Skip to main content

2020 Portfolio

Page 1

JASMAINE FRANKLIN PORTFOLIO


PGAL PFVS

10

LAX AIRPORT_ CONRAC

CVG AIRPORT_ CONRAC

22

26

PGAL

PGAL

16

GWCC_ BC EXPANSION PGAL

DELRAY_ SPRINGHURST_ THE ADAM HOTEL TOWNPLACE/FAIRFEILD PFVS

STUDIO PEEK

TABLE OF CONTENTS

04

PFVS

32

EDWARD RESIDENCE RENOVATION PEEK DESIGN GROUP

36

THESIS_ BONES TO BUILT

5TH YEAR_SPRING STUDIO

40

ORGANIC MUSUEM OF ART 4TH YEAR_SPRING STUDIO

42

IVAN ALLEN JR BLVD

3RD YEAR_SPRING STUDIO


3


LAX AIRPORT_CONRAC PGAL

4

THIRD PARTY RENDERING


GENERAL NOTES

G-01

G-02

G-03

G-05

G-07

G-09 G-10

G-22

G-23

G-29 G-30 G-33

G-34

G-45

1. REFER TO A0.110 FOR PARTITION TYPES 2. REFER TO A0.120 FOR FINISH SCHEDULE 3. REFER TO A0.130 FOR DOOR SCHEDULE 4. REFER TO LIFE SAFETY PLANS FOR FIRE RATED WALLS 5. WHERE ENLARGED DRAWINGS ARE REFERENCED, SEE ENLARGED PLANS FOR DIMENSIONS, ELEVATION, KEY NOTES, ETC. 6. ALL INTERIOR DIMENSIONS ARE TO FACE OF STRUCTURE , U.N.O. 7. REFER TO A2.100 SHEET SERIES FOR DRAINAGE AND EDGE OF SLAB PLANS 8. REFER TO LANDSCAPE DRAWINGS FOR HARDSCAPE, LANDSCAPE, PAVING, IRRIGATION, ETC., AND COORDINATE WITH CIVIL DRAWINGS FOR DRAINAGE AND ADJACENT PAVEMENT 9. REFER TO STRUCTURAL DRAWINGS FOR ALL STRUCTURAL ELEMENT SIZES, CONNECTIONS AND DETAILS 10. REFER TO FUELING AND EQUIPMENT DRAWINGS FOR ALL EQUIPMENT WITHIN MAINTENANCE BAYS, CARWASH BAYS, FUELING AREA, EQUIPMENT ROOM, ETC 11. ALL JERSEY BARRIERS ARE MOVEABLE CONCRETE BARRIERS PER TP, PART 2B-20.1.A.1. REMAINDER OF BARRIERS TO BE LOCATED IN COORDINATION WITH TENANTS. 12. IR-#=INTERIOR RAMP # 13. ER-#=EXTERIOR RAMP # 14. STRIPING IS ONLY REQUIRED FOR EXIT WALKWAYS AND COMMON USE AREAS. IT IS UP TO EACH TENANT TO STRIPE THEIR IS SPACE. 15. REFER TO A5.101 FOR STRIPING DETAILS 16. REFER TO A8 SERIES FOR FINISH PLANS

G-46

887'-0" 36'-0"

36'-0"

36'-0"

36'-0"

36'-0" 18'-0"

216'-0"

36'-0"

108'-0"

5'-0" 54'-0"

36'-0"

198'-0"

36'-0"

TYP

D-01

D-02

2

DWP

A6.100

2

ER-1

A7.110

1

2

A7.100

A7.100

ER-2

UP

ER-3

UP

UP

3

4

A7.100

A7.100

D-A

D-B D-C

Q-1

STAIR 14

STAIR 1

Q-10

131' - 0"

6 DFU

6 DFU

6 DFU

RS14-101

RS1-101

5

UP

UP

296 DFU

G-B

4

5

296 DFU

296 DFU

CAV

60'-0"

IR-1

13' - 1 15/16"

G-A

60'-0"

CAV

Q-A 316 DFU

19

AC VAN

STAIR 13

Q-B

EVCS AC VAN

AC

RS13-101

G-C

17

CAV

ER-4

60'-0"

18

Q-C 358 DFU

290 DFU

60'-0"

G-D

G-E

SECTOR A

STAIR 2 RS2-101

1 / A2.210A

60'-0"

1

G-F

STAIR 27

A7.101

17

SECTOR B 1 / A2.210B

SECTOR AA

1 A7.101

5'-0"

RS27-101

60'-0"

G-G

Q-D

16

Q-E

15

Q-F

14

Q-G Q-H

13

6 888 DFU

G-H

290 DFU

60'-0"

STAIR 15 RS15-101

2 A7.101

A7.101

RS16-101

G-J

60'-0"

Q-J Q-K

12

2

STAIR 16

Q-L

STAIR 21

STAIR 3

11

RS21-101

RS3-101

42 DFU

10

G-K

60'-0"

SECTOR C

60'-0"

D S

1493 DFU

S 1391 DFU

DN

D S

)

2

019

T ra n

s

oft

S

olu

tio

n

,s

In

c.A

l r ig

ht

s

re

serv

e

d

.

STAIR 22

7 (US -62011

(c )

WB

HTO

AAS

7 (US -62011

)

2

019

T ra n

s

oft

S

luo

tio

n

,s

In

c.A

l r ig

ht

s

re

serv

e

d

.

RS22-101

(c )

WB

HTO

3 3 A7.101

)

T ra n

s

oft

S

olu

tio

n

,s

In

c.A

l r ig

ht

s

re

serv

e

d

.

7 (US -62011

019 2

WB

HTO

A6.100

3 A7.101

7

503 DFU

AAS

(c )

RS26-101

AAS

Q-T

6

STAIR 5

D W

RS5-101

5

G-R

303 DFU

60'-0"

STAIR 6

G-S

SECTOR E

RS6-101

60'-0"

STAIR 7

SECTOR F

1 / A2.210E

RS7-101

RS20-101

S

4 19

STAIR 23

1 / A2.210F

STAIR 20 STAIR 19

RS23-101

98 DFU

RS19-101

5'-0"

G-T

RS18-101

STAIR 26

G-Q

G-V

3

SECTOR CC

60'-0"

G-U

9

8

UP

AC VAN

A6.100

RS12-101

RS17-101

EVCS AC VAN

1

SECTOR BB

STAIR 12

1 / A2.210D

STAIR 17

STAIR 18

RS4-101

CAV

1,215'-0"

G-P

60'-0"

G-N

SECTOR D

1 / A2.210C

STAIR 4

5'-0"

60'-0"

G-M

2

1

60'-0"

STAIR 25

60'-0"

G-W

RS25-101

50 DFU 74 DFU

STAIR 8

4

4

A7.101

A7.101

S

STAIR 11

RS8-101

RS11-101

D S

5

5 A7.101

60'-0"

A7.101

50 DFU

ER-4

G-Y

60'-0"

1 / A2.210H IR-2

G-AA

50 DFU

UP

STAIR 24

EVCS

EVCS

EVCS

EVCS

CAV

CAV

9

CAV

CAV

CAV

CAV

CAV

YIELD

354 DFU

EVCS

37

EVCS

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

AC VAN

EVCS

EVCS

CAV

EVCS AC VAN

AC

EVCS AC

45

AC

4 A7.100

AC

S

RS10-101

3 A7.100

EVCS

UP

EVCS

ER-7

EVCS

UP

159'-1 1/4"

EVCS

ER-6

UP

STAIR 10

AC

RS9-101

ER-5

1 A7.110

RS24-101

2 A7.100

AC VAN

STAIR 9

CAV

3

83 51

4 A6.100

N

B

F

G

H

BB CC

№.

1 2

REGISTRATION

DATE

DESCRIPTION

PROJECT TITLE

LAX CONSOLIDATED RENT-A-CAR FACILITY

COPYRIGHT © 2020

01-17-2020 EARLY START - RFCD-APDU #2 04-15-2020 CURRENT STATUS DOCUMENT-ISSUED FOR CONSTRUCTION, INCLUDES RFIS/ASI 1-356

NS

ED AR CH I Y P. GER RE

SHEET TITLE

SHEET NUMBER

C-27945 07-31-2019 2 21

TE

RENEWAL DATE

RR & IS GARAGE - LEVEL 1 PLAN - OVERALL

CT

E

REVISIONS

A

D

RR/IS 5251 W. 98TH ST. CSB (5TH FLOOR) WEST 5251 W. 98TH ST., SUITE 500 CSB (5TH FLOOR) EAST 5251 W. 98TH ST., SUITE 501 QTA 525 S. LA CIENEGA BLVD. DWP YARD 5274 W. ARBOR VITAE ST. FIRE COMMAND CENTER 9617 S. LA CIENEGA BLVD.

ST

C

AA

F

PROJECT LOCATION

A

TE

PGAL 6033 W. CENTURY BLVD. SUITE 895 LOS ANGELES, CA 90045

NI A

KEY PLAN

CONSULTANT

LIC E

CONTRACTOR

LA GATEWAY PARTNERS 5200 W. CENTURY BLVD. SUITE 201 LOS ANGELES, CA 90045

1

1" = 60'-0"

JEF

DEVELOPER

RR/IS - LEVEL 1 FLOOR PLAN - OVERALL

R BE

DATE STAMP:

1 / A2.210G

Q-GG

2 A7.114

CAV

FILE NAME:

SECTOR H

CAV

BIM 360://5200277 ConRAC - BIM Coordination/ARCH_LAX-ConRAC_RR_RVT2019_.rvt 4/22/2020 1:38:13 PM

60'-0"

SECTOR G

G-Z

AC

G-X

O F CA LI FO

R

A2.001

5


RCP LEGEND (FS3) SURFACE MOUNTED LED DOWNLIGHT (FS4) WALL MOUNTED SCONCE LIGHT (LP1) 4' PENDENT LINEAR LED LIGHT (LP1A) 4' SURFACE MOUNTED LED LIGHT (LR1A) 12' RECESSED LINEAR LED LIGHT (LR2A) 2' RECESSED LINEAR LED LIGHT (LR3) 4' RECESSED LINEAR LED LIGHT (R1) PARKING GARAGE LED LIGHT, SHOWN IN READY RETURN (R2) PARKING GARAGE LED LIGHT, SHOWN IN IDLE STORAGE (R3) PARKING GARAGE LED LIGHT SHOWN AT EXTERIOR RAMP ENTRANCES (R5) 2'x4' LED LIGHT (R7) LINEAR LED LIGHT (R8) ARCHITECTURAL WALL SCONCE (RD1) RECESSED LED DOWNLIGHT (RD2) RECESSED LED SQUARE DOWNLIGHT (S81) SEMI-RECESSED PATHWAY LIGHT

NORTH CORE - LEVEL 1

(X1) EMERGENCY EXIT SIGN

3

(ACP) 2x2 ACOUSTICAL CEILING PANEL (BAF) BAFFLE CEILING BASIS OF DESIGN-USG BARZ (EXP) OPEN TO STRUCTURE (GYP) GYPSUM BOARD (MCP) METAL CEILING PANEL

G-14

KEYNOTE LEGEND

NUMBER

M

J

J

22' - 5 5/8"

13' - 11 3/8"

EMERGENCY ELEC

1 A4.340

R-136

121' - 0"

EQ

T B142

M182

OS

M

R-140

SUBSTATION ROOM

FCM

R-137

SEE A3.009 FOR STAIR LANDNG LIGHT LAYOUT

A7.140 M180

STAIR 15

36' - 0 5/8"

M182

DN

8' - 4"

J T

UP

12' - 0"

EQ

M

D D

M182

M182 D M(D)

M182

R-137B

B142 10.51

D M(D) R-138

T

M180

D R-139B

M180

G-J 8' - 0" O.C. TYP. LP2

5' - 8"

CM

J

EQ

8' - 0"

8' - 0"

8' - 0"

EQ

AC 4 A5.100

10 A8.500

Sim

1' - 3"

16' - 9"

1' - 0"

AC

F

G-J

M(D)

R-138

10' - 5"

OPEN TO STRUCTURE DD M(D) J T

11' - 8 1/4" J

DW

9' - 11 3/4"

J

DD

TENANT TR

LP2

1' - 0"

M(D)

R6.1

UP

RS15-101

R6

8' - 1 3/8"

D

M

EQ

J

J

9' - 8 3/8"

R6.1

T

R-140

R-141

2

A7.125

STAIR 15

RECYCLING

DB

FAMILY

1

25' - 7 5/8"

EQ

J

EQ J

CM

8' - 4"

59' - 7 5/8"

22' - 11 3/8"

M

RECYCLING

OS

DB

M

59' - 0"

M

EQ

J

J R6

R-141

16' - 8"

12' - 0" 12' - 0"

R-143

B142

M(D) R-138

MEN

R-142

4' - 0"

18' - 0"

8' - 4" R.O. 13' - 5 1/4"

4' - 6 3/4" 1' - 1 1/4"

8' - 0"

16' - 8 3/4" 73' - 4"

3' - 4"

5' - 10"

12' - 0"

3' - 4"

R.0.

0' - 10"

21' - 10 3/8"

R.0.

0' - 8 3/8"

3 A4.301

3' - 3 5/8"

N

PROJECT LOCATION

A

B D

E

F

G

H

BB CC

RR/IS 5251 W. 98TH ST. CSB (5TH FLOOR) WEST 5251 W. 98TH ST., SUITE 500 CSB (5TH FLOOR) EAST 5251 W. 98TH ST., SUITE 501 QTA 525 S. LA CIENEGA BLVD. DWP YARD 5274 W. ARBOR VITAE ST. FIRE COMMAND CENTER 9617 S. LA CIENEGA BLVD.

REVISIONS №.

1 2

REGISTRATION DATE

DESCRIPTION

PROJECT TITLE

LAX CONSOLIDATED RENT-A-CAR FACILITY

COPYRIGHT © 2020

01-17-2020 EARLY START - RFCD-APDU #2 04-15-2020 CURRENT STATUS DOCUMENT-ISSUED FOR CONSTRUCTION, INCLUDES RFIS/ASI 1-356

NS

ED AR CH I Y P. GER RE

SHEET TITLE

SHEET NUMBER

C-27945 07-31-2019 2 21

TE

RENEWAL DATE

RR & IS GARAGE - ENLARGED CORE - LEVEL 1 - SECTOR C

CT

C

AA

TE

PGAL 6033 W. CENTURY BLVD. SUITE 895 LOS ANGELES, CA 90045

1

F

KEY PLAN

CONSULTANT

1/8" = 1'-0"

NI A

CONTRACTOR

LA GATEWAY PARTNERS 5200 W. CENTURY BLVD. SUITE 201 LOS ANGELES, CA 90045

RR - ENLARGED CORE PLAN - LEVEL 1 - SECTOR C

2

LIC E

DEVELOPER

1/8" = 1'-0"

JEF

RR/IS - ENLARGED CORE RCP - LEVEL 1 - SECTOR C

A

BIM 360://5200277 ConRAC - BIM Coordination/ARCH_LAX-ConRAC_RR_RVT2019_.rvt 4/22/2020 2:01:22 PM

DB

VESTIBULE

ST

DATE STAMP:

R-144-A

D

R BE

FILE NAME:

PLUMBING CHASE

M182

J

8' - 4"

OS

FAMILY

F

6

DB

EBP

15' - 11 7/8"

J TENANT TR

R-145

R-144

RS15-101

T

WOMEN

VESTIBULE

AC

M182

16' - 8"

12' - 0"

8' - 4"

12' - 0"

R-137

OPEN TO STRUCTURE

R-146

T M(D) D

3' - 2 5/8"

3.18

J

JAN.

T

EM

9' - 10"

J

3' - 1"

R.O. AC

M(D)D

18' - 0"

T

R-143

Sim

1 A4.122

OS

R.O.

M(D)

1' - 3"

B142

R-142

OS

AED 12' - 4 3/8" eVP

6' - 4"

DB

RD1

D

RE3-101

D

10' - 4"

3' - 4"

M(D)

12' - 0"

R-137A

G-H

0' - 4 3/8"

UP

49' - 3 5/8"

M(D)

W D

R.O.

DM(D)

8' - 4"

36' - 5"

VESTIBULE

RD1

D

1 A5.100

R-139

4,334.86 SF

M

M182

M182

MEN

OS

1 A4.330

FUTURE TENANT BUILD-OUT

0' - 6"

16' - 8"

DWN

1' - 0" 15' - 9"

15' - 8"

6' - 8"

9' - 8"

R-145

LR1A

8' - 4"

M182

R-135A

0' - 8"

J

WOMEN

LR1A

D D

M182

1' - 3 5/8"

D

OS

RD1

eVP

12' - 0" 12' - 0"

3' - 4"

41' - 0" 24' - 3"

10' - 0"

F

J

M M

OS

SUBSTATION ROOM

M182

ELEV. 3

MPOE #1

OS OS

OS

A7.140

B142

16' - 0"

F

8' - 4" 8' - 4"

16' - 8"

J J

1' - 4"

DESCRIPTION

CONCRETE SHEAR WALL - RE: STRUCTURAL AED CABINET FIRE EXTINGUISHER CABINET OVERHEAD DIRECTION SIGN – RE: SIGNAGE DWGS FENCE,

10.41

T T

R-135B

R.O.

F

EQ

4' - 2"O.C. TYP. 7' - 5 1/8"

10' - 0"

8' - 4"

F

T T

3.18

T

M180

R-135

R-146

VESTIBULE D D

AED 8' - 4"

M

EQ

12' - 0"

DM

JAN.

RD1

M2 M JJ A4.122

DB

12' - 0"

J

R-136

OPEN TO STRUCTURE

D

R-133

B142

FCM

M

OS

EMERGENCY ELEC

T

OPEN TO STRUCTURE

J M

EBP EBP

G-H

D

RE3-101

J

R6.1

OS

CM

ELEV. 3

R-144

R-139A

TENANT MPOE

R-134

16' - 8"

3

3.18 10.41 10.51 10.65 32.08

9

T

EM EM 8' - 4"

R6.1

5 A8.500

R.O.

M182

R6

12' - 0"

D

J

12' - 0"

125' - 0"

M

2' - 8"

A8.500

T R-133 M(D) D

TENANT TR

D

CM

BAFFLE CEILING AT 9'-0" A.F.F.

AC T

J

AED 8' - 4"

13' - 6 33/256"

D

13

T R-134 M(D) M182

D

M

J

OPEN TO STRUCTURE

A8.500

J

8' - 4" OS

D M

J

12' - 0"

R-139

CEILING AND LIGHTING BY TENANT. EXPOSED STRUCTURE AND CODEMINIMUM LIGHTING PROVIDED

18" GLASS DRAFT CURTAIN AC

M

E.Q.

CM

T

5' - 0"

J

E.Q.

8' - 4"

D

5' - 0" 10' - 3 5/8"

6' - 10"

CM

4' - 6"

16' - 8"

R-135 OPEN TO STRUCTURE

8' - 0"

FUTURE TENANT BUILD-OUT

JJ

D

MPOE #1

1' - 11 5/8"

LUGGAGE CARTS

3' - 4"

A4.340

R.O.

J

F EQ

J

J

23' - 9 3/4"

32.08

EQ R6.1

16' - 0 3/8"

1' - 4" 8

3' - 4" 3' - 0"

G-F

6' - 6 1/2"

G-G

GWB ON 3 5/8" MTL STUD 9'-0" A.F.F.

8' - 0"

8' - 0"

J

12' - 0"

8' - 0"

CM

T

eVP 8' - 4"

6' - 8 3/8"

T

eVP

M(D) J T R6.1 T

8' - 0"

0' - 9 1/2" TYP.

18' - 4 3/4"

OPEN TO T STRUCTURE

T T

5' - 8"

R.O.

8' - 0"

R6

OS

12' - 0"

J

LP2 111'-8 1/2"

R-133

R-134 OPEN TO STRUCTURE

2' - 8" 3' - 4" LP2

5' - 5 1/2"

11' - 1 1/4" 7' - 11 1/4" 3' - 2"

1' - 8"

ESCALATOR PIT 8'-4"

J

J J

M(D)

W

D

D

11' - 4 3/4" 10' - 0 3/4"

1' - 4"

A7.121

J

A8.500

T

TENANT MPOE

T

7' - 7 3/8"

TYP.

R6.1

D

9

8' - 0" O.C.

J

D

T

D

TENANT TR

W D

6 A4.340

J

T T M

R6.1

3

10.65

7 A4.340

8 J A4.340

D

16' - 6 5/8"

18" GLASS DRAFT CURTAIN

EQ

16' - 8"

EQ

J

4' - 7 5/8"

G-G

EQ

LP2

G-21

18' - 0"

FUTURE TENANT CUSTOMER SERVICE BOOTH ZONE

38' - 2"

M(D) 8' - 4"

EQ

18' - 0"

G-20

18' - 0"

G-21 22' - 6"

G-F

0' - 10"

G-19

18' - 0"

M(D)

G-20

G-19

G-18

18' - 0"

OS

G-18

G-17

0' -1'4-3/8" 7 5/8"

G-17

18' - 0"

122' - 7 5/8"

G-16

A7.120

G-16

82' - 7"

3

G-15

18' - 0"

33' - 3 3/8"

G-14

G-15

18' - 0"

NOTE: THE UNDERSIDE OF STRUCTURAL DECK, SOFFITS, AND BEAMS IN THE PUBLICLY VISIBLE PORTIONS OF READY/RETURN FACILITIES (FROM GRID LINE G-01 TO G-34) SHALL BE PAINTED WITH TWO COATS OF WHITE PAINT

O F CA LI FO

R

A4.100


G-20

CEILING HUNG TOILET PARTITION

RCP LEGEND

G-20

CEILING HUNG TOILET PARTITION

SS CORNER GUARD,TYP

WALL MOUNTED RECESSED LINEAR LIGHTS

WALL MOUNTED RECESSED LINEAR LIGHTS

SS CORNER GUARD, TYP

(FS3) SURFACE MOUNTED LED DOWNLIGHT (FS4) WALL MOUNTED SCONCE LIGHT

PTW-1

(LP1) 4' PENDENT LINEAR LED LIGHT

PTW-2

PTW-1

4' - 0"

T-11

DURESS BUTTON T-7

T-1

T-4

T-20

T-23

4 A8.500

98'-6"

T-23

T-11 T-5

T-4

RR - WOMEN'S RESTROOM ELEV 4

1/4" = 1'-0"

T-1

(LR3) 4' RECESSED LINEAR LED LIGHT

RR/IS - LEVEL 1

98'-6"

98'-6"

(R1) PARKING GARAGE LED LIGHT, SHOWN IN READY RETURN

RR/IS - LEVEL 1 T-8

T-7

98'-6"

T-21

(R2) PARKING GARAGE LED LIGHT, SHOWN IN IDLE STORAGE

T-22

RR - WOMEN'S RESTROOM ELEVATION

15

1/4" = 1'-0"

1/4" = 1'-0"

RR - WOMEN'S RESTROOM ELEVATION

14

(R3) PARKING GARAGE LED LIGHT SHOWN AT EXTERIOR RAMP ENTRANCES

13

1/4" = 1'-0"

(R5) 2'x4' LED LIGHT

T-1 T-11

SS CORNER GUARD,TYP

(LR2A) 2' RECESSED LINEAR LED LIGHT

SS-1

RR/IS - LEVEL 1 SS-1

RR - WOMEN'S RESTROOM ELEVATION

16

CEILING HUNG TOILET PARTITION BEYOND

(LR1A) 12' RECESSED LINEAR LED LIGHT

T-5

1

RR/IS - LEVEL 1

(LP1A) 4' SURFACE MOUNTED LED LIGHT

T-1

42"

1

PTW-1

T-11 T-21

G-20

WALL MOUNTED RECESSED LINEAR LIGHTS

SS CORNER GUARD, TYP

G-20

WALL MOUNTED RECESSED LINEAR LIGHTS

CEILING HUNG TOILET PARTITION

(R7) LINEAR LED LIGHT (R8) ARCHITECTURAL WALL SCONCE

PTW-1

(RD1) RECESSED LED DOWNLIGHT

PTW-1 PTW-1

T-11

4' - 0"

7 A8.500

T-22

RR/IS - LEVEL 1

42"

98'-6"

1

RR - MEN'S RESTROOM ELEV 4

1/4" = 1'-0"

(S81) SEMI-RECESSED PATHWAY LIGHT

SS-1

T-5

98'-6"

T-4

(ACP) 2x2 ACOUSTICAL CEILING PANEL

RR/IS - LEVEL 1

(BAF) BAFFLE CEILING BASIS OF DESIGN-USG BARZ

98'-6"

3

(EXP) OPEN TO STRUCTURE

T-5

RR - MEN'S RESTROOM ELEVATION

12

RR/IS - LEVEL 1

98'-6"

T-4

(X1) EMERGENCY EXIT SIGN

T-21

T-1

RR/IS - LEVEL 1 T-23

T-21

1

T-1

2

T-22 T-7

T-23

T-7

(RD2) RECESSED LED SQUARE DOWNLIGHT

T-8

7 A8.500

Sim

RR - MEN'S RESTROOM ELEVATION

11

1/4" = 1'-0"

1/4" = 1'-0"

RR - MEN'S RESTROOM ELEVATION

10

9

1/4" = 1'-0"

(GYP) GYPSUM BOARD

0' - 8"

G-20

9' - 0"

T-7

T-4 1

T-14

R.O.

R-174

T-8

T-5

T-23

T-5

RR/IS - LEVEL 1

RR/IS - LEVEL 1

98'-6"

98'-6"

T-1

SS-1

DB

F.D.

