Architecture Portfolio Architect Mostafa Magdy Moahmmed
Personal Statment A highly motivated and hardworking architect with two years experience, who is recently seeking for an opportunity for moving forward in order to gain more experience and knowledge in architecture field
Mostafa Magdy Architect
I also have a several months experience as a site engineer which has qualified me to become a partialy aware of almost all site aspects and construction challenges, those experiences have been utilized in giving ultimate attention to detail in a conceptual and workshop drawings phases in order to overcome those challenges. Eventual career goal is to become a fully-qualified and experienced architect, with the longer-term aspiration of moving into project management using BIM technology to achieve such a goal.
Education AL-AZHAR University In Cairo Bachelor of architectural studies [September 2010 - June 2015] Helwan University ( Faculty Of Fine Arts) Certificate of Attendance architectural studies Lectures (96 hours of a workshop) [October 2014- September 2014]
Work Experience ZFP Consultants [Dec 2018- Present] (Junior Architect) Job Contribution: - Translating the approved design concepts into technically feasible solutions - P repares detailed design drawings according to design specification for each project component using CAD/BIM technology depending on needs and according to standards, codes, techniques and engineering practices. - Projects Scale as follows: - Design development Tender drawings of Holiday inn hotel in KSA. - Tender drawings of JW Marriott hotel in KSA. - Tender drawings of STC Parking building in KSA. - Design development and tender drawings of SABIC Museum in KSA.
Soft Skills Mindfulness Communication Adaptability Collaboration Conflict Resolution Competitive Dedicated Resilient Desire to Learn Quick-witted Interests
ARKAN Consultants [May 2017- Dec 2018] (Junior Architect) Job Contribution: - Compiling data for architectural plans, specifications, reports, etc. - Preparation of design development drawings. According to world and local architectural standards - Developing and/or coordinating development of detailed tender drawings and specifications for projects. - Projects Scale as follow: - Residential Compound (KORBA HEIGHTS - GOLD YARD) - Commercial & Clinical Malls (NORTH PLUS - ELEGANTRY) Misr El Kheir Foundation [April 2017 - May 2017] (Project Contract ) Job Contribution: Restoration of an old building in NASR City at heritage conservation Program A day to day management of the site including supervising and monitoring the site labour force REDCON For Construction Services [Mars 2017 - April 2017] (Trainee) Job Contribution: A day to day management of the site including supervising and monitoring the site labour force Air Defense Command Center [Mars 2016 - Mars 2017] (Soldier) Graphic Designer and D visualizer deals with the following programs .Photoshop, Revit, autoCAD, Microsoft Office Package S.C.D For Engineering Consultants [October 2015 - November 2015] (Internship)
I CAN SPEAKE Arabic : Native English
Certificates Certificate and Samples are attached upon request
CONTENTS
PROJECTS Environmental and Tourism Studies Center (Acadmic Project) Development of Suez Canal Axis
(Grad Project)
Private Tower G +10
(Design)
Private Villa (IN PROGRESS)
(Design)
Korbinta HEIGHTS (IN PROGRESS)
(Remodeling)
Fishermen Village
(Design & Planning)
KORBA HEIGHTS
(Tender Drawings)
North Plus
(Tender Drawings)
Sketching
DESERT SEEDS Enviromental and tourism studies center Location : Egypt | Area : 16.000 sqm | Building Type : Studies Center | Role : Design & Visualize Period : March 2014 - May 2014
In the heart of the Egyptian Eastern Desert, there are many types of life that rely on the ecosystem, and here lie the responsibilities on us as Egyptian architects to reduce the destruction of this environment in order to ensure the preservation of life. the project has begun to develop a center for environmental studies to benefit from the existing ecosystem and to develop mechanisms to preserve it and to reintegrate humans into this environment by developing a new type of ecotourism based on non-encroachment on the coast and preservation of coral reefs in the area and a new type of rare desert plant cultivation.
LAYOUT Concept & Views
Development of Suez Canal Axis Mega Project Location : Suez | Area : 1.000.000 sqm | Building Type : Residential- Commercial - scientific | Role : Design & Planning - Visualizing | Software : Revit Architecture - autoCAD - PhotoShop CC
Location: -
The development of the Suez Canal axis has always been an important project for architects and planners. because of the strategic importance of the Suez Canal, the surrounding ecosystem is considered to be an invaluable national resource for a rare marine life. This is reflected on land. Rare plants and animals harmonized within this closed ecosystem This project consists primarily of hotel units to help develop tourism investments within the region and a marine science research center that helps to develop multiple applications based on marine science. Housing complexes have been set up within the project for its employees to form the nucleus of a community that capable of spreading urban development. Site Located on the southern entrance of the suez canal which provides an accessibility from Sea Land and Air Routes also descending topography towards the sea privileging the project with an open view. Site orientation provides preferred wind from three surrounding direction.
