DESIGN OF G+4 EXISTING SCHOOL BULIDING BY RETROFITTING JACKETING OF COLUMN Jayesh Gahukar1, Rushikesh Chincholkar2, Rohit Waghmare3, Ganesh Vetale4, Prital Kalasur5 1-5Savitribai
Phule Pune University, D. Y. Patil College of Engineering, Akurdi, Pune, India ---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Retrofitting is the process of adding something to the existing building using different methods to increase the strength of building, remove defects or design error, to add more stories to the building, etc. It is a building involves changes in system or structure after its initial construction. This process can improve the performance of building. This process also makes the building structure seismic resistance structure or building. Retrofitting process saves time after construction and also reduces the cost of construction. Key Words: Retrofitting, Existing Building, Strength of building, design error, Seismic resistance.
1.INTRODUCTION
Fig -1: RC Jacketing
In this project we are going to design G+4 building (existing G+2) by providing retrofitting jacketing to the column on G+2 existing building. Without reconstructing the whole building or adding stories directly on the constructed building can leads to failure of the building. To avoid failure we can use Retrofitting process.
1.4. Procedure of providing RC jacketing on Column Step 1: Cleaning and roughening the surface. Step 2: Installing dowels for fastening the stirrups. Step 3: Installing dowels for fastening the lower main steel.
1.1 Problem Statement
Step 4: Installing dowels for fastening the upper main steel.
A G+2 already constructed building, for adding 2 more stories on that building by providing retrofitting jacketing of column. We can increase the strength of building so that it can capable to bare the load which comes from additional stories.
Step 5: Installing the new stirrups and steel bars. Step 6: Coating the surface with epoxy. Step 7: Pouring the new concrete layer.
1.2 Objectives
2. MATERIALS
1. To increase the strength of building so that it can bared load of stories to be added on building. 2. To make the building earthquake resistance. 3. To reduce the cost of construction.
1.3. RC Jacketing It is a technique of retrofitting and as the name suggest jacketing is the process in which additional materials are to structural components to increase their strength and durability. Means giving protective layer to the component is called as RC jacketing. RC Jacketing of structural column and beams is widely known method and is the most popularly used for strengthening building. The process of jacketing is an ideal solution for seismic retrofitting structure.
© 2021, IRJET
|
Impact Factor value: 7.529
Steel plates Steel reinforced concrete Ordinary Portland cement Concrete and Mortar: Bonding Agent Anti-corrosive Agent Bricks
2.1 Materials Properties 1) Anticorrosive Coating: Mix and apply Fosroc Nitozinc Primer/equivalent, two components, zinc rich, epoxy primer to the exposed rebars all around in two coats and allowed to fully dry.
|