T-5

1' - 4 3/4"

F140 T-11 T-1 4' - 6 3/4"

T-8

0' - 7 3/8" A130

F140

T-21 F140 4' - 9 1/2"

RR/IS - LEVEL 1

R-174

6' - 0 3/8"

F140

T-21

98'-6"

EQ EQ T-4

T-23 M180

FINISH LEGEND

T-21 T-20

J

T-20

5' - 6 7/8"

PTW-1

T-22

2' - 6"

PTW-1

(MCP) METAL CEILING PANEL

A160

FAMILY

2' - 6"

PTW-1

3' - 6 7/8"

PTW-1

PTW-1 Sim

7 A8.500

M182

8' - 0 7/8" 3' - 10"

G-20

SCHLUTER TRIM SURROUND DOOR FRAME

NOTE: THE UNDERSIDE OF STRUCTURAL DECK, SOFFITS, AND BEAMS IN THE PUBLICLY VISIBLE PORTIONS OF READY/RETURN FACILITIES (FROM GRID LINE G-01 TO G-34) SHALL BE PAINTED WITH TWO COATS OF WHITE PAINT

PT-B - 6"x12"PORCELAIN BASE

T-7 T-22 4' - 6 3/8"

15' - 3 3/8"

PWT-1 - CROSSVILE BASALT 12"x 24"PORCELAIN WALL TILE; COLOR: SILICA

1' - 0"

PWT-2 - CROSSVILLE RETRO ACTIVE 2.0 4"x12"PORCELAIN WALL TILE; COLOR; ROYAL NAVY UPS

T-4

RR - FAMILY RESTROOM ELEVATION

RR - FAMILY RESTROOM ELEVATION

7

1/4" = 1'-0"

G-20

1/4" = 1'-0"

FAMILY RESTROOM LEVEL 1-3-SECTOR G

6

G-19 EQ

17' - 9 3/16"

PTW-1

3 A8.500

R6

OS

5' - 7"

5' - 2"

1' - 11"

EQ

3' - 4"

EQ

1' - 5 5/8"

F140

T-5

R-141

M182 4' - 9 1/8" 1' - 4 3/4"

0' - 10 1/2"

J

3'-0" CLEAR T-21

ALIGN

10' - 3 1/2"

6'-3" CLEAR J

3' - 0" 2' - 6"

T-7

T-21 T-8

DB

T-14

F.D.

F130

12' - 2 3/8" R-143

11 / A4.122

T-5

FAMILY

F.D.

ø5'-0"

4' - 6 3/4"

F130

EQ

F130

J 26.34

F130

T-7 T-22

DB

T-1 T-11

T-1 T-11

3' - 4"

3' - 4"

F160 T-1 T-11

0' - 10"

A140

7 / A4.122

1' - 5 3/8"

26.27 3' - 4"

3' - 4"

Description

Counter Mounted Soap Dispenser Wall Mounted Soap Dispenser Automated Paper Towel Dispenser (Recess Mounted) Convertible Combination Towel and Waste Unit (Recess Mounted) Straight Grab Bar (36") Straight Grab Bar (42") Framed Mirror (Surface Mounted) Hat and Coat Hook Napkin Disposal, Surface-Mounted Twin Jumbo-Roll Toilet Tissue Dispenser (Surface Mounted) Seat Cover Dispenser (Surface Mounted) Diaper Changing Station (Recess Mounted)

4' - 6 3/8"

MEN

10 / A4.122

T-4

T-1 T-2 T-4 T-5 T-7 T-8 T-11 T-14 T-20 T-21 T-22 T-23

5'-7" CLEAR

ALIGN

1' - 4" 4' - 9"

6' - 1"

F140

15' - 7 5/8" 2' - 4 3/8"

Type Mark

T-22 T-7 T-22 T-22 3' - 1"

Description

COUNTER MOUNTED LAVATORY WALL MOUNTED W.C. WALL MOUNTED URINAL FLOOR MOUNTED MOP SINK WALL MOUNTED LAVATORY FLOOR DRAIN

TOILET ACCESSORIES

26.27

F130

6'-3" CLEAR

3'-0" CLEAR

DB

6' - 10"

T-22

3' - 1"

1' - 3"

A160

F140

T-20 A160 T-21 T-8

R-140

RECYCLING R-140

M182

R-141

2' - 4 1/8"

16 / A4.122

14 / A4.122

T-22

T-11 T-1 T-4

T-20

1 2 3 5 6 7

F130

6' - 1 3/4"

F140

F140

5'-7" CLEAR T-21

4' - 0"

6' - 5"

5' - 5 1/2"

ALIGN

2' - 1"

J T-23

T-14

3' - 1"

3' - 3 7/8"

F160

2' - 6"

J M180

1' - 7 3/4"

1' - 1" ALIGN

5' - 5 1/2"

7' - 6" 5' - 2 3/4"

18' - 5 1/2"

6' - 0"

26.27

F.D.

T-14

7' - 6 1/4"

PLUMBING FIXTURES

Type Mark

COUNTER MOUNTED LAVATORY

9 / A4.122

WALL MOUNTED LINEAR LED

1' - 6"

J

TYP

2' - 4"

A160

3' - 1"

3' - 1"

3'-1" CLEAR

CMU-B1 - ANGELUS BLOCK CO., INC BURNISHED CONCRETE MASONRY BLOCK; COLOR: NATURAL GREY FINISH ON PUBLIC FACE ONLY

2' - 10 1/2"

CONC-LB

3' - 1"

7' - 1 1/8"

R-141

T-20

T-22

6 / A4.122

R-140

OPEN TO STRUCTURE

GWB ON MTL STUD 9'-0" A.F.F.

T-20

1' - 11"

6' - 11"

M1120

3' - 4 7/8"

M J

RECYCLING

DB

FAMILY

R-140

PTW-1

PTF-1

RD1

T-20

26.27

8 / A4.122

RECYCLING

8' - 0 7/8"

TYP

7' - 10 3/4"

0' - 8"

3 A8.500

5' - 9"

PTW-1

PTW-1

18' - 5 1/2"

1' - 9 1/8"

WALL MOUNTED RECESSED LINEAR LIGHTS

EQ

PTW-1

FAMILY

T-21

EQ

2' - 7"

J

1' - 3"

J TYP

J

3 A8.500

T-14 3'-0" CLEAR

T-21

1' - 11"

R-144-A

6' - 11"

5' - 11 3/4"

J

TYP

R-141

PTW-1

M

EQ

PTW-1 PTW-1

PLUMBING CHASE

10.51

EQ

PTW-1

3' - 2"

OS

TYP

3' - 2"

EQ

J

PTW-1

3 A8.500

2' - 2 1/4"

3 A8.500

3 A8.500

PTW-1

PTW-1 PTW-2

EQ

T-14 3'-0" CLEAR

T-21

T-23

F130 1' - 5 3/8"

F130

T-8

WALL MOUNTED LINEAR LED

4' - 3 3/8"

EQ OS

T-14 3'-1" CLEAR

R-144

A160

R-143 RD1 GWB ON MTL STUD 9'-0" A.F.F.

PTW-1 PTW-1

TYP

10' - 5 7/8"

MEN

PTF-1

PTW-1

TYP

A160

F130

EQ

13 / A4.122

R-142

2' - 4 3/8"

3' - 4"

15 / A4.122 12' - 2 3/8"

R-145

VESTIBULE

4' - 0"

A8.500

F160

R-142 M1120

3' - 4"

10.01

OS

R-143

TYP

2' - 9"

17' - 4 1/4"

GWB ON MTL STUD 9'-0" A.F.F.

6' - 4"

ALIGN

11

EQ

TYP

6' - 5 3/4"

J

J

MEN 3 A8.500

TYP

3 A8.500

R-142

3' - 0"

BIM 360://5200277 ConRAC - BIM Coordination/ARCH_LAX-ConRAC_RR_RVT2019_.rvt 6/14/2020 4:10:47 PM DATE STAMP:

VESTIBULE Sim

DB

DB

EQ

5' - 10"

EQ

3 A8.500

EQ

TYP PTW-1

PTW-1

FILE NAME:

3 A8.500

VESTIBULE R-142

3' - 0"

J

LR1A

EQ

PTW-1

PTW-2

PTF-1 6 A8.500

EQ

PTW-1 PTW-1

TYP

2' - 6"

Sim

A8.500

3 A8.500

PTW-2

SS END CAP

4

PTW-1

PTW-1 PTW-2 PTW-1

4' - 1 1/8" 0' - 10 1/4" 1' - 7 5/8"

2' - 7 5/8"

D

TYP

19' - 3"

19' - 3"

6' - 0"

G-H

EQ

T-4

1' - 3"

WOMEN

2' - 4"

F160

F160

12 / A4.122

G-V

10' OS- 0"

2' - 6"

EQ

6' - 9" WALL MOUNTED RECESSED LINEAR LIGHTS

2' - 1"

5' - 6"

G-H

1 A8.500

M180

T-11 T-1

15' - 6 1/4"

6' - 11"

EQ

10' - 10 5/8"

EQ

EQ

WALL MOUNTED LINEAR LED

2' - 6"

7' - 6"

5' - 8 3/4"

7' - 3 1/4"

J J

WALL MOUNTED RECESSED LINEAR LIGHTS

T-5

T

A160

7' - 6 1/4"

10.51

5

F130

3' - 3 7/8"

M1120

17' - 11 1/2"

DB

J

2' - 9"

DB

7' - 6"

G-H

6' - 4" LR1A

PTW-1

PTW-1

5' - 11 3/4"

PTW-2

EQ

3' - 0"

EQ PTW-1

T-11 T-1

CMU-B - ANGELUS BLOCK CO., INC BURNISHED CONCRETE MASONRY BLOCK; COLOR: GLACIER WHITE FINISH ON PUBLIC FACE ONLY

M182

F130

23.11

2' - 6 1/2"

R-145 GWB ON MTL STUD 9'-0" A.F.F.

5' - 10"

PTW-1

PTW-1

TYP

T-11 T-1

A160

7' - 10 3/4"

3' - 3"

3 A8.500

PTW-1

WOMEN

2' - 6"

OS

3' - 11 1/2"

R-144 GWB ON MTL STUD 9'-0" A.F.F.

TYP

R.O.

3 A8.500

PTF-1

OS TYP

R-144

LBF-1 - LIGHT BROOM FINISH

R-146

M180

WALL MOUNTED LINEAR LED

10.01

RD1

17' - 4 1/4"

VESTIBULE

10' - 0 1/2"

R-145

TYP

Sim

A8.500

1' - 0"

3 A8.500

11

WOMEN

J

PTW-1 PTW-2

PTW-2

PTW-1

TYP

3' - 0"

PTF-1

4

3 A8.500

ALIGN

PTW-1

TYP

EQ

3 A8.500

R-144

A8.500

6 A8.500

VESTIBULE

M1120

4' - 6 3/8"

T

PTW-1

VESTIBULE

R-146

0' - 9 1/2"

3' - 2 1/4"

26.38

2' - 9 3/8"

D

EQ

J

EQ

1' - 3"

PTW-1 PTW-1

RF-1 - ROTARY FINISH

F130

JAN.

M180

TYP

SS END CAP

6 A8.500

EQ

TYP

EQ

6 A8.500

TYP

3 A8.500

PTW-1

3' - 2"

J

PTW-1 PTW-2

3' - 2"

26.38

M182

J

PTW-1

3 A8.500

EQ

M180

0' - 7"

3' - 7"

3' - 1 3/8"

OPEN TO STRUCTURE WALL MOUNTED RECESSED LINEAR LIGHTS

1' - 9 1/8"

J

R-146

R-146

2' - 4 1/8"

1' - 6 3/8"

J JAN.

D

OPEN TO STRUCTURE

2' - 0"

JAN.

CONC - HARD TROWEL FINISH

1' - 3"

G-21

M

2' - 9 3/8"

EQ

4' - 6 3/8"

EQ

G-21

17' - 7 1/4"

EQ

PFT-1 - CROSSVILLE BASALT 12"x12" PORCELAIN FLOOR TILE; COLOR: BEDROCK

G-20

3 A7.121

10' - 5 7/8"

G-21

17' - 7 1/4"

G-20

5

1/4" = 1'-0"

G-21

2' - 7"

3 A7.121

10' - 5 1/8"

8

3' - 4" R.O.0' - 10 5/8"

1/4" = 1'-0"

7' - 1 1/8"

RR - FAMILY RESTROOM ELEVATION

J

5' - 8 3/8" 0' - 9 3/8"

16' - 5"

15' - 11 5/8"

1' - 3"

N

RR - ENLARGED FINISH PLAN - RESTROOM LEVEL 1-3 DEVELOPER

CONTRACTOR

LA GATEWAY PARTNERS 5200 W. CENTURY BLVD. SUITE 201 LOS ANGELES, CA 90045

1/4" = 1'-0"

RR - ENLARGED RCP - RESTROOM LEVEL 1-3

4

RR - ENLARGED PLAN - SECTOR G CORE RESTROOM LEVEL 1-3

3

1/4" = 1'-0"

KEY PLAN

CONSULTANT

PGAL 6033 W. CENTURY BLVD. SUITE 895 LOS ANGELES, CA 90045

PROJECT LOCATION

A

B

C

D

E

F

G

H

AA BB CC

RR/IS 5251 W. 98TH ST. CSB (5TH FLOOR) WEST 5251 W. 98TH ST., SUITE 500 CSB (5TH FLOOR) EAST 5251 W. 98TH ST., SUITE 501 QTA 525 S. LA CIENEGA BLVD. DWP YARD 5274 W. ARBOR VITAE ST. FIRE COMMAND CENTER 9617 S. LA CIENEGA BLVD.

1/4" = 1'-0"

RR - ENLARGED PLAN - NORTH/SOUTH CORE RESTROOM LEVEL 1-3

2

REVISIONS №.

1 2

REGISTRATION DATE

DESCRIPTION

01-17-2020 EARLY START - RFCD-APDU #2 04-15-2020 CURRENT STATUS DOCUMENT-ISSUED FOR CONSTRUCTION, INCLUDES RFIS/ASI 1-356

1/4" = 1'-0"

1 PROJECT TITLE

LAX CONSOLIDATED RENT-A-CAR FACILITY

COPYRIGHT © 2020

SHEET TITLE

RR & IS GARAGE - ENLARGED RESTROOM LEVEL 1 - 3 SHEET NUMBER

A4.122

7


KEYNOTE LEGEND

NUMBER

10.01 CC-1 CMU-1 GYP-X PC-1

G-G

FILLED WITH ELASTIC COMPOUND

0' - 7 3/8"

SEISMIC RESTRAINT & BOLT PROVIDED & INSTALLED BY MANUFACTURER

0' - 0 3/8"

RR/IS - LEVEL 5

0' - 6 3/8"

152'-6"

0' - 11 7/8"

CONCRETE TOPPING SLAB RE: STRUCTURAL

SEISMIC RESTRAINT & BOLT INSTALLED BY MANUFACTURER ESCALATOR FLOOR PLATE

RR/IS - LEVEL 3 125'-10"

PER SHOPS

ESCALATOR FLOOR PLATE

POLYCARBONATE GLAZED WALL SYSTEM

CONCRETE COLUMN RE: STRUCTURE

EXPANSION JOINT COVER

3' - 0"

DESCRIPTION

WAYFINDING SIGN – RE: SIGNAGE DWGS COLUMN COVER EXTERIOR CONCRETE MASONRY UNITS

CONCRETE SLAB RE: STRUCTURAL

EDGE OF ESCALATOR CONC. WALL RE: STRUCTURAL

BEAM RE: STRUCTURAL

2' - 0"

ESCALATOR UPPER SUPPORT DETAIL - 40' & 54' 1 1/2" = 1'-0" 7 ESCALATOR

ESCALATOR LOWER SUPPORT DETAIL, TYP 1 1/2" = 1'-0" 6

RR/IS - LEVEL 3 125'-10"

0' - 10 5/8" 0' - 3 1/4" 0' - 0 3/8"

RR/IS - LEVEL 5 ESCALATOR

152'-6"

0' - 6"

CONCRETE TOPPING SLAB RE: STRUCTURAL CONCRETE SLAB RE: STRUCTURAL

ESCALATOR FLOOR PLATE FILLED WITH ELASTIC COMPOUND

SCHEDULED PARTITION RUN GYP BOARD PAST EACH FLOOR PLATE

BEAM RE: STRUCTURAL

SEISMIC RESTRAINT & BOLT PROVIDED & INSTALLED BY MANUFACTURER

ESCALATOR UPPER SUPPORT DETAIL - 26' 1 1/2" = 1'-0" 5 ESCALATOR

GYPBOARD AT ESCALATOR SECTION 1 1/2" = 1'-0" 4

3D - SECTOR E CORE ESCALATORS

3

PEDESTRAIN CANOPY

CC-1

10.01 CC-1 10.01

PC-1

GYP-X

FS4

CMU-1

8

DATE STAMP:

FILE NAME:

BIM 360://5200277 ConRAC - BIM Coordination/ARCH_LAX-ConRAC_RR_RVT2019_.rvt 6/14/2020 4:19:17 PM

FS4

3D - SECTOR G CORE ESCALATORS DEVELOPER

CONTRACTOR

LA GATEWAY PARTNERS 5200 W. CENTURY BLVD. SUITE 201 LOS ANGELES, CA 90045

KEY PLAN

CONSULTANT

PGAL 6033 W. CENTURY BLVD. SUITE 895 LOS ANGELES, CA 90045

2 PROJECT LOCATION

A

B

C

D

E

F

G

H

AA BB CC

RR/IS 5251 W. 98TH ST. CSB (5TH FLOOR) WEST 5251 W. 98TH ST., SUITE 500 CSB (5TH FLOOR) EAST 5251 W. 98TH ST., SUITE 501 QTA 525 S. LA CIENEGA BLVD. DWP YARD 5274 W. ARBOR VITAE ST. FIRE COMMAND CENTER 9617 S. LA CIENEGA BLVD.

ESCALATOR PIT, TYP

REVISIONS №.

1

3D - SECTOR C CORE ESCALATORS REGISTRATION

DATE

04-15-2020 RFCD-APDU #12 - ISSUED FOR APPROVAL

DESCRIPTION

1

PROJECT TITLE

LAX CONSOLIDATED RENT-A-CAR FACILITY

COPYRIGHT © 2020

SHEET TITLE

RR & IS GARAGE - ESCALATORS - PLANS & SECTIONS SHEET NUMBER

A4.343


OPENNESS CALCS

G-46

REFER TO RFM #9 FOR ADDITIONAL INFORMATION OPENNESS CALCULATIONS - LEVEL 3 BRIDGE

NORTH ELEV. = 0% SOUTH ELEV. = 0% EAST ELEV. = 34.00% UNDER LANDING + 100% OPEN TO SKY TO F.O. QTA (55'-3" BRDIGE LENGTH UNDER LANDING X 13'-8" BRIDGE CLR. HEIGHT) - (55'-3" BRIDGE LENGTH UNDER LADING X 3'-6" UPTURNED BEAM) - (30'-0" WIDTH OF RAMP & COLUMNS X 10'-2 RAMP AREA) = (755.27 SF AREA OF EAST FACADE UNDER LANDING) - (193.38 SF AREA OF UPTURNED BEAM) - (305.10 AREA OF RAMP) = 256.79 SF AREA OPEN / 755.27 AREA OF EAST FACADE = 34.00% OPEN UNDER LANDING WEST ELEV. = 34.00% UNDER LANDING + 100% OPEN TO SKY TO F.O. QTA (55'-3" BRDIGE LENGTH UNDER LANDING X 13'-8" BRIDGE CLR. HEIGHT) - (55'-3" BRIDGE LENGTH UNDER LADING X 3'-6" UPTURNED BEAM) - (30'-0" WIDTH OF RAMP & COLUMNS X 10'-2 RAMP AREA) = (755.27 SF AREA OF WEST FACADE UNDER LANDING) - (193.38 SF AREA OF UPTURNED BEAM) - (305.10 AREA OF RAMP) = 256.79 SF AREA OPEN / 755.27 AREA OF WEST FACADE = 34.00% OPEN UNDER LANDING

EXPANSION JOINT COVER ASSEMLY TO CONTINUE UP C.I.P WALLS CMU CRASH WALL

RR/IS - LEVEL 2 112'-2" 1' - 0"

OPENNESS CALCULATIONS - LEVEL 2 BRIDGE

0' - 8"

CONC. SLAB, RE: ST. DWGS.

EXPANSION JOINT AT RR/IS AND BRIDGES TO QTA TYP.

7

G-W

30' - 0"

6

15' - 10"

4' - 0"

R9 '-0 "

7.01

-0" R9'

G-E

3/4" = 1'-0"

G-V

60' - 0" 14' - 2"

G-46

1' - 8"

3D - JOCKEY RAMP

NORTH ELEV. = 0% SOUTH ELEV. = 0% EAST ELEV. = 56.15% (129'-2" BRDIGE LENGTH X 13'-8" BRIDGE CLR. HEIGHT) - (129'-2" BRIDGE LENGTH X 3'-6" UPTURNED BEAM) - (1'-8" COLUMN WIDTH X 10'-2" COLUMN HEIGHT) - (30'-0" WIDTH OF RAMP & COLUMNS X 10'-2 RAMP AREA) = (1765.75 SF AREA OF EAST FACADE) - (452.10 SF AREA OF UPTURNED BEAM) - (17.00 SF AREA OF COLUMN) - (305.10 AREA OF RAMP) = 991.55 SF AREA OPEN / 1765.75 AREA OF EAST FACADE = 56.15% OPEN WEST ELEV. = 56.15% (129'-2" BRDIGE LENGTH X 13'-8" BRIDGE CLR. HEIGHT) - (129'-2" BRIDGE LENGTH X 3'-6" UPTURNED BEAM) - (1'-8" COLUMN WIDTH X 10'-2" COLUMN HEIGHT) - (30'-0" WIDTH OF RAMP & COLUMNS X 10'-2 RAMP AREA) = (1765.75 SF AREA OF WEST FACADE) - (452.10 SF AREA OF UPTURNED BEAM) - (17.00 SF AREA OF COLUMN) - (305.10 AREA OF RAMP) = 991.55 SF AREA OPEN / 1765.75 AREA OF WEST FACADE = 56.15% OPEN

G-D G-45

EQ

EQ

EQ

27' - 0"

EQ

G-46

EQ

2' - 0"

18' - 2"

7.01

3' - 0"

30' - 0"

Q-CC

RR/IS - TRANSVERSE SECTION AT RAMP AND BRIDGES G-Y

G-X

G-W

G-V

G-U G-T

G-S

G-R

G-Q

1/16" = 1'-0"

G-P G-N

RR/IS - JOCKEY RAMP LANDING - ENLARGED PLAN

5

G-M

G-K

Q-1

3' - 0"

36' - 0"

6' - 0"

1' - 0"

** NOTE: FULLY SPRINKLERED UNDER LANDINGS, BRIDGES

127' - 10"

C.I.P. UPTURNED CONCRETE BEAM, RE:STRUCTURAL

6' - 0"

24' - 0"

6' - 0"

12' - 0"

1' - 6"

16' - 6"

R2 0'-0 "

10' - 0"

10' - 0" 2' - 2"

12' - 0"

QTA - LEVEL 1

98'-6"

18' - 0"

EQ

12' - 0"

13' - 8"

EQ

26' - 1"

29' - 1"

13' - 3" CLR.

LEVEL 1 - FIRE LANE

4' - 8"

EQ

24' - 0" 30' - 0"

G-46

5' - 6"

EQ

6' - 0"

112'-6"

4' - 0"

4' - 10"

R3'-0 "

9' - 0" 14' HYDRAULIC BARRIER AND GATE ARM, TYP

24' - 0"

CONCRETE JERSEY BARRIER, FINAL CONFIGURATION TO BE COORDINATED W/ FUTURE TENANT LAYOUTS

QTA - LEVEL 2

CLR.

12' - 9"

RR/IS - LEVEL 1

OPEN TO SKY

0.3%

LEVEL 2 BRIDGE

13' - 8"

112'-2"

ACCESS CONTROL CARD READER, RE: SECURITY

QTA - LEVEL 3

EQ

12' - 0"

EXPANSION JOINT 4" DIAGONAL STRIPING

Sim

6 A7.114

EQ

12' - 9"

RR/IS - LEVEL 2

UPTURNED BEAM OVER FIRE LANE 0.5%

126'-6"

13' - 8"

125'-10"

LEVEL 3 BRIDGE

@ FIRE LANE

RR/IS - LEVEL 3

CLR.

12' - 11 1/2"

LEVEL 4 LANDING

13' - 8"

139'-6"

CLR.

