Architecture Portfolio Architect Mostafa Magdy Moahmmed
Personal Statment A highly motivated and hardworking architect with five years experience, who is recently seeking for an opportunity for moving forward in order to gain more experience and knowledge in architecture field
Mostafa Magdy Architect
I also have a several months experience as a site engineer which has qualified me to become a partialy aware of almost all site aspects and construction challenges, those experiences have been utilized in giving ultimate attention to detail in a conceptual and workshop drawings phases in order to overcome those challenges. Eventual career goal is to become a fully-qualified and experienced architect, with the longer-term aspiration of moving into project management using BIM technology to achieve such a goal.
Education AL-AZHAR University In Cairo Bachelor of architectural studies [September 2010 - June 2015] Helwan University ( Faculty Of Fine Arts) Certificate of Attendance architectural studies Lectures (96 hours of a workshop) [October 2014- September 2014]
Work Experience ZFP Consultants [Dec 2018- Present] (Junior Architect) Job Contribution: - Translating the approved design concepts into technically feasible solutions - Prepares detailed design drawings according to design specification for each project com ponent using CAD/BIM technology depending on needs and according to standards, codes, techniques and engineering practices. - Projects Scale as follows: - Design development construction drawings of Holiday inn hotel in KSA. - Construction drawings of JW Marriott hotel in KSA. - Construction drawings of STC HQ admin, parking building in KSA. - Construction drawings of SABIC Museum in KSA, - Construction drawings of International Hospitality Management Academy New Alamein City (Associate Member Of “Ecole Hôtelière de Lausanne“).
Soft Skills Mindfulness Communication Adaptability Collaboration Conflict Resolution Competitive Dedicated Resilient Desire to Learn Quick-witted Interests
ARKAN Consultants [May 2017- Dec 2018] (Junior Architect) Job Contribution: - Compiling data for architectural plans, specifications, reports, etc. - Preparation of design development drawings. According to world and local architectural stan dards - Developing and/or coordinating development of detailed tender drawings and specifications for projects. - Projects Scale as follow: - Residential Compound (KORBA HEIGHTS - GOLD YARD) - Commercial & Clinical Malls (NORTH PLUS - ELEGANTRY) Misr El Kheir Foundation [April 2017 - May 2017] (Project Contract ) Job Contribution: Restoration of an old building in NASR City at heritage conservation Program A day to day management of the site including supervising and monitoring the site labour force REDCON For Construction Services [Mars 2017 - April 2017] (Trainee) Job Contribution: A day to day management of the site including supervising and monitoring the site labour force Air Defense Command Center [Mars 2016 - Mars 2017] (Soldier) Graphic Designer and D visualizer deals with the following programs
I CAN SPEAKE Arabic : Native English
Certificates Certificate and Samples are attached upon request
Building Codes
CONTENTS
SABIC Museum and Convention Center
(Construction Drawings)
Holiday-Inn Hotel
(Construction Drawings)
KORBA Heights
(Construction Drawings)
North Plus
(Construction Drawings)
Development of Suez Canal Axis
(Graduation Project)
Environmental and Tourism Studies Center
(Acadmic Project)
Fishermen Village
(Design & Planning)
Sketching
SABIC Museum and Convention Center Location : KSA | Area : 7050 sqm | Building Type : Museum | Role : Construction drawings Software : Autodesk Revit
1
2
3
4
5
NOTES:
N
S60°40'W MAKKAH
D
A
AE
AB
AC
AD
6000
B71
A02
8000
0 3400 4000 4000
-
B71
UP
A03
-
B71
UP
A04
-
B71
UP
0
00 80
0°
1
1
A05
-
B71
0° 2.7
00 80
2.7
00 16
0°
XB
4000
4000
B71
2.7
XX B71
A01
-
4000
0° 1.2 0° 1.5
B71
B71
D
AH
B71
B71
AA
-
XA
-
-
AG
-B71
AF
-B71 -B71 -B71 -B71
B71-AR-DD-201
B71-AR-DD-215
A06
-
B71
B71-AR-DD-210 0° 2.7
XY
-
B71
0° 2.7
B
PARTIAL ( P4 )
PARTIAL ( P4 )
PARTIAL ( P2 )
PARTIAL ( P5 )
A07
-
B71
2.7
0°
A08
A09
-
B71
-
B71
A10
-
B71
2.7 0°
A11
2.7
0°
B71
2.7
1
1
A12
-
B71
0°
A13
0°
B71 2.7 0°
UP
1
2.70°
2.7
B03
-
A16
-
B71
A17
-
B71
A18
-
B71
PARTIAL ( P6 )
1
PARTIAL ( P5 )
PARTIAL ( P7 )
PARTIAL ( P7 )
PARTIAL ( P6 )
PARTIAL ( P8 )
PARTIAL ( P8 )
A19
-
B71
B71-AR-DD-219 A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
2.7 0° DN RAMPDN DN SLOP
0°
1
-
B71
XY
B71-AR-DD-213
B71
0° 2.7
-
B08
-
2.7
B71
B71-AR-DD-201
1
0° 2.7
B07
1
MAIN BLDG. (B71) EL 643000
D
0° 2.7
B71
0°
B09
-
B71
B71-AR-DD-210
600
800
B10
-
B71
800 440
0
0
0
0 800 0 344
BD
BA
BB
00
NORTH
P4 P2 P5 P7 P3 P6 P8 P9
(B72b) EL 642700
(B74) EL 642200
(B72a) EL 642700
CLIENT
اﻟﻤﺎﻟﻚ
B71
B71
B71
-
BE BF B71 -
P1
B
N S6 0°4 0'W
-
-
BC -
2 B71-AR-DD-219
(B72d) EL 643400
(B73) EL 641200 (B72c) EL 641150
AH KK MA
B06
-
B71-AR-DD-218
KEY PLAN
E 1:12
PARTIAL ( P8 )
B71
FEB. 2019 MNBO AZE CHST DATE BY CHECK PM
REVISIONS SCHEDULE 2.7
PARTIAL ( P8 )
B05
-
B
PARTIAL ( P3 ) 0°
B04
-
B71
PARTIAL ( P5 )
PARTIAL ( P6 )
B71
PARTIAL ( P2 )
PARTIAL ( P6 )
B71
B71
2.70 °
0°
-
A15
-
0°
2.70 °
PARTIAL ( P3 )
B02
45 .85 °
B71
2.70 °
WP
B71-AR-DD-216 2.7
A14 2.7
UP
B71
B71-AR-DD-217
-
2.7
B71-AR-DD-213
21.5 5°
B01
-
C
-
PARTIAL ( P9 )
C
PARTIAL ( P2 )
PARTIAL ( P1 )
B71-AR-DD-201
- ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS. - DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. - FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS. - FOR FINISHES REF. TO ID DWG's, SERIES 100 - FOR DOORS, ARCHITRAVES, GLAZED DOORS, WINDOWS, CURTAIN WALLS & SCREENS TYPES, SCHEDULES & DETAILS REFER TO GENERAL DRAWINGS, SERIES 800. - FOR MISCELLANEOUS DETAILS REFER TO GENERAL DRAWINGS, SERIES 900 . - FOR KITCHENS' EQUIPMENTS, TOILET FIXTURES & ACCESSORIES SCHEDULES, MOUNTING HEIGHTS & DETAILS REFER TO GENERAL DRAWINGS, SERIES 500. - PANTRY IS FOR DESIGN INTENT ONLY, TECHNICAL SUPPLIER TO PROVIDE FINAL EQUIPMENTS' SELECTION IN SHOP DRAWINGS. - ALL TOILET & KITCHEN AREAS SHALL BE PROVIDED WITH WATERPROOFING MEMBRANE LAID ON TOP OF STRUCTURAL SLAB AND EXTENDED 200MM. HIGH ON WALL ABOVE FINISH FLOOR LEVEL ( REF. TO SPECS ). - FOR EXHAUST FANS & HVAC EQUIPMENTS & OPENINGS, REFER TO MECHANICAL DRAWINGS. - LOCATIONS OF PADS AND ROOF PENETRATIONS SHOWN IN ROOF PLANS SHALL BE COORDINATED WITH STRUCTURE, PLUMBING AND MECHANICAL DRAWINGS. - FOR DRAINAGE REFER TO PLUMBING DRAWINGS. - UNO DOOR JAMB IS @ 200mm FROM NEAREST ADJACENT WALL FACE, OTHERWISE WILL BE SHOWN ON DRAWINGS. - ALL PROPOSED LEVEL SHALL BE VERIFIED ON SITE TO MATCH WITH THE EXISTING LEVELS. - LEVELS INDICATED ON ALL FLOOR PLANS ARE REFERENCED CIVIL GRADING LEVELS. - FOR WALLS TYPES,THK., FIRE RATE ,ETC.... REFER TO GENERAL SHEET GA-DD-701
B71
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ
C
SAUDI BASIC INDUSTRIES CORPORATION
B71-AR-DD-201
B71
PROJECT NAME
اﺳﻢ اﻟﻤﺸﺮوع
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ SABIC MUSEUM AND CONVENTION CENTER RIYADH BUILDING NAME
اﺳﻢ اﻟﻤﺒﻨﻰ
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ MAIN BUILDING (B71) CONSULTANT
A
اﻹﺳﺘﺸﺎرى
A ZFP PROJECT NO.: J18-01500 PM: CHST PD: RSMM PC: HEA TITLE:
ﻣﺴﻘﻂ أﻓﻘﻰ ﻣﺠﻤﻊ ﻟﻠﺪور اﻷرﺿﻲ A B71-AR-DD-101
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
ﻣﺴﻘﻂ أﻓﻘﻰ ﻣﺠﻤﻊ ﻟﻠﺪور اﻷرﺿﻲ
GROUND FLOOR MASTER PLAN
GROUND FLOOR MASTER PLAN
0
1 : 400
4
8
12
16
20
40 SCALE:
SCALE 1 : 400
1
PA: HEAH ID: SYKE SE: FHAF
2
3
4
METERS
5
1 : 400
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-101
SHEET NUMBER
-
REVISION:
00
1
2
3
4
5
NOTES:
N
-
-
-
B71
B71
B71
B71
XY
A06
A05
A04
-
S60°40'W
A07
1
MAKKAH
-
B71
2
B71-AR-DD-215 HPL CLADDING (REF.TO ID DWGs)
B71-AR-DD-213 GD04
0 56 R1
0.8
PARTIAL ( P4 )
PARTIAL ( P2 ) 3 ABLUTION DETAIL g 10 h
PARTIAL ( P5 ) 0° 0.8
W B8 3 9 42
b 20 s -
W B6 3 5 41
WAITING RM
b 20 s -
B71 GR-018
b 20 s -
b 15 p -
JAN
ABLUTION
0° 0.3
M. TOILETS B71 GR-021
A11
W B8 3 9 42
W C2 3 - 32
b 20 s -
b 15 p -
WOODEN CLADDEING (REF.TO ID DWGs)
GD01
FLOOR MAT DETAIL
GA-DD-901
b 20 s -
b 20 s 1
b 20 s 1
W B2 3 4 31
B71
CW06
10
b 20 s 1
M F1 A4 2 - 21
A10
-
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BLACK COLOR
FURNITURE (REF.TO ID DWGs)
b 20 h b 20 s -
B71
GD02
GD03
TRIMLESS RECESSED FIRE HOSE CABINET DETAIL
B71 GR-022
B71 GR-020
-
B71 GR-092
CW02
GA-DD-902
b 20 s 1
5 27 80 R1
A09
VESTIBULE
GD03
3
LOBBY
STRUCTURAL COLUMN (REF. TO SE DWGs)
CW03
b 20 s -
B71 GR-019
B71
C
7 R1
GD02
CW02
00 30
W B6 3 5 41
W C2 3 - 32
RECEPTION HALL
B71
C
WOODEN LOUVERS (REF TO ID DWGs)
B71 GR-023
b 20 s -
W C2 3 - 32
-
1.6 0°
MARBLE CLADDEING (REF.TO ID DWGs ) W C2 3 - 32
EL.643.000 GRD FFL
W B5 3 9 42
1.1
W C2 3 - 32 W C2 3 - 32
W C1 3 - 32
W B5 3 9 42
B71 GR-024
M F1 A4 2 - 21
W C2 3 - 32
JAN
XB -
M. TOILETS B71 GR-031
b 10 h -
LOBBY
b 20 s -
61 5
0.8 0°
W C1 3 - 32
W C2 3 - 32
b 20 s -
W B2 3 4 31 b 20 s 1
b 20 s 1 M F1 A4 2 - 21
M F1 A2 2 6 23
JAN
B71 GR-098
F. TOILETS B71 GR-032
PARTIAL ( P2 )
b 20 p -
PARTIAL ( P3 )
GIFT SHOP
30 0
0 38
0.7
b 20 p -
R1 79 40 0
b 20 s -
PARTIAL ( P6 )
b 20 s 1
b 20 s 1
0 42 79 R1
5°
SOLAR HEATING MECH. RM. b 20 B71 GR-035
50 0
R1 55
20 0 b 20 s -
E
A12
-
B71
DT F1 - -
EL.643.000 GRD FFL
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ
DT F1 - -
SAUDI BASIC INDUSTRIES CORPORATION PROJECT NAME
B71
ﻣﺴﻘﻂ أﻓﻘﻰ ﺟﺰﺋﻲ ﻟﻠﺪور اﻷرﺿﻰ A B71-AR-DD-106
1
BA
B71-AR-DD-210
HALL 2
WOODEN CLADDEING (REF.TO ID DWGs)
ds 10 -
DT F1 - -
AF
DT F1 - -
PARTIAL ( P7 )
-
ds 10 -
AE B71
AB
AA
XX
-
-
-
B71
B71
MAIN BUILDING (B71) CONSULTANT
اﻹﺳﺘﺸﺎرى
A PM: CHST PD: RSMM PC: HEA TITLE:
AD
AC
-
B71
-
B71
PA: HEAH ID: SYKE SE: FHAF
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
ﻣﺴﻘﻂ أﻓﻘﻰ ﺟﺰﺋﻲ ﻟﻠﺪور اﻷرﺿﻰ
GROUND FLOOR PARTIAL PLAN (5 OF 9)
GROUND FLOOR PARTIAL PLAN (5 OF 9)
0
1 : 100
1
2
3
4
5
10 SCALE:
SCALE 1 : 100
1
اﺳﻢ اﻟﻤﺒﻨﻰ
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ
B71
PARTIAL ( P8 )
PARTIAL ( P6 )
s
BUILDING NAME
-
PARTIAL ( P5 )
ZFP PROJECT NO.: J18-01500
B71
B71
اﺳﻢ اﻟﻤﺸﺮوع
SABIC MUSEUM AND CONVENTION CENTER RIYADH
b 20 s -
-
(B74) EL 642200
(B72a) EL 642700
اﻟﻤﺎﻟﻚ
DT F1 - -
B71 GR-045
1 B08
P4 P2 P5 P7 P3 P6 P8 P9
(B72b) EL 642700
B71-AR-DD-219
-
NORTH
CLIENT
B71 GR-041 b 20 s 1
P1
B
ds 10 -
GATHERING HALL
ds 10 -
B71-AR-DD-502
b 20 s 1
(B72d) EL 643400
B71
S6 0°4 0'W
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ DT F3 - -
B71 GR-036
QUIBLA DIRECTION
AG
-
DEMOUNTABLE PARTIION PANELS
B71 GR-037
A/V CTRL
g 10 h -
FHC
HALL 4
B71 GR-042
N
(B73) EL 641200 (B72c) EL 641150
ds 10 -
DT F1 - -
PANTRY
40 0
R
W B3 3 5 12
FURNITURE (REF.TO ID DWGs)
B71 GR-083
B71-AR-DD-213
b 20 s -
MAIN BLDG. (B71) EL 643000
HPL CLADDING (REF.TO ID DWGs)
W B5 3 9 42
b 20 s -
LOBBY
B71 GR-039
B71 GR-034
PARTIAL ( P5 )
2
A
FEMALE PRAYER
EQ
M F1 A2 2 6 21
R1 70
b 20 s -
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
W B3 3 9 05 b 20 s 1
b 20 s 1
B71 GR-033
STAINLESS LOUVERS (REF ID DWGs)
W B5 3 9 42
LOBBY
B71 GR-038
EQ
W C2 3 - 32 W C2 3 - 32
W B2 3 4 31 b 20 s -
R1 57
b 20 s W C2 3 - 32
b 10 h -
B71 GR-030
70 0
20 45
W C2 3 - 32 W C2 3 - 32
W C1 3 - 32
b 20 s 1
ABLUTION
B71 GR-028
B71
b 20 s -
KEY PLAN
DT F3 - -
FEB. 2019 MNBO AZE CHST DATE BY CHECK PM
REVISIONS SCHEDULE
B71
b 20 s -
20 0
b 20 s 1
MARBLE CLADDEING (REF.TO ID DWGs )
A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
AH
-
R1 63
b 20 s 1
W C2 3 - 32
W B5 3 9 42
W C2 3 - 32
20 55
W C2 3 b 20 p - 32 -
B71-AR-DD-501
1.1 5°
W C2 3 - 32
DT F3 - -
EQ
b 20 s 1
W C2 3 - 32
b 20 s 1
M F1 A4 2 - 21
EQ
W B4 3 9 42
W B5 3 9 42
00
R
20 0
JAN
b 20 s 1
b 20 s 1
B
b 20 s W 1 B2 3 4 31
B71 GR-093 W C2 3 - 32
FURNITURE (REF.TO ID DWGs)
0.5 5°
B71 GR-027
b 20 s 1 W C2 3 - 32
FURNITURE (REF.TO ID DWGs)
COMM RM
b 20 s -
EQ
WOODEN LOUVERS (REF TO ID DWGs)
5.5 5°
0°
R1 67 2
0°
B71 GR-029
0.7 0°
EQ
16 8
85 0
0.6
B71 GR-025
b 20 s
1.3 0°
AH KK MA
1.3
B
M F1 A2 2 6 23
ELEC RM
M A3 1 1 55
B71 GR-040
CORRIDOR
B71 GR-026
F. TOILETS
EL.643.000 GRD FFL
17
b 10 h -
W C1 3 - 32
M F1 A2 2 6 23
17 1
0°
PLAZA
0°
CORRIDOR 0.5 5°
1
85 38
R
1.3
R
LINE OF CLADDING ABOVE
0.1 3° b 20 s -
FHC b 20 s
b 20 s -
METAL CLADDING (REF.TO ID DWGs)
EL.643.000 GRD FFL 2°
16 7 R
b 20 s -
B71 GR-064
0.8
25 0
16 00
90 0
0 90
R1 63 15 0
b 20 s -
B71-AR-DD-501
MARBLE CLADDEING (REF.TO ID DWGs )
R1 64
A
1
1.4
PRE-FUNCTION b 20 s -
