PROJECT undersTanding: WhaT We KnoW abouT The Frolio school The Frolio Middle School project is a major step in implementing Abington’s vision for revitalization of its school facilities. As such, it represents an opportunity to accomplish a number of important goals: ▪ Modernize and improve or replace a school building that, although extremely well maintained, is undersized and inadequate for current and future needs . ▪ create new educational space and transform existing space to meet the current needs of education that the existing building is ill-suited for. ▪ look at possible changes in educational delivery at the Middle School (and possibly high School) level(s), and provide long-term flexibility for changes in approach to teaching and learning in the building. The need to address the Frolio Middle School Building has been discussed for many years, and the Town has recently won MSBA approval to proceed with Feasibility Study and Schematic design and Town approval to fund the work. Based on the published enrollment certification, as an option to a new middle school, MSBA may be open to the possibility of a combined Middle and high School project (grades 6-12).
Given the apparent interest in being able to take a project for Town votes in the spring of 2014, we have outlined a schedule to reconcile the MSBA requirements and milestone dates to allow this possibility. In the sections that follow, we will illustrate some of the educational planning issues that are part of designing a 21st century Middle School or Middle/high School and will also show how some of these might apply to possible design approaches for a new Frolio School.
Planning a neW 21sT cenTury school For abingTon
Program legend classroom clusTer clASSRooM (cR) ScIence (ScI) SPecIAl ed / ReSouRceS (R) coMPuTeR lAB (cl)
sci
cr cr
cr r
PlAnnInG MIddle School TeAM cluSTeRS Middle School educational planning is typically based on educational teams, and we understand that the Frolio School is configured in a teaming structure. In many schools, however, including the Frolio, a team approach to teaching exists in the confines of a building designed for an older educational model, which can limit the effectiveness of team teaching. Purpose-designed middle schools can more effectively accommodate team teaching by providing classroom configurations that are readily combined into team clusters, with science rooms included in individual team clusters. As an example, the Pepperell Middle School, of which a grade wing is illustrated here, is designed as a team-taught middle school for grades 6, 7 and 8. The plan of a single grade wing shows how classrooms and science rooms can be combined into team clusters. This allows the creation of individual “home bases” for teams, within the larger context of the wing that houses the entire grade. The grade Frolio Middle School, Abington, MA -1-
r cr sci cr cr cr
sci
cr cr
TyPIcAl MS clASSRooM WInG oRGAnIZed In TeAM cluSTeRS. nISSITISSIT MIddle School, PePPeRell, MA
wing also includes toilets, a computer/Technology, Special education space, so that it functions as a selfcontained educational community within the larger school. Teacher team planning is encouraged to take place within the educational team space.
PlAnnInG ThAT SuPPoRTS A FocuS on STeM current secondary educational thinking emphasizes the importance of bringing a unified approach to the teaching of Science, Technology, engineering and Mathematics (STeM). The Middle School team cluster approach lends itself well to this. The traditional high School, typically designed around a strict division of departments, is less well configured to support this. Recent thinking on High School design reflects elements of the middle school team cluster design, with spaces created for smaller learning communities that include science labs, flexible classrooms and other kinds of flexible learning spaces. Team planning space is typically provided within the cluster to encourage teambased planning. The illustration of a prototypical STeM cluster shows one way of achieving this. A detail from our plans for the new essex north Shore Agricultural and Technical School (currently under construction) shows how this can be incorporated into a new secondary school. We have been able to achieve similar results (with some modifications) in our planning for High School renovations as well.
FlexIBle clASSRooM deSIGn A key element of 21st century School design is the creation of Flexible classrooms. This term refers to classrooms that are configured and equipped so that they are readily adaptable to different approaches to instruction, including lecture mode, small group arrangements, project arrangement, seminar arrangement and others. The success of the Flexible Classroom is dependent on the configuration and detailing of the room itself and on the use of furnishings and movable equipment.
disPersed science/Tech ▪ Promotes interdisciplinary teaching classroom clusTers ▪ Around flexible learning alcoves ▪ Select operable partitions ▪ Good visibility and connections ▪ Supports project based activities, teaming
uPPeR leVel
disPersed Planning ▪ Fosters collaborative work
MAIn leVel
loWeR leVel
esseX norTh shore agriculTural Technical school sTacKed Plan classroom
SMAll GRouPInGS
MedIuM GRouPInGS
lARGe GRouPInGS
lecTuRe ARRAnGeMenT
PRoJecT ARRAnGeMenT
deBATe ARRAnGeMenT
FleXible classroom layouTs
classroom
science lab prep
teacher planning
storage
flexible learning
connected classroom
ProToTyPe sTem clusTer Frolio Middle School, Abington, MA -2-
science lab
oPTions For a neW Frolio school
ISSueS FoR A coMBIned MS/hS TAunTon exAMPle For many school districts, particularly those with modest enrollment numbers, combining the middle and high schools into a single complex offers opportunities to both save money and provide richer facilities. At the same time, this approach can generate concerns about the impact of mixing middle-grade students and high School students in the same building. There are a number of design strategies for addressing these concerns. Plans for a combined MS/hS building will often provide separate academic wings with separate entrances and separate administration areas for Middle School and high School. decisions are required regarding which major spaces (including cafeterias, libraries, auditoriums and gymnasiums) might be shared and which need to be provided separately for MS and hS use. These decisions need to reect both cost concerns and community attitudes as to what degree of spacesharing is acceptable. The Taunton Middle and high School, a recently completed additions and renovations project, shows one approach to addressing these concerns. In the plan diagram included here, middle school and high school academics are housed in separate wings with separate entrances. Because this is a large (2600) school, many of the major spaces, including gymnasiums, libraries, and cafeterias, are provided separately for the middle and high schools. The auditorium is shared, and a 3rd major entrance is provided for community use.
hS AcAdeMIc
hS enTRAnce
MAIn enTRAnce
Plan - TauTon hs and ParKer ms
MS enTRAnce MS AcAdeMIc
Program legend hIGh School AcAdeMIc hIGh School lARGe SPAceS MIddle School AcAdeMIc MIddle School lARGe SPAceS ShARed SPAceS
An important part of our Feasibility Study is the ShARed AudIToRIuM development and evaluation of multiple alternate
approaches to solving middle school space needs. This requires looking at a wide range of possible options, from reuse of the existing building to multiple options for construction of a major new facility. In the section following, we will discuss some implications of these approaches as they impact the Frolio School project and will show a few diagrammatic examples of how these might be approached.
1. RenoVATIon And/oR exPAnSIon oF The exISTInG FRolIo School For the sake of completeness, it is necessary to address this option. however, depending on the grade structure chosen, a new Frolio Middle School may range in size from 90,000 to 110,000 GSF. The existing building, at 51,000 GSF, is too small to house a Middle School for Abington without substantial expansion as well as a thorough renovation. It is also a concern that the site is very small, and it appears there is little likelihood of expanding the building onto adjoining sites. For these reasons, it does not seem likely that this approach will yield a viable solution.
2. Re-uSe oF AnoTheR exISTInG BuIldInG FoR The FRolIo School
Frolio Middle School, Abington, MA -3-
It is necessary to investigate the possibility of using another existing building, including, but not limited to, other school buildings to house the Frolio School. however given the size requirements of Frolio, it is unlikely that (with the possible exception of the existing HS building) there exists a suitably configured building of an appropriate size.
3. cReATIon oF A neW 3-GRAde FRolIo MIddle School
RooF
4. cReATIon oF A neW 4-GRAde FRolIo MIddle School A very similar kind of thinking applies to the design and siting of a 4-grade middle school. The conceptual plan for a 3-grade school can be readily adapted for a 4-grade school, and it can be used as a tool for the same kind of site evaluation studies. Because this is so similar, we are not illustrating it separately.
siTe Plan - neW 6-8 middle school
This appears to be a strong option for the Frolio Middle School. As part of our approach to developing options, we are including a preliminary plan diagram of a possible new school. This plan illustrates, for a school the size of a new 6-8 Frolio, some of the concepts we described earlier as important aspects of middle school planning.
