potential in mind, the two primary objectives for this project are to reconnect fragmented landscapes creating a functional ecological infrastructure, and to improve people’s access to these landscapes through better-designed street and trail connections.

We suggest to couple these ecological and social objectives through four physical strategies: to reconnect fragmented habitats with the use of ecological ribbons and boulevards of trees to promote new habitats and to reconnect people with the water (waterfront parks), to reduce flooding issues due to excess imperviousness in region (blvd of trees, stormwater retrofits, permeable surfaces), and finally to return human scale to region (design for people to use the space not only machines and industry).

BLVD of Trees


Proposed Systems + Design Concepts

Addressing Storm Water Runoff

Shared Street

Shared Street


The C3 Plan aims to create better connections in the region and more water conscious landscapes. The proposed sites were selected

resilient spaces. The overarching goal of this plan is to create a comprehensive system of parkland, trails, and boulevards that connec

new parkland, 63 miles of new bicycle trails, 34 miles of prairie restoration along new and existing trails, 18 Blue-Green Boulevards (19


Proposed Systems + Design Concepts

d because they would transform what are currently vacant or underutilized land into more connected, ecological friendly, and

ct them to one another. Overall, this plan includes 86 new sites/interventions which amounts to a little more than 11 square miles of

97.75 miles total), and 32 miles of new shoreline access opportunities.


The proposed parkland will return significant green space and biodiversity to a region with a high amount of impervious surfaces and

surfaces and will help mitigate the flooding problems in the region by slowing and storing water. Also, the inclusion of habitat restorat

within these new park sites that the new shoreline access opportunities are located; these particular sites will help restore peoples’ ac


Proposed Systems + Design Concepts

d industrial uses. The new parkland will be much better equipped to handle storm water than pavement and other impervious

tion in all the new park sites will help return a significant amount of biodiversity to this once incredibly biodiverse region. Finally, it is

ccess to water in a region where currently most of the waterfront has been occupied by non-public uses such as industry.


Regional Plan

The C3 Plan aims to create better connections in the region and more water conscious landscapes. The proposed sites were selected because they would transform what are currently vacant or underutilized land into more connected, ecological friendly, and resilient spaces. The overarching goal of this plan is to create a comprehensive system of parkland, trails, and boulevards that connect them to one another. Overall, this plan includes 86 new sites interventions which amounts to a little more than 11 square miles of new parkland, 63 miles of new bicycle trails, 34 miles of prairie restoration along new and existing trails, 18 Blue-Green Boulevards (197.75 miles total), and 32 miles of new shoreline access opportunities.

The proposed parkland will return significant green space and biodiversity to a region with a high amount of impervious surfaces and industrial uses. The new parkland will be much better equipped to handle stormwater than pavement and other impervious surfaces and will help mitigate the flooding problems in the region by slowing and storing water. Also, the inclusion of habitat restoration in all the new park sites will help return a significant amount of biodiversity to this once incredibly biodiver region. Finally, it is within these new park sites that the new shoreline access opportunities are located; these particular sites will help restore peoples’ access to water in a region where currently most of the waterfront has been occupied by non-public uses such as industry.


Columbia University // Summer 2021

Air Pollution

Environmental Justice In Newark, NJ

Reclaim The Air Project team: Javier Ortiz, Mingsung Kim, Sam Dye, Carmen Yu


Newark ’s environment can’t be understood without the understanding of the invisible environment. Because of air pollution, vulnerable communities have faced social and environmental issues that can be linked to the air pollution caused by the toxic factories, waste sites, transportation, water, and foul odors, and this has lead to increased health concerns and has affected respiratory and cardiovascular health of multi-generational families.

Listed in this map are some of the major pollutants in Newark. Covanta, for instance, is an incinerator that sits within a low income community in Newark. With more than 1,000,000 tons of garbage brought in each year, Carbon Monoxide, Methane, Lead, and Particulate Matter are just some of the air pollutants that are create major health issues in the community of Newark, NJ and throughout the region.


Air Pollution


Looking at the carbon cycle, we can see the contributors to the air pollution such as traffic, facilities, and landfills as previously mentioned. These pollutants then fall and cause health issues, contaminate the soil and pollute the water. This map helps us understand that this is more than just a local issue, but instead, air pollution is affecting people at a regional scale. The high winds carry these pollutants through the state.

This diagram represents two categories of particular matter, big and heavy being PM 10 and PM 2.5 Small and light particles. When considering the carbon cycle, we can see the contributors to the air pollution such as traffic, facilities, and landfills as previously mentioned. These pollutants then fall and cause health issues, contaminate the soil and pollute the water.

Animation of air pollution simulation


Air Pollution


Design Strategies

Using this design matrix, we address air pollution at a multi scale approach looking at River edge, Wetland, and street. Depending on the selected site condition, some of the design Matrix can be applied to reduced air pollution.

The absorb and capture method decreases air pollution by capturing air pollution and carbon with air and water vapor technology. Protect and shelter is a system to shield the vulnerable communities from pollutants. And lastly, alert and educate will create awareness in the community of the high levels of contaminants and to continue the efforts in combating air pollution.


Wetlands

Wetlands are highly productive and biologically diverse systems that enhance water quality, control erosion, maintain stream flows, sequester carbon. This Carbon Sink consist of Floating Plant Beds with Mist Machines. The floating plant beds help filter the water while also providing new habitats for species in the wetland. The Mist Machines alert visitors of high levels of air pollutions and also help reduce the levels of toxins.

The ground cover plants along the river prevent the fallen pollution from contaminating the water. Along with this, the land form creates safe spaces for animals to take cover from high levels of pollution.


Presented here is the wetlands near the Hackensack River, because of the close proximity to polluting facilities and waste sites this areas had an opportunity to increase and improve habitat for plants and animals while protecting human health and the environment through ecological enhancement.