b 20 s -
B71-AR-DD-210
0°
0.2 0°
STONE CLADDEING (REF.TO ID DWGs)
b 10 h b 20 p -
B71
LINE OF SHADE ABOVE
FHC W B8 3 9 42
0 21 69 R1
85 38
A08
-
CW06
B71 GR-015
B71 GR-017
b 20 s -
b 15 p -
XA -
5 81
00 10
-
ADMIN
0 20 63 R1
DIRECTORS RM
D
b 20 s -
B71 GR-096
gp 1 c -
R1 50
PARTIAL ( P4 )
GA-DD-501
B71 GR-016
b 20 s -
Wxx
b 20 s -
b 20 s -
BRIEFING RM
5°
5 88 73 R1
75 MANAGER
GD01
b 20 s -
b 20 s -
R1 57 25 0
D
- ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS. - DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. - FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS. - FOR FINISHES REF. TO ID DWG's, SERIES 100 - FOR DOORS, ARCHITRAVES, GLAZED DOORS, WINDOWS, CURTAIN WALLS & SCREENS TYPES, SCHEDULES & DETAILS REFER TO GENERAL DRAWINGS, SERIES 800. - FOR MISCELLANEOUS DETAILS REFER TO GENERAL DRAWINGS, SERIES 900 . - FOR KITCHENS' EQUIPMENTS, TOILET FIXTURES & ACCESSORIES SCHEDULES, MOUNTING HEIGHTS & DETAILS REFER TO GENERAL DRAWINGS, SERIES 500. - PANTRY IS FOR DESIGN INTENT ONLY, TECHNICAL SUPPLIER TO PROVIDE FINAL EQUIPMENTS' SELECTION IN SHOP DRAWINGS. - ALL TOILET & KITCHEN AREAS SHALL BE PROVIDED WITH WATERPROOFING MEMBRANE LAID ON TOP OF STRUCTURAL SLAB AND EXTENDED 200MM. HIGH ON WALL ABOVE FINISH FLOOR LEVEL ( REF. TO SPECS ). - FOR EXHAUST FANS & HVAC EQUIPMENTS & OPENINGS, REFER TO MECHANICAL DRAWINGS. - LOCATIONS OF PADS AND ROOF PENETRATIONS SHOWN IN ROOF PLANS SHALL BE COORDINATED WITH STRUCTURE, PLUMBING AND MECHANICAL DRAWINGS. - FOR DRAINAGE REFER TO PLUMBING DRAWINGS. - UNO DOOR JAMB IS @ 200mm FROM NEAREST ADJACENT WALL FACE, OTHERWISE WILL BE SHOWN ON DRAWINGS. - ALL PROPOSED LEVEL SHALL BE VERIFIED ON SITE TO MATCH WITH THE EXISTING LEVELS. - LEVELS INDICATED ON ALL FLOOR PLANS ARE REFERENCED CIVIL GRADING LEVELS. - FOR WALLS TYPES,THK., FIRE RATE ,ETC.... REFER TO GENERAL SHEET GA-DD-701
2
3
4
METERS
5
1 : 100
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-106
SHEET NUMBER
5 OF 9
REVISION:
00
1
2
3
4
5
NOTES:
N
-
-
-
B71
B71
B71
B71
XY
A06
A05
A04
-
S60°40'W
A07
1
MAKKAH
-
B71
2
B71-AR-DD-215 HPL CLADDING (REF.TO ID DWGs)
B71-AR-DD-213 GD04
0 56 R1
0.8
PARTIAL ( P2 ) 3 ABLUTION DETAIL g 10 h
PARTIAL ( P5 ) 0° 0.8
W B8 3 9 42
b 20 s -
W B6 3 5 41
WAITING RM
b 20 s -
B71 GR-018
b 20 s -
b 15 p -
GA-DD-902
b 20 s 1
5 27 80 R1
JAN
ABLUTION
0° 0.3
M. TOILETS B71 GR-021
GD01
FLOOR MAT DETAIL
GA-DD-901
b 20 s -
b 20 s 1
A11
W B8 3 9 42
W C2 3 - 32
b 20 s -
b 15 p -
WOODEN CLADDEING (REF.TO ID DWGs)
B71
CW06
10
b 20 s 1
M F1 A4 2 - 21 b 20 s 1
W B2 3 4 31
A10
-
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BLACK COLOR
FURNITURE (REF.TO ID DWGs)
b 20 h b 20 s -
B71
GD02
GD03
TRIMLESS RECESSED FIRE HOSE CABINET DETAIL
B71 GR-022
B71 GR-020
A09
-
B71 GR-092
CW02
3
LOBBY
STRUCTURAL COLUMN (REF. TO SE DWGs)
CW03
VESTIBULE
GD03
b 20 s -
B71 GR-019
B71
C
7 R1
GD02
CW02
00 30
W B6 3 5 41
W C2 3 - 32 W C2 3 - 32
RECEPTION HALL
B71
C
WOODEN LOUVERS (REF TO ID DWGs)
B71 GR-023
b 20 s -
W C2 3 - 32
-
1.6 0°
MARBLE CLADDEING (REF.TO ID DWGs )
EL.643.000 GRD FFL
W B5 3 9 42
1.1
W C2 3 - 32 W C2 3 - 32
W C1 3 - 32
W B5 3 9 42
B71 GR-024
0.1 3°
W C2 3 b 20 p - 32 -
b 20 s 1 b 20 s 1
W C2 3 - 32
M F1 A4 2 - 21
W C2 3 - 32
JAN
XB
B71
M. TOILETS B71 GR-031
W C2 3 - 32
B71 GR-030
b 10 h -
LOBBY
b 20 s -
61 5
0.8 0°
W C1 3 - 32
W C2 3 - 32
b 20 s -
W B2 3 4 31 b 20 s 1
b 20 s 1 M F1 A4 2 - 21
M F1 A2 2 6 23
JAN
B71 GR-098
F. TOILETS B71 GR-032
b 20 p -
PARTIAL ( P2 ) PARTIAL ( P3 )
GIFT SHOP
0.7
b 20 p -
R1 79 40 0
PARTIAL ( P6 )
b 20 s 1
b 20 s 1
0 42 79 R1
5°
SOLAR HEATING MECH. RM. b 20 B71 GR-035
b 20 s -
(B72d) EL 643400
B71
50 0
A12
-
B71
DT F1 - -
B
B71
ﻣﺴﻘﻂ أﻓﻘﻰ ﺟﺰﺋﻲ ﻟﻠﺪور اﻷرﺿﻰ A B71-AR-DD-106
1
BA
B71-AR-DD-210
B71 GR-045
EL.643.000 GRD FFL
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ
DT F1 - -
SAUDI BASIC INDUSTRIES CORPORATION PROJECT NAME
ds 10 -
HALL 2
ds 10 -
DT F1 - -
WOODEN CLADDEING (REF.TO ID DWGs)
AF
DT F1 - -
B71 GR-041
PARTIAL ( P7 )
اﺳﻢ اﻟﻤﺒﻨﻰ
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ
B71
ds 10 -
AE
-
B71
MAIN BUILDING (B71) CONSULTANT
PARTIAL ( P8 )
PARTIAL ( P6 )
s
BUILDING NAME
-
PARTIAL ( P5 )
-
AB
AA
XX
-
-
-
B71
B71
اﻹﺳﺘﺸﺎرى
A PM: CHST PD: RSMM PC: HEA TITLE:
AD
AC
-
B71
-
B71
PA: HEAH ID: SYKE SE: FHAF
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
ﻣﺴﻘﻂ أﻓﻘﻰ ﺟﺰﺋﻲ ﻟﻠﺪور اﻷرﺿﻰ
GROUND FLOOR PARTIAL PLAN (5 OF 9)
GROUND FLOOR PARTIAL PLAN (5 OF 9)
0
1 : 100
1
2
3
4
5
10 SCALE:
SCALE 1 : 100
1
اﺳﻢ اﻟﻤﺸﺮوع
SABIC MUSEUM AND CONVENTION CENTER RIYADH
ZFP PROJECT NO.: J18-01500
B71
B71
اﻟﻤﺎﻟﻚ
DT F1 - -
GATHERING HALL
b 20 s -
-
(B74) EL 642200
(B72a) EL 642700
CLIENT
1 B08
NORTH
P4 P2 P5 P7 P3 P6 P8 P9
(B72b) EL 642700
ds 10 -
B71-AR-DD-219
-
P1
S6 0°4 0'W
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ B71-AR-DD-502
b 20 s 1
AG
-
DEMOUNTABLE PARTIION PANELS
E
DT F3 - -
b 20 s 1
b 20 s -
R1 55
20 0
PANTRY
B71 GR-037
B71 GR-036
QUIBLA DIRECTION
HALL 4
B71 GR-042 DT F3 - -
N
(B73) EL 641200 (B72c) EL 641150
ds 10 -
DT F1 - -
A/V CTRL
g 10 h -
FHC
b 20 s -
LOBBY
40 0
R
W B3 3 5 12
FURNITURE (REF.TO ID DWGs)
0 38
B71 GR-083
B71-AR-DD-213
30 0
B71 GR-034
STAINLESS LOUVERS (REF ID DWGs)
PARTIAL ( P5 )
2
A
FEMALE PRAYER
b 20 s -
MAIN BLDG. (B71) EL 643000
HPL CLADDING (REF.TO ID DWGs)
W B5 3 9 42
M F1 A2 2 6 21
R1 70
b 20 s -
EQ
B71 GR-039
B71 GR-033
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
W B3 3 9 05 b 20 s 1
b 20 s 1
KEY PLAN
EQ
R1 57
EQ
W C2 3 - 32
W B5 3 9 42
LOBBY
B71 GR-038
W C2 3 - 32
W C2 3 - 32
W B2 3 4 31
MARBLE CLADDEING (REF.TO ID DWGs )
b 20 s -
W C2 3 - 32
b 10 h -
b 20 s -
70 0
20 45 W B5 3 9 42
W C1 3 - 32
b 20 s 1
ABLUTION
B71 GR-028
-
b 20 s -
B71-AR-DD-501
1.1 5°
W C2 3 - 32
W C2 3 - 32
FEB. 2019 MNBO AZE CHST DATE BY CHECK PM
REVISIONS SCHEDULE
B71
b 20 s -
20 0
b 20 s 1
W C2 3 - 32
b 20 s 1
M F1 A4 2 - 21
b 20 s 1
b 20 s 1
A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
AH
-
EQ
FURNITURE (REF.TO ID DWGs)
JAN
B71 GR-093 W C2 3 - 32
DT F3 - -
W B5 3 9 42
20 55
b 20 s 1 W C2 3 - 32
B
b 20 s W 1 B2 3 4 31
EQ
W B4 3 9 42
R1 63
B71 GR-027
B71 GR-025
R1 67 2
B71 GR-029
FURNITURE (REF.TO ID DWGs)
0.5 5°
COMM RM
b 20 s -
EQ
WOODEN LOUVERS (REF TO ID DWGs)
5.5 5°
0°
00
R
16 8
85 0
0.6
CORRIDOR
20 0
M F1 A2 2 6 23
0.7 0°
B71 GR-040
1
ELEC RM
b 20 s
1.3 0°
CORRIDOR 0.5 5°
b 20 s -
B71 GR-026
F. TOILETS
0°
B
0°
AH KK MA
1.3
PLAZA
M F1 A2 2 6 23
b 10 h -
W C1 3 - 32
EL.643.000 GRD FFL
FHC b 20 s
85
17 1
0°
R
LINE OF CLADDING ABOVE
b 20 s -
38 17
R
1.3
METAL CLADDING (REF.TO ID DWGs)
M A3 1 1 55
2°
16 7 R
b 20 s -
B71 GR-064
0.8
25 0
16 00
90 0
0 90
R1 63 15 0
b 20 s -
B71-AR-DD-501
MARBLE CLADDEING (REF.TO ID DWGs )
EL.643.000 GRD FFL
R1 64
A
1
1.4
PRE-FUNCTION b 20 s -
b 20 s -
B71-AR-DD-210
0°
0.2 0°
STONE CLADDEING (REF.TO ID DWGs)
b 10 h b 20 p -
B71
LINE OF SHADE ABOVE
FHC W B8 3 9 42
0 21 69 R1
85 38
A08
-
CW06
B71 GR-015
B71 GR-017
b 20 s -
b 15 p -
XA -
5 81
00 10
-
ADMIN
0 20 63 R1
DIRECTORS RM
D
b 20 s -
B71 GR-096
gp 1 c -
R1 50
PARTIAL ( P4 )
GA-DD-501
B71 GR-016
b 20 s -
Wxx
b 20 s -
PARTIAL ( P4 )
b 20 s -
BRIEFING RM
5°
5 88 73 R1
75 MANAGER
GD01
b 20 s -
b 20 s -
R1 57 25 0
D
- ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS. - DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. - FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS. - FOR FINISHES REF. TO ID DWG's, SERIES 100 - FOR DOORS, ARCHITRAVES, GLAZED DOORS, WINDOWS, CURTAIN WALLS & SCREENS TYPES, SCHEDULES & DETAILS REFER TO GENERAL DRAWINGS, SERIES 800. - FOR MISCELLANEOUS DETAILS REFER TO GENERAL DRAWINGS, SERIES 900 . - FOR KITCHENS' EQUIPMENTS, TOILET FIXTURES & ACCESSORIES SCHEDULES, MOUNTING HEIGHTS & DETAILS REFER TO GENERAL DRAWINGS, SERIES 500. - PANTRY IS FOR DESIGN INTENT ONLY, TECHNICAL SUPPLIER TO PROVIDE FINAL EQUIPMENTS' SELECTION IN SHOP DRAWINGS. - ALL TOILET & KITCHEN AREAS SHALL BE PROVIDED WITH WATERPROOFING MEMBRANE LAID ON TOP OF STRUCTURAL SLAB AND EXTENDED 200MM. HIGH ON WALL ABOVE FINISH FLOOR LEVEL ( REF. TO SPECS ). - FOR EXHAUST FANS & HVAC EQUIPMENTS & OPENINGS, REFER TO MECHANICAL DRAWINGS. - LOCATIONS OF PADS AND ROOF PENETRATIONS SHOWN IN ROOF PLANS SHALL BE COORDINATED WITH STRUCTURE, PLUMBING AND MECHANICAL DRAWINGS. - FOR DRAINAGE REFER TO PLUMBING DRAWINGS. - UNO DOOR JAMB IS @ 200mm FROM NEAREST ADJACENT WALL FACE, OTHERWISE WILL BE SHOWN ON DRAWINGS. - ALL PROPOSED LEVEL SHALL BE VERIFIED ON SITE TO MATCH WITH THE EXISTING LEVELS. - LEVELS INDICATED ON ALL FLOOR PLANS ARE REFERENCED CIVIL GRADING LEVELS. - FOR WALLS TYPES,THK., FIRE RATE ,ETC.... REFER TO GENERAL SHEET GA-DD-701
2
3
4
METERS
5
1 : 100
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-106
SHEET NUMBER
5 OF 9
REVISION:
00
1
2
3
4
5
NOTES:
10000
EL. 648.500 MEZZ FFL EL. 643.000 GRD FFL
EL. 643.000 GRD FFL
B
PARTIAL ( P5 )
PARTIAL ( P4 )
PARTIAL ( P4 )
PARTIAL ( P3 )
MASTER ELEVATION (B)
D
1 : 400
PARTIAL ( P2 )
PARTIAL ( P1 ) EL. 643.000 GRD FFL
واﺟﮭﺔ ﻣﺠﻤﻌﺔ
4500
EL. 648.500 MEZZ FFL
10000
EL. 653.000 ROOF TOSS
4500
10000
EL. 648.500 MEZZ FFL
5500
EL. 653.000 ROOF TOSS
C
5500
PARTIAL ( P1 )
1 : 400
C
B71-AR-DD-201
PARTIAL ( P3 )
PARTIAL ( P2 )
واﺟﮭﺔ ﻣﺠﻤﻌﺔ
MASTER ELEVATION (A)
PARTIAL ( P2 )
A B71-AR-DD-201
5500
EL. 653.000 ROOF TOSS
D
4500
D
PARTIAL ( P2 )
PARTIAL ( P1 )
- ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS. - DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. - FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS. - FOR FINISHED GRADE LEVELS REFER TO CIVIL DWG's. - UNLESS NOTED OTHERWISE ELEVATIONS LEVELS EQUATE F.F.L. INDICATED IN CIVIL DWGS. - FOR EXHAUST FAN & A/C UNIT OPENING REFER TO MECHANICAL DRAWINGS. - FOR MISCELLANEOUS DETAILS REFER TO GENERAL DRAWINGS, SERIES 900. - FOR WINDOW, LOUVER, GLAZED DOOR, CURTAIN WALL & DOOR TYPES REFER TO FLOOR PLANS.
B71-AR-DD-201
واﺟﮭﺔ ﻣﺠﻤﻌﺔ
MASTER ELEVATION (D) 1 : 400
A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
FEB. 2019 MNBO AZE CHST DATE BY CHECK PM
REVISIONS SCHEDULE KEY PLAN
(B72d) EL 643400
B
P1
B
NORTH
(B74) EL 642200
(B72a) EL 642700
CLIENT
PARTIAL ( P2 )
PARTIAL ( P3 )
PARTIAL ( P2 )
PARTIAL ( P3 )
PARTIAL ( P2 )
PARTIAL ( P3 )
PARTIAL ( P2 )
S6 0°4 0'W
P4 P2 P5 P7 P3 P6 P8 P9
(B72b) EL 642700
PARTIAL ( P3 )
N
(B73) EL 641200 (B72c) EL 641150
AH KK MA
MAIN BLDG. (B71) EL 643000
اﻟﻤﺎﻟﻚ
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ SAUDI BASIC INDUSTRIES CORPORATION PROJECT NAME
EL. 643.000 GRD FFL
اﺳﻢ اﻟﻤﺸﺮوع
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ
4500
10000
EL. 648.500 MEZZ FFL
SABIC MUSEUM AND CONVENTION CENTER RIYADH
5500
EL. 653.000 ROOF TOSS
BUILDING NAME
اﺳﻢ اﻟﻤﺒﻨﻰ
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ MAIN BUILDING (B71)
C
A
B71-AR-DD-201
واﺟﮭﺔ ﻣﺠﻤﻌﺔ
CONSULTANT
MASTER ELEVATION (C) 1 : 400
اﻹﺳﺘﺸﺎرى
A ZFP PROJECT NO.: J18-01500 PM: CHST PD: RSMM PC: HEA TITLE:
PA: HEAH ID: SYKE SE: FHAF
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
واﺟﮭﺎت ﻣﺠﻤﻌﺔ
MASTER ELEVATIONS 0
4
8
12
16
20
40 SCALE:
SCALE 1 : 400
1
2
3
4
METERS
5
1 : 400
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-201
SHEET NUMBER
-
REVISION:
00
1
2
3
4
5
NOTES:
EL. 655.115 T.O.CLADDING
EL. 656.300 T.O.CLADDING
6mm THK SINGLE TEMPERED SPANDREL GLASS
PAINT ON CEMENT PLASTER
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BEIGE COLOR
EL. 654.600 T.O.CLADDING
EL. 657.400 T.O.CLADDING
EL. 654.220 T.O.PARAPET
EL. 657.250 T.O.CLADDING
EL. 654.600 T.O.CLADDING
OPEN
OPEN
EL. 655.115 T.O.CLADDING
EL. 654.600 T.O.CLADDING
EL. 645.500 T.O.CLADDING
PARTIAL ( P2 )
D
PARTIAL ( P1 )
- ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS. - DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. - FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS. - FOR FINISHED GRADE LEVELS REFER TO CIVIL DWG's. - UNLESS NOTED OTHERWISE ELEVATIONS LEVELS EQUATE F.F.L. INDICATED IN CIVIL DWGS. - FOR EXHAUST FAN & A/C UNIT OPENING REFER TO MECHANICAL DRAWINGS. - FOR MISCELLANEOUS DETAILS REFER TO GENERAL DRAWINGS, SERIES 900. - FOR WINDOW, LOUVER, GLAZED DOOR, CURTAIN WALL & DOOR TYPES REFER TO FLOOR PLANS.
D
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
3800
EL. 645.700 T.O.CLADDING
5500
EL. 648.500 MEZZ FFL
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
10000
4500
EL. 653.000 ROOF TOSS
C
C
EL. 643.000 GRD FFL TRAVERTINE MARBLE TILES CLADDING 500X1500MM BLACK COLOR
FOR GRADE LEVEL REF. TO CE & LS DWGs.