5. cReATIon oF A neW MIddle School/hIGh School second Floor Plan- neW 6-8 middle school
We know that site studies have been undertaken to determine a possible best site for a new school, but it appears that this process has not led to a consensus as to a best approach or best site. Because we do not have a specific site for a new school, we are showing the new building with a conceptual generic site plan. The building plan itself can be treated as a programmatic kit of parts and can be reconfigured to adapt to specific site constraints. For this reason, it is a very useful tool for testing the suitability of different possible sites to house a new Middle School.
Recognizing the potential advantages and efficiencies that can be realized in a combined Middle-high School, it may be desirable to at least conceptually explore this option. Assuming a new site, this approach has the advantage that a new school could be built with virtually no disruption to the ongoing operation of the existing Middle School and high School. on the negative side, this approach has the potential to be expensive. It also has the disadvantage that, if pursued, the Town would need to identify a use for a vacant high School building. Program legend MS AcAdeMIc ScIence SPecIAl ed
FirsT Floor Plan - neW 6-8 middle school
TeAcheR’S WoRKRooM coMPuTeR lAB oTheR
Frolio Middle School, Abington, MA -4-
6. cReATIon oF An ABInGTon MIddle School/hIGh School By RenoVATInG exISTInG hIGh School WITh A neW MIddle School WInG This has the potential to be an attractive viable option, and it has a number of distinct advantages: ▪ It puts the new middle school on a townowned site with potentially reduced site costs and minimal potential abutter issues. ▪ It gives the town the benefit of a renovated high School along with a new Middle School. ▪ It allows for inherent efficiencies of construction and operation. We are including here a preliminary plan diagram of a possible middle school addition to the existing high school. We have configured this to reflect the planning principals discussed above for combined middle/high schools, including separate academic wings for middle school and high school with separate entrances. The site plan has also been configured to reflect this organization. Because we have not had discussions with educators and parents, we have had to make some assumptions about what parts of the school might appropriately be shared. For this exercise, we have assumed separate libraries, separate new gymnasiums, a new shared auditorium created from the existing gymnasium, and a shared cafeteria divided into separate lunchrooms for middle school and high school. This plan assumes construction of all-new gymnasiums at both Middle and high School level. other approaches are possible that require less construction and therefore less cost.
siTe Plan - eXPanded ms/hs
It is important to note that building on an already developed school site will potentially save the town a large amount of money. MSBA guidelines typically allow reimbursement on site costs up to 8% of building construction cost. Since most schools built on new sites will require higher site costs, it is common for new building projects to have substantial site costs that the town pays for 100%. new school projects that build additions to existing schools typically have smaller site costs, and this site cost differential is likely to be a 100% savings to the Town. Additionally, since existing Abington schools are on town sewer and new sites may not be, the substantial cost of on-site sewage disposal, if required, is a potential unreimbursed cost to the town.
MS AddITIon
eXisTing high school Second FlooR MS AddITIon
Program legend hS AcAdeMIc
TeAcheR’S WoRKRooM
MS AcAdeMIc
ShARed
MS ScIence
oTheR
eXisTing high school FIRST FlooR Plans (3rd Floor noT shoWn)
SPecIAl ed Frolio Middle School, Abington, MA -5-
The Feasibility Study and Schematic Design Process
Cost Control as part of the study process
The Study Schedule The necessary steps in the Feasibility Study (FS) and Schematic Design (SD) process are clearly spelled out in MSBA Guidelines (Modules 3 and 4). The RFS for the Frolio School identifies durations for the FS and SD phases that appear targeted to allow MSBA Board approval of Schematic Design at its January 2014 meeting, allowing the possibility of Town votes in April 2014. The schedule for MSBA projects at the FS and SD level must take into account that that each phase requires formal approval by the MSBA’s Board of Directors, which meets only 6 times a year. Phase completion deadlines must meet specific submission dates established for the intended Board approval date. With this in mind, we have tentatively identified some critical milestone dates.
FS Submission (preferred SD Report) for MSBA Board Approval
June 13, 2013
MSBA Board Approval - Preferred Schematic Report
July 31, 2012
A major goal of the FS and SD process is to reconcile the appropriate project scope with an acceptable budget. Our practice, in the 30 years we have been designing schools, is to make cost control and cost estimating a key element of the design process. To this end, we work with our cost estimator (with whom we have a 25 year relationship) to develop rough project budgets for comparison purposes during the FS phase and a fully developed and detailed construction cost estimate and project budget at the SD phase. These are reconciled with cost estimates produced by the OPM to provide an agreed on project budget for going forward.
Identifying Community Concerns We know that community outreach is of critical importance to this project. Gaining support from the community will require an ongoing process of public communication, both providing information and responses to concerns and, of equal importance, engaging in processes to ensure that community concerns are heard and understood, and that the project is developed in a way that is responsive to those concerns. The Abington RFS has made clear that identifying community concerns relating to both community and taxpayer impact and educational
SD Submission for MSBA Board Approval (Project Scope and Budget)
December 12, 2013
MSBA Board Approval - SD submission: (Board meeting date not set)
January 2014
Possible Town votes on MSBA approved Frolio School Project:
April 2014
Frolio Middle School, Abington, MA -6-
Essex North Shore Design Group Meeting impact is a point of major focus. Our work will include an early public involvement process to identify those concerns. We believe that a successful school project for Abington depends on establishing a relation with the public that incorporates openness, honesty, trust and credibility. This means not just persuading, but truly engaging key stakeholders to define the goals, priorities and concerns of the public, so that he project is shaped by their perception of what is appropriate and acceptable. In such an engagement, it is our task to provide material that explains the need for the project. This will be in the form of both graphic material and narrative information and data. One of the things we pride ourselves on as a firm is our process for the evaluation of alternatives and development of solutions. We organize material in such a way that the required decision processes are clear and readily explainable in subsequent discussions. This approach facilitates the creation of materials for use in explanation of the project to the public. It is part of our service to participate in the public process, both to take part in presentations and, equally important, to listen to concerns from the public. This includes participation in public forums, community meetings and Town meeting.
DESIGNER SELECTION APPLICATION
2
1.
Commonwealth of Massachusetts
Project Name/Location For Which Firm Is Filing:
2. Project #
Frolio
This space for use by Awarding Authority only. Standard Designer Application Form for Municipalities and Public Agencies not within DSB M I D D L E S C H O O L Jurisdiction TOWN OF ABINGTON, MA (Updated July 2011) 3a. Firm (Or Joint-Venture) - Name and Address Of Primary Office To Perform The Work: 3e. Name Of Proposed Project Manager: For Study: (if applicable)] Joseph S. Drown, AIA Design Partnership of Cambridge, Inc. 500 Rutherford Avenue Charlestown, MA 02129
3b.
MA Reg # 9244
For Design:
Date Present and Predecessor Firms Were Established:
Federal ID #:
Joseph S. Drown, AIA MA Reg # 9244
3f.
Name and Address Of Other Participating Offices Of The Prime Applicant, If Different From Item 3a Above:
3g.
Name and Address Of Parent Company, If Any:
3h. (1)
Check Below If Your Firm Is Either: SDO Certified Minority Business Enterprise (MBE)
1981
3c.
(if applicable)
04-300-8134
3d.
Name and Title Of Principal-In-Charge Of The Project (MA Registration Required): David R. Finney, AIA, LEED AP MA Reg # 5949
Email Address: dfinney@design-partnership.com Phone No: 4.