RR/IS - LEVEL 4

EMERGENCY EGRESS STAIR BEYOND RAMP (LEVEL 1 - 4) BEYOND

-0" R3'

13' - 0"

152'-6"

OPEN TO SKY

RR/IS - LEVEL 5

G-J

G-H

G-G G-F

1/16" = 1'-0"

Q-BB

RR/IS - JOCKEY BRIDGE - ENLARGED PLAN

4

G-E

G-D

G-C

1/16" = 1'-0"

3

G-B

5 A7.114

RR/IS - LEVEL 5

BRIDGE 4

8.0%

11.2%

LEVEL 2 LANDING

12.4%

LEVEL 1 DRIVEWAY

LEVEL 3 LANDING

BRIDGE 2

BRIDGE 3

BRIDGE 1

8.0%

11.2%

LEVEL 3 LANDING

11.5%

LEVEL 2 LANDING

LEVEL 1 DRIVEWAY

RETAINING WALL

LEVEL 1 DRIVEWAY

SHEAR WALL

13'-8" 13'-8" 13'-8" 13'-0"

152'-6" LEVEL 4 LANDING

12.3%

12.4%

LEVEL 1 DRIVEWAY

SHEAR WALL

RR/IS - LEVEL 4 139'-6" RR/IS - LEVEL 3 125'-10" RR/IS - LEVEL 2 112'-2" RR/IS - LEVEL 1

SHEAR WALL

98'-6"

RR/IS - QTA/RR JOCKEY RAMP AND EXPRESS BRIDGES G-Y

G-X

G-W

60' - 0"

G-V

60' - 0"

3 A7.114

60' - 0"

G-U 60' - 0"

G-T 5' - 0"

G-S

G-R

60' - 0"

G-Q

60' - 0"

G-P

60' - 0"

60' - 0"

G-N

5' - 0"

G-M

G-K

60' - 0"

60' - 0"

G-H

60' - 0"

RR/IS PARKING STRUCTURE OPEN PARKING STRUCTURE

G-G

60' - 0"

60' - 0"

G-F 5' - 0"

G-E

G-D

60' - 0"

60' - 0"

4 A7.114

G-C

G-B

60' - 0"

60' - 0"

EMERGENCY EGRESS STAIR & ELEC/TECHNOLOGY ROOM STACK

2

G-A 60' - 0"

EMERGENCY EGRESS STAIR & ELEC/TECHNOLOGY ROOM STACK

G-46

36' - 0"

36' - 0"

131' - 0"

13' - 5"

CLEAR

EQ EQ

CLEAR

13' - 5 3/8"

13' - 1"

CLEAR

13' - 1"

36' - 0"

36' - 0"

36' - 0"

36' - 0"

36' - 0"

0.5%

0.3%

36' - 0"

36' - 0"

36' - 0"

36' - 0"

5' - 0"

36' - 0"

36' - 0"

36' - 0"

36' - 0"

36' - 0"

36' - 0"

36' - 0"

36' - 0"

22' - 5 3/8" 13' - 6 5/8"

36' - 0"

40' - 0"

40' - 0"

36' - 0"

40' - 0"

40' - 0"

36' - 0"

5' - 0"

27' - 0"

Q-1

QTA PARKING STRUCTURE OPEN PARKING STRUCTURE

Q-GG

Q-FF

Q-EE

Q-DD

Q-CC

Q-BB

Q-AA

Q-Z

Q-Y

Q-X

Q-W

Q-V

Q-U Q-T

Q-S

Q-R

Q-Q

Q-2

Q-P

Q-N

Q-M

Q-L

Q-K Q-J

Q-H

Q-G

Q-F

Q-E

Q-D

Q-C

Q-B

Q-A

RR/IS - JOCKEY RAMP AND EXPRESS BRIDGES OVERALL

D

E

F

G

H

AA BB CC

1

REGISTRATION DATE

04-15-2020 RFCD-APDU #12 - ISSUED FOR APPROVAL

DESCRIPTION

1/32" = 1'-0"

1

PROJECT TITLE

LAX CONSOLIDATED RENT-A-CAR FACILITY

COPYRIGHT © 2020

NS

ED AR CH I Y P. GER RE

SHEET TITLE

07-31-2019 2 21

TE

RENEWAL DATE

RR & IS GARAGE - BUILDING SECTION THRU JOCKEY RAMPS SHEET NUMBER

C-27945

NI A

B

C

№.

F

A

RR/IS 5251 W. 98TH ST. CSB (5TH FLOOR) WEST 5251 W. 98TH ST., SUITE 500 CSB (5TH FLOOR) EAST 5251 W. 98TH ST., SUITE 501 QTA 525 S. LA CIENEGA BLVD. DWP YARD 5274 W. ARBOR VITAE ST. FIRE COMMAND CENTER 9617 S. LA CIENEGA BLVD.

REVISIONS

CT

PGAL 6033 W. CENTURY BLVD. SUITE 895 LOS ANGELES, CA 90045

PROJECT LOCATION

TE

LA GATEWAY PARTNERS 5200 W. CENTURY BLVD. SUITE 201 LOS ANGELES, CA 90045

KEY PLAN

CONSULTANT

LIC E

CONTRACTOR

JEF

DEVELOPER

A

BIM 360://5200277 ConRAC - BIM Coordination/ARCH_LAX-ConRAC_RR_RVT2019_.rvt 4/22/2020 3:05:34 PM

FIRE LANE

ST

DATE STAMP:

36' - 0"

LEVEL 3 LANDING LEVEL 1 DRIVEWAY BELOW

LEVEL 2 LANDING LEVEL 1 DRIVEWAY BELOW

R BE

FILE NAME:

LEVEL 4 LANDING LEVEL 3 BRIDGE BELOW LEVEL 2 BRIDGE BELOW

CLEAR

CLEAR

13' - 4 3/8"

LEVEL 3 LANDING LEVEL 2 BRIDGE BELOW LEVEL 1 DRIVEWAY BELOW

0.5%

CLEAR

EQ EQ

LEVEL 3 BRIDGE LEVEL 2 LANDING BELOW LEVEL 1 DRIVEWAY BELOW

296 DFU

50 DFU

13' - 4 3/8"

10' - 0"

5' - 0"

EMERGENCY EGRESS STAIR & ELEC/TECHNOLOGY ROOM STACK

G-J

1/32" = 1'-0"

O F CA LI FO

R

A7.114

9


CVG AIRPORT_CONRAC PGAL

10


GENERAL NOTES 1 4-A2.12

1 4-A2.22A

C-105.1 UP DN

C-H.1 32'-6"

A

GENERAL NOTES 1. REFER TO A0.10 FOR PARTITION TYPES 2. REFER TO 4-A0.25 FOR FINISH SCHEDULE 3. REFER TO 4-A0.30 FOR DOOR SCHEDULE 4. REFER TO LIFE SAFETY PLANS FOR FIRE RATED WALLS 5. WHERE ENLARGED DRAWINGS ARE REFERENCED, SEE ENLARGED PLANS FOR DIMENSIONS, ELEVATION, KEY NOTES, ETC. 6. ALL INTERIOR DIMENSIONS ARE TO FACE OF GYP, U.N.O. 7. REFER TO 4-A2.50 SHEET SERIES FOR FLOOR SLOPES AND EDGE OF SLAB PLANS 8. REFER TO LANDSCAPE DRAWINGS FOR HARDSCAPE, LANDSCAPE, PAVING, IRRIGATION, ETC., AND COORDINATE WITH CIVIL DRAWINGS FOR DRAINAGE AND ADJACENT PAVEMENT 9. REFER TO STRUCTURAL DRAWINGS FOR ALL STRUCTURAL ELEMENT SIZES, CONNECTIONS AND DETAILS 10. REFER TO FUELING AND EQUIPMENT DRAWINGS FOR ALL EQUIPMENT WITHIN MAINTENANCE BAYS, CARWASH BAYS, FUELING AREA, EQUIPMENT ROOM, ETC 11. SEE SHEETS 4-A0.40 THROUGH 4-A0.42 FOR WINDOW TYPES

1 4-A2.32

C-B.3

EXISTING T1 GARAGE TO REMAIN

7'-6"

A.8

40'-0"

B

CSB

20'-0" 20'-0"

C D

EXISTING TERMINAL TO REMAIN

DN UP DN

C-M.5

40'-0"

E

F 32'-0"

360'-0"

UP

QTA

8'-0"

F.8

40'-0"

G

8'-0" 20'-0" 20'-0" 20'-0" 20'-0"

H J K L M

READY RETURN WEST-A

31

READY RETURN EAST-B

40

32

47

33

46

1 4-A2.22B

41

42

RETURN HELIX

READY HELIX

36

32'-0"

M.2

30

37

43

N 35

34 1 4-A4.21

2'-9" 20'-0"

22'-0"

45

20'-0"

30'-0"

49'-3"

3'-0"

40'-0"

40'-0"

40'-0"

40'-0"

40'-0"

87'-0"

44

2 4-A4.21

60'-0"

60'-0"

60'-0"

60'-0"

60'-0"

3'-0"

60'-0"

60'-0"

60'-0"

60'-0"

977'-0"

01

02

03

04

05

06 07

09

08

10

11

1313.3

12

13.714

15

16

17

18

19

20

21

22

23

24

LEVEL 2 FLOOR PLAN - OVERALL

1" = 50'-0"

EXISTING T2 GARAGE TO REMAIN

1 4-A2.11

2 EXISTING T3 GARAGE TO REMAIN

1 4-A2.21A

C-B.3

EXISTING T1 GARAGE TO REMAIN

1 4-A2.31

C-105.1 UP

C-H.1 32'-6"

A

7'-6"

A.8

UP

20'-0" 20'-0" 80'-0" 40'-0"

B

C D

C-M.5

EXISTING TERMINAL TO REMAIN

UP

40'-0"

E

CSB

READY RETURN GARAGE

SERVICE YARD

32'-0"

QTA

8'-0"

1 4-A2.21B

GARAGE EAST (GROUND TRANSPORTATION)

L M M.2

SERVICE YARD

8'-0" 20'-0" 20'-0" 20'-0" 20'-0"

J

K

30

31

40

37

32

41

47

42

RETURN HELIX

READY HELIX

36

32'-0"

H

33

43

46

34

45

2 4-A4.20

44

MATCHLINE

35

1 4-A4.20

JOCKEY BRIDGE

2'-9" 20'-0"

22'-0"

20'-0"

30'-0"

49'-3"

3'-0"

40'-0"

40'-0"

40'-0"

40'-0"

40'-0"

87'-0"

60'-0"

60'-0"

60'-0"

60'-0"

60'-0"

3'-0"

60'-0"

60'-0"

60'-0"

60'-0"

CSB

977'-0"

01

02

03

04

05

MATCHLINE

N

DATE STAMP: 3/1/2019 2:53:59 PM

FILE NAME:

C:\@RevitLocals\CVG CONRAC - ARCH - RVT2018 - MODEL_RTownson@pgal.com.rvt

40'-0"

G

360'-0"

F F.8

06 07

08

09

10

11

12

1313.3

13.714

15

16

17

18

19

20

21

22

23

24

LEVEL 1 FLOOR PLAN - OVERALL CONSULTANT

ARCHITECT

PGAL, INC 1425 ELLSWORTH INDUSTRIAL BLVD, #15 ATLANTA, GA 30318 [T] 404-602-3800 [F] 404-602-3810

READY RETURN GARAGE WEST

QTA GARAGE

PGAL

DATE

#

REVISION

BY

AUTH.

1" = 50'-0"

1

MATCHLINE

READY RETURN GARAGE EAST

RETURN HELIX

PLAN NORTH

READY HELIX

KEY PLAN

CVG International Airport New Consolidated Rental Car Facility

KENTON COUNTY AIRPORT BOARD

OVERALL FLOOR PLANS − LEVELS 1 AND 2 1003084 CHK BY:

PROJ.NO:

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

DATE:

PJH

03/01/2019 APPR. BY:

DRAWN BY:

RRT

SCALE:

JAW AS SHOWN

100% BP4 ISSUED FOR CONSTRUCTION

SHEET NO:

4−A2.02

11


C-M.5

KEYNOTES 1

1. ARCHITECTURAL PRE-CAST CONCRETE TILT-UP PANEL ON HELIX RAMP 2. PRE-CAST CONCRETE STAIR ENCLOSURE WITH FORMLINER 3. CUSTOM STAINLESS STEEL MESH PANELS (MP-#) 4. BLANK STAINLESS STEEL MESH PANELS 5. IMPACT RATED HORIZONTAL GALVANIZED CABLE BARRIERS @ 4” O.C. WITH VERTICAL TUBE STEEL METAL SUPPORTS – RE: STRUCT. 6. GLAZED ALUMINUM STOREFRONT SYSTEM

4-A7.00

A

A.8

B

C

E

D

G

F

H

K

J

L

M

N

5

2

FRL-1 TYP

TYP

LEVEL 5 929'-5 1/4" LEVEL 4 915'-5 1/4" LEVEL 3 901'-5 1/4" LEVEL 2 887'-5 1/4"

MATERIALS & ASSEMBLIES FCS-1 FRL-1 PCB-1

LEVEL 1 - T.O. GARAGE DRIVE 871'-5 1/4"

TENSIONED METAL MESH SYSTEM CONCRETE FORMLINER PRECAST CONCRETE BASE

1 TYP

C-M.5

WEST ELEVATION - CSB & READY RETURN GARAGE 1/32" = 1'-0" 4

CUSTOMER SERVICE BUILDING OMITTED TO SHOW GARAGE ELEVATION BEYOND FOR CLARIFICATION PURPOSES

1 4-A7.00

N

2

M

4

L

K

J

H

TYP

5

G

F

E

J.9

D

B

C

A.8

A

PCB-1

TYP

LEVEL 5 929'-5 1/4" LEVEL 4 915'-5 1/4" LEVEL 3 901'-5 1/4" LEVEL 2 887'-5 1/4" LEVEL 1 - T.O. GARAGE DRIVE 871'-5 1/4" 1 TYP

EAST ELEVATION - CSB & READY RETURN GARAGE

1/32" = 1'-0"

3

2 4-A7.00

13.7 14

15

16

17

18

19

20

21

22

23

24

5

FCS-1 TYP

16'-0"

14'-0"

14'-0"

14'-0"

TYP

LEVEL 5 929'-5 1/4" LEVEL 4 915'-5 1/4" LEVEL 3 901'-5 1/4" LEVEL 2 887'-5 1/4" LEVEL 1 - T.O. GARAGE DRIVE 871'-5 1/4"

1 TYP

SOUTH ELEVATION - CSB & READY RETURN GARAGE

1/32" = 1'-0"

2

12

C-110

1 4-A6.02

24

23

22

21

20

19

18

17

16

15

14 13.7

13.3 13

12

10

11

09

08

07

3

0.80.6

5 TYP

FCS-1 TYP

4-A7.00

PCB-1

2

LEVEL 5 929'-5 1/4" LEVEL 4 915'-5 1/4" LEVEL 3 901'-5 1/4" LEVEL 2 887'-5 1/4"

CSB LOW LANDING 872'-5 1/4"

LEVEL 1 - T.O. GARAGE DRIVE 871'-5 1/4" 1 TYP

DATE STAMP: 3/1/2019 3:07:59 PM

FILE NAME:

C:\@RevitLocals\CVG CONRAC - ARCH - RVT2018 - MODEL_RTownson@pgal.com.rvt

2 4-A7.00

NORTH ELEVATION - CSB & READY RETURN GARAGE 1/32" = 1'-0" 1 CONSULTANT

ARCHITECT

PGAL, INC 1425 ELLSWORTH INDUSTRIAL BLVD, #15 ATLANTA, GA 30318 [T] 404-602-3800 [F] 404-602-3810

PGAL

DATE

#

REVISION

BY

AUTH.

CVG International Airport New Consolidated Rental Car Facility

KENTON COUNTY AIRPORT BOARD

ELEVATIONS − CSB & READY RETURN GARAGE 1003084 CHK BY:

PROJ.NO:

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

DATE:

PJH

03/01/2019 APPR. BY:

DRAWN BY:

RRT

SCALE:

JAW AS SHOWN

100% BP4 ISSUED FOR CONSTRUCTION

SHEET NO:

4−A6.00


A

A

A

CAST-IN-PLACE COLUMN BEYOND LINE OF COLUMN BEYOND

SST UPPER FIXED BRACKET

LEVEL 4 915'-5 1/4" MAXIMUM EMBEDMENT OF POST-INSTALLED ANCHORS IS 3"; RE STRUCUTRAL

GALV STL POST-INSTALLED ANCHORS AS RQD

INTERMEDIATE PIVOT BRACKET

WOVEN SST FABRIC WITH FACTORY-ETCHED PATTERN FORMED INTO EXTENDED LOOPS AT TOP ATTACHMENT

3/4" = 1'-0"

8

GALV STL BRACKET AS RQD

DETAIL SECTION AT GARAGE SKIN ATTACHMENT - INTERMEDIATE

3/4" = 1'-0"

J-BOX; RE: ELECTRICAL

WOVEN SST FABRIC WITH FACTORY-ETCHED PATTERN FORMED INTO EXTENDED LOOPS AT BOTTOM ATTACHMENT

8 4-A6.50

BRACKET

SST ROUND TUBE BOTTOM ATTACHMENT EXTERIOR LIGHTING; RE: ELECTRICAL

5/8" X 7" SS HEX BOLT WITH NEOPRENE FACED WASHERS AND LOCK NUT

VARIES

4 3/4" X 6" X 1/4" ALUMINUM TUBE

ADJUSTABLE SST BOTTOM BRACKET

2

COLUMN BEYOND

EDGE OF SLAB

MAXIMUM EMBEDMENT OF POST-INSTALLED ANCHORS IS 3"; RE STRUCUTRAL

PERFORATED METAL PANEL

3/4" = 1'-0"

6

GARAGE SKIN - ATTACHMENT PLAN DETAIL

3/4" = 1'-0"

5

16

4-A6.50

CAST IN PLACE CONC. KNEE WALL; RE: STRUCTURAL

1/2" X 5 1/2" CONCRETE EXPANSION ANCHOR

LEVEL 2 887'-5 1/4"

DETAIL SECTION AT GARAGE SKIN ATTACHMENT - BOTTOM

7

A

A

CONDUIT; RE: ELECTRICAL

8" MIN; RE: STRUCTURAL

LEVEL 5 MAXIMUM EMBEDMENT OF 929'-5 1/4" POST-INSTALLED ANCHORS IS 3"; RE: STRUCUTRAL

SST ROUND TUBE BOTTOM ATTACHMENT BEYOND

SLEEVING; RE: STRUCTURAL

EDGE OF SLAB

5" MIN; RE: STRUCTURAL

5" MIN; RE: STRUCTURAL

SST ROUND TUBE TOP ATTACHMENT

DETAIL SECTION AT GARAGE SKIN ATTACHMENT - TOP

CONCRETE DECK; RE: ST DWGS

CONCRETE DECK; RE: ST DWGS

GALV STL EMBED RECOMMENDED BY MESSER THP TO CONFIRM

LOW PARAPET 931'-7"

LOW PARAPET 931'-7"

LEVEL 5 929'-5 1/4"

LEVEL 5 929'-5 1/4"

C.I.P. CONCRETE COLUNM BEYOND 14'-0"

HORIZONTAL GALVANIZED CABLE BARRIERS, TYP.

4'-0"

WOVEN METAL SCREEN LIGHT; RE: ELECTRICAL

WOVEN METAL SCREEN SUPPORT

LEVEL 1 - T.O. GARAGE DRIVE 871'-5 1/4"

LEVEL 4 915'-5 1/4"

LEVEL 4 915'-5 1/4"

LEVEL 3 901'-5 1/4"

LEVEL 3 901'-5 1/4"

7 4-A6.50

14'-0"

FOUNDATION; RE: STRUCTURAL

DETAIL SECTION AT GARAGE SKIN ATTACHMENT - CURB

3/4" = 1'-0"

4

A 14'-0"

HORIZONTAL GALVANIZED CABLE BARRIERS C.I.P. CONCRETE COLUNM BEYOND

T3 BAGGAGE CLAIM MECH LEVEL 890'-5 1/4"

T3 BAGGAGE CLAIM MECH LEVEL 890'-5 1/4"

T3 BAGGAGE CLAIM MECH LEVEL 890'-5 1/4"

LEVEL 2 887'-5 1/4"

LEVEL 2 887'-5 1/4"

LEVEL 1 - CSB F.F. 871'-11 1/4"

LEVEL 1 - T.O. GARAGE DRIVE 871'-5 1/4"

6 4-A6.50

WALL SECTION AT GARAGE SKIN-QTA

15'-6"

12'-5" SEE 4-A6.51 FOR PANEL TYPES 4 4-A6.50

DATE STAMP: 3/1/2019 3:10:47 PM

FILE NAME:

C:\@RevitLocals\CVG CONRAC - ARCH - RVT2018 - MODEL_RTownson@pgal.com.rvt

LEVEL 2 887'-5 1/4"

LEVEL 1 - T.O. GARAGE DRIVE 871'-5 1/4"

1/4" = 1'-0"

3

WALL SECTION AT GARAGE SKIN

1/4" = 1'-0"

TYP GARAGE SKIN

2

CONSULTANT

ARCHITECT

PGAL, INC 1425 ELLSWORTH INDUSTRIAL BLVD, #15 ATLANTA, GA 30318 [T] 404-602-3800 [F] 404-602-3810

PGAL

DATE

#

REVISION

BY

AUTH.

1/4" = 1'-0"

1

CVG International Airport New Consolidated Rental Car Facility

KENTON COUNTY AIRPORT BOARD

ENLARGED GARAGE SKIN DETAILS 1003084 CHK BY:

PROJ.NO:

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

DATE:

03/01/2019 APPR. BY:

DRAWN BY:

Author

SCALE:

Checker Approver AS SHOWN

100% BP4 ISSUED FOR CONSTRUCTION

SHEET NO:

4−A6.50

13


GENERAL NOTES

GENERAL NOTES 1. REFER TO A0.10 FOR PARTITION TYPES 2. REFER TO 4-A0.25 FOR FINISH SCHEDULE 3. REFER TO 4-A0.30 FOR DOOR SCHEDULE 4. REFER TO LIFE SAFETY PLANS FOR FIRE RATED WALLS 5. WHERE ENLARGED DRAWINGS ARE REFERENCED, SEE ENLARGED PLANS FOR DIMENSIONS, ELEVATION, KEY NOTES, ETC. 6. ALL INTERIOR DIMENSIONS ARE TO FACE OF GYP, U.N.O. 7. REFER TO 4-A2.50 SHEET SERIES FOR FLOOR SLOPES AND EDGE OF SLAB PLANS 8. REFER TO LANDSCAPE DRAWINGS FOR HARDSCAPE, LANDSCAPE, PAVING, IRRIGATION, ETC., AND COORDINATE WITH CIVIL DRAWINGS FOR DRAINAGE AND ADJACENT PAVEMENT 9. REFER TO STRUCTURAL DRAWINGS FOR ALL STRUCTURAL ELEMENT SIZES, CONNECTIONS AND DETAILS 10. REFER TO FUELING AND EQUIPMENT DRAWINGS FOR ALL EQUIPMENT WITHIN MAINTENANCE BAYS, CARWASH BAYS, FUELING AREA, EQUIPMENT ROOM, ETC 11. SEE SHEETS 4-A0.40 THROUGH 4-A0.42 FOR WINDOW TYPES

KEYNOTE LEGEND

2 4-A7.01

8.02

C-100

LINE OF STRUCTURE ABOVE

40'-0"

1 4-A6.08

C-112

1'-6"

C-M.5

1° 10

10'-0"

C-112A

8.04

21

22

23

4-A8.04

F230 F230

UP

24

11 3/8"

STAIR 3

6'-9 3/8"

C-128

4.99%

C-124

A260

TECH.

C-126

C-124

A260

A260

C-127

18'-6"

A260

WOMEN'S

MEN'S

C-125

C-127

C-N 1 4-A4.31

10'-11"

1 4-A5.04

77'-0" 105'-4 3/8"

GGGG

LEVEL 1 ENLARGED FLOOR PLAN - CSB

PGAL, INC 1425 ELLSWORTH INDUSTRIAL BLVD, #15 ATLANTA, GA 30318 [T] 404-602-3800 [F] 404-602-3810

PGAL

DATE

#

REVISION

BY

AUTH.

MATCHLINE SEE 1 / 4-A2.21B

A260

C-123

C-M

C-128B

CSB

ARCHITECT

1 4-A7.01

A260 C-128A

2 4-A5.04

JAN. C-126

EMER. ELEC.

1'-0 5/8"

CONSULTANT

29'-10"

1'-4"

4-A8.04

C-122A

5

4-A6.02

4-A7.52

NURSING MOTHERS ROOM

C-122B

10'-10"

FFFF

1

2

DN

24'-11 5/8"

C-122

S3-101

4-A7.01

4.99%

877'-5 1/4"

1 4-A9.09

3 4-A5.04

EXISTING 4.99% BAGGAGE CLAIM

9.02

877'-5 1/4"

C-123

ELECTRICAL

S3-101

2 4-A7.01

3

4-A8.02

3'-7 1/4"

1 4-A9.03

C-102

F230

16'-2 3/8"

6

3'-0" 5'-9 3/4"

CIRCULATION

3

MATCHLINE

MATCHLINE REF 1 / 4-A2.21A

20

4-A7.01

1

FIDS BY OWNER. PROVIDE POWER AND DATA

23'-3 3/4"

10'-0"

4-A8.01

35'-10 1/8"

4

F.E.C.

3

4-A8.02

A260

A260

4-A8.02

4.95%

F.E.C.

1 4-A4.35

5

4-A6.02

874'-2 1/4"

4 4-A5.01

9 4-A5.01

C-8

8'-5 1/2" 65'-11 5/8"

A260

4-A8.02

29'-8 1/4"

874'-2 1/4"

5 4-A8.04

C-8

21'-3 3/4"

8.02

4'-9 3/4" 11 1/4" 1'-5 1/8"

6"

9.02

3

1 34'-5 3/8"

A260

5

9.02

4-A7.01

3

READY RETURN GARAGE 19

3'-10"

11'-0"

9.02

23'-5 1/2"

4-A8.04

C-9

C-121

9.03

8.02

VESTIBULE

C-9

C-120

A260

871'-11 1/4"

4-A7.70

CAFE/ LOUNGE

63'-9"

18'-10 1/2"

4

4-A8.03

C-112B

6 4-A8.02

C-119

A260

2

31'-3 1/8"

CAFE

C-119

29'-5 5/8"

9.03

9.02

1'-6"

C-10

A260

CAFE SUPPORT

F.E.C.

