INSTALLATION GUIDE

Breathable Membrane Install Guide

November 2026, V2.0 1


Contents Prior to Installation ................................................................................... 3 Timber Frame Underlay Installation ...................................................... 4 Timber Frame Window Reveal Dressing ............................................... 7 Timber Frame Internal Corner................................................................ 8 Steel Frame Underlay Installation.......................................................... 9 Steel Frame Window Reveal Dressing ................................................ 12 Steel Frame Internal Corner ................................................................. 13 Penetration Sealing .............................................................................. 14 Attachment Sealing ............................................................................. 15

2


Prior to Installation

Responsibilities This Installation Guide outlines recommended installation practices and is intended as a general reference for typical underlay applications. It is not a substitute for the expertise and responsibility of qualified building professionals carrying out installations, nor does it cover every possible situation. Installers remain responsible for confirming that the details provided are suitable for the specific application. Installation must be carried out by a competent person with the appropriate training, qualifications, or experience to perform the work correctly.

Health & Safety Follow standard health and safety practices when handling and installing ClimaGuard™ Breathable Membrane. Comply with applicable Australian Work Health & Safety (WHS) legislation and site-specific requirements, including hazard identification, safe work procedures, and use of appropriate PPE. Refer to relevant Safety Data Sheets (SDS) available on the ITI Australia website for additional product-specific information.

General Installation ClimaGuard™ Breathable Membrane shall be installed in accordance with AS 4200.2:2017, Pliable building membranes and underlays, Part 2: Installation. All joints shall have a minimum 150 mm overlap, or a minimum 50 mm overlap where the joint is taped on the exterior face. All end laps shall be fixed at a stud to form a continuous membrane. When installed to timber framing, the membrane is fixed to studs at 150mm centres using staples. Staples must be zinc-coated or stainless-steel, with a minimum 12mm width and at least 1.3 mm thick. For cavity applications, fixings should be in accordance with the manufacturer’s recommendations. When installed to steel framing, the membrane is fixed to studs using double sided tape, which is suited to cladding directly fixed to the stud work. Mechanical fixings with a broad-headed washer at 300 mm centres are to be used for cavity walls. Window reveal installation steps are guidelines only. Window reveal dressing should always consider the flashing detailing specific to the project. Refer to the Australian Glass & Window Association (AGWA) A Guide to Residential Installation for additional information. ClimaGuard™ may remain exposed for up to 60 days before installation of the exterior cladding, subject to this installation guide and inspection for damage before cladding. Repair or replace any damaged membrane before installing the cladding.

3


Timber Frame Underlay Installation

1

Carefully inspect the timber frame and address any sharp edges or protrusions that may tear or puncture the surface of the membrane.

2

Measure and mark the membrane width up from the bottom of the frame to establish the top edge of the first sheet.

50mm

3

Position the membrane to start below the bottom plate and lap over the base flashing/DPC to form a positive drainage path to the exterior. Best Practice: Extend the membrane min. 50 mm below the bottom plate, unless the base flashing or cladding system requires a greater lap. 4


4

Fix the top corner with 4-6 staples then roll out the membrane across the studs. Trim to length, pull taut, and fix the opposite corner in the same way. Fix along the top edge of the membrane at each stud.

6

Complete the bottom sheet, fixing membrane at each vertical stud with staples. Continue installing the membrane layers above, using the same steps but in an upsidedown orientation compared to the bottom layer.

5

Pull the membrane down from the centre until taut and then fix with 2-4 staples at the bottom edge. Pull the bottom corners taut and fix with 2-4 staples. Fix along the bottom edge of the membrane at each stud.

Ensure that each new layer overlaps the one beneath by at least 150 mm. This overlap is critical for seamless coverage and optimal performance of the membrane system. Note: a minimum overlap of 50 mm can be used when laps are taped. 5


7

Once the membrane layers have been installed, seal all vertical and horizontal overlaps with Jointing Tape. Ensure that firm pressure is applied for secure and effective adhesion.

8

Best Practice: For maximum level of weather resistance, cut Staple Head Sealing squares of the Jointing Tape and place over each staple point.

Note: overlaps under 150mm must be taped, as required by AS 4200.2:2017.

6


Timber Frame Window Reveal Dressing

1

Cut the membrane from the centre of the window area out towards each of the four corners, at approx. 45° angles. This will create four flaps that can then be folded neatly back into the window reveal.

2

Ensure all four sides of the window reveal are clear and smooth, then fold the membrane flaps back into the reveal. Keep the membrane taut, fix the flaps at the rear edge of the window reveal at 150 mm centres.

3

Seal window head corners with tape, extending down each side of the jamb. Apply angled lengths of tape on the face of the membrane below the sill, making sure the tape touches the sill corners. Seal all vertical and horizontal membrane overlaps with Jointing Tape.

4

Repeat the application of angled lengths of tape at the head. Seal the sill with a continuous length of tape, extending up each side of the jamb. Best practice: Repeat this process on the rear of the frame. 7


Timber Frame Internal Corner

1

The membrane should be installed in separate sections to prevent curved corners and accidental penetrations. Align the bottom membrane tightly into the corner and extend it outwards along the wall. Fix it back to the frame following the process in previous sections.