Aside from enhancing water quality, controlling erosion, the wetlands park will significantly reduce air pollution with the mist towers, air filter towers and increase in canopy and ground cover. The selected tree species are based on how much CO2 they can capture. For instance the American sweet gum can capture about 380 lb of CO2 a year.

Animation of Wetlands Intervention


Wetlands


Coastal

The design matrix for the coastal intervention entails five main components and two main design strategies. The Mist Towers and Hyper Accumulating Plants are part of the first design strategy for the coastal site. This intervention helps collect heavy metals and particulate matter.

Air Filtration Shelter is the second intervention for the coastal site. The filtration structure allows for the community to access the waterfront continuously even when levels of air pollution are high. Along with this are alert systems and street air filtrations.


The coastal intervention allows for residents of Newark to reclaim access to the Passaic river. Previously, residents of Newark were not able to access the waterfront because of heavy contamination from an incinerator and also constant pollution into the river. This not only limited access to the river, but it was increasing the levels of air pollution.

Illustrated is a new waterfront intervention where Newark residents are able to interact with the coastal line. The mist towers continue to clean the air to provide a safe environment. With this new waterfront access, previous ecological habitats are resorted too. The waterfront also provides shelter when levels of air pollutions are at a high level. These shelters allow to continuous access to the waterfront.

Animation of Coastal Intervention


Coastal


ULI Hines Design Competition 2022

Oakland Housing equity and Health in Oakland, CA

Project team: Javier Ortiz, Achmad Maulana, Junho Lee, Naoya Kamio, Sarah Nia


Seamlessl

empower t

underserve

Through th

and econo

Oasis is a 2

needs. The

(non-auto)

333,681 SF

SF under-f affordable

be built in a


ly intertwining Chinatown, Jack London, and Old Oakland, Oasis is a new well-community campus which strives to energize and

the people of Oakland. This new destination affords overdue attention to Oaklanders’ well-being. We know Oakland’s

ed face high poverty levels, extreme pollution, and isolation from critical opportunities and resources that enable wellness.

houghtful programming and bold infrastructure, Oasis promotes well-being by increasing access to resources for healthy living

omic development while delivering more opportunities for skills development and community connection.

2.5 million SF mixed-use development project founded on comprehensive programming that serves Oakland’s public health

e center of Oasis is a dynamic well-community campus made accessible via an integrated transit hub and a new pedestrian

) boulevard. The campus strives to serve Oakland’s medical, nutrition, physical activity, and education needs. It is anchored by

F of dedicated relevant medical and wellness clinics, as well as a community college. At the center of the campus is a 222,660

freeway marketplace and outdoor sports space. Supporting revenue drivers and community benefits include 516,667 SF of housing (68%), 241,111 SF of market-rate housing, 296,007 SF of office space, and 199,132 SF of retail. The development will

a single phase over two years of construction.


Site Analysis and Context Site Analysis and Context


Concepts Concepts Concepts

Preservation: Preserving the structure for new purpose, Preservation: Preserving the structure for new purpose, reduce carbonreduce footprint, carbon footprint, maintaining the character of the neighborhood. maintaining the character of the neighborhood. Preservation: Preserving the structure for new purpose, reduce carbon footprint, maintaining the character of the neighborhood.

Accessiblity: Connecting site to adjacent neighborhoods

through blue green boulevards. Accessiblity: Connecting site to adjacent through blue green Accessiblity: Connecting site to neighborhoods adjacent neighborhoods through blue green boulevards. boulevards.

Urban Renewal: 68% Affordab Urban Renewal: 68% Affordable housing of the freeway, ensuring historically communities canunderserved take fullAffordab advanta ensuring and segr Urbanhistorically Renewal: 68% communities’ benefits. of the freeway, ensuring historically advantage of thecan surrounding communitie communities take full advanta communities’ benefits.

Community Wellness: This well

ed by retail and office space for affo Community Wellness: This well-commu entrepreneurs, and community Community Wellness: This serv well ed by retail and office space for affo office space for affordable and fresh food, entrepreneurs, and community serv services.


ble housing to the north south g to the north and south of theand freeway,

Urban Remediation: Reimagines the spaces under the existing Urban Remediation: Reimagines the spaces under the existing I-980/I-880 freeway as I-980/I-880 freeway as a new landscape of recreation, sports, markets and community a new landscape of recreation,gathering. sports,markets gathering. Urban Remediation: Reimagines and the community spaces under the existing I-980/I-880 freeway as a new landscape of recreation, sports, markets and community gathering.

l-community campus is surroundordable and fresh food, local unity campus is campus surroundedisby retail and vices. l-community surroundordable and fresh food, local , local entrepreneurs, and community vices.

Green Space: Increase in green space to help reduce air

y underserved and segregated age ofcommunities the surrounding regated take full south ble housing to the can north and y underserved and segregated es’ benefits. age of the surrounding

pollution but also promote outdoor activity. Green Space: Increase in green space to help reducetoairhelp pollution but also Green Space: Increase in green space reduce air promote pollution but also promote outdoor activity. outdoor activity.


Programmatic Section

Programmatic Section Opportunity

Most dramatically, connecting the north and south portions of the well-community campus, Oasis reimagines the spaces under the e

and accessible all day. Building on the existing green space at Jefferson Square Park, the revitalization under the freeway provides mo young and old to gather, be active, and invest in their well-being.

To the north and south of the freeway, Oasis helps the community by providing care, bringing together clinics for essential services su

Oakland, the campus also offers community college learning spaces for health, nutrition, and food-related skills and career developm

address critical neighborhood needs. This well-community campus is surrounded by retail and office space for affordable and fresh f

south of the freeway, ensuring historically underserved and segregated communities can take full advantage of the surrounding com


existing I-980/I-880 freeway as a new landscape of recreation, sports, markets, and community gathering – bright

ore space for community engagement. Basketball, playgrounds, gardens, and even a food marketplace for the

uch as asthma management, women’s services, and geriatrics. For those aspiring to help care for the people of

ment. Oasis takes a holistic view of Oakland’s well-being by prioritizing retail, office, and residential spaces that

food, local entrepreneurs, and community services. The site features (68%) affordable housing to the north and

mmunities’ benefits.


