Do Good Fiscal Report - 2024

Page 1


DOING GOOD, IDAHO

Nestled snuggly against golden Tamarack and deep green pines on a hillside overlooking the St. Joe River, about 25 miles east of St. Maries, the three-room schoolhouse of Calder Elementary is a beacon for its community that serves 19 students and three teachers. Inside, just off the secondary school classroom in the basement is a renovated closet that serves as the school’s small library.

“Learning begins with reading. It is where young students can let their imaginations run free,” said Megan Sindt, the school’s administrator when she received a Bucks for Books award from the Idaho Lottery.

The Idaho Lottery was created specifically to make a difference for Calder Elementary, and all of Idaho’s public schools, and for the Idahoans who prepare today’s students for tomorrow’s success.

Calder School Bucks for Books Recipient $1,000 Award

In 2024 the Idaho Lottery celebrated its 35th Anniversary returning a record dividend of $84 million to the People of Idaho on July 19, 2024, during a public ceremony with Governor Brad Little at The Village in Meridian. Since 1989, the Idaho Lottery has returned $1.273 BILLION to benefit our good causes: public education and the State of Idaho’s permanent building facilities, like our public universities and college campuses.

DIVIDEND DISTRIBUTION

During the 2024 legislative session, the Idaho Legislature passed Governor Little’s plan for school investment and property tax relief for Idaho’s citizens that emphasizes fiscal responsibility and a long-term vision that ensures lottery proceeds optimally benefit Idaho’s schools, students, and property taxpayers.

Therefore, effective FY 2025, there will be changes in priorities in how dividend monies may be spent by schools. However, there will be no changes to the formulas. The Department of Education will continue to receive 5/8 of the Lottery dividend annually, and the Permanent Building Fund will continue to receive 3/8 of the Lottery dividend for state-owned facilities.

The legislation enacted a hierarchy for Idaho public school districts to use the funding in the following order of priority:

1. Reduce the levy for voter-approved school bonds.

2. Reduce the levy for voter-approved temporary supplemental school levies.

3. Reduce the levy for voter-approved school plant facility levies.

4. Any remaining funds may be used for construction, renovation, or maintenance needs, used to secure/ make payments on a new school facilities bond, or may be reserved for future school facility construction or renovation needs.

The Idaho Lottery continued its trademark performance of rigorously managing their budget. Here is a breakdown of Where the Money Goes:

DO GOOD PROGRAMS

When the Idaho Lottery was voted into existence by Idahoans in 1988, it was done with the intent of providing supplemental funding to enhance public education and the State of Idaho’s permanently owned facilities. Thirty-five years later and after pumping more than a billion dollars in additional funding for Idahoans this mission remains at the core of the Lottery’s everyday operations.

The Idaho Lottery offers four Do Good initiatives beyond the annual dividend: Love Your School, Bucks for Books, Classroom Wishlist, and Scratch for Schools. These participatory ventures provide specific resources for classroom needs and libraries. The combination of these four programs reached 579 public schools with a total of $394,319 awarded for individual classroom and library needs.

Scratch for Schools had some swashbuckling fun with ten events; hosting 459 schools who won over $160,000.

The competition was fierce, producing some of the most competitive scratching in Scratch for Schools history. At each event, schools received 200 unscratched tickets, an entire pack of Blackboard’s Loot, a pirate themed ticket created specifically for Scratch for Schools.

Now in its 23rd year, the original and longest running Do Good initiative has held 185 events and awarded more than $1.8 million for specific classroom and school needs since October 2001.

Priest River Lamannah High won $267 for their school.

TThe Idaho Lottery jump-started Anne Gigray-Kinley’s Food and Finance classroom at Middleton Middle School with Classroom Wishlist items of new cooking equipment, cake pans, new knife sets, air fryers, and four brand-new stoves.

In FY 2024, Classroom Wishlist enjoyed its best year, awarding a total of 91 school projects worth $173,856. Since the program began, there have been an amazing 274 school projects funded worth $439,199.