Skeches and Concept Conceptual Layout #1 1
3
2
Sec 1:1 3 2 1
Sec 2:2
Conceptual Layout #2 Sec 3:3
Development of Suez Canal Axis The project Considered Ecofriendly material as a solution to reduce the heat gain of buildings with matter of economic value and Its shapeliness so adding double skin facade which reduces heat gain Of buildings which opposite the sun by 60% and roof garden which will do the same as ecological solution vertical garden also will provide more shapeliness and less heat gain To building with considering to build with local And recycled material such as glasses bottle etc solar cells as Power source will increase the ecological value witch affecting the economic value .9
General Layout
Master Plan
Main Section
Suez Hotel The hotel is designed according to the standards and limitations of the Egyptian code as well as the environmental determinants in the area in order to establish an environmental system and an integrated relationship between the building and the surrounding environment. Thermal energy is one of the most important challenges that I faced in design. It was overcome by thermal insulation of the building by double brick and vertical garden to reduce the increase of internal building temperature. The Islamic decoration was also used to reduce the direct sunlight on the facade
Sect
tion A:A
A
A
G.Floor Plan
Hotel Room Plan
Development of Suez Canal Axis Research Center
Both of two buildings have been designed to be integrated into the nature of the Earth as part of the public space in order to achieve harmony between the building and the human element as a whole. The building is based on the closed loop self-feeding system by using solar panels as an energy source taking into account control of the temperature of the internal building by appropriate thermal insulation to reduce the consumption of energy within the building
Research Center 3D View
Convention Center East Elevation
Convention Center Section
Private Tower G +10 Residential Building Location : Sohag | Area : 300 sqm | Building Type : Residential | Role : Design - Visualizing Period : Dec 2017 | Software : Revit Architecture - PhotoShop CC
Geometric Concept
Typical Floor Plan
Section
Front Elevation
Korbinta HEIGHTS (IN PROGRESS) Residential Villa Location : New Korba | Area : 400 sqm | Building Type : Residential | Role : Remodeling Period : Jan 2018 | Software : Revit Architecture This project is being remodeled in Revit architectural program to benefit from BIM technology applications in this project. KORBENTA Villas is a set of five-piece villas (CLUSTERS) system in different areas ranging from 317 sqm to 398 sqm
Private Villa (IN PROGRESS) Residential
Fishermen Village Labour Housing (Urban Planning) Location : Suez | Area : 39.000 sqm | Building Type : Residential | Role : Design & Planning Period : Oct 2014 - Dec 2014
The main purpose of this project is to emphasize the importance of living parity in the urban communities of the labor force in Egypt. Housing is the most important challenges to the labor force that leads to the erosion of that layer in the small cities and causes their migration to the big cities for the sake of their daily living. Therefore, we must think towards integrated and equal urban communities that offer their residents the opportunity to work and adequate housing resulting in a healthy and integrated society. Based on the above, the project was designed to meet the needs of its residents in terms of construction, green spaces and playgrounds for children etc, taking into consideration the class diversity among the inhabitants of the village, workers, owners, and employees without specifying any lines that separating between them and ensuring the integration of different classes in harmony.
Mid-Class Units Typical Floor (160 sqm)
Econmic-Class Units Typical Floor (100 sqm)
KORBA HEIGHTS Residential Towers Location : New KORBA | Area : 600 ACRES | Building Type : Residential | Role : Tender Dwg Period : Oct 2017 | Software : autoCAD Al Korba Heights is a residential complex in the new city of Korba. Our mission as a team is to prepare fully detailed tender drawings in order to establish the upcoming phases, The first of three stages was created based on the drawings attached.
KORBA HEIGHTS Residential Towers
KORBA HEIGHTS
KORBA HEIGHTS
A
B
C
D
X-06 K08
X-10
X-09
K08
K08
TOP OF PARAPET +26.10
01
01
+25.50 T.O.SS
Y-06
Y-06
K08
K08
+23.80
Y-06
F.F.L
K08
02
02
X-10 K08
1
T.O.SS ROOF +22.50
X-09
2
K08
DETAILED PLAN @ TYP, LEVEL ( B_L6 )
K08_AST_502
1:25
F.F.L L7 +19.40
F.F.L L 6 +16.20
F.F.L L2 +3.40
03
03
F.F.L L5 +13.00
F.F.L L 6 +16.20
F.F.L L4 +9.80
F.F.L L1 +0.20
PART 2 PART 1 04
04
F.F.L L3 +6.60
F.F.L L5 +13.00
F.F.L L2 +3.40
F.F.L GR -3.00
F.F.L L1 +0.20
F.F.L L4 +9.80 05
05
F.F.L GR -3.00
F.F.L BAS -7.50
F.F.L BAS -6.20
F.F.L L3 +6.60
F.F.L BAS -7.50
06
06
2
DETAILED SECTION PART 1OF2
K08_AST_502
PROJECT :
3
DETAILED SECTION PART 2OF2
K08_AST_502
1:25
A
B
4
HEIGHTS
D
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
K19
04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
Heliopolis Developers Group MAIN CONSULTANT :
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
MODIFICATIONS
REV
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN.
OWENER :
1:50
C
GENERAL NOTE :
KORBA
DETAILED SECTION
K08_AST_502
1:25
K14
K20
K21
K1
K18
K2
K17
K3
K16
K4
K6
K10
--------------------28-12-2017
SHEET TITLE BUILDING K_08 ELEVATORS DETAILS
DWG SIZE A
K11
DATE
--------------------100% ISSUE FOR REVIEW
K5
K15
K13
K12
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
K9
K8
K7
DRAWING NUMBER K08_AST_502
0
CAD FILE NAME DRAWN BY:
NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY
CHECKED
:
APPROVED :
DWG REV 00
ALI ABDELAZIZ
DRAWING SCALE 1 : 50
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
001
1 : 50
REV DATE
K08_AST_502
28-12-2017
PROJECT NO :
002-2016
KORBA HEIGHTS 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS
REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
100%ISSUE FOR REVIEW
28-12-2017
B K19
K14
K20
K21
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K1
K18
K11
K10
K9
K8
K7
PROJECT : B
KORBA HEIGHTS
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_08 ELEVATION (1)
DWG SIZE A
K08_AED_ 201
0
CAD FILE NAME
ELEVATION(1)
1
DRAWING NUMBER
DESGIN &DRAWN BY:
1:50 CHECKED
:
APPROVED : 01
02
03
04
05
05
DWG REV 00
ALI ABDELAZIZ
DRAWING SCALE
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
S.N.
1 : 50
001 28/12/2017
REV DATE
K08_AED_ 201 NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY
PROJECT NO :
16002
KORBA HEIGHTS 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS
REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
100%ISSUE FOR REVIEW
28-12-2017
B K19
K14
K20
K21
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K1
K18
K11
K10
K9
K8
K7
PROJECT : B
KORBA HEIGHTS
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_08 ELEVATION (3)
DWG SIZE
DRAWING NUMBER K08_AED_ 203
A 0 CAD FILE NAME
DESGIN &DRAWN BY:
ELEVATION(3)
1
CHECKED
:
APPROVED : 01
02
03
04
05
05
DWG REV 00
ALI ABDELAZIZ
DRAWING SCALE
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
S.N.