Community Benefits 68% of residential housing is affordable - Ensuring more access and opportunity to historically underserved unhoused, low, and mid-income families.

Reimagined vibrant and expansive under-freeway space - positioning it as a center point of the

redevelopment, featuring a food marketplace, physical activity & recreation, and gathering space for all ages

Easily accessible care services - clinics specializing in care management for critical needs such as asthma care, women’s serv and geriatrics

Relevant retail and office space for the community - focusing on access to fresh food, local entrepreneur support, economic development and community services

Education spaces for health, food, and nutrition vocations - supporting well-being from every aspect, including skills development

Bold blue-green boulevard connection system + transit hub - to access between communities to the east, west, north, and without adding to air pollution


vices,

south


Total Mix Use Total Mix Use

Affordable Housing

25%

Market - Rate Housing Community Center

20%

20%

Retail 2%

12%

2%

Office 15%

15%

Transit Hub Parking

10%

32%

10%

16%


20%20%

Affordable Affordable Housing Housing

25%25%

Market Market - Rate - Rate Housing Housing 2% 2%

Community Community Center Center Retail Retail

15%15%

12%12%

Office Office Transit Transit HubHub

25%

Affordable Affordable Housing Housing

25%

10%10%

Parking Parking 16%16%

MarketMarket - Rate -Housing Rate Housing Community Community CenterCenter Retail Retail 12%

12%

Office Office Transit Transit Hub Hub ParkingParking

16%

32%

32%

Affordable Affordable Housing Housing MarketMarket - Rate -Housing Rate Housing 68%

68%

Affordable Housing

Market - Rate Housing 68%

68% OF AFFORDABLE UNITS 468 AFFORDABLE 219 MARKET - RATE

68% OF68% AFFORDABLE OF AFFORDABLE UNITS UNITS 468 AFFORDABLE 468 AFFORDABLE 219 MARKET 219 MARKET - RATE - RATE


Financial Summary

Financial Summary Financial Summary

Total

Unlev

Lever 2022-4832

21 ULI Hines Student Competition

Equity 2022-4832

ULI Hines Student Competition

For Presentation

516,667 SF (25%)

#F5E40B

Market-Rate Housing

241,111 SF (12%)

#FF9933

Wellness/Education/Training Center

333,681 SF (16%)

#FF9999

Retail

199,132 SF (10%)

#FF6699

Affordable Housing Affordable Housing

Market-Rate Housing

Wellness/Education/Training Center Office

Retail

296,007 SF (15%)

#93CDDD

Transit Hub

Office

34,444 SF (2%)

#A6A6A6

Parking

396,112 SF (20%)

Transit Hub

Total GSF -

#7F7F7F

2,017,155 SF

Parking

500,000

1,000,000

1,500,000

2,000,000

Total GSF -

500,000

1,000,000

1,500,000

2,


Total Development Cost

$447,072,258

Unlevered IRR

7.8%

Levered IRR

11.0%

Equity Multiple

1.52x

Total Development Cost

$447,072,258

Unlevered IRR

7.8%

Levered IRR

11.0%

Equity Multiple

1.52x

For Presentation Board

516,667 SF (25%)

#F5E40B

241,111 SF (12%)

#FF9933

333,681 SF (16%)

#FF9999 For Presentation Board

199,132 SF (10%)

#FF6699

296,007 SF (15%)

#93CDDD

34,444 SF (2%)

#A6A6A6

Total Development Cost #7F7F7F 396,112 SF (20%)

$447,072,258

2,017,155 SF

00,000

2,000,000

Unlevered IRR

7.8%

Levered IRR

11.0%

Equity Multiple

1.52x

For Presentation Board

516,667 SF (25%)

#F5E40B

241,111 SF (12%)

#FF9933

333,681 SF (16%)

#FF9999

199,132 SF (10%)

#FF6699

296,007 SF (15%)

#93CDDD

34,444 SF (2%)

#A6A6A6

396,112 SF (20%)

7 SF (25%) ,000,000 1 SF (12%)

2,017,155 SF #F5E40B #FF9933

#7F7F7F


Section

OASIS North View The blue green boulevard is a bold approach connecting neighborhoods on all sides of OASIS while increasing engagement with the businesses and community.


Section

Access

To facilitate access to these community benefits and establish a new connection with the surrounding neighborhoods, Oasis breaks t

pedestrian, cyclist, and also ecological path. This connection system spans east and west of the center of the site, and provides a pat at the northwest of the campus.

tional Perspective

WELLNESS CENTER

Clinics specializing in care management for critical needs such as asthma care, women’s services, and geriatrics.

Plan


the barrier of the highway and introduce a new connection system of blue green boulevards that serve as a

thway to the north and south. Oasis further enables access and connectivity through its integrated transit hub

COMMUNITY CENTER H.U.B. (HEALTH UNITY BRIDGE)

Positioning it as a centerpoint of the redevelopment, featuring a food marketplace, physical activity & recreation, and gathering space for all ages.

Financial Summary

Focusing on access to fresh food, local entrepreneur support, economic development and community. services.


GREEN Neighborhood The Facade of the building includes vertical green wall that will help reduce

pollution and filter the air for residents and the community.


Transit Hub With a focus on accessibility, the integrated transit hub ensures more Oaklanders can take full advantage of OASIS while lending to the environmental sustainability of the surrounding neighborhoods.


Illinois Solar Decathlon // Summer 2020

ISD Solar Decathlon Build competition, Organized by the U.S. Department of Energy.