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
واﺟﮭﺔ ﺟﺰﺋﯿﺔ A B71-AR-DD-209
24mm THK. (6 12 6) DOUBLE TEMPERED INSULATED GLASS, COATED OUTSIDE, CLEAR INSIDE, ON POWDER COATED ALUMINUM FRAME AND THERMAL BREAK SECTION
PARTIAL ELEVATION D (1 OF 2) 1 : 100
A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
FEB. 2019 MNBO AZE CHST DATE BY CHECK PM
PARTIAL ( P2 )
B
KEY PLAN MAIN BLDG. (B71) EL 643000
6mm THK SINGLE TEMPERED SPANDREL GLASS
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
EL. 649.235 T.O.CLADDING
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BEIGE COLOR
(B72d) EL 643400
EL. 655.050 T.O.CLADDING
POWDER COATED STEEL SHADE (REF. TO SE DWGs)
OPEN
EL. 653.382 T.O.CLADDING
P1
B
EL. 655.320 T.O.CLADDING
N
(B73) EL 641200 (B72c) EL 641150
S6 0°4 0'W
AH KK MA
PARTIAL ( P1 )
REVISIONS SCHEDULE
NORTH
P4 P2 P5 P7 P3 P6 P8 P9
(B72b) EL 642700
(B74) EL 642200
(B72a) EL 642700
CLIENT
اﻟﻤﺎﻟﻚ
EL. 653.000 ROOF TOSS
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ 4500
SAUDI BASIC INDUSTRIES CORPORATION PROJECT NAME
اﺳﻢ اﻟﻤﺸﺮوع
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ SABIC MUSEUM AND CONVENTION CENTER RIYADH
10000
EL. 648.500 MEZZ FFL
BUILDING NAME
اﺳﻢ اﻟﻤﺒﻨﻰ
5500
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ MAIN BUILDING (B71) CONSULTANT
A
EL. 643.000 GRD FFL
B B71-AR-DD-209
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BLACK COLOR
METAL CLADDING (REF. TO ID DWG)
A
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
24mm THK. (6 12 6) DOUBLE TEMPERED INSULATED GLASS, COATED OUTSIDE, CLEAR INSIDE, ON POWDER COATED ALUMINUM FRAME AND THERMAL BREAK SECTION POWDER COATED STEEL COLUMN (REF. TO SE DWGs)
ZFP PROJECT NO.: J18-01500 PM: CHST PD: RSMM PC: HEA TITLE:
PA: HEAH ID: SYKE SE: FHAF
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
واﺟﮭﺎت ﺟﺰﺋﯿﺔ
واﺟﮭﺔ ﺟﺰﺋﯿﺔ
PARTIAL ELEVATIONS
PARTIAL ELEVATION D (2 OF 2)
0
1 : 100
1
2
3
4
5
10 SCALE:
SCALE 1 : 100
1
اﻹﺳﺘﺸﺎرى
2
3
4
METERS
5
1 : 100
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-209
SHEET NUMBER
-
REVISION:
00
1
2
3
4
5
NOTES: - ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS. - DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. - FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS. - FOR FINISHED GRADE LEVELS REFER TO CIVIL DWG's. - UNLESS NOTED OTHERWISE ELEVATIONS LEVELS EQUATE F.F.L. INDICATED IN CIVIL DWGS. - FOR EXHAUST FAN & A/C UNIT OPENING REFER TO MECHANICAL DRAWINGS. - FOR MISCELLANEOUS DETAILS REFER TO GENERAL DRAWINGS, SERIES 900. - FOR WINDOW, LOUVER, GLAZED DOOR, CURTAIN WALL & DOOR TYPES REFER TO FLOOR PLANS.
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BLACK COLOR
1
6mm THK SINGLE TEMPERED SPANDREL GLASS
GA-DD-901
TYPICAL ROOFING DETAIL
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BEIGE COLOR
OPEN
D
1300
850
D EL. 653.000 ROOF TOSS
4500
4500
GYPSUM/ CEMENT CEILING TO WALL DETAILS
6000
GA-DD-701
3300
2
2500
EL. 646.532 T.O.CLADDING
5500
EL. 645.710 T.O.CLADDING
500
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
10000
EL. 648.500 MEZZ FFL
4000
SLABS & BEAMS REF. TO SE DWGs. 6mm THK. SINGLE TEMPERED CLEAR GLASS, ON POWDER COATED ALUMINUM FRAME
MUSEUM
B71 GR-084
2200
B71 GR-085
3000
CORRIDOR
EL. 643.000 GRD FFL
9
C
GA-DD-701
C
TYP. RAISED FLOOR DETAIL
ﻗﻄﺎع 1 B71-AR-DD-213
SECTION 1 : 100
AA
AB
-
AC
-
B71
-
B71
B71
AD
AE
-
AF
-
B71
AG
-
B71
-
B71
B71
AH
-
B71
A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
FEB. 2019 MNBO AZE CHST DATE BY CHECK PM
REVISIONS SCHEDULE TRAVERTINE MARBLE TILES CLADDING 500X1500MM BLACK COLOR
EL. 653.576 T.O.CLADDING
EL. 654.600 T.O.CLADDING
EL. 654.500 T.O.CLADDING
EL. 655.900 T.O.CLADDING
1 OPEN
GA-DD-901
MAIN BLDG. (B71) EL 643000
EL. 654.600 T.O.CLADDING
EL. 655.050 T.O.CLADDING
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
(B72d) EL 643400
4500
SLABS & BEAMS REF. TO SE DWGs.
S6 0°4 0'W
NORTH
P4 P2 P5 P7 P3 P6 P8 P9
(B72b) EL 642700
(B74) EL 642200
(B72a) EL 642700
اﺳﻢ اﻟﻤﺸﺮوع
300 5700
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ POWDER COATED STEEL COLUMN (REF. TO SE DWGs)
RECEPTION HALL B71 GR-023
SABIC MUSEUM AND CONVENTION CENTER RIYADH BUILDING NAME
VESTIBULE
3000
3000
3900
B71 GR-064
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ SAUDI BASIC INDUSTRIES CORPORATION
2700
3000
1500 100
10000
PLAZA
B71 GR-083
POWDER COATED STEEL SHADE (REF. TO SE DWGs)
PROJECT NAME
5500
GIFT SHOP
اﻟﻤﺎﻟﻚ
6
LIGHT COVE @ GA-DD-701 GYPSUM BOARD CEILING DETAIL
STAINLESS STEEL STIPES REF. TO ID DWG.
اﺳﻢ اﻟﻤﺒﻨﻰ
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ
B71 GR-092
MAIN BUILDING (B71)
EL. 643.000 GRD FFL
CONSULTANT COUNTER REFER TO ID 12mm THK. FRAMELESS SINGLE TEMPERED CLEAR GLASS, DOUBLE PIVOTED DOOR WITH SAND BLAST AS PER ID
A
METAL CLADDING (REF. TO ID DWG)
METAL CLADDING (REF.TO ID DWGs)
STONE CLADDEING (REF.TO ID DWGs)
MARBLE CLADDEING (REF.TO ID DWGs )
2 GA-DD-902
SURFACE MOUNTED FIRE HOSE CABINET DETAIL
24mm THK. (6 12 6) DOUBLE TEMPERED INSULATED GLASS, COATED OUTSIDE, CLEAR INSIDE, ON POWDER COATED ALUMINUM FRAME AND THERMAL BREAK SECTION
اﻹﺳﺘﺸﺎرى
A ZFP PROJECT NO.: J18-01500
24mm THK. (6 12 6) DOUBLE TEMPERED INSULATED GLASS, COATED OUTSIDE, CLEAR INSIDE, ON POWDER COATED ALUMINUM FRAME AND THERMAL BREAK SECTION
PM: CHST PD: RSMM PC: HEA TITLE:
ﻗﻄﺎع 2
N
(B73) EL 641200 (B72c) EL 641150
CLIENT
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
B71-AR-DD-213
P1
B
1200
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR EL. 653.000 ROOF TOSS
EL. 648.500 MEZZ FFL
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BEIGE COLOR EL. 655.945 TYPICAL ROOFING T.O.CLADDING DETAIL
WHITE POLY CARBONATED SKY LIGHT ON POWDER COATED ALUMINUM FRAMES (AS PER MFTR.)
STAINLESS STEEL STIPES REF. TO ID DWG.
4000
B
EL. 653.580 T.O.CLADDING
KEY PLAN
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BLACK COLOR
AH KK MA
STRETCHED CEILING REFER TO ID DWGs
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BEIGE COLOR
PA: HEAH ID: SYKE SE: FHAF
SECTION
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
ﻗﻄﺎﻋﺎت
SECTIONS
1 : 100
0
1
2
3
4
5
10 SCALE:
SCALE 1 : 100
1
2
3
4
METERS
5
1 : 100
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-213
SHEET NUMBER
-
REVISION:
00
1
2
3
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BEIGE COLOR
OPEN
4
5
NOTES: - ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS. - DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. - FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS. - FOR FINISHED GRADE LEVELS REFER TO CIVIL DWG's. - UNLESS NOTED OTHERWISE ELEVATIONS LEVELS EQUATE F.F.L. INDICATED IN CIVIL DWGS. - FOR EXHAUST FAN & A/C UNIT OPENING REFER TO MECHANICAL DRAWINGS. - FOR MISCELLANEOUS DETAILS REFER TO GENERAL DRAWINGS, SERIES 900. - FOR WINDOW, LOUVER, GLAZED DOOR, CURTAIN WALL & DOOR TYPES REFER TO FLOOR PLANS.
1
TYPICAL ROOFING GA-DD-901 DETAIL
EL.655.350 T.O.CLADDING TRAVERTINE MARBLE TILES CLADDING 500X1500MM BLACK COLOR
EL. 655.050 T.O.CLADDING
EL. 654.600 T.O.CLADDING
D
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
2891
D
EL. 653.000 ROOF TOSS
SLABS & BEAMS REF. TO SE DWG
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
C
GALV. STEEL FRAME FOR INSULATION FIXATION
4500
C
VAPOR RETARDER POWDER COATED STEEL SHADE (REF. TO SE DWGs)
RIGID INSULATION
6
LIGHT COVE @ GA-DD-701 GYPSUM BOARD CEILING DETAIL
A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
CEILING LVL.
FEB. 2019 MNBO AZE CHST DATE BY CHECK PM
REVISIONS SCHEDULE
EL. 648.500 MEZZ FFL
KEY PLAN
10000
10000
SPANDREL GLAZING GA-DD-803 DETAIL
(B72d) EL 643400
2800
STONE CLADDEING (REF.TO ID DWGs)
B
2
P1
B
NORTH
P4 P2 P5 P7 P3 P6 P8 P9
(B72b) EL 642700
TYP. CW DETAIL
GA-DD-803
N S6 0°4 0'W
AH KK MA
MAIN BLDG. (B71) EL 643000
6
(B73) EL 641200 (B72c) EL 641150
(B74) EL 642200
(B72a) EL 642700
CLIENT
اﻟﻤﺎﻟﻚ
7600
3 GA-DD-906
METAL STUDS FOR CEILING FIXATION
CURTAIN FIXATION SYSTEM WITH ALUMINUM CANOPY
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ 5500
SAUDI BASIC INDUSTRIES CORPORATION PROJECT NAME
CEILING LVL.
اﺳﻢ اﻟﻤﺸﺮوع
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ
10 GA-DD-803
SABIC MUSEUM AND CONVENTION CENTER RIYADH GLAZED DOOR DETAILS
BUILDING NAME
3200
CONSULTANT
TRAVERTINE MARBLE TILES CLADDING 500X1500MM BROWN COLOR
VESTIBULE B71 GR-092
24mm THK. (6 12 6) DOUBLE TEMPERED INSULATED GLASS, COATED OUTSIDE, CLEAR INSIDE, ON POWDER COATED ALUMINUM FRAME AND THERMAL BREAK SECTION
A
1
ZFP PROJECT NO.: J18-01500 PM: CHST PD: RSMM PC: HEA TITLE:
1
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
WALL SECTION
FOR GRADE LEVEL REF. TO CE & LS DWGs.
SLABS & BEAMS REF. TO SE DWGs.
1 : 25
PA: HEAH ID: SYKE SE: FHAF
ﻗﻄﺎع ﺗﻔﺼﯿﻠﻲ
ﻗﻄﺎع ﺗﻔﺼﯿﻠﻲ
WALL SECTION
اﻹﺳﺘﺸﺎرى
A
EL. 643.000 GRD FFL
B71-AR-DD-215
اﺳﻢ اﻟﻤﺒﻨﻰ
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ MAIN BUILDING (B71)
0
0.25
0.5
0.75
1
1.25
2.5 SCALE:
SCALE 1 : 25
2
3
4
METERS
5
1 : 25
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-215
SHEET NUMBER
-
REVISION:
00
1
2
3
4
5
NOTES: - DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. - UNO DIMENSIONS ARE IN MILLIMETERS AND ELEVATION LEVELS ARE IN METERS. - FOR FINISH GRADE LEVELS REF. TO CIVIL DWG's. - FOR WALL, DOOR & WINDOW TYPES REF. TO AR FLOOR PLANS. - FOR EXHAUST FAN & A/C UNIT OPENING REF. TO MECH. DWG's. - FOR STANDARD DETAILS REFER TO GENERAL DRAWINGS SHEET GA-DD-401. - FOR SLABS AND BEAMS DIMENSIONS REF. TO SE. DWG's.
AG
-
B71
6 GA-DD-401
1
D
GA-DD-401
2 GA-DD-401
CONCRETE STEP DETAIL
3 173 0 585
GUARD/HANDRAIL DETAIL
@ DS REA 6T
WALL BRACKET DETAIL 8 159
1 B71-AR-DD-401
840
D
680 =1 280
UP
EL. 101.167 FFL
EL.643.000 GRD FFL
STAIR#1
B71 GR-001
3 153
UP
A01
-
8 40 80= @2 DS 1 REA 394 3T 0° 1.5
B71
201
EL. 101.833 UP FFL 8 156
8T
C
159
DS REA
2
1
9
TYPICAL ROOFING GA-DD-901 DETAIL
LADDER AT ROOF GA-DD-401 HATCH DETAIL
0 2 24 80 = @2
8 583
8
EL. 653.000 ROOF TOSS
C
A02
-
4500
B71
A B71-AR-DD-401
1 STAIR#1
STAIR#01 @ GROUND FLOOR
GA-DD-401
GUARD/HANDRAIL DETAIL
B71 01-001
1 : 50
6
AG
GA-DD-401
-
B71
CONCRETE STEP DETAIL
10000
1
6
B71-AR-DD-401
CONCRETE STEP GA-DD-401 DETAIL
7 378
EL. 103.833 FFL
STAIR#1
60 =5 280
DN
8 159
LADDER AT ROOF HATCH DETAIL
@ DS REA 2T
9 GA-DD-401
@ DS REA 9T
520 =2 280
4 158
2
WALL BRACKET GA-DD-401 DETAIL
0 585
5500
3 173
1
GUARD/HANDRAIL GA-DD-401 DETAIL
B
SLABS & BEAMS REF. TO SE DWGs.
B71 GR-001
167 9
DN
STAIR#1
EL. 643.000 GRD FFL
EL. 103.333 FFL
B71 01-001
A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
KEY PLAN MAIN BLDG. (B71) EL 643000
2 GA-DD-401
WALL BRACKET DETAIL (B72d) EL 643400
A01
0° 1.5
8 159
(B72b) EL 642700
(B74) EL 642200
(B72a) EL 642700
اﻟﻤﺎﻟﻚ
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ SAUDI BASIC INDUSTRIES CORPORATION اﺳﻢ اﻟﻤﺸﺮوع
SABIC MUSEUM AND CONVENTION CENTER RIYADH BUILDING NAME
0 2 24 80 = @2 DS REA
2 GA-DD-401
اﺳﻢ اﻟﻤﺒﻨﻰ
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ MAIN BUILDING (B71) CONSULTANT
اﻹﺳﺘﺸﺎرى
WALL BRACKET DETAIL
A
B71-AR-DD-401
A
SECTION (1) 1 : 50
ZFP PROJECT NO.: J18-01500
A02
-
PM: CHST PD: RSMM PC: HEA TITLE:
B71
STAIR#01 @ MEZZANINE FLOOR
PA: HEAH ID: SYKE SE: FHAF
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
ﻣﺴﺎﻗﻂ أﻓﻘﯿﺔ و ﻗﻄﺎﻋﺎت ﺗﻔﺼﯿﻠﯿﺔ ﻟﻠﺴﻼﻟﻢ
1 : 50
STAIR AREA PLANS & SECTIONS 0
0.5
1
1.5
2
2.5
5 SCALE:
SCALE 1 : 50
1
NORTH
CLIENT
2
1
B
S6 0°4 0'W
P4 P2 P5 P7 P3 P6 P8 P9
PROJECT NAME
201
8T
B71-AR-DD-401
N
(B73) EL 641200 (B72c) EL 641150
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ
EL.105.500 MZ FFL
B71
P1
B
DN
-
FEB. 2019 MMSF AZE CHST DATE BY CHECK PM
REVISIONS SCHEDULE
AH KK MA
7 RISERS @167=1167 8 RISERS @167=1333 10 RISERS @167=1667 4 RISERS @167=667 3 RISERS @167=500
EL. 648.500 MEZZ FFL
2
3
4
METERS
5
1 : 50
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-401
SHEET NUMBER
-
REVISION:
00
1
2
3
4
5
NOTES: - FOR KITCHEN's EQUIPMENTS, TOILETS FIXTURES & ACCESSORIES SCHEDULE, MOUNTING HEIGHTS & DETAILS REF. TO GENERAL DRAWINGS, SERIES 500. - ALL TOILETS & TEA ROOMS FLOOR TILES WILL BE ANTI SLIP TILES. - ALL TOILET & KITCHEN AREAS SHALL PROVIDED WITH WATERPROOFING MEMBRANE LAID ON TOP OF STRUCTURAL SLAB AND EXTENDED 200MM. HIGH ON WALL ABOVE FINISH FLOOR LEVEL ( REF. TO SPECS ). - FOR FLOOR DRAINS, REFER TO PLUMBING DRAWINGS. - KITCHEN EQUIPMENTS AND CABINETS LAYOUT WILL BE PROVIDED FOR DESIGN INTENT AND FOR PROVIDING THE PROPER FITTINGS IN THE OTHER TRADES. - KITCHEN EQUIPMENTS / CABINETS WILL BE NOT IN SCOPE.