1 : 50
001 28/12/2017
REV DATE
K08_AED_ 201 NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY
1:50
PROJECT NO :
16002
KORBA HEIGHTS 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS
REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
---
100%ISSUE FOR REVIEW
28-12-2017
B K19
K14
K20
K21
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K1
K18
K11
K10
K9
K8
K7
PROJECT : B
KORBA HEIGHTS
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_08 SECTIONS
DWG SIZE
DRAWING NUMBER
A
K08_ASS_ 301
0
CAD FILE NAME DESGIN &DRAWN BY:
SECTION
1
CHECKED
1:50 01
02
03
:
APPROVED : 04
05
05
DWG REV 00
K08_ASS_ 301 NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY ALI ABD ALAZIZ
DRAWING SCALE
S.N. 001
1 : 50 REV DATE
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
28-12-2017
PROJECT NO :
16002
KORBA HEIGHTS 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS
REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
---
100%ISSUE FOR REVIEW
28-12-2017
B K19
K14
K20
K21
K1
K18
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K11
K10
K9
K8
K7
PROJECT : B
KORBA HEIGHTS
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_08 SECTIONS
DWG SIZE A
DRAWING NUMBER K08_ASS_ 302
0
CAD FILE NAME DESGIN &DRAWN BY:
CHECKED
1:50 01
02
03
:
APPROVED : 04
05
05
DWG REV 00
K08_ASS_ 301 NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY
SECTION
1
ALI ABD ALAZIZ
DRAWING SCALE
S.N. 002
1 : 50 REV DATE
MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
28-12-2017
PROJECT NO :
16002
North Plus Commercial & Clinical Location :New Cairo | Area : 3000 sqm | Building Type : Commercial & Clinical | Role : Tender Dwg Period : Dec 2017 | Software : autoCAD North Plus is a commercial medical complex with private medical clinics and shops located in North 90th Road New Cairo.
North Plus
North Plus 01
Y-01
02
03
Y-02
Y-03
Y-04
Y-05
Y-06
NP
NP
NP
NP
NP
ADMIN
ADMIN
B3
B3
005
04
Y-07
Y-08
NP
NP
004
B3
05
Y-09
Y-10
Y-11
Y-12
NP
NP
NP
NP
ADMIN
ADMIN B3
003
05
Y-13
Y-14
Y-15
Y-16
Y-17
Y-18
NP
NP
NP
NP
NP
NP
002
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
X-14 NP
+2.50 F.C.L
F3
F3
NP 95/L1
96/L1
S
S
F3
97/L1 +2.50 F.C.L
S
D
H
S
H
+2.50 F.C.L
+2.65 F.C.L
+2.50 F.C.L
A PT 04
+2.40 F.C.L
+2.40 F.C.L
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN.
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
F3
A1
STAIR 02 B3
FA/L1
WAP
91/L1
F3
S
+2.40 F.C.L
A PT 11
90/L1
D
04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
A PT 11
94/L1
F3
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
X-13
+2.40 F.C.L
A PT 11
108/L1
109/L1
110/L1
H
H
H
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY.
A2
RECESSED MOUNTED, WATER-RESISTANT LED DOWNLIGHT, Ø 20MM , 13w. LUMIN NOT LESS THAN 1000LUMEN, IP=40 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
A2E
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY. RECESSED MOUNTED, WATER-RESISTANT LED DOWNLIGHT, Ø 20MM , 13w. LUMIN NOT LESS THAN 700LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
A3
X-12
+2.60 F.C.L
A4
NP
A4E
+2.50 F.C.L
UP
LUMIN NOT LESS THAN 1800LUMEN, IP=20 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
A1E
001
A5E
+2.60 F.C.L
SURFACE MOUNTED L=120cm LIGHTING FIXTURE LED LIGHT MODULE 20w, LUMIN NOT LESS THAN2200LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
F3
S
A PT 04
F3E
101/L1
F3E
A PT 06
F3
F3
86/L1
72/L1
H
H
CEILING MOUNTED SELF-CONTAINED SINGLE SIDED EXIT SIGN WITH 4W LED, IP65, FOR MAINTAINED / NON-MAINTAINED EMERGENCY LIGHTING NOT LESS THAN 3 HOURS DURATION
CEILING INFORMATION OUTLET FOR WIRELESS ACCESS POINT DOME CCTV CAMERA (HANGING BOTTOM OF CEILING)
C
NP
+2.65 F.C.L
ADDRESSABLE PHOTOE-FAECTRIC SMOKE DETECTOR COMPLETE WITH ISOLATOR BASE.
S
011
SHOULD BE A 2 SLEEVES 110MM IN THE BEAM TO BE SHOWN IN SHOP DRAWINGS
A PT 06
H
BOLLARD WITH REFLECTORS FOR 25W LED LIGHT LAMP, WITH MOUNTING PLATE FOR BOLTING TO A FOUNDATION OR ANCHORAGE UNIT, IP67.
WAP
X-10
87/L1
EX
NP UP
B3
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY.
SMART FORM -RECESSED MOUNTED LED-MODULE, 60X60 CM. (NON DIMMABLE), 41W . LUMIN NOT LESS THAN4000LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
C2
X-11
F3
F3E
S
STORAGE
DITTO ABOVE, BUT CONNECTED TO EMERGENCY CIRCUIT.
SMART FORM -RECESSED MOUNTED LED-MODULE, 60X60 CM. (NON DIMMABLE), 72W LUMIN NOT LESS THAN 6200LUMEN, WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
b F4
F3
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY.