North Idaho:

Frederick Post Learning Center (Post Falls)

Hayden Canyon Charter (Hayden)

Kootenai Classical Academy (Post Falls)

Lake City High School (Coeur d’Alene)

Priest River Lamanna High School (Priest River)

Sandpoint High School (Sandpoint)

St Maries High School (St. Maries)

Washington Elementary (Sandpoint)

North Central Idaho:

Deary Elementary (Deary)

Nezperce School District (Nezperce)

Sacajawea Middle School (Lewiston)

Southwest Idaho:

Basin Elementary (Idaho City)

Birch Elementary (Nampa)

Cascade High School (Cascade)

Centennial High School (Boise)

Eagle Elementary (Eagle)

Eagle Hills Elementary (Meridian)

East Canyon Elementary (Nampa)

Frontier Elementary (Boise)

Hawthorne Elementary (Boise)

Hillsdale Elementary (Meridian)

Homedale Middle School (Homedale)

Joplin Elementary (Boise)

Lake Hazel Elementary (Boise)

Lake Hazel Middle School (Boise)

Mary McPherson Elementary (Meridian)

Meadows Valley School (New Meadows)

Melba Elementary School (Melba)

Meridian Academy High School (Meridian)

Middleton Heights Elementary (Middleton)

Middleton Middle School (Middleton)

New Plymouth Elementary (New Plymouth)

North Star Public Charter School (Eagle)

Park Intermediate School (Weiser)

Ponderosa Elementary (Meridian)

Syringa Middle School (Caldwell)

Ustick Elementary (Boise)

Weiser High School (Weiser)

West Junior High School (Boise)

Wilson Elementary (Caldwell)

Canyon Springs High School (Caldwell)

Victory Middle School (Meridian)

South Central Idaho:

Bliss High School (Bliss)

Glenns Ferry Elementary (Glenns Ferry)

I.B. Perrine Elementary (Twin Falls)

Jerome High School (Jerome)

Kimberly Middle School (Kimberly)

Minidoka School District (Paul)

Sawtooth Elementary (Twin Falls)

Shoshone Elementary (Shoshone)

Twin Falls High School (Twin Falls)

Wendell Elementary (Wendell)

Wood River High School (Hailey)

Southeast Idaho:

Claude A Wilcox Elementary (Pocatello)

Ellis Elementary (Chubbuck)

Green Acres Elementary (Pocatello)

Indian Hills Elementary (Pocatello)

Lewis and Clark Elementary (Pocatello)

Paris Elementary (Paris)

Syringa Elementary (Pocatello)

Washington Elementary (Pocatello)

East Idaho:

Aberdeen Middle School (Aberdeen)

Adams Elementary (Rexburg)

American Heritage Charter School (Idaho Falls)

Arco Elementary School (Arco)

Butte County High School (Moore)

Chief Tahgee Elementary Academy (Fort Hall)

Farnsworth Middle School (Rigby)

Fernwaters Public Charter School (Salmon)

I.T. Stoddard Elementary (Blackfoot)

Jefferson School District #251 (Rigby)

Mountain Valley Elementary (Idaho Falls)

Riverside Elementary (Blackfoot)

Riverview Elementary (Shelley)

Sunnyside Elementary (Idaho Falls)

A thousand dollars can make a big difference for any Idaho school. And, in Idaho, we stretch our dollars further. That’s why during FY 2024 the Idaho Lottery created the Love Your School program where players get to be the hero for a school!

Using the Lottery’s VIP Club, players use their points to get an entry into a drawing. At the end of each month, the Lottery selects one player and that player gets to give a $1,000 award to the school they LOVE the most.

For a list of recipients and our VIP Club heroes, visit www.idaholottery.com/giving-back/love-your-school

For the fifth year, the Idaho Lottery teamed up with the Idaho Commission for Libraries to deliver this year’s Bucks for Books awards. At every school, the experience is often the same. Young students become excited to see new books and oftentimes new books they’ve requested from their librarian. Bucks for Books is making a difference for early education literacy in Idaho.

There were 20 recipients for a total of $50,000 this year. Since 2019, Bucks for Books has awarded 109 schools with a total of $275,000 for new book acquisition.

