Skip to main content

Jaimi Yra's Professional Architectural Portfolio

Page 1

JAIMI YRA ARCHITECTURAL PORTFOLIO


PERSONAL STATEMENT

Architecture is the built form of a history lecture, the vision of an architect, the experiences of a community and an inspiration for the future. Architecture tells a thousand stories without saying a single word. My story, beginning as a young immigrant and progressing to a young professional, has invariably driven my work. Architecture is so much more than simply creating beautiful structures. There is a cause and effect to architecture. An effective design should reveal the passions, stories, and dreams of not only its creator, but also its audience. I’ve learned to understand architecture as a means to articulate our experiences through analyzing and interpreting the world in which we live. Our experiences are components of our culture, the society we inhabit, our inspirations, and our personal values.


2013

nejmark architects

2012

2011

2010

2009

2008

2007

2006

university of manitoba

bachelor of environmental design


TABLE OF CONTENTS 50 electronic avenue 01 fremont village 03 ebb + flow 05 bazay residential 07 cloverdale developments trail appliances 09 no frills 11 centerm cof 13 lower fort garry 15 from excess to access 17 strata 21 laneway housing 23

2021

ciccozzi architecture

2020

mgba (mallen gowing berzins arch.) architecture + interior design

2019

2018

republic arch. inc.

2017

2016

2015

2014

carleton university

masters of architecture

via architecture inc.


50 electronic avenue MIX-USE RESIDENTIAL DEVELOPMENT

PROJECT TYPE: LOCATION: DATE: OFFICE: CONSTRUCTION BUDGET: CLIENT:

residential & commercial port moody, british columbia february 2019 - november 2019 ciccozzi architecture $50m panatch group

This mix-use residential development consists of west (Phase 1) and east (Phase 2) developments, with 2 levels of parking, underground and upper parkade. COPYRIGHT RESERVED. THIS DRAWING MUST NOT BE SCALED. VARIATIONS AND MODIFICATIONS TO WORK SHOWN ON THESE DRAWINGS SHALL NOT BE CARRIED OUT WITHOUT WRITTEN PERMISSION FROM THE ARCHITECTS. THIS DRAWING IS THE EXCLUSIVE PROPERTY OF CICCOZZI ARCHITECTURE INC. AND CAN BE REPRODUCED ONLY WITH THEIR WRITTEN PERMISSION.

The development is a massive complex that provides several above grade wood construction 6 storey mixuse residential buildings, 2 storey amenity building, and several interior courtyards. REVISION: NO.:

DATE:

DESCRIPTION:

ISSUE: DATE:

DESCRIPTION:

01.09.16

ISSUE FOR DEVELOPMENT PERMIT

18.09.17

RE-ISSUE FOR DEVELOPMENT PERMIT

Units range from one bedroom, one bedroom with den, two bedroom, two bedroom with den, three bedroom, three bedroom with den, four bedroom, and four bedroom with den units. 07.03.18

RE-ISSUE FOR DEVELOPMENT PERMIT

12.04.18

RE-ISSUE FOR DEVELOPMENT PERMIT

03.05.18

RE-ISSUE FOR DEVELOPMENT PERMIT

31.08.18

RE-ISSUE FOR DEVELOPMENT PERMIT

SEAL:

West (Phase 1) - Commercial: 19,570 sq. ft. - 7 CRUs 200 - 2339 COLUMBIA STREET VANCOUVER, B.C. CANADA V5Y 3Y3 TEL: (604) 687-4741

West (Phase 1) - Amenity: 12,926 sq. ft. - 2 Storey West (Phase 1) - Residential: 159,742 sq. ft. - 138 Units East (Phase 2) - Residential: 290,340 sq. ft. - 220 Units PROJECT:

50 ELECTRONIC AVE

3115 MURRAY ST PORT MOODY, BC

MURRAY STREET DRAWN:

CHECKED BY:

AG

RC PROJECT NO.:

D

SCALE:

CA 442 SHEET TITLE:

D

PERSPECTIVE

D

<<

D

REVISION NO.:

PHASE 1

SHEET NO.:

-

PHASE 2

35' 8" + Ex 35'9" ] [ 10.87m (10.90m)

A0.3

+ Ex 36'1" >> + Ex (10.99m) 35'11" + 35'9" (10.95m)

D

A

SIAMESE CONNECTION

COMMERCIAL EXIT 35' 4" + 39'-1" [ 10.78m ] DN 7R

ANNUNCIATOR PANEL

E.G

.3

D

2'2

.6

14

" (9

.8

D

2m

)

PARKADE EXIT

2"

27

[3.00m]

+ 39'-1"

(10

.10

.3

3'1

1/2

SETBACK

" (1

0

CRU 1 3105 MURRAY STREET

.10

m)

CRU 2 3123 MURRAY STREET

9'-1018" [3.00m]

CRU 3 CRU 4 CRU 5 3133 MURRAY ST. 3135 MURRAY ST. 3137 MURRAY STREET

CRU 6 3139 MURRAY STREET CRU 7 3141 MURRAY STREET

EL. 1 F.F. EL. 2

32"

PROPERTY LINE

F.G

COMM. EXIT CORRIDOR

m)

WATER FEATURE

" (9 E.G. 32'1.827" .8 0 m) + (9.80m)

WEST BUILDING LOBBY 3131 MURRAY ST.

.8

COMMERCIAL PARKING EXIT

2'1

9'-1018"

E.G

.3

PROPERTY LINE

E.G. 32'2.614" F.G + .3 3 (9.82m) SETBACK'1 1/

COMMERCIAL CORRIDOR

RESIDENTIAL EXIT

1 2 3 4 5 6 7 8 910 11 1213141516171819202122232425262728293031

32"

HUB COMMERCIAL 50 ELECTRONIC AVENUE

BIKE STORAGE

+ FG 34'9 1/2"

6362616059585756555453525150494847464544434241403938373635343332

RESIDENTIAL GARBAGE S.C.

S.C.

S.C.

S.C.

S.C.

44

43

42

41

40

39

383940414243444546

PARKING EXIT CORRIDOR 0

28

RES. SETBACK (16M) 29

30

32

31

33

34

35

PARKING FOR TRUCK

FEC 65 432 1

S.C.

109 8 7

DN 14R AMENITY

BIKE STORAGE

22232425262728293031323334353637

PODIUM EXIT

COMMERCIAL GARAGE

AMENITY LOBBY 3131 MURRAY STREET

4'-0"

21201918 17161514 1312 11 10 9 8

PARKADE EXIT

4'-0" 474849505152535455

(10.60m)

727170696867 787776757473

CANOE STORAGE

RESIDENTIAL EXIT

765 43 2 1

COMMERCIAL EXIT

6'-10" 4'-0"

RESIDENTIAL EXIT CORRIDOR

5657585960616263646566

COMMERCIAL EXIT CORRIDOR

11 12131415161718192021222324

293 143 142141140 139 138 137 136 144

DN 15R

135 134 133 132131130 1

1

36

37

38

S.C.

S.C.

S.C.

2

3

4

EL. 3

COMM. SETBACK (10M)

COMMERCIAL PARKING

)

6m

1.0

" (1

PARKADE ENTRY

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

27

22

21

20

.8 (19

E.V

E.V

E.V

E.V

E.V

E.V

<<

01

26

m)

1

0

6m ) .9 (10 6"

1/2 " 4' 11

5' 11. 49

S.C.

.6

.3

M.C. 1

F.G

E.G

33

3.4

6'

.3

E.G

PHASE 1

PHASE 2

50 electronic avenue

mix-use residential development CANADIAN PACIFIC RAILWAY

>>

19

18

1


R

I

25

RIGHT Rendering of exterior of the building

0Ã&#x2DC;

ST

M

D

BELOW Overall plan of entire development - Ground floor

D

D

OPPOSITE PAGE Rendering of amenity area and common outdoor area

S S S S

) 6m .7 3.6

+ 35'8"

5' E.G

32"

32"

EL. 4

5'-0"

EL. 5

32"

32"

.3

36' 7" [ 11.14m ]

F.G

+ 39'-1"

+ 39'-1"

32"

32"

EXISITNG S.R.O.W.

