
1 minute read
OMAS TECNOSISTEMI: manufacturing of filling systems
The enquiries of packaging machineries for syrups, liquid integrators and powders for the Food & Nutraceutical sectors increased a lot in the last year.
In addition to the Single Pitch Indexing Monobloc and continuous motion Monobloc and to the Filling & Capping Line for single-doses, bottles, jars and instable containers, the company received orders for installation for preparing and mixing, such as dissolvers and turbo-emulsifier in different sizes and versions.
Advertisement
The new design and the high quality finishing are the most appreciated aspects and they make easier the maintenance and the cleaning operations; touch screen panels to handle the receipts and also all the operations to handle the machine, the possibility to be ready for the 4.0 industry and personalization to improve the performances and the users’ needs.
Flexicap is the OMAS solution for both aluminum and plastic capsules for liquids, soluble and coffee products, which aroused a lot of interest and appreciation among the Italian and International users.
It is available in different models from a minimum of two lanes up to 120 capsules, to a maximum of eight lanes up to 450 capsules per minute according to the format and to the product to fill.
The flexibility of all the system makes extremely simple and fast all the changeover operations and/or product to handle.
All the components are completely inspectionable from all the sides.
Thanks to the long experience in designing and construction of the machines, we can customize and satisfy every single request to improve all the customers’ needs.
Omas Tecnosistemi Spa is on the national and international market through a wide network of distribu- tors and agents and in continuous collaboration with the central sales office of the company. www.omastecnosistemi.it
We will be showing the last solutions at INTERPACK 2023, Düsseldorf.





The company also focuses on the internal training of the technical staff but also of the Sales & Ser vice according to the Normative & the Market requests.
The company, in order to achieve the targets established is also increasing the working Staff and new machineries are introduced such as the machine for lapping and three new automatic vertical warehouses interfaced with the ERP.



New works are in progress for the realization of the new production site that will be completed in 2024.
A warehouse unit storage, a mechanical machining and a carpentry are also in working progress.
An environment with high technology 4.0 efficiency and environmental sustainability, the environmental and the working spaces will be better handled in order to dedicate the actual site exclusively to the mounting of the machineries.