DITTO ABOVE, BUT WITH 1 HOUR BACK UP BATTERY. F3
99/L1
RECESSED MOUNTED, STORE FLUX, FOUR LED MODULES , 25w. LUMIN NOT LESS THAN 2700LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
RECESSED MOUNTED, TURN ROUND WATER-RESISTANT LED DOWNLIGHT, Ø 20MM , 20w. LUMIN NOT LESS THAN 1800LUMEN, IP=45 WITH ALL ACCESSORIES NEEDED FOR INSTALLATIONS.
A5
111/L1
112/L1
113/L1
S
H
H
H
H
ADDRESSABLE RATE OF RISE HEAT DETECTOR COMPLETE WITH ISOLATOR BASE
M
ADDRESSABLE MULTI DETECTOR COMPLETE WITH ISOLATOR BASE.
104/L1 S
+2.65 F.C.L
ADDRESSABLE PHOTOE-FAECTRIC SMOKE DETECTOR COMPLETE WITH ISOLATOR BASE ABOVE FALSE CEILING
b
b SUPPLY REGISTER
X-09
RETURN REGISTER
NP
EXHAUST GRILL
RETURN CEILING DIFFUSER
C
SUPPLY CEILING DIFFUSER
F3
F3
THERMOSTAT.
T
X-08
ACCESS DOOR
NP
F3
F3
F3E
F3
F3
F3E
73/L1
131/L1
H
H
+2.60 F.C.L AREA TO BE FINISHED BY OWNER .
PAINT TYPE A-PT-06
84/L1
117/L1
H
H
UPRIGHT SPRINKLER HEAD PENDENT FLUSH SPRINKLER HEAD
83L1
85/L1
130/L1
116/L1
X-07
H
H
H
H
NP
MODIFICATIONS
REV
A PT 06 A PT 06
82/L1
H
F3
74/L1
F3
129/L1
F3E
H
F3
H
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
NP
F3E
A PT 06
BY
X-06
F3
F3E
B
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
+2.60 F.C.L
118/L1
H 81/L1
128/L1
H
H
79/L1
119/L1
X-05
H
NP
H
F3
80/L1
F3E
75/L1
H
+2.60 F.C.L
H
F3
F3
127/L1
F3
F3E
H
PROJECT :
F3 F3
NORTH PLUS
B
120/L1
H
X-04
126/L1
NP
H 121/L1
F3
F3E
H
OWENER :
F3
i A PT 02
Heliopolis Developers Group
A PT 01
X-03 77/L1
F3
F3E
A
78/L1
H
H
123/L1
M
H
F3E
F3
F3E
F3E
F3E A PT 02
i
i
SHEET TITLE
122/L1
M
REFLECTED CEILING PLAN @ LEVEL B3 -6.95
NP_ADT_111_B3 (-6.95)
MAIN CONSULTANT :
124/L1
F3
H
1
A
NP
76/L1
S
i
THIRD BASEMENT FLOOR REFLECTED CEILING PLAN
n
1:50
DWG SIZE A
X-02 NP
X-01 NP 01
02
03
04
05
05
0
DRAWING NUMBER
NP_ADT_111_B3 (-6.95)
CAD FILE NAME
NP_ADT_111_B3 (-6.95)
DESGIN &DRAWN BY:
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
CHECKED
:
APPROVED :
ALI ABDELAZIZ
NADA EZAT AMR MUSTAFA
SCALE
1:50
REV 02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
North Plus 01
02
03
2
Y-02
Y-06
NP-AWS-310
NP
NP
1
04
1
Y-07
NP-AWS-313
NP
05
05
GENERAL NOTE :
1
Y-08
NP-AES-203
NP-AES-203
Y-09
Y-10
Y-11
Y-12
NP
NP
NP
NP
NP
2
2
Y-13
NP-AWS-312
Y-17
NP-AWS-311
NP
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
NP
1 NP-ASS-302
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
D
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED. 05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
06 D
NP-ASD-401
X-12
X-12
NP
NP STAIR 01 L2
STAIR 02
UP
055
L2
02
001
NP-AVD-403
+12.70 F.F.L
X-11
X-11
02
NP
NP
NP-AVD-403 UP
X-10
X-10
06
NP
NP
NP-ASD-401 STORAGE L2
STORAGE
053
L2
L2
053
C
ELEC. ROOM
STORAGE
L2
002
054
B.ROOM
X-09
L2
B.ROOM
052
L2
X-09
003
NP
NP
CORRIDOR L2
C
056
X-08
X-08
NP
NP
WAITING L2
WAITING
051
L2
WAITING
044
L2
WAITING
043
L2
WAITING
036
L2
WAITING
035
L2
WAITING
028
L2
WAITING
027
L2
WAITING
020
L2
WAITING
019
L2
WAITING
012
L2
011
WAITING L2
004
X-07
X-07
NP
NP
1
1
NP-AES-204
NP-AES-202 B.ROOM L2
B.ROOM
050
L2
B.ROOM
045
L2
B.ROOM
042
L2
037
B.ROOM L2
B.ROOM
034
L2
B.ROOM
029
L2
B.ROOM
026
L2
B.ROOM
021
L2
B.ROOM
018
L2
013
B.ROOM L2
L2
X-06
NP
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
005
X-06
NP
1
MODIFICATIONS
REV
B.ROOM
010
BY
DATE
-------
100 % ISSUE FOR CONSTRUCTION
16-11-2017
1
NP-AWS-312
NP-AWS-310 DOCTORS ROOM1 L2
DOCTORS ROOM1
049
L2
DOCTORS ROOM1
046
L2
DOCTORS ROOM1
041
L2
038
DOCTORS ROOM1 L2
DOCTORS ROOM1
033
L2
DOCTORS ROOM1
030
L2
DOCTORS ROOM1
025
L2
022
DOCTORS ROOM1 L2
DOCTORS ROOM1
017
L2
014
DOCTORS ROOM1 L2
DOCTORS ROOM1 L2
009
1
006
NP-ASS-301
B
X-05
X-05
NP
NP DOCTORS ROOM2 L2
048
DOCTORS ROOM2 L2
DOCTORS ROOM2
047
L2
DOCTORS ROOM2
040
L2
039
DOCTORS ROOM2 L2
DOCTORS ROOM2 L2