FEC

FEC

+ 39'-1"

SETBACK

32"

FEC

+ 39'-1"

32"

32"

32"

32"

32"

32"

EAST BUILDING LOBBY 55 KLAHANIE DRIVE

32"

6'

7"

DN 6R

DN 6R

DN 6R

22

" (1

0

S

+ 36'4"

5'-0"

.3

+ 36'0"

m)

K

15

SETBAC

IE

(11.

+ 39'-1"

KLAHAN

S

+5R FG 39'-1" + FFE 39'-1"

+ 39'-1"

FIREWALL

S

DN 5R

+ 39'-1"

TY LINE

9'-10 18" [3.00m]

+b s 36'7 "

+ 39'-1"

35' 3" [ 10.74m ]

PROPER

DN 6R

D D

35' 11" [ 10.94m ]

Slope DN 8.3% DN

+ 39'-1"

+ 39'-1"

S

ANNUNCIATOR PANEL

'3"

+ 36

+ 36'3"

DN 6R

SETBACK

SIAMESE CONNECTION

INTERSECTION AT MURRAY STREET AND ELECTRONIC AVE LOOKING SOUTHEAST DN 5R

'8" + 35

DN 6R

'5"

][3.00m 9'-1018"

+ 35

DN 7R

+ 35'3"

36' 6" [ 11.12m ]

FIREWALL D

FIREWALL PROPERTY LINE

S

D

File: 442 Cover Sheet.vwx Plotted: 8/30/18 at 9:58:51 AM

D

KLAHANIE DRIVE

FEC 32"

FEC

RESIDENTIAL EXIT

8

9

10

1

S.C.

VEHICULAR LANE

FEC

32"

32"

32"

7

9'-1018" [3.00m]

414039383736353433323130292827262524232221201918 171615 1413 12 11 10 9 8 7 6 5 4 3 2 1

2

3

4

5

RESIDENTIAL ELECTRICAL ROOM

BIKE STORAGE 4243444546474849505152535455565758596061626364656667686970717273747576777879808182

RES. SETBACK (16M)

6

S.C.

7

8

S.C.

S.C.

9

11

10

12

13

SERVICES/ STORAGE SERVICES/ STORAGE

15

16

17

18

19

20

21

22

23

24

S.C.

S.C.

S.C.

S.C.

S.C.

S.C.

S.C.

S.C.

S.C.

S.C.

WIDENED VEHICULAR LANE

RESIDENTIAL ELECTRICAL ROOM

124 123 122121120119118117116115114113112111110 109 108 107 106 105 104 103 102101 100 999897969594939291908988878685848382 0 129 128 127 126 125

6

4'-11" 1.50m

PARKING EXIT CORRIDOR

BIKE STORAGE

5

19'-814" [6.00m]

RESIDENTIAL EXIT CORRIDOR

RESIDENTIAL EXIT CORRIDOR

93031323536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081

BOLLARDS TYP.

39' 6" [ 12.03m ]

PARKADE EXIT

PODIUM EXIT

EXISITNG S.R.O.W.

RESIDENTIAL GARBAGE 9'-1018" [3.00m]

16

15

14

13

12

11

51

50

49

48

47

46

45

44

43

42

41

40

39

38

37

36

35

34

33

32

31

30

29

28

27

26

25

F.G

3'

1'6 ) 6m

2.6

" (1

1/2

mix-use residential development

E.G

.4

.4

50 electronic avenue

19'-878" [6.02m]

PROPERTY LINE

RESIDENTIAL PARKING

COMM. SETBACK (10M)

SETBACK

17

FEC

32"

32"

32"

LOT C

38' 9" [ 11.82m ]

2-WAY BIKE LANE

DN 3R DN 3R

32"

DN 3R

32"

32"

DN 3R

DN 3R

DN 3R

EXISTING PEDESTRIAN OVERPASS

DN 3R DN 3R

DN 3R

LANDSCAPED BUFFER

32"

EL. 6 F.F.

.5

35

" (1

3.1

2m

)

PARKING EXIT

02


fremont village MIX-USE RESIDENTIAL DEVELOPMENT

PROJECT TYPE: LOCATION: DATE: OFFICE: CONSTRUCTION BUDGET: CLIENT:

residential & commercial port coquitlam, british columbia may 2017 - may 2018 mgba $35m onni group

1.1b

1.14 80' 10 1/2" Stair shaft

24.65m Stair shaft

70' 10 1/2" Rooftop

21.6m Rooftop

Bylaw [table 6.31.3] 19.0m [62' 4"] 60' 9" 6th Floor

18.52m 6th Floor

50' 7 1/2" 5th Floor

15.43m 5th Floor

40' 6" 4th Floor

12.34m 4th Floor

30' 4 1/2" 3rd Floor

9.26m 3rd Floor

20' 3" 2nd Floor

6.17m 2nd Floor

Ground Floor 0'0"

Ground Floor 0.00m

This mix-use residential development consists of three 6-storey buildings, Building R, S, and T.

1.6e

1.8

1.1c

1.13

1.1d

1.11

1.14

1.1b

1.7

1.1c

1.6e

Building R Commercial: 16,028 sq. ft - 5 CRUs Building R Residential: 92,228 sq.ft. - 83 Units 1.5i

Building S Commercial: 15,099 sq. ft - 13 CRUs

1.7

Building T Commercial: 25,513 sq. ft - 17 CRUs Building T Residential: 141,368 sq.ft. - 150 Units

24.65m Stair shaft

70' 10 1/2" Rooftop

21.6m Rooftop

Bylaw [table 6.31.3] 19.0m [62' 4"] 60' 9" 6th Floor

18.52m 6th Floor

50' 7 1/2" 5th Floor

15.43m 5th Floor

40' 6" 4th Floor

12.34m 4th Floor

30' 4 1/2" 3rd Floor

9.26m 3rd Floor

20' 3" 2nd Floor

6.17m 2nd Floor

Ground Floor 0'0"

Ground Floor 0.00m

On Grade Parking: 455 stalls Underground Parking: 610 stalls Worked with project architect during rezoning of mixed use multi-residential development. Ensured that all aspects of the community planning objectives were met in the design of the site plan and exterior of building. Assisted project architect during public hearings and through development permit application.

1.5i

1.9

3

INLET INV. 0.06

ERT

212'-7"

10'-2 1/2" 18'-0 1/2"

18'-0 1/2" 6'-4 1/2"

49'-1"

27'-3"

UP

22'-8 1/2"

Scale: 1/16" = 1'-0"

70'-10 1/2"

3'-11"

24'-7 1/2"

21'-9 1/2"

67'-6"

20'-10"

DECEMBER 21 - 10am

MARCH 21 - 10am

RETAIL T1

32'-5"

18'-0 1/2"

UNIT T107 1,394 s.f.

4"

UNIT T104 1,557 s.f.

70'-10 1/2"

97'-5 1/2"

18'-0 1/2"

9,839 S.F.

UNIT T105 1,528 s.f.

8'-10 1/2"

25' -6"

DN

48'-1 1/2"

UNIT T106 1,528 s.f. 18'-0 1/2"

139'-0"

0 1/2" 18'24'-

1.2g 1.10 1.12

22'-11 1/2"

UNIT T108 1,392 s.f.

0"

24'-7"

24'-0 1/2"

17'-2 1/2"

127'-6 1/2"

24'-6 1/2"

26'-6"

W/M EX. 2.0

18'-0 1/2"

18'-0 1/2" 55'-9 1/2"

UNIT S207 823 s.f.

UNIT S206 646 s.f.

UNIT S205 928 s.f.

6'-0"

UNIT S204 901 s.f.

5'-6"4'-5"

104'-0 1/2"

WATER MH

UNIT T103 689 s.f.

73'-5 1/2"

20'-10 1/2"

17'-1 1/2"

18'-0 1/2" 3'-9"

EX. 250mmØ D.I. W/M

8'-1"

DN

20'-7 1/2"

24'-7 1/2"

20'-4"

24'-1"

UNIT T102 851 s.f.

