IRJET - Analysis of Aluminium Formwork Structure based on Duration and Cost

Page 1

International Research Journal of Engineering and Technology (IRJET)

e-ISSN: 2395-0056

Volume: 08 Issue: 06| June 2021

p-ISSN: 2395-0072

www.irjet.net

ANALYSIS OF ALUMINIUM FORMWORK STRUCTURE BASED ON DURATION AND COST Sujit Shelke1, Kanupriya Waghmare2, Nikhil Thorat3, Rohan Wadekar4, Prof. Nikhil Maske5 1,2,3,4B.E.

(Civil) Student, Dr. D. Y. Patil School of Engineering & Technology, Lohegaon, Pune, 412105 India. Dr. D.Y. Patil School of Engineering & Technology, Lohegaon, Pune, 412105 India. ---------------------------------------------------------------------***---------------------------------------------------------------------5Professor,

Abstract - Construction is the highly growing sector in India. today's Indian population are increasing vastly. now a days India need the mass housing, in minimum time. that’s why the new construction technology is required. the object of this study to analysis the aluminum formwork based on cost and time and also analyzing the methodology, types of formworks, lob scheduling, factor selection of formwork, advantage and limitation. And we will be seeing the Which problems are creating the during work on high rise building. Aluminum formwork system is the best way to get the mass housing in minimum time, cost and manpower.

1.1 OBJECT OF THE STUDY

Key Words: - Formwork, Achievement of good quality structure, duration, cost etc.

Step 1: Select the suitable topic.

Our aim to prove that, the aluminum formwork is suitable for high-rise building as well as mass housing Construction. This formwork is easy to handle, time durable, cost consuming, light weight martial therefore heavy machinery are not required. That’s why this formwork is suitable for contractor to complete the project within in less time and less cost. 2. METHODOLOGY

Step 2: Study form the available source (books, literature, Report etc.)

1. INTRODUCTION

Step 3: Making a list of companies. Select the Construction companies’ site for collecting actual data.

Construction is one of the significant sectors of Indian economy and is an integral part of the development. Today India’s urban population is the second largest in the world and its future development leads to increased demand for housing to cope with this problem India should desperately need to plan for acquisition of land and rapid creation of dwelling units. One of the most important factors in determining the success of a construction project in terms of speed, quality cost and safety of work is the formwork used in the project as it accounts about 35 to 40 percent of the total project cost of the structure [2]. Formwork is defined as temporary structures to support the concrete until it supports itself. Its molds the concrete to different types of formworks used in construction, generally differing according to the building requirements. Formworks are generally made by wood, steel, aluminum or prefabricated forms into which the concrete is poured [4]. The construction of formwork takes time and involves expenditure up to 20 to 25% of the cost of the structure or even more. There are many types of formworks like timber formwork, aluminum formwork, tunnel formwork. Aluminum formwork system is use in mass housing projects like multi storey building, row house projects. And will use in develop country like USA, RUSSIA etc. [3]. in India this technology is using vastly. in India the core company of construction are mostly use aluminum formwork to achieve the best quality of homes in less time and cost. aluminum formwork is using in metro city for mass housing like Pune, Mumbai, Delhi, Bangalore, tamil-nadu etc.

© 2021, IRJET

|

Impact Factor value: 7.529

Step 4: Making the list of various formworks used in construction. Step 5: Making the list of formworks, which are affected on construction. Step 6: visit the various companies’ and contractors for interview to identify the various problem are created in various formwork. Step7: Case study analysis on ongoing project. Step 8: Analysis of selected projects speed, time, cost, manpower, machinery, quality. Conventional 3. FORMWORK 1) Conventional formwork Conventional formwork method is suitable for small construction project. its oldest method of formwork. In this type required various type of martial like wooden ply, Bamboo, carpentry. In this formwork the manpower, time, cost and machinery are required in more quantity. Repetitions (10-15) are less in this type. 2) Steel formwork Steel formwork is good material to use in big project. The repetitions are more that’s why its suitable for tanks, dam, retaining wall, chimney, high rise buildings, bridges etc. steel formwork are

|

ISO 9001:2008 Certified Journal

|

Page 1685


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.