PROJECT OF HELSINKI CENTRAL STATION
Purpose: Renovation of building, the contradiction between the 2D documentation and the current condition Size: 27 300 m2 Role: 3D modeling according to the standards provided, quality check Process and use of technology: The building was scanned in parts with a laser scanner and the 3D model was made in stages, connected to each other, with all the necessary information and according to the requirements BIM Standard: Construction Classification 2000 (TALO 2000) Phases of the project: Reconstruction
PROJECT OF ŁÓDŻ POST- INDUSTRIAL COMPLEX
Purpose: Complex reconstruction for residential and retail use Size: 7 550 m2 (building area) Role: 3D modeling of buildings, documentation templates Process and use of technology: - The model used for generating 2D documentation, specification of elements (doors, windows, building parts) - BIM model with high LOD. - BCF communication Phases of the project: Reconstruction
PEKABEX
Purpose: Multidisciplinary model for Facility Management Size: 15 000 m2 Role: 3D modeling, classification of the objects, building structures, and MEP according to the standard, IFC files developing for the use on BIM Sync platform, clash detection Process and use of technology: The project was created using fully provided technical 2D documentation BIM Standard: COBie, LOD 300, RIBA 6 Phases of the project: A new construction
PROJECT OF DEVELOPING OF PSE STANDARD (POLISH POWER SYSTEMS)
Purpose: - The linear infrastructure models created as an example for contractors, taking into account the BIM methodology. - Creation of BIM standard for the access to target information, integrating databases, classification of particular objects Role: Creating the example model of the power station and linear infrastructure, IFC files, IFS translators, communication with the use of BCF, BIM Sync and BIM Collab platform Process and use of technology: Creating parts of electric power infrastructure in different stages from conception and construction to future use. BIM Standard: Standard for PSE, Open BIM
PROJECT OF THE OFFICE RECONSTRUCTION
Purpose: Making up a detailed design for the construction, which was built 7 years ago. It has concrete structures - the foundation, ceiling, and columns. The project accommodates more than 850 employees, provides comfortable use, energy saving. The building is covered with a modern glass facade, contains the open space, relax zones, kitchen, main hall, specialized and technological rooms combined in 8 floors with technical and underground level. Size: 11 000 m2 Role: As a Lead Architect I was coordinating the work of architects, engineers, and constructors along the design and construction process. I was also working for the concept of the future use of the building, sketches, 3D model, controlling the IFC files for exchange purposes, doing technical drawings, detailed design, and interior design, working with expertise institutions, providing meetings with the client.
PROJECT OF THE APARTMENT COMPLEX IN KIEV
Purpose: Efficient design of buildings from the concrete panels completely produced with the insulation, windows, and decoration. The apartment complex consists of three buildings in every phase. The design offered more than 356 apartments (1 to 6-rooms flats), ground floor with offices and marketplaces. It is a comfortable living place in the urban environment. There are playgrounds, sports ground, underground parking. Size: 6 buildings with 22 500 m2 Role: As an architect, I was working for creating a 3D model, technical drawings, detailed design, organizing meetings, and communicating with a client Phases of the project: New construction
CONCEPTUAL PROJECT OF THE DATA CENTER
Purpose: This project developed in collaboration with the government institution, where the work of computers and additional services controlled the banking system. The Ukrainian largest data center contains rooms with machines and other technical equipment, cooling system. Role: - Creating concept design, sketches, working on project development, 3D model. - Attending meetings with the building executor - Working on detailed design Phases of the project: Conceptual design
INTERIOR DESIGN OF THE OFFICE BUILDING
Purpose: Design of the working and recreation areas, conference rooms, kitchen, main hall, technical rooms. Size: 11 000 m2 Role: Interior design of the building consisting of 8 levels, calculation of sunlight for the optimal choice of louvers, choosing materials, design of the furniture, 3D model and 2D design documentation. Phases of the project: New construction