D
D AB
0.5 5°
-
B71
CORRIDOR
1.1
B71 GR-027
B71 GR-025
00 11
0 70
B71
FD HS1
B71
HS1 FD
HS1 FD
WC3
TPH1
RH1
WCh TPH1 GB2
FMh LAVh
B71 GR-098 RH1 RH1 RH1 RH1
PTD
F. TOILETS
B71 GR-034
FMh LAVh
2.1 0°
0 70
FD JS FCT
PTD
6
B71 GR-032
LAV1
LAV1
GA-DD-501
SD
HD
PTD FD
LAV1
A DETAILED DESIGN & ENGINEERING- 60% REV. ISSUED FOR
KEY PLAN
B71
MAIN BLDG. (B71) EL 643000
SD FD
5
(B72d) EL 643400
VANITY TOP DETAIL
GA-DD-501
0°
2
0 70 0 70
SD
P1
B
FLOOR DRAIN DETAIL
GA-DD-501 LAV1
HD
00 41 00 20
5
N
(B73) EL 641200 (B72c) EL 641150
S6 0°4 0'W
NORTH
P4 P2 P5 P7 P3 P6 P8 P9
(B72b) EL 642700
FD PTD
FEB. 2019 MGDH AZE CHST DATE BY CHECK PM
REVISIONS SCHEDULE
AC
-
LAV1 SD
BUILT-IN JANITOR SINK DETAIL
SD
SD LAV1 FM1
PTD
1.7
0 70
B
6°
JAN
RH1
FEMALE PRAYER
SD
C
AH KK MA
0 70
LAV1
GB4
50 19
RHh RHh
LAV1
WCh
11 55
RH1
RHh RHh
0°
00 11
0 70
GB2
TPH1
0.2
RH1
0°
00 11
0 70
RH1 RH1
0.5 5°
RH1
GB4
SD
A10
-
RH1
RH1
HS1 FD
GB2 TPH1
LAV1
TPH1
WC3
WC3
GB2
LAV1
B71
1.4
0 70
RH1 RH1
1.7
HS1 FD
TPH1
FM1
A06
70 0
0.6 0° 0.6 0°
WC3
A09
-
RH1
70 0
0 70
RH1 RH1
M. TOILETS
LAVh FMh
SD
LOBBY
B71 GR-033
HS1 FD
B71 GR-021
-
PTD
WC3
LAV1
LAV1
WCh GB4
GB3a
0°
00 11
RH1 RH1
TPH1
LAV1
RH1 FD GB3a FCT
0°
0.3
HS1 FD
TPH1
LAV1
0.8
HS1 FD
TPH1
70 0
00 11
FD
2.4 0°
WC3
TPH1
FD HS1
GB2 PTD
HS1 FD
RH1
GA-DD-501
ABLUTION
TPH1 WC3
WC3
11 00
0°
00 11
LAV1
RH1
B71 GR-030 FD
TPH1 RH1
RHh RHh
HS1
RH1 RH1
1.1 5°
TPH1
WC3
FD
TPH1
HD
0°
WC3
HD
FLOOR DRAIN DETAIL
0.3
TPH1 RH1 RH1
1.6
FD HS1
EQ
FD
WC3
5°
HD
21 85
WC3 HS1 FD
B71 GR-031
PTD JS FCT
FD FD HS1
WC3
HS1 FD
RH1 RH1
EQ
00 16
0.6
HS1
21 86
HS1
0°
RH1 RH1 RH1 RH1
50 34
2
70 0 FD
50 13
B71
M. TOILETS
FD
0.3
C
0° 1.6
A05
44 13
RH1 RH1 TPH1
LAV1
B71 GR-028
0 45
LAV1
SD
JAN
WC3
11 00
FD
TPH1
11 00
JS
JAN
B71 GR-022
0.1 7° RH1 RH1
70 0
SD FM1
FCT
RH1 RH1 RH1 RH1
RH1 RH1 RH1 RH1
11 00
SD LAV1
70 0
B71 GR-020
HD
FD PTD
LAV1
11 00
B71 GR-026
ABLUTION
LOBBY
-
SD
ELEC RM
BUILT-IN JANITOR SINK DETAIL
EQ
0° 1.6
GA-DD-501
11 00
6
PTD
0.5 5°
11 55
FCT JS
FD
RH1
B71 GR-019
RH1 FD GB3a
FCT
B71 GR-093
0°
RH1
GB3a
FCT GB3a RH1 FCT
GB3a
JAN
0.8
0 75 0 75
B71
0°
COMM RM
1 74
ABLUTION DETAIL
EQ
3 GA-DD-501
A08
-
5°
0.6
(B74) EL 642200
(B72a) EL 642700
CLIENT
AB
اﻟﻤﺎﻟﻚ
-
B71
VANITY TOP DETAIL
GA-DD-501
اﻟﺸﺮﻛﺔ اﻟﺴﻌﻮدﯾﺔ ﻟﻠﺼﻨﺎﻋﺎت اﻷﺳﺎﺳﯿﺔ SAUDI BASIC INDUSTRIES CORPORATION PROJECT NAME
اﺳﻢ اﻟﻤﺸﺮوع
اﻟﺮﯾﺎض- ﻣﺘﺤﻒ وﻣﺮﻛﺰ ﻣﺆﺗﻤﺮات ﺳﺎﺑﻚ SABIC MUSEUM AND CONVENTION CENTER RIYADH
ﻣﺴﻘﻂ أﻓﻘﻰ ﺗﻔﺼﯿﻠﻲ A B71-AR-DD-501
BUILDING NAME
ﻣﺴﻘﻂ أﻓﻘﻰ ﺗﻔﺼﯿﻠﻲ
TOILETS & WASHES AREA PLAN (GR-020, GR-021)
B
1 : 50
B71-AR-DD-501
اﺳﻢ اﻟﻤﺒﻨﻰ
اﻟﻤﺒﻨﻰ اﻟﺮﺋﯿﺴﻲ MAIN BUILDING (B71)
TOILETS & WASHES AREA PLAN (GR-031, GR-032)
CONSULTANT
1 : 50
A
اﻹﺳﺘﺸﺎرى
A ZFP PROJECT NO.: J18-01500 PM: CHST PD: RSMM PC: HEA TITLE:
PA: HEAH ID: SYKE SE: FHAF
LC: MBAI HV: SHMO PG: GSAM CE: ASWO HC: MFMT/MYMA LS: MDUL
ﻣﺴﺎﻗﻂ أﻓﻘﯿﺔ ﺗﻔﺼﯿﻠﯿﺔ وواﺟﮭﺎت داﺧﻠﯿﺔ ﻟﻠﺤﻤﺎﻣﺎت
TOILET AREA PLANS & INTERNAL ELEVATIONS 0
0.5
1
1.5
2
2.5
5 SCALE:
SCALE 1 : 50
1
2
3
4
METERS
5
1 : 50
BUILDING NUMBER
B71
DISCIPLINE IDENTIFIER
AR
DRAWING PHASE SEQUENCE NUMBER
DD-501
SHEET NUMBER
-
REVISION:
00
2
3
4
Holiday-Inn Hotel Location : KSA | Area : 13,365 sqm | Building Type : Resdential | Role : Design Development Software : autoCAD
5
1
2
3
4
5 NOTES:
• DO NOT SCALE DWGS DIMENSION GIVEN SHALL GOVERN. • UNO DIMENSIONS ARE IN MILLIMETERS AND ELEVATION / SECTION LEVELS ARE IN METERS.
01
02
B01
03
B01
04
B01
05
B01
06
B01
B01
A
1
07
08
B01
B01-A201
09
B01
1
10
B01
• GROUND FLOOR FINISH LEVEL(GROUND FFL 100.00) AS INDICATED IN DRAWINGS EQUIVALENT TO LEVEL 131.10 m AS SHOWN IN SITE DRAWINGS.
11
B01
B01
• FOR WALL TYPES & DETAILS REF. TO SHEET # G-A701
B01-A209
B01-A216
• FOR WALLS SOUND TRANSMITTAL, REFER TO STC SCHEDULE AT SHEET # G-A702
42000 4700
3700
4200
4200
4200
4200
4200
4200
4200
4200
D
D
• FOR WALL FIRE RATING REFER TO SCHEDULE BELOW AND SERIES # A600 • FOR DOOR TYPES, WALL OPENINGS, SCHEDULES & DETAILS TO SHEET # G-A801 • FOR CURTAIN WALL, WINDOW, AND GLAZED DOOR TYPES REF. TO SERIES # A800
B01
t
4200
1951
2535 269
4200
1664
4200
t
2700
t t
2650
t t
1500
8150
1200
4200 250
t
4200
2650 1250
IRRIGATION WATER TANK
CLIENT:
B
tt
tt
PROJECT NAME:
tt
STAIR NO.(01)
tt tt
H
B01
B01 B-01
A
UP
B01
B01 B-66
AL AHSA - KINGDOM OF SAUDI ARABIA
tt
DRAWING TYPE
tt
UP
HOTEL BUILDING
4200
PARTIAL (P1) PARTIAL (P2)
CONSULTANT:
K
B01 2150
SERVICE RM
DESIGN SERVICES FOR HOLIDAY INN HOTEL AND SUITES
J
B01-A401
tt
B01 B-65
B01 B-63
B01 B-62
ROAD WIDTH 20.00 M
A B01-A202
13 G-A902
tt
6950
7000
1525 RAW WATER TANK
GRAY WATER TANK
PRODUCT GRAY WATER TANK
ROAD WIDTH 80.00 M
4200
tt tt
M F3 F1 1a 6 51
RECESSED FIRE HOSE CABINET DETAIL
tt
tt
tt
tt
tt
tt
t
EL. 96.00 BSMT FFL
SAB
PM
4200
3250
850 1150
1800
t
2875 EL. 96.00 BSMT FFL
SAB SAB
AZE AZE YMEM
CHECK
4200 37800
2100
1750 1100
t
2050
t t
1750
200
t
t t t
2700
t
2750
6200
t t t
2600
3050 2960
t t
2100
t
t t t t t
t t t t t
1060
3050
3190
t
t
3190
1800
t
t t
t t
2800
t t t
2900
t
1850
t
tt tt
tt
t
2000 300
t
2000
15750
t
3825
t t
t
2064
t
t
A B01-A405
BY
P1
A
1800
t
3090
t t t
t t
2350
650
t
910
700
t t
2810
4750
1600
t
t
8260
t
t
425
t
3900
t t
t t
1600
4300
t
t
t
t
t
t
t
bi 35 s 1
t
t
t
t
t
t
B-56 B01
t
t
STAIR NO(03)
t
t M A1 1 6 21
t
t
t
t
12300 t
t
2162
t
b 20 s -
UP
t
890
600 1000
1050
2800
t
b 20 s 1
B01 B-73
t
t
8050
t
4000
TRAINING RM
B01 B-54
t
2450
2000
850
STAFF DINNING
t
3950
COLD
t
4200
2535
HOT
WALL OPENING
t
3600
tt
t t t t
750
DIRTY DROP OFF 1250
t
700
1350
b 20 s -
t
b 20 s 2
t
b 20 s 1
t
tt
3090
t
3600
b 20 s 1
t
B01 B-02
2950
t
tt
1510
t
t
t
t
t
1338
tt
1600
t t
t
1450
t
t
5610
tt
tt
5060
6200 11500
t
t
CORRIDOR
b 20 s 1
EL. 96.00 BSMT FFL
tt
200
t
tt
3230
9300 1450
MF C1 1a 6 11
t
tt
2200
M A1 1 5 21
t
OPEN ABOVE b 10 s -
t
tt
5850
1150
2550
750
t
t
M F1 A1 1 6 41
M A1 1 5 21
M F1 F1 1a 6 1
MF C1 1a b 20 s 6 13 1
tt
t t
t
t
t
4200
t
t
t
t
4200
1549
t
t
1300
1100
1580
OADS
DATE
(B01) HOTEL BUILDING
G
tt
6300
t
t
4200
2100
t
350
t
850
t
1150
t
695
t
1500
t
2850 2600
t
1550
t
1350
t
4200
t
tt
t
tt
tt
t
tt
t t
tt
tt
t
tt
tt
t
tt
tt t
t
JAN
B01 B-55
B01 B-04
GD05
JS
B01 B-70
CORRIDOR t
tt
3020
t
tt
t
M F2 A1 1 6 21
t
tt
t
b 20 s - b 10 s 2015 1
2035
MADD MADD
FEB. 2019
ISSUED FOR
B01
MEETING ROOM
b 15 s gb12 b 20 s -
APR. 2019 MAR. 2019
BASIC TENDER
F
tt
ph - p -
FINAL TENDER STAGE
A
KEY PLAN
tt
M A1 1 3 31
FINAL TENDER STAGE
B
REVISION SCHEDULE
B01
gb12 -
4400 4050
350
t
t
1700
GD05
B01 B-05
t
t
t
B01 B-03
b 20 s -
t
t
2850
b 20 s -
INTERVIEW RM
CORRIDOR b 10 h -
1200
DISH WASH
gb12 -
b 10 s 6100 -
t
t
8300
gb12 -
B01
REV.
E
B01
tt
b 15 s -
t
t
t
t
M A1 1 3 31
t
t
t
2700
B01 B-13
GD05
t
t
t
CONCRETE STEP
b 20 s -
gb12 -
B09 B-09
DIRECTOR OF HUMAN RESOURCE
gb12 -
b 20 s -
3750 4400 DIRECTOR OF PR
b 20 s -
t
t
3050
1 G-A903
350
t
t
t
DOCK BUMPERS DETAILS
gb12 -
GD05 ph - p -
6100
1 B01-A212
B B01-A501
1600
b 10 s -
D
B01
B01 B-06
b 20 s -
t
t
2800
M C1 1a 5 13
t
t
t M F1 E1 1 6 1
C
B01 B-08
t
t
4200
b 15 s -
STAFF ENTRANCE
DOCK LEVELER
C
t
ADMINISTRATION ZONE
t
t
37800
B01 B-12
b 20 s b 10 s -
B01 B-33
1700 b 20 s 1
t
MALE STAFF LOCKERS & CHANGE ROOMS
t
t
UP
gs 6 h -
t
CHEMICAL STO
B01 B-07
t
t
B01
t
t
1000
UP
gs 6 h -
SALES MANAGER
BEVERAGES
M F3 E1 1a 6 51
gs 6 h -
b 20 s 1
M F1 A1 1 6 31
2000 FEMALE STAFF LOCKERS & CHANGE ROOMS
B01 B-31
t
t
t
UNIFORM ISSUE
4900
b 20 s 1
t
b 20 s 1
t
tt
b 10 s -
M F2 H2 1 7 25
t
t
M F2 A1 1 6 21
t
t
t
200
t
M C1 1a 5 13
B01 B-11
M F1 A1 1 6 31
B01 B-57
M F2 A1 1 6 21
t
t
t
t
M F1 E2 1 6 2
t
8400
t
b 20 s 1
1800
t
t
t
1800
5800
1800
t
LOBBY
SH01
b 20 s 1
gs 6 h -
DIRECTOR OF MARKETING
t M F2 A1 1 6 21
B01 B-17
B01 B-72
t
M C1 1a 5 13
t
700
t
t
t
t
t t
3800 STEWARDING STO
t
t
HC
b 20 s 1
t
t
gs 6 h -
t
t
t
t
4200
t
t
t
b 20 s 1
t
t
t
t
ELEV. NO. ( 1 ) TYPE ( A ) (Service ELEV.)
800
t
1750
t
4200
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t t
450
t
tt
4200
M F1 E3 1 6 2
t
B01 B-10
t
t
1800
tt
4200
t
tt
tt
tt
B01 B-14
b 20 s 1
t
3850 FINANCIAL MANAGER
t
t
t
tt
2150
t
CORRIDOR ABLUTION
b 20 s 1
t
tt
G-A903
tt
t
t
6
GUARDRAIL DETAIL DETAIL
tt
t
G-A903
t
SHOE RACK
t
B01 B-30
tt
t
B01 B-68
t
t
t
t
b 20 s 1
DN
4
B01 B-43
W03
M F1 E1 1 5 11
bi 35 s -
t
1800
t
CARD WET WASTE READER CHILLED STO
B01 B-51
b 15 s b 20 s -
t
ELEV. NO. ( 2 ) TYPE ( B ) ( FIRE ELEV.)
t
SH01
EL. 94.80 FFL
t
t
1700
900
t
t
SECURITY OFFICE & TIME KEEPER
t
t
t
LOADING W02 AREA
5000
t
2900
tt
M E1 1 5 11
t
CORRIDOR
CLEANER'S STO
tt
tt
b 20 s 2
t
b 20 s 1
M F3 A1 1 6 21
B01 B-53
3900
EL. 96.00 BSMT FFL
tt
3200 RECYCLING ROOM
t
b 10 s -
B01 B-69
t
b 20 s 2
900
tt
t
tt
M A1 1 5 21
t
tt
b 20 s -
t
• ALL FRONT OF HOUSE DOOR DETAILS ARE FOR REFERENCE ONLY, FOR FINAL INPUT REFER TO INTERIOR DESIGN DRAWINGS.
b 20 s 1
200 t
2600
b 20 s 1
b 20 s 1
1400
tt
B01-A406
CORRIDOR
tt
M F3 A2 1 6 22
tt
1300
tt
tt
3750 800
M F2 A1 1 6 21
b 20 s 1
7000
t
2000
tt
B01-A501
5800
B01 B-74
M F2 A1 1 6 21
tt
B01 B-47
tt
GARBAGE ROOM
b 20 s 2
tt
CORRIDOR
9250
t
M F3 E2 1 6 2
EL. 96.00 BSMT FFL
8200
tt
M F2 A2 1 6 24
t
t
RAISED FLOOR
A
M F1 A13 1 6 27
t
1400
EL. 96.00 B. F.F.L. SERVER ROOM & EL. 95.45 STC ROOM T.O.SS. B01 B-29
t
b 20 s 1
t
K
B01
t
GOODS RECEIPT DECANT
t
tt
HC 2000
t
A
MF A1 1 6 23
t
t
M F2 A1 1 6 21
t
EL. 96.00 BSMT FFL
W01
t
b 15 s -
t
b 20 s 1
t
PARTIAL (P1) PARTIAL (P2)
1800
M F1 E2 1 6 2
tt
B01 B-52
t
tt
b 20 s 1
B01 B-48
L
b 20 s 2
tt
2300
RECEVING OFFICER OFFICE B01 B-50
B01
FISH D/F
tt
tt
M F1 A1 1 6 11
b 20 s 1
t
B01 B-26 tt
CHUTE
t
b 20 s -
J
B01
A
1675
B01 B-34
tt
B01 B-42
t
t
PRAYER RM
800
B01 B-41
tt
375
FISH PREP
M F1 E1 1 6 21
t
t
2300
t
t
b 15 s -
B01 B-49
t
t
RAW-WASH
t
t
H
t
M F2 A1 1 6 21
DIRTY LINEN
ELEC RM
b 20 s - 2450
1900 t
M F1 E5 1 6 21
t
b 20 s -
2400
2000
B01 B-40
b 15 s -
B01 B-27
b 15 s -
B01 B-46
B01
575
FISH CHILLER
M E1 1 5 21
FRUIT&VEG. CHILLER
t
t
B01 B-24
b 15 s -
800
t
t
BEVERAGE STO
B01 B-25
B01 B-38
G
t
t
2150
BEVERAGE CHILLER
B01 B-35
CORRIDOR
B01
t
t
4500 GENERAL D/F
B01 B-44
b 20 s 1
M A1 1 5 21
2300
M F2 A1 1 6 21
t
b 20 s -
VEG PREP
B
1300
COMM
B01 B-28
b 20 s -
5800
M E1 1 5 21
2000
t
525
t
t
B01 B-39 M A1 1 5 21
b 20 s b 15 s 1 1 M F1 E1 1 6 1
t
DRY STO
b 20 s -
650
2300
t
t
B01 B-37
t
t
MEAT PREP
1625
b 20 s -
M F2 A3 1 6 22
CABINET DETAIL
4000
B01 B-45
M E1 1 5 21
975
900
t
t
t
t
t
t
t
t
2750
MEAT CHILLER
G-A902
EL. 96.00 BSMT FFL
t
MACHINE PAD
b 20 s 1
t
t
t
B01 B-18
850
t
B01 B-36
t
MEAT D/F
MACHINE PAD FOR DETAIL REFER TO SE & HVAC DRAWINGS
B01 B-32
b 20 s 1 M F1 A1 1 5 11
13 RECESSED FIRE HOSE
M F3 E1 1a 6 51
3950
B01-A212
B01
b 20 s -
3200 TELEPHONE OPERATOR
t
SECURITY SYSTEMS
400 B01 B-16
4850 MAINTENANCE WORKSHOP
t
EL. 98.65 TOSS
t
• ALL KITCHEN, LAUNDRY AND PANTRIES EQUIPMENTS ARE FOR REFERENCE ONLY, FINAL INPUT SHALL BE BY SPECIALIST
797
340
b 20 s 1
t
E
B01 B-19
tt
UP
t
EL. 98.00 F.F.L.
t
2800 CHIEF ENGINEERING OFFICE
M F1 A1 1 5 11
b 20 s 1
t
tt
tt
B01-A403
B01
t
tt
tt
UP
A
B01 B-23
3760
t
tt
M F3 F1 1a 6 51
MACHINE PAD
• FOR DRAINAGE REFER TO PG. DRAWINGS
B
3680
B01 B-15
t
tt
EL. 98.00 FFL
STAIR NO.(02)
A
b 20 s b 20 s 1
t
D
MACHINE PAD
t
t b 20 s 1 M F2 A3 1 6 22
FOR LEVEL REF. TO CE DRAWINGS
B01
B01-A206
M F1 A1 1 5 11
t
B01-A214
t
2800
t
B01 B-22
t
1800
t
ENGINEERING STO
t
t
t
b 20 s 1
6100
t
M F2 A3 1 6 22
1008
t
t
• UNO DOOR JAMB IS @ 200mm FROM NEAREST ADJACENT WALL FACE
B01
MECHANICAL ROOM
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
C
1
b 20 s 1
B01 B-20
1650
3193
3560
t
ASSITANT ENGINEERING OFFICE
B01
F
1732
t
B
B01
1
MACHINE PAD 2329
MACHINE PAD
t
B01 B-21
MACHINE PAD
t
2950
FURNITURE STO
• FOR TOILET FIXTURES & ACCESSORIES REF. TO SHEETS # G-A501
26200
t
11100
UP
B01
ZFP PROJECT NO.:
L
B01 EL. 93.25 T.O.SS
J17-03600
PM-KSA: SAB
PA: HMG / YMEM
PD:
---
ID: AMKA
PG: GSAM
CE: ASWO
PM:
AESM
SE: MHBK
HC: MFMT/MYMA
LS: ASKD
HV: YMSS
LC: AEMI
TITLE:
A B01-A102
BASEMENT PARTIAL PLAN (1 OF 2)
1
5550
5550
B01 B-64
5550
C
• FOR MISCELLANEOUS DETAILS REF. TO SERIES # G-A900
A
A
BASEMENT PARTIAL PLAN (1 OF 2) 0
B01-A209
1
5
SCALE 1:100
1:100
2
3
4
10 METERS
5
SCALE:
1 : 100
SHEET NO.:
B01-A102
SHEET REVISION:
B01
1
2 01
3
02
B01
03
B01
04
B01
05
B01
4
06
B01
1
07
B01
A
08
B01
B01-A201
1
5
09
B01
10
B01
NOTES:
11
B01
• DO NOT SCALE DWGS DIMENSION GIVEN SHALL GOVERN.