1'-4 5/8"

1'-6"

1'-6" 5'-0" 11 1/4"

5'-9" 16'-5"

40'-0" 9.03

4

5'-0" 11 1/4"

1'-6"

9.05

C-111

4-A7.01

F.E.C.

3'-10"

5'-0" 11 1/4"

5'-4"

3'-10"

1'-6"

4-A8.03

A260

A260

C-118

4 4-A5.04

4 7/8"

4.95%

10'-0 1/8"

10'-2 3/4"

3'-10"

1'-6" 5'-0" 11 1/4"

3'-10"

12'-11"

WAITING

A260

E

DATE STAMP: 3/1/2019 2:58:03 PM

C:\@RevitLocals\CVG CONRAC - ARCH - RVT2018 - MODEL_RTownson@pgal.com.rvt

1

C-117

CONFERENCE ROOM

A260

38'-0 1/8"

21'-11" A260

C-118

4-A8.03

874'-2 1/4"

9'-2 1/4"

C-117

STOR.

5

A260

8.04

1'-0 5/8"

FILE NAME:

9.03

38'-11 3/8"

4-A8.02

54'-3 5/8"

27'-1"

40'-0" 118'-11 3/8"

C-110A

4-A6.07

14

A260

F.E.C. 2'-11"

A260

14'-4 1/4"

SIM

DIGITAL DIRECTORY BY OWNER. PROVIDE POWER AND DATA

2

C-116

A260

26'-0"

C-116B

B.O.H. 4

6°

3

A260 A260

TYP

3/32" = 1'-0"

1

1'-0 5/8"

8.02 1 4-A4.37

52'-7 1/4"

30'-0"

8 3/4"

A260

C-115

10 1/4"

C-110

12'-8 5/8"

VESTIBULE

19'-0 1/8"

C-116A

B.O.H. 3

878'-1 1/4" T.O. CURB

1'-7"

1 4-A7.71

8'-9 1/4"

C-109

A260

26'-0"

0.8

876'-0 23/32"

878'-1 1/4" T.O. RETAINING WALL

C-7

38'-0 1/8" 4 7/8"

° 79

1° 10

C-110B

1 4-A8.01

1'-7"

4 7/8"

876'-5" T.O. CURB

14'-11 1/2" 3 3/8"

11"

4-A8.01

38'-0 1/8"

TYP

876'-0 5/8"

23'-8"

876'-5" T.O. RETAINING WALL

1 4-A7.71

0.6

876'-0 1/2"

1'-2"

4-A7.01

C-6

C-110

38'-10"

6

871'-11 1/4"

12.01

C-115

C-114

9.02

8 4-A5.01

874'-10 1/4" T.O. CURB

A260

B.O.H. 2

11'-1" 9.03

1'-7"

4 7/8"

1'-2"

TYP

5

52'-0"

C-129

A260

A260

4'-0"

COUNTER

C-114

1 4-A7.71

24'-7"

1'-6"

4-A8.03

7'-0 3/4"

DDDD

3

C-109

A260

874'-10 1/4" T.O. RETAINING WALL

876'-0 3/8"

1'-2 1/2"

60'-10 5/8"

4-A8.04

9.05

26'-10 3/4"

7'-11 1/2" 3'-1 1/2" 3 3/4" A260

6

1'-8 1/4"

CHASE / SUPPORT

3'-4 7/8"

C-107

1 4-A7.54

C

C-113

JAN.

C-107

10'-8"

C-L

C-106

38'-0 1/8"

11'-0"

MEN C-108

6

24'-10"

38'-10" C-5

4-A8.03

C-109

876'-0 1/8"

873'-2 1/4" T.O. CURB

4'-0"

4 4-A6.02

B.O.H. 1

40'-0"

40'-0"

1'-7"

4 7/8"

C-108

875'-0 3/8"

16'-10 3/8"

S2-101

FAMILY RR

TYP 1'-2"

38'-0 1/8"

A260

C-113

1 4-A7.71

1'-7"

4 7/8"

C-103

12.01

2'-1 5/8"

C-107B

QUEUING

4'-0"

52'-0"

6'-9 3/8"

1'-0 1/4"

2

13'-8 3/4"

80'-0 1/8"

STAIR 2

8'-0"

4-A8.03

18'-1 1/8"

20'-10"

1 4-A4.30

C-105

9"

7'-11"

F.E.C.

C-106

61'-2 7/8"

18'-0"

11"

WOMEN

1 4-A9.02

C-K

4-A8.05

XX

28'-7"

S2-101B

UP

C-107 40'-0"

4-A7.01

873'-1 1/4" T.O. CURB

39'-7 1/8"

19'-11"

1'-0 3/8"

C-106

40'-0"

5

C-4

1

9.02

4-A8.04

5'-9 3/8"

1 4-A7.71

4 4-A7.54

8

8'-5 3/4"

1 4-A6.02

874'-0 1/4"

TYP

9.02

C-101

C-104B C-104A

C-J

4-A8.01

4-A8.04

S2-101A

B

4-A8.01

4

EEEE

40'-0" 38'-10"

873'-1 1/4" T.O. CURB

5'-0" 11 1/4"

C-104

18'-9 1/4"

C-I

1'-2"

4

F.E.C.

27'-5"

4-A8.04

1 4-A4.36

C-105 C-105.1

4-A7.01

C-4

2

VESTIBULE

873'-0 23/32"

38'-10"

TYP

4

ELEVATOR QUEUING

7

1 4-A7.01

9'-1 1/2" 9 1/4" 7'-2 3/4" 1'-1 1/2"

1 4-A9.21

1 4-A7.71

9.03

4 4-A8.08

12.01

40'-0"

873'-1 1/4" T.O. CURB

C-4

7 4-A5.01

S1-101

UP

10'-11 1/8"

CCCC

STAIR 1

3 4-A5.01

9.05 C-104

1'-2"

F.E.C.

5'-4"

E1B-101

9.02 9.03

873'-0"

40'-0" 38'-10 1/2"

C-3

E1A-101 1 4-A5.01

C-103

1'-1 1/2"

C-2

C-1

E1C-101

ELEV. 1A

5'-9"

C-G C-H C-H.1

E1D-101

20'-2"

6'-6" 1'-1 1/2" 7'-7 1/2"

5'-4" 5'-4"

ELEV. 1B

5'-4"

C-F

A

4-A6.02

ELEV. 1C

5'-4"

C-D

E1E-101

ELEV 1D

20'-2"

1'-1 1/2"

ELEV. 1E 2

C-102

1 4-A9.01

27'-5 1/2"

C-C

TWO (2) FULLY GLAZED AUTOMATIC SLIDING DOORS WITH EMERGENCY BREAKOUT FULL HEIGHT GLAZING TO GARAGE THRESHOLD TO PROVIDE PROTECTION FROM ELEMENTS TERRAZZO FLOORING CUSTOM PREFINISHED ALUMINUM COLUMN ENCLOSURE ARCHITECTURAL WALL PANELS FULL HEIGHT WITH S.S BASE CUSTOM MILLWORK TRANSACTION COUNTER. PROVIDE CONDUIT AND PULL-STRING TO INDIVIDUAL TENANT TELCOMM CLOSETS

8.04

4-A7.01

28'-10"

28'-7"

8'-0"

C-B C-B.3

C-E

3

C-101

5'-6 3/4"

MATCHLINE

C-99

C-A

MATCHLINE

PLAN NORTH

KEY PLAN

CVG International Airport New Consolidated Rental Car Facility

KENTON COUNTY AIRPORT BOARD

LEVEL 1 ENLARGED FLOOR PLAN − CSB 1003084 CHK BY:

PROJ.NO:

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

DATE:

PJH

03/01/2019 APPR. BY:

DRAWN BY:

RRT

SCALE:

JAW AS SHOWN

100% BP4 ISSUED FOR CONSTRUCTION

SHEET NO:

4−A2.31

J.9


C-M.5 C-A C-N

F

E

C-M

C

C-B.3 C-C

C-E

C-H.1 C-H

XX

C-I

C-J

C-K

C-L

KEYED NOTES

DDDD

J.9

EMP-2 TYP

EMP-2 TYP

EMP-2

EMP-2

LEVEL 5 929'-5 1/4"

LEVEL 5 929'-5 1/4"

EMP-1A TYP

FRL-1 TYP

LEVEL 4 915'-5 1/4"

LEVEL 4 915'-5 1/4" EMP-1A TYP

LEVEL 3 901'-5 1/4"

C-101

LEVEL 2 887'-5 1/4"

LEVEL 2 887'-5 1/4"

LEVEL 1 - CSB F.F. 871'-11 1/4"

T.O. SCREEN 875'-11 1/2"1 - CSB F.F. LEVEL 871'-11 1/4"

C-102

WEST ELEVATION - ENLARGED CSB

C-103

C-104

3 4-A7.01

MATERIALS & ASSEMBLIES

LEVEL 3 901'-5 1/4"

EMP-1B TYP

EAST ELEVATION - ENLARGED CSB 1/16" = 1'-0" 5

C-100

#

1. ALUMINUM PLATE RAIN SCREEN PANEL SYSTEM, (EMP-1A) 2. ALUMINUM PLATE RAIN SCREEN PANEL SYSTEM, (EMP-1B) 3. INSULATED METAL WALL PANEL, (EMP-2) 4. CLEAR VISION INSULATED GLASS, (GL-1) 5. PRECAST CONCRETE BASE, (PCB-1) 6. VISION BARRIER SCREEN, (LVR-1)

B EEEE

C-105.1 C-105

C-106

C-107

4

5

6

4-A7.01

4-A7.01

4-A7.01

1/16" = 1'-0"

C-2 C-4 C-5 C-6 C-7 C-8 C-10 C-12 EMP-1 EMP-1A EMP-1B EMP-2 FRL-1

4

C-108

ALUMINUM CURTAIN WALL ALUMINUM CURTAIN WALL ALUMINUM CURTAIN WALL ALUMINUM CURTAIN WALL ALUMINUM CURTAIN WALL ALUMINUM WINDOW ALUMINUM CURTAIN WALL ALUMINUM CURTAIN WALL ALUMINUM PLATE RAIN SCREEN SYSTEM ALUMINUM PLATE RAIN SCREEN SYSTEM INSULATED METAL WALL PANEL CONCRETE FORMLINER

C-109

LEVEL 5 929'-5 1/4"

EMP-2 TYP

EMP-1A TYP

EMP-1A TYP

C-12

C-12

LEVEL 4 915'-5 1/4" EMP-2 TYP

C-12

LEVEL 3 901'-5 1/4"

LEVEL 2 887'-5 1/4" C-8

C-10

C-8

LEVEL 1 - CSB F.F. 871'-11 1/4"

SOUTH ELEVATION - ENLARGED CSB

EMP-1A

C-109

EMP-1B

C-108

C-107

C-106

C-105.1 C-105

C-104

C-103

C-102

62'-0"

4-A7.01

HIGH PARAPET 948'-5" 6

5

C-7

4-A7.01

EMP-1A TYP

C-5

C-6

C-4

C-4

C-4

C-2

LEVEL 5 929'-5 1/4"

EMP-1A EMP-1A TYP TYP

LEVEL 4 915'-5 1/4"

LEVEL 4 915'-5 1/4" 7

LEVEL 3 901'-5 1/4"

11'-0"

EMP-1 TYP

EMP-1 TYP

EMP-1 TYP

EMP-1 TYP

EMP-1 TYP

LEVEL 3 901'-5 1/4" EMP-1A TYP

LEVEL 2 887'-5 1/4"

8"

50°

50°

50°

50°

50°

50°

50°

11'-0"

15'-6"

LEVEL 2 887'-5 1/4"

EMP-1 TYP

ELEVATED ROADWAY

14'-0"

11'-0"

LEVEL 5 929'-5 1/4"

14'-0"

EMP-1A

11'-0"

100°

4-A7.01

EMP-1B

11'-0" 76'-1"

11'-0"

80°

50°

C:\@RevitLocals\CVG CONRAC - ARCH - RVT2018 - MODEL_RTownson@pgal.com.rvt

4-A7.01

4

14'-0"

10'-1"

80°

DATE STAMP: 3/1/2019 3:08:42 PM

C-100

3

2'-0"TYP.

FILE NAME:

C-101

3

1/16" = 1'-0"

LEVEL 1 - CSB F.F. 871'-11 1/4"

LEVEL 1 - CSB F.F. 871'-11 1/4"

NORTH ELEVATION - ENLARGED CSB NORTHWEST ELEVATION - ENLARGED CSB

1/16" = 1'-0"

2

CONSULTANT

ARCHITECT

PGAL, INC 1425 ELLSWORTH INDUSTRIAL BLVD, #15 ATLANTA, GA 30318 [T] 404-602-3800 [F] 404-602-3810

PGAL

DATE

#

REVISION

BY

AUTH.

1/16" = 1'-0"

1

CVG International Airport New Consolidated Rental Car Facility

KENTON COUNTY AIRPORT BOARD

ELEVATIONS − ENLARGED CSB 1003084 CHK BY:

PROJ.NO:

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

DATE:

PJH

03/01/2019 APPR. BY:

DRAWN BY:

RRT

SCALE:

JAW AS SHOWN

100% BP4 ISSUED FOR CONSTRUCTION

SHEET NO:

4−A6.02

15


GWCC_BC EXPANSION PGAL

16


BC-A

BC-A9 BC-B BC-C BC-C1 BC-C2 BC-C3

31'-2 7/8"

19'-2" 3'-11"

5'-8"

11"

1'-10" 25'-6 1/4"

45'-0" 3'-6"

2"

3'-10 1/4"

BC-L BC-M

2'-9"

C-14Y C-14.6 C-16.1C-16.17C-16.4 B-16.52iv C-16.5 C-16.8 C-17Y 60'-9"

BC-J BC-K

FLOOR PLAN NOTES

3'-11" 15'-11"

C-18Y

16'-9"

3'-8 5/8"

C-19Y C-19-1

91'-2"

91'-2"

B-20Y C-21Y 89'-4"

3'-3"

91'-2"

1'-10"

7'-6 1/2"

C-22Y

BC-C21 C-23Y

28'-3"

30'-2 7/8"

1'-10"

B-24

22'-4 5/8"

2'-9"

B-25 B-26

91'-2"

91'-2"

14'-0"

7'-6 1/2"

C-X6

980'-1"

45'-7"

980'-0 1/2"

C-U4 45'-7"

SECTOR H 1 / A2.10H

288'-8 1/4"

264'-11 1/4"

45'-7"

C-T

EXISTING

C-R4

377'-8 3/8" 14'-8"

28'-10 1/4"

C-Q

2 1/8"

45'-7"

NEW DOORS IN EXISTING OPERABLE PARTITION RE: LIFE SAFETY DRAWINGS

8"

JAN BC116 STORAGE B117

MEN B113

1 / A2.10C

B EXHIBIT HALLS

1 / A2.10B

15'-2" 30'-5" 4'-8" 8'-0" 7'-7" 20'-1 7/8"

1'-10"

SECTOR A

1 / A8.04

22'-7"

17'-4"

14'-7 7/8"

62'-11"

393'-0 1/4"

1 / A2.10A

142'-1 3/4" 156'-9 5/8"

5"

NEW FLOOR CONSTRUCTION DEPRESSED

BC-12 BC-11 BC-10.2

PROJECT NAME

GEORGIA WORLD CONGRESS CENTER

EXISTING WALL/COLUMN TO REMAIN NEW WALL/COLUMN PATH OF EXPANSION JOINT ABOVE

PROJECT LOCATION

C-F.6 C-E.8

285 ANDREW YOUNG INT'L BLVD ATLANTA, GA 30313

BC-9 BC-8

DRAWING HISTORY №.

DESCRIPTION

100% CONSTRUCTION DOCUMENTS 1 CONSTRUCTION PERMIT SET 3 IR-22 FINISH FLOOR ELEVATIONS 6 IR-70 FLOOR BOX CHANGES 9 RFI - 394

BC-7

B-B.2iv

DATE

2018-0302 2018-0413 2018-1128 2019-0308 2019_0709

BC-3 KEY PLAN

BAA

BC-2

B-A.9iv

BC-1

BBB

BC-09

H G F E D C B A

Copyright © 2017

B100K

BB

(2) NEW EGRESS DOORS

B100L

B-AAA.85iv

INFILL WHERE EXISTING OVERHEAD DOOR HAS BEEN REMOVED

B-B.5ziv BC NEW B5 EAST EGRESS DOORS

BC-C4

[T] (303) 722-5000

REGISTRATION

10'-2 1/2" 23'-0"

BC-12.2

421 BROADWAY DENVER, CO 80203

BCC

NEW DOORS IN OPERABLE PARTITIONS SEE LIFE SAFETY DRAWINGS

(E) VEST

NEW EXTERIOR SLAB ON GRADE PAVING

27'-6"

3'-8 3/8"

A7.00

SECTOR B

BC-12.3

28'-0"

(E) STORAGE

A7.00

SECTOR C

5'-6 1/8"

11'-4" 12'-6"

VALVE RISER B119

(E) WOMEN

6 / A6.02

2 / A8.04

22'-3"

9

PART STOR B120

3 / A8.04 VALVE RISER B108

(E) ELEV

wh

C-H

21'-5 5/8"

WOMEN B121

5 4

3'-2 7/8"

978.30'

JAN BC128 IDF BC129

NEW FLOOR CONSTRUCTION

BC-4

40'-0"

2 / A6.02

WOMEN BC126

11'-0 1/8"

2 / A8.02

DESIGN ARCHITECT

FLOOR PLAN LEGEND BC-12.4

BC-10

1'-8"

30'-5"

C-M

10'-10"

30'-4"

EXISTING

PART STOR B109 wh

(E) EL MR

39'-4 3/8" 216'-6 1/4"

30'-5"

(E) MEN

STORAGE B110

STORAGE B116 (E) OP PART STOR

75'-1"

1 / A8.00

30'-5"

FLOOR BOX LOCATION RE: MEP/IT FOR MORE INFO

WOMEN B114

IDF B115

64'-2 3/8"

10'-0" 10'-5" 10'-0" 10'-0" 10'-5" 10'-0" 10'-0" 10'-4" 10'-0" 30'-4"

5'-6"

31'-4"

SIM

[T] 404 602 3800 [F] 404 602 3810 www.pgal.com

BC-6

11"

31'-4"

1 / A2.10D

4'-6"

6 A8.50

30'-4"

1 / A6.02

30'-8" 10'-0"

30'-0"

30'-5"

SECTOR D

42'-2"

1 / A8.02

A7.00

16'-2 5/8"

1:20

30'-5"

29'-0"

30'-4"

5'-0"

30'-5"

TRUCK RAMP DOWN 1:20

4 / A8.02

1 / A2.10E

30'-0"

982.25'

3 / A6.02

8 / A6.02

73'-7 1/2"

EXHIBIT HALL BC BC100

1 ASK1.31

SECTOR E

30'-0"

1 / A2.10F

MEN BC123

1 / A8.01

EXHIBIT HALL BC BC103

61'-1 7/8"

2 / A8.00

SECTOR F

WOMEN BC122

JAN BC132

TYPICAL SLAB CONTROL JOINT LAYOUT SEE STRUCTURAL FOR MORE INFO

30'-0"

10'-0" 10'-5" 10'-0" 10'-0" 10'-4" 10'-0" 10'-0" 11'-4" 10'-0"

TYP

2 / A8.01

TRUCK RAMP DOWN 1:20

982.25'

3 / A8.01

MEN C123 WOMEN C122

RAMP DOWN

1:20

1 / ASK1.30

10" 11 3/8" 54'-10" 196'-8 7/8"

2

SIM

NEW MANHOLE COVER ON EXTENDED EXISTING MANHOLE

MEN BC111

A7.00

4"

13 A8.50

6 A8.50

982.25'

WOMEN BC112 JAN BC118

IDF BC119

32'-2 3/8"

RAMP DOWN

9'-9 5/8"

8"

WOMEN C112

MEN C111

1

C:\@RevitLocals\GWCC-A_R18_jasmainefranklin.rvt 7/9/2019 9:54:50 AM

VALVE RISER C124

23'-9"

979.92' 2 / ASK1.25 FAM C113 STO C131

wh

C-N4 C-N

8"

EXISTING

1 / A2.10G

IDF BC120

wh JAN C118

6 / A8.01

FILE NAME: DATE STAMP:

2 / A8.03

2'-0" 18'-10 5/8"

23'-9"

VALVE RISER C110

33'-6"

34'-2 5/8"

1 / A8.03

SECTOR G

43'-8"

OP PART STO C121

OP PART STO C114

PGAL 1425 ELLSWORTH INDUSTRIAL BLVD. SUITE 15 ATLANTA, GA 30318

FENTRESS ARCHITECTS

43'-8 1/4" 16'-5"

361'-3 3/8"

ARCHITECT OF RECORD

49'-0"

21'-3 5/8"

10'-0"

44'-8" 22'-2"

BC-C22

45'-7"

C EXHIBIT HALLS 1'-2 3/8"

14. SEE CODE PLANS FOR LOCATIONS OF DOORS FOR EXITING IN OPERABLE PARTITIONS. 15. SEE OVERALL FLOOR PLAN LEVEL 1 FOR FLOOR BOX LOCATIONS 16. SEE ENLARGED PLANS FOR FLOOR DRAIN LOCATIONS IN TOILET ROOMS. 17. SEE OVERALL FLOOR PLAN LEVEL 1 FOR FLOOR BOX LOCATIONS\. 18. DEPRESSED SLAB TO MATCH OTHER RESTROOMS. DEMO PRIOR TO NEW BATHROOMS BEING CONSTRUCTED. 19. PROVIDE CONCRETE SLAB SAWCUT CONTROL JOINTS, EQUALLY SPACED BETWEEN FLOOR BOX CENTERLINES @ APPROXIMATELY 10' 0.C. SEE A2.10 20. EXTERIOR DIMENSIONS ARE TYPICALLY TO FACE OF CMU OR FACE OF SHEATHING. 21. INTERIOR DIMENSIONS ARE TYPICALLY TO FACE OF CMU UON. 22. SEE OVERALL PLANS (A2.10, A2.20, A2.30) FOR ALL COLUMN GRIDS AND DIMENSIONS. 23. ELEVATION TARGETS ON PLAN IDENTIFY ELEVATION AT TOP OF CONCRETE UON. 24. PROVIDE BOLLARDS AT OUTSIDE CORNERS OF EIFS UON. 25. PROVIDE FR PLYWOOD ALL WALLS OF IDF ROOMS 6" AFF TO 8'-6" AFF, PAINTED WITH FR SATIN WHITE, LEAVING THE FIRE RATING STAMP CLEAR OF PAINT. PROVIDE A CLASS C FIRE EXTINGUISHER IN EACH IDF. 26. SEE LEVEL 1 PLANS FOR TYPICAL DIMENSIONS. 27. COLUMN CORNERS ARE CHAMFERED UON. A. WHERE COLUMNS ARE TILED, PROVIDE SQUARE CORNERS. B. WHERE CMU WALL ALIGNS WITH COLUMN FACE PROVIDE SQUARE CORNER C. SEE A8.50 FOR TYPICAL DETAILS

45'-7"

976.00'

GEORGIA WORLD CONGRESS CENTER 285 ANDREW YOUNG INT'L BLVD. ATLANTA, GA 30313 [T](404) 223-8828

FLOOR PLAN NOTES

C-W 9

CLIENT

1. ELEVATION 982.0 IS INTENDED TO ALIGN WITH THE FINISH FLOOR ELEVATION OF THE EXISTING B HALLS. 2. ELEVATION 980.0 IS INTENDED TO ALIGN WITH THE FINISH FLOOR ELEVATION OF THE EXISTING C HALLS. 3. PROVIDE 4"X4"X8' STAINLESS STEEL CORNER GUARDS ON CMU CORNERS EXPOSED TO THE EXHIBIT HALL. SEE DETAIL 4. SEE PLUMBING AND ELECTRICAL DRAWINGS FOR LOCATION AND EXTENT OF UNDERGROUND CONDUIT FOR WATER AND COMPRESSED AIR DISTRIBUTION. 5. COORDINATE LOCATIONS OF ACCESS PANELS WITH THE ARCHITECT PRIOR TO FABRICATION AND INSTALLATION 6. SEE INTERIOR ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS 7. PROVIDE ACOUSTICAL INSULATION ABOVE THE TOILET ROOM CEILINGS. 8. SEE STRUCTURAL DRAWINGS FOR RIGGING LOCATIONS. 9. PROVIDE DOCK BUMPERS ON ALL DOCKS. PROVIDE DOCK LEVELERS AND CONTROLS ON 2 DOCKS IN THE B5 DOCKS AND 2 DOCKS IN THE C4 DOCKS. SEE A2.10G&H AND A2.10A FOR LOCATIONS. 10. FOR BOLLARD DETAIL SEE DETAIL 6 / A7.76 11. PROVIDE EDGE ANGLES AT LOADING DOCK SLAB EDGE. COORDINATE WITH STRUCTURAL. 12. FE-2 IDENTIFIED ON THE PLAN IS A CANISTER WALL HUNG FIRE EXTINGUISHER. SEE SPECIFICATIONS. 13. FE-1 IDENTIFIED ON THE PLANS IS A RECESSED FIRE EXTINGUISHER CABINET. SEE SPECIFICATIONS AND DETAIL 3 / A8.51