ADAPTHAUS Project team: Javier Ortiz (Landscape Lead), Marcus Benoff, Cher Wong


Design

Illinois Solar Decathlon is building a modular house which revolves around the concepts of adaptability and affordability. The target market for our project includes young professionals in the Urbana - Champaign area. ADAPTHAUS promotes and displays core concepts of sustainability and accessibility through its design features, layout, modularity, and subsystem integration. The design provides users the flexibility to efficiently use the space inside the house for multipurpose activities and adapt to the needs of the occupants over time. Illinois Solar Decathlon conducted housing market surveys to understand the needs of young professionals in the Urbana Champaign area. Our design serves the current needs of the client while also incorporating provisions for future requirements. This is where the concept of modularity emerges, and the idea of an adaptable space becomes a core concept for our project.


Section elevatio

landscape desig


Design

As much as the envelope helps control the energy consumption in the house by keeping climate conditions stable in the interior through the season, the energy system for this house was also a fundamental aspect of the design and is thought as part of the guiding design elements for the project.

The house gathers solar energy through PV panels. Being a Positive Energy Home, the energy acquired is all the energy needed for the house, with additional energy generated and stored.

Because of this, the energy gathering was fundamental. The roof of the modules is designed to fit the necessary PV panels to collect the energy for the home, and 12 south facing PV panels are placed in each module. This location allows for an optimization of energy collection, that is articulated to the spatial distribution of the home.

on illustrating Module C and Module A and also part of the

gn.


Design

The two modules that conform this house are planned to optimize the intake of natural light, taking advantage of the site orientation and managing glare through passive shading strategies. East facing windows are designed with overhangs made of the same wooden material as cladding to control glare, while south facing windows are offered shade through the exterior canopy of the house, while paralleling optimizing natural light intake. North facing windows do not use passive shading elements, and ac quire additional natural light access in Module C.

Artificial light in the interior of the house is also thought as a sustainable system, utilizing only LED lights to reduce energy consumption and offer long durability for the users.


. T S

120'-10 13 16"

T

.

CLEANOUT

T

1 38'-5 16 "

NORTH PATIO

120'-10 13 16"

CLEANOUT

7'-0"

MODULE A

FILTER (SEPTIC TANK 4.5' diameter)

1 38'-5 16 "

T

N

U

S

PLANTING BED

NORTH PATIO

MODULE C

U

1' x 2' POROUS CONCRETE STONES MODULE A

FILTER

N

A

L

PLANTING BED

RAIN BARREL (SEPTIC TANK (2' diameter)4.5' diameter)

STEP

L

x 2' POROUS ABS PIPE1'3"

RAISED PLANTER

RAIN BARREL AQUIFER PIPE

A

W

CONCRETE STONES

(2' diameter)

SOUTH DECK 458.920 ft sq.

STEP

RAISED FOOD GARDEN PLANTER

ABS PIPE 3"

W

RAISED PLANTER

CLEANOUT AQUIFER PIPE

RAISED FOOD GARDEN PLANTER

15'-0"

RAISED PLANTER

N

N

.

.

CLEANOUT

LOW MOW MIX TURF

PLANTING BED

LOW MOW MIX TURF

PLANTING BED

E

.

E

1

1

B

.

R

A

D

B

L

R

E

A

Y

A

D

L

V

E

LANDSCAPE PLAN - 1202 N. WALNUT 1' = 81 "

LANDSCAPE PLAN - 1202 N. WALNUT " in the Landscape Architecture Lead Role was to create construction documents. After completing these drawings, as a 1'Part= of81 being we communicated the construction details to the contractor.


SEEDED GRASS

LEGEND

GRAVEL PAVEM

Landscape Architecture Design

EXISTING LAWN

CONCRETE PAT

EXISTING GRAVEL

EXISTING TREES

ILLINOIS SOLAR DECATHLON 2018 - 21

7'-0"

SITE EXTENTS

ADAPTHAUS RAIN BARREL CONTACT (2' diameter) MAYUR MISTRY (mmistry2@illinois.edu)

RAIN BARREL (2' diameter) GRAVEL DRIVEWAY

SEEDED GRASSES

GRAVEL 1202 N WALNUT STREET, CHAMPAIGN, IL - 61820 DRIVEWAY

GRAVEL PAVEMENT

CONSULTANTS:

736.1

EXISTING ELEVATION POINT

736.1

PROPOSED ELEVATION POINT

GREYWATER AQUIFER PIPE

SOUTH DECK 458.920 ft sq.

1 38'-5 16 "

NORTH PATIO

MODULE C PARKING GRAVEL PAVEMENT

62'-0"

RUNOFF EXISTING TREES

DIRECTION ILLINOIS

TRASH DISPOSAL BIN (with fence) CANOPY • DARCY BEAN CONSTRUCTION • T ORNTON TOMASETTI • AFFILIATED ENGINEERS INC

TEAM NA

ADAPTHAUS GREYWATER AQ CONTAC CONNECT PIPE SITE EXTENTS MAYUR MIST

Allium canadense ALC Allium schoenoprasum ALS ARM Aronia melanocarpa CAI Callirhoe involucrata PARKING Carex pensylvanica CAP GRAVEL PAVEMENT CAR Carex rosea Campsis radicans CARA RAIN BARREL CEC Cercis canadensis diameter) CHL (2' Chasmanthium latifolium COS Cornus sericea GRAVELpallida ECP Echinacea DRIVEWAY GEM Geranium maculatum OLR Oligoneuron rigidum Parthenocissus quinquefolia PAQ TRASH DISPOSAL PAV Panicum virgatum BIN (with fence) 'Apache Rose' PHG Phlox x glaberrima 'ForeverPink' CANOPY Phlox paniculata 'Ditomfra' PHP EXISTING Pycnanthemum virginianum PYV BACK / GRAVEL Salvia nemorosa 'Caradonna' SAN ALLEY Sorghastrum nutans SON SPH Sporobolus heterolepis

CONCRETE PATHWAY

736.1

EXISTING ELEVATION POINT

736.1

PROPOSED ELEVATION POINT

MODULE A

D R

RAISED PLANTER

15'-0"

EXISTING BACK ALLEY / GRAVEL

PARKING GRAVEL PAVEMENT

62'-0"

UNIVERS

1202 NAQ WAL GREYWATER PIPE GRAVEL PAVEMENT CONSULT

PLANTS

62'-0" GREYWATER AQUIFER CONNECT PIPE

7'-0"

ELEVATION POIN

EXISTING GRAVEL

SEEDED GRASSES

RUNOFF DIRECTION

TRASH DISPOSAL 120'-10 13 16"BIN (with fence) CANOPY

PROPOSED EXISTING LAWN

736.1

UNIVERSITY OF ILLNIOS URBANA- CHAMPAIGN

CONCRETE PATHWAY

MODULE C

EXISTING ELEVATION POIN

736.1 LEGEND

TEAM NAME

SOUTH DECK 458.920 ft sq.