B01
• UNO DIMENSIONS ARE IN MILLIMETERS AND ELEVATION / SECTION LEVELS ARE IN METERS.
B01-A209
B01-A216
42000 4700
3700
4200
4200
4200
4200
4200
4200
4200
• GROUND FLOOR FINISH LEVEL(GROUND FFL 100.00) AS INDICATED IN DRAWINGS EQUIVALENT TO LEVEL 131.10 m AS SHOWN IN SITE DRAWINGS.
4200
• FOR WALL TYPES & DETAILS REF. TO SHEET # G-A701 • FOR WALLS SOUND TRANSMITTAL, REFER TO STC SCHEDULE AT SHEET # G-A702
D
D EL. +107.10 T.O.PARAPET
• FOR CURTAIN WALL, WINDOW, AND GLAZED DOOR TYPES REF. TO SERIES # A800
SLOPE TO DRAIN 1% (TYP.)
6 G-A901
4
GLAZED RAIL FIXATION DETAIL (BESIDE WALL) FEMALE BATHROOM
G-A904
MALE BATHROOM
LOCKERS
16600 7300
1000
400 300
800
875 325 800 400 1000
4200 4200
700
B01 1-41
ST.KING RM
B01 1-43
BATH RM
B01 1-44
800
4200 200 200 1000 2000 800
gd10 s 1
1200
4200 800 400 1000 800
gd10 s 1
4200 200 200 1000 2000 800
gd10 s 1
1200
4200 800 400 1000 800
200 200 1000
gd10 s 1
2000
4200 800
4200
UP
37800
1750
830
gs 6 c -
PROJECT NAME:
G
B01
bi 35 s -
DESIGN SERVICES FOR HOLIDAY INN HOTEL AND SUITES
4200
ID
1000
2525
7225
5200
4700
300
2025
650
B01-A202
bi 35 s -
gs 6 c -
1925
AL AHSA - KINGDOM OF SAUDI ARABIA
5 G-A902
700
650
b 20 s 2 FHC
ID
2250 970 gs 6 c -
PANTRY
RECESSED FIRE HOSE CABINET DETAIL
13
CONSULTANT:
A
B01 1-01
J
B01
B01 1-46
SUITE ONE BEDROOM
PARTIAL (P1) PARTIAL (P2)
UP
gd10 s -
4100 800 1900
PA: HMG / YMEM
PD:
---
ID: AMKA
PG: GSAM
CE: ASWO
AESM
SE: MHBK
HC: MFMT/MYMA
LS: ASKD
2
3
4
5
HV: YMSS
LC: AEMI
FIRST PARTIAL PLAN (1 OF 2)
10 METERS
SCALE:
1 : 100
1
J17-03600
PM-KSA: SAB
PM: TITLE:
5
SCALE 1:100
1:100
ZFP PROJECT NO.:
300 0
FIRST PARTIAL PLAN (1 OF 2)
A
B01-A401
UP
POWDER RM
HOTEL BUILDING
G-A902
B01 1-45
200 200 1000 1000
B01
M F3 F1 1a 6 53
STAIR NO(01)
1800
ID
DRAWING TYPE
H
gd10 s 1
4200
1095
ACCESS DOOR EL. 106.60 1st FFL
ID/F1
2025
BATH RM
BEDROOM
B01 1-02
2275
b 15 s 2
gd10 s 1
900
2275
gd10 c gs 6 c -
B01 1-42
1330
6975
2025
650 1205
1850 7175
gd10 c gs 6 c -
ST.KING RM
B01 1-40
1000 ID
2525
2270
BATH RM
b 20 s 2
gd10 s 1 b 15 s 2 b 20 s 1
900
BEDROOM
ID/F1
1930 470
gs 6 c gd10 c -
4200
700
700 1750
5200 4700
830 350
7225
ID
b 20 s 2
A
bi 35 s -
6975
B01 1-38
gd10 s 1
925
470
BATH RM BATH RM
gd10 s 1
B01
950
4200
2320
845
b 15 s 2
575
B
gd10 s -
ID
2250
ID
575
ROAD WIDTH 20.00 M
4200
B01 1-39
b 15 s 2
2000
1950
5200
ST.KING RM
B01 1-36
b 20 s 2
gs 6 c -
B01 1-05
ID
4700
ST.KING RM
gd10 c gs 6 c -
2300
1455
1900 ID
POWDER RM
470
2270
470 gs 6 c gd10 c -
2525
1000
2270
gd10 s
B01 1-06
2250
1025
1 SUITE ONE BEDROOM B01 1-04 PANTRY
POWDER RM
gs 6 c -
ID/F1
600 600
2525
ID
2275
1025
4350
LIVING AREA
LIVING AREA
1950
4700
1930
1925
875
1930
B01 1-37
SAB
F
2000 4200
ID/F1 gd10 s 1
950
SUITE ONE BEDROOM PANTRY B01 1-07
1330
1930 650
2525
b 10 s gd10 s 2 1
ID/F1
875 2525
870 1205
b 20 s 2 ID/F1
gd10 s 1
2250 1700
b 20 s 1
gd10 s 1
600 600 ID
gs 6 s ID
950
LIVING AREA
5550 800
M F1 F1 1a 6 1
2000
gd10 s -
ID
bi 35 s -
B01 1-03
GD06
4200
B01 1-09
gs 6 s -
E
PLANTER
BALACONY
bi 35 s -
1025
BATH RM
ELEV. NO. ( 3 ) TYPE ( C ) ( Guest ELEV.)
4700
B01 1-35
9570
930
B01 1-34
B01 1-10
EL. 106.60 1st FFL
B01 1-11
1025
BEDROOM
gd10 s 1
ELEVATOR LOBBY
ID/F1
CORRIDOR
b 15 s 1
BATH RM
LINEN STO
B01 1-33
2200
2450 785
LOST & FOUND
ELEV. NO. ( 3 ) TYPE ( C ) ( Guest ELEV.)
ELEV. NO. ( 1 ) TYPE ( A ) (Service ELEV.)
b 20 s 1
2245
2270
2500
b 15 s -
7150 LAUNDARY
M F1 A1 1 6 1
875
2060
1550 1400
b 20 s -
SAB SAB
PM
ROAD WIDTH 80.00 M
B01
5350 bi 35 s -
4200
EL. 106.60 1st FFL
2300
900
2000
2600
b 20 s 1
ID/F1
875 M A1 1 5 21
470
1000 180 220 9550 2000
b 20 s 2
M F2 A1 1 6 21
MACH PAD
ELEV. NO. ( 2 ) TYPE ( B ) ( FIRE ELEV.)
470
M F2 A12 1 6 21
ELEVATOR LOBBY
ELEC RM
M F2 A1 1 6 23
B01 1-29
2945
975
M F2 A1 1 6 21
M F2 A1 1 6 23
SERVICE LOBBY
900
b 20 s 1
B01 1-13
900
AZE AZE YMEM
CHECK
P1
6250
GD06
1205
2200 3950 1440
220 600 1105
2125
M F2 A1 1 5 11
b 15 s 1
2075
COMM RM
1800 1200
2225
B01 1-08
ELEV. NO. ( 3 ) TYPE ( C ) ( Guest ELEV.)
CHUTE HC 2000
BY
CLIENT:
BALACONY b 20 s 2
b 20 s 2
B01 1-12
b 20 s 2
B01 1-14
7100
M F1 A1 1 6 21
M F2 A1 1 6 21
b 20 s 2
ME LC
3350
B01 1-32
900
b 20 s 1
2180
2600
180 220 1000
B01 1-30
2400
1220
PARTIAL (P1) PARTIAL (P2)
B01 1-15
4000
M F2 A2 1 6 21
800
J
B01
HOUSEKEEPING/ CLEAN LINEN
OADS
DATE
(B01) HOTEL BUILDING
1
UP
G-A902
PLANTER
PLANTER
8250 ID/F1
b 20 s 2
14
CAST IN PLACE SOLID CMU PLANTER BOX DETAIL 6250
b 20 s 1
7250 b 20 s 1
b 20 s -
900 LAUNDARY PUMP RM MANAGER
A B01-A406
GD02
b 15 s 1
2320
1000
b 20 s 1
EL.+106.35 TOSS
B01 1-16
6975
2670
3030 2100
b 20 s -
b 20 s 1
2800
2000
1500
B01 1-27
2100
1020
B01 1-28
5000
1000 400 780
MALE MALE PRAYER RM ABLUTION
800
4200
bi 35 s -
A
4900
RECEPTION
M F1 F1 1a 6 1
HMG MADD
FEB. 2019
ISSUED FOR
B01-A212
bi 30 s 1
1900
APR. 2019 MAR. 2019
BASIC TENDER
D
KIDS POOL
bi 30 s 1
bi 30 s 1
800
b 15 s 1
ID/F1
2800
2000
3000
b 20 s -
800
L01
1175
2100
FINAL TENDER STAGE
A
B01
EL. +106.25 TOSS
B01 1-18
2150
b 20 s 1
ID/F1
B01 1-26
4850
1220
2225
H
B01
EL. 106.60 1st FFL
b 20 s 2
4850
B01 1-31
SWIMMING POOL DECK
STAINLESS STEEL HANDRAIL FOR DETAIL REFER TO LS
UP M F2 F1 1a 3 21
FINAL TENDER STAGE
B
KEY PLAN
2500 900
b 15 s 2
FEMALE FEMALE PRAYER RM ABLUTION B01 1-25
bi 30 s 1
B01
REV.
REVISION SCHEDULE
B01 1-49
FHC
180
UP
W F1 B1 2 5 1
EL. +107.05 FFL
JUICE BAR
B01 1-50
650
b 15 s 2
800
4200 4200
COMPRESSOR
B01 1-23
1730
M F3 F1 1a 6 53
UP
BAR PANTERY
CORRIDOR ID/F1
EL. +106.80 TOSS
PLANTER
4600
B01 1-17
1680
1220
b 10 s 1
C
B01
EL. +108.20 T.O.PARAPET
OUTDOOR COURTYARD
4200
EL.+106.50 TOSS PLANTER
PLANTER
650
GYM
B01 1-22
EL. +105.85 TOSS
OPEN ABOVE
300X100 mm SOLID WOOD POSTS WITH VENEER FINISH FIXED AS PER MFTR (TYP)
6870
B01 1-48
2600
BATHROOM
800 200
4200 37800
bi 35 s -
4200
975
9400
TYPICAL MOVABLE PLANTER FOR DETAIL REFER TO LS DRAWINGS
2525
1000
b 10 h -
2150
1000 180 220
ID
2325 b 20 S -
B
B01 C
SWIMMING POOL SHOWER
b 15 h -
6975
2050
b 15 s -
PLANTER
b 20 s -
1945
800
1750
L01
G
B01-A108
2245 1150
ID
1200
1000 400 780 220 1000
B01 1-24
B01
A
1850
1930
2450
ID
TYPICAL NOZZLE LOCATION FOR DETAIL REFER TO PG DWG'S
UP
SWIMMING POOL DECK FOR FINISH REFER TO LS. DWGS
b 10 s -
5 R197 R2325
STAIR NO(02)
B01
A
• ALL FRONT OF HOUSE DOOR DETAILS ARE FOR REFERENCE ONLY, FOR FINAL INPUT REFER TO INTERIOR DESIGN DRAWINGS.
B01
EDGE OF BUILDING ABOVE bI 35 s -
ID
800
4200
A B01-A403
B01
B01-A206
• ALL KITCHEN, LAUNDRY AND PANTRIES EQUIPMENTS ARE FOR REFERENCE ONLY, FINAL INPUT SHALL BE BY SPECIALIST
b 20 h -
ID
2250
bi 35 s -
F
b 20 s -
800
4200
D
B01
1
POWDER COATED ALUMINUM POST (TO MATCH WOOD) FIXATION AS PER MFTR.
LINE OF SHADE ABOVE FOR DETAIL REFER TO LS
EL. +108.20 T.O.PARAPET
975
950
CHANGING
2000
B01
B01-A214
1725
900
4200
C
425
1600
CHANGING
B01-A212
• FOR DRAINAGE REFER TO PG. DRAWINGS
GLAZED RAIL FIXATION DETAIL
G-A904
LOCKERS
b 15 s -
b 20 s -
ID
L01
ID
B
• UNO DOOR JAMB IS @ 200mm FROM NEAREST ADJACENT WALL FACE
SLOPE TO DRAIN 1% (TYP.)
3
B01 1-19
1230 4350
ID
b 10 h -
b 15 s -
ID
3900 1000
CHANGING
1950 bi 35 s -
bi 35 s -
E
• FOR TOILET FIXTURES & ACCESSORIES REF. TO SHEETS # G-A501
1025
2000
799
4200
B
B01
1
B01 1-47
• FOR MISCELLANEOUS DETAILS REF. TO SERIES # G-A900
SCUPPER DETAIL
A
1801
B01
C
B01 1-20
bi 20 s -
380
A
HC BATHROOM
• FOR WALL FIRE RATING REFER TO SCHEDULE BELOW AND SERIES # A600 • FOR DOOR TYPES, WALL OPENINGS, SCHEDULES & DETAILS TO SHEET # G-A801
EL. +106.50 TOSS
SHEET NO.:
B01-A108
SHEET REVISION:
B01
1
2
3
4
5 NOTES:
A
1
B01-A201
01
02
03
B01
• GROUND FLOOR FINISH LEVEL(GROUND FFL 100.00) AS INDICATED IN DRAWINGS EQUIVALENT TO LEVEL 131.10 m AS SHOWN IN SITE DRAWINGS.
04
B01
• UNO DIMENSIONS ARE IN MILLIMETERS AND ELEVATION / SECTION LEVELS ARE IN METERS.
B01-A209
B01-A216
B01
• DO NOT SCALE DWGS DIMENSION GIVEN SHALL GOVERN.
1
05
B01
06
B01
07
B01
D
08
B01
09
B01
10
B01
• FOR WALL TYPES & DETAILS REF. TO SHEET # G-A701
11
B01
B01
• FOR WALLS SOUND TRANSMITTAL, REFER TO STC SCHEDULE AT SHEET # G-A702
D
42000 4700
3700
4200
4200
4200
4200
4200
4200
4200
• FOR WALL FIRE RATING REFER TO SCHEDULE BELOW AND SERIES # A600 • FOR DOOR TYPES, WALL OPENINGS, SCHEDULES & DETAILS TO SHEET # G-A801
4200
• FOR CURTAIN WALL, WINDOW, AND GLAZED DOOR TYPES REF. TO SERIES # A800 • FOR MISCELLANEOUS DETAILS REF. TO SERIES # G-A900 • FOR TOILET FIXTURES & ACCESSORIES REF. TO SHEETS # G-A501 bi 35 s -
1900
400
4200
2000
4200
4175
400 1000 400 4001000 400 2000 400 400
4200 4200
2000 400 400 2000
UP
4200 1925
gs10 c gs 6 c -
BATH RM
ST.KING RM
4200 400 1000400 4001000 400 2000
TWIN BEDROOM
B01 8-44
gd10 s 1
gd10 s 1
400 400
2000
4200
gd10 s 1
4200
400 1000 400 400 1000 400
2000
BEDROOM gd10 s 1
B01 8-45
400 400
2000
37800
gd10 s 1
1100
EL. 132.40 8th FFL
H
RECESSED FIRE H CABINET DETAIL
B01
L01
L01
A
DESIGN SERVICES FOR HOLIDAY INN HOTEL AND SUITES AL AHSA - KINGDOM OF SAUDI ARABIA
4200
M F3 F1 1a 6 51
B01 8-49
B01 8-01
HOTEL BUILDING
B01-A401
J
PANTRY
SUITE ONE BEDROOM B01 8-50
LIVING AREA
A ZFP PROJECT NO.:
1900 300
K
B01
400
L01
CONSULTANT:
B01
UP
4100
400 1000 400 400800 800
UP
DRAWING TYPE
A
STAIR NO(01)
EIGHTH FLOOR PLAN 1:100
A
1
B01-A205
B01-A209
PA: HMG / YMEM
---
ID: AMKA
PG: GSAM
CE: ASWO
AESM
SE: MHBK
HC: MFMT/MYMA
LS: ASKD
5
SCALE 1:100
3
4
LC: AEMI
EIGHTH FLOOR PLAN
METERS
1 : 100
2
HV: YMSS
10
SCALE:
1
J17-03600
PM-KSA: SAB PD: PM: TITLE:
bi 35 s -
0
B01-A116
PROJECT NAME:
2000
1925
825
1075
b 20 s 2 b 20 s 2
G
800
700 2525
ID
875
900
B A
2000
7150
1000 400400
350
1350
650 650
gs 6 c -
gd10 c -
4200
bi 35 s -
bi 35 s -
1950 POWDER RM
2250
ID
gs10 c gs 6 c -
4700
B01 8-41
2000
SAB
PM
B01
ID
B01 8-47
1930
650
950
1930 gs 6 c gs10 c -
900
2275
B01 8-46
ST.KING RM
400 400
SAB
AZE YMEM
CHECK
B01-A202
4200
gs10 c gs 6 c -
b 15 s gd10 s 2 1
b 20 s 2
900
BATH RM
B01 8-43
1930
BEDROOM
4200
ID
2270
b 15 s 2
gd10 s 1
5150
B01 8-42
LIVING AREA gd10 c -
BY
ROAD WIDTH 20.00 M
bi 35 s -
6975
ID
BATH RM
900
ID/F1
1971
ID
5
G-A902
1000
650 2270
2525
2525
2270
b 20 s 2
7175
gs 6 c gs10 c -
OADS
DATE
CLIENT:
F
B01
ID/F1
925
4650
ID
ID
BATH RM
ID/F1
600 600
450
BATH RM
450
ID
SHAFTS ACCESS DOOR
b 15 s 2
B01 8-48
875
2525
CORRIDOR
gd10 s 1
ID/F1
875
gd10 s 1
gs 6 c gs10 c -
2275
2025
750 750
b 15 s gd10 s 2 1
b 20 s 2
4700
6975
1354 900
2200
ID
ID
2525
1000
1950
450
b 20 s 2
gd10 s 1
2525
b 15 s 2
600 2725
2275
B01 8-40
SUITE ONE BEDROOM
gs 6 c -
1950
2250 900
650
gd10 s 1
1925
750
900
2250
PANTRY
gs 6 c -
2275
ID
EL. 132.40 8th FFL
400
ID
300
1925
650
7225
ID
-
gs10 c -
9275
4600
ELEV. NO. ( 3 ) TYPE ( C ) ( Guest ELEV.)