13'-1"

1/8" = 1'-0"

2

PROJECT NUMBER

1003026 GWCC-043 SHEET TITLE

OVERALL FLOOR PLAN - LEVEL 1

SHEET NUMBER 2 A2.10

LEVEL 1 (982.00)

1/32" = 1'-0"

1

NORTH

A2.10

17


CLIENT

C-16.5

BC-B

C-16.8 BC-C

BC-C1

GEORGIA WORLD CONGRESS CENTER 285 ANDREW YOUNG INT'L BLVD. ATLANTA, GA 30313 [T](404) 223-8828

C-17Y

BC-12.3

PGAL 3'-5 5/8"

ALIGN

BC-12.2

3'-8 1/4"

1'-7 5/8"

ARCHITECT OF RECORD

M58

3'-7"

M68

BC-12

25 / A8.10

M68

27 / A8.10

28 / A8.10

FAM C113

M56

1'-7"

FLOOR DRAIN RE: PLUMBING

IEJ01 9'-10" 2 A8.51

2'-6" 2'-6"

12'-8 3/8"

5'-6 5/8"

M56

3'-1" 3'-0"

M56

BC119

3'-1" 3'-0"

3'-1" 3'-0"

1'-7" 3'-1"

10'-8 3/8"

KEY PLAN

2'-4"

5'-8"

EQ

2'-6"

TYP 3'-0"

M89

EQ

4'-4 3/8" 2'-0 5/8"

2'-3 1/2"

2'-6"

M68

3'-0"

3'-0"

MEN B113 2 / A8.10

5'-4 3/8"

1 / A8.10

3'-0"

M68

1'-8" 3'-0"

3'-0"

M58

M59

1'-8"

M58

3'-1"

MIN. CLEAR

3'-1"

3'-1"

Copyright © 2017

4'-11"

M89

B110

M58

M58 M58

M89

REGISTRATION

M89

2'-4"

30'-5 5/8"

1'-6" 3'-0"

M58 M14

2'-6"

H G F E D C B A

13'-6"

FLOOR DRAIN RE: PLUMBING

5'-1"

2'-6"

3'-7"

M14 2'-4"

1'-8 3/4"

1'-8 3/4"

2'-3 1/2"

M58

13'-2 5/8"

EQ

M58 M14 5'-1 3/8"

6'-10 5/8"

5'-4 3/8"

M14

2'-6"

2'-11 1/8"

M68

1'-7"

M58

5'-8 3/8"

2'-6"

6'-2"

3'-1"

3'-1"

3'-1"

3'-1"

1'-7"

2'-11" STORAGE B110

M89

2'-3 5/8" 8'-7 5/8"

4'-11"

17 / A8.12

3'-1" 3'-0"

7 5/8"

3'-1"

3'-2 3/8"

M68

3'-1"

5'-10 5/8"

8 / A8.10

7 / A8.10

EQ

M58

2'-4"

M14

5'-4 3/8"

5'-1"MIN. CLEAR

3'-1"

11'-0"

2'-10 3/8"

3'-1"

C-F.6

10 / A8.10

M18

1'-10"

8"

EQ

2'-3 1/2"

1'-8 3/4"

M18

M18

xxxx-xxxx

JAN BC116

PROJECT NUMBER

1003026 GWCC-043

M58 M56

M19

RECESS RE: PLUMBING 11'-8"

7'-3 1/8"

M68

3'-0"

2018-0413

WATER HEATER ON CURB RE: PLUMBING

3 / A8.10

2'-6"

BC111

M18

M58

MEN

3'-0"

5 / A8.10 WOMEN 27'-4 5/8" B114 6 / A8.10

M14

M18

M68

9 / A8.10

2'-6"

M58

2'-0"

4'-0"

19'-4"

M58

3'-0"

DATE

2018-0302

BBB

M89

M58

3'-1"

1'-5"

FLOOR DRAIN RE: PLUMBING

M18

12 / A8.10

E-M193

1'-4"

2'-6"

3'-1" 3'-1"

5'-3 3/8"

3'-1"

M58

11'-0 3/8"

M18

BC118

8'-2 5/8"

3'-0"

M58

EQ

M68

M68

2'-8"

4'-8"

14'-4"

JAN BC118

8"

EQ

M14

11 / A8.10

5'-1 3/8"

IDF

2'-4"

M89

2'-6" M14

BC119

1'-8"

2'-6"

3'-1"

M14

8"

TYP 3'-1"

M89

2'-6"

3'-0"

4 / A8.10

2'-6"

3'-0"

2'-0 5/8"

EQ

3'-0"

3'-1"

2'-11"

1'-7" 1'-0"

M89

3'-1"

11'-0"

2'-8"

M58

EQ M14

3'-1"

DESCRIPTION

100% CONSTRUCTION DOCUMENTS 1 CONSTRUCTION PERMIT SET 5 Revision 9

FLOOR DRAIN RE: PLUMBING

MIN. CLEAR

1'-4"

M14

1'-6"

M18

2'-6"

TYP

5'-1"

3'-1"

3'-6 3/8"

3'-1"

2'-6"

DRAWING HISTORY №.

8"

M68

3'-1" 1'-6"

M18

5'-1" MIN. CLEAR

3'-1"

2'-6"

2'-1 3/8"

M14

2'-8"

3'-1"

M56

6'-6 7/8" M58

EQ

RECESS RE: PLUMBING

M58

FLOOR DRAIN RE: PLUMBING

6'-0"

11'-4 3/8"

3'-1"

3'-0"

2'-8"

2'-2"

3'-1"

M18

8'-6 3/8"

2'-6"

8"

M58

3'-0"

3'-0"

5'-4"

M68

2'-4"

3'-0"

M58

3'-1"

6'-8 3/8"

4'-0"

BC112

3'-1" 3'-0"

1'-3 5/8"

7'-4"

WOMEN

3'-1" 3'-0"

M56 M56

5'-5 3/4"

3'-1" 3'-0"

M66

M19

BC-9

3'-0"

16'-8 5/8"

3'-0"

3'-1"

M89

3'-8 3/8"

3'-1" 3'-0"

13 / A8.10

14 / A8.10

3'-8 3/4"

M58

2'-4"

3'-1" 3'-0"

15 / A8.10

3'-0"

18'-2 3/4"

BC116

6'-0 5/8"

3'-1"

5'-6 3/4"

8'-10 5/8"

FLOOR DRAIN RE: PLUMBING PANEL RE: ELECTRICAL

M89

M68

TYP 3'-1"

4'-0 3/8"

1'-3" M89

M58

1'-6"

16 / A8.10

5'-1 5/8" MIN. CLEAR

M89

M68

M58

C-H

4'-0"

C-17Y BC-C2 BC-C4

BC-C1

1'-3"

M89

BC-B

5'-0"

7'-4"

285 ANDREW YOUNG INT'L BLVD ATLANTA, GA 30313

EQ

3'-0"

5'-1" MIN. CLEAR

M58

2'-4"

M14

1'-11 5/8"

M58

GEORGIA WORLD CONGRESS CENTER PROJECT LOCATION

M58

5'-11 3/8"

7'-10 3/8"

PROJECT NAME

M14

6'-4 3/4"

2'-11 3/8"

M89

WOMEN C112

2'-4"

TYP

3'-6"

4'-0"

1'-4"

4'-0"

EQ

3'-1" 3'-0"

3'-1"

1'-6"

3'-5" 3'-6 3/8"

EQ

2'-11 5/8" M14

M68

23 / A8.10

3'-1"

1'-4"

M68

2'-8"

3'-0"

3'-1"

1'-6"

TYP

5'-3 1/2"

2'-6"

5'-1"MIN. CLEAR

18 / A8.10

[T] (303) 722-5000

22 / A8.10

FLOOR DRAIN RE: PLUMBING

3'-0" 5'-0"

MIN. CLEAR

17 / A8.10

2'-6"

19 / A8.10

MEN C111

421 BROADWAY DENVER, CO 80203

M14

24 / A8.10

3'-1"

EQ 2'-6"

M58 5 A7.76

2'-0"

M14 M68

20 / A8.10

FENTRESS ARCHITECTS

1'-4"

8"

M68

2'-2 5/8"

M58

3'-1"

2'-8"

M14

2'-11 5/8"

2'-4"

1'-11 5/8"

M58

M14

2'-0"

2'-4"

M58

8"

1'-4"

6'-0"

C118

M14

2'-6"

13'-8 3/8"

BC-10.2 M58

JAN

5'-1"

6'-0"

M58

M89

wh

M58

2'-8"

M68

1'-7"

C118

1'-8"

1'-4 3/4"

7'-4 3/8"

3'-7"

M68

E-M193

BIM 360://GA-WCC/GWCC-A_R18.rvt 12/10/2018 10:18:05 AM

DESIGN ARCHITECT

C131

21 / A8.10

5'-4 3/8"

WATER HEATER ON CURB RE: PLUMBING

FILE NAME: DATE STAMP:

7'-11 5/8" M68

FLOOR DRAIN RE: PLUMBING

18

MIN

26 / A8.10

8"

[T] 404 602 3800 [F] 404 602 3810 www.pgal.com

M89

4'-11 3/8"

C113

M14

1425 ELLSWORTH INDUSTRIAL BLVD. SUITE 15 ATLANTA, GA 30318

SHEET TITLE

M89

ENLARGED TOILET ROOM PLANS

2'-0"

SHEET NUMBER

ENLARGED TOILET ROOM - SECTOR F

1/4" = 1'-0"

3

ENLARGED TOILET ROOM - SECTOR C

1/4" = 1'-0"

1

NORTH

A4.00


EQ

MATERIALS & FINISHES

EQ

CWT-1 CWT-1

FIRE ALARM DEVICE

E-1

CWT-1

H-1

G-1

D-3

D-1

CWT-1

1 A8.60

C-1

D-2

G-1

SIM

2'-10"

B-1

LEVEL 1 - BLDG C 980'-1"

CWB-1

C113 FAMIY ELEVATION 4

1/4" = 1'-0"

1 A8.60

LEVEL 1 - BLDG C 980'-1"

CWB-1

C113 FAMILY ELEVATION 3

28

LEVEL 1 - BLDG C 980'-1"

CWB-1

1/4" = 1'-0"

SS1

C113 FAMILY ELEVATION 2

27

STAINLESS STEEL END CAP RE: DETAILS A8.50 AND A8.60

5 A8.60

SIM

9 A8.60

1/4" = 1'-0"

C113 FAMILY ELEVATION 1

26

SS END CAP RE: DETAILS A8.50 AND A8.60

FIRE ALARM DEVICE

FIRE ALARM DEVICE CWT-1 H-1

D-1

CWT-1

EQ 1 A8.60

C112 WOMENS ELEVATION 4

CWT-1

CWT-2

CWT-1

1 A8.60

CWT-1 CWB-1

24

LEVEL 1 - BLDG C 980'-1"

CWB-1

C112 WOMENS ELEVATION 3

1/4" = 1'-0"

SIM

EQ

TYP

CWT-1

C112 WOMENS ELEVATION 2

23

1/4" = 1'-0"

CWT-1

TYP

B-1

TYP

E-1

CWT-1

EXHIBIT HALL WALLS (SEE ELEV) CEILINGS

P2

LT GREY

INTERIOR PARTITIONS UON (BOH SPACES)

P3

DK GREY

CRASHRAILS, EXTERIOR RAILINGS, EXTERIOR EXPOSED STEEL UON

P5

GREY

DOORS FRAMES AND STEEL SUPPORTS TO MATCH EXISTING HALL C

P6

GREY

EXHIBIT HALL WALLS (SEE ELEV)

TO MATCH EXISTING HALL C

P7

BLACK

GYPBOARD PARTITION ABOVE B.O. TRUSS' PLENUM ELEMENTS AND UNDERSIDE OF ROOF

TO MATCH EXISTING HALL C

BEIGE

PREFINISHED ALUMINUM COPING

SAFETY YELLOW

BOLLARDS, TEMP SAFETY RAILING

EIFS1 BEIGE

TO MATCH EXISTING C HALL EIFS

MP1

TO MATCH EIFS1

BEIGE

MARAZZI MODERN FORMATION UNPOLISHED 12X24 COLOR: SMOKY RIDGE

CWT1 GREY

MARAZZI MATERIKA GLAZED CERAMIC WALL TILE FLAT 16X48 COLOR: GRIGIO

CWT2 DK GREY

MARAZZI MATERIKA GLAZED CERAMIC WALL TILE LINEAR 16X48 COLOR: FANGO

CWB1 GREY

MARAZZI MODERN FORMATION 6X12 TO MATCH FLOOR TILE

QA1

WHITE

QUARTZ AGGLOMERATE COUNTERTOP CORIAN COARSE CARRARA

TP1

SILVER

STAINLESS STEEL EMBOSSED TOILET PARTITIONS

SC1

21

1/4" = 1'-0"

SEALED CONCRETE. SEE SPECIFICATION

RB1

BLACK

CWT-1

GEORGIA WORLD CONGRESS CENTER 285 ANDREW YOUNG INT'L BLVD. ATLANTA, GA 30313 [T](404) 223-8828 ARCHITECT OF RECORD

CFT1 GREY

X-1

SS END CAP RE: DETAILS A8.50 AND A8.60

CWT-1

CWT-2

LEVEL 1 - BLDG C 980'-1"

CWB-1

SS-1

C112 WOMENS ELEVATION 1

CWT-1

CWT-2

C-1

REMOVABLE SHROUD PANEL

1 A8.60

CWB-1

22

SS END CAP RE: DETAILS A8.50 AND A8.60

FIRE ALARM DEVICE

9 A8.60

CWB-1

9 A8.60

CWT-1

CWT-1

E-1

TYP

EQ

LEVEL 1 - BLDG C 980'-1"

CWB-1

SIM

5 A8.60

CWT-1

1/4" = 1'-0"

CWT-2

A-2

WHITE

P8

25

1/4" = 1'-0"

TOILET PARTITION

EQ

SIM

LEVEL 1 - BLDG C 980'-1"

CWB-1

CWT-1

CWT-2

TYP

LEVEL 1 - BLDG C 980'-1"

CWB-1

CLIENT

TO MATCH EXISTING HALL C

P1

PGAL 1425 ELLSWORTH INDUSTRIAL BLVD. SUITE 15 ATLANTA, GA 30318 [T] 404 602 3800 [F] 404 602 3810 www.pgal.com

4" HIGH RUBBER BASE (BOH SPACES)

TOILET ACCESSORY, SEE A8.13

DESIGN ARCHITECT

FIRE ALARM DEVICE

TYP

CWT-2

CWT-1

1 A8.60

H-1

SIM

EQ

TYP

EQ

1 A8.60

SIM

TYP

C-1

TYP

B-1

A-2

TYP

EQ

EQ

CWT-1 CWB-1

LEVEL 1 - BLDG C 980'-1"

CWB-1

C111 MENS ELEVATION 4 5 A8.60

D-1

TYP

5 A8.60

CWB-1

C111 MENS ELEVATION 3

20

5 A8.60

FIRE ALARM DEVICE

CWT-2

EQ

1/4" = 1'-0"

SIM

F-8

LEVEL 1 - BLDG C 980'-1"

SIM

1/4" = 1'-0"

CWB-1

C111 MENS ELEVATION 2

19

SS END CAP CWT-1

SIM

CWT-1 CWT-1

EQ

1 A8.60

C-1

C-1

TYP

E-1

TYP

A-2

CWT-1

D-3

LEVEL 1 - BLDG C 980'-1"

1/4" = 1'-0"

CWB-1

REMOVABLE SHROUD PANEL

1 A8.60

C111 MENS ELEVATION 1

18

LEVEL 1 - BLDG C 980'-1"

CWB-1

FENTRESS ARCHITECTS

3

421 BROADWAY DENVER, CO 80203

17

1/4" = 1'-0"

[T] (303) 722-5000 FIRE ALARM DEVICE

TYP TYP H-1

SIM

D-2

9 A8.60

D-1

D-3

TYP

D-2

TYP

TYP

PROJECT NAME

GEORGIA WORLD CONGRESS CENTER

CWT-2

CWT-1 TYP H-1

EQ

B-1

LEVEL 1 - BLDG B 982'-3"

CWB-1

BC112 - WOMENS ELEVATION 4

1/4" = 1'-0"

F-8

REMOVABLE SHROUD PANEL

BC112 - WOMENS ELEVATION 3

16

TYP

LEVEL 1 - BLDG B 982'-3"

B-1

CWB-1

1/4" = 1'-0"

15

LEVEL 1 - BLDG B 982'-3"

TYP

1 A8.60

BC112 - WOMENS ELEVATION 2

CWB-1

LEVEL 1 - BLDG B 982'-3"

CWB-1

9 A8.60

1/4" = 1'-0"

BC112 - WOMENS ELEVATION 1

14

1/4" = 1'-0"

13

PROJECT LOCATION

285 ANDREW YOUNG INT'L BLVD ATLANTA, GA 30313 DRAWING HISTORY №.

CWT-1

CWT-1

FIRE ALARM DEVICE

CWT-1

CWT-1 CWT-2

E-1

SS END CAP RE: DETAILS A8.50 AND A8.60

CWT-1

CWT-2

CWT-2

CWT-1

D-3 D-2

CWT-1

H-1

CWT-2

EQ

1 A8.60

SIM

C-1

EQ

B-1

1/4" = 1'-0"

CWB-1

CWB-1

SS END CAP RE: A8.60 AND A8.50

FIRE ALARM DEVICE

5 A8.60

CWT-1

EQ

EQ

5 A8.60

SIM

CWT-1

SIM

CWT-2

1 A8.60

D-2

LEVEL 1 - BLDG B 982'-3"

CWB-1

SS END CAP RE: A8.50 AND A8.60 FOR DETAILS

EQ

CWB-1

EQ

CWT-1

CWT-2

FILE NAME: DATE STAMP:

1/4" = 1'-0"

SIM

B114 WOMENS ELEVATION 3

8

SIM

1/4" = 1'-0"

EQ

CWT-1 1 A8.60

G-1

D-2

E-1

CWT-1

TYP

CWT-1

9

A-2

TYP

CWT-1

CWT-1

CWT-2

G-1

D-3

REGISTRATION

D-1

TYP

Copyright © 2017

D-2

LEVEL 1 - BLDG B 982'-3"

CWB-1

TYP

CWB-1

LEVEL 1 - BLDG B 982'-3"

CWB-1

REMOVABLE SHROUD PANEL

TYP

1/4" = 1'-0"

B114 WOMENS ELEVATION 1

6

SS END CAPS RE: A8.50 AND A8.60 FOR DETAILS

CWT-1 CWT-1

CWT-1

CWT-1

D-3

TYP

SIM

H-1

TYP

D-1

TYP

CWT-1

TYP TYP

E-2 A-2

1/4" = 1'-0"

5 EQ

CWT-1

CWB-1

CWB-1

B113 MENS ELEVATION 4

1/4" = 1'-0"

4

CWB-1

LEVEL 1 - BLDG B 982'-3" OPEN TO VESTIBULE BEYOND

B113 MENS ELEVATION 3

TYP TYP

1/4" = 1'-0"

3

B113 MENS ELEVATION 2

LEVEL 1 - BLDG B 982'-3"

D-2 F-8

1/4" = 1'-0"

2

EQ

CWT-1

FIRE ALARM DEVICE

CWT-2 C-1 B-1

LEVEL 1 - BLDG B 982'-3"

KEY PLAN

H-1

TYP

SS END CAP RE: A8.50 AND A8.60 FOR DETAIL

CWT-2

EQ

A-2

1 A8.60 TYP

B114 WOMENS ELEVATION 2

7

1/4" = 1'-0"

CWT-1 CWT-1

TYP

B-1

SS END CAP RE: A8.50 AND A8.60 FOR DETAILS

CWT-1

D-3

E-1

FIRE ALARM DEVICE

FIRE ALARM DEVICE CWT-2

TYP

LEVEL 1 - BLDG B 982'-3" TYP

TYP TYP

CWB-1 9 A8.60

TYP

CWB-1 1 A8.60

TYP

REMOVABLE SHROUD PANEL

B113 MENS ELEVATION 1

1/4" = 1'-0"

1

PROJECT NUMBER

1003026 GWCC-043 SHEET TITLE

TYP

BIM 360://GA-WCC/GWCC-A_R18.rvt 12/10/2018 10:25:58 AM

B114 WOMENS ELEVATION 4

CWT-2

BC111 - MENS ELEVATION 1

10

CWT-1 CWT-1

LEVEL 1 - BLDG B 982'-3"

CWB-1

1 A8.60

SS END CAP RE: DETAILS A8.50 AND A8.60

9 A8.60

5 A8.60

1/4" = 1'-0"

C-1

D-3

CWT-2

CWB-1

BC111 - MENS ELEVATION 2

11

CWT-1

CWT-1

CWB-1

2018-1128

TYP

1/4" = 1'-0"

1'-0"

1 A8.60

SIM

CWB-1

BC111 - MENS ELEVATION 3

12

CWB-1

9 A8.60

TYP

CWB-1

BC111 - MENS ELEVATION 4

F-8

CWB-1

LEVEL 1 - BLDG B 982'-3"

5 @ 16" EA

CWB-1

LEVEL 1 - BLDG B 982'-3"

2018-0413

REMOVABLE SHROUD PANEL

EQ

B-1

LEVEL 1 - BLDG B 982'-3"

DATE

2018-0302

TYP

C-1

D-1

EQ

TYP

A-2

DESCRIPTION

100% CONSTRUCTION DOCUMENTS 1 CONSTRUCTION PERMIT SET 3 IR-22 FINISH FLOOR ELEVATIONS

TYP

CWB-1

TYP

FIRE ALARM DEVICE

SIM

4'-0"

5 A8.60

LEVEL 1 - BLDG B 982'-3" 3

INTERIOR ELEVATIONS TOILET ROOMS

SHEET NUMBER

A8.10

19


CLIENT

BC-K BC-J

MATERIALS & FINISHES EXHIBIT HALL WALLS (SEE ELEV) CEILINGS

P2

LT GREY

INTERIOR PARTITIONS UON (BOH SPACES)

P3

DK GREY

CRASHRAILS, EXTERIOR RAILINGS, EXTERIOR EXPOSED STEEL UON

P5

GREY

DOORS FRAMES AND STEEL SUPPORTS TO MATCH EXISTING HALL C

P6

GREY

EXHIBIT HALL WALLS (SEE ELEV)

TO MATCH EXISTING HALL C

P7

BLACK

GYPBOARD PARTITION ABOVE B.O. TRUSS' PLENUM ELEMENTS AND UNDERSIDE OF ROOF

TO MATCH EXISTING HALL C

BEIGE

PREFINISHED ALUMINUM COPING BOLLARDS, TEMP SAFETY RAILING

EIFS1 BEIGE

TO MATCH EXISTING C HALL EIFS

MP1

TO MATCH EIFS1

BC-C4 BC-C3 BC-C2C-17Y BC-C1 BC-C BC-B BC-A9 EXISTING ROOF ROOF BEYOND

1

PREFINISHED ALUMINUM COPING ROOF ACCESS LADDER

2

ELECTRICAL PENTHOUSE BEYOND, METAL PANEL WITH PREFINISHED ALUMINUM COPING, TYP

A7.51

4 A7.52

MP1

1,032'-5"

GEORGIA WORLD CONGRESS CENTER 285 ANDREW YOUNG INT'L BLVD. ATLANTA, GA 30313 [T](404) 223-8828

T.O.P. L-01

L-01

MEMBRANE FLASHING

ARCHITECT OF RECORD

ROOF PARAPET WEST ELEVATION

BC-A9 BC-B BC-C BC-C1 C-17Y BC-C2 BC-C3 BC-C4

MARAZZI MODERN FORMATION UNPOLISHED 12X24 COLOR: SMOKY RIDGE

CWT1 GREY

MARAZZI MATERIKA GLAZED CERAMIC WALL TILE FLAT 16X48 COLOR: GRIGIO

CWT2 DK GREY

MARAZZI MATERIKA GLAZED CERAMIC WALL TILE LINEAR 16X48 COLOR: FANGO

CWB1 GREY

MARAZZI MODERN FORMATION 6X12 TO MATCH FLOOR TILE

QA1

WHITE

QUARTZ AGGLOMERATE COUNTERTOP CORIAN COARSE CARRARA

TP1

SILVER

STAINLESS STEEL EMBOSSED TOILET PARTITIONS

RB1

C-18Y

MP1

CFT1 GREY

SC1

C-19-1 C-19Y

A7.51

SAFETY YELLOW

BEIGE

C-21Y B-20Y

MECHANICAL UNIT BEYOND, TYP

WHITE

P8

C-22Y

TO MATCH EXISTING HALL C

P1

C-18Y

C-19Y C-19-1

B-20Y C-21Y

4

3

A7.52

A7.51

C-22Y

MECHANICAL UNIT BEYOND, TYP

ELECTRICAL PENTHOUSE BEYOND, TYP

1/16" = 1'-0"

5

EXISTING ROOF ROOF BEYOND

4 A7.51

PREFINISHED ALUMINUM COPING

1,032'-5" T.O.P.

