Case Study:
Indoff
General Atomics Electromagnetic Systems
Problem: Being a world leader in aircraft systems, GA was in need of a platform to easily transport drones in order to put final touches on the aircraft.
Objective: To create a platform that would efficiently place drones in a locked position.
Solution: Indoff and GA engineers worked together to create a 20-inch high mezzanine to be placed under an existing crane system. Four centered cutouts in the base were also added to ensure easy placement and stability.
Benefits: Special features include a handicapped ramp, four staircases and a guard rail surrounding the entire platofrm.
Corporate Headquarters 11816 Lackland Road, St. Louis, MO 63146 www.indoff.com