032
DOCTORS ROOM2
031
L2
DOCTORS ROOM2
024
L2
DOCTORS ROOM2
023
L2
DOCTORS ROOM2
016
L2
015
DOCTORS ROOM2 L2
008
DOCTORS ROOM2 L2
007
PROJECT :
X-04
X-04
NP
NP
NORTH PLUS
B
OWENER :
Heliopolis Developers Group A
1 Y-02
Y-06
Y-07
Y-08
Y-09
NP
NP
NP
NP
NP
A
1
1 NP-AES-201
Y-10
Y-11
Y-12
Y-13
NP
NP
NP
NP
MAIN CONSULTANT :
NP-AWS-311
Y-17 NP
SHEET TITLE
LEVEL 2 FLOOR PLAN +12.70
NP_APS_106_L2 +12.70
NORTH PLUS LEVEL 2 FLOOR PLAN +12.70
1:50
DWG SIZE A
DRAWING NUMBER
0
NP_APS_106_L2 +12.70
CAD FILE NAME
NP_APS_106_L2 +12.70
DESGIN &DRAWN BY:
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
CHECKED
:
APPROVED : 01
02
03
04
05
05
ALI ABDELAZIZ
NADA EZAT AMR MUSTAFA
SCALE
REV
1 : 50
02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
North Plus 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
D
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED. 05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
Y-02
Y-03
Y-04
Y-05
Y-06
Y-07
Y-08
NP
NP
NP
NP
NP
NP
NP
D
1 NP-ASS-302
Y-09
Y-10
Y-11
Y-12
Y-13
Y-14
Y-15
Y-16
NP
NP
NP
NP
NP
NP
NP
NP
TOP OF PARAPET
Y-17
NP-AWS-311
NP
TOP OF PARAPET
+29.40 UR
1
+29.40
+29.10
T.O.SS PAINT
A PT 01
A PT 01
PAINT
TOP OF PARAPET +26.70 TOP OF PARAPET +26.00 5MM GROOVE
R
+24.60
North PLUS
100 MM LED LIGHT GROOVE
Clinics & Commercial
T.O.SS CLADDING
A MT 01
C
A MT 01
A ME 01
L4
+20.70
F.F.L
F.F.L
F.F.L
+20.60
+20.60
CLADDING
LOUVERS
C
CLADDING
L3
A CW 01
+16.70
F.F.L
A CW 01
F.F.L
F.F.L
+16.60
+16.60
CLADDING
MODIFICATIONS
REV
E.L L2
F.F.L
+12.90
+12.70
+12.20
A MT 01
F.F.L E.L
A MT 02
+11.60 CLADDING
A MT 01
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
CLADDING
16-11-2017
CLADDING CLADDING
PAINT
A PT 13
F.F.L
L1 +8.70
+8.60
F.F.L CLADDING CLADDING
CLADDING
A MT 02
A MT 01
A CW 02
A CW 02
CLADDING
PROJECT :
PAINT
A PT 13
NORTH PLUS
B
F.F.L
F.F.L
GR +3.70
PAINT
F.F.L
+3.70
+3.60
F.F.L
+3.60
OWENER :
A PT 14
CLADDING
PAINT
A PT 13 A CW 02
Heliopolis Developers Group A CW 02
F.F.L
F.F.L
-0.17 B1
-------
100 % ISSUE FOR CONSTRUCTION
DATE
A MT 03
B
A
BY
-0.17
F.F.L
F.F.L
-0.50
A MT 03
CLADDING
A
MAIN CONSULTANT :
CLADDING
-0.50
-0.40
F.F.L
F.F.L
1 NP-AES-202
-1.20
FRONT ELEVATION
SHEET TITLE
1:50
NORTH PLUS ELEVATIONS DWG SIZE A
0
DRAWING NUMBER NP-AES-201
CAD FILE NAME
NP-AES-201
DESGIN &DRAWN BY:
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
CHECKED
:
APPROVED : 01
02
03
04
05
05
ALI ABDELAZIZ
NADA EZAT AMR MUSTAFA
SCALE
REV
1 : 50
02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
01
02
03
04
X-04
X-05
X-06
NP
NP
NP
05
X-07
X-08
X-09
NP
NP
NP
TOP OF PARAPET +29.40 UR
+29.10
T.O.SS
1
1
NP-ASS-301
NP-AWS-310
05
X-10
X-11
X-12
NP
NP
NP
GENERAL NOTE :
TOP OF PARAPET
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
+29.40 UR
+29.10 T.O.SS
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
D
PAINT
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
A PT 13
TOP OF PARAPET
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
TOP OF PARAPET
+26.70
+26.70
TOP OF PARAPET +26.00 D
F.F.L R
+24.60
R
+24.60
T.O.SS
A MT 01
+24.60 T.O.SS
CLADDING
5MM GROOVE
A CW 01
CLADDING
L4
CLADDING
A MT 01
F.F.L
+20.70
L4
+22.60
F.F.L LOUVERS
+20.70 F.F.L
A MT 04 C
PAINT
L3
A PT 13
F.F.L
+16.70 CLADDING
F.F.L
L3
+16.60 A MT 01
A MT 01
CLADDING
+16.70 F.F.L
C
F.F.L
F.F.L L2
+12.70 CLADDING
F.F.L
CLADDING CLADDING
A MT 02
LOUVERS
+12.90
+12.65
L2
A MT 01 A MT 01
F.F.L
A MT 02
+12.70 F.F.L
CLADDING
+11.60 A MT 01
MODIFICATIONS
REV
A MT 01
L1 +8.70
CLADDING
L1 +8.70
F.F.L
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
F.F.L
BY
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
TOP OF PARAPET T.O.S.S
+6.20
+5.90 B
A PT 14
PAINT
RMU GR 011
F.F.L GR +3.70
F.F.L +3.95
+3.70
GR +3.70
F.F.L
F.F.L F.F.L +2.70