MEMBRANE FLASHING

4" HIGH RUBBER BASE (BOH SPACES)

ROOF PARAPET EAST ELEVATION

C-M BC-12 BC-11 BC-10 C-H BC-9 BC-8

BC-7

BC-6

5

3

3

2

A7.52

A7.00

A7.52

A7.00

BC-4

BC-3 BAA

BC-2 BC-1 BBB BC-09

1

1

A7.00

A7.52

BCC

C-M BC-12 BC-11 BC-10 C-H BC-9 BC-8 5

MECHANICAL UNIT

A7.52

ELECTRICAL PENTHOUSE, METAL PANEL WITH PREFINISHED ALUMINUM COPING

2 A7.52 MP1

3 P8 PREFINISHED ALUMINUM COPING GAS PIPING A7.50UP AND OVER BUILDING

1

L-01

A7.50

BC-7

BC-6

3

3

2

A7.00

A7.52

A7.00

BC-4

BC-3 BAA

MP1

10'-0"

GAS PIPING UP AND OVER BUILDING

10'-0"

10'-0"

10'-0"

1

1

A7.00

A7.52

2

10'-0"

ROOF BEYOND

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

REVEAL EIFS1

24'-3"

EXISTING BRIDGE

421 BROADWAY DENVER, CO 80203 [T] (303) 722-5000

TYP 1 REVEAL A7.75

LIGHT FIXT RE: ELEC

PROJECT NAME

WATER FLOW ALARM RE: FA DRAWINGS

8'-0"

8'-0"

NOTE: SEE 3 / A6.02

BOLLARDS NEW DOOR IN EXISTING STAIR

BC

3

OPEN TO DOORS BEYOND

.

P5

NEW HM DOORS & FRAMES, TYP

EXPANSION JOINT, TYP 3

LEVEL 1 - BLDG B 982'-3" LEVEL 1 - BLDG C 980'-1"

EXISTING EGRESS STAIR CASE OUTLINE 8" CONCRETE FILLED STEEL PIPE BOLLARD, TYP (PTD SAFETY YELLOW)

CONCRETE RAMP

WATER FLOW ALARM RE: FA DRAWINGS

8

1/16" = 1'-0"

NEW EIFS

50'W X 16'H TRACKING HANGER DOOR MP1 . . .

GEORGIA WORLD CONGRESS CENTER

WATER FLOW ALARM RE: FA DRAWINGS

EIFS1

EXISTING EGRESS STAIR CASE OUTLINE

FULLY GROUTED CMU GAS PIPING ENCLOSURE PROVIDE ACCESS PANEL RE: MECH

FOR DETAIL

SOUTH ELEVATION OVERALL

BB

NEW EIFS EIFS1

LEVEL 1 - BLDG B 982'-3" LEVEL 1 - BLDG C 980'-1"

5'-9"

16'-0"

6'-3"

BOLLARDS

FULLY GROUTED CMU GAS PIPING ENCLOSURE PROVIDE ACCESS PANEL. RE: MECH

FENTRESS ARCHITECTS

10'-0"

NEW EIFS

2

DESIGN ARCHITECT

P8

ROOF ACCESS LADDER, TYP

A7.50

EIFS1

4

P8

PREFINISHED ALUMINUM COPING

A7.52

L-01

10'-0"

1/16" = 1'-0"

BC-2 BC-1 BBB BC-09

4 A7.50

EIFS1

EIFS1

1425 ELLSWORTH INDUSTRIAL BLVD. SUITE 15 ATLANTA, GA 30318 [T] 404 602 3800 [F] 404 602 3810 www.pgal.com

ROOF ACCESS LADDER

SEALED CONCRETE. SEE SPECIFICATION BLACK

PGAL

BC-J BC-K

SOUTH ELEVATION

1/16" = 1'-0"

3

PROJECT LOCATION

285 ANDREW YOUNG INT'L BLVD ATLANTA, GA 30313 DRAWING HISTORY

BCC

№.

BC-C21

OVERFLOW DRAIN OUTLET RE: MECHANICAL

GAS PIPING UP AND OVER BUILDING RE: MECHANICAL P8 PREFINISHED ALUMINUM COPING

P8

EXISTING B HALL COLUMNS

10'-0"

EXISTING FASCIA

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

2

2

A7.54

A7.53

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

DESCRIPTION

100% CONSTRUCTION DOCUMENTS 1 CONSTRUCTION PERMIT SET 3 IR-22 FINISH FLOOR ELEVATIONS 5 Revision 9

5'-1 3/4"

DATE

2018-0302 2018-0413 2018-1128 xxxx-xxxx

V.I.F. VERTICAL REVEALS EXISTING BUILDING BEYOND

OVERFLOW DRAIN SYSTEM RE: PLUMBING

EIFS1

22'-6"

GALVANIZED PROTECTION RAIL

BC-09

BAA BC-3

P5

BC-4

BC-6

BC-7

BC-8 BC-9

3

LD1.B5-9

EXISTING COLUMN, TYP

LD1.B5-8

LD1.B5-7

LD1.B5-6

LD1.B5-5

LD1.B5-4

LD1.B5-3

LD1.B5-2

RELOCATED TRASH COMPACTOR

BC-10 BC-11

BC-13 C-N C-N4

C-Q

C-R4

C-T

GALV STEEL PLATE COLUMN PROTECTION, TYP TYP ALL COLUMNS TO REMAIN AT B DOCK

DOCK BUMPERS

B HALL WEST ELEVATION - NORTH

C-U4

C-W

3 A7.50

A7.00

4

WATER FLOW ALARM RE: FA DRAWINGS

2

2

1

3

A7.00

A7.50

A7.00

10'-0"

A7.52

PREFINISHED ALUMINUM COPING

P8

4

5

A7.54

A7.53

2 REGISTRATION

Copyright © 2017 SEE AG SERIES FOR SIGNAGE

ROOF BEYOND

A7.50

ROOF ACCESS LADDER L-01

A7.50

10'-0"

MECHANICAL UNIT BEYOND

5

1/16" = 1'-0"

C-X6

ELECTRICAL PENTHOUSE BEYOND 1

KEY PLAN

LD1.B5-1 TEMPORARY SAFETY RAILING SEE A1.10 (PTD SAFETY YELLOW)

GALVANIZED STEEL CRASHBAR 8" FULLY GROUTED CMU X8' TALL GAS PIPING ENCLOSURE. PROVIDE ACCESS PANEL. RE: MECH BOLLARDS

6

1/16" = 1'-0"

2'-0" V.I.F.

LEVEL 1 - BLDG B 982'-3"

NEW HM DOORS & FRAMES, TYP

GALVANIZED PROTECTION RAIL EXISTING EXIT DOORS EXISTING B HALL EXTERIOR WALL

B HALL NORTH EXTERIOR ELEVATION

LIGHT FIXTURE RE: ELEC SEE RCP 22'-6" 22'-6"

22'-6"

3

P5

NEW EXIT DOORS

OPEN TO BEYOND

8'-3"

LEVEL 1 - BLDG B 982'-3"

TYP 1 REVEAL A7.75

NEW EIFS

EXISTING BUILDING

OVERFLOW DRAIN SYSTEM RE: PLUMBING

GAS PIPING UP AND OVER THE BUILDING, BEYOND RE: MECHANICAL

MP1

10'-0"

WATER FLOW ALARM BELL RE: FA DRAWINGS

NEW EIFS

EQ

EQ

TYP

TYP

EIFS1

FILE NAME: DATE STAMP:

20

10'-0"

10'-0"

10'-0"

10'-0"

10'-0"

B4 DOCK

MP1

ROOF DRAIN OVERFLOW, TYP RE: STRUC FOR PIPE SUPPORT

P8

EXISTING EXTERIOR EIFS WALL

8'-4" 1'-8"

60'W .X 25'H TRACKING . HANGER DOOR .

.

CONCRETE RAMP

GALVANIZED STEEL CRASH RAILING SYSTEM

B HALL DOCK

10'-0"

NEW BC HALL

10'-0"

10'-0"

10'-0"

10'-0"

9'-3"

NEW EIFS WALL BEYOND EIFS1

LIGHT FIXTURE RE: ELECTRICAL

GALV CRASHRAIL BEYOND

PROJECT NUMBER

NEW EIFS TO MATCH EXISTING MATCH EXISTING REVEALS

FCD

ROOF DRAIN P8 OVERFLOW OUTLET RE: STRUC FOR SUPP 8" CONCRETE FILLED STEEL PIPE BOLLARD, TYP (PTD SAFETY YELLOW)

EIFS1 NEW OPENING IN EXISTING EXTERIOR WALL, TYP

1 A7.75 TYP REVEAL

1003026 GWCC-043

12'-0"

10'-0"

SHEET TITLE 16'-0"

10'-0"

2'-1"

10'-0"

16'-5"

10'-0"

16'-0" TYP

10'-0"

2'-0"

BIM 360://GA-WCC/GWCC-A_R18.rvt 12/10/2018 10:23:59 AM

LIGHT FIXTURE RE: ELECTRICAL

3

LEVEL 1 - BLDG B 982'-3" NEW HM DOORS & FRAME, P5 TYP

EXPANSION JOINT, TYP

LD1.C4-10

LD1.C4-9

EXISTING CONCRETE COLUMN, TYP

LD1.C4.8 LD1.C4-7 LD1.C4-6 BOLLARDS, (PTD SAFETY YELLOW) TYP NEW C.I.P. STAIR, TYP

8" FULLY GROUTED CMU X8' TALL NEW GALVANIZED STEEL GUARDRAIL, TYP GAS PIPING ENCLOSURE . PROVIDE ACCESS PANEL RE: MECH

BOLLARDS

LD1-C4-5

C HALL DOCKS

LD1.C4-4

16' OVERHEAD DOOR BEYOND, TYP CONCRETE KNEE WALL

LD1.C4-3

LD1.C4-2

LD1.C4-1

DOCK BUMPERS, TYP OVERFLOW ROOF DRAIN OUTLET RE: PLUMBING

P8

P5 NEW EXIT DOORS NEW 24'x30' OVERHEAD DOOR

OVERALL ELEVATIONS

LEVEL 1 - BLDG C 980'-1" P5

BC HALL - C HALL NORTH ELEVATION

SHEET NUMBER

1/16" = 1'-0"

1

A6.02


CLIENT

MATERIALS & FINISHES WHITE

EXHIBIT HALL WALLS (SEE ELEV) CEILINGS

P2

LT GREY

INTERIOR PARTITIONS UON (BOH SPACES)

P3

DK GREY

CRASHRAILS, EXTERIOR RAILINGS, EXTERIOR EXPOSED STEEL UON

P5

GREY

DOORS FRAMES AND STEEL SUPPORTS TO MATCH EXISTING HALL C

P6

GREY

EXHIBIT HALL WALLS (SEE ELEV)

TO MATCH EXISTING HALL C

P7

BLACK

GYPBOARD PARTITION ABOVE B.O. TRUSS' PLENUM ELEMENTS AND UNDERSIDE OF ROOF

TO MATCH EXISTING HALL C

BEIGE

PREFINISHED ALUMINUM COPING

P8

SAFETY YELLOW

BOLLARDS, TEMP SAFETY RAILING

EIFS1 BEIGE

TO MATCH EXISTING C HALL EIFS

MP1

TO MATCH EIFS1

BEIGE

MARAZZI MODERN FORMATION UNPOLISHED 12X24 COLOR: SMOKY RIDGE

CWT1 GREY

MARAZZI MATERIKA GLAZED CERAMIC WALL TILE FLAT 16X48 COLOR: GRIGIO

CWT2 DK GREY

MARAZZI MATERIKA GLAZED CERAMIC WALL TILE LINEAR 16X48 COLOR: FANGO

CWB1 GREY

MARAZZI MODERN FORMATION 6X12 TO MATCH FLOOR TILE

QA1

WHITE

QUARTZ AGGLOMERATE COUNTERTOP CORIAN COARSE CARRARA

TP1

SILVER

STAINLESS STEEL EMBOSSED TOILET PARTITIONS

RB1

BC-09

BC-1 BC-2

OPERABLE PARTITION STORAGE DOOR, TYP GIRDER TRUSS

PGAL 1425 ELLSWORTH INDUSTRIAL BLVD. SUITE 15 ATLANTA, GA 30318 [T] 404 602 3800 [F] 404 602 3810 www.pgal.com

SEALED CONCRETE. SEE SPECIFICATION BLACK

4" HIGH RUBBER BASE (BOH SPACES)

NOTE: SEE AG SERIES FOR SIGNAGE SCHEDULE AND GRAPHICS

1

BC-3

A7.00 1

BC-4

3

A7.52

BC-6

A7.54

EXPANSION JOINT

2

2

A7.52

A7.00

BC-7

BC-8

3

3

A7.52

A7.00

BC-9 C-H

LIGHT FIXTURE RE ELECTRICAL

OPERABLE PARTITION TRACK OPERABLE PARTITION

REVEAL/CONTROL JOINTS, TYP

EXPOSED STEEL PAINT TO MATCH ADJACENT WALL TYP

PROVIDE BLOCKING COORDINATE WITH OWNER'S SIGNAGE REQUIREMENTS PROVIDE BLOCKING

GIRDER TRUSS

NEW MEMBRANE ROOF

STRUCTURAL TRUSSES BEYOND

EXPANSION JOINT

ROOF 1,026'-0"

SANDWICH TRUSS

P7

DESIGN ARCHITECT

BC-12 BC-12.2 BC-12.3 BC-12.4 BC-13

5 A7.52

STRUCTURAL TRUSSES

SANDWICH TRUSS

BC-10

P7

FENTRESS ARCHITECTS

OPERABLE PARTITION TRACK

P7

P7

P1

.

.

E1.BC1

DRINKING FOUNTAIN

3

3

NEW COLUMN ENCASED IN CONCRETE TO BOTTOM OF STRUCTURE

EXISTING B HALL

SIM TYP

ELECTRICAL PANEL OPEN TO TOILETS BEYOND

OPEN TO TOILETS BEYOND

R1.BC118

A1.C105 RAMP

980'-3"

R1.C114

CMU CONTROL JOINT, TYP

UTILITY RECESS RE: ELECTRICAL

BC-12.4 C-M BC-12 BC-11

BC-10

C-H BC-9

BC-8

BC-7

BC-6

3

1

2

A7.00

A7.50

A7.00

BC-4

BC-3 BAA

3

1 A7.00

1/8" = 1'-0"

KEY PLAN

EXPANSION JOINT OPERABLE PARTITION TRACK

ROOF 1,026'-0" REGISTRATION

P1

P1

P1

ALIGN REVEALS TO EXISTING EXHIBIT B HALL REVEALS

FILE NAME: DATE STAMP:

3'-0"

P7

TYP 4 A8.60

REVEAL/CONTROL JOINTS, TYP

1,012'-0" P1 P1

P1

NEW COLUMN ENCASED IN CONCRETE TO BOTTOM OF STRUCTURE

60'W 4 PANEL HORIZONTAL SLIDING HANGER DOOR BEYOND

.

.

.

EQ

OPEN TO VESTIBULE BEYOND

28'-0"

SIM 3 A8.60

EQ

R2.BC126A

OPEN TO TOILETS BEYOND

R2.BC126B

OPEN TO TOILETS BEYOND

R1.BC128 R2.BC130 OPEN TO TOILETS BEYOND

FE-1

R1.BC129

R1.B120

16'-0"

OPEN TO EXHIBIT HALL ENTRY BEYOND .

EQ EQ

TOP OF CURB NEW COLUMN ENCASED IN CONCRETE TO BOTTOM OF STRUCTURE

EXISTING C HALL

FLOOR MOUNTED HAND RAIL

1'-2"

10"

6"TYP AED

LIGHTING CONTROLS BEHIND ACCESS PANEL RE: ELEC

PILASTER

NEW BC HALL

STAINLESS STEEL CORNER GUARD, OUTSIDE CORNERS, TYP

DRINKING FOUNTAIN

PROJECT NUMBER

1003026 GWCC-043

982'-3"

SHEET TITLE

LEVEL 1 - BLDG B 982'-3" LEVEL 1 - EXIST B

980'-3" 3

TRANSITION ZONE BETWEEN NEW FFE 982'-3" AND EXISTING SLAB FFE

TOP OF CURB

4'-0"

EQ 16'-0"

5'-0"

4'-0"

R1.C121

OPEN TO TOILETS BEYOND

P1

8'-0 3/8"

R2.BC123EQ FE-1

OPEN TO TOILETS BEYOND

25'-0"

R2.BC122

RAMP

4'-0"

CMU, TYP A1.C106

EXIT SIGN RE: ELEC

5'-0"TYP

P1 EXIT SIGN RE: ELEC

32'-0"

P1

COLUMN BEYOND TRANSITION ZONE BETWEEN NEW FFE 982'-3" AND EXISTING SLAB FFE

Copyright © 2017

BOTTOM OF TRUSS

P1

NEW GWB WALL WITH REVEALS, TYP

P1

18'-0"

BIM 360://GA-WCC/GWCC-A_R18.rvt 12/10/2018 10:25:12 AM

OPERABLE PARTITION DOOR BEYOND

OPERABLE PARTITION STORAGE DOOR, TYP

P7

NEW GWB BULKHEAD/SOFFIT OPERABLE PARTITION

2018-1128

COORDINATE WITH OWNER'S SIGNAGE REQUIREMENTS PROVIDE BLOCKING

P7 P7

2018-0413

2

OPERABLE PARTITION

P7

DATE

2018-0302

EXPOSED STEEL. PAINT TO MATCH ADJACENT WALL

LIGHT FIXTURE RE: ELECTRICAL

P7

DESCRIPTION

100% CONSTRUCTION DOCUMENTS 1 CONSTRUCTION PERMIT SET 3 IR-22 FINISH FLOOR ELEVATIONS

NEW MEMBRANE ROOF

4 A7.50

A7.50

OPERABLE PARTITION TRACK

№.

BC-2 BC-1BBB BC-09

A7.50

2

EXPANSION JOINT

285 ANDREW YOUNG INT'L BLVD ATLANTA, GA 30313

EXISTING C HALL BC EXHIBIT HALL SOUTH INTERIOR ELEVATION

BC-13

PROJECT LOCATION

DRAWING HISTORY

LEVEL 1 - BLDG B 982'-3" LEVEL 1 - EXIST B LEVEL 1 - BLDG C 980'-1" LEVEL 1 - EXIST C

FLOOR MOUNTED HAND RAIL

NEW STEEL COLUMN ENCASED IN CONCRETE TO 28'-0", TYP

NEW BC HALL

TRANSITION ZONE BETWEEN NEW FFE 982'-3" AND 3 EXISTING SLAB FFE

TOP OF CURB

STAINLESS STEEL CORNER GUARD, OUTSIDE CORNERS, TYP

NEW HM DOORS & FRAME, TYP

P1

LIGHTING CONTROLS BEHIND ACCESS PANEL RE: ELECTRICAL MECHANICAL SENSORS RE: MECHANICAL

CMU, TYP

4 5/8"TYP

SIGNAGE. SEE AG2.10 NEW COLUMN ENCASED IN CONCRETE TO 28'-0" @ C-17Y & BC2

AED

4 A8.60

1'-8 5/8" FE-1 2'-0" 1'-2 5/8" R2.BC112

R2.BC111

.

OPEN TO TOILETS BEYOND

TRANSITION ZONE BETWEEN NEW FFE 982'-3" AND EXISTING SLAB FFE

982'-3"

8 A8.60

E1.BC2

28'-0"

EXIT SIGN RE ELEC

GEORGIA WORLD CONGRESS CENTER

OPERABLE PARTITION

FIRE ALARM DEVICE RE: FA DRAWINGS

TYP

3'-0"

.

8'-0 3/8"

OPEN TO TOILETS BEYOND

P1

50'W 4 PANEL HORIZONTAL SLIDING HANGER DOOR BEYOND

SIM

3'-0"

EXIT SIGN RE: ELEC

P1

A1.BC116

16'-0"

R2.B114

5'-0"

R2.B113

3 A8.60

PROJECT NAME

ALIGN REVEALS TO EXISTING EXHIBIT B HALL REVEALS

CAMERA. RE: IT

3 A8.60

29'-9"

EXIT SIGN OVER DOORS BEYOND COLUMN

P1

P1

NEW GWB WALL WITH REVEALS, TYP

SIM TYP

18'-0"

TYP

P7 P1

R1.B109

7 A8.60

3'-9"

REVEAL/CONTROL JOINT TYP

5'-0"

P1

3'-9"

P1

3

421 BROADWAY DENVER, CO 80203 [T] (303) 722-5000

1,012'-0" BOTTOM OF BC TRUSS

TOP OF CURB

GEORGIA WORLD CONGRESS CENTER 285 ANDREW YOUNG INT'L BLVD. ATLANTA, GA 30313 [T](404) 223-8828 ARCHITECT OF RECORD

CFT1 GREY

SC1

BCC

TO MATCH EXISTING HALL C

P1

3'-4"

SIGNAGE SEE AG.2.01

NEW STEEL COLUMN ENCASED IN CONCRETE TO 28'-0", TYP

NEW HM DOORS & FRAME, TYP

EXISTING B HALL

3

INTERIOR ELEVATIONS EXHIBIT HALL

LEVEL 1 - BLDG C 980'-1" LEVEL 1 - EXIST C

BC EXHIBIT HALL NORTH INTERIOR ELEVATION

SHEET NUMBER

1/8" = 1'-0"

1

A8.00

21


DELRAY_THE ADAM HOTEL PFVS

22


LEVEL 1 FLOOR PLAN

FIRST FLOOR PLAN TYPICAL FLOOR PLAN

23


NORTH ELEVATION

EAST ELEVATION

24


SOUTH ELEVATION

WEST ELEVATION

25


1 A-202

1

1.2

2

2.8

3

4

5

6

7

8

9

1 / A-401

PFVS

1 / A-402

SPRINGHURST_HOTEL 10

11

12

12.4

13

15

15.4

16

19

18

A RCH I T E CT U RE

20.9 21

P L A N N I N G I N T E R I O R S 2 A-300

250' - 1 1/2" 15' - 3 1/2"

4' - 11"

10' - 4 1/2"

15' - 3 1/2"

7' - 2"

79' - 4 1/2" 1

OFFICE 106

ELEVATOR LOBBY 137

FITNESS 156

WORK 105

105A

104

156B

133A

6

SALES 104

ELEV. 2

CORRIDOR 133

2" RECESS 101B

VESTIBULE 101 2' - 5 1/2"

4

F 11' - 4"

3' - 6"

G

G

6

12' - 3 1/2"

F 5

2' - 6"

12' - 9 1/2"

6 2' - 6"

1

A-302

A-302

A.1 2' - 0"

12' - 0 1/2"

3

3

1A A-421

6

ACCESSIBLE FFIS - KING 142

1 A-817

1

A-301

A-306

A-303

TERRACE

A-306 2

FFIS - KING 'A' 139

A-300 10X10 WOOD POST

2' - 0"

H

PORTE COCHERE

2

12' - 3 1/2"

101A A.1 2

155A

FFIS QUEEN/QUEEN 'A' 140

133B

A-301

1

FFIS - KING 'A' 141

4 A-817

WOOD TRELLIS ABOVE SEE A-121 2" RECESS

EXTERIOR LOW WALL SEE SHEET A-100

1 A-424

CORRIDOR 155

FFIS - KING SUITE 146

1 A-201

6' - 6"

6' - 0" 3' - 7" 5' - 10"

FFIS - KING 'A' 143

FFIS - KING SUITE 144

FFIS - KING 'A' 145

2" RECESS

D.9 E

G

7' - 4 1/2"

1 / A-402

2

1 / A-401

CANOPY ABOVE SEE A-121

A-300

1 A-300

2 A-202

J

K

5' - 10"

LIGHT BOLLARDS (SEE ELECTRICAL)

B.9

L E

ELEV. 1

27' - 2"

2' - 4 1/2"

157

156A

6

E

TPS - DOUBLE QUEEN 'A' 110

1A A-414

138

2' - 0"

3

8"

3' - 6 5/8" M

3

BREAKFAST AREA 134

LOBBY 102

REG. 103

ELEC. 157

K

7' - 4 1/2"

7' - 8"

L

7' - 4 1/2"

5' - 10"

FFIS - KING 'A' 147

13' - 2 1/2"

ACCESSIBLE FFIS - KING SUITE 148

M

5' - 10"

13' - 2 1/2"

FFIS - KING 'B' 149

4

4

N

4

9' - 0 1/4"

155B

1

STAIR #2 1S2

6

P

3' - 10 7/8"

A-305

5' - 10"

3

13' - 5"

FFIS - KING 'B' 153

1 A-703

1S2

Q 9' - 6 7/8"

FFIS QUEEN/QUEEN 'A' 154

7' - 4 1/2"

FFIS - KING 'B' 151

40' - 1"

5' - 10"

A-300

FFIS QUEEN/QUEEN 'A' 152

13' - 2 1/2"

A-300

7' - 4 1/2"

FFIS QUEEN/QUEEN 'A' 150

3 A-425

AT

136

This Document is the property of PFVS Architects and is to be used only in connection with the project named herein. Reproduction, in whole or in part, shall be allowed only with the express written or verbal permission. Drawing scales as shown are valid on the original size document which is 30 by 42 inches. c 2017 PFVS, Inc.

CONSTRUCTION DOCUMENT Sheet Title:

A-306

GENERAL NOTES

LEGEND 101

1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O.