16'-11 1/2"

UNIT T101 900 s.f.

UP

24'-8"

JUNE 21 - 10am

244'-3 1/2"

RESIDENTIAL ELEVATOR LOBBY

"

UNIT S104 1,525 s.f.

SEPTEMBER 21 - 10am

SOLAR STUDIES

12'-1 1/2"

Not to Scale

18'-0 1/2"

LOADING / UTILITIES 26'-9"

7,421 S.F.

106'-3 1/2"

1/2

RETAIL S1

22'-11 1/2"

20'-6"

18'

-0

1/2"

UNIT S105 1,546 s.f.

26'-7"

18'-0

1/2"

1/2"

8'-10 1/2"

BUILDING S

UNIT S106 1,279 s.f.

1/2"

11'-10

51'-1

20'-0 1/2"

PAR. STOR. RM.

DN

3

24'-7 1/2"

13'-2

23'-2"

15'-

244'-3 1/2"

RESIDENTIAL REFUSE ROOM

UNIT S201 1,310 s.f.

10"

20'-

10"

20'-

9 1/2"

15'6"

17'-

5 1/2"

95'-1 1/2"

26'-9 1/2"

7,678 S.F.

UNIT S202 1,546 s.f.

221'-5 1/2"

RETAIL S2

22'-11 1/2"

102'-3 1/2"

UNIT S203 1,524 s.f.

86'-10"

153'-5"

UP

UP

22'

55'-9 1/2" 10'-8"

24'-7"

24'-0 1/2"

22'-0"

23'-2"

24'-11 1/2"

0.220

9'-2"

43'-11"

BOC

19.813

CB

CB

CB

FRS

PC

A6

A6

CC

CC

SS

CC

A6

PC

A6

SS

C3 2,560 SF

PC PC HP

C&V AFP

A6

CB

CB

D 4,800 SF

AFP

FR PC

FRS

CC

CC

C2 2,693 SF

CANOPY ABOVE

FR

C&V

C&V

2

PROPERTY LINE

STM MH RIM=4.75

CULVERT

PP

LS

SIDEWALK PP

PP

GW

SIDEWALK

STM MH RIM=5.07

UNIT T202 1,224 s.f.

UNIT T203 1,224 s.f.

UNIT T201 4,334 s.f.

UNIT T204 1,429 s.f.

UNIT T206 1,429 s.f.

UNIT T207 1,429 s.f.

UNIT T205 1,429 s.f.

AWNING

AWNING

UNIT T102 851 s.f.

AWNING

AWNING

MH RIM=4.73 LS

LS

W W

SLOPE OF

SLOPE

OF

UNIT S206 646 s.f.

LS

LOADING /

LS

CONCRETE

UTILITIES

FIRE ROUTE

UNIT R201 3,429 s.f.

LS

EX. 250mmØ D.I. W/M

EX.

LS

AWNING

LANDSCA

ASPHALT

ASPHALT

AWNING

PLANTER

AWNING

SETBACK

LS

3

CB RIM=4.44

RETAIL R2

setback

AWNING

LINE OF COLUMNS

AWNING

LS

ASPHALT

setback

PARKING

RETAIL R1 PLANTER

GARBAGE

Ø

BRICK LS

ENCLOSURE

W/M

ASPHALT

HANEY No.

PAR. STOR. RM.

JAN. CL.

MAINTENANCE ROOM

SCALE

CB RIM=3.17

PARKING

CB RIM=3.18

CB

PLANTER

RIM=4.53

PARKING

MAIN

RESIDENTIAL ELEVATOR LOBBY

TOE OF SLOPE

3

LS

FIRE ROUTE TOP OF SLOPE

ASPHALT WALKING PLANTER

PATH

STM MH RIM=4.49

ASPHALT PARKING PLANTER

SP

LS

LS

SAND BAG WALL

LS

FH W

OUTLET INV. 0.402 SP

BELFAST

EX.

800mmØ

W/M

HANEY

MAIN

PROJECT NO.

16054 REVISION

DRAWING NO.

D.I.

CB RIM=2.70

AVENUE

INLET INV. 0.416

W/M

CB RIM=2.21

DP-02

EX.

CB RIM=2.22

250mmØ

CB RIM=2.33

PMT location 03

EX. 915mmØ

AS NOTED

CB RIM=3.25

CULVERT

CB RIM=2.45

EX.

300mmØ

CULVERT

OUTLET INV. 1.164

AS NOTED

LOADING / UTILITIES

8,033 S.F.

LS

1372mm

BUILDING R RESIDENTIAL REFUSE ROOM

PLANTER

LS

EX.

UNIT R102 1,525 s.f.

7,995 S.F.

AWNING

PARKING

RIM=4.43 CB

geogrid

geogrid

PLOT DATE

OPEN GRASS FIELD

AWNING

BRICK

2.5m 1.8m

UNIT R103 2,843 s.f.

PE

No.

UNIT R202 4,566 s.f.

FIRE ROUTE

PARKING

HANEY

UNIT R101 3,665 s.f.

W/M

AWNING

2m

MAIN

KEY PLAN

Site Plan & Solar Studies

LS

W W

CB RIM=4.51 SAN MH RIM=4.57

LINE OF COLUMNS

AWNING

1372mm Ø

Scale: 1:3000

Scale: Not to Scale

7,421 S.F.

CROSSWALK UB

FH

UB UB

AWNING

2

FH

STM MH RIM=4.46

BUILDING S PARCEL C EAST 41,708.0 sq.m. (448,941 sq.ft.)

RETAIL S1 UNIT S102 1,027 s.f.

LS STM MH RIM=4.73

AWNING

LS

LS

AWNING

BUILDING 'Q' 820 VILLAGE DRIVE PORT COQUITLAM

AWNING

fremont village

W/M EX. 2.0

UNIT S207 823 s.f.

TOP

UNIT S104 1,525 s.f.

ASPHALT

W W

SAN MH RIM=4.66 SAN MH RIM=4.66

AWNING

DRAIN RIM=5.01

EX.

mix-use residential development

SIDEWALK

UNIT T103 689 s.f.

UNIT T101 900 s.f.

CB RIM=4.46

UB W

LINE OF COLUMNS

UNIT S103 945 s.f.

STEEL STEEL

60mmØ 60mmØ

PLAN BCP45149

RESIDENTIAL ELEVATOR LOBBY

UNIT S106 1,279 s.f. UNIT S105 1,546 s.f.

FH

AWNING

UB

W

LS

UB

CROSSWALK

CULVERT CULVERT

UB

CROSSWALK

EX. 1880-12 1880-12

WW

UB

AWNING UB

CB RIM=4.51

UB UB

UNIT S101 1,099 s.f.

MEDIAN

BUILDING 'U' 815 VILLAGE DRIVE PORT COQUITLAM

AWNING

LS

AWNING

BUILDING R - PERSPECTIVE

SHEET TITLE:

FREMONT STREET

AWNING

CONC.

setback

setback

geogrid

geogrid

1.8m

CB RIM=4.58

AWNING UB UB

CB RIM=4.58

W

DRAIN RIM=5.00 STOR

DRAIN RIM=5.01

7,678 S.F. Rem 3

PAR. STOR. RM.

LS

OVERHANG

LS

UB STM MH RIM=4.66

SAN MH RIM=4.67

FH LINE OF COLUMNS

IINLET NV. -0.211

5

RETAIL S2

UNIT S202 1,546 s.f. UNIT S201 1,310 s.f. LS

CROSSWALK LS

PARAPET

UB

WW

LS

SETBACK

UNIT S205 928TOEs.f.

UNIT S203 1,524 s.f.

CB RIM=4.78

PARAPET LS

LS

LOADING

PE

REFUSE ROOM

CROSSWALK LS

ASPHALT PARKING

ASPHALT

UB

ROOM 383 ft² 110

ROOM 278 ft² 111

LANDSCA

WATER MH

FIRE ROUTE

CB RIM=4.57

LS

CB RIM=4.60

GARBAGE ENCLOSURE DRAIN RIM=5.08

ELEC Area

ELEC Area

2m

IINLET NV. -0.136

RESIDENTIAL

EXIT

CB RIM=4.77

PMT

LO HIG HWUG H AY H

SIDEWALK

EXIT LS

ROUTE

LANDSCAPE

SETBACK

D

AWNING

)

UNIT S204 901 s.f.