RUNOFF DIRECTION GREYWATER AQUIFER CONNECT PIPE GREYWATER AQUIFER PIPE

• DARCY BE • T ORNTO • AFFILIATE

ALC ALS ARM CAI CAP CAR CARA CEC CHL COS ECP GEM OLR PAQ PAV PHG PHP PYV SAN SON SPH

PLANTING BED

STEP

EXISTING BACK ALLEY / GRAVEL

PLANTING BED

RAISED PLANTER

RAISED FOOD GARDEN PLANTER

RAISED PLANTER

15'-0"

PLANTING BED NO.

DESCRIPTION

1

ENTRANCE (ADA-ACCESSIBLE PAVING - CONCRETE 4" THICKNESS)

ADA RAMP

E

Y

.

LOW MOW MIX TURF

B

R

A

A

D

V L

DETAIL REVISION

ENTRANCE (ADA-ACCESSIBLE PAVING - CONCRETE ENTRANCE (ADA-ACCESSIBLE 4" THICKNESS)

ADA RAMP E

E

Y

.

ADA RAMP

A

V

E

.

DATE

2/23/2021

NO.

1

D

PAVING - CONCRETE 4" THICKNESS)

LANDSCAPE PLAN DRAWN BY:

LANDSCAPE TEAM

LA

CHECKED BY:

L101 team,

DRAWN BY:

CHECKED BY


1"

SEE SHEET L000 FOR LANDSCAPE PLANT SCHEDULE

EAR OF .,

02

02

TR TO AL

#12 G 12" PONDING DEPTH

OOT BALL

00

2

3" MULCH

00

-02

-02

NATIVE UNDISTURBED SOILS -04

-04

PLANTING BED - SECTION

1'=1'


Landscape Architecture Design

The plant installation was one of the cruial part of the installation process. These section details allowed for an easier installation process. In this we had three different tree species and six planting beds.

Along with the planting, we proposed an outdoor patio with a pergola. Adjacent to the pergola is a food garden with an English Ivy that will intertwine with th pergola.

ILLINOIS SOLAR DECATHLON 2018 - 21 TEAM NAME ADAPTHAUS

CONTACT MAYUR MISTRY (mmistry2@illinois.edu)

UNIVERSITY OF ILLNIOS URBANA- CHAMPAIGN

REE TIE MATERIAL: SET LOOSE LLOW FOR DIAMETER GROWTH

GALVANIZED GUY WIRES

1202 N WALNUT STREET, CHAMPAIGN, IL - 61820

CONSULTANTS: • DARCY BEAN CONSTRUCTION • T ORNTON TOMASETTI • AFFILIATED ENGINEERS INC

SET ROOT CROWN AT 1" ABOVE FINISH GRADE

LANDSC

6' DIA. MULCH AREA CLEAR OF GRASSES, WEEDS ETC., MIN 2"-3" OF MULCH REMOVE BULB FROM TOP 32 OF ROOT BALL REMOVE ALL WIRE AND STRING NATIVE BACKFILL SOIL FINISHED GRADE

6'

STAKES BURRIED 3" BELOW FINISH GRADE UNDISTURBED SUBGRADE

TREE PLANTING - SECTION


Landscape Architecture Design

As an additional, sustainable, ecological measure and benefit, the home will include its very own grey water system. This will feature a septic tank and aquifer pipes, through which filtered grey water can permeate the surrounding soils and provide an additional reliable water source to the two large western edge-bordering native plant communities on the property. The food garden will help the residents to inter act more with nature and save some produce and herb-related trips to the grocery stores while also eliminating some plastic bag use. Fresh produce and herbs are irreplaceable. The planned food garden is arranged such that many of the plants will provide some benefits to their surrounding ones, and the mint will not only be a great herb for teas and sweets, but its strong scent will help to deter aphids from the remainder of the food garden plants. ILLINOIS SOLAR DECATHLON 2018 - 21 TEAM NAME ADAPTHAUS

CONTACT MAYUR MISTRY (mmistry2@illinois.edu)

UNIVERSITY OF ILLNIOS URBANA- CHAMPAIGN 1202 N WALNUT STREET, CHAMPAIGN, IL - 61820

CONSULTANTS: • DARCY BEAN CONSTRUCTION • T ORNTON TOMASETTI • AFFILIATED ENGINEERS INC

PLANTS ALC ALS ARM CAI CAP CAR CARA CEC CHL COS ECP GEM OLR PAQ PAV PHG PHP PYV SAN SON SPH

Allium canadense Allium schoenoprasum Aronia melanocarpa Callirhoe involucrata Carex pensylvanica Carex rosea Campsis radicans Cercis canadensis Chasmanthium latifolium Cornus sericea Echinacea pallida Geranium maculatum Oligoneuron rigidum Parthenocissus quinquefolia Panicum virgatum 'Apache Rose' Phlox x glaberrima 'ForeverPink' Phlox paniculata 'Ditomfra' Pycnanthemum virginianum Salvia nemorosa 'Caradonna' Sorghastrum nutans Sporobolus heterolepis


Landscape Architecture Design

Plant palette in this sustainable home’s landscape design, the emphasis on ecological sustainability is just as strong as the sustainability of the home itself. On site, the planting design, aside from the small food garden, consists almost solely of native plant species, aside from a couple of tall pink phlox varieties and some sod grass varieties for lawn space, all of which are perennials. From Red Osier Dogwood and Indian Grass to Pennsylvania Sedge and Wild Geranium, the native plants help to restore more native soil conditions and keep soils healthier and microbially diverse.