Fax No.: [617] 241-5143
[617] 241-9800
SDO Certified Woman Business Enterprise (WBE) SDO Certified Minority Woman Business Enterprise (M/WBE)
Personnel From Prime Firm Included In Question #3a Above By Discipline (List Each Person Only Once, By Primary Function -- Average Number Employed Throughout The Preceding 6 Month Period. Indicate Both The Total Number In Each Discipline And, Within Brackets, The Total Number Holding Massachusetts Registrations):
Admin. Personnel Architects Acoustical Engrs. Civil Engrs. Code Specialists Construction Inspectors Cost Estimators Drafters
5.
(2) (3)
2 10
3 12
( ( ( ( ( ( ( (
9
) ) ) ) ) ) ) )
Ecologists Electrical Engrs. Environmental Engrs. Fire Protection Engrs. Geotech. Engrs. Industrial Hygienists Interior Designers Landscape Architects
Has this Joint-Venture previously worked together?
Updated July 2011
1
(
)
( ( ( ( ( ( (
) ) ) ) ) ) )
Yes
Licensed Site Profs. Mechanical Engrs. Planners: Urban./Reg. Specification Writers Structural Engrs. Surveyors
(
)
( ( ( ( ( ( (
) ) ) ) ) ) )
Other
3
Total
31
(
)
( ( ( ( ( ( (
) ) ) ) ) ) )
No
North Middlesex Regional High School, Townsend, MA
Municipalities & Other Public Agencies Form
6.
List ONLY Those Prime And Sub-Consultant Personnel Specifically Requested In The Advertisement. This Information Should Be Presented Below In The Form Of An Organizational Chart. Include Name Of Firm And Name Of The One Person In Charge Of The Discipline, With Mass. Registration Number, As Well As MBE/WBE Status, If Applicable:
aBington PUBlic schools D E S I G N E R SELECTION PA N EL / M A S S A CH USETTS SCHOOL B UILDIN G A UTHORITY
O WN ER ’ S P R O J E CT M A N A G E R KN I G H T , BA G G E & A N D E R S O N , I N C.
c d W co n s Ulta n ts , in c. ENVIRONMENTAL PERMITTING HAZARDOUS MATERIALS CIVIL ENGINEERING
d e s i g n P a r t n e r s h i P o F c a m B r i d g e architectUre
WBE/MBE
engi neers d e s ig n g r o UP , in c. S TR U CT UR A L EN G I N EER I N G MBE
W a r n e r la r s o n , in c. LANDS C A P E A R C H I T EC T UR E v av in te r n a tio n a l, in c. F IR E PR OTEC T I O N EN G I N EER I N G PLU M BI N G EN G I N EER I N G MBE
r. W. sUlliv a n e n g in e e r in g H VA C EN G I N EER I N G ELEC T R I C A L EN G I N EER I N G DAT A /C O MMUN I C A T I O N S C O D E C O N SUL T A N T SEC UR I T Y C O N SUL T A N T cra Btree mc gra th a s s o cia te s , in c. F OOD S ER VI C E C O N SUL T A N T MBE
da vi d r . F i n n eY , a i a , l eed a P P R I N CI P A L- I N - CH A R G E MA REG. #5949 j osePh s. dr oW n , a i a * P R O J E CT M A N A G E R MA REG. #9244 da W n m . gU a r r i el l o, a i a , l eed a P B d+ c * P R O J E CT A R CH I T E CT MA REG. #20301 r oB er t B . vogel , a i a , l eed a P B d+ c * E D U CA T I O N A L P R O G R A M M E R MA REG. # 3601 st ePh en P. ga r veY , l eed a P B d+ c DESIGNER l ee h . m or r i sset t e, a i a , l eed a P B d+ c DESIGNER MA REG. # 20720
ca va n a Ugh tocci a s s ocia te s , in c A COUSTICA L CON SULTA N TS
Ka l in a s s ocia te s , in c. SPECIFICA TION S CON SULTA N T
Poin t-l in e -s Pa ce , in c. LIB RA RY / M EDIA CON SULTA N T FURN ITURE, FIX TURES A N D EQ UIPM EN T r oB e r t l or e l l i a s s ocia te s , in c. THEA TRICA L CON SULTA N T thor n ton toma s e tti SUSTA IN A B LE/ GREEN DESIGN / REN EW A B LE EN ERGY CON SULTA N T e s s e n tia l de s ign a n d e s tima tin g COST ESTIM A TIN G con l e Y a s s ocia te s , in c. TRA FFIC CON SULTA N T WBE
da vi d e. c a Pa l do, a i a , l eed a P* T E CH N I CA L LE A D *Completed the Certification and / or Recertification for School Project Designers and Owners Project Managers (MCPPO)
Updated July 2011
North Middlesex Regional High School, Townsend, MA -18-
Municipalities & Other Public Agencies Form
WBE
MBE
P r o p o s e d
1
P r o j e c t
T e a m
Discipline
Firm Providing the Service
Personnel
A rc h i te c t u r e
Design Partnership of Cambridge, Inc.
Design Team led by: Dawn M. Guarriello, AIA, LEEP AP BD+C
2
x
x
E n vi ro n m e nt a l P e r m it t ing
CDW Consultants, Inc.
Kathleen Campbell, P.E., L.S.P., LEED AP / MA # 39420, LSP 9984
3
x
x
Hazardo u s M a t e r ia ls
CDW Consultants, Inc.
Edwin G. Morgan / MA # AI51838, AP51839, AM51114, AD00008
4
x
x
Ci vi l E n gine e r ing
CDW Consultants, Inc.
Jack Goodhall, P.E. / MA # 30725
5
x
S tru c t u ral Eng ine e r ing
Engineers Design Group, Inc.
Mehul Dhruv, P.E. / MA # 37453
L an dsc ap e A r c hit e c t ur e
Warner Larson, Inc.
David J. Warner, ASLA / MA # 1209
6 7
x
F i re Pro te c t ion Eng ine e r ing
VAV International, Inc.
Semoon Oh, P.E. / MA # 31457
8
x
Pl u m bi n g Eng ine e e r ing
VAV International, Inc.
Peter Radzim, P.E. / MA # 46907
9
HV A C E n g ine e r ing
R.W. Sullivan Engineering
Patrick J. Curran, P.E., LEED AP/ MA # 39596
10
E l e c t ri c al Eng ine e r ing
R.W. Sullivan Engineering
John H. Tan. P.E., RCSS / MA # 45265
11
D ata / Co m m unic a t ions C ons u lt a nt
R.W. Sullivan Engineering
John H. Tan. P.E., RCSS / MA # 45265
F o o d S e rv ic e C ons u lt a nt
Crabtree McGrath Associates, Inc.
John Sousa Jr.
13
L abo rator y C ons ult a nt
Design Partnership of Cambridge, Inc.
Design Team Led by: Dawn M. Guarriello, AIA, LEED AP BD+C
14
A c o u st i c a l C ons ult a nt
Cavanaugh Tocci Associates Inc.
Lincoln B. Berry
15
S pe c i fi c a t ions C ons ult a nt
Kalin Associates, Inc.
Mark Kalin, FAIA, FCSI, LEED / MA # 4657
16
L i brary / M e d ia C ons ult a nt
Point-Line-Space, Inc
Peter S. Constable
17
Th e at ri c a l C ons u lt a nt
Robert Lorelli Associates, Inc.
Robert Lorelli
18
S u stai n ab le / Gr e e n / R e ne wa b le Energy
Thornton Tomasetti
Gunnar Hubbard, AIA, LEED Fellow / MA # C28932
19
Co st E st i m a t ing
Essential Design and Estimating
Robert Goodie, AIA / MA # 6702
20
A c c e ssi bilit y C ons u lt a nt
Design Partnership of Cambridge, Inc.
Design Team led by: Dawn M. Guarriello AIA, LEED AP BD+C
Traffi c C ons u lt a nt
Conley Associates, Inc.