Below is a list of this year’s awardees:

North Idaho:

Calder Elementary School, Calder = $1,000

West Ridge Elementary, Post Falls = $1,000

North Central Idaho:

Troy Elementary School, Troy = $2,000

Treasure Valley:

Sherman Elementary, Nampa = $3,000

Future Public School, Garden City = $3,000

Pat Anderson School, Caldwell = $3,000

Chief Joseph School of the Arts, Meridian = $3,000

Lakevue Elementary, Nampa = $3,000

South Central Idaho:

Murtaugh Elementary, Murtaugh = $3,000

Bliss Elementary, Bliss = $3,000

Carey Elementary, Carey = $3,000

Southeast Idaho:

Connor Academy, Chubbuck = $2,000

East Idaho:

Ridge Crest Elementary, Blackfoot = $3,000

Fort Hall Elementary, Fort Hall = $1,000

Ethel Boyes Elementary, Idaho Falls = $2,000

Stanley Elementary/Jr. High School, Stanley = $3,000

Dora Erickson Elementary, Idaho Falls = $3,000

Cottonwood Elementary, Rigby = $3,000

Summit Hills Elementary, Idaho Falls = $3,000

Kennedy Elementary, Rexburg = $2,000

is a breakdown of Idaho Lottery’s

Pocatello Tile upgrade, bathroom remodel, $2,287,086 $24,298,599 lighting upgrade, secure entrance, carpet, general maintenance

Pocatello Community Rubber base, bathrooms upgrade, $0 $402,187 Charter doors and window, routine maintenance

BEAR LAKE

Bear

roof

BENEWAH

Plummer / Worley Joint Replace windows, HVAC service $62,532 $897,155 and replacement/repair, repair freezer, repair boiler, LED lighting replacement, repair refrigerator, general repairs

St. Maries Joint HVAC installation and upgrades, $176,942 $2,185,426 replace floors and refinishing, electrical repairs, roof repairs and replacement

BINGHAM

Learning Ctr. new coolant, plumbing repairs, carpet

benefits, plumbing, carpet, $500,493 $4,478,321 HVAC repairs and upgrades, fire alarm

BLAINE Blaine County Interior paint, lighting, plumbing $616,911 $6,096,734 repairs, flooring, filtered drinking fountains, gym repairs, water heaters, HVAC repairs Syringa

$572,484 remodel music room, flooring, leak repairs, HVAC repairs, re-key doors

Horseshoe Bend Finish remodel of locker room, new girls locker room, new HVAC $38,613 $560,359

Promise Academy New School, received no funding

County (former)

M. Bird Charter General repairs and maintenance,

bathroom stalls, heaters

Lake Pend Oreille HVAC upgrades, roofing, replacement $761,355

of windows, doors, flooring

West Bonner County Maintenance, mechanical controls, $188,244

lighting, filtration, soundproofing, signage, security, communication system

BONNEVILLE

Charter doors, wall rebuild

Bonneville Joint Routine maintenance and repairs, $2,524,686 $20,645,764 roofing, bleacher replacement Idaho Falls Salaries/benefits, install controlled $1,906,000 $20,215,407 access, electrical, polished concrete, gym floor refinish/repair, repair ceilings, carpet replace/repair fire sprinklers, camera systems Monticello Montessori Plumbing repairs, electrical, HVAC,

paint and general maintenance

Charter (closed)

Valley Elementary Carpet cleaning, resurface gym floor

with volleyball pole inserts, air duct repairs and upgrades, new fire alarm system Taylor’s Crossing HVAC, refinish gym floor, carpet cleaning $0 $436,255 Charter plumbing, heat roof tape installation, electrical, install gutters, drinking fountain, roof repairs, water shield

Pine Charter Carpet, tile, HVAC, plumbing repairs,

paint, water bottle fill station, eye faucets replaced, grease trap, fume hood, locks

Gem Prep - Nampa Maintenance and building repairs, $0 $206,211 hood installation

Heritage Community Emergency shower install, painting, $0 $410,523 HVAC services, replace carpet, carpet and window cleaning, bathroom plumbing, window repairs and tinting, handyman services

Idaho Arts Charter Salaries and benefits, general repairs, $0

door locks, alarm doors upgrades, glass treatments, AC repairs, window replacement Legacy

room update, wall repair Liberty Charter Plumbing, lighting, electrical, alarm systems, $0

