Delay Analysis in Construction and Project Planning and Scheduling Using Primavera P6: A Review Mr. F.M. Saiyad1, Dr. J. M. Shinde2 1 P.G. Student of M.Tech, Dept. of Civil-Construction and Management, Ashokrao Mane Group of Institutions
Vathar, Tarf Vadgaon, Dist-Kolhapur, Maharashtra, India 2 P. G. Project Guide, Head of Department, Department of Civil Engineering, Ashokrao Mane Group of Institutions
Vathar, Tarf Vadgaon, Dist-Kolhapur, Maharashtra, India ---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - The paper aims on reviewing the journals which
drawn regarding specific causes of delays (Sharmila et al., 2024).
are based on delay analysis in construction industry and Planning and scheduling of projects by Primavera P6. Total 15 journals were studied. The most of the journals were based on delay analysis in construction projects. The main purpose of the paper is to review various journals and find out the best suited method used for delay analysis and the software use for Planning and Scheduling of the various projects also some methods that are used for the various delay analysis. Delays in construction projects are a recurring challenge, often leading to significant setbacks in terms of time, cost, and quality. As the construction sector serves as a major driver of both rural and urban infrastructure development, inefficiencies within this industry can hinder broader economic progress. This research contributes by presenting a concise analysis of the principal causes behind cost overruns in construction projects. By identifying these underlying issues, stakeholders can take informed steps to address them and minimize their impact. The study is particularly aimed at assisting professionals in the public construction sector to adopt proactive measures for reducing delays and ensuring timely project completion. The construction industry plays a vital role in national development but frequently faces project delays, leading to cost overruns and reduced quality. This study identifies the key causes of such delays and their financial impact. It highlights the importance of consistent funding, skilled financial management, and timely progress payments to ensure project continuity. By addressing these challenges, stakeholders especially in public sector projects can implement strategies to minimize delays and enhance overall project performance.
As construction projects become increasingly large and complex, efficient communication and timely information exchange become more challenging. At the core of any successful construction project lie the principles of proper planning and development. The three critical parameters that influence project outcomes are time, cost, and quality. Delays can adversely affect one or more of these elements. Improper execution and inadequate risk assessment further worsen the situation. Modern project management tools such as Primavera P6 are highly effective in enabling detailed planning, scheduling, and monitoring of construction activities. The software assists in estimating the start and finish times of various tasks, thereby minimizing potential delays. Moreover, risk and delay analysis can be enhanced by integrating feedback obtained through structured questionnaires into the planning process. Several studies have focused on the application of Delay Analysis Methods (DAMs), such as the SCL Protocol and AACE International Recommended Practices. These studies recommend integrating such tools into contractual frameworks to ensure fair and accurate Extensions of Time (EOT) (Rathee and Kabre, 2018). Primavera was also used to compare planned versus actual schedules, revealing the importance of proactive delay management during the construction phase. The study further emphasized developing strategies to mitigate risks throughout the project lifecycle (Mate and Hinge, 2015).
Key Words: Primavera P6, Delay analysis, Stakeholders, Cost over , Scheduling , etc.
Various journals have discussed the use of software tools for time management, such as scheduling with Primavera P6. Techniques like Time Impact Analysis (TIA) have been used by project managers for more accurate delay assessments. Several researchers identified that critical delay factors often stem from poor planning and scheduling, as well as external influences and financial constraints. Delays caused by such factors frequently lead to cost overruns and project inefficiencies.
1.INTRODUCTION Most of the research studies have utilized statistical methods and questionnaire surveys to identify the primary causes of construction delays. The Relative Importance Index (RII) was commonly applied for survey analysis, while some researchers also employed SPSS software for delay analysis and Primavera for achieving effective project management results (Aravindhan et al., 2023). Using pre-structured questionnaires and statistical techniques, conclusions were