COMMERCIMT LOUVERS
SUPER MARKET
005 B1
A MT 01
B1
PROJECT :
011
NORTH PLUS
B
F.F.L B1
-0.33
-0.50
F.F.L
B1
-0.50 F.F.L
F.F.L -1.20
OWENER :
SLOPE
TRANS
1/6
B2 001
GARAGE B2
00
Heliopolis Developers Group A
F.F.L B2
MAIN CONSULTANT :
-3.85
-4.00
B2
T.O.SS
T.O.SS
SLOPE
A
1/6
STORAGE
GARAGE
B3 013
B3
-4.00
B3
SHEET TITLE
00
NORTH PLUS
-6.95
B3
F.F.L
ELEVATIONS
-7.05 T.O.SS DWG SIZE A
0
DRAWING NUMBER NP-AES-202
CAD FILE NAME
NP-AES-201
DESGIN &DRAWN BY:
1
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
SIDE ELEVATION
CHECKED
NP-AES-202 1:50
:
APPROVED : 01
02
03
04
05
05
ALI ABDELAZIZ
NADA EZAT AMR MUSTAFA
SCALE
REV
1 : 50
02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
North Plus 01
02
03
04
Y-02
Y-03
Y-04
Y-05
Y-06
Y-07
Y-08
Y-09
Y-10
NP
NP
NP
NP
NP
NP
NP
NP
NP
TOP OF PARAPET
05
+29.40
05
Y-11
Y-12
Y-13
Y-14
Y-15
Y-16
Y-17
NP
NP
NP
NP
NP
NP
NP
TOP OF PARAPET
GENERAL NOTE :
UR
1 13
PAINT
A PT 13
A PT 13
PAINT
A PT 13
+29.10 T.O.SS
NP-AWS-311
A PT 01
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
+29.40
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
PAINT
D
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
TOP OF PARAPET
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
TOP OF PARAPET
+26.70
+26.70 TOP OF PARAPET
CLADDING D
+26.00 A MT 01
T.O.SS
A MT 01
+24.60
CLADDING
R
+24.60 T.O.SS
CELLING
A PT 09 A PT 09
LOUVERS
CLADDING
DOCTORS ROOM1
A ME 01
L4
DOCTORS ROOM1
049
L4
DOCTORS ROOM1
046
L4
DOCTORS ROOM1
041
L4
038
DOCTORS ROOM1 L4
DOCTORS ROOM1
033
L4
DOCTORS ROOM1
030
L4
DOCTORS ROOM1
025
L4
DOCTORS ROOM1
022
L4
017
DOCTORS ROOM1 L4
DOCTORS ROOM1
014
L4
DOCTORS ROOM1
009
L4
A ME 01
006
A MT 01
A MT 01
CELLING
LOUVERS
CLADDING
L4
+20.70 F.F.L
CELLING
A PT 09 A PT 09
DOCTORS ROOM2 L3
DOCTORS ROOM1
048
L3
DOCTORS ROOM1
045
L3
DOCTORS ROOM1
040
L3
037
DOCTORS ROOM1 L3
DOCTORS ROOM1
032
L3
DOCTORS ROOM1
029
L3
DOCTORS ROOM1
024
L3
DOCTORS ROOM1
021
L3
016
DOCTORS ROOM1 L3
L3
C
DOCTORS ROOM1
DOCTORS ROOM4
013
CELLING
L3
008
005
L3
+16.70 F.F.L
CELLING C
A PT 09 A PT 09
DOCTORS ROOM1
DOCTORS ROOM1 L2
L2
049
DOCTORS ROOM1
046
L2
DOCTORS ROOM1
041
L2
038
DOCTORS ROOM1 L2
DOCTORS ROOM1
033
L2
DOCTORS ROOM1
030
L2
DOCTORS ROOM1
025
L2
DOCTORS ROOM1
022
L2
017
DOCTORS ROOM1 L2
DOCTORS ROOM1
014
L2
CELLING
DOCTORS ROOM1
009
L2
006
L2
+12.70 F.F.L
COMMERCIMT L1
COMMERCIMT
COMMERCIMT
010
L1
L1
009
COMMERCIMT
008
L1
COMMERCIMT
007
L1
COMMERCIMT
COMMERCIMT
006
L1
L1
005
COMMERCIMT
004
L1
A PT 14
F.F.L
CLADDING
PAINT
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
L1 +8.70 A MT 01
BY
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
A PT 14
TOP OF PARAPET
PAINT
+6.20
TOP OF PARAPET B
MODIFICATIONS
REV
003
+5.40
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
COMMERCIMT
GR 009
GR 008
GR 007
GR 006
GR 005
GR 004
GR 003
GR 002
GR +3.70 F.F.L
PAINT
COMMERCIMT B1
SUPER MARKET
COMMERCIMT
010
B1
B1
009
COMMERCIMT
011
B1
SUPER MARKET
COMMERCIMT
008
B1
B1
007
COMMERCIMT
011
B1
A PT 01
PROJECT :
COMMERCIMT
006
B1
005
NORTH PLUS
B
F.F.L T.O.SS
T.O.SS
-0.60
-0.60
-0.18 B1
-0.50 F.F.L
OWENER :
GARAGE
T.O.SS
B2
GARAGE
00
B2
GARAGE
00
B2
00
Heliopolis Developers Group
-3.13 A
T.O.SS B2
-4.00
-4.00
MAIN CONSULTANT :
T.O.SS A
T.O.SS GARAGE
-5.85
B3
GARAGE
00
B3
GARAGE
00
B3
GARAGE
00
B3
SHEET TITLE
00
NORTH PLUS T.O.SS
T.O.SS
-7.05
-7.05
B3
DETAILED SECTIONS
-7.05 T.O.SS DWG SIZE A
0
DRAWING NUMBER
NP-ASS-301
NP-ASS-301 01
02
03
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
DETAILED SECTION
CHECKED
1:50
:
APPROVED : 04
05
05
ALI ABDELAZIZ
SCALE 1 : 50
NP-ASS-301
CAD FILE NAME
DESGIN &DRAWN BY:
1
NADA EZAT AMR MUSTAFA
REV 02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
North Plus 01
02
03
04
X-04
X-05