HVAC repair and replacement, resurface gym floor, flooring, touchless drinking fountains, partial maintenance salaries

HVAC repairs and replacement, $160,013

general maintenance, replaced roof

lighting systems, roof replaced

Alarm

foyer, repairs per inspection reports, roof repairs, greenhouse, remodel library

fire sprinkler system, HVAC upgrades, flooring repairs/upgrades

floor, electrical, plumbing, maintenance

floors, carpet, sinks/urinals, fire radio/alarm system, pest abatement, rekey

CARIBOU Grace Joint Kitchen and gym roof, snow stops $99,221 $1,109,390 for roof, plumbing, electrical, classroom roof, miscellaneous maintenance North Gem

paint, drain lines for bathrooms, $24,725 $387,682 wall repairs, replaced and cleaned carpet, gym floor sealant, maintenance Soda Springs Joint Maintenance, roof repair, cafeteria

floor, boiler maintenance, heating, new boiler, man trap install, plumbing, electrical

CASSIA

Cassia County Joint Theater rigging repair, HVAC $1,058,138 $10,577,889 repairs and replacements, roofing, flooring, paint

$1,058,138 $10,577,889

Clark County Joint Repair walk-in freezers, update locks, $20,029 $367,834 repair fire suppression, film for windows, remodel entry, lunch room, water heater

CLEARWATER

Orofino Joint Paint exterior, remodel classroom, $239,983

windows, roofing, new door and frame, handicap ramp and handrail, refinish gym floor

CUSTER

Challis Joint Salaries, benefits, access control, $67,190 $951,944 supplies/materials, heat unit replacements Mackay Joint Annual inspections, refinish gym and $41,327 $504,404 stage floors, HVAC, window replacement, lighting, water heater, boiler repairs

asbestos abatement, new tile, carpet

High School and supplies to maintain building

FRANKLIN

HVAC, CTE building upgrades

IDAHO

Cottonwood Joint Maintenance, gym floors refinishing, $86,395 $928,807 install heating units, remodel, gym roof

Grangeville Joint (former)

Mountain View Fire alarm system and inspections, $218,341 $1,660,491 HVAC, supplies and materials, snake sewer lines, plumbing, carpet tiles/floor coverings

Salmon River Joint Replace gym floor, bleachers, water

heater, heater/cooler, etc.

JEFFERSON

KOOTENAI

equipment, interiors, & flooring

Academy Charter drinking fountain, misc. safety updates/repairs

Kootenai Classical New School, received no funding –

Kootenai Joint Water heater, fire system testing, $40,885 $500,645 repair kit, repair drain line, heating system, gym floor refinishing, painting, circuits in gym, boiler, replace heat pump

Lakeland Maintenance, repair/replace siding, $884,685 $8,304,387 trim, windows and doors, replace bleachers

North Idaho Stem Carpet, repair wiring, rmaintenance, $0 $379,333 Charter roofing repair, door lock repair

Post Falls Salaries for HVAC technician, $1,136,695 $10,302,059 electrician, carpenter to perform building maintenance, flooring, paint TOTAL $3,862,296 $39,509,473 LATAH

Genesee Joint Lighting, windows, electrical panel $56,018 $646,305 upgrade, boiler repairs/maintenance, painting, regular maintenance

Idaho Distance Education Academy (closed) – $664,474 Kendrick Joint HVAC upgrades, fieldhouse building, $57,097 $624,833 roof replacement Moscow Carpet replacement - all schools $411,135 $4,655,967

Charter Carpet cleaning, bathroom remodel, $0

fire alarm upgrade, general maintenance

and fire system maintenance

and repairs, roof venting

Troy Salaries/benefits, flooring, cameras

install, repairs/maintenance, refinished gym floor, fire extinguisher service, intercom repair

and benefits,

building maintenance, refinished gym floor, HVAC repairs, replaced windows and siding, gym repairs, electrical

