ITI floor framing insta RIMBOARD TO FLOORING CONNECTION

Nail Lamina

Rimboard to Floor Connection - Particle Board Flooring Fixing

19mm

Hand Driven

Nails

22mm

65x2.80

Edge (mm)

65x2.80

Side (mm)

150

300

Machine Driven

65x2.50

65x2.50

150

300

Self Drilling

10g x 50mm

10g x 50mm

150

300

Screws

150mm Use correct nails as required to fix rimboard to flooring

75x3.05mm Nails. One each to top and bottom flange

Bolt Lamin

Rimboard to top plate via 75x3.05 skew nails at 150mm centres

2 Ply Lamination requires 2 Rows of Bolts

WEB STIFFENER REQUIREMENTS 600mm

Web Stiffener Requirements (mm) Depth

Min. Thickness (mm)

Web Stiffener Height Minimum

Maximum

Nail Size

Nail Quantity (Each Side)

240

21

121

143

65x2.8

3

300

21

181

203

65x2.8

3

360

21

241

263

65x2.8

3

400

21

281

303

65x2.8

3

BOLT LAMINATION NOTES: M12 (8.8/S) bolts with 55mm washers M12 (8.8/S) bolts with 55mm washers Minimum 60mm edge clearance requ Apply an additional 2, or 3 M12 bolts d Bolt members together prior to applyi

1. 2. 3. 4. 5.

BATTEN SCREW La

Notes: 1. Web stiffeners shall be installed in pairs – one to each side of the web. 2. Web stiffeners shall be cut to fit between the flanges of the Swelite Wooden I-Joist, leaving a minimum 3mm gap (25mm maximum). At bearing locations the stiffeners shall be installed tight to the bottom flange. At locations of concentrated loads the stiffeners shall be installed tight to the top flange. 3. Web stiffeners shall be cut from plywood, LVL or OSB Rim Board. 35mm timber is permissible. Do not use 19mm timber (as it tends to split). 4. Web stiffeners shall be the the minimum width as the bearing lengths required. 5. See Web Stiffener Requirements for minimum stiffener thickness, maximum stiffener height and required nailing. 150mm 6. Where Web Stiffeners are required for use with Joist Hangers the thickness is required to be that of the distance between the web and outside of the flange i.e. H-47mm = 18mm, HI-70 = 30mm & HB-97 = 44mm SCREW LAMINATION NOTES:

Web stiffeners required under load bearing walls

38mm min. end support length Refer to table for web stiffener requirements

1. 2. 3. 4. 5. 6. 7. 8.

Web stiffeners required where hangers do not restrain top flange by 20mm min. Web stiffener to fill out the web and flange

Detail applicable to a 14g Bugle Head Not acceptable for 36mm members in Drive opposing screw pattern to oppo Not acceptable for members less than 2 Rows for 2 ply configurations & 3 Ro Refer to table for minimum edge and e Minimum of 45mm embedment into se Suitable for both face and top loaded

2 Ply Lamination Configuration Screw Lengt 36mm 36mm Not Permitte 45mm 45mm Not Permitte 63mm 45mm 100mm(1) 63mm 63mm 125mm

63mm min. intermediate support length Refer to table for web stiffener requirements

Screws to be driven through the face o (2) 63mm member to be positioned in the (1)

B1

I-Joist support Nailing

B3 squash blocks to ends of i-joist

Concentrated loads from openings or roof framing

do not cut holes too close to supports

Refer to the hole cutting guide for assistance on determining the allowable size and location of holes

1-2mm deeper than I-Joist Minimum of 35mm clearance required from end of I-Joist Fix to support by nailing 75x3.05 nails through the bottom flange on either side of the I-Joist

QC Code Link to ITI Spec Sheets

ITI Product Weights

90x35 Squeeze blocks fitted to both sides of I-Joists 2.80x65mm framing nail to to each I-Joist flange 2.80x65mm framing nail skewed to top plate

Holes in Spec Joists (SJI)

Safe Loading of Materials onto Floor Framing 450mm Ctrs

TECHNICAL SUPPORT (02) 8805 5000 ewpnsw@iti.net.au

Less Time. Less Waste. Less Mistakes. More Profit

ISSUE 1.0 - FEBRUARY 2025 2021


Turn static files into dynamic content formats.

Create a flipbook
ITI - Design Link - Brochure by itiaustralia - Issuu