X-06
X-07
NP
NP
NP
NP
PAINT
A PT 01
TOP OF PARAPET
05
X-08
X-09
X-10
X-11
NP
NP
NP
NP
UR
05
GENERAL NOTE :
X-12 TOP OF PARAPET
+29.40
NP
+29.40
1
+29.10
NP-ASS-301
T.O.SS
UR
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
+29.10 T.O.SS
1
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
NP-AWS-310
PAINT
A PT 01
A CW 01
CLADDING
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
+26.70
CLADDING
D
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
TOP OF PARAPET
A MT 01
F.F.L R
+24.70
+24.60
R
T.O.SS
+24.60 T.O.SS
CELLNG
CLADDING
A PT 09
A PT 09
A MT 01
DOCTORS ROOM1
DOCTORS ROOM2 L4
L4
031
030
B.ROOM L4
WAITING
029
L4
STAIR 01
CORRIDOR
028
L4
CELLNG
L4
056
055
F.F.L +21.53
L4
+20.70
L4 CLADDING
F.F.L
CELLNG
+20.70 F.F.L
A MT 01
A PT 09 C
DOCTORS ROOM2 L3
DOCTORS ROOM1
030
L3
029
WAITING
B.ROOM L3
L3
028
CORRIDOR
027
L3
STAIR 01
056
L3
053
F.F.L
A CW 01
CLADDING
+17.70
L3
+16.70
L3 CLADDING
F.F.L
CELLNG
+16.70 F.F.L
A MT 01
A PT 09
A PT 09
CELLNG
C
CLADDING
A CW 01
STAIR 01 DOCTORS ROOM2 L2
DOCTORS ROOM1
031
L2
030
B.ROOM L2
029
WAITING L2
L2
CORRIDOR
028
L2
055
F.F.L
056
+13.70
L2
CLADDING
+12.70
L2
A MT 03
F.F.L
+12.70 F.F.L
CLADDING
A MT 02
MODIFICATIONS
STAIR 01 L1
012
REV
F.F.L COMMERCIMT L1
CORRIDOR
007
L1
A MT 01
L1 +8.70 CLADDING
F.F.L
CLADDING
CLADDING
CLADDING
L1 +8.70 F.F.L
A MT 01
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
+9.70
013
BY
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
A MT 02
A MT 01
A MT 01
CLADDING
STAIR 01 GR 010
F.F.L
COMMERCIMT GR 006
+5.37
B
F.F.L GR +3.70
+3.70
F.F.L
COMMERCIMT B1
SUPER MARKET
008
B1
CONTROL ROOM
011
B1
B1
+3.55
F.F.L
GR +3.70 F.F.L
+3.32
SUPER MARKET
STORAGE
002
F.F.L
B1
004
PROJECT :
011
B1
-0.18
T.O.SS
-0.50
B1
-0.60
F.F.L
NORTH PLUS
B
F.F.L -0.50 F.F.L
T.O.SS -1.60 OWENER : STAIR 01 GARAGE B2
B2
GARAGE
00
B2
008
F.F.L
00
B.ROOM B2
007
-3.06
T.O.SS
Heliopolis Developers Group
-3.40 T.O.SS B2
-4.00
B2
-4.00
T.O.SS
-4.00
A
MAIN CONSULTANT :
T.O.SS
A
GARAGE B3
T.O.SS B3
F.F.L
-6.90
-7.05
GARAGE
00
B3
F.F.L
00
-6.90
-7.05
ADMIN B3
SHEET TITLE
003
-6.40
F.F.L
T.O.SS
-6.90
NORTH PLUS
T.O.SS
B3
-7.35
T.O.SS
DETAILED SECTIONS
-7.05 T.O.SS DWG SIZE A
0
DRAWING NUMBER
NP-ASS-301
NP-ASS-302 01
02
03
04
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
DETAILED SECTION
CHECKED
1:50
:
APPROVED : 05
05
ALI ABDELAZIZ
SCALE 1 : 50
NP-ASS-302
CAD FILE NAME
DESGIN &DRAWN BY:
1
NADA EZAT AMR MUSTAFA
REV 02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
North Plus 01
02
03
04
05
05
GENERAL NOTE
Y-10
Y-11
NP
NP
1 NP_AST_401
Y-12
Y-10
NP
Y-11
NP
NP
1 NP_AST_401
Y-12
Y-10
NP
Y-11
NP
NP
1 NP_AST_401
Y-12
Y-10
NP
Y-11
NP
NP
1 NP_AST_401
01. ALL DRAWINGS AND AND AS SUCH REMA FIRM. THEY ARE TO ALL COPIES ARE TO MAIN CONSULTANT
Y-12 NP
02. THESE DRAWINGS M PRIOR WRITTEN AP
D
03. DIMENSIONS ON TH DIMENSIONS ARE T
04. ALL DIMENSIONS O NOTE: (millmeter) OR
X-12
05. ANY INCONSISTENC ATTENTION OF AND BEFORE THE WORK
X-12
NP
NP
D
-0.50 F.F.L
+8.70 F.F.L
-1.34 F.F.L
+7.03 F.F.L
+20.70 F.F.L
X-11
X-11
NP
NP
-6.90 F.F.L
-6.41 F.F.L
-0.50 F.F.L
+0.34 F.F.L
+8.70 F.F.L
+9.70 F.F.L
UP
+12.70 F.F.L
C
UP
X-10
X-10
NP
NP
C
Y-10
Y-11
NP
NP
Y-10
Y-12 NP
DETAILED PLAN @ LEVEL B3 -6.95
1 NP_AST_401
Y-11
NP
3 NP_AST_401
1:25
Y-12
NP
Y-10
NP
Y-11
NP
NP
DETAILED PLAN @ LEVEL B1 -0.50
5 NP_AST_401
1:25
Y-12
Y-10
NP
Y-11
NP
NP
DETAILED PLAN @ LEVEL L1 +8.70
6
1:25
Y-12 NP
DETAILED PLAN @ LEVEL TYP( L2 : L4 )
NP_AST_401
1:25
M
REV
Y-10
Y-11
NP
NP
1 NP_AST_401
Y-12
Y-10
NP
X-12
X-12
NP
Y-11
NP
NP
NP
1 NP_AST_401
Y-10
Y-12
X-12
X-12
NP
Y-11
NP
NP
NP
NP
1 NP_AST_401
Y-12 NP
X-12
DESCRIP
10 09 08 07 06 05 04 03 02 01 00
100 % ISSUE FOR CO
X-12
NP
NP
B
-3.85 F.F.L
-4.76 F.F.L
+3.70 F.F.L
+24.60 T.O.SS.