Jennifer Conley, P.E., AICP / MA # 41418
12
21
x
x
22
F u rn i t u re , Fix t u r e s a nd Eq u ip m e nt Co nsu lt a nt Point-Line-Space, Inc
Peter S. Constable
23
C o de C ons u lt a nt
R.W. Sullivan Engineering
Kevin S. Hastings, P.E., LEED AP / MA # 41651
24
S e c u ri ty C ons ult a nt
R.W. Sullivan Engineering
John H. Tan. P.E.,RCSS / MA # 45265
25
E du c at i o na l P r og r a m m ing
Design Partnership of Cambridge, Inc.
Robert B. Vogel, AIA, LEED AP BD+C / MA # 3601
North Middlesex Regional High School, Townsend, MA -19-
7. a.
Brief Resume Of ONLY Those Prime Applicant and Sub-Consultant Personnel Requested In The Advertisement. Confine Responses To The Space Provided On The Form and Limit Resumes To ONE Person Per Discipline Requested In The Advertisement. Resumes Should Be Consistent With The Persons Listed On The Organizational Chart In Question # 6. Additional Sheets Should Be Provided Only As Required For The Number Of Key Personnel Requested In The Advertisement And They Must Be In The Format Provided. By Including A Firm As A Sub-Consultant, The Prime Applicant Certifies That The Listed Firm Has Agreed To Work On This Project, Should The Team Be Selected.
Name and Title Within Firm:
david r. Finney, aia, leed aP President
b.
Project Assignment: Pri n c i P a l - i n -cha r ge
c.
Name and Address Of Office In Which Individual Identified In 7a Resides:
MBE WBE
design Partnership of cambridge, inc. 500 Rutherford Avenue Charlestown, MA 02129
As Principal-in-charge, Dave will oversee the activities of individual team members and of the team as a whole. Dave will marshal and commit the firm’s resources to the project.
related eXPerience
d.
Years Experience: With This Firm:
e.
Education: Degree(s) /Year/Specialization
With Other Firms:
27
8
ad d itio n & re no v atio n
BA / 1982 / Architecture; MA / 1974 / Arts; BA / 1972 / Arts
f.
Active Registration: Year First Registered/Discipline/Mass Registration Number 1984 / Architecture / MA #5949, LEED Accredited Professional
g.
Current Work Assignments and Availability For This Project: Current Projects: Rhode Island College Art Center and David Prouty High School.
h.
Time will be allocated, approximately, per phase as follows: Feas.
sd
dd / cd
Bid
ca
40%
40%
TBD
TBD
TBD
Other Experience and Qualifications Relevant To The Proposed Project: (Identify Firm By Which Employed, If Not Current Firm): David is an architect and educational facilities planner with more than 35 years of experience in the planning of K–12 schools. As President of DPC, he is responsible for the firm’s specialization in design and planning of diverse educational environments, as well as associated enrollment projections and educational space programs.
Bennet Middle School Manchester, CT Nettle Middle School Haverhill, MA Parker Middle School Reading, MA Nissitissit Middle School Pepperell, MA Blake Middle School Medfield, MA Pembroke Middle School Pembroke, MA Galvin Middle School Wakefield, MA Wetherbee K-8 School Lawrence, MA Fitzgerald K-8 School Cambridge, MA
David’s deep commitment is manifest in his publications and public presentations on educational planning, including public advocacy for advanced school design. A presenter at CEFPI and other local and national educational conferences on school planning and design, he has been a frequent champion for school planning issues.
Morse K-8 School Cambridge, MA Chatham K-8 School Weston, MA Mill Pond Intermediate School Westborough, MA Medfield High School Medfield, MA Pembroke High School Pembroke, MA Manchester High School Manchester, CT South Elementary School Hingham, MA Lincoln Elementary School Melrose, MA Woodland Elementary School Weston, MA
s Us tainaBle d e s ig n David Prouty High School Spencer, MA Essex North Shore Agricultural Technical School Danvers, MA John D. Runkle K-8 School, Brookline, MA Rhode Island School for the Deaf Pre K-12 School Providence, RI
* Feas. - Feasibility Study, SD - Schematic Design, DD - Design Development, CD - Construction Documents, Bid - Bidding, Const. - Construction, Compl. - Completion
Updated July 2011
North Middlesex Regional High School, Townsend, MA -20-
Municipalities & Other Public Agencies Form
7. a.
Brief Resume Of ONLY Those Prime Applicant and Sub-Consultant Personnel Requested In The Advertisement. Confine Responses To The Space Provided On The Form and Limit Resumes To ONE Person Per Discipline Requested In The Advertisement. Resumes Should Be Consistent With The Persons Listed On The Organizational Chart In Question # 6. Additional Sheets Should Be Provided Only As Required For The Number Of Key Personnel Requested In The Advertisement And They Must Be In The Format Provided. By Including A Firm As A Sub-Consultant, The Prime Applicant Certifies That The Listed Firm Has Agreed To Work On This Project, Should The Team Be Selected.
Name and Title Within Firm:
joseph s. drown, aia Principal
b.
Project Assignment: Pro j e c t
c.
m a n a ge r
Name and Address Of Office In Which Individual Identified In 7a Resides:
MBE WBE
design Partnership of cambridge 500 Rutherford Avenue Charlestown, MA 02129
As Project manager, Joe will be responsible for contracts with both the owner and our sub-consultants; creating, monitoring, and maintaining schedules of work; coordination of project cost estimates; and coordination of deliverables and other documentation. r e l a te d e XPe r ie n ce
d.
Years Experience: With This Firm:
e.
Education: Degree(s) /Year/Specialization
With Other Firms:
20
0
ad d itio n & re no v atio n
BA / 1990 / Architecture; Associate / 1978 / Engineering
f.
Active Registration: Year First Registered/Discipline/Mass Registration Number 1994 / Architecture / MA #9244 Certification for School Project Designers & Owners Project Managers
g.
Current Work Assignments and Availability For This Project: Current Projects: Assabet Valley Regional Technical High School and David Prouty High School.
h.
Time will be allocated, approximately, per phase as follows: Feas.
sd
dd / cd
Bid
ca
40%
40%
TBD
TBD
TBD
Other Experience and Qualifications Relevant To The Proposed Project: (Identify Firm By Which Employed, If Not Current Firm): Since joining Design Partnership in 1992, Joe has specialized in planning, design, and construction administration for K-12 educational projects. With over 25 years of experience as Construction Administrator, Job Captain, Project Architect, Project Manager and Technical Manager, he provides clients with expertise in all phases of a project’s life cycle. In his capacity as director of the firm’s policy and practice of cost control and project delivery, Joe ensures that all DPC projects are completed on-time and on-budget. He works closely with clients, community groups and government representatives to build consensus and ensure successful project results. Joe’s strength in management is matched by an experienced eye for innovative cost effective and efficient design.
Updated July 2011
Blake Middle School Medfield, MA Nettle Middle School Haverhill, MA West Tisbury School K– 8 School West Tisbury, MA Holyoke High School Holyoke, MA Hingham High School Hingham, MA Dracut High School Dracut, MA Martha’s Vineyard Regional High School Oak Bluffs, MA Medfield High School Medfield, MA Wellesley High School Wellesley, MA Solomon Schecter Day School Stoughton, MA
Riverside School Danvers, MA Lincoln Elementary School Melrose, MA Sutton Elementary School Sutton, MA Wyman Elementary School Burlington, MA Lilja Elementary School Natick, MA Brown Elementary School Natick, MA Hingham South Elementary School Hingham, MA Mendon Upton Elementary School Mendon, MA Murdock Hall - MCLA North Adams, MA UCONN W.B. Young Building Storrs, CT
s Us tainaBle d e s ig n David Prouty High School Spencer, MA Thompson & Stratton Elementary Schools Alternative Energy Study Arlington, MA Pembroke High School Alternative Energy Study Pembroke, MA
North Middlesex Regional High School, Townsend, MA -21-
Municipalities & Other Public Agencies Form
7. a.