LEMHI

FernWaters Public Heat pump repairs, sheetrock/drywall, $0

Charter insulation repairs Salmon Safety and door locks, new gym floor,

carpet, furnaces, upgrade to LED lights

bleachers, replace broken windows

and CO protection, maintain facilities, HVAC services, setup back door, carpet

Joint Maintenance, carpet, flooring, cabinets

in classrooms, doors, water bottle filler

LINCOLN Dietrich Light fixture/ballast repairs, remodel

$439,617 wood shop, floor/carpet upkeep, boiler maintenance, classroom upgrades, paint

maintenance, fire alarm panels,

thermostats, electrical, boiler repair, heating motor repairs, FOBs for school entrance, return air sensors repair, boiler water treatments

Shoshone Joint Carpet, paint for classrooms/halls, tile $99,560 $1,039,525 bathroom wall, sand gym floor, electrical and plumbing for water fountains, windows, repair intercom system, air/heat repairs

MADISON

MINIDOKA

Lewiston Independent Roofs, new floor coverings, kitchen $883,719

improvements, build/install cabinets

Pinecrest Academy New School, received no funding

of Lewiston

Elementry (closed)

HVAC new/repairs

lights, general maintenance Homedale Joint Maintenance, building repair, roof

repair/replacement, floor covering, HVAC, paging/bell system, security cameras

Filer Salaries, benefits, repairs to security $290,910 $2,889,678 systems, paint, windows, carpet, HVAC, restrooms, plumbing, supplies

Gem Prep: Twin Falls New School, received no funding – –

Hansen Misc. repairs/supplies, repair heaters, $58,541 $733,361 hot water heater, tile, carpet, bathroom updates, exterior doors, weight room walls

Kimberly Salaries/benefits, supplies, carpet $385,299 $3,188,952 HVAC repair/replacement, windows, family restroom, contractors, water coolers

Murtaugh Joint Gym floor, HVAC, maintenance $82,550 $643,452

Pinecrest Academy of ID Not required to report* $0 $55,131

RISE Charter Not required to report* $0 $25,290

Three Creek Joint HVAC system, ongoing repairs and $838 $19,529

Elementary maintenance of building

Twin Falls Carpet, miscellaneous projects $1,757,171 $15,986,778

Wings Middle Charter (Closed) – $45,998

Xavier Charter

Replace heat exchange, repair HVAC, $667,372 replaced urinal, repair gas regulator, lighting TOTAL $2,876,261 $27,756,292 VALLEY

Cascade Automatic door locking system, gym $38,070 $594,568 floor refinishing, classroom flooring

McCall-Donnelly Joint Water heater, flooring, glass/window, $269,415 $2,302,030 HVAC maintenance, bleachers, painting

Mountain Community Not required to report*

$7,842 TOTAL $307,485 $2,904,440 WASHINGTON Cambridge Joint Rekeying locks, heating replacement,

$380,267 water leak repair, pump repair Midvale Electrical, thermostats, new HVAC, $29,350 $295,076 water heater, ag shop electric work, painting, carpet and tile for classrooms Weiser

*Idaho Code 33-1019 requires the Department of Education to collect information from charter schools and districts on projects of which moneys from the school’s building maintenance allocation were expended. If they do not own the facility, they are not required to report. These schools do not own their school building(s) and therefore are not required to report.

LOTTERY DIVIDENDS

$1,273,000,000

Permanent Building Fund Projects in FY24:

Each year, the Idaho Department of Administration’s Division of Public Works and the Permanent Building Fund Advisory Council prioritize which facilities are improved based on need, timeliness, and cost. The Idaho Lottery is pleased to do its part to provide the necessary resources.