FIRE

5586

FH

3

2m

HEE

( Plan

FREMONT STREET

up at 12.5%

ROUTE No.

FIRE

0m . 25

MAIN

)

MEDIAN

EX

54 visitors stalls

HANEY

UG

9168

CB RIM=4.13

0.00'

gate

TOP OF SLOPE

W/M

LO

( Plan

gate

LS

CB RIM=4.14

OPEN GRASS FIELD

LS

LS

gate

AWNING

B)

UNIT T104 1,557 s.f.

FH LS

BIKESTORAGE # 1

BIKESTORAGE # 2

TOE OF SLOPE

Ø

2923

Fremont Village Parcel C East

W

CB RIM=4.39

LS

AWNING

GARBAG E AND RECYC. BIKESTORAGE # 3

PMT location 01

AWNING

( Plan

FH

UNIT T105 1,528 s.f.

AWNING

TOWER B LOBBY

gate

9,839 S.F.

CB RIM=4.61

UB

AWNING

gate

BIKESTORAGE # 4

BIKESTORAGE # 5

MANAGER'S OFFICE

RETAIL T1

UNIT T106 1,528 s.f.

LS

LS

0.00'

0.00' EXIT

1372mm

W EED Y.

No. 2

STM MH RIM=4.56

LOADING / UTILITIES

UNIT T107 1,394 s.f.

T

LINE

EX.

FIRE ROUTE

T

PROPER TY

RETAIL REFUSE ROOM

BUILDING T FIRE ROUTE

CB RIM=4.80

CB RIM=4.71

T

SETBACK

AWNING

mØ

PE

UNIT T208 1,284 s.f.

UP PAD

RAMP

CONCRETE

28'-2"

LANDSCA

FIRE ROUTE

FIRE 2m

FIRE

3/4"

MAIL RM.

RESIDENTIAL ELEVATOR LOBBY

UNIT T108 1,392 s.f.

LS

PMT location 02 gate

14'-1"

ROUTE

6'-7 3/4"

11'-3

RESIDENTIAL REFUSE ROOM

15,674 S.F.

UB LS

0.00'

A 164 STALLS

1/2"

setback setback

RIM=4.34 CB

TL

FIRE ROUTE

PAD

CONCRETE

ROUTE

0.00'

R 2'-11

RETAIL T2

LOBBY

TOWER A

T

EXIT

2'-0"

ENTRY

geogrid geogrid

UNIT T209 1,892 s.f.

SETBACK APE LANDSC

ROUTE

1.5m

FIRE 2.5m 1.8m

2.5m

PARCEL C EAST SITE PLAN Scale: 1" = 50 ft

1.56'

T

PLAN BCP49178

20'-2"

R

T

DITCH

BIKESTORAGE # 7 1.0'

T

BIKESTORAGE # 6

ROUTE

FIRE ROUTE FROM

DITCH

T

EXIT

FIRE

PLAN BCP45149

SETBACK LINE

OF

3/4"

D.I . W/ M

TY EDGE

3'-2

T LV ER CU

SETBACK

WALL

AT PROPER 7.5m

1/2"

0m mØ

PE G

LS

PP

T

T

Rem 3

LANDSCA

RETAININ

INLET INV. 0.416

5'-5

EX . 30

T

3

1

EXIT

ROUTE

T

2m

ER

DRIVEWAY

LV

CULVERT

SP

LS

CB RIM=4.64

INLET INV. 0.07

1700mmØ

STM MH RIM=5.01

1200mmØ

EX.

MEDIAN

CB RIM=4.89

ASPHALT

CU

EX.

SHERLING AVENUE

GW

mØ

THIS DRAWING MUST NOT BE SCALED. THE CONTRACTOR IS TO VERIFY ALL DRAWING DIMENSIONS AND DATA NOTED HEREIN WITH CONDITIONS ON THE SITE AND IS HELD RESPONSIBLE FOR

REPORTING DISCREPANCIES TO MALLEN GOWING BERZINS ARCHITECTURE INCORPORATED. THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SIGNED BY THE CONSULTANT.

PROJECT:

6.0m BUILDING SETBACK 4.0m LANDSCAPE SETBACK

BCH MH RIM=5.49

FIRE

EX . 80

www.mgba.com

ELEC/TEL PROPAN E CAGES PROPAN E CAGES

AFP

SHERLING AVENUE

SS

info@mgba.com

PP

GARDEN (CANOPY AREA) = 2,950 S.F.

H3 1532 SF

C1 6,314 SF

A6

A6

A6

4m LANDSCAPE SETBACK

PP

AFP

PP

Y MAIN

W/M EX.2.00 W/M 2.00 EX.

PLAN BCP45149

OUTLET INV. 0.402

HANE

RV

PP

GROSS FLOOR AREA = 151,988 S.F. GARDEN (SHADE CLOTH) = 5,862 S.F.

AFP

CC

HP

6m FRONT BLDG SETBACK

0m

mØ W/M

CPRG

DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF SERVICE, ARE THE PROPERTY OF MALLEN GOWING BERZINS ARCHITECTURE INCORPORATED, THE COPYRIGHT IN THE SAME BEING RESERVED TO THEM. NO REPRODUCTION IS ALLOWED WITHOUT THE PERMISSION OF MALLEN GOWING BERZINS ARCHITECTURE INCORPORATED AND WHEN MADE MUST BEAR ITS NAME. ALL PRINTS TO BE RETURNED.

FIRE ROUTE H2 1470 SF

C 11,567 SF

FR

A6

CC

FRS

A6

J 151,290 SF

H1 1185 SF

BOC

PC SS

FRS

CC

FR

FH

SS

HP

HP

CB

CC

FH

HP

CC

FIRE ROUTE PC

FR

PC

FRS A6

CC SS

A6

TOS

CB

CB

SS SS

FRS

FIRE ROUTE PC

FRS CANOPY ABOVE

SS

FR

SS

SS

A6

FRS

CB

SS

SS

A6

FIRE ROUTE CANOPY ABOVE

E - Mark's Work Wearhouse 16,000 SF

CB

SS

CANOPY ABOVE

A6

503'-6"

FR

PC

FH

PC

FIRE ROUTE

SS

CB

CB

1/2"

4m LANDSCAPE & INTERIOR SIDE BLDG. SETBACK

FRS

REFER TO LAND. FOR TREE DIAMONDS

A6

FRS CANOPY ABOVE

A6

FR

CB

FR

STOCKROOM

PC

FR

RIGHT-IN ONLY

FR

A6 SS

SS

3,293 S.F APPENDAGE DOCK

C&V AFP

A6

BATTERY STORAGE

SS

HP

HP

FRS

A6

EX. 250mmØ D.I. W/M

SS

SS

SS

HP

FREMONT CONNECTOR

CB

CB

CB

FRS HP

274'-8"

OUTLET INV. 1.164

JB DR

VANCOUVER BRITISH COLUMBIA CANADA

FH

PC

FR A6

SS

AFP

65'-4"

4.0m LANDSCAPE SETBACK 6.0m BUILDING SETBACK

PROPERTY LINE TOS

PC

A6

PC

CART CORRAL

FIRE ROUTE

FRS

1

A6 SS PLAN BCP45149

SS

FRS

EX. 915m

03

A6

HP

SS

A6

SPEED HUMP

CB

FH

TOS

PC

A6 SS

SS

PC

FIRE ROUTE

SPEED HUMP

PC

CB

PROPERTY LINE

24'-8 1/2"

FRS

CB

A6

CB

C&V

PROPERTY LINE

8'-10"

HP A6

SS FRS

PC

SPEED HUMP

C&V

6.0m BUILDING SETBACK

24'-5 1/2"

FIRE ROUTE

INLET INV. 0.06

36'-3"

FRS

FRS

11 12

C&V

C&V

27'-11"

DESCRIPTION

604.484.8285 AFP

EX. 250mmØ D.I. W/M

24'-9 1/2"

6.0m BUILDING SETBACK

PP

98'-5 1/2"

159'-5 1/2"

ISSUED FOR DP REVIEW

SUITE 300 - 7 EAST SIXTH AVENUE

PROPERTY LINE

184.673

11'-9"

43'-11 1/2"

9 10

PC

FRS

13'-2 44'-3 1/2"

NICOLA AVENUE

8

'-0"

9'-10"

.3

OPPOSITE PAGE Building R Exterior Elevations & Rendering

7

22'-3"

96'-8 1/2"

9'-9 1/2"

6

62

CUSTOM NATIVE RIPARIAN RESTORATION MIX

No

5

CANOPY ABOVE

IN

EX. 1200mmØ STM

EX. 1200mmØ STM

BOC

MA

B2 19,356 SF

4

CANOPY ABOVE

Y

ELEC ROOM

3

53'-2"

UNIT R103 2,843 s.f.