Brief Resume Of ONLY Those Prime Applicant and Sub-Consultant Personnel Requested In The Advertisement. Confine Responses To The Space Provided On The Form and Limit Resumes To ONE Person Per Discipline Requested In The Advertisement. Resumes Should Be Consistent With The Persons Listed On The Organizational Chart In Question # 6. Additional Sheets Should Be Provided Only As Required For The Number Of Key Personnel Requested In The Advertisement And They Must Be In The Format Provided. By Including A Firm As A Sub-Consultant, The Prime Applicant Certifies That The Listed Firm Has Agreed To Work On This Project, Should The Team Be Selected.
Name and Title Within Firm:
dawn m. guarriello, aia, leed aP Bd+c associate
b.
Project Assignment: Pro j e c t
c.
a r chite ct
Name and Address Of Office In Which Individual Identified In 7a Resides:
MBE WBE
design Partnership of cambridge 500 Rutherford Avenue Charlestown, MA 02129 3
d.
Years Experience: With This Firm:
e.
Education: Degree(s) /Year/Specialization
related eXPerience
11
With Other Firms:
ad d itio n & re no v atio n
BA / 1998 / Architecture BS / 1997 / Building Science
f.
Active Registration: Year First Registered/Discipline/Mass Registration Number 2004 / Architecture / MA # 20301 Certification for School Project Designers & Owners Project Managers
g.
Current Work Assignments and Availability For This Project: Current Projects: Essex North Shore Agricultural Technical School.
h.
Time will be allocated, approximately, per phase as follows: Feas. sd Bid ca dd / cd 60%
60%
TBD
As Project architect, Dawn will direct and participate in all aspects of design while directing the educational programming and planning. She will lead the user interview process and be the day-to-day contact.
TBD
TBD
Other Experience and Qualifications Relevant To The Proposed Project: (Identify Firm By Which Employed, If Not Current Firm):
Dawn brings over 11 years of experience, the majority of which has been in educational design, to Design Partnership of Cambridge. Dawn’s strength is in her ability to understand the user needs and to forecast and include the need for future flexibility in her designs. Her technical background allows her to seamlessly translate her creative ideas into a buildable structure. Dawn has a rich background in public school design through her experiences at DPC and with other firms. She has worked on program types from Early Childhood Centers to High Schools as well as Colleges and Universities. Most recently, Dawn has worked with Maryann Thompson on the Hopkinton Elementary School project. Dawn utilized her technical expertise to complete a day lighting analysis of the school. This capability allows for early integration of sustainable feature in the design.
McDevitt Middle School Waltham, MA * John F. Kennedy Middle School Waltham, MA * Chelmsford Middle School Chelmsford, MA * McEnchem High School Marietta, GA *** Souhegan High School Amherst, NH** Shamrock Elementary School Woburn, MA * Robin Hood Elementary School Stoneham, MA * Center Elementary School Hopkinton, MA
Colonial Park Elementary School Stoneham, MA * Worcester State College Student Center Worcester, MA Massachusetts Institute of Technology Building E15 Cambridge, MA Rhode Island College Athletic Center Providence, RI Boston Beanstock Boston, MA* Abaqus, Incorporated Providence, RI **** Rising Sun Mill Providence, RI****
s Us tainaBle d e s ig n Essex North Shore Agricultural Technical School Danvers, MA Fort Lewis College Student Union Durango, CO Avery Elementary School Dedham, MA* Project completed while with: *Flansburgh Architects ** Dore & Whittier Architects ***Nichols Carter Grant Architects **** Red House Designs
* Feas. - Feasibility Study, SD - Schematic Design, DD - Design Development, CD - Construction Documents, Bid - Bidding, Const. - Construction, Compl. - Completion
Updated July 2011
North Middlesex Regional High School, Townsend, MA -22-
Municipalities & Other Public Agencies Form
7. a.
Brief Resume Of ONLY Those Prime Applicant and Sub-Consultant Personnel Requested In The Advertisement. Confine Responses To The Space Provided On The Form and Limit Resumes To ONE Person Per Discipline Requested In The Advertisement. Resumes Should Be Consistent With The Persons Listed On The Organizational Chart In Question # 6. Additional Sheets Should Be Provided Only As Required For The Number Of Key Personnel Requested In The Advertisement And They Must Be In The Format Provided. By Including A Firm As A Sub-Consultant, The Prime Applicant Certifies That The Listed Firm Has Agreed To Work On This Project, Should The Team Be Selected.
Name and Title Within Firm:
robert B. vogel, aia, leed aP Bd+c Principal
b.
Project Assignment: e dUc a t i o n al
c.
P r ogr a m m e r
Name and Address Of Office In Which Individual Identified In 7a Resides:
MBE WBE
design Partnership of cambridge 500 Rutherford Avenue Charlestown, MA 02129
As educational Programmer, Bob will facilitate the thinking behind the educational programming. He will support the user interview process, help define the mission and vision for the project and encourage innovative academic planning.
related eXPerience
d.
Years Experience: With This Firm:
e.
Education: Degree(s) /Year/Specialization
With Other Firms:
9
24
ad d itio n & re no v atio n
MA / 1971 / Architecture BA / 1966 / Arts
f.
Active Registration: Year First Registered/Discipline/Mass Registration Number 1973 / Architecture / MA #3601, LEED Accredited Professional Certification for School Project Designers & Owners Project Managers
g.
Current Work Assignments and Availability For This Project: Current Projects: Assabet Valley Regional Technical High School.
h.
Time will be allocated, approximately, per phase as follows: Feas.
sd
dd / cd
Bid
ca
60%
60%
TBD
TBD
TBD
Other Experience and Qualifications Relevant To The Proposed Project: (Identify Firm By Which Employed, If Not Current Firm): For over 35 years, Bob has focused his career on educational planning and design, from individual facilities to community-wide master plans and feasibility studies, including intensive development of educational specifications and space programs. Bob’s design experience includes schools serving every level of education – early childhood through higher education. As a principal of DPC and a LEED Accredited Professional, Bob continues to advocate for high performance, energy efficient and sustainable design in the service of educational objectives and a broader concern for the environment.
Bennet 6th Grade Academy Manchester, CT Pembroke Middle School Pembroke, MA Wellesley Middle School Wellesley, MA Galvin Middle School Wakefield, MA Parker MS / Taunton HS Taunton, MA Marston Mills Middle School Barnstable, MA * Bourne Middle School Bourne, MA * Trottier Middle School Southborough, MA *
Chenery Middle School Belmont, MA Fowler Middle School Maynard, MA Barnstable Middle School Hyannis, MA * Bellingham Middle School Bellingham, MA * Berkley Middle School Berkley, MA* Friedman Middle School Taunton, MA * Lexington Elementary School Master Plan Lexington, MA Walker Elementary School Taunton, MA
s Us tainaBle d e s ig n Essex North Shore Agricultural Technical School Danvers, MA Rhode Island School for the Deaf PreK-12 School Providence, RI Thompson & Stratton Elementary Schools Alternative Energy Study Arlington, MA Pembroke High School Alternative Energy Study Pembroke, MA Projects completed while with: * Keyes Associates, Inc.
Updated July 2011
North Middlesex Regional High School, Townsend, MA -23-
Municipalities & Other Public Agencies Form
7. a.
Brief Resume Of ONLY Those Prime Applicant and Sub-Consultant Personnel Requested In The Advertisement. Confine Responses To The Space Provided On The Form and Limit Resumes To ONE Person Per Discipline Requested In The Advertisement. Resumes Should Be Consistent With The Persons Listed On The Organizational Chart In Question # 6. Additional Sheets Should Be Provided Only As Required For The Number Of Key Personnel Requested In The Advertisement And They Must Be In The Format Provided. By Including A Firm As A Sub-Consultant, The Prime Applicant Certifies That The Listed Firm Has Agreed To Work On This Project, Should The Team Be Selected.