A

2. ALL WINDOW TYPES ARE TYPE 'A' FOR TPS AND TYPE 'B' FOR FFIS U.N.O.

7/12/2017 8:56:45 AM

3. SEE ENLARGED PLAN PUBLIC SPACE - SHEETS A-401 AND A-402 TPS GUESTROOMS - SHEETS A-410 SERIES FFIS GUESTROOMS - SHEETS A-420 SERIES

26

4. SEE A-400 FOR INTERIOR PARTITION TYPES

WINDOW DESIGNATION - SEE SHEET A-602 1

STAMP CONCRETE WITH HERRINGBONE PATTERN

2

PRE MANUFACTURED OUTDOOR FIRE PIT

3

EYE WASH STATION

4

HOSE BIBB

1 HOUR RATED PARTITION

5

OUTDOOR GRILL

2 HOUR RATED PARTITION

6

KEY CARD ACCESS

HEARING IMPAIRED EXTERIOR CONVENIENCE OUTLET FD

24' - 6"

KEY NOTES

DOOR DESIGNATION - SEE SHEET A-601

FLOOR DRAIN NON-RATED PARTITION

2' - 2"

7' - 11 1/4"

25' - 11 1/2"

18' - 4 1/4"

5' - 2 1/2"

5' - 8"

23' - 1 1/2"

56' - 5 1/2"

14

17

14.1

18

Job Number

NORTH

1

A-101

FIRST LEVEL FLOOR PLAN SCALE: 1/8" = 1'-0"

REF: A-121

FIRST LEVEL FLOOR PLAN

20

6 A-300

SPRINGHURST, KENTUCKY

IT 107

CORRIDOR 138

6' - 0"

E

J 158B

6

FOR

135

Description:

DUAL BRAND HOTEL

1 A-303

GUEST LAUNDRYFD 136

Date:

01.31.2017 Permit Set 04.10.2017 CB-01_Construction Set 06.26.2017 CB-03_Marriott Comments

WHITE LODGING SERVICES

FOOD PREP 135

8' - 0"

1 A-819

2" RECESS

11' - 6 7/8"

7' - 2"

LOUNGE 131

FAMILY 159

ICE 136B

5' - 2"

2 A-303

SHOWER 159

DINNING 132

#

1 3

B.2

TOWNE PLACE SUITES/FAIRFIELD INN & SUITES

6' - 0" 3' - 0"

FD FD FD

FD

106

50' - 3 1/4"

INDOOR POOL 158

A

B

160' - 2 1/8"

TPS - STUDIO 'A' 112

E

QUICK PRINT

2" RECESS

3

3' - 10 5/8"

E

POOL EQUIP. 160

3

3

107

H 6' - 0"

6

6' - 0"

160

130B

127

9 A-501

3' - 8 5/8"

4

105B

TPS - STUDIO 'A' 114

POOL DEHUMIDIFIER 161 3

161

CORRIDOR 111

117B

115

MECH. 116

129

7' - 2"

E

6' - 0"

JAN 115

3

F.1

6' - 0"

I

158A

9' - 0"

F.1

2 A-305

7' - 2"

6

VESTIBULE 130

CORNER MARKET 128

124

6' - 4"

9' - 3"

8"

2A

6' - 11 5/8"

122

3

MARKET STORAGE 124

4' - 1"

5' - 10"

116B

ENG. 122

126

5' - 10"

7' - 4 3/4"

3

125B

6 A-300

8' - 3 1/2"

A-203

9' - 0"

E.1

5' - 10"

7' - 4 1/4"

1' - 3"

3' - 1 3/8"

23' - 0"

20' - 10"

123A

121

SERVICE CORRIDOR 117

E.5

F.8

LAUNDRY 121

120

117A

MEN 127

WOMEN 126

7' - 1 1/2"

9' - 7 1/2"

6"

1AS1

4"

1S1

LINEN 120

FD

3

116A

F.4

MECH. 125

BREAK ROOM 123

LUGGAGE 129

6' - 8"

5' - 10"

5' - 10"

123B

STAIR #1 1S1

6

FD

FD

7' - 9"

1 130A

8' - 1"

1 A-702

CART STORAGE 129A

E

118B

119

4

F

6' - 0" 125A

HK OFFICE 119

D.3

A-201

3

6' - 7"

A-300

D.1

2

5' - 10"

2' - 2 3/4"

5' - 2 7/8"

5' - 2 1/2"

62' - 6 1/2"

C D

118A

9' - 11"

DW

4' - 6"

B.9

3' - 6"

ELEC. 118

1

1' - 2"

20' - 8"

B.1

18' - 4 1/4"

B

1' - 2" 10' - 3 3/8"

A.2

13' - 11"

4"

A-305

A-300

LIGHT BOLLARDS (SEE ELECTRICAL) CANOPY ABOVE

6' - 5"

4" 3' - 2 7/8"

6' - 0"

12' - 0 1/2"

LIGHT BOLLARDS (SEE ELECTRICAL)

CONCRETE LANDING

REF.

1' - 2"

1' - 11"

2 A-304

26' - 7 1/2"

21' - 10"

49' - 9 1/2" 3

1 A-304

19' - 3"

6' - 0"

16' - 2 1/2"

15' - 3 1/2"

27' - 1"

45' - 9 1/2"

15' - 3 1/2"

24' - 0 3/4"

15' - 6 1/2"

11 1/4"

31' - 1"

15' - 3 1/2"

13' - 2 1/2"

15' - 3 1/2"

13' - 2 1/2"

28' - 10 7/8"

15' - 3 1/2"

13' - 2 1/2"

15' - 3 1/2"

65' - 6 1/2"

15' - 3 1/2"

13' - 2 1/2"

1' - 11"

26' - 8 1/2"

16009

Scale As indicated Drawn: JB Checked: KKL Date: 04/10/2017

A-101

ISSUE FOR CONSTRUCTION


TOWN PLACE SUITES 25 GUESTROOMS

1

FAIRFIELD INN & SUITES 21 GUESTROOMS

A-202

1

2

3

4

5

6

7

8

9

10

11

12

13

15

16

19

18

A RCH I T E CT U RE

21

P L A N N I N G I N T E R I O R S

3' - 1" 4' - 11 7/8"

5' - 10"

5' - 0"

5' - 5 7/8"

5' - 10"

8' - 5"

5' - 10"

A-702

4' - 2 1/2"

1B A-414

TPS - STUDIO 'A' 207

TPS - STUDIO 'A' 209

TPS - DOUBLE QUEEN 'A' 211

15' - 3 1/2"

5' - 6"

5' - 10"

13' - 2 1/2" 3' - 11 1/2"

5' - 10"

8' - 5"

5' - 10"

10' - 5 7/8"

5' - 10"

8' - 5"

5' - 10"

10' - 5 7/8"

OVERFLOW SCUPPER BELOW

5' - 10"

2A

26' - 4 1/2"

7' - 4"

5' - 10" 3' - 11 1/2"

5' - 10"

1A A-426

TPS - STUDIO 'A' 221

TPS - STUDIO 'A' 223

FFIS QUEEN/QUEEN 'C' 229

TPS - STUDIO 'A' 227

TPS - STUDIO 'A' 225

FFIS QUEEN/QUEEN 'C' 231

FFIS QUEEN/QUEEN 'A' 233

FFIS QUEEN/QUEEN 'A' 235

1 3

Date:

Description:

01.31.2017 Permit Set 02.22.2017 Permit Response 04.10.2017 CB-01_Construction Set 06.26.2017 CB-03_Marriott Comments

FFIS - KING 'A' 239

1 A-422

GUTTER

1 A-415

OVERFLOW SCUPPER BELOW

FFIS QUEEN/QUEEN 'A' 240

4' - 1 1/4" 3' - 6"

5' - 2 1/2" 27' - 0 3/4"

G

3 A-300

MTL COPING

GUTTER

ACCESSIBLE FFIS - KING 242

FFIS - KING 'A' 241

FFIS - KING SUITE 244

FFIS - KING 'A' 243

4' - 4"

FFIS - KING 'A' 245

65' - 6 1/2"

7' - 4"

7' - 8"

K 13' - 2 1/2"

A-201

J

7' - 4"

CORRIDOR 238

FFIS - KING SUITE 246

1

5' - 10"

7' - 4"

1 A-423

1 A-121

5' - 10"

2 A-300

13' - 2 1/2"

L

M

5' - 10"

FFIS - KING 'B' 249

4

4

N

7' - 4"

13' - 2 1/2"

FFIS - KING 'B' 251

40' - 1"

A-300

FFIS QUEEN/QUEEN 'B' 252

5' - 10"

A-300

7' - 4"

FFIS QUEEN/QUEEN 'B' 250

13' - 2 1/2"

4' - 0"

3"

5' - 10"

FFIS - KING 'A' 247

3' - 8 1/8"

ACCESSIBLE FFIS QUEEN/QUEEN SUITE 248

1 A-429

3' - 11"

5' - 10"

FFIS - KING 'B' 253

LEGEND 101 A

3. SEE ENLARGED PLAN PUBLIC SPACE - SHEETS A-401 AND A-402 TPS GUESTROOMS - SHEETS A-410 SERIES FFIS GUESTROOMS - SHEETS A-420 SERIES 4. SEE A-400 FOR INTERIOR PARTITION TYPES

WINDOW DESIGNATION - SEE SHEET A-602

EXTERIOR CONVENIENCE OUTLET FD

KEY NOTES

DOOR DESIGNATION - SEE SHEET A-601

HEARING IMPAIRED

FLOOR DRAIN

1

STAMP CONCRETE WITH HERRINGBONE PATTERN

2

PRE MANUFACTURED OUTDOOR FIRE PIT

3

EYE WASH STATION

4

HOSE BIBB

1 HOUR RATED PARTITION

5

OUTDOOR GRILL

2 HOUR RATED PARTITION

6

KEY CARD ACCESS

NON-RATED PARTITION

8' - 0"

GENERAL NOTES 2. ALL WINDOW TYPES ARE TYPE 'A' FOR TPS AND TYPE 'B' FOR FFIS U.N.O.

2S2

3 A-703

STAIR #2 2S2

C

28' - 1 1/2"

1' - 0" 5' - 2 1/2"

17

23' - 1 1/2"

18

Q

This Document is the property of PFVS Architects and is to be used only in connection with the project named herein. Reproduction, in whole or in part, shall be allowed only with the express written or verbal permission. Drawing scales as shown are valid on the original size document which is 30 by 42 inches. c 2017 PFVS, Inc.

CONSTRUCTION DOCUMENT Sheet Title:

7' - 11 1/4"

14

P

13' - 5"

FFIS QUEEN/QUEEN 'B' 254

1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O.

F

20

SECOND LEVEL FLOOR PLAN Job Number

6 A-300

1

A-102

SECOND FLOOR PLAN SCALE: 1/8" = 1'-0"

NORTH

AT

1A A-411

E

SPRINGHURST, KENTUCKY

12' - 6"

OVERFLOW SCUPPER BELOW

1 A-300

7' - 4"

DOWN SPOUT

DOWN SPOUT

11' - 4 1/8"

3

9' - 10"

1 A-412

3 1' - 11"

5' - 10"

FFIS - KING 'C' 237

ELEV. 2

FOR

TPS - STUDIO 'C' 228

TPS - STUDIO 'A' 226

DUAL BRAND HOTEL

TPS - STUDIO 'A' 224

D.3

WHITE LODGING SERVICES

TPS - STUDIO 'A' 222

18' - 7 1/2"

TPS - STUDIO 'A' 220

D D.1

TOWNE PLACE SUITES/FAIRFIELD INN & SUITES

ACCESSIBLE TPS - DOUBLE QUEEN 218

3

5' - 10"

TPS - DOUBLE QUEEN 'A' 216

5' - 2"

8' - 5"

TPS - DOUBLE QUEEN 'A' 214

5' - 10" 7 1/2"

1' - 0" 5' - 10"

TPS - DOUBLE QUEEN 'A' 212

ELEC. 232

C

13' - 2 1/2"

TPS - STUDIO 'A' 210

ELEVATOR LOBBY 234

D

230

3' - 9 1/2"

ELEV. 1

IT 230

3"

TPS - STUDIO 'A' 208

LOUVERED DOOR

2 A-701

13' - 2 1/2"

CORRIDOR 203

28' - 2"

29' - 2 7/8" 24' - 5"

TPS - STUDIO 'B' 206

TPS - STUDIO 'B' 204

F

7/10/2017 1:34:24 PM

#

13' - 2 1/2"

6

5' - 10" 3' - 4 3/8"

3

5' - 10"

4' - 4"

202

D

5' - 5 1/2"

A

B

LINEN STORAGE 202

3

23' - 0"

MTL COPING

R.D.

23' - 0"

TPS - STUDIO 'A' 219

5' - 10" 3' - 11 1/2"

OVERFLOW SCUPPER BELOW

R.D.

GUTTER

TPS - DOUBLE QUEEN 'B' 217

7' - 4"

A-300

232

D.3 2

3' - 5"

6

OVERFLOW SCUPPER BELOW

A-300

13' - 5"

26' - 11"

3' - 11 1/2" 5' - 10"

3

MTL COPING

D.1

A-201

13' - 2 1/2"

3"

MTL COPING

3"

A-300

13' - 2 1/2"

A-203

TPS - DOUBLE QUEEN 'A' 215

TPS - DOUBLE QUEEN 'A' 213

15' - 3 1/2"

75' - 11 1/2" 4' - 5 1/2" 4' - 11 7/8"

2

3"

15' - 3 1/2"

CANOPY BELOW

5' - 2 1/2"

23' - 0"

18' - 4 1/4" 3/8"

STAIR #1 2S1 2S1

5' - 2 1/2"

15' - 3 1/2"

5' - 2" 2' - 0"

ACCESSIBLE TPS - ONE BEDROOM 205

ELEV. 3

3 A-702

5' - 10"

1A A-414

3"

5

15' - 3 1/2"

16' - 0 1/2" 10' - 5 7/8"

1 A-300

15' - 6 1/2"

45' - 10 1/2"

7' - 0 1/2"

2"

B.2

D

7' - 2 5/8"

15' - 3 1/2"

3"

11' - 3 3/8" 5' - 10" 4' - 0"

6' - 6"

B

C

15' - 3 1/2"

30' - 1" 5' - 10"

1 A-417

A

15' - 3 1/2"

3' - 0"

31' - 0 1/2"

15' - 3 1/2"

4' - 2" 2' - 4"

1' - 1"

15' - 3 1/2"

24' - 2 1/4"

15' - 3 1/2"

23' - 0"

15' - 6"

16009

Scale As indicated Drawn: JB Checked: KKL Date: 04/10/2017

A-102

REF: A-121

ISSUE FOR CONSTRUCTION

27


EXTERIOR FINISHES MATERIAL: MANUFACTURER: COLOR/FINISH:

EXTERIOR INSULATION FINISH BASF #37302/SAHARA FINISH

EF-2

MATERIAL: MANUFACTURER: COLOR/FINISH:

EXTERIOR INSULATION FINISH BASF #32134/SAHARA FINISH

EF-3

MATERIAL:

EXTERIOR INSULATION FINISH SYSTEM BASF SW6231ROCK CANDY/FINE FINISH

J

K

L

M

N

P

Q

3 A-305

2 A-203

ROOF ELEMENT

HIGH PARAPET 54' - 8"

EF-2

STOREFRONT OLDCASTLE CLEAR ANNODIZED, W/ LOW-E INSUL. TINTED GLASS

MC-3

MC-1

MATERIAL: MANUFACTURER: COLOR/FINISH:

METAL (ALUM.) COPING TBD COLOR TO MATCH EF-1

AL-1

A

D

MC-2

MATERIAL: MANUFACTURER: COLOR/FINISH:

METAL (ALUM.) COPING TBD COLOR TO MATCH EF-2

MC-3

MATERIAL: MANUFACTURER: COLOR/FINISH:

METAL OVERHEAD DOOR TBD COLOR TO MATCH EF-3

EF-5

A

D

MC-4

MATERIAL: MANUFACTURER: COLOR/FINISH:

METAL OVERHEAD DOOR TBD COLOR TO MATCH BR-2

PT-1

MATERIAL: MANUFACTURER: COLOR/FINISH:

PAINT

A

D

PT-2

MATERIAL: MANUFACTURER: COLOR/FINISH:

PAINT

PT-3

MATERIAL: MANUFACTURER: COLOR/FINISH:

PAINT

TBD COLOR TO MATCH BR-2

EF-1

MATERIAL: MANUFACTURER: COLOR/FINISH:

ALUMINUM TBD CLEAR-ANNODIZED

EF-2

MC-3

FOURTH LEVEL 34' - 8" EF-3

EF-6

EF-6

THIRD LEVEL 25' - 4" EF-1

TBD COLOR TO MATCH EF1

SECOND LEVEL 16' - 0"

TBD COLOR TO MATCH EF2

EF-1

EF-2

EF-2

CJ

CJ

EF-1

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ PT-3

PT-3

FIRST LEVEL 0"

ARCHITECTURAL LOUVER - PAINT

4. 5.

A-303

ALL GLAZING TO BE TYPE GL-1, UNLESS INDICATED OTHERWISE. SEE SHEET A-602 FOR WINDOW SCHEDULES & ELEVATIONS 'CJ' INDICATES VERTICAL 3/8" EXPANSION JOINT AT BRICK AND 3/8" CONTROL JOINTS AT CMU (TO ALIGN WITH BRICK EXPANSION JOINTS), UNLESS NOTED OTHERWISE. ALL HOLLOW METAL METAL DOORS AND FRAME SHALL BE PAINTED TO MATCH ADJACENT BRICK SURFACE ARCHITECTURAL LOUVERS AT GUESTROOM WINDOWS SHALL BE ANNODIZE, U.N.O.

1

STEEL/GLASS ENTRANCE CANOPY BY OTHERS

6

GENERAL NOTES

3.

Description:

DECK BEARING 43' - 4"

EF-5

PT-2

2.

Date:

01.31.2017 Permit Set 04.10.2017 CB-01_Construction Set 06.26.2017 CB-03_Marriott Comments

1 3

LOW PARAPET 48' - 8"

MATERIAL: MANUFACTURER: COLOR/FINISH:

1.

#

EF-6 MC-1

SF-1

AL-1

H

2

EXTERIOR INSULATION FINISH SYSTEM BASF #32134/FINE FINISH

MANUFACTURER: COLOR/FINISH:

G

F

A-306

EXTERIOR INSULATION FINISH SYSTEM BASF #31435/FINE FINISH

MATERIAL:

E

D

2

A-201

2

3

4

5

6

7

8

9

10

LOW WALL AND PIER WITH CAST STONE CAP

NOTE: ALL WINDOW ARE TYPE 'B', UNLESS NOTED OTHERWISE.

WEST ELEVATION SCALE: 1/8" = 1'-0"

11

REF: A-101

12

13

14

16

15

ROOF ELEMENT 1

2

1

A-303

A-302

A-302

18

21 20 SIGN TOWER 58' - 8"

1 A-301

2 A-303

19 17

1 A-203 SIGNAGE

3

MC-4

A-306

1 A-306

AVERAGE BLDG HEIGHT = 53'-0"

3. A-204

EF-6 LOW PARAPET 48' - 8"

MC-2 MC-3

EF-1

HIGH PARAPET 54' - 8"

MC-1

1 A-204

DECK BEARING 43' - 4" EF-5 C EF-3 FOURTH LEVEL 34' - 8"

AL-1

AT

MATERIAL: MANUFACTURER: COLOR/FINISH:

EF-6

C

SPRINGHURST, KENTUCKY

EF-5

B.2

B

EXTERIOR INSULATION FINISH SYSTEM BASF #37302/FINE FINISH

MANUFACTURER: COLOR/FINISH:

FOR

MATERIAL:

DUAL BRAND HOTEL

EF-4

I N T E R I O R S

WHITE LODGING SERVICES

MANUFACTURER: COLOR/FINISH:

P L A N N I N G

TOWNE PLACE SUITES/FAIRFIELD INN & SUITES

3

A RCH IT E CT U RE

EF-1

EF-4

C

THIRD LEVEL 25' - 4" SF-1 EF-5

C

AL-1

EF-6

SECOND LEVEL 16' - 0" EF-1

EF-2

EF-2 EF-2

EF-1 F

F

E

CONSTRUCTION DOCUMENT

EF-2

Sheet Title:

9' - 2"

E

FIRST LEVEL 0" ARCHITECTURAL LOUVER - PAINT SEE MECH.

ARCHITECTURAL LOUVER - PAINT

STEEL/GLASS ENTRANCE CANOPY W/ STONE BASE

AUTOMATIC SLIDING ENTRANCE

TRELLIS OVER PATIO

1

7/10/2017 1:35:57 PM

A-201

28

SOUTH ELEVATION SCALE: 1/8" = 1'-0"

REF: A-101

This Document is the property of PFVS Architects and is to be used only in connection with the project named herein. Reproduction, in whole or in part, shall be allowed only with the express written or verbal permission. Drawing scales as shown are valid on the original size document which is 30 by 42 inches. c 2017 PFVS, Inc.

NOTE: ALL WINDOW ARE TYPE 'A', UNLESS NOTED OTHERWISE.

BUILDING ELEVATIONS Job Number Scale

16009

1/8" = 1'-0" Drawn: JS Checked: KKL Date: 04/10/2017

A-201

ISSUE FOR CONSTRUCTION


A RCH IT E CT U RE P L A N N I N G

EXTERIOR FINISHES MATERIAL: MANUFACTURER: COLOR/FINISH:

EXTERIOR INSULATION FINISH BASF #37302/SAHARA FINISH

EF-2

MATERIAL: MANUFACTURER: COLOR/FINISH:

EXTERIOR INSULATION FINISH BASF #32134/SAHARA FINISH

EF-3

MATERIAL:

EXTERIOR INSULATION FINISH SYSTEM BASF SW6231ROCK CANDY/FINE FINISH

MATERIAL: MANUFACTURER: COLOR/FINISH: MATERIAL: MANUFACTURER: COLOR/FINISH:

STOREFRONT OLDCASTLE CLEAR ANNODIZED, W/ LOW-E INSUL. TINTED GLASS

MC-1

MATERIAL: MANUFACTURER: COLOR/FINISH:

METAL (ALUM.) COPING TBD COLOR TO MATCH EF-1

MC-2

MATERIAL: MANUFACTURER: COLOR/FINISH:

METAL (ALUM.) COPING TBD COLOR TO MATCH EF-2

MC-3

MATERIAL: MANUFACTURER: COLOR/FINISH:

METAL OVERHEAD DOOR TBD COLOR TO MATCH EF-3

MC-4

MATERIAL: MANUFACTURER: COLOR/FINISH:

METAL OVERHEAD DOOR TBD COLOR TO MATCH BR-2

PT-1

MATERIAL: MANUFACTURER: COLOR/FINISH:

PAINT

PT-2

MATERIAL: MANUFACTURER: COLOR/FINISH:

PAINT

PT-3

MATERIAL: MANUFACTURER: COLOR/FINISH:

PAINT

MATERIAL: MANUFACTURER: COLOR/FINISH:

ALUMINUM TBD CLEAR-ANNODIZED

Q

3

P

N

M

L

K

J

G

A-305

E

F

D.3

B.2

C

B

3. A-204

2 A-204

HIGH PARAPET 54' - 8"

MC-2 EF-2

MC-3

LOW PARAPET 48' - 8"

EF-6

MC-3 EF-5

SIGNAGE

TBD COLOR TO MATCH EF1

MC-1

TBD COLOR TO MATCH EF2

D

EF-3

D

EF-5

EF-3

FOURTH LEVEL 34' - 8"

EF-4

TBD COLOR TO MATCH BR-2

EF-6

4. 5.

THIRD LEVEL 25' - 4"

D

GENERAL NOTES

3.

MAIN PARAPET 46' - 8" DECK BEARING 43' - 4"

AL-1

2.

SECOND LEVEL 16' - 0"

ALL GLAZING TO BE TYPE GL-1, UNLESS INDICATED OTHERWISE. SEE SHEET A-602 FOR WINDOW SCHEDULES & ELEVATIONS 'CJ' INDICATES VERTICAL 3/8" EXPANSION JOINT AT BRICK AND 3/8" CONTROL JOINTS AT CMU (TO ALIGN WITH BRICK EXPANSION JOINTS), UNLESS NOTED OTHERWISE. ALL HOLLOW METAL METAL DOORS AND FRAME SHALL BE PAINTED TO MATCH ADJACENT BRICK SURFACE ARCHITECTURAL LOUVERS AT GUESTROOM WINDOWS SHALL BE ANNODIZE, U.N.O.

EF-1 SF-1

E

EF-2

E

E

EF-1

E

FIRST LEVEL 0"

WITH TINTED GLAZING

2

A-202

21

19

16

2 A-305

13

15

12.4

12

11

EAST ELEVATION SCALE: 1/8" = 1'-0"

10

8

7

6

5

MC-4

A-301

1

EF-6

REF: A-101

9

1

3

ROOF ELEMENT

SIGNAGE

3. A-204

A-305

4

2

1

2

1

A-304

A-304

MC-1 INT PARAPET 50' - 8" MC-3 MC-2

EF-3

B

B

B

B

MC-3

MC-2

MC-3 AL-1

Description:

3 A-203

EF-6

1.