4700
B01 8-08
ELEV. NO. ( 3 ) TYPE ( C ) ( Guest ELEV.)
5200
400 1000 400 400 1000 400 2000 400400 2000 400 1000 400 400 1000 400 2000 4200 4200 4200 4350 SUITE SUITE gd10 c gd10 s ONE BEDROOM gd10 c ONE BEDROOM 1 B01 8-06 B01 8-03 BEDROOM BEDROOM POWDER POWDER LIVING AREA LIVING AREA BATH RM BATH RM RM RM PANTRY B01 8-02 gs 6 c B01 8-07 B01 8-04 PANTRY B01 8-05
gd10 s 1
5200
2000
2025
400
ID/F1
2525
900
gs 6 c -
500
L01
4200
4100 2300
2275
2450
2000 400 2700 LIFT LOBBY
6975
B01 8-39
bi 35 s -
L01
1000 400 ELEV. NO. ( 3 ) TYPE ( C ) ( Guest ELEV.)
ID
b 20 s 2
b 15 s 2
MADD
FEB. 2019
ROAD WIDTH 80.00 M
(B01) HOTEL BUILDING
4200
1930
bi 35 s -
400 1000 400
1950
2000 4200 4200
400 1000400 4001000 400
625
2275
875 875
2250 675 600 2250 900 2275 575 3900 3347 ID
POWDER RM
gd10 s 1
b 20 s -
L01
B01 8-38
1000
400 400
A B01-A406
6975
6975
3350
M F2 C1 1a 6 23
4200 400 1000400 4001000 400 2000 875
L01
D B01-A501
400
400
800100
B01
b 20 s 2
MAR. 2019
ISSUED FOR
B01
ELEV. NO. ( 1 ) TYPE ( A ) (Service ELEV.)
2300
BASIC TENDER
B01-A212
E
ID/F1
b 20 s 2
1200
2515 ID
2000 ELEC RM
FINAL TENDER STAGE
A
KEY PLAN
1
bi 35 s -
4700
1175
gs10 c -
LOBBY
B
REV.
REVISION SCHEDULE
650
1475
B01 8-37
D
B01
ELEV. NO. ( 2 ) TYPE ( B ) ( FIRE ELEV.)
b 20 s 2
5200
875 875 600 300615
525
bi 35 s -
HVAC
B01 8-09
4700
2270
1930
400 400 4250
gs 6 c -
gs 6 c -
5875 BEDROOM
2000
gd10 s 1
C C
ID/F1
1950
ID
1022 400
b 20 s 2
gd10 s 1
• ALL FRONT OF HOUSE DOOR DETAILS ARE FOR REFERENCE ONLY, FOR FINAL INPUT REFER TO INTERIOR DESIGN DRAWINGS.
B01
5000
M F2 A9 1 6 21
CHUTE
B01 8-10
M F2 C1 1a 6 23
675
BATH RM
8400
B01 8-11
b 20 s 2
SD
• ALL KITCHEN, LAUNDRY AND PANTRIES EQUIPMENTS ARE FOR REFERENCE ONLY, FINAL INPUT SHALL BE BY SPECIALIST
B
RH X2
HC
COMM RM
1425
PANTRY
1175
8400
LIVING AREA
gd10 c -
LC 1800
b 20 s 1
FM2
LAV2
MA8 1 3 32
b 20 s -
ME MF F4 1a 6 3
ID/F1
1450
B01 8-51
• FOR DRAINAGE REFER TO PG. DRAWINGS
B01 bi 35 s -
FD HS TPH WC-1
B01 8-12
b 15 s 2
ID
b 20 s 2
HOUSEKEEPING/ CLEAN LINEN
ID/F1
B01 8-36
gs 6 c B01 8-13 gd10 c -
ID
2800 TOILET
b 20 s 1
b 20 s 2
gd10 s 1
SUITE ONE BEDROOM
ST.KING RM
2050
650
gs10 c -
B01 8-14
450
875 2175
600 600
1930 1930
gd10 s 1
2525
gs 6 c -
gd10 s 1
900
650
4100
2000 2000
B01 8-35
4200
400 1000 400 400 1000 400
1425
gd10 s 1
1175
B01 8-33
B01 8-34
650
ID/F
2525
4700 BATH RM
2000
K
400 1000 400
4200
A
gd10 s 1
650
ID
gd10 c -
ID/F
BATH RM
ST.KING RM
2525
1175
gs 6 c -
B01 8-32
2000
4200
J
B01
ID/F
135°
B01
ST.KING RM gd10 s 1
4200
4200
H
650
gs10 c -
ID
gd10 s 1
ID
B01 8-31
800
4700 BATH RM
b 15 s 2
BATH RM
6975
400 400
G
B01
gs10 c -
2270
4200
A B01-A206
gs 6 c -
B01 8-30
gd10 s 1
b 20 s 2
B01 8-15
BEDROOM gs 6 c -
b 20 s 2
2525
2175
B
bi 35 s -
400 1000 400 4001000 400
F
37800
B01-A212
4200
4200
2000
4700 ST.KING RM
1000
EL. 132.40 8th FFL
2050
400
B01
B01
4700 BATH RM 300
• UNO DOOR JAMB IS @ 200mm FROM NEAREST ADJACENT WALL FACE
A
B01
bi 35 s -
L01
2400
b 20 s 2
DN
5200
2525
b 15 s 2
gd10 s 1
B01 8-17
950
L01
2640
4200
B01-A403
LIVING AREA PANTRY POWDER RM ID
FHC
E
1
gd10 s 1
6 51
B01 8-16
gs 6 c -
ID
2025
900
STAIR NO(02) F1M F31a
DN B01 8-29
A
gd10 s 1
SUITE ONE BEDROOM
1925
B01
gs10 s -
6900 6975
650 b 15 s 2 gd10 s 1 b 20 s 2 b 20 s 2
B01 8-19
2270
4650
ID
ID/F
ID
2525
TWIN BEDROOM
gs 6 s -
2025
B01 8-27
ID/F
1930
600 600
1925 gs 6 c -
B01 8-26
BATH RM B01 8-18
ID/F
gd10 s 1
s
B01 8-20
800
650
B01 8-28
gd10 s 1
1780 gs10 c -
BATH RM
TWIN gd10 BEDROOM 1
2525
CORRIDOR
RM
B01 8-21
800
875
1425
ID/F
400
D
ST.KING RM
b 15 s 2
gd10 s 1
650
ID
6975
4100
4200
bi 35 s -
1175
2525
gs10 c -
1000 400
1 B01-A214
875
gs 6 s - BATH
1925
875
B01 8-24
2000
B01
2275
gs 6 c -
1395
C
875
b 15 s 2
400 1000
gs10 s -
ID
b 20 s 2
875
BATH RM
gd10 s B01 8-25 1
gd10 s 1
1925
1925 4700
400 400
C
650
gd10 s 1
b 20 s 2
875
B01 8-22
TWIN BEDROOM
ID/F
1125
2275
BATH RM
1425
ID/F
100 1900 6900
2525
gs 6 c -
2000
4200
400 1000400 400 1000 400
B
B01
B01 8-23
1125
ID
gs10 c -
TWIN BEDROOM
4150
2000
b 20 s -
4200
4200
L01 bi 35 s -
1100
625
250
400
A
B01
300 1000 400
350
5
SHEET NO.:
B01-A116
SHEET REVISION:
B00
1
2
3
4
5 NOTES:
• ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS. • DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN.
01
B01
02
B01
03
06
05
04
B01
B01
B01
07
B01
09
10
B01
PAINT ON CEMENT PLASTER
8 G-A901
• GROUND FLOOR FINISH LEVEL(GROUND FFL 100.00) AS INDICATED IN DRAWINGS EQUIVALENT TO LEVEL 131.10 m AS SHOWN IN SITE DRAWINGS.
B01 POWDER COATED ALUMINUM POST (TO MATCH WOOD) FIXATION AS PER MFTR.
• FOR FINISHED GRADE LEVELS REF. TO CIVIL DWG'S
LADDER HOCK DETAIL
D T.O.PARAPET
VOID
• FOR EXHAUST FAN & A/C UNIT OPENING REF. TO MECH.DWG'S • FOR CURTAIN WALL,LOUVERS AND GLAZED DOOR REFER TO SERIES A800.
400 VOID
3600
1200
• FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS.
11
B01
800
400
T.O.PARAPET EL. 140.000 UPPER ROOF TOSS
B01
POWDER COATED ALUMINUM LOUVERS ON POWDER COATED ALUMINUM FRAMES ( TO MATCH WOOD )
PAINT ON CEMENT PLASTER
D
08
B01
• FOR MISCELLANEOUS DETAILS REF. TO SERIES G-A900 • FINISHES, DESIGN, COLORS & CONFIGURATION WILL BE SUBJECT TO ENGINEER /CLIENT APPROVAL
DOUBLE GLAZED CURTAIN WALL FOR DETAILS REFER TO SERIES B01-A800
4000
EL. 136.40 ROOF TOSS
DOUBLE GLAZED CURTAIN WALL FOR DETAILS REFER TO SERIES B01-A800
3600
EL. 132.40 8th FFL
EL. 128.80 7th FFL
RIYADH STONE CLADDING
C
3600
C
3600
EL. 125.20 6th FFL
EL. 121.60 5th FFL
B
FINAL TENDER STAGE
A
BASIC TENDER
REV.
MAR. 2019
MAUE
FEB. 2019
ESFG
DATE
ISSUED FOR
BY
SAB
AZE YMEM
SAB
CHECK
PM
3600
REVISION SCHEDULE
2 G-A904
44400
STONE GROOVE DETAIL
(B01) HOTEL BUILDING
UP
3600
EL. 118.00 4th FFL
ROAD WIDTH 80.00 M
KEY PLAN
ROAD WIDTH 20.00 M
EL. 114.40 3rd FFL
CLIENT:
B 3600
B
EL. 110.80 2nd FFL
4200
POWDER COATED ALUMINUM POST (TO MATCH WOOD) FIXATION AS PER MFTR. PAINT ON CEMENT PLASTER
7 G-A902
500
PROJECT NAME:
1600
1600
500
900
T.O.PARAPET EL. 106.60 1st FFL
PLASTER GROOVE DETAIL
DESIGN SERVICES FOR HOLIDAY INN HOTEL AND SUITES
6600
AL AHSA - KINGDOM OF SAUDI ARABIA
DRAWING TYPE
5000
VOID
HOTEL BUILDING
PAINT ON CEMENT PLASTER EL. 100.00 GRD FFL
A 4000
A
CONSULTANT:
FOR GRADE LEVEL REFER TO CE DWGS
ZFP PROJECT NO.:
RIYADH STONE CLADDING
EL. 96.00 BSMT FFL
PA: HMG / YMEM
PD:
---
ID: AMKA
PG: GSAM
CE: ASWO
PM:
AESM
SE: MHBK
HC: MFMT/MYMA
LS: ASKD
HV: YMSS
LC: AEMI
TITLE:
0
A B01-A205
J17-03600
PM-KSA: SAB
ELEVATION
5
SCALE 1:100
10
ELEVATIONS
METERS
1:100 SCALE:
1 : 100
1
2
3
4
5
SHEET NO.:
B01-A205
SHEET REVISION:
B00
1
2
3
4
5 NOTES:
J
K
B01
PARTIAL (P2) PARTIAL (P1)
B01
H
G
B01
B01
B01
PAINT ON CEMENT PLASTER
• FOR MISCELLANEOUS DETAILS REF. TO SERIES G-A900 • FINISHES, DESIGN, COLORS & CONFIGURATION WILL BE SUBJECT TO ENGINEER /CLIENT APPROVAL
2000
350
2800
4000
TWIN BEDROOM
SUITE FOR FLOOR ONE BEDROOM FINISHES B01 8-06 REF. TO ID DWGS BEDROOM
CORRIDOR
B01 8-45
B01 8-48
TWIN BEDROOM
2800
3600
800
EL. 132.40 8th FFL
• FOR EXHAUST FAN & A/C UNIT OPENING REF. TO MECH.DWG'S • FOR CURTAIN WALL,LOUVERS AND GLAZED DOOR REFER TO SERIES A800.
900
EL. 136.40 ROOF TOSS
SUITE ONE BEDROOM
CORRIDOR
B01 7-44
B01 7-47
B01 7-06
BEDROOM
TWIN BEDROOM
2800
3600
800
EL. 128.80 7th FFL
B01 6-47
B01 6-06
BEDROOM
C
TWIN BEDROOM
2800
3600
33900
800
EL. 125.20 6th FFL
SUITE ONE BEDROOM
CORRIDOR
B01 6-44
C
D
OPEN VOID
1200
1200 2000
G-A901
TYPICAL ROOFING DETAIL
• FOR FINISHED GRADE LEVELS REF. TO CIVIL DWG'S
800
800
400
T.O.PARAPET
3600
1
• GROUND FLOOR FINISH LEVEL(GROUND FFL 100.00) AS INDICATED IN DRAWINGS EQUIVALENT TO LEVEL 131.10 m AS SHOWN IN SITE DRAWINGS.
T.O.PARAPET SLOPE
SLOPE EL. 140.000 UPPER ROOF TOSS
• DON'T SCALE DRAWINGS, DIMENSIONS SHOWN SHALL GOVERN. • FOR LEGENDS AND SYMBOLS REFER TO COVER SHEETS.
T.O.PARAPET
D
• ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS.
F
SUITE ONE BEDROOM
CORRIDOR
B01 5-44
B01 5-47
B01 5-06
BEDROOM
TWIN BEDROOM
2800
3600
800
EL. 121.60 5th FFL
SUITE ONE BEDROOM
CORRIDOR
B01 4-44
B01 4-47
FINAL TENDER STAGE
APR. 2019 MAR. 2019
MADD MAUE
A
BASIC TENDER
FEB. 2019
AGMZ
YMEM
DATE
BY
CHECK
ISSUED FOR
TWIN BEDROOM
SUITE ONE BEDROOM
CORRIDOR
B01 3-44
B01 3-47
AZE AZE
SAB SAB SAB
PM
ROAD WIDTH 80.00 M
KEY PLAN
2800
3600
FINAL TENDER STAGE
B
REVISION SCHEDULE
800
EL. 118.00 4th FFL
B01
REV.
B01 4-06
BEDROOM
(B01) HOTEL BUILDING
B01 3-06
BEDROOM
ROAD WIDTH 20.00 M
TWIN BEDROOM
4300
EL. 110.80 2nd FFL
1
SUITE ONE BEDROOM
CORRIDOR
B01 2-44
L
B01
B01 2-47
CLIENT:
B01 2-06
BEDROOM
B
CLG LEVEL S.KING ROOM
STRUCTURE SLAB SUITE REF. SE FOR ONE BEDROOM DETAILS B01 1-07
CORRIDOR
B01 1-43
G-A901
B01 1-11
BALACONY B01 1-08
BEDROOM
500
TYPICAL ROOFING DETAIL
B01
400
M
B01
4200
N
B01
2800
3600
P
B
UP
800
EL. 114.40 3rd FFL
EL. 106.60 1st FFL
FOR FLOOR FINISHES REF. TO ID DWGS STRUCTURE SLAB REF. SE FOR DETAILS
PROJECT NAME:
CLG LEVEL FEMALE TOILET
B01 G-14
4000
A
MEETING ROOM B01 G-12
DESIGN SERVICES FOR HOLIDAY INN HOTEL AND SUITES AL AHSA - KINGDOM OF SAUDI ARABIA
DRAWING TYPE
FOR GRADE FINISH LEVEL, REFER TO CE. DWGS &FOR MATERIAL FINISH, REFER TO LS. DWGS
B01 B-60
G-A903
WALL ACCESS DOOR DETAIL @ WATER TANKS
HOTEL BUILDING
MAINTENANCE CORRIDOR
CONSULTANT:
B01 B-66
RAW WATER TANK
PUMP ROOM
B01 B-61
B01 B-65
STAFF DINNING
CORRIDOR
B01 B-54
A
B01 B-55
LAV1
2750
7 G-A901
ZFP PROJECT NO.:
WATER TANK LADDER DETAIL
J17-03600
PM-KSA: SAB
PA: HMG / YMEM
PD:
---
ID: AMKA
PG: GSAM
CE: ASWO
PM:
AESM
SE: MHBK
HC: MFMT/MYMA
LS: ASKD
HV: YMSS
LC: AEMI
TITLE:
0
EL. 93.25 TANK TOSS
1
B01 G-07
5400
EL. 96.00 BSMT FFL
COMBINE PRODUCT POTABLE WATER & FIRE WATER TANK
800
3
B01-A210
BACK OFFICE
FOR FLOOR FINISHES REF. TO ID DWGS
13850
EL. 100.00 GRD FFL
3000
CORRIDOR
B01 G-09
300
CLG LEVEL
B01 G-22
MALE TOILET
2300
5000
BANQUETTE
3300
6600
B01 G-10
FEMALE STAFF LOCKERS & CHANGE ROOMS
PARTIAL SECTION (1 OF 2)
B01 B-07
8
1:100
G-A902
1
2
GRATING DETAIL
MALE STAFF LOCKERS & CHANGE ROOMS B01 B-06
0
5
SCALE 1:100
PARTIAL SECTION (1 OF 2)
10 METERS
SCALE:
1 : 100
3
4
5
SHEET NO.:
B01-A210
SHEET REVISION:
B01
KORBA HEIGHTS Residential Towers Location : New KORBA | Area : 600 ACRES | Building Type : Residential | Role : Tender Dwg Period : Oct 2017 | Software : autoCAD Al Korba Heights is a residential complex in the new city of Korba. Our mission as a team is to prepare fully detailed tender drawings in order to establish the upcoming phases, The first of three stages was created based on the drawings attached.
A
B
C
D
X-06 K08
X-10
X-09
K08
K08
TOP OF PARAPET +26.10
01
01
+25.50 T.O.SS
Y-06
Y-06
K08
K08
+23.80
Y-06
F.F.L
K08
02
02
X-10 K08
1
T.O.SS ROOF +22.50
X-09
2
K08
DETAILED PLAN @ TYP, LEVEL ( B_L6 )
K08_AST_502
1:25
F.F.L L7 +19.40
F.F.L L 6 +16.20
F.F.L L2 +3.40
03
03
F.F.L L5 +13.00
F.F.L L 6 +16.20
F.F.L L4 +9.80
F.F.L L1 +0.20
PART 2 PART 1 04
04
F.F.L L3 +6.60
F.F.L L5 +13.00
F.F.L L2 +3.40
F.F.L GR -3.00
F.F.L L1 +0.20
F.F.L L4 +9.80 05
05
F.F.L GR -3.00
F.F.L BAS -7.50
F.F.L BAS -6.20
F.F.L L3 +6.60
F.F.L BAS -7.50
06
06
2
DETAILED SECTION PART 1OF2
K08_AST_502
PROJECT :
3
DETAILED SECTION PART 2OF2
K08_AST_502
1:25
A
B
4
HEIGHTS
D
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
K19
04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
Heliopolis Developers Group MAIN CONSULTANT :
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
MODIFICATIONS
REV
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN.