106'-3 1/2"

8,033 S.F.

26'-7 1/2" 44'-3 1/2"

1/2"

19'-8"

NE

B1 12,277 SF

2FRS

CART CORRAL

22'-0 1/2"

24'-7

HA

24'-7 1/2"

/M

6m REAR BLDG SETBACK

1

CANOPY ABOVE

W

4m LANDSCAPE SETBACK

6m REAR BLDG SETBACK

Building B 31,632 SF

A - Canadian Tire 63,700 SF

MAINTENANCE ROOM

41'-8 1/2"

4m LANDSCAPE SETBACK

FRS

STREET

Ø

UNIT R102 1,525 s.f.

UNIT R101 3,665 s.f.

1/2" 24'-7

1/2"

8'-7 1/2"

mm

PAR. STOR. RM.

JAN. CL.

SS

RECEIVING

FREMONT

72

LOADING / UTILITIES

A6

A4

A4

6m REAR BLDG SETBACK

TOC

. 13

Rem.28

A6

4m LANDSCAPE SETBACK

RECEIVING L105

RESIDENTIAL ELEVATOR LOBBY

DATE

MALLEN GOWING BERZINS A R C H I T E C T U R E

Plan 4318

NICOLA AVENUE

Pcl."A" Plan 2354

PROPERTY LINE

BUILDING R RESIDENTIAL REFUSE ROOM

UP

RETAIL R1

46'-8"

1/2"

36

NICOLA AVENUE

Plan 1033

CB

34'-8 1/2"

1/2" 18'-0

1/2"

79'-8

37

2.0 EX. SAN 3.2 EX. BCH

EX. 200mmØ SAN

BCH

18'-0 1/2"

7,995 S.F.

HAWKINS STREET

18'-0

16'-0"

4'-10

F/M

EX

"

19'-8"

SAN

RIGHT Site Plan

103'-8 7'-6"

-8"

LS

BCH

BASE OF BANK

5'-0"

188'

BUILDING Q SCOPE OF WORK

WM

RETAIL R2 UP

DN

2017-02-14

MGBA MGB A

Plan 27244 50mmØ

2.25

BOC

UP

UNIT R202 4,566 s.f.

HAWKINS STREET

26'-7 1/2"

EX. 200mmØ W/M

12'-11"

59'-8 1/2"

EX. 200mmØ SAN

35'-5"

27'-9 1/2"

EX.

24'-5 1/2"

EX. W/M

1/2"

0 1/2"

BCH

17'-8 1/2"

24'-6"

35'-5"

36'-4"

189'-3

195'-1

1 REV

ARCHITECT:

0.9 EX. BCH

17'-2"

1/2" 14'-10"

UNIT R201 3,429 s.f.

88'-7"

1/2" 8'-10

106'-3 1/2"

1/2" 8'-10

44'-3 1/2"

52'-9 1/2"

24'-1"

17'-3"

1/2"8'-10

18'-0 1/2"

8'-0"

141'-6" DN

12'-1

25'-4 1/2" 26'-8"

-2"

13'-2 1/2"

26'-7"

UNIT S103 945 s.f.

86'-1 1/2"

56'

EX. 250mmØ D.I. W/M

1/2" 18'-0

1/2

"

-4"

18'-0 1/2"

13'-2 1/2"

-3

1/2

26'-7"

5'-8 1/2"

-1

1/2"

1/2"

42'

18'-0

27'-8"

59'-8

71'-7"

23'

23'-2"

59'

"

16'-3" 21'-3"

-0"

1/2"

1/2"

UNIT S102 1,027 s.f.

UNIT S101 1,099 s.f.

23'-2"

1/2"

92'-0

26'-

7"

28'-3

93'-2

No. 2

INLET INV. -0.184

EX. 2200mmØ CULVERT

OUTLET INV. -0.214

1.12 1.15

1.15

MANAGER'S OFFICE

BUILDING T

27'-1"

18'-0 1/2"

" 1/2 '-0 18

132'-10 1/2"

62'-

13'-11 1/2"

1.2h

DN

UNIT T201 4,334 s.f.

UNIT T202 1,224 s.f.

UNIT T203 1,224 s.f.

UNIT T204 1,429 s.f.

UNIT T205 1,429 s.f.

UNIT T206 1,429 s.f.

UNIT T207 1,429 s.f.

UNIT T208 1,284 s.f.

1/2

"

1.3f

20'-4"

DN UP

'-8

RETAIL REFUSE ROOM LOADING / UTILITIES

RESIDENTIAL ELEVATOR LOBBY

17

1/2"

1.7

23'-11 1/2"

53'-2" 5'-2" 21'-5 1/2" 6'-2 1/2"

UNIT T209 1,892 s.f.

MAIL RM.

8 1/2"

17'-

11

1.15 1.12

BUILDING R - SOUTH ELEVATION

39'-8 1/2"

15,674 S.F.

1.9

1.7 1.11

RESIDENTIAL REFUSE ROOM

RETAIL T2

1.2g

1.13

61'-7"

195'-5 1/2"

17'-

ERT

LV

LV

Ø CU

Ø CU

mm

mm

36'-4"

1.2h

INLET INV. 0.07

00

00

17

12

EX.

EX.

95'-2 1/2"

1.3f 1.15

1.1b 1.1a 1.6e 1.8 1.1c

1.14 80' 10 1/2" Stair shaft

1.9

1.3f

1.7

1.5i

Scale: 1/16" = 1'-0"

Building S Residential: 73,330 sq.ft. - 70 Units

18'-0 1/2"

1.15 1.12

BUILDING R - NORTH ELEVATION

1

-

1.1c

1.11

1.3f

1.14

1.7 1.10


1.8

1.11 1.13

1.10

1.9

1.1a

1.1c

1.10 1.12 1.2h 1.2g

1.1b

1.15

1.14 1.8

1.7

1.12

1.6e

1.10

1.1d

1.3f

1.11 80' 10 1/2" Stair shaft

24.65m Stair shaft

70' 10 1/2" Rooftop

21.6m Rooftop

Bylaw [table 6.31.3] 19.0m [62' 4"] 60' 9" 6th Floor

18.52m 6th Floor

50' 7 1/2" 5th Floor

15.43m 5th Floor

40' 6" 4th Floor

12.34m 4th Floor

30' 4 1/2" 3rd Floor

9.26m 3rd Floor

20' 3" 2nd Floor

6.17m 2nd Floor

Ground Floor 0'0"

Ground Floor 0.00m

1.9

1.8

1.5i

1.5i

1.15 1.12

1.1b

1.2h

1.2g

1.1b

1.15

1.14

1.8

1.6e

1.15

1.1b

1.4

1.1c

1.7

1.6e 1.1a

1.2h 1.2g

1.7

1.9

80' 10 1/2" Stair shaft

24.65m Stair shaft

70' 10 1/2" Rooftop

21.6m Rooftop

Bylaw [table 6.31.3] 19.0m [62' 4"] 60' 9" 6th Floor

18.52m 6th Floor

50' 7 1/2" 5th Floor

15.43m 5th Floor

40' 6" 4th Floor

12.34m 4th Floor

30' 4 1/2" 3rd Floor

9.26m 3rd Floor

20' 3" 2nd Floor

6.17m 2nd Floor

Ground Floor 0'0"