The native plants also flower at various times from Spring through fall, and provide a source of food for native pollinators, as well as small native bird species. The plant communities have the potential to provide habitat for additional wildlife, and require minimal maintenance once mature, as they will be mostly self-sustaining. The plant communities will serve as an ecological hotspot within the ILLINOISinviting SOLAR DECATHLON 2018 - 21 surrounding urban environments. The aesthetic value of the ecologically native plant TEAM NAME

communities is a more than ample garden reward, even during theADAPTHAUS cold winter months. The native plant CONTACT

communities also require less water than the average garden

MAYUR MISTRY (mmistry2@illinois.edu)

UNIVERSITY OF ILLNIOS URBANA- CHAMPAIGN 1202 N WALNUT STREET, CHAMPAIGN, IL - 61820

CONSULTANTS: • DARCY BEAN CONSTRUCTION • T ORNTON TOMASETTI • AFFILIATED ENGINEERS INC

PLANTS ALC ALS ARM CAI CAP CAR CARA CEC CHL COS ECP GEM OLR PAQ PAV PHG PHP PYV SAN SON SPH

Allium canadense Allium schoenoprasum Aronia melanocarpa Callirhoe involucrata Carex pensylvanica Carex rosea Campsis radicans Cercis canadensis Chasmanthium latifolium Cornus sericea Echinacea pallida Geranium maculatum Oligoneuron rigidum Parthenocissus quinquefolia Panicum virgatum 'Apache Rose' Phlox x glaberrima 'ForeverPink' Phlox paniculata 'Ditomfra' Pycnanthemum virginianum Salvia nemorosa 'Caradonna' Sorghastrum nutans Sporobolus heterolepis


Columbia University // Fall 2021 Boundless Brooklyn Affordable Housing in NYC

2

B

Project team: Javier Ortiz, Cesar Delgado


To accomplish a Boundless Vision for the Boundless Dean Project, we are aiming for a rezoning to R7D. To be congruent with the

ambitious rezoning request and maximize what we can do with the acquired envelope, we are envisioning an 11 stories building th

develops in an L shape to maximize efficiency and design opportunities. With the project, we accomplish 133 apartment units mix 1 bedroom and studios fitting the target niche.

The shape and the facade treatments are driven by the input of the community translated in having visual and physical connection

to the adjacent public playground, having a direct contact with the community facilities that we envision. Additionally, we aim to create economic wealth building through our Modular wall paneling jobs training program. The goal is to

CONTEXT

recruit 10-20 workers to build and train at one of our out of state manufacturer partners within 100 miles. This type of 542 Dean Street andseniors 516 Bergen Street areintegrating two underutilized City-owned construction uses sustainable insulation to keep warm, while passive house principles, saving on operating sites located within a block of each other in the Prospect Heights

neighborhood within Brooklyn’s Community District 8. The sites are expenses, and training local workers for in a growing job sector. located near major commercial corridors on Flatbush Avenue and Atlantic Avenue.

HOOD CONTEXT

ew n the s!”

ground floor of these new ndance of empty retail in the more empty storefronts!”

542 Dean Street and 516 Bergen Street are two underutilized City-owned sites located within a block of each other in the Prospect Heights neighborhood within Brooklyn’s Community District 8. The sites are located near major commercial corridors on Flatbush Avenue and Atlantic Avenue.

542 Dean Street

542 Dean Street


hat

xing

ns

Zoning


d Floor







The ground floor or our pr

daycare-after school at th

 



we see residential access 







a direct connection betwe



 

  

The ground floor outdoor trees as noted on the left 



 

 

Moving on to the second fl

Floor Plan

provided by storefront gla





10 floors that have residen 

 







floor that has a green roof



    



 [ 1000 sf ]





  

[ 600 00 - 620 sf ] 

[ 450-470 sf ]





 

  

 

shape and the facade trea 



physical connections to t    that we envision.



 





private outdoor experienc

mediation space, where re

essory






Architectural Design

roject allocates both of the community amenities: the pool at the northeast, and the 

southwest of the plan, which through operable glass partitions, is flexible to open up he

een the public space easement on the left, and a meditation garden on the right. In pink,

 



sory spaces that include lobby, lounge room and mailroom.



space provides a connection to Dean Park, while being surrounded by linear path of



hand side. The council ring on the bottom right, allows for residents to have a more

 

 

esidents are able to relax.





ce while enjoying the view to the park and being close. The council ring serves as a

 

floor plan we observe the configuration of a double sided corridor with natural light



ass that contains one of the decentralized common spaces that we can find on 4 of the

ntial units. Our second and last typical floor plan is shown in this case on our seventh

 plan. The f open to residents and a dog terrace depicted in pink at the south of the  



atments are driven by the input of the community translated in having  visual and

the adjacent public playground, having a direct contact with the community facilities













 

       

   

 

   









 


One Bedroom and Studio 7' - 0"

Typical 1B 3/16" = 1'-0"

32' - 6" BEDROOM KITCHEN

BATHROOM

7' - 0"

21' - 0"

7' - 0"

SHARED BALCONY

31' - 6" BEDROOM

7' - 0"

SHARED BALCONY

UNITS SUMMARY 1B (625 sf to 650 sf) - 73 UNITS 2B (850 sf) - 1 UNIT Studio (400 to 450 sf) - 59 UNITS TOTAL 133 UNITS

VESTIBULE

KITCHEN

BEDROOM

LIVING

The building is mad KITCHEN

radiant heating infill

program mentioned BATHROOM VESTIBULE

Description BEDROOM

SHARED BALCONY

Share Date

Typical U

LIVING

LIVING

KITCHEN

LIVING BATHROOM KITCHEN

SHARED BALCONY

LIVING

BATHROOM

31' - 6"

compromised. We a

Project number Date Drawn by Checked by

BEDROOM

32' - 6"

design. With this dra

Project: Boundless Dean

KITCHEN

17' - 0"

BEDROOM

No.