OWENER :
1:50
C
GENERAL NOTE :
KORBA
DETAILED SECTION
K08_AST_502
1:25
K14
K20
K21
K1
K18
K2
K17
K3
K16
K4
K6
K10
--------------------28-12-2017
SHEET TITLE BUILDING K_08 ELEVATORS DETAILS
DWG SIZE A
K11
DATE
--------------------100% ISSUE FOR REVIEW
K5
K15
K13
K12
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
K9
K8
K7
DRAWING NUMBER K08_AST_502
0
CAD FILE NAME DRAWN BY:
NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY
CHECKED
:
APPROVED :
DWG REV 00
ALI ABDELAZIZ
DRAWING SCALE 1 : 50
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
001
1 : 50
REV DATE
K08_AST_502
28-12-2017
PROJECT NO :
002-2016
01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS
REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
100%ISSUE FOR REVIEW
28-12-2017
B K19
K14
K20
K21
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K1
K18
K11
K10
K9
K8
K7
PROJECT : B
KORBA HEIGHTS
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_08 ELEVATION (1)
DWG SIZE A
K08_AED_ 201
0
CAD FILE NAME
ELEVATION(1)
1
DRAWING NUMBER
DESGIN &DRAWN BY:
1:50 CHECKED
:
APPROVED : 01
02
03
04
05
05
DWG REV 00
ALI ABDELAZIZ
DRAWING SCALE
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
S.N.
1 : 50
001 28/12/2017
REV DATE
K08_AED_ 201 NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY
PROJECT NO :
16002
01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS
REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
100%ISSUE FOR REVIEW
28-12-2017
B K19
K14
K20
K21
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K1
K18
K11
K10
K9
K8
K7
PROJECT : B
KORBA HEIGHTS
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_08 ELEVATION (3)
DWG SIZE
DRAWING NUMBER K08_AED_ 203
A 0 CAD FILE NAME
DESGIN &DRAWN BY:
ELEVATION(3)
1
CHECKED
:
APPROVED : 01
02
03
04
05
05
DWG REV 00
ALI ABDELAZIZ
DRAWING SCALE
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
S.N.
1 : 50
001 28/12/2017
REV DATE
K08_AED_ 201 NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY
1:50
PROJECT NO :
16002
01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS
REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
---
100%ISSUE FOR REVIEW
28-12-2017
B K19
K14
K20
K21
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K1
K18
K11
K10
K9
K8
K7
PROJECT : B
KORBA HEIGHTS
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_08 SECTIONS
DWG SIZE
DRAWING NUMBER
A
K08_ASS_ 301
0
CAD FILE NAME DESGIN &DRAWN BY:
SECTION
1
CHECKED
1:50 01
02
03
:
APPROVED : 04
05
05
DWG REV 00
K08_ASS_ 301 NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY ALI ABD ALAZIZ
DRAWING SCALE
S.N. 001
1 : 50 REV DATE
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
28-12-2017
PROJECT NO :
16002
01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS
REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
---
100%ISSUE FOR REVIEW
28-12-2017
B K19
K14
K20
K21
K1
K18
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K11
K10
K9
K8
K7
PROJECT : B
KORBA HEIGHTS
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_08 SECTIONS
DWG SIZE A
DRAWING NUMBER K08_ASS_ 302
0
CAD FILE NAME DESGIN &DRAWN BY:
CHECKED
1:50 01
02
03
:
APPROVED : 04
05
05
DWG REV 00
K08_ASS_ 301 NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY
SECTION
1
ALI ABD ALAZIZ
DRAWING SCALE
S.N. 002
1 : 50 REV DATE
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
28-12-2017
PROJECT NO :
16002
North Plus Commercial & Clinical Location :New Cairo | Area : 3000 sqm | Building Type : Commercial & Clinical | Role : Tender Dwg Period : Dec 2017 | Software : autoCAD North Plus is a commercial medical complex with private medical clinics and shops located in North 90th Road New Cairo.
01
Y-01
02
03
Y-02
Y-03
Y-04
Y-05
Y-06
NP
NP
NP
NP
NP
ADMIN
ADMIN
B3
B3
005
04
Y-07
Y-08
NP
NP
004
B3
05
Y-09
Y-10
Y-11
Y-12
NP
NP
NP
NP
ADMIN
ADMIN B3
003
05
Y-13
Y-14
Y-15
Y-16
Y-17
Y-18
NP
NP
NP
NP
NP
NP
002
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
X-14 NP
+2.50 F.C.L
F3
F3
NP 95/L1
96/L1
S
S
F3
97/L1 +2.50 F.C.L
S
D
H
S
H
+2.50 F.C.L
+2.65 F.C.L
+2.50 F.C.L
A PT 04
+2.40 F.C.L
+2.40 F.C.L
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN.
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
F3
A1
STAIR 02 B3
FA/L1
WAP
91/L1
F3
S
+2.40 F.C.L
A PT 11
90/L1
D
04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
A PT 11
94/L1
F3
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
X-13
+2.40 F.C.L
A PT 11
108/L1
109/L1
110/L1
H
H
H
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY.
A2
RECESSED MOUNTED, WATER-RESISTANT LED DOWNLIGHT, Ø 20MM , 13w. LUMIN NOT LESS THAN 1000LUMEN, IP=40 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
A2E
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY. RECESSED MOUNTED, WATER-RESISTANT LED DOWNLIGHT, Ø 20MM , 13w. LUMIN NOT LESS THAN 700LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
A3
X-12
+2.60 F.C.L
A4
NP
A4E
+2.50 F.C.L
UP
LUMIN NOT LESS THAN 1800LUMEN, IP=20 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
A1E
001
A5E
+2.60 F.C.L
SURFACE MOUNTED L=120cm LIGHTING FIXTURE LED LIGHT MODULE 20w, LUMIN NOT LESS THAN2200LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
F3
S
A PT 04
F3E
101/L1
F3E
A PT 06
F3
F3
86/L1
72/L1
H
H
CEILING MOUNTED SELF-CONTAINED SINGLE SIDED EXIT SIGN WITH 4W LED, IP65, FOR MAINTAINED / NON-MAINTAINED EMERGENCY LIGHTING NOT LESS THAN 3 HOURS DURATION
CEILING INFORMATION OUTLET FOR WIRELESS ACCESS POINT DOME CCTV CAMERA (HANGING BOTTOM OF CEILING)
C
NP
+2.65 F.C.L
ADDRESSABLE PHOTOE-FAECTRIC SMOKE DETECTOR COMPLETE WITH ISOLATOR BASE.
S
011
SHOULD BE A 2 SLEEVES 110MM IN THE BEAM TO BE SHOWN IN SHOP DRAWINGS
A PT 06
H
BOLLARD WITH REFLECTORS FOR 25W LED LIGHT LAMP, WITH MOUNTING PLATE FOR BOLTING TO A FOUNDATION OR ANCHORAGE UNIT, IP67.
WAP
X-10
87/L1
EX
NP UP
B3
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY.
SMART FORM -RECESSED MOUNTED LED-MODULE, 60X60 CM. (NON DIMMABLE), 41W . LUMIN NOT LESS THAN4000LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
C2
X-11
F3
F3E
S
STORAGE
DITTO ABOVE, BUT CONNECTED TO EMERGENCY CIRCUIT.
SMART FORM -RECESSED MOUNTED LED-MODULE, 60X60 CM. (NON DIMMABLE), 72W LUMIN NOT LESS THAN 6200LUMEN, WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
b F4
F3
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY.
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY. F3
99/L1
RECESSED MOUNTED, STORE FLUX, FOUR LED MODULES , 25w. LUMIN NOT LESS THAN 2700LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
RECESSED MOUNTED, TURN ROUND WATER-RESISTANT LED DOWNLIGHT, Ø 20MM , 20w. LUMIN NOT LESS THAN 1800LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
A5
111/L1
112/L1
113/L1
S
H
H
H
H
ADDRESSABLE RATE OF RISE HEAT DETECTOR COMPLETE WITH ISOLATOR BASE
M
ADDRESSABLE MULTI DETECTOR COMPLETE WITH ISOLATOR BASE.
104/L1 S
+2.65 F.C.L
ADDRESSABLE PHOTOE-FAECTRIC SMOKE DETECTOR COMPLETE WITH ISOLATOR BASE ABOVE FALSE CEILING
b
b SUPPLY REGISTER
X-09
RETURN REGISTER
NP
EXHAUST GRILL
RETURN CEILING DIFFUSER
C
SUPPLY CEILING DIFFUSER
F3
F3
THERMOSTAT.
T
X-08
ACCESS DOOR
NP
F3
F3
F3E
F3
F3
F3E
73/L1
131/L1
H
H
+2.60 F.C.L AREA TO BE FINISHED BY OWNER .
PAINT TYPE A-PT-06
84/L1
117/L1
H
H
UPRIGHT SPRINKLER HEAD PENDENT FLUSH SPRINKLER HEAD
83L1
85/L1
130/L1
116/L1
X-07
H
H
H
H
NP
MODIFICATIONS
REV
A PT 06 A PT 06
82/L1
H
F3
74/L1
F3
129/L1
F3E
H
F3
H
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
NP
F3E
A PT 06
BY
X-06
F3
F3E
B
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
+2.60 F.C.L
118/L1
H 81/L1
128/L1
H
H
79/L1
119/L1
X-05
H
NP
H
F3
80/L1
F3E
75/L1
H
+2.60 F.C.L
H
F3
F3
127/L1
F3
F3E
H
PROJECT :
F3 F3
NORTH PLUS
B
120/L1
H
X-04
126/L1
NP
H 121/L1
F3
F3E
H
OWENER :
F3
i A PT 02
Heliopolis Developers Group
A PT 01
X-03 77/L1
F3
F3E
A
78/L1
H
H
123/L1
M
H
F3E
F3
F3E
F3E
F3E A PT 02
i
i
SHEET TITLE
122/L1
M
REFLECTED CEILING PLAN @ LEVEL B3 -6.95
NP_ADT_111_B3 (-6.95)
MAIN CONSULTANT :
124/L1
F3
H
1
A
NP
76/L1
S
i
THIRD BASEMENT FLOOR REFLECTED CEILING PLAN
n
1:50
DWG SIZE A
X-02 NP
X-01 NP 01
02
03
04
05
05
0
DRAWING NUMBER
NP_ADT_111_B3 (-6.95)
CAD FILE NAME
NP_ADT_111_B3 (-6.95)
DESGIN &DRAWN BY:
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
CHECKED
:
APPROVED :
ALI ABDELAZIZ
NADA EZAT AMR MUSTAFA
SCALE
1:50
REV 02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
01
02
03
2
Y-02
Y-06
NP-AWS-310
NP
NP
1
04
1
Y-07
NP-AWS-313
NP
05
05
GENERAL NOTE :
1
Y-08
NP-AES-203
NP-AES-203
Y-09
Y-10
Y-11
Y-12
NP
NP
NP
NP
NP
2
2
Y-13
NP-AWS-312
Y-17
NP-AWS-311
NP
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
NP
1 NP-ASS-302
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
D
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED. 05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
06 D
NP-ASD-401
X-12
X-12
NP
NP STAIR 01 L2
STAIR 02
UP
055
L2
02
001
NP-AVD-403
+12.70 F.F.L
X-11
X-11
02
NP
NP
NP-AVD-403 UP
X-10
X-10
06
NP
NP
NP-ASD-401 STORAGE L2
STORAGE
053
L2
L2
053
C
ELEC. ROOM
STORAGE
L2
002
054
B.ROOM
X-09
L2
B.ROOM
052
L2
X-09
003
NP
NP
CORRIDOR L2
C
056
X-08
X-08
NP
NP
WAITING L2
WAITING
051
L2
WAITING
044
L2
WAITING
043
L2
WAITING
036
L2
WAITING
035
L2
WAITING
028
L2
WAITING
027
L2
WAITING
020
L2
WAITING
019
L2
WAITING
012
L2
011
WAITING L2
004
X-07
X-07
NP
NP
1
1
NP-AES-204
NP-AES-202 B.ROOM L2
B.ROOM
050
L2
B.ROOM
045
L2
B.ROOM
042
L2
037
B.ROOM L2
B.ROOM
034
L2
B.ROOM
029
L2
B.ROOM
026
L2
B.ROOM
021
L2
B.ROOM
018
L2
013
B.ROOM L2
L2
X-06
NP
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
005
X-06
NP
1
MODIFICATIONS
REV
B.ROOM
010
BY
DATE
-------
100 % ISSUE FOR CONSTRUCTION
16-11-2017
1
NP-AWS-312
NP-AWS-310 DOCTORS ROOM1 L2
DOCTORS ROOM1
049
L2
DOCTORS ROOM1
046
L2
DOCTORS ROOM1
041
L2
038
DOCTORS ROOM1 L2
DOCTORS ROOM1
033
L2
DOCTORS ROOM1
030
L2
DOCTORS ROOM1
025
L2
022
DOCTORS ROOM1 L2
DOCTORS ROOM1
017
L2
014
DOCTORS ROOM1 L2
DOCTORS ROOM1 L2
009
1
006
NP-ASS-301
B
X-05
X-05
NP
NP DOCTORS ROOM2 L2
048
DOCTORS ROOM2 L2
DOCTORS ROOM2
047
L2
DOCTORS ROOM2
040
L2
039
DOCTORS ROOM2 L2
DOCTORS ROOM2 L2
032
DOCTORS ROOM2
031
L2
DOCTORS ROOM2
024
L2
DOCTORS ROOM2
023
L2
DOCTORS ROOM2
016
L2
015
DOCTORS ROOM2 L2
008
DOCTORS ROOM2 L2
007
PROJECT :
X-04
X-04
NP
NP
NORTH PLUS
B
OWENER :
Heliopolis Developers Group A
1 Y-02
Y-06
Y-07
Y-08
Y-09
NP
NP
NP
NP
NP
A
1
1 NP-AES-201
Y-10
Y-11
Y-12
Y-13
NP
NP
NP
NP
MAIN CONSULTANT :
NP-AWS-311
Y-17 NP
SHEET TITLE
LEVEL 2 FLOOR PLAN +12.70
NP_APS_106_L2 +12.70
NORTH PLUS LEVEL 2 FLOOR PLAN +12.70
1:50
DWG SIZE A
DRAWING NUMBER
0
NP_APS_106_L2 +12.70
CAD FILE NAME
NP_APS_106_L2 +12.70
DESGIN &DRAWN BY:
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
CHECKED
:
APPROVED : 01
02
03
04
05
05
ALI ABDELAZIZ
NADA EZAT AMR MUSTAFA
SCALE
REV
1 : 50
02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
North Plus 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
D
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED. 05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
Y-02
Y-03
Y-04
Y-05
Y-06
Y-07
Y-08
NP
NP
NP
NP
NP
NP
NP
D
1 NP-ASS-302
Y-09
Y-10
Y-11
Y-12
Y-13
Y-14
Y-15
Y-16
NP
NP
NP
NP
NP
NP
NP
NP
TOP OF PARAPET
Y-17
NP-AWS-311
NP
TOP OF PARAPET
+29.40 UR
1
+29.40
+29.10
T.O.SS PAINT
A PT 01
A PT 01
PAINT
TOP OF PARAPET +26.70 TOP OF PARAPET +26.00 5MM GROOVE
R
+24.60
North PLUS
100 MM LED LIGHT GROOVE
Clinics & Commercial
T.O.SS CLADDING
A MT 01
C
A MT 01
A ME 01
L4
+20.70
F.F.L
F.F.L
F.F.L
+20.60
+20.60
CLADDING
LOUVERS
C
CLADDING
L3
A CW 01
+16.70
F.F.L
A CW 01
F.F.L
F.F.L
+16.60
+16.60
CLADDING
MODIFICATIONS
REV
E.L L2
F.F.L
+12.90
+12.70
+12.20
A MT 01
F.F.L E.L
A MT 02
+11.60 CLADDING
A MT 01
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
CLADDING
16-11-2017
CLADDING CLADDING
PAINT
A PT 13
F.F.L
L1 +8.70
+8.60
F.F.L CLADDING CLADDING
CLADDING
A MT 02
A MT 01
A CW 02
A CW 02
CLADDING
PROJECT :
PAINT
A PT 13
NORTH PLUS
B
F.F.L
F.F.L
GR +3.70
PAINT
F.F.L
+3.70
+3.60
F.F.L
+3.60
OWENER :
A PT 14
CLADDING
PAINT
A PT 13 A CW 02
Heliopolis Developers Group A CW 02
F.F.L
F.F.L
-0.17 B1
-------
100 % ISSUE FOR CONSTRUCTION
DATE
A MT 03
B
A
BY
-0.17
F.F.L
F.F.L
-0.50
A MT 03
CLADDING
A
MAIN CONSULTANT :
CLADDING
-0.50
-0.40
F.F.L
F.F.L
1 NP-AES-202
-1.20
FRONT ELEVATION
SHEET TITLE
1:50
NORTH PLUS ELEVATIONS DWG SIZE A
0
DRAWING NUMBER NP-AES-201
CAD FILE NAME
NP-AES-201
DESGIN &DRAWN BY:
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
CHECKED
:
APPROVED : 01
02
03
04
05
05
ALI ABDELAZIZ
NADA EZAT AMR MUSTAFA
SCALE
REV
1 : 50
02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
01
02
03
04
X-04
X-05
X-06
NP
NP
NP
05
X-07
X-08
X-09
NP
NP
NP
TOP OF PARAPET +29.40 UR
+29.10
T.O.SS
1
1
NP-ASS-301
NP-AWS-310
05
X-10
X-11
X-12
NP
NP
NP
GENERAL NOTE :
TOP OF PARAPET
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
+29.40 UR
+29.10 T.O.SS
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
D
PAINT
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
A PT 13
TOP OF PARAPET
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
TOP OF PARAPET
+26.70
+26.70
TOP OF PARAPET +26.00 D
F.F.L R
+24.60
R
+24.60
T.O.SS
A MT 01
+24.60 T.O.SS
CLADDING
5MM GROOVE
A CW 01
CLADDING
L4
CLADDING
A MT 01
F.F.L
+20.70
L4
+22.60
F.F.L LOUVERS
+20.70 F.F.L
A MT 04 C
PAINT
L3
A PT 13
F.F.L
+16.70 CLADDING
F.F.L
L3
+16.60 A MT 01
A MT 01
CLADDING
+16.70 F.F.L
C
F.F.L
F.F.L L2
+12.70 CLADDING
F.F.L
CLADDING CLADDING
A MT 02
LOUVERS
+12.90
+12.65
L2
A MT 01 A MT 01
F.F.L
A MT 02
+12.70 F.F.L
CLADDING
+11.60 A MT 01
MODIFICATIONS
REV
A MT 01
L1 +8.70
CLADDING
L1 +8.70
F.F.L
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
F.F.L
BY
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
TOP OF PARAPET T.O.S.S
+6.20
+5.90 B
A PT 14
PAINT
RMU GR 011
F.F.L GR +3.70
F.F.L +3.95
+3.70
GR +3.70
F.F.L
F.F.L F.F.L +2.70
COMMERCIMT LOUVERS
SUPER MARKET
005 B1
A MT 01
B1
PROJECT :
011
NORTH PLUS
B
F.F.L B1
-0.33
-0.50
F.F.L
B1
-0.50 F.F.L
F.F.L -1.20
OWENER :
SLOPE
TRANS
1/6
B2 001
GARAGE B2
00
Heliopolis Developers Group A
F.F.L B2
MAIN CONSULTANT :
-3.85
-4.00
B2
T.O.SS
T.O.SS
SLOPE
A
1/6
STORAGE
GARAGE
B3 013
B3
-4.00
B3
SHEET TITLE
00
NORTH PLUS
-6.95
B3
F.F.L
ELEVATIONS
-7.05 T.O.SS DWG SIZE A
0
DRAWING NUMBER NP-AES-202
CAD FILE NAME
NP-AES-201
DESGIN &DRAWN BY:
1
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
SIDE ELEVATION
CHECKED
NP-AES-202 1:50
:
APPROVED : 01
02
03
04
05
05
ALI ABDELAZIZ
NADA EZAT AMR MUSTAFA
SCALE
REV
1 : 50
02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
01
02
03
04
Y-02
Y-03
Y-04
Y-05
Y-06
Y-07
Y-08
Y-09
Y-10
NP
NP
NP
NP
NP
NP
NP
NP
NP
TOP OF PARAPET
05
+29.40
05
Y-11
Y-12
Y-13
Y-14
Y-15
Y-16
Y-17
NP
NP
NP
NP