Ground Floor 0.00m

1.9 1.5i

1.7

4

1.8

1.7

1.12 1.10 1.3f

1.13

1.15

1.11

1.12

1.14

1.7

1.1b

1.3f

1.1c 1.13

1.1a

1.12 1.10 1.2g

1.6e 1.8

1.5i 1.3f

1.14

1.12 1.2h 1.10

1.9

Scale: 1:200

1.14 1.8 1.1a 1.1b 1.1c 1.14 1.6e 1.13

1.1a

1.11

BUILDING R - EAST ELEVATION

2

4 1.8 1.13 1.6e 1.1a

1.14

1.12 1.10 1.9 1.3f

1.5i 1.2g 1.2h

1.11 1.8 1.1b 1.14 1.1c

1.9

1.12 1.10

1.7 1.6e 1.13 1.1a

1.3f

1.5i

1.7

1.11

1.1d

1.13 1.6e 1.1c

1.4

1.1b 1.11 1.6e 1.14 1.8

1.3f 1.12

1.15 1.2h 1.2g

1.9 1.5i

1.3f 1.12 1.15 1.7

1.5i

BUILDING R - WEST ELEVATION Scale: 1/16" = 1'-0"

MATERIAL LEGEND

COLOR LEGEND a b

fremont village

mix-use residential development

BM-118 "SNOWFALL WHITE" BM 2134-10 "IRON MOUNTAIN"

c

BM HC-27 MONTEREY WHITE

d

BM HC-165 BOOTHBAY GREY

e

VICWEST "CHARCOAL GREY"

f

SW 7069 "IRON ORE"

g

BRICK MASONRY "TAN TERRA"

h

BRICK MASONRY SOLDIER COURSE "SEATTLE CREAM"

i

"FLAT GREY"

1.1

CEMENTITIOUS PANEL

1.2

BRICK

1.3

EIFS FINISH

1.4

CONCRETE WALL

1.5

CONCRETE BASE

1.6

PROFILED METAL CLADDING

1.7

PROFILED PARAPET FLASHING

1.8

METAL ROOF CLADDING

1.9

METAL GLASS CANOPY

1.10

STOREFRONT GLAZING

1.11

WOOD CLADDING SOFFIT

1.12

SIGNAGE

1.13

VINYL FRAMED WINDOWS

1.14

GLAZED BALCONY

1.15

SPANDREL PANELS

04


ebb + flow RESIDENTIAL DEVELOPMENT - TOWNHOMES

PROJECT TYPE: LOCATION: DATE: OFFICE: CONSTRUCTION BUDGET: CLIENT:

residential north vancouver, british columbia october 2018 - july 2019 ciccozzi architecture $25m woodbridge homes ltd. & citimark

Residential development consists of six buildings with 1, 2, 3 storey units. Buildings above grade are of wood construction with a total of 3 storeys with a roof top patio. Units range from one bedroom (14 adaptable units), two bedroom, two bedroom with den, three bedroom, three bedroom with den, and four bedroom units. The Building 1: 28,604 sq. ft - 25 Units Building 2: 22,219 sq.ft. - 24 Units Building 3: 13,316 sq.ft. - 12 Units Building 4: 10,672 sq. ft - 10 Units Building 5: 22,023 sq.ft. - 20Units Building 6: 23,507 sq.ft. - 18 Units Total Area for FSR (floor space ratio): 120, 341 sq.ft. Underground Parking: 78,691 sq.ft., 178 stalls Involved during the building permit application process and coordinated internal and consultant team during construction document production. Mentored and led an internal team in preparation for the tender process and construction drawings to meet all schedule deadlines.

TOP Rendering the corner of Building 1 MIDDLE Rendering of exterior of townhouses BOTTOM Rendering rooftop patio spaces OPPOSITE PAGE Rendering of exterior of townhouses

05

ebb + flow

residential development - townhomes


ebb + flow

residential development - townhomes

06


bazay residential RESIDENTIAL DEVELOPMENT - DUPLEX

PROJECT TYPE: LOCATION: DATE: OFFICE: CLIENT:

residential calgary, alberta february - august 2011 nejmark architects elan construction ltd.

A contractor's development company sought the help of Nejmark Architects to apply for the building development permit in Calgary for a residential duplex. Completed entire application drawing set and construction drawing package for the project.

07

bazay residential

residential development - duplex


2-54 Adelaide P 204 947 3775

Drawings and specification copyright in the same being permission of the architects

The contractor is to verify d held responsible for reporti

PROJECT TITLE:

BAZAY M

NEW DUPLE 411 - 11th S CALGARY, A LOT 3 BLOCK 134 PLAN 2935 X SHEET TITLE:

MAIN FLO

COMMISSION NU

TOP Duplex Main Floor Plan RIGHT Window Well Details OPPOSITE PAGE - TOP LEFT Exterior Photo OPPOSITE PAGE - BOTTOM LEFT Party Wall Section Details OPPOSITE PAGE - RIGHT Wall Section Detail

bazay residential

residential development - duplex

08


cloverdale developments trail appliances COMMERCIAL DEVELOPMENT

SECTION 7 TOWNSHIP 8

commercial surrey, british columbia january 2017 - july 2018 mgba $10m echo lakes investment

The site of this project required a new zoning during the subdivision. Numerous complications were dealt with during the subdivision and development permit application due to the covenants and riparian area within the property. Provided several iterations for the city for required 5m easements and setbacks within property. Negotiations were completed back and forth for several weeks to determine a site iteration that met all the needs of the city, the client, and the community.

PROPOSED LEFT TURN ACCESS FROM 57th AVENUE

57 AVENUE ACCESS FIRE TRUCK ROUTE

19'-5 3/4" [5.9 m]

5'-1 1/2" [1.6 m]

PLAN EPP63044 PROPOSED EASEMENT

BCP47843 EASEMENT PLAN 17

Assisted architect and attended community public hearing to present proposal for site to the municipality and community members.

49'-3" [15 m]

FIRE TRUCK ROUTE

DFO RC FROM PL

152'-8" [46.5 m]

The ability to communicate intentions with client, city planning department, consultants, and community members allowed the process for the rezoning, subdivision, and development permit to go as smoothly as possible.

53.77

57 AVENUE

FREE STANDING SIGN

7.5m (24'-7 1/4") SIDE YARD SETBACK

PROJECT TYPE: LOCATION: DATE: OFFICE: CONSTRUCTION BUDGET: CLIENT:

18'-0 1/2" [5.5 m]

30

32

24'-6" [7.5 m]

165'-3" [50.4 m]

30

SRW

16'-4 3/4" [5 m]

PLAN EPP34279 SRW

264'-1" PROPERTY [80.5 m]

AISLE

FIRE TRUCK ROUTE

5m SRW PLAN EPP63044 PROPOSED EASEMENT DFO RESTRICTED COVENENT (DFO RC) 26.483m FROM PL

86'-9 3/4" [26.5 m]

20m FROM TOB

26.727 TOP OF BANK (TOB) HIGH WATER MARK (HWM)

HIGH WATER MARK (HWM)

09

PLAN 24493 SRW

OPPOSITE PAGE Site Plan of development

cloverdale developments trail appliances commercial development

1

SITE PLAN

Scale: 1" = 20'-10"


FIRE TRUCK ROUTE

29.57

SC

SC

SC

SC

SC

SC

SC

SC

SC

SC

SC

7.5m (24'-7 1/4") SIDE YARD SETBACK

13'-1 1/4" 13'-9 1/2" 12'-1 1/4" 4 [4.2 m] [3.7 m]

LOADING AREA

10'-10" 3.3

TRAIL APPLIANCES

30,780 s.f. (2,859.5 s.m.) GROUND FLOOR + 5,507 s.f. (511.6 s.m.) 2nd FLOOR

RECYCLING & GARBAGE AREA

181.34

40'-6" LOADING [12.3 m]