2

Pull the second section of the membrane into the internal corner and trim it, ensuring a 150 mm overlap of the first membrane. Fix it back to the frame following the process in previous sections.

3

Repeat the same for the top membrane, ensuring it overlaps the bottom membrane by 150 mm. Press the membrane firmly into the corner to prevent any curvature or radius forming. Seal all vertical overlaps with Jointing Tape.

4

Seal all horizontal overlaps with Jointing Tape. Ensure that firm pressure is applied for secure and effective adhesion. Note: overlaps under 150 mm must be taped, as required by AS 4200.2:2017. 8


Steel Frame Underlay Installation

1

Carefully inspect the steel frame and address any sharp edges or burrs that may damage the surface of the membrane. Ensure the frame surface is clean of contaminants that could affect the adhesion of the Double-Sided Tape.

2

Membrane installation starts at the bottom of the frame. Measure and mark the membrane width up from the bottom of the frame to establish the top edge of the first sheet. Apply double-sided tape to all external faces of the metal framing and press firmly to ensure a secure bond.

50mm

3

Position the membrane to start below the bottom track and lap over the base flashing/DPC to form a positive drainage path to the exterior. Best Practice: Extend the membrane min. 50 mm below the bottom track, unless the base flashing or cladding system requires a greater lap. 9


4

Remove the release liner from the area of double-sided tape designated for the initial membrane layer. Align with the marked line and pull taut and affix the top edge securely.

6

Complete the bottom sheet pressing firmly across the entire membrane section to ensure firm adhesion to the Double-Sided Tape. Continue installing the membrane layers above, using the same steps but in an upsidedown orientation compared to the bottom layer.

5

Pull the membrane taut from the centre and fix. Pull the bottom corners taut and fix. Press down firmly across the bottom edge.

Ensure that each new layer overlaps the one beneath by at least 150 mm. This overlap is critical for seamless coverage and optimal performance of the membrane system. Note: a minimum overlap of 50 mm can be used when laps are taped. 10


7

Once the membrane layers have been installed, seal all vertical and horizontal overlaps with Jointing Tape. Ensure that firm pressure is applied for secure and effective adhesion. Note: overlaps under 150 mm must be taped, as required by AS 4200.2:2017.

11


Steel Frame Window Reveal Dressing

1

Cut the membrane from the centre of the window area out towards each of the four corners, at approx. 45° angles. This will create four flaps that can then be folded neatly back into the window reveal.

2

Ensure all four sides of the window reveal are clean and apply the Double-Sided Tape along the rear edge of the window reveal, carefully remove the release liner. Fold the membrane flaps back into the reveal. Keep the membrane taut and press firmly.

3

Seal window head corners with tape, extending down each side of the jamb. Apply angled lengths of tape on the face of the membrane below the sill, making sure the tape touches the sill corners. Seal all vertical and horizontal membrane overlaps with Jointing Tape.

4

Repeat the application of angled lengths of tape at the head. Seal the sill with a continuous length of tape, extending up each side of the jamb. Best practice: Repeat this process on the rear of the frame. 12


Steel Frame Internal Corner

1

The membrane should be installed in separate sections to prevent curved corners and accidental penetrations. Align the bottom membrane tightly into the corner and extend it outwards along the wall. Fix it back to the frame following the process in previous sections.

2

Pull the second section of the membrane into the internal corner and trim it, ensuring a 150mm overlap of the first membrane. Fix it back to the frame following the process in previous sections.

3

Repeat the same for the top membrane, ensuring it overlaps the bottom membrane by 150 mm. Press the membrane firmly into the corner to prevent any curvature or radius forming. Seal all vertical overlaps with Jointing Tape.

4

Seal all horizontal overlaps with Jointing Tape. Ensure that firm pressure is applied for secure and effective adhesion. Note: overlaps under 150 mm must be taped, as required by AS 4200.2:2017. 13


Penetration Sealing

1

Make two 45° slits through the membrane, ensuring they are just large enough to fit the diameter of the pipe. Be careful not to extend the cuts too far.

3

Best Practice: Make sure the pipe is clean. Stretch the appropriately sized EPDM sealing collar over the pipe, ensuring a tight fit. Slide the sleeve up until it sits snugly against the face of the membrane.

2

Push the pipe through the cuts in the membrane and then trim away any excess material to aid the installation of the EPDM sealing collar.

4

Best Practice: Apply the Jointing Tape along the bottom edge of the collar. Ensure that it forms a good bond onto both the collar and the membrane. Apply Jointing Tape to the sides of the collar. Apply Jointing Tape across the top edge. 14


Attachment Sealing

1

Apply a patch of Jointing Tape to the membrane and fix attachment through this. Best Practice: For larger attachments it is recommended that all edges be sealed with Jointing Tape for optimal weatherproofing performance.

15


ClimaGuard™ has been tested to and complies with AS 4200.1:2017. This product should be installed in accordance with AS 4200.2:2017. ClimaGuard™ is a trademark of ITI Group. © ITI Group. All rights reserved. For more product information, visit www.climaguard.com.au or email sales@climaguard.com.au

16