Name and Title Within Firm:
steve P. garvey, leed aP Bd+c b.
Project Assignment: de s i g n e r
c.
Name and Address Of Office In Which Individual Identified In 7a Resides:
MBE WBE
design Partnership of cambridge, inc. 500 Rutherford Avenue Charlestown, MA 02129
d.
Years Experience: With This Firm:
e.
Education: Degree(s) /Year/Specialization
7
With Other Firms:
related eXPerience
5
ad d itio n & re no v atio n
B.Arch / 2004 / Architecture / Magna Cum Laude
f.
Active Registration: Year First Registered/Discipline/Mass Registration Number LEED Accredited Professional
g.
Current Work Assignments and Availability For This Project: Current Projects: Rhode Island College Art Center and David Prouty High School.
h.
Steve will serve as designer for the Frolio Middle School project. He will work hand-in hand with the Joe, Dawn and Lee to incorporate technical and programmatic features into the design.
Time will be allocated, approximately, per phase as follows: Feas.
sd
dd / cd
Bid
ca
40%
40%
TBD
TBD
TBD
Other Experience and Qualifications Relevant To The Proposed Project: (Identify Firm By Which Employed, If Not Current Firm):
Having joined Design Partnership in 2004, Steve has worked on a variety of projects from renovations of middle and high schools to feasibility studies for student unions. As a LEED Accredited Professional, Steve, is not only essential in the design process, but also in the facilitation of sustainable strategies at every step of the way. He ensures the selection of materials, technologies and strategies are energy efficient, low maintenance and cost effective.
MIT Building 9 Parker Middle and Taunton High School Cambridge, MA Taunton, MA Worcester State College Student Center Wellesley Middle School Worcester, MA Wellesley, MA University of North Carolina Student Union Bennet 6th Grade Academy Charlotte, NC Manchester, CT Trum Field Athletic Complex Manchester High School Somerville, MA Manchester, CT Manning Bowl Center Elementary School Lynn, MA Hopkinton, MA Rhode Island College Recreation Center Historic Preservation Study Flint Library Middleton, MA Providence, RI Sailing Center - Harvard University Rhode Island College Art Center Cambridge, MA Providence, RI MCLA Murdock Hall North Adams, MA
Most recently Steve has been involved in the design of a LEED Platinum Student Center for Fort Lewis College in Durango, CO, as well as projects being designed to be certified MA-CHPS or LEED including the Runkle School in Brookline, Carver Elementary School and the Essex North Shore Agricultural Technical School.
s Us tainaBle d e s ig n Essex North Shore Agricultural Technical School Danvers, MA David Prouty High School Spencer, MA John D. Runkle K- School Brookline, MA Fort Lewis College Student Union Durango, CO
* Feas. - Feasibility Study, SD - Schematic Design, DD - Design Development, CD - Construction Documents, Bid - Bidding, Const. - Construction, Compl. - Completion
Updated July 2011
North Middlesex Regional High School, Townsend, MA -24-
Municipalities & Other Public Agencies Form
7. a. b.
Brief Resume Of ONLY Those Prime Applicant and Sub-Consultant Personnel Requested In The Advertisement. Confine Responses To The Space Provided On The Form and Limit Resumes To ONE Person Per Discipline Requested In The Advertisement. Resumes Should Be Consistent With The Persons Listed On The Organizational Chart In Question # 6. Additional Sheets Should Be Provided Only As Required For The Number Of Key Personnel Requested In The Advertisement And They Must Be In The Format Provided. By Including A Firm As A Sub-Consultant, The Prime Applicant Certifies That The Listed Firm Has Agreed To Work On This Project, Should The Team Be Selected.
Name and Title Within Firm:
lee h. morrissette, aia, leed aP Bd+c Project Assignment: de s i g n e r
c.
Name and Address Of Office In Which Individual Identified In 7a Resides:
design Partnership of cambridge, inc. 500 Rutherford Avenue Charlestown, MA 02129
d.
Years Experience: With This Firm:
e.
Education: Degree(s) /Year/Specialization
1
MBE WBE
10
With Other Firms:
related eXPerience ad d itio n & re no v atio n
B. Arch / 2002 / Architecture / Cum Laude
f.
Active Registration: Year First Registered/Discipline/Mass Registration Number 2009 / Architecture / MA #20720, LEED Accredited Professional
g.
Current Work Assignments and Availability For This Project: Current Projects: David Prouty High School
h.
Lee will serve as designer for the Frolio Middle School project. He will work hand-in hand with Joe, Dawn and Steve to incorporate technical and programmatic features into the design.
Time will be allocated, approximately, per phase as follows: Feas.
sd
dd / cd
Bid
ca
40%
40%
TBD
TBD
TBD
Other Experience and Qualifications Relevant To The Proposed Project: (Identify Firm By Which Employed, If Not Current Firm): Lee joined Design Partnership in 2011. As a licensed architect and LEED Accredited professional, he has a variety of architectural experience in project delivery methods and design practice. From traditional design-bid-build, to full service architecture and engineering practice, to small office design-build. Additionally, Lee brings knowledge and experience in a variety of project types to include residential and retail based mixed-use, commercial, and publicly funded educational building types, both K-12 and higher education. Most recently, Lee has played a role in the design development and documentation of the Essex North Shore Agricultural Technical School. While comfortable in a number of 3D digital environments, Lee is helping to lead the development and production of new projects using building information modeling (BIM).
Assabet Valley Regional Technical High School Assabet, MA, David Prouty High School Spencer, MA Essex North Shore Agricultural Technical School Danvers, MA UCONN W.B. Young Building Storrs, CT Rhode Island Collge Art Center Providence, RI Tewksbury Memorial High School* Tewksbury, MA Grafton, High School* Grafton, MA
Andover Bancroft Elementary School * Andover, MA East Greenwhich Middle School * East Greenwich, RI Henry T. Wing Elementary School * East Sandwich, MA DeNormandie Wharf ** Boston, MA Freeport Village Station ** Freeport, ME Wisconsin Place ** Friendship Heights, MD Patriot Place ** Foxboro, MA Rock Spring** Bethesda, MD
s Us tainaBle d e s ig n W.B. Young Building, University of Connecticut Storrs, CT David Prouty High School Spencer, MA Projects completed while with: * Symmes Maini McKee Associates ** Arrowstreet, Inc. *** Coburn Development, Inc. **** Saiber Saiber, Inc.
* Feas. - Feasibility Study, SD - Schematic Design, DD - Design Development, CD - Construction Documents, Bid - Bidding, Const. - Construction, Compl. - Completion
Updated July 2011
North Middlesex Regional High School, Townsend, MA -25-
Municipalities & Other Public Agencies Form
7. a.
Brief Resume Of ONLY Those Prime Applicant and Sub-Consultant Personnel Requested In The Advertisement. Confine Responses To The Space Provided On The Form and Limit Resumes To ONE Person Per Discipline Requested In The Advertisement. Resumes Should Be Consistent With The Persons Listed On The Organizational Chart In Question # 6. Additional Sheets Should Be Provided Only As Required For The Number Of Key Personnel Requested In The Advertisement And They Must Be In The Format Provided. By Including A Firm As A Sub-Consultant, The Prime Applicant Certifies That The Listed Firm Has Agreed To Work On This Project, Should The Team Be Selected.
Name and Title Within Firm:
david e. capaldo, aia, leed aP Principal
b.
Project Assignment: t e c h n i c a l
c.
le a d
Name and Address Of Office In Which Individual Identified In 7a Resides:
MBE WBE
design Partnership of cambridge 500 Rutherford Avenue Charlestown, MA 02129
d.
Years Experience: With This Firm:
e.