+2.02 F.F.L
+23.20 F.F.L
PROJECT :
N
B
X-11
X-11
NP
NP
X-11
X-11
NP
NP
X-11
X-11
NP
NP
OWENER :
-3.85 F.F.L
-3.02 F.F.L
+3.70 F.F.L
+24.60 T.O.SS.
+5.37 F.F.L
UP
+21.53 F.F.L
H A
X-10
X-10
NP
NP
X-10
X-10
NP
NP
X-10
X-10
NP
MAIN CONSULTAN
NP
A
Y-10
Y-11
NP
NP
Y-12 NP
Y-10
Y-11
NP
NP
Y-12 NP
Y-10
Y-11
NP
NP
Y-12
SHEET TITL
NP
ST
2 NP_AST_401
DETAILED PLAN @ LEVEL B2 -3.90 1:25
4 NP_AST_401
DETAILED PLAN @ LEVEL GR +3.70 1:25
7 NP_AST_401
DETAILED PLAN @ LEVEL ROOF 1:25
DWG SIZE A
0
DRAWING NP-AST-401
CAD FILE NAME
NP
DESGIN &DRAWN BY:
MOHAMED T DOHA SHALA MOSTAFA MA
CHECKED
:
APPROVED :
ALI ABDELA
North Plus 01
02
03
04
05
05
GENERAL NOTE : Y-10
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
NP
NP
4
01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS.
K00-ATS-171
Y-09
NP
3
Y-08
NP K00-ATS-171
Y-07
02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
X-04 NP D
X-01
X-02
X-03
X-04
NP
NP
NP
NP
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED. 05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
TANK B3
D
T.O.SS
-6.90 T.O.SS
-3.40
009
-4.00 T.O.SS
X-03 NP
-7.50 T.O.SS
PUMP ROOM B3
-7.50 T.O.SS
TANK B3
TANK
008
B3
010
B3
009
-7.35 T.O.SS
-6.90 T.O.SS
010
TANK
T.O.SS -6.90
-8.55 T.O.SS
X-02 NP
X-01 NP
C
Y-07
Y-08
Y-09
NP
NP
NP
Y-10
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
NP
DETAILED PLAN @ B3 -6.95
1 NP-ATS-171
2 NP-ATS-171
1:50
DETAILED SECTION 1:50
Y-08
Y-09
Y-10
NP
NP
NP
3
NP
K00-ATS-171
2
Y-07
K00-ATS-171
C
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
X-04 NP
-3.40 T.O.SS
-3.40 T.O.SS
-3.40 T.O.SS
X-01
X-02
X-03
X-04
NP
NP
NP
NP
-3.85 T.O.SS
B2
-4.00 T.O.SS
MOUSQE 009
-6.80
TANK
TANK
B3
B3
010
009
BY
-------
100 % ISSUE FOR CONSTRUCTION
DATE
16-11-2017
-6.80
-6.90
F.F.L
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
T.O.SS
NP
B2
MODIFICATIONS
REV
-3.40
X-03
F.F.L
T.O.SS -7.50
-7.50
T.O.SS
-7.05 T.O.SS
B3
-7.05 T.O.SS
T.O.SS
1 K00-ATS-171
B
X-02 NP
X-01 NP
Y-07
Y-08
Y-09
NP
NP
NP
Y-10 NP
2 NP-ATS-171
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
DETAILED PLAN @ B2 -3.90
3 NP-ATS-171
1:50
DETAILED SECTION 1:50
PROJECT :
NORTH PLUS
B
Y-07
Y-08
Y-09
Y-10
Y-11
Y-12
Y-13
Y-14
Y-15
NP
NP
NP
NP
NP
NP
NP
NP
NP
OWENER :
-3.40 T.O.SS
B2
-4.00
-3.85
-4.00
F.F.L
T.O.SS
T.O.SS
Heliopolis Developers Group
TANK B3
PUMP ROOM
010
B3
A
MAIN CONSULTANT :
008
A
-6.80
B3
-7.05
T.O.SS
-6.90
F.F.L
T.O.SS
-7.35
-7.25
-7.35
T.O.SS
F.F.L
T.O.SS
SHEET TITLE NORTH PLUS TANKS DETAILS
-8.55 T.O.SS
DWG SIZE A
0
DRAWING NUMBER
NP-ATS-171
NP-ATS-171 01
02
03
MOHAMED TITO DOHA SHALAPY MOSTAFA MAGDY
DETAILED SECTION
CHECKED
1:50
:
APPROVED : 04
05
05
ALI ABDELAZIZ
SCALE 1 : 50
NP-ATS-171
CAD FILE NAME
DESGIN &DRAWN BY:
1
NADA EZAT AMR MUSTAFA
REV 02
S.N. 001 16-11-2017
REV DATE PROJECT NO :
16005
Sketching At the past three years I enjoyed drawing as a hobby and use it as a tool to express my ideas, i enjoy both architecture drawing and anatomy
Thank You