STATE EDUCATION BUILDINGS

BOISE STATE UNIVERSITY

- MPCB (Bldg 123) Generator Backup Power

- MCMR (Bldg 393) 3rd Floor Labs West Side Finish Out, PH 1

- Campus Wide Classroom Improvements

- Campus Wide Lab Upgrades

- Albertsons Library (Bldg 027) Renovations

- Data Facilities Fire Suppression & Mechanical Updates

- MEC (Bldg 101) HVAC Improvements

-Campus Wide Campus Survey

- Pioneer Hall (Bldg 056) Film Program Space Remodel

- Campus Wide Emergency Generator Network

- Yanke Family Research Park (Bldg 289) Skylight Refurbish

- MCMR (Bldg 393) 3rd Floor Labs East Side Finish Out, Ph 2

- Gage St Warehouse (Bldg 352) Data Center Upgrades

- Campus Wide Dedicated Cooling for Comm Rooms

- Campus Wide Upgrade All Comm Room Doors to Badged Entry

- HML (Bldg 100) Boiler Replacement

- SPEC (Bldg 062) Air Handler Replacement

- Copper Basin (Bldg 075) Roof Replacement

- Campus Wide Comm Closet Cleanup for Policy Compliance

- EMA (Bldg 015) Surveillance System

- New Science Research Building (Supplemental Funding)

- Restrooms ADA Upgrades

COLLEGE OF EASTERN IDAHO

- Campus Wide HVAC System Controls and Restroom Remodels

- Architectural Survey for Office & Receiving / Storage Facility

- Sessions Bldg Upper Floor Fire Sprinklers

COLLEGE OF SOUTHERN IDAHO

- Desert Bldg Welding & Automotive Program Retrofit

- Campus Wide Exterior Security Cameras, Ph 1 , 2 and 3

- Canyon Bldg New Elevator Install

- Campus Wide ADA Classroom Teaching Stations

COLLEGE OF WESTERN IDAHO

- NMEC Welding Expansion (Agency Funds $500,000)

IDAHO ED SERVICES FOR THE DEAF AND THE BLIND

- Admin Bldg Parking Area

- Campus Sidewalk Replacement & Classroom Emergency Exit Wheelchair Access

- Residential Cottages

- Bus Storage Barn

IDAHO STATE UNIVERSITY

- Medical Lab Sci Program Permanent Space

- Research Data Center & Nuclear Reactor Facility Backup Power Generator

- Multiple Bldgs Electronic Access Control Installation

- Meridian Campus (MD 722) Psychopharmacology Research Lab

- Student Health Center Bengal Pharmacy Refresh

- Lillibridge Bldg ECE Core Teaching Labs 9, 26, & 126

- Plant Sci Bldg Greenhouse Space Power & HVAC Improvements

- Math & Stats Classrooms 301 - 313 Upgrades

- Beckley Nursing Remodel & Equip Tiered Classroom 209

- CHE Bldg Rm 214 Renovation (University Place)

- Law Enforcement Bldg ADA Restroom Shower Areas

- PAS Expansion and Colocation

LEWIS - CLARK STATE COLLEGE

- Williams Conference Center Fire Sprinkler System

- Multibuilding ADA Improvements and Fire Alarm System

- Multibuilding Utility Infrastructure/ HVAC Study (Def Maint)

- Clearwater Hall Envelope Repairs (Def Maint)

- Reid Centennial and Thomas Jefferson Hall Envelope Repairs (Def Maint)

- Campus Wide Sidewalk Improvements (Def Maint)