NP
NP
NP
TOP OF PARAPET
GENERAL NOTE :
UR
1 13
PAINT
A PT 13
A PT 13
PAINT
A PT 13
+29.10 T.O.SS
NP-AWS-311
A PT 01
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
+29.40
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
PAINT
D
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
TOP OF PARAPET
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
TOP OF PARAPET
+26.70
+26.70 TOP OF PARAPET
CLADDING D
+26.00 A MT 01
T.O.SS
A MT 01
+24.60
CLADDING
R
+24.60 T.O.SS
CELLING
A PT 09 A PT 09
LOUVERS
CLADDING
DOCTORS ROOM1
A ME 01
L4
DOCTORS ROOM1
049
L4
DOCTORS ROOM1
046
L4
DOCTORS ROOM1
041
L4
038
DOCTORS ROOM1 L4
DOCTORS ROOM1
033
L4
DOCTORS ROOM1
030
L4
DOCTORS ROOM1
025
L4
DOCTORS ROOM1
022
L4
017
DOCTORS ROOM1 L4
DOCTORS ROOM1
014
L4
DOCTORS ROOM1
009
L4
A ME 01
006
A MT 01
A MT 01
CELLING
LOUVERS
CLADDING
L4
+20.70 F.F.L
CELLING
A PT 09 A PT 09
DOCTORS ROOM2 L3
DOCTORS ROOM1
048
L3
DOCTORS ROOM1
045
L3
DOCTORS ROOM1
040
L3
037
DOCTORS ROOM1 L3
DOCTORS ROOM1
032
L3
DOCTORS ROOM1
029
L3
DOCTORS ROOM1
024
L3
DOCTORS ROOM1
021
L3
016
DOCTORS ROOM1 L3
L3
C
DOCTORS ROOM1
DOCTORS ROOM4
013
CELLING
L3
008
005
L3
+16.70 F.F.L
CELLING C
A PT 09 A PT 09
DOCTORS ROOM1
DOCTORS ROOM1 L2
L2
049
DOCTORS ROOM1
046
L2
DOCTORS ROOM1
041
L2
038
DOCTORS ROOM1 L2
DOCTORS ROOM1
033
L2
DOCTORS ROOM1
030
L2
DOCTORS ROOM1
025
L2
DOCTORS ROOM1
022
L2
017
DOCTORS ROOM1 L2
DOCTORS ROOM1
014
L2
CELLING
DOCTORS ROOM1
009
L2
006
L2
+12.70 F.F.L
COMMERCIMT L1
COMMERCIMT
COMMERCIMT
010
L1
L1
009
COMMERCIMT
008
L1
COMMERCIMT
007
L1
COMMERCIMT
COMMERCIMT
006
L1
L1
005
COMMERCIMT
004
L1
A PT 14
F.F.L
CLADDING
PAINT
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
L1 +8.70 A MT 01
BY
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
A PT 14
TOP OF PARAPET
PAINT
+6.20
TOP OF PARAPET B
MODIFICATIONS
REV
003
+5.40
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
GR 009
GR 008
GR 007
GR 006
GR 005
GR 004
GR 003
GR 002
GR +3.70 F.F.L
PAINT
COMMERCIMT B1
SUPER MARKET
COMMERCIMT
010
B1
B1
009
COMMERCIMT
011
B1
SUPER MARKET
COMMERCIMT
008
B1
B1
007
COMMERCIMT
011
B1
A PT 01
PROJECT :
COMMERCIMT
006
B1
005
NORTH PLUS
B
F.F.L T.O.SS
T.O.SS
-0.60
-0.60
-0.18 B1
-0.50 F.F.L
OWENER :
GARAGE
T.O.SS
B2
GARAGE
00
B2
GARAGE
00
B2
00
Heliopolis Developers Group
-3.13 A
T.O.SS B2
-4.00
-4.00
MAIN CONSULTANT :
T.O.SS A
T.O.SS GARAGE
-5.85
B3
GARAGE
00
B3
GARAGE
00
B3
GARAGE
00
B3
SHEET TITLE
00
NORTH PLUS T.O.SS
T.O.SS
-7.05
-7.05
B3
DETAILED SECTIONS
-7.05 T.O.SS DWG SIZE A
0
DRAWING NUMBER
NP-ASS-301
NP-ASS-301 01
02
03
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
DETAILED SECTION
CHECKED
1:50
:
APPROVED : 04
05
05
ALI ABDELAZIZ
SCALE 1 : 50
NP-ASS-301
CAD FILE NAME
DESGIN &DRAWN BY:
1
NADA EZAT AMR MUSTAFA
REV 02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
01
02
03
04
X-04
X-05
X-06
X-07
NP
NP
NP
NP
PAINT
A PT 01
TOP OF PARAPET
05
X-08
X-09
X-10
X-11
NP
NP
NP
NP
UR
05
GENERAL NOTE :
X-12 TOP OF PARAPET
+29.40
NP
+29.40
1
+29.10
NP-ASS-301
T.O.SS
UR
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
+29.10 T.O.SS
1
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
NP-AWS-310
PAINT
A PT 01
A CW 01
CLADDING
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
+26.70
CLADDING
D
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
TOP OF PARAPET
A MT 01
F.F.L R
+24.70
+24.60
R
T.O.SS
+24.60 T.O.SS
CELLNG
CLADDING
A PT 09
A PT 09
A MT 01
DOCTORS ROOM1
DOCTORS ROOM2 L4
L4
031
030
B.ROOM L4
WAITING
029
L4
STAIR 01
CORRIDOR
028
L4
CELLNG
L4
056
055
F.F.L +21.53
L4
+20.70
L4 CLADDING
F.F.L
CELLNG
+20.70 F.F.L
A MT 01
A PT 09 C
DOCTORS ROOM2 L3
DOCTORS ROOM1
030
L3
029
WAITING
B.ROOM L3
L3
028
CORRIDOR
027
L3
STAIR 01
056
L3
053
F.F.L
A CW 01
CLADDING
+17.70
L3
+16.70
L3 CLADDING
F.F.L
CELLNG
+16.70 F.F.L
A MT 01
A PT 09
A PT 09
CELLNG
C
CLADDING
A CW 01
STAIR 01 DOCTORS ROOM2 L2
DOCTORS ROOM1
031
L2
030
B.ROOM L2
029
WAITING L2
L2
CORRIDOR
028
L2
055
F.F.L
056
+13.70
L2
CLADDING
+12.70
L2
A MT 03
F.F.L
+12.70 F.F.L
CLADDING
A MT 02
MODIFICATIONS
STAIR 01 L1
012
REV
F.F.L COMMERCIMT L1
CORRIDOR
007
L1
A MT 01
L1 +8.70 CLADDING
F.F.L
CLADDING
CLADDING
CLADDING
L1 +8.70 F.F.L
A MT 01
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
+9.70
013
BY
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
A MT 02
A MT 01
A MT 01
CLADDING
STAIR 01 GR 010
F.F.L
COMMERCIMT GR 006
+5.37
B
F.F.L GR +3.70
+3.70
F.F.L
COMMERCIMT B1
SUPER MARKET
008
B1
CONTROL ROOM
011
B1
B1
+3.55
F.F.L
GR +3.70 F.F.L
+3.32
SUPER MARKET
STORAGE
002
F.F.L
B1
004
PROJECT :
011
B1
-0.18
T.O.SS
-0.50
B1
-0.60
F.F.L
NORTH PLUS
B
F.F.L -0.50 F.F.L
T.O.SS -1.60 OWENER : STAIR 01 GARAGE B2
B2
GARAGE
00
B2
008
F.F.L
00
B.ROOM B2
007
-3.06
T.O.SS
Heliopolis Developers Group
-3.40 T.O.SS B2
-4.00
B2
-4.00
T.O.SS
-4.00
A
MAIN CONSULTANT :
T.O.SS
A
GARAGE B3
T.O.SS B3
F.F.L
-6.90
-7.05
GARAGE
00
B3
F.F.L
00
-6.90
-7.05
ADMIN B3
SHEET TITLE
003
-6.40
F.F.L
T.O.SS
-6.90
NORTH PLUS
T.O.SS
B3
-7.35
T.O.SS
DETAILED SECTIONS
-7.05 T.O.SS DWG SIZE A
0
DRAWING NUMBER
NP-ASS-301
NP-ASS-302 01
02
03
04
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
DETAILED SECTION
CHECKED
1:50
:
APPROVED : 05
05
ALI ABDELAZIZ
SCALE 1 : 50
NP-ASS-302
CAD FILE NAME
DESGIN &DRAWN BY:
1
NADA EZAT AMR MUSTAFA
REV 02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
01
02
03
04
05
05
GENERAL NOTE
Y-10
Y-11
NP
NP
1 NP_AST_401
Y-12
Y-10
NP
Y-11
NP
NP
1 NP_AST_401
Y-12
Y-10
NP
Y-11
NP
NP
1 NP_AST_401
Y-12
Y-10
NP
Y-11
NP
NP
1 NP_AST_401
01. ALL DRAWINGS AND AND AS SUCH REMA FIRM. THEY ARE TO ALL COPIES ARE TO MAIN CONSULTANT
Y-12 NP
02. THESE DRAWINGS M PRIOR WRITTEN AP
D
03. DIMENSIONS ON TH DIMENSIONS ARE T
04. ALL DIMENSIONS O NOTE: (millmeter) OR
X-12
05. ANY INCONSISTENC ATTENTION OF AND BEFORE THE WORK
X-12
NP
NP
D
-0.50 F.F.L
+8.70 F.F.L
-1.34 F.F.L
+7.03 F.F.L
+20.70 F.F.L
X-11
X-11
NP
NP
-6.90 F.F.L
-6.41 F.F.L
-0.50 F.F.L
+0.34 F.F.L
+8.70 F.F.L
+9.70 F.F.L
UP
+12.70 F.F.L
C
UP
X-10
X-10
NP
NP
C
Y-10
Y-11
NP
NP
Y-10
Y-12 NP
DETAILED PLAN @ LEVEL B3 -6.95
1 NP_AST_401
Y-11
NP
3 NP_AST_401
1:25
Y-12
NP
Y-10
NP
Y-11
NP
NP
DETAILED PLAN @ LEVEL B1 -0.50
5 NP_AST_401
1:25
Y-12
Y-10
NP
Y-11
NP
NP
DETAILED PLAN @ LEVEL L1 +8.70
6
1:25
Y-12 NP
DETAILED PLAN @ LEVEL TYP( L2 : L4 )
NP_AST_401
1:25
M
REV
Y-10
Y-11
NP
NP
1 NP_AST_401
Y-12
Y-10
NP
X-12
X-12
NP
Y-11
NP
NP
NP
1 NP_AST_401
Y-10
Y-12
X-12
X-12
NP
Y-11
NP
NP
NP
NP
1 NP_AST_401
Y-12 NP
X-12
DESCRIP
10 09 08 07 06 05 04 03 02 01 00
100 % ISSUE FOR CO
X-12
NP
NP
B
-3.85 F.F.L
-4.76 F.F.L
+3.70 F.F.L
+24.60 T.O.SS.
+2.02 F.F.L
+23.20 F.F.L
PROJECT :
N
B
X-11
X-11
NP
NP
X-11
X-11
NP
NP
X-11
X-11
NP
NP
OWENER :
-3.85 F.F.L
-3.02 F.F.L
+3.70 F.F.L
+24.60 T.O.SS.
+5.37 F.F.L
UP
+21.53 F.F.L
H A
X-10
X-10
NP
NP
X-10
X-10
NP
NP
X-10
X-10
NP
MAIN CONSULTAN
NP
A
Y-10
Y-11
NP
NP
Y-12 NP
Y-10
Y-11
NP
NP
Y-12 NP
Y-10
Y-11
NP
NP
Y-12
SHEET TITL
NP
ST
2 NP_AST_401
DETAILED PLAN @ LEVEL B2 -3.90 1:25
4 NP_AST_401
DETAILED PLAN @ LEVEL GR +3.70 1:25
7 NP_AST_401
DETAILED PLAN @ LEVEL ROOF 1:25
DWG SIZE A
0
DRAWING NP-AST-401
CAD FILE NAME
NP
DESGIN &DRAWN BY:
MOHAMED T DOHA SHALA MOSTAFA MA
CHECKED
:
APPROVED :
ALI ABDELA
01
02
03
04
05
05
GENERAL NOTE : Y-10
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
NP
NP
4
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
K00-ATS-171
Y-09
NP
3
Y-08
NP K00-ATS-171
Y-07
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
X-04 NP D
X-01
X-02
X-03
X-04
NP
NP
NP
NP
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED. 05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
TANK B3
D
T.O.SS
-6.90 T.O.SS
-3.40
009
-4.00 T.O.SS
X-03 NP
-7.50 T.O.SS
PUMP ROOM B3
-7.50 T.O.SS
TANK B3
TANK
008
B3
010
B3
009
-7.35 T.O.SS
-6.90 T.O.SS
010
TANK
T.O.SS -6.90
-8.55 T.O.SS
X-02 NP
X-01 NP
C
Y-07
Y-08
Y-09
NP
NP
NP
Y-10
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
NP
DETAILED PLAN @ B3 -6.95
1 NP-ATS-171
2 NP-ATS-171
1:50
DETAILED SECTION 1:50
Y-08
Y-09
Y-10
NP
NP
NP
3
NP
K00-ATS-171
2
Y-07
K00-ATS-171
C
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
X-04 NP
-3.40 T.O.SS
-3.40 T.O.SS
-3.40 T.O.SS
X-01
X-02
X-03
X-04
NP
NP
NP
NP
-3.85 T.O.SS
B2
-4.00 T.O.SS
MOUSQE 009
-6.80
TANK
TANK
B3
B3
010
009
BY
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
-6.80
-6.90
F.F.L
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
T.O.SS
NP
B2
MODIFICATIONS
REV
-3.40
X-03
F.F.L
T.O.SS -7.50
-7.50
T.O.SS
-7.05 T.O.SS
B3
-7.05 T.O.SS
T.O.SS
1 K00-ATS-171
B
X-02 NP
X-01 NP
Y-07
Y-08
Y-09
NP
NP
NP
Y-10 NP
2 NP-ATS-171
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
DETAILED PLAN @ B2 -3.90
3 NP-ATS-171
1:50
DETAILED SECTION 1:50
PROJECT :
NORTH PLUS
B
Y-07
Y-08
Y-09
Y-10
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
NP
NP
NP
NP
OWENER :
-3.40 T.O.SS
B2
-4.00
-3.85
-4.00
F.F.L
T.O.SS
T.O.SS
Heliopolis Developers Group
TANK B3
PUMP ROOM
010
B3
A
MAIN CONSULTANT :
008
A
-6.80
B3
-7.05
T.O.SS
-6.90
F.F.L
T.O.SS
-7.35
-7.25
-7.35
T.O.SS
F.F.L
T.O.SS
SHEET TITLE NORTH PLUS TANKS DETAILS
-8.55 T.O.SS
DWG SIZE A
0
DRAWING NUMBER
NP-ATS-171
NP-ATS-171 01
02
03
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
DETAILED SECTION
CHECKED
1:50
:
APPROVED : 04
05
05
ALI ABDELAZIZ
SCALE 1 : 50
NP-ATS-171
CAD FILE NAME
DESGIN &DRAWN BY:
1
NADA EZAT AMR MUSTAFA
REV 02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
Development of Suez Canal Axis Mega Project Location : Suez | Area : 1.000.000 sqm | Building Type : Residential- Commercial - scientific | Role : Design & Planning - Visualizing | Software : Revit Architecture - autoCAD - PhotoShop CC
Location: -
The development of the Suez Canal axis has always been an important project for architects and planners. because of the strategic importance of the Suez Canal, the surrounding ecosystem is considered to be an invaluable national resource for a rare marine life. This is reflected on land. Rare plants and animals harmonized within this closed ecosystem This project consists primarily of hotel units to help develop tourism investments within the region and a marine science research center that helps to develop multiple applications based on marine science. Housing complexes have been set up within the project for its employees to form the nucleus of a community that capable of spreading urban development. Site Located on the southern entrance of the suez canal which provides an accessibility from Sea Land and Air Routes also descending topography towards the sea privileging the project with an open view. Site orientation provides preferred wind from three surrounding direction.
Skeches and Concept Conceptual Layout #1 1
3
2
Sec 1:1 3 2 1
Sec 2:2
Conceptual Layout #2 Sec 3:3
Development of Suez Canal Axis The project Considered Ecofriendly material as a solution to reduce the heat gain of buildings with matter of economic value and Its shapeliness so adding double skin facade which reduces heat gain Of buildings which opposite the sun by 60% and roof garden which will do the same as ecological solution vertical garden also will provide more shapeliness and less heat gain To building with considering to build with local And recycled material such as glasses bottle etc solar cells as Power source will increase the ecological value witch affecting the economic value .9
General Layout
Master Plan
Main Section
Suez Hotel The hotel is designed according to the standards and limitations of the Egyptian code as well as the environmental determinants in the area in order to establish an environmental system and an integrated relationship between the building and the surrounding environment. Thermal energy is one of the most important challenges that I faced in design. It was overcome by thermal insulation of the building by double brick and vertical garden to reduce the increase of internal building temperature. The Islamic decoration was also used to reduce the direct sunlight on the facade
Sect
tion A:A
A
A
G.Floor Plan
Hotel Room Plan
Development of Suez Canal Axis Research Center
Both of two buildings have been designed to be integrated into the nature of the Earth as part of the public space in order to achieve harmony between the building and the human element as a whole. The building is based on the closed loop self-feeding system by using solar panels as an energy source taking into account control of the temperature of the internal building by appropriate thermal insulation to reduce the consumption of energy within the building
Research Center 3D View
Convention Center East Elevation
Convention Center Section
DESERT SEEDS Enviromental and tourism studies center Location : Egypt | Area : 16.000 sqm | Building Type : Studies Center | Role : Design & Visualize Period : March 2014 - May 2014
In the heart of the Egyptian Eastern Desert, there are many types of life that rely on the ecosystem, and here lie the responsibilities on us as Egyptian architects to reduce the destruction of this environment in order to ensure the preservation of life. the project has begun to develop a center for environmental studies to benefit from the existing ecosystem and to develop mechanisms to preserve it and to reintegrate humans into this environment by developing a new type of ecotourism based on non-encroachment on the coast and preservation of coral reefs in the area and a new type of rare desert plant cultivation.
LAYOUT
Concept & Views
Fishermen Village Labour Housing (Urban Planning) Location : Suez | Area : 39.000 sqm | Building Type : Residential | Role : Design & Planning Period : Oct 2014 - Dec 2014
The main purpose of this project is to emphasize the importance of living parity in the urban communities of the labor force in Egypt. Housing is the most important challenges to the labor force that leads to the erosion of that layer in the small cities and causes their migration to the big cities for the sake of their daily living. Therefore, we must think towards integrated and equal urban communities that offer their residents the opportunity to work and adequate housing resulting in a healthy and integrated society. Based on the above, the project was designed to meet the needs of its residents in terms of construction, green spaces and playgrounds for children etc, taking into consideration the class diversity among the inhabitants of the village, workers, owners, and employees without specifying any lines that separating between them and ensuring the integration of different classes in harmony.
Mid-Class Units Typical Floor (160 sqm)
Econmic-Class Units Typical Floor (100 sqm)
Sketching
Thank You