NEW PROPERTY LINE

315'-5 1/2" PROPERTY [96.2 m]

SRW (329101C)

124'-7" BUILDING [38 m]

20'-9 1/4" [6.3 m]

20'-0" [6.1 m] 24'-5 3/4" [7.5 m] 0m 3.0 0'-0" 10

6'-5 3/4" [2 m]

40'-4" LOADING [12.3 m]

CUSTOMER PICKUP ZONE

4'-2 1/4" 1.3

20m FROM TOB

HIGHWAY 10

41'-3 1/2" [12.6 m]

24'-11 1/4" [7.6 m]

18'-0 1/2" [5.5 m]

18'-0 1/2" [5.5 m]

262'-8 3/4" BUILDING [80.1 m]

7.5m (24'-7 1/4") FRONT YARD SETBACK

FIRE TRUCK ROUTE

69.42

18'-0 1/2" 6'-7 3/4" [5.5 m] 2

AISLE

6'-0" FENCE ON NEW PROPERTY LINE

2'-10 1/2" [0.9 m]

15'-8 1/4" [4.8 m]

SIAMESE CONNECTION

SRW (329101C)

DIRECTIONAL SIGN 25'-7 1/4" [7.8 m]

PLAN BCP47482 2

36'-1" [11 m]

PLAN BCP47843 EASEMENT

8

2

20'-0 1/4" [6.1 m]

270'-10" FIRE TRUCK ROUTE [82.6 m]

NEW FIRE HYDRANT

0" BE 0'10 0m M 3.0

5m SRW

20'-0 1/4" [6.1 m]

DIRECTIONAL SIGN

SC

11'-4 1/4" [3.5 m]

SC

AISLE

SC

3'-11 3/4" [1.2 m]

36'-1" [11 m]

SC

22'-3 3/4" [6.8 m]

5

16 SC

22'-1 1/2" [6.7 m]

4

FIRE TRUCK ROUTE

5m SRW

AISLE

6

20 .9 2

PLAN BCP47843 EASEMENT SRW

16'-4 3/4" [5 m]

14'-9 1/2" [4.5 m]

FREE STANDING SIGN

1.03 ha

3

01/09/20

2

10/03/20

1

07/13/20

REV

DATE

M

ARCHITECT:

MAL A R

SUITE

VANCO

86'-11 1/2" [26.5 m] 40'-1 1/2" [12.2 m]

RAR SPEA

86'-10 3/4" [26.5 m]

65'-7 1/4" [20 m]

FROM TOB

7.5m (24'-7 1/4") SIDE YARD SETBACK

DRAWINGS THE PROPER INCORPORA THEM. NO R PERMISSION INCORPORA PRINTS TO B

26.727

1

THIS DRAW VERIFY ALL D WITH COND REPORTING ARCHITECT USED FOR C CONSULTAN

PROJECT:

TOP OF BANK (TOB)

PLAN BCP47846 SRW HIGH WATER MARK (HWM)

181.35

595'-0 1/4" PROPERTY [181.4 m]

TR CL

HIGH WATER MARK (HWM)

17395 Surrey

16'-6 3/8" [5.04]

7'-4 1/4" [2.2 m]

RIPARIAN AREA 0.485 ha

22'-7" [6.9 m]

604.484

10'-6 1/2" [3.2 m] 6'-8 3/4" [2.1 m]

T

EXISTING 56 AVENUE ACCESS

PLAN BCP47848 SRW

T

EXISTING BUILDING

SHEET TITLE:

commercial development

PLAN BCP47847 SRW

cloverdale developments trail appliances

PLOT DATE SCALE

DRAWING NO

10


no frills TENANT IMPROVEMENTS

PROJECT TYPE: LOCATION: DATE: OFFICE: CONSTRUCTION BUDGET: CLIENT:

commercial trail, british columbia february - july 2012 nejmark architects $750,000 loblaw companies ltd.

As a project coordinator for Nejmark Architects, I worked mainly on commercial projects ranging from Scotiabank to Staples. However, my main responsibility was to oversee projects related to No Frills and Extra Foods. I completed all stages for each project: providing a project schedule to the client; producing construction documents (including building code review); tender phase; building permit applications; contract administration (including construction site visits); and continued until substantial completion. I worked closely with the clients, coordinated drawings with the engineers, and managed other coordinators working on No Frills projects. Many of the projects, such as the No Frills in Trail, BC renovated an existing Extra Foods and subdivided the space into two; a CRU space and a smaller grocery store, No Frills. Construction budgets ranged from $400,000 to $900,000.

11

no frills

tenant improvements


TOP Photo of Extra Foods Main Entrance MIDDLE Photo of No Frills Entrance with Temporary Extra Foods Sign BOTTOM Exterior Elevation of No Frills OPPOSITE PAGE - TOP Photo of No Frills Main Entrance OPPOSITE PAGE - BOTTOM Floor Plan of No Frills Tenant Improvement

no frills

tenant improvements

12


centerm cof HERITAGE RESTORATION & EXTENSION

PROJECT TYPE: LOCATION: DATE: OFFICE: CLIENT:

heritage restoration & extension vancouver, british columbia june - december 2020 via architecture inc. canada port authority The project consists of a renovation to the main heritage building, Centerm COF. The intent is to preserve the heritage facade and include an extension in the back to meet tenant requirements. Involved in the construction administration of the project. Keeping the project on schedule during construction by coordinating and leading internal office team and engineer consultants with shop submittal reviews and answering RFI's (request for information) from the contractor promptly. The main objective is to work with the team to determine alternatives to meet the construction schedule and reduce cost. Completed field reviews during construction every month to help with construction efficiency and to ensure that all heritage and LEED requirements were met.

TOP Heritage facade during construction MIDDLE Second level north side view during construction BOTTOM First level north-east view during construction OPPOSITE PAGE - TOP Heritage facade north-east exterior elevation rendering OPPOSITE PAGE - MIDDLE Extension facade south-west exterior elevation rendering OPPOSITE PAGE - BOTTOM Heritage facade south view during construction

13

centerm cof

heritage restoration & extension


centerm cof

heritage restoration & extension

14


lower fort garry HERITAGE BUILDING RECAPITALIZATION

PROJECT TYPE: LOCATION: DATE: OFFICE: CLIENT:

heritage building renovation lower fort garry national historical site, manitoba september 2015 - april 2016 republic architecture inc. public works government canada

The project consists of a renovation to the main building, Big House, in the Lower Fort Garry National Historical Site. The intent is to provide a four season event venue with washroom facilities, heating, proper lighting and barrier-free access in both the main and basement floors of the Big House. The proposed design of the project included an extension to the north side of the building, the Shed, which houses the barrier-free lift and vestibule. The design of the shed needed to comply with FHBRO (Federal Heritage Building Review Office) requirements as well as be distinguishable to the character defining elements of the existing building. The new addition seeks to be simple and unobtrusive in design.

15

lower fort garry

heritage building recapitalization


The subordinate and contemporary character of the proposed new shed was communicated materially through contrast to the Big House's stone walls. The primary cladding for the exterior walls of the shed is horizontally-oriented wood siding, painted white. During the design development phase, a design to light up the exterior cladding was proposed. The proposal included a substratum of lighting hidden behind the siding. This feature would be nearly invisible to visitors during the daytime, preserving the commemorative integrity of the Lower Fort Garry National Historic Site. However, during evening events, this lighting feature could be activated, to add both site lighting and visual interest to the experience of the site.