Education: Degree(s) /Year/Specialization
20
With Other Firms:
related eXPerience 0
1990-1993 / Architecture Major; 1989-1990 / Liberal and Fine Arts Studies
f.
Active Registration: Year First Registered/Discipline/Mass Registration Number AIA, AZ #36889, LEED AP Certification for School Project Designers & Owners Project Managers
g.
Current Work Assignments and Availability For This Project: Current Projects: Assabet Valley Regional Technical High School. Time will be allocated as needed for this initiative.
h.
As technical lead, Dave will provide major input on issues of code, phasing, and buildability as they relate to design content, and coordination of engineering consultants with DPC’s work and the Owner’s intent.
Other Experience and Qualifications Relevant To The Proposed Project: (Identify Firm By Which Employed, If Not Current Firm): A member of the Design Partnership team since 1992, David has worked on numerous projects as Project Manager, Project Architect, Construction Administrator, Lead Technical Architect and Job Captain. David currently heads the Construction Administration and Technical Operations Departments within the firm. His diverse background includes specialized construction knowledge of lighting design and electrical trades, as well as expertise in project management, building assessment and construction administration services. He is a registered architect and has nearly two decades of school - related project experience.
ad d itio n & re no v atio n Hingham High School Wetherbee K–8 School Hingham, MA Lawrence, MA Martha’s Vineyard Regional High School Flagg-Adams Middle School Oak Bluffs, MA Holliston, MA Placentino Elementary School Nettle Middle School Holliston, MA Haverhill, MA Miller Elementary School Smith Leadership Academy Charter Holliston, MA Boston, MA Lincoln Elementary School Nissitissit Middle School Melrose, MA Pepperell, MA Lilja Elementary School Soloman Schecter K-8 Day School Natick, MA Norwood, MA Wyman Elementary School West Tisbury K–8 School Burlington, MA West Tisbury, MA Riverside Elementary School Parker Middle and Taunton High School Danvers, MA Taunton, MA Memorial Elementary School Reading Memorial High School Medfield, MA Reading, MA Perly Early Learning Center Holyoke High School Georgetown, MA Holyoke, MA
s Us tainaBle d e s ig n Thompson & Stratton Elementary Schools Alternative Energy Study Arlington, MA David Prouty High School Spencer, MA
* Feas. - Feasibility Study, SD - Schematic Design, DD - Design Development, CD - Construction Documents, Bid - Bidding, Const. - Construction, Compl. - Completion
Updated July 2011
North Middlesex Regional High School, Townsend, MA -26-
Municipalities & Other Public Agencies Form
8a.
Current and Relevant Work By Prime Applicant Or Joint-Venture Members. Include ONLY Work Which Best Illustrates Current Qualifications In The Areas Listed In The DSB Advertisement (List Up To But Not More Than 5 Projects). a. Project Name and Location b. Brief Description Of Project and c. Client’s Name, Address and Phone d. Completion e. Project Cost (In Thousands) Principal-In-Charge Services (Include Reference To Areas Number. Include Name Of Contact Person Date (Actual Construction Fee For Work For Of Experience Listed In DSB Or Estimated) Costs(Actual, Or Which Firm Was Advertisement) Estimated If Not Responsible. Completed)
john d. rUnKle school Brookline, MA
Town of Brookline 333 Washington Street Brookline, MA 02445 Nancy Daly 161 Rawson Road [617] 232-0728 daly.nan@gmail.com
Grades Served: K-8 Enrollment: 560 Students Scope: Renovation / New Building Size: 105,000 SF
DAVID R. FINNEY, AIA, LEED AP DESIGN PARTNERSHIP OF CAMBRIDGE
eXtensive PUBlic oUtreach resUlts in a “neW” school WidelY celeBrated BY the commUnitY... c h a l l e n g e : To double the size of the existing school to accommodate an increasing population and achieve programmatic space and amenity parity within the school system all within the confines of a small site and to the satisfaction of extremely conservative and involved neighbors. s o l U t i o n : The design removes an existing 2-story wing whose construction was not on par with the original building and whose plan was inefficient. This was replaced with three stories of new construction that includes a new cafeteria and kitchen at grade with a new gym above. The former cafeteria was repurposed for an expanded media center and the former gym became a new multi-purpose room.
A K-8 school that addresses and balances the needs and desires of the broader school community for a sustainable environment dedicated to the 21st Century teaching and learning.
resUlt:
Project highlights:
▪ DPC engaged in an extensive and “hands-on” community outreach program to help in the design of the exterior envelope of the school
▪ The new floor plan significantly improves the efficiency, safety and
way-finding of the school The new site plan drastically improves parking and pedestrian safety Design maximize community access to core spaces Facility will achieve MA-CHPS status New courtyard, design in collaboration with science faculty, will be used as an outdoor classroom and integrated into core curriculum ▪ Building is carefully zoned by floor into three schools-within-a-school: PreK-2, 3-5 and 6-8. Core and enrichment spaces are shared
▪ ▪ ▪ ▪
Updated July 2011
North Middlesex Regional High School, Townsend, MA -36-
2012
23,876
2,063 (includes sub-consultants)
8a.
Current and Relevant Work By Prime Applicant Or Joint-Venture Members. Include ONLY Work Which Best Illustrates Current Qualifications In The Areas Listed In The DSB Advertisement (List Up To But Not More Than 5 Projects). a. Project Name and Location b. Brief Description Of Project and c. Client’s Name, Address and Phone d. Completion e. Project Cost (In Thousands) Principal-In-Charge Services (Include Reference To Areas Number. Include Name Of Contact Person Date (Actual Construction Fee For Work For Of Experience Listed In DSB Or Estimated) Costs(Actual, Or Which Firm Was Advertisement) Estimated If Not Responsible. Completed)
nissitissit middle school Pepperell, MA
North Middlesex Reg. School District 23 Main Street Townsend, MA 01469
Grades Served: 6-8 Enrollment: 800 Students Scope: New Construction Building Size: 125,000 SF
Gerald Martin, Business Manager [978] 597-8713
DAVID R. FINNEY, AIA, LEED AP DESIGN PARTNERSHIP OF CAMBRIDGE
a school designed to alloW For team teaching and eXPansion to meet FUtUre enrollment groWth... c h a l l e n g e : To create a 21st century learning environment in a 1914
structure that: allows for the desired educational program, rectifies the inequity in the Town’s two existing neighborhood middle schools, provides for a grade-level system that creates a “transitional learning environment” and serves as a beacon for the community. Through close association with faculty, staff and school community, the structure was reconfigured to provide 3-teacher team programs with embedded science and remedial education. Primary learning spaces inhabit corner locations and feature natural daylight and fresh air.
solUtion:
r e s U l t : A sustainable, innovative and thoughtfully planned middle school
that brings new energy to the community and provides an environment that allows for the education standards sought and deserved by the community.
Project highlights:
▪ Reconfigures four structures (two from 1914) into a transitional environment in the heart of an urban community.
▪ Surrounded by city streets ▪ Transparency of bridges and gates allows for visibility of school activities.
▪ 3-teacher teams have embedded science and remedial education,
a pattern expressed precisely in the plans of the two academic buildings ▪ The academy’s curriculum also contains unified arts and technology ▪ Support facilities such as administration and counseling, the library, cafeteria and the large school/community gym are mainly located in the remaining 2 buildings of the complex. Updated July 2011
North Middlesex Regional High School, Townsend, MA -37-
2002
18,430 Estimated
1,197 (includes sub-consultants)
8a.