Date:

01.31.2017 Permit Set 04.10.2017 CB-01_Construction Set 06.26.2017 CB-03_Marriott Comments

1 3

EXTERIOR INSULATION FINISH SYSTEM BASF #32134/FINE FINISH

SF-1

AL-1

#

EXTERIOR INSULATION FINISH SYSTEM BASF #31435/FINE FINISH

1 A-204

EF-5

MAIN PARAPET 46' - 8" DECK BEARING 43' - 4"

AT

MANUFACTURER: COLOR/FINISH: EF-6

EXTERIOR INSULATION FINISH SYSTEM BASF #37302/FINE FINISH

SPRINGHURST, KENTUCKY

MATERIAL:

FOR

MANUFACTURER: COLOR/FINISH: EF-5

DUAL BRAND HOTEL

MATERIAL:

WHITE LODGING SERVICES

MANUFACTURER: COLOR/FINISH: EF-4

I N T E R I O R S

TOWNE PLACE SUITES/FAIRFIELD INN & SUITES

3

EF-1

EF-4

EF-4 FOURTH LEVEL 34' - 8" EF-3 EF-6

B

B

B

EF-6

B

AL-1 EF-6

EF-5

B

B

B

EF-5

B

EF-1 EF-2

EF-2

F

EF-1

7/10/2017 1:36:20 PM

ARCHITECTURL LOUVER - PAINT SEE MECH

(64"x18") ARCHITECTURL LOUVER - PAINT SEE MECH

F

(102"x18") ARCHITECTURL LOUVER - PAINT SEE MECH

BUILDING ELEVATIONS

PT-1 EF-2

E

G

AUTOMATIC SLIDING ENTRANCE

1

A-202

NORTH ELEVATION SCALE: 1/8" = 1'-0"

REF: A-101

ARCHITECTURL LOUVER - PAINT SEE MECH

E

Sheet Title:

8' - 7"

I

9' - 0"

E

8' - 11"

E

9' - 2"

EF-2

13' - 3 1/2"

10"

EF-1

EF-1

EF-1

8' - 10"

OVERFLOW SCUPPERS

This Document is the property of PFVS Architects and is to be used only in connection with the project named herein. Reproduction, in whole or in part, shall be allowed only with the express written or verbal permission. Drawing scales as shown are valid on the original size document which is 30 by 42 inches. c 2017 PFVS, Inc.

CONSTRUCTION DOCUMENT SECOND LEVEL 16' - 0"

EF-2 SF-1

THIRD LEVEL 25' - 4"

FIRST LEVEL 0"

(64" X 14") ARCHITECTURL LOUVER - PAINT SEE MECH NOTE: ALL WINDOWS ARE TYPE 'A', UNLESS NOTED OTHERWISE.

Job Number Scale

16009

1/8" = 1'-0" Drawn: JS Checked: KKL Date: 04/10/2017

A-202

ISSUE FOR CONSTRUCTION

29


KEY NOTES

303 PTAC

204

204

TPS - STUDIO 'A' ELEVATION

6

A-411

REF: A-411

EQ

303

EQ

D16B/ X-404 2 A-813

16 3

326

X-300 X-300B

X-273

3' - 0"

4

A-411

X-102

3

X-302 X-302B

304

31 X-212L (X-212R) X-220

3

X-216

X-213 X-273

204

TPS - STUDIO 'A' ELEVATION SCALE: 3/8" = 1'-0"

12

2

D

1' - 6"

2

14

191 T01

D.1

T06

X-505

0D6 100

5

20

23

A

100

22

T03

8' - 0"

2' - 5"

0A3

4" 29

23' - 0"

D16/X-404_X-404B

TPS - STUDIO 'A' 224

CLEAR

DESK

22'-10 3/4"

6"

8' - 6 3/4"

2B6

X-283

0F3

101 102

SOAP DISHES AND SHELF TO BE ALIGNED WITH NEAREST GROUT LINE.

21

MOTORIZED WINDOW TREATMENT AS REQUIRED.

22

CLOSET LIGHT TO BE TURNED ON AND OFF BY MEANS OF A CLOSET DOOR JAMB SWITCH.

23

UNDERCABINET LIGHT CENTERED OVER SINK.

24

BLOCKING IN CEILING FOR DRAPERY TRACKS. COORDINATE LOCATION WITH MANUFACTURER'S INSTALLATION REQUIREMENTS.

25

WALL MOUNTED (3) GANG OUTLET ABOVE DESK CENTERED ON DESK

26

OUTLETS FOR TV, CABLE, AND POWER FOR TV MOUNTED IN OPENING OF WALL MOUNTED TV PANEL, COORDINATE HEIGHT WITH PANEL AS REQUIRED

27

DESK BACK PANEL TO BE SUPPLIED BY MILLWORK COMPANY

28

DOUG MOCKET WIRE MANAGEMENT TRAY UNDER DESK CONSOLE TO BE PROVIDED BY MILLWORK COMPANY

29

FURNLITE 1202P-FUUR PROVIDED BY MILLWORK CONTRACTOR

30

CUTOUT FOR MICROWAVE OUTLET TO BE MADE IN FIELD BY INSTALLER OF MILLWORK

31

CENTER ARTWORK ON WALL

32

INDICATE BLOCKING IN WALL FOR ALL CASEWORK, FIXTURES, GRAB BARS AND ACCESSORIES. COORDINATE LOCATION WITH MANUFACTURERS INSTALLATION REQUIREMENTS. PTAC FOR TYPICAL GUEST ROOM HVAC

33

1' - 8"

X-101

FOR CEILING HEIGHTS ABOVE 8'-6" UTILIZE THE ALTERNATE TRACK SYSTEMS: X-404ALT1 FOR 8'-6" - 9'-6" CEILING HT AND X-404ALT2 FOR 9'-6" CEILING HT PROVIDE ACCESSIBLE SWITCH FOR HEADBOARD LIGHT.

LEGEND AND NOTES 191

CARPET

M

A

T

TV

J

X-302

DATA JUCTION BOX RACEWAY & WIRING

X-303B

X-102

1

TPS - STUDIO 'A' ENLARGED FURNITURE PLAN REF:

2

A-411

TPS - STUDIO 'A' ENLARGED RCP SCALE: 3/8" = 1'-0"

REF: A-112

4 1/4"

1B

A-411

TPS - STUDIO B SCALE: 3/8" = 1'-0"

REF:

1A

A-411

14'-7" CLEAR

TPS - ENLARGED BATH - STUDIO A SCALE: 3/8" = 1'-0"

REF: A-102

4 1/4"

6 5/8"

F

NOTE: ADDED ELECTRICAL TAGS (SEE ELECTRICAL)

1

WALL DESIGNATION - A-400

100

FINISHES - SEE INTERIOR FINISH INDEX

1'-0"

THERMOSTAT

DATA

TPS - STUDIO 'A' 224

F

1i 0A1

KEYNOTE TAG

I N T E R I O R S

#

1 3

Date:

Description:

01.31.2017 Permit Set 04.10.2017 CB-01_Construction Set 06.26.2017 CB-03_Marriott Comments

CEILING TAG / HEIGHT RECESSED CAN LIGHT

TELEPHONE OUTLET 4

DOOR DESIGNATION -A-601 TOILET ACCESSORY TAG - A430s

GROUND FAULT INTERRUPTER, GFI DUPLEX RECEPTACLE

2B6

CARPET PAD

A-411

F01

MASTER SWITCH DUPLEX RECEPTACLE

5 6

X-212B

X-220

3' - 8"

CAST MARBLE SHOWER SURROUND. INSTALL W/FULL TILE AT SHOWER PAN OR TOP EDGE OF TUB. SCRIBE TOP TIGHT TO CEILING.

20

35

7

X-215

X-286

7/10/2017 1:39:50 PM

VERIFY FINAL DIMENSIONS WITH SHOWER ASSEMBLY SUPPLIER

19

3

X-216

X-303

30

OUTLETS FOR QUAD AND DATA. SEE ELEVATION FOR ADDITIONAL INFORMATION. INDICATE EXTENDED FACEPLATES WHERE REQUIRED.

18

LIGHT SWITCH 191

34 X-500A X-500B X-212L (X-212R)

SCALE: 3/8" = 1'-0"

PROVIDE BLOCKING FOR TV MOUNTING BRACKET.

17

34

TRANSITION STRIP

X-273

K-104 K-210M K-211

7' - 0"

5' - 4 3/4"

401

K-281

3

REFRIGERATOR OUTLET.

16

CLEAR

X-213

X-601 X-601A

28

A-411

CENTER FIXTURE IN SHOWER/TUB.

15

T02 34

6"

ELEC. PANEL 6' - 6"

0A3

VINYL SHEET

D31/X-400_X-400B A

27

X-106B

DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP.

14

33

21'-10 3/4"

1' - 8"

R74

7' - 6" 401

D29/X-401 _X-401B

2' - 2 7/8"

EQ

4

X-300

X-106A

SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHTS PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. REFER TO ID SPEC MANUAL.

13

5'-6 1/4" CLEAR 0A3

13

10 X-286

1' - 0"

VINYL SHEET

5' - 4 3/4"

X-710

6' - 9 7/8"

L-70

J

9

4

THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL.

12

EQ

4' - 0"

1' - 0"

X-706-42

X-303 X-303B

OUTLETS FOR TV, CABLE, PHONE, AND DESK MOUNTED PLUG-STRIP TO BE GANGED BEHIND CREDENZA. SEE ELEVATION FOR ADDITIONAL INFORMATION. INDICATE EXTENDED FACEPLATES WHERE REQUIRED.

11

X-711

3

X-503

15

D

D.1

6 5/8"

1 A-432

11

6

IRON AND IRONING BOARD STORAGE ACCESSORY TO BE LOCATED INSIDE WARDEOBE.

REF: A-121

11

14

9

10

X-215

REF: A-411

T

CONTINUE ACCENT WALL COVERING AROUND TO INSIDE CORNER ON ADJACENT WALL.

X-101 X-500A X-500B

322

203

201

TPS - STUDIO 'A' ELEVATION SCALE: 3/8" = 1'-0"

322

304

304

X-213

204

EQ

ART

30

304

322

3' - 11 1/2"

X-286

EQ

SOFA

3

303

A-411

13

326

303

X-303 X-303B

LOCATE BOTTOM OF ARTWORK TO CLEAR SHOWER DOOR PULL.

8

3 3

SIM

6' - 0"

K-281

5

X-300

X-601 X-601A

X-283

WALL MOUNTED STOP LOCATION WHEN CONNECTING DOOR OPENS NEAR MIRROR.

7

REF: A-121

2' - 0"

3

SCALE: 3/8" = 1'-0"

305

26

322

TPS - STUDIO 'A' ELEVATION

5' - 0"

SCALE: 3/8" = 1'-0"

12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLET.

6

201

3' - 8"

7

5

P L A N N I N G

AT

K-281 X-286

A-411

INDICATE OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURING IN SAME CAVITY WITHIN PARTITION. HATCHED AREA INDICATES SPACE WHERE OUTLETS SHOULD OCCUR.

303

X-283

3 A-302

4

X-505

3

A RCH I T E CT U RE

SPRINGHURST, KENTUCKY

X-601 X-601A

X-303 X-303B

1

6' - 8" GLASS DOOR W/FULL HEIGHT FIXED PANEL. PROVIDE UCHANNEL ON TOP, BOTTOM, & WALL SIDE. PROVIDE CONTINUOUS BLOCKING IN WALL AND CEILING FOR CHANNELS AND HINGES. SEE MANUFACTURER FOR ADDITIONAL REQUIREMENTS.

FOR

32

X-102

ACCENT TEXTURE INTEGRATED INTO TUB/SHOWER SURROUND BY MANUFACTURER.

3 326

DUAL BRAND HOTEL

X-101

326

2 3

314

WHITE LODGING SERVICES

322

21

LOCATE OPERABLE SASH ON OPPOSITE SIDE OF PTAC UNIT.

TOWNE PLACE SUITES/FAIRFIELD INN & SUITES

24

1

RECESSED LED STRIP LIGHT X-601 (X-601)

FF&E - SEE INTERIOR FINISH INDEX INDICATES OPPOSITE HAND FF&E INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURING IN SAME CAVITY WITHIN PARTITION INDICATES BLOCKING IN WALL FOR CASEWORK ALL CASEWORK, FIXTURES, GRAB BARS, & ACCESSORIES. COORDINATE LOCATION W/MANUF INSTALL REQUIREMENTS

1. ALL EXTERIOR CORNERS SHALL HAVE FULL HEIGHT CORNER GUARDS PER FINISH INDEX. 2. WHERE REQUIRED FOR ACCESIBILITY, PROVIDE MOTORIZED SHADES. REFER TO DRAPERY MANUAL AND ID SPEC MANUAL FOR ADDITIONAL INFORMATION AND POWER REQUIREMENTS. 3. DOORBELL SWITCH, LIGHT, AND DISCONNECT SWITCH TO BE PROVIDED AT HEARING IMPAIRED AND ACCESSIBLE GUESTROOMS. 4. ALL DIMENSIONS ARE TO OUTSIDE FACE OF GYPSUM U.N.O.

This Document is the property of PFVS Architects and is to be used only in connection with the project named herein. Reproduction, in whole or in part, shall be allowed only with the express written or verbal permission. Drawing scales as shown are valid on the original size document which is 30 by 42 inches. c 2017 PFVS, Inc.

CONSTRUCTION DOCUMENT Sheet Title:

TPS - STUDIO 'A' & 'B' Job Number

16009

Scale As indicated Drawn: JB Checked: KKL Date: 04/10/2017

A-411

ISSUE FOR CONSTRUCTION


6 A-302

FLUID APPLIED WRB

5/8" EXTEROR SHEATHING FLUID APPLIED WRB

DRAINABLE EIFS

DRAINABLE EIFS

3/4"

3/4"

10.

A-302

F.4

F.4

SCALE: 6" = 1'-0"

6

A-302

REF: A-302

LOW PARAPET 48' - 8"

EIFS PLAN DETAIL SCALE: 6" = 1'-0"

MAIN PARAPET 46' - 8"

1" 3/4"

STEEL ANGLE (SEE STRUCTURAL)

DECK BEARING 43' - 4"

SINGLE-PLY MEMBRANE ROOFING ON TAPERED INSULATION OVER MTL DECK

#

DECK BEARING 43' - 4"

1 3

3/4"

2' - 0"

3 5/8"

BATT INSULATION

5/8" EXTERIOR SHEATHING

3"

5/8" GWB CAULK

10. A-302

SCALE: 3" = 1'-0"

5

A-302

REF: A-302

EIFS DETAIL SCALE: 1 1/2" = 1'-0"

TPS - DOUBLE QUEEN 'A' 414

7' - 4" (R.O.)

1"

3 5/8" MTL STUD 7' - 4"

1"

REVEAL FLUID APPLIED WRB

EIFS SILL DETAIL

Description:

STOREFRONT WINDOW SYSTEM

5/8" GWB

3/4"

Date:

01.31.2017 Permit Set 04.10.2017 CB-01_Construction Set 06.26.2017 CB-03_Marriott Comments

1' - 7"

6

1 1/2"

SINGLE-PLY MEMBRANE ROOFING ON TAPERED INSULATION OVER MTL DECK

2" DRAINABLE EIFS

12

ROWLOCK EIFS SILL

9

THIRD LEVEL 25' - 4"

5/8" EXTERIOR SHEATHING

3/4"

A-302

COMPOSITE CONCRETE SLAB ASSEMBLY (TYPICAL -SEE STRUCTURAL)

4"

FLUID APPLIED WRB

6' - 3"

REVEAL

2" DRAINABLE EIFS

I N T E R I O R S

LOW PARAPET 48' - 8" PREFINISHED MTL. COPING

REF:

F.4

3" DRAINABLE EIFS - BRICK FINISH

P L A N N I N G

1"

EIFS SECTION DETAIL

TOP OF ROWLOCK 13' - 10"

A RCH I T E CT U RE

7 A-302

6' - 1 3/4"

1"

3/4"

5/8" EXTEROR SHEATHING

TPS - DOUBLE QUEEN 'A' 414

EIFS REVEAL REF: A-302

CAULK SOLID SURFACE SILL

5/8" EXTERIOR SHEATHING 6" METAL FRAMING

FLASHING

ALUM. BRAKE METAL

WALL SYSTEM: - 2" DRAINABLE EIFS - FLUID APPLIED WRB - 5/8" EXT. SHEATHING - 6" CFMF - BATT INSULATION - 5/8" GWB

2' - 0"

THIRD LEVEL 25' - 4" SLOPE

4

A-302

REF: A-302

1' - 4"

SUSPENDED GWB CEILING (SEE RCP)

REF: A-302

7' - 4"

SIM.

P.T. WOOD BLOCKING

TPS - DOUBLE QUEEN 'A' 214

SEALANT (BOTH SIDES)

LOW PARAPET 48' - 8"

3

F.4 PREFINISHED MLT COPING

6 A-301

3

SUSPENDED GWB CEILING (SEE RCP)

EIFS AT GRADE DETAIL SCALE: 3" = 1'-0"

THIRD LEVEL 25' - 4"

7' - 4" (R.O.)

SCALE: 3" = 1'-0"

COMPOSITE CONCRETE SLAB ASSEMBLY (TYPICAL - SEE STRUCTURAL)

COMPOSITE CONCRETE SLAB ASSEMBLY (TYPICAL - SEE STRUCTURAL)

FLUID APPLIED WRB

EIFS AT GRADE LEVEL

TPS - DOUBLE QUEEN 'A' 314

WALL SYSTEM: - 2" DRAINABLE EIFS - FLUID APPLIED WRB - 5/8" EXT. SHEATHING - 6" CFMF - BATT INSULATION - 5/8" GWB

5 A-302

SLOPE

8

3 A-302

BLOCKING

1 1/2" RIGID INSULATION

FINISHED GRADE

A-302

TPS - DOUBLE QUEEN 'A' 314

5/8" PROTECTION BOARD

FLUID APPLIED WRB FINISHED GRADE

FLASHING

2"

BLOCKING

3/4"

5/8" PROTECTION BOARD 1 1/2" RIGID INSULATION

3/4"

FIRST LEVEL 0" 2"

FIRST LEVEL 0" ALUM. BRAKE METAL

TPS - DOUBLE QUEEN 'A' 214

ARCHITECTURAL LOUVER

EXTEND ROOFING MEMBRANE OVER PARAPET 3/4" EXTERIOR GRADE PLYWOOD

MAIN PARAPET 46' - 8"

SEALANT

X-208C

PTAC UNIT WALL SLEEVE

PTAC UNIT WALL SLEEVE

THIRD LEVEL 25' - 4"

P.T. WOOD BLOCKING SINGLE PLY MEMBRANE ROOFING

ROOF LEVEL 44' - 9" SIGNAGE

TAPERED INSULATION

5/8" GWB COMPOSITE CONCRETE SLAB ASSEMBLY (TYPICAL -SEE STRUCTURAL)

5/8" EXTERIOR SHEATHING R-13 BATT INSULATION 3 5/8" MTL STUD

EIFS STARTER BASE TRACK

5/8" GWB

2" DRAINABLE EIFS

CAULK

STOREFRONT SYSTEM

P.T. WOOD BLOCKING CAULK

CORNER BEAD

1" CLEAR INSULATED GLASS

7/10/2017 1:37:30 PM

1 1/2" FACE OF STOREFRONT

11

A-302

SECTION @ FFIS PTAC DETAIL SCALE: 1 1/2" = 1'-0"

2" DRAINABLE EIFS

2' - 8 1/4"

WORK 105

This Document is the property of PFVS Architects and is to be used only in connection with the project named herein. Reproduction, in whole or in part, shall be allowed only with the express written or verbal permission. Drawing scales as shown are valid on the original size document which is 30 by 42 inches. c 2017 PFVS, Inc.

WORK 105

CONSTRUCTION DOCUMENT 3

FLASHING MEMBRANE EIFS STARTER BASE TRACK

CAULK P.T. WOOD BLOCKING CORNER BEAD

FLASHING CAULK

1 1/2"

1' - 4"

FACE OF STOREFRONT

CORNER BEAD P.T. WOOD BLOCKING WALL BEYOND

LOW PARAPET SECTION DETAIL SCALE: 1 1/2" = 1'-0"

REF: A-302

4 A-302

5/8" GWB

BATT INSULATION

FLASHING MEMBRANE

Sheet Title:

3 5/8" MTL STUD

STEEL ANGLE (SEE STRUCT.)

A-302

CEILING (SEE RCP)

R-13 BATT INSULATION 6" CFMF

EIFS STARTER BASE TRACK

7

11 3/4"

COMPOSITE CONCRETE SLAB ASSEMBLY (TYPICAL -SEE STRUCTURAL)

5/8" EXTERIOR SHEATHING METAL DECKING (SEE STRUCT.)

6" CFMF

1" CLEAR INSULATED GLASS

SIM.

CEILING (SEE RCP)

FLUID APPLIED WRB

DECK BEARING 43' - 4"

STOREFRONT SYSTEM

5 A-303

5/8" GWB

THIRD LEVEL 25' - 4"

FLASHING

BACKER ROD AND SEALANT

EXTEND FLASHING BEHIND STOREFRONT SYSTEM

STEEL ANGLE (SEE STRUCTURAL)

FLUID APPLIED WRB

6" CFMF FLASHING MEMBRANE

PTAC UNIT

1" PRE-FINISHED ALUM. LOUVER AND FRAME INTEGRAL WITH WINDOW FRAME. LOUVER TO HAVE ALUM.

STEEL KICKER (SEE STRUCTURAL)

WALL SYSTEM: - 3" DRAINABLE EIFS - FLUID APPLIED WRB - 5/8" EXT. SHEATHING - 6" CFMF - BATT INSULATION - 5/8" GWB

(R.O.) 7' - 4"

FLUID APPLIED WRB

6 1/4"

STEEL ANGLE (SEE STRUCTURAL)

BATT INSULATION

2' - 1 1/4" BOTTOM OF SILL

2" DRAINABLE EIFS

2' - 2" BOTTOM OF SILL

1' - 11 1/2" BOTTOM OF X-208C

PTAC UNIT

EXTEND FLASHING BEHIND STOREFRONT SYSTEM

6 1/4"

1" PRE-FINISHED ALUM. LOUVER AND FRAME INTEGRAL WITH WINDOW FRAME. LOUVER TO HAVE ALUM.

STEEL KICKER (SEE STRUCTURAL)

WALL SYSTEM: - 3" DRAINABLE EIFS - FLUID APPLIED WRB - 5/8" EXT. SHEATHING - 6" CFMF - BATT INSULATION - 5/8" GWB

BLOCKING

3 SPRAY ON FIREPROOFING

TOP OF ROWLOCK 13' - 10"

BACKER ROD AND SEALANT

CAULK WALL BEYOND

STOREFRONT SYSTEM 1" CLEAR INSULATED GLASS

8 A-302

CONCRETE SLAB ON GRADE (SEE STRUCTURAL)

FIRST LEVEL 0"

CONCRETE SLAB ON GRADE (SEE STRUCTURAL) 6 1/4"

BLOCKING

13' - 10"

SEALANT

9 A-302 SPRAY ON FIREPROOFING

TOP OF ROWLOCK 13' - 10"

3

SECOND LEVEL 16' - 0"

3 2' - 7"

F.4 5/8" EXTERIOR GRADE PLYWOOD WHERE THERE IS SIGNAGE

5' - 0"

SECOND LEVEL 16' - 0"

A.2

AT

BACKER ROD AND SELANT

SPRINGHURST, KENTUCKY

5/8" GWB

EIFS STARTER BASE TRACK

5/8" EXTERIOR SHEATHING

FOR

3" DRAINABLE EIFS

2 X WOOD BLOCKING

DUAL BRAND HOTEL

5/8" GWB

WHITE LODGING SERVICES

6 1/4"

BACKER ROD AND SELANT

TOWNE PLACE SUITES/FAIRFIELD INN & SUITES

1/2"

EIFS STARTER BASE TRACK

7' - 4" (R.O.)

3" DRAINABLE EIFS

3

2' - 0"

FLASHING

FOURTH LEVEL 34' - 8"

3

BATT INSULATION

7' - 4"

BACKER ROD AND SEALANT

2' - 0"

FOURTH LEVEL 34' - 8"

SHIM

STOREFRONT SYSTEM

2' - 0"

1" CLEAR INSULATED GLASS

FIRST LEVEL 0" FINISHED GRADE

FINISHED GRADE

Job Number

1' - 4" 1 1/2" FACE OF STOREFRONT

3

A-302

SECTION @ TPS PTAC DETAIL SCALE: 1 1/2" = 1'-0"

REF: A-302

2

A-302

WALL SECTION SCALE: 1/2" = 1'-0"

REF: A-101

WALL SECTIONS & DETAILS

1

A-302

WALL SECTION SCALE: 1/2" = 1'-0"

REF: A-101

16009

Scale As indicated Drawn: JS Checked: KKL Date: 04/10/2017

A-302

ISSUE FOR CONSTRUCTION

31


EDWARD RESIDENCE RENOVATION PEEK DESIGN GROUP

32


33


34


35


THESIS_BONES TO BUILT

ENCLOSURE

RIBS

SPINE

5TH YEAR_SPRING STUDIO

36


37


STUDY MODELS

38


39


ORGANIC MUSUEM OF ART 4TH YEAR_SPRING STUDIO

40


FRONT ELEVATION B THE ATLANTA BELTLINE

A

A B

N SITE PLAN

FRONT ELEVATION

SECTION AA

SECTION BB 41


IVAN ALLEN JR BLVD 3RD YEAR_SPRING STUDIO

42


STUDY MODEL PROGRESSION

N

WEST ELEVATION

SOUTH ELEVATION

EAST ELEVATION

43


Turn static files into dynamic content formats.

Create a flipbook
2020 Portfolio by Jasmaine Franklin - Issuu