TOP Photo of Existing Big House MIDDLE 3D Rendering of Shed During Daytime BOTTOM 3D Rendering of Shed at Night OPPOSITE PAGE - TOP Site Plan OPPOSITE PAGE - BOTTOM Floor Plans in Design Development Stage

lower fort garry

heritage building recapitalization

16


from excess to access A NEW FORM OF FOOD DISTRIBUTION IN WINNIPEG, MANITOBA - MASTERS THESIS

PROJECT TYPE: LOCATION: DATE: ADVISOR:

master of architecture thesis winnipeg, manitoba september 2014 - april 2015 professor roger connah

Global food production and distribution to cities have created opportunities and difficulties, simultaneously. The problems caused by todayâ&#x20AC;&#x2122;s methods of food production continue to grow: increasing carbon emissions, the formation of food deserts, a lack of public knowledge regarding the content of food, and related health issues are examples. Exploring global and local development and distribution, this thesis aimed to explore how food production and distribution has evolved over time, as well as how agricultural technology and architectural design can contribute to a new form of food distribution in Winnipeg, Manitoba. The intent is to redirect and transform the current state of the global food system from a position of excess to a state of access, whereby affordable nutritious, locally produced food is readily available to consumers.

N

Through the rehabilitation of the abandoned James Avenue Pump House Station in downtown Winnipeg, a new network and form of food distribution using sourcing, localization and accessibility is proposed.

A

ALLEY FLOOR PLAN Aquaponics system will use the existing water pipes and the alley floor (pit) will serve as the fish tank.

17

A

A

A

ENGINE FLOOR PLAN James Avenue Pump House engine floor to be restored and will contain the growing beds. Fresh produce can be directly picked from the growing beds (green grocer).

from excess to access

a new form of food distribution in winnipeg, manitoba - masters thesis

B

B

A

A

GROUND FLOOR PLAN Building extended towards Amy Street. Serves as the year round farmer's market


TOP View of project from Waterfront & James Ave. BOTTOM - BOTH PAGES Floor Plans OPPOSITE PAGE Site Plan B

B

A

A

C

MEZZANINE & TOP FLOOR PLAN Mezzanine in the pump house will house the community kitchen. The floor above the farmers market contains the restaurant and terrace community garden.

C

GROUND FLOOR PLAN Ground floor of the processing and production building consists of garage for the mobile grocery trucks, composting and recycling sorting rooms.

from excess to access

a new form of food distribution in winnipeg, manitoba - masters thesis

C

C

TOP FLOOR PLAN The top floor of the processing and production building is the vertical harvesting area. These A-Frame structures grow approx. the same amount of produce as 17,000 sq.ft. of farmland.

18


Terrace Community Garden

Locally owned and supplied

Restaurant

Existing Exterior Wall to remain between existing building and new addition

Year-Round Rotating Vertical Harvest

The program played a major role in the design of the Food Exchange Hub. The program consists of: a year round farmer’s market; cold storage area; educational/nutritional centre; community kitchen; indoor/ outdoor community gardens and local agriculture community education centre; and a depot for mobile grocery trucks. This program will be designed in parallel with the history of the building, meaning the machines and architectural characteristics will remain intact at the James Avenue Pump House station.

Educational/Nutrition Centre/Community Kitchen

Mobile Grocery Truck Depot

Recycling & Composting Area

Apple Tree in Atrium Viewing platform/ Continuation of community market

Fermentation Room and Training Area ” 17’-0 ” r: 1 10’-3 Floo r: 1 Top Floo ine zan Mez

Cold Storage

und Gro

Bas

oor:

Fl ent

em

-0 83’

r: Floo

’-0”

100

Green Grocer

”

1/2 1’-8 r: 9 ” Floo 1/2 ne Engi 75’-5 oor: y Fl le Al

”

TOP Program Axonometric

Year-Round Community/ Farmer’s Market

Building History & Equipment Education

New Forms of Agriculture Education/Aquaponics System

BOTTOM - BOTH PAGES Program Strategy Section OPPOSITE PAGE Cross Section A - Education

COMPOST & RECYCLING

APPLES

FOOD

TRUNK

STRUCTURE/ SUPPLY

ROOTS

STORAGE/ NUTRITION

ECO-FRIENDLY MOBILE GROCERY TRUCK DEPOT

SKYWALK

AMY STREET

Basement Floor: 83’-0”

PROCESSING & PRODUCTION

CONCEPT

19

VERTICAL HARVESTING/ NEW FORM OF COLD STORAGE AGRICULTURE

from excess to access

a new form of food distribution in winnipeg, manitoba - masters thesis


Mezzanine Floor: 110’-3”

Ground Floor: 100’-0”

Engine Floor: 91’-8 1/2”

Alley Floor: 75’-5 1/2”

RESTAURANT

INDOOR COMMUNITY/ FARMER’S MARKET

TERRACE COMMUNITY GARDEN

AQUAPONICS/ NEW FORM OF AGRICULTURE

EDUCATION/NUTRITION CENTRE/ COMMUNITY KITCHEN

GREEN GROCER

Top Floor: 117’- 0”

WATER FILTER SYSTEM

Mezzanine Floor: 110’-3” Ground Floor: 100’-0” Engine Floor: 91’- 8 1/2”

Alley Floor: 75’-5 1/2”

COMMUNITY

EDUCATION

from excess to access

a new form of food distribution in winnipeg, manitoba - masters thesis

20


strata SPROTT SCHOOL OF BUSINESS - MASTERS PROJECT

PROJECT TYPE: LOCATION: DATE: PROFESSOR: TEAM MEMBERS

m.arch studio 1 ottawa, ontario september - december 2013 claudio sgarbi tzvetelina videnova (m.arch students) marc falardau (business student)

The project required a collaboration between students from the Masters of Architecture program and the Sprott School of Business. The project explored the potential relocation of the Sprott School of Business to Albert Island, on the outskirts of Downtown Ottawa. The location is rich with history. Strata emphasizes the importance of the schools connection to the business communities of both Ottawa and Gatineau. The design of Strata is shaped by the history of the site. It incorporates two facades which indicates the importance of the industrial era of the 1900's. These facades surround the heart of Sprott, the auditorium, where the majority of the school's classes and events take place. The project was a team collaboration between architecture graduate students and undergraduate business students.

21

strata

sprott school of business - masters project


Determining the structural components was a requirement of the project.

TOP 1:250 Model RIGHT Axonometric View of Truss System OPPOSITE PAGE - TOP Aerial View of Core/Auditorium 1:250 Model OPPOSITE PAGE - BOTTOM LEFT Site Plan OPPOSITE PAGE - BOTTOM Street view of Strata heading towards Ottawa from Gatineau

strata

sprott school of business - masters project

22


laneway housing EC:0 STUDIO - UNDERGRADUATE PROJECT

PROJECT TYPE: LOCATION: DATE: PROFESSOR:

arch. studio 4 toronto, ontario september - december 2008 peter sampson

Incorporating sustainable design strategies was the main objective of the studio. However, the term sustainability was not limited to building design. This project focused on the lifestyle of families living in one of downtown Toronto's prestigious and costly neighbourhoods, the South Annex. As determined by research and interviews, many of the families in the neighbourhood hire nannies to help take care of their children. In many ways, the nannies act as stabilizers of the social ecology. Nannies improve the efficiency of the household so parents can provide a better economic future for their families. However, nannies often struggle to find efficiency in their own lives, working long hours and traveling long distances to and from work on a daily basis. The proposed site is positioned in the laneway of 184 Lippincott Street. The proposal is to supply laneway housing for nannies. This reduces time, energy and inefficiency.

Prefabricated housing requires less time and energy to build, thus making it more efficient, while also reducing production waste. The intention is to design easy to assemble components on site, which use a numerical system. 23

laneway housing

ec:0 studio - undergraduate project


This is an intermediate exploration of a working instrument that mediates between a person and their environment. The instrument sits between a person, their body, and their environment, and provides a personal method to establish dwelling. This particular instrument is designed to measure comfort. When touched on the metal strips, a sound is created. The tones change with the personâ&#x20AC;&#x2122;s comfort level. The measurements are conducted using heart rates, respiration, and perspiration.

TOP SKETCHES Exploration Sketches of the Instrument RIGHT Final Model of the Instrument OPPOSITE PAGE - BOTTOM 3D Axonometric Drawing OPPOSITE PAGE - TOP LEFT Site Plan

laneway housing

ec:0 studio - undergraduate project

24


THANK YOU!


Turn static files into dynamic content formats.

Create a flipbook
Jaimi Yra's Professional Architectural Portfolio by Jaimi Yra - Issuu