Client: NYC Department of Housing Preservation and Development

www.boundlessbrooklyn.com

public rather than th

31' - 6"

SHARED BALCONY

VESTIBULE

7' - 0"

Typical 1B 3/16" = 1'-0"

been proved is a fun

17' - 0"

A401

SHARED BALCONY

VESTIBULE

One Bedroom and Studio 1

SHARED

BALCONY Continuing with a ty

31' - 6"

KITCHEN

32' - 6"

BEDROOM

LIVING

BATHROOM

21' - 0"

LIVING

nd Studio

BATHROOM VESTIBULE

VESTIBULE

UNITS SUMMARY VESTIBULE 1B (625 sf to 650 sf) - 73 UNITS 2B (850 sf) - 1 UNIT Studio (400 to 450 sf) - 59 UNITS TOTAL 133 UNITS

21' - 0"

BATHROOM

VESTIBULE

2

Typical Studio 1B 3/16" = 1'-0"

A401

2 1 A401

Typical Studio 3/16" = 1'-0"

7' - 0"

17' - 0"

Client: NYC Department of Housing Preservation and Development

www.boundlessbrooklyn.com

Project: Boundless Dean

17' - 0"

0"

One Bedroom and Studio

1

A401

UNITS SUMMARY 1B (625 sf to 650 sf) - 73 UNITS 2B (850 sf) - 1 UNIT Studio (400 to 450 sf) - 59 UNITS TOTAL 133 UNITS

SHARED BALCONY

No.

Description

Date

Typical U Project number Date Drawn by Checked by


Architectural Design

ypical floor plan we see how one of our main strategies repeat: shared balconies, which through case studies has

nctional strategy against senior isolation. These are examples on how the two typologies can develop centering the

he private and the connection with the shared balconies, and having spaces large enough to achieve an inclusive

awing, we wanted to depict a little bit of the feeling we want to have with the shared balcony, where privacy is not

are also providing an enlarged vestibule.

de of a typical concrete frame construction around a concrete core. Precast Concrete floor paneling with thermal

ls between the columns. This processes also allows for easier installation of prefab modular wall paneling jobs

d earlier.

ed Balcony .


Boundless Dean is more than just a housing project. Aside from providing 100% affability of housing units and enhance proper design and performance, boundless dean will address social issues that the neighborhood and city faces. Such as pollution. Throughout this irritate process, we asked ourselves; what is the future of environmental and socially sustainable domestic spaces that address senior isolation in urban contexts?


Roof top

Landscape Architecture

The accessible rooftop, has a year round picturesque view that also serves for gatherings and a community garden space. The landscape planting was selected for low maintenance, and also Solar panels are elevated and laid out across the roof top that create a path. To add on, the roof top will reduce storm water runoff, reduce energy use, and also clean air and support urban wildlife while giving residents of boundless dean a healthy and safe environment.

Boundless Dean bridges the connection to Dean Park. With a transitional path to the building and park, community residents are able to seamlessly experience both places while only a green buffer of planted trees and perennials acting as a boundary.

Roof top


Boundless Dean Boundless dean is part of the future of environmental and socially sustainable domestic spaces that address senior isolation in urban contexts


MOA DESIGN COMPETITION // Summer 2020

Art as Sanctuary Designing a sustainable rest area

HARMONIZE Project team: Javier Ortiz (Lead), Cesar Gomez, Matthew Torchalski, Elias Martin


MOA DESIGN COMPETITION - FINALIST


Harmonize addresses the climate in which it would reside by utilizing materials and plants which are well suited to handle the harsh conditions of coastal bluffs such as high winds and saltwater spray. The selection of Corten steel as the exterior finish material was not just due to its appealing weathered aesthetic but also because of its ability to withstand the test of time in a coastal environment as it is “preweathered” and will not deteriorate further and will not require continual painting or refinishing.

The design of Harmonize is environmentally friendly / sustainable in several ways. Firstly, the selection of Corten steel as the exterior finish material would eliminate the need to continually refinish or replace weathered or damaged sections of the structure. The bench and hammers for the wind chimes are both made from sustainable harvested redwood due to the rot resistant qualities and long-life of this wood.

COASTAL VIEW


Design Concepts


480 sqft 1" 35'-42 34'-10"

GREEN ROOF GARDEN 443 sqft

20'

STEEL CORD

NATIVE PLANTING GREEN ROOF GARDEN

WIND CHIMES

WOOD BENCH

1" 35'-42

REBAR

FOOTING GRAVEL

20°

SUBGRADE

1" 4'-72

1'-

1'-6"

480 sqft

CORTEN STEEL

1" 35'-42

34'-10"

GREEN ROOF GARDEN 443 sqft

PATH

20'

1" 1'-92

131 sqft

8'

GREEN ROOF SUPPORT

1

NATIVE PLANTING

Drawing Details 3 32''

= 1'

GREEN ROOF GARDEN WOOD BENCH

STEEL CORD WIND CHIMES

REBAR

1" 35'-42

CONCRETE FOOTING GRAVEL SUBGRADE

20°

1" 4'-72 1'-6"

10


LEGEND

Design Concepts

Beach strawberry Red fescue Seaside daisy Red fescue

10' 1" 9'-12

PROJECT NO. SUBMISSION

Design and Build Competition July 11, 2020

California poppy Subgrade

N

Gravel

1'-1"

DRAWING DETAILS

Concrete

The green roof will absorb almost all the rain that falls on it thus eliminating the possibility of significant storm water runoff that would otherwise result from a completely impermeable structure; this quality allows Harmonize to fit in with and complement its surrounding natural environment without some of

HARMONIZE

10'-11" 1" 7'-22

the potential problems associated with the built environment such as the negative impacts of increased

-6"

storm water runoff on ecosystems.