Current and Relevant Work By Prime Applicant Or Joint-Venture Members. Include ONLY Work Which Best Illustrates Current Qualifications In The Areas Listed In The DSB Advertisement (List Up To But Not More Than 5 Projects). a. Project Name and Location b. Brief Description Of Project and c. Client’s Name, Address and Phone d. Completion e. Project Cost (In Thousands) Principal-In-Charge Services (Include Reference To Areas Number. Include Name Of Contact Person Date (Actual Construction Fee For Work For Of Experience Listed In DSB Or Estimated) Costs(Actual, Or Which Firm Was Advertisement) Estimated If Not Responsible. Completed)
Bennet 6th grade academY Manchester, CT
Grades Served: 6th Enrollment: 600 Scope: Renovate as New Building Size: 108,000 SF
Town of Manchester 41 Center Street Manchester, CT Mr. Keith Epstein, AIA Fmr. Facilities Manager Manchester Public Schools [800] 463-0061
DAVID R. FINNEY, AIA, LEED AP DESIGN PARTNERSHIP OF CAMBRIDGE
transForming a historic landmarK to Provide teaching clUsters ... c h a l l e n g e : To create a 21st century learning environment in a 1914 structure that allows for the desired educational program and rectifies the inequity in the Town’s two existing neighborhood middle schools, provides for a grade-level system that creates a “transitional learning environment” and serves as a beacon for the community. Through close association with faculty, staff and school community, the structure was reconfigured to provide 3-teacher team programs with embedded science and remedial education. Primary learning spaces inhabit corner locations and feature natural daylight and fresh air.
solUtion:
r e s U l t : A sustainable, innovative and thoughtfully planned middle school
that brings new energy to the community and provides an environment that allows for the education standards sought and deserved by the community.
Project highlights:
▪ Reconfigures four structures (two from 1914) into a transitional environment in the heart of an urban community.
▪ Surrounded by city streets ▪ Transparency of bridges and gates allows for visibility of school activities.
▪ 3-teacher teams have embedded science and remedial education,
a pattern expressed precisely in the plans of the two academic buildings ▪ The academy’s curriculum also contains unified arts and technology ▪ Support facilities such as administration and counseling, the library, cafeteria and the large school/community gym are mainly located in the remaining 2 buildings of the complex. Updated July 2011
North Middlesex Regional High School, Townsend, MA -38-
2008
34,000 Estimated
2,720 (includes sub-consultants)
8a.
Current and Relevant Work By Prime Applicant Or Joint-Venture Members. Include ONLY Work Which Best Illustrates Current Qualifications In The Areas Listed In The DSB Advertisement (List Up To But Not More Than 5 Projects). a. Project Name and Location b. Brief Description Of Project and c. Client’s Name, Address and Phone d. Completion e. Project Cost (In Thousands) Principal-In-Charge Services (Include Reference To Areas Number. Include Name Of Contact Person Date (Actual Construction Fee For Work For Of Experience Listed In DSB Or Estimated) Costs(Actual, Or Which Firm Was Advertisement) Estimated If Not Responsible. Completed)
PEMBROKE MIDDLE SCHOOL AND HIGH SCHOOL Pembroke, MA
DAVID R. FINNEY, AIA, LEED AP DESIGN PARTNERSHIP OF CAMBRIDGE
Grades Served: (MS) 6-8 (HS) 9-12 Enrollment: (MS) 550 Students (HS) 900 Students Scope: Addition/Renovation Building Size: (MS) 50,000 SF (HS) 212,760 SF
Town of Pembroke 100 Center Street Pembroke, MA 02359 Beth Dwyer, Chair of Secondary School Building Committee [781] 829-2157
FEASIBILITY STUDY RESULTS IN A DECISION TO CONVERT A MIDDLE SCHOOL TO A HIGH SCHOOL THROUGH ADDITIONS AND RENOVATIONS AND TO MODERNIZE A JUNIOR HIGH SCHOOL TO BE A STATE-OF-THE ART TEAM TEACHING ENVIRONMENT... H S C H A L L E N G E : Re-purpose a junior high school built in 1974 with
Central air, electric resistance heat, minimal day-lighting and no natural ventilation into a state-of-the-art high school while 900 students attend regularly scheduled classes.
H S S O L U T I O N : A three-year, phased, occupied project that renovated 167,760 SF of educational and athletic space and constructed 45,000 SF of new space, including a new main entrance. H S R E S U L T : A modernized learning environment on four levels, connected
by a central atrium topped with a 100’ skydome that allows for necessary circulation and opportunity for student and staff interaction and display of student work.
M S C H A L L E N G E : To convert an outmoded and outdated junior high school built in 1965 into a modern middle school operating in a team teaching model. M S S O L U T I O N : A plan, developed in conjunction with new school administrators and instructors, re-defined the internal structure and program to meet modern accessibility, code, energy efficiency, and aesthetic standards. M S R E S U L T : A community based middle school that operates per modern
educational paradigms built out of an otherwise outmoded facility and that utilized much of the existing structure.
Updated July 2011
North Middlesex Regional High School, Townsend, MA -39-
(MS) 2004
(MS) 14,624
(HS) 2006
(HS) 112,000
(MS) 1,8,00 (includes sub-consultants) (HS) 7,716 (includes sub-consultants)
8a.
Current and Relevant Work By Prime Applicant Or Joint-Venture Members. Include ONLY Work Which Best Illustrates Current Qualifications In The Areas Listed In The DSB Advertisement (List Up To But Not More Than 5 Projects). a. Project Name and Location b. Brief Description Of Project and c. Client’s Name, Address and Phone d. Completion e. Project Cost (In Thousands) Principal-In-Charge Services (Include Reference To Areas Number. Include Name Of Contact Person Date (Actual Construction Fee For Work For Of Experience Listed In DSB Or Estimated) Costs(Actual, Or Which Firm Was Advertisement) Estimated If Not Responsible. Completed)
neW ParKer middle school and taUnton high school Taunton, MA
DAVID R. FINNEY, AIA, LEED AP DESIGN PARTNERSHIP OF CAMBRIDGE
Grades Served: (MS) 5-8 (HS) 9-12 Enrollment: (MS) 600 Students (HS) 2,600 Students Scope: Addition/Renovation Building Size: (MS) 78,169 SF (HS) 467,500 SF
City of Taunton 15 Summer Street Taunton, MA 02780 Wayne E. Walkden, Sup’t of Building [508] 821-1015
addition and renovations rejUvenate a camPUs and alloW For dePartmental academic strUctUre... c h a l l e n g e : Provide 21st Century spaces for a 2,600 student high school
through 450,000 SF of renovation and 65,000 SF of new construction while replanning a building originally designed to support a house structure to a departmental space arrangement.
s o l U t i o n : To provide space for additional high school population and
a learning environment dedicated to the specific needs of the middle school. The new wing, constructed in Phase 1, allowed the middle school to vacate its space within the high school generating “swing space” so 100% occupancy could be maintained during construction.
A thorough restructuring of spaces and systems of a large facility originally designed for a different era and a different educational structure. The new mechanical and electrical infrastructure provides an additional 40 to 50 year life span while upgraded spaces, technology and equipment rival those of a newly constructed school. In addition the Parker Middle School now proudly “owns” its own purpose-built, selfcontained wing.
resUlt:
Project highlights:
▪ Natural light used within or through the corridors and classrooms ▪ Phasing of both schools allowed the students to attend classes with minimal disruption throughout the building process
▪ The Country School was replaced with a new school on the site of the original school and the original was demolished post construction
▪ Interior design created to the scale of younger children ▪ Design utilizes planning principles to allow for strong staff supervision ▪ Building envelope insulation to help keep energy use substantially below code thresholds
Updated July 2011
North Middlesex Regional High School, Townsend, MA -40-
2011
112,000
7,716 (includes sub-consultants)
ARCHITECTURE INTERIOR DESIGN TECHNOLOGY MASTER PLANNING PROGRAMMING
HO O D B U S IN E S S P A R K 5 0 0 R U THE R F O RD A VEN UE CHA R L E S TO W N , MA 0 2 1 2 9 T 6 17. 241. 9800 F 617. 241. 5143 WWW . D E S IG N - P A R T N ER S H I P . C O M