PROJECT TITLE

DRAWING TITLE

The native plants on the green roof will also attract a wide array of native birds and pollinators like bees

LEGEND and butterflies. The five plants selected for the green roof are also host plants to several species of butstrawberrybut certainly not limited to, Acmon Blue (Icaricia acmon), Dotted Blue terflies and mothsBeach including, Red fescue

(Euphilotes enoptes), Orange v Moth (Argyrotaenia franciscana), Umber Skipper (Poanes melane), Seaside daisy

1'-6" 10' 1" 9'-12

0'

PROJECT NO.

Design and Build Competition

11, 2020 SUBMISSION Red fescuemardon), and Mardon Skipper (Polites SachemJuly(Atalopedes

campestris).

California poppy Subgrade

N

Gravel Concrete

DESIGNED BY

Cesar, Brittany, Elias, Javier, Matthew

HARMONIZE

DRAWING DETAILS

CT LE

ING LE

DRAWN BY Cesar, Brittany, Elias, Javier, Matthew

1'-1"

10'-11" 1" 7'-22 1'-6"


Project Name l BLANK

The plant list focuses on the The plant list focuses on the built environment. This nativewildlife, plant selection att and helps maintain a healthy while providing a picturesque view throughout the year. maintain aenvironment healthy environment while providing a picturesque view througho Plant Palette l Green Roof a pictu The plant list focuses on the built environment. This native plant selection attracts local wildlife, and helps

Plant Name Beach strawberry Seaside daisy Red fescue Hummingbird sage California poppy

JAN

3. Fest Red

2. Erigeron glaucus Seaside dasiy

1.Fragaria chiloensis Beach strawberry

FEB

MAR

APR

Bloom Time and Color

MAY

JUN

JUL

AUG

SEPT

OCT

N


PLANT PALETTE + DESIGN

Plant Pallet + Design

built enviorment. This native plant selection attracts local local awildlife, helps stracts mantain healthyand enviorment while providing out the year. uresque view throughout the year.

tuca rubra d fescue

NOV

DEC

4. Salvia spathacea Hummingbird sage

5. Eschscholzia californica California poopy

Ecological Value Attracts birds, butterflies. Provides edible fruit Attracts butterflies, bees

2

Attracts birds. It is a nutritious and palatable forage grass for domestic and wild animals.

4

Attracts butterflies, birds, hummingbirds, bees

5

Attracts butterflies, hummingbirds, bees

1

3


This fro wa way,

NWLD-DESIGN & BUILD

Project Manager - Designer // NWLD Residential Landscape

NWLD-CAD D

Designing an outdoor living space

Garden Steppers

Dining

Lounge

Lawn

Trellis

Existing Concrete

Playground Mulch

E C

Perennial Bed

Shrubs

SCALE: 1" = 8'-0"

13'-3"

4'

4'

10'-2"

15'-9" 13'-1" 7'-9" 9"

3'-1" 5'-11" 8'-2"

Ma

629 Gunderson Avenue - Oak Park, Illinois

2'-4"

8'

PRODUCED BY AN AUTODESK STUDENT VERSION

GLENN RESIDENCE

10'-2" 2'-6" 1'-11"

Option 2

GLENN RESIDENCE SCALE: 1" = 8'-0"

House

Paver Patio

Concrete Pathway

Play House

Here is a trace overlay on a cad drawing. It shows a concept for the client. The client requested a modern look and feel with low maintenance. This illustration show the design process I have and how I approached project while I worked at NWLD.

Pergola

629 Gunderson Avenue - Oak Park, Illinois

08.15.19

N

The CAD drawings at the bottom show the phases in which the project can be started. Two options are produced and then lead to the final master plan.


DR AWINGS This project was completed during my time as a Project Manager and Designer at Nathan Wright Landscape Design. The drawings on the left illustrate part of the design process after speaking with

In this project the client wanted to see the final design in a set of clients. two phases. shwon on the left is the final design.

Sketching on top of existing conditions was the first part of the process to show clients and contractors what the design intent is. This project was done in phases, and the drawing on the top left should the final phase.

A crucial part of this project was to specify paving, planting, and other landscape materials needed to

Existing Concrete

create this outdoor living space.

Perennial Bed

Dining House

aster Plan

Paver Patio

Lawn

N

08.15.19

Existing Concrete Concrete Pathway Existing Concrete Playground Mulch

Lawn

Option 1

GLENN RESIDENCE SCALE: 1" = 8'-0"

Perennial Bed

629 Gunderson Avenue - Oak Park, Illinois

08.15.19

N


he process of the o remove all the o design with a

Perennial Bed

Dining House Paver Patio

Lawn

N

Existing Concrete Concrete Pathway Existing Concrete Playground Mulch

Lawn

Option 1

LENN RESIDENCE

ALE: 1" = 8'-0"

Perennial Bed

629 Gunderson Avenue - Oak Park, Illinois

08.15.19


Installation + Design

Having worked at a Design and Build company gave me an opportunity to have some hands on experience. The drawing on the top left shows part of the initial phase of the project. Part of this instillation includes a brick patio.

Similar patio installation projects where completed during my time as a Project Manager and Designer. Another one is shown in the images on the bottom left. These images illustrate the process of leveling, fire pit installation, and brick layer. Assisting in this installing gave in a hands on persecutive of how projects are carried out from initial design phase to constructions.


JAVIER ORTIZ Contact information Jo2669@columbia.edu 773 - 661 - 7990 1520 N Kedvale Chicago, IL


Turn static files into dynamic content formats.

Create a flipbook
Landscape, Architecture and Urban Design Portfolio by Javier Ortiz - Issuu