- Wittman Complex/ Mechanical Tech Bldg System Up

NORTH IDAHO COLLEGE

- Mclain Hall Restroom Remodel and Refresh

- Maintenance Shop Garage Addition

- Damaged Bldg Demolition

- Campus Sidewalk Expansion for Connectivity

- Winton Hall Bldg Dental Assisting Program Educational Space

UNIVERSITY OF IDAHO

- Hartung Theater Elevator & Accessibility Improvements

- College of Natural Resources Universal Accessibility Improvements

- North Campus Entrance Hwy 8 Frontage Improvements

- Stadium Drive Improvements

- Art and Architecture Main HVAC Improvements

- Idaho Ave Pedestrian Mall Improvements, Pine Street to Line Street

- Paradise Creek Pedestrian Bridge at Hello Walk Alignment

- Admin Bldg HVAC, Ph 3

- Fire Suppression Systems Engineering Analysis, FM Global

- Surface Water Flooding Engineering Analysis, FM Global

- Facilities Services Fire Suppression Improvements, FM Global

- Admin Bldg Provost Office Suite Renovations

- Research Lab Improvements Archtiectural & Engineering Analysis

- Classroom Improvements Archtiectural & Engineering Analysis

- CNR Backup Power Emergency Generator

- Blake House Video Production Center Improvements

- Memorial Gym Locker Room Improvements Architectural & Engineering Analysis

- Admin Bldg Convert Former NOC to Offices & Renovate Southeast Entry

- Art & Architecture South Improvements

- Campus Drive Repairs, Ph 4

- West Campus Entry Gateway Improvements, Idaho Ave

- Facilities Services Construction Docs Archive Expansion & Lobby Improvements

- Paradise Creek Pedestrian Bridge at Lot 60 Walkway Alignment

- Meat Science and Innovation Center

- McCall K-12 STEM Education Campus Improvement

STATE PERMANENT BUILDINGS

ADMINISTRATION, DEPARTMENT OF

- Parking Structure #1, Floors 4 & 5 Repairs

- LBJ Flooring

- Capitol Mall Concrete

- Supreme Court Floors 1 & 2 Asbestos Abatement

- Replace Roofs on Chinden Campus - Bldg 5, 6 and 7

- Borah Bldg Floors 2 - 4 Ceiling and Lighting Upgrades

- Borah Bldg Floors 2-4 ADA Restroom Upgrades

- Garage #1 Basement Office & Postal Add ADA Restrooms

- JRW Perimeter Sidewalk Brick Replacement

- LBJ LED Light Fixture Replacement

AGRICULTURE, DEPARTMENT OF

- IFQAL Bldg Parking Lot Replacement

CORRECTION, DEPARTMENT OF

- NICI Unit 1 & Recreation Stair, Ramp, & Curb ADA Access

- EBCRC Restroom Remodel

- NCRC New Bldg for Visiting & Programming

- NICI New Bldg for Training & Programming

- SBWCC Unit 1 Roof

- ISCI Upgrade Exterior Perimeter and Exterior Bldg Lighting

- PWCC Upgrade Lighting

- SICI Main Dorm HVAC

- SBC

EDUCATION, DEPARTMENT OF

- LBJ Office Space Renovation

GOVERNOR’S INITIATIVE PROJECT

- Steunenberg Monument and Capitol Grounds Improvements

- IDOC Secure Forensic Facility

HEALTH AND WELFARE, DEPARTMENT OF

- State Labs Natural Gas, Vacuum Piping, and Equipment Removal

- SHN Replace VCT Flooring

- SHS Patient Treatment Facility C & D Wing Bathroom Remodel

- SWITC Utilities, Infrastructure and Campus Planning Study

- SHS Patient Treatment Facility Secure Walkway/ Visitation Area

- SHS Patient Treatment Facility Roadway Asphalt & Dock Concrete

IDAHO STATE HISTORICAL SOCIETY

- Stricker Ranch & Rock Creek Station ADA Public Access

- History Center Bldg Expansion with Mobile Shelving

- Idaho State Museum Interior Doors ADA Push Button Access

IDAHO STATE POLICE

- Dist 4 HQ Lab Additions

- Dist 3 Meridian HQ Campus ADA

- Meridian Campus HQ Security Access and Emergency Power Upgrades

- Dist 3 Meridian HQ Bldg 3 Training Facility Roof

JUVENILE CORRECTIONS, DEPARTMENT OF

- JCC St. Anthony Visitation Annex (DPW Project No. 21537)

- JCC St. Anthony Perimeter Fence, Ph 3 (DPW Project No. 21721)

LABOR, DEPARTMENT OF

- Annex Bldg Remodel / Conference Rm Relocation

LANDS, DEPARTMENT OF

- Payette Lakes Supervisory Area Office Carpet Replacement

LIQUOR DIVISION, IDAHO STATE

- Tool Room

MILITARY, DIVISION OF

- Idaho Falls RC and Site Repair

- Bldg 500 / 501 Classroom Addition

- Bldg 557 Roof and HVAC Repairs

- Edgemeade RC Storage Facility and Vault/ Supply Room Repair

- Orchard Range RC Utilities and Site Development Design

MULTI - AGENCY

- Carnegie Library Renovation

PARKS & RECREATION, DEPARTMENT OF

- Eagle Island SP Staff Housing Renovation

- Hells Gate SP ADA Restroom Remodel

- Lake Cascade SP Reroof Shop

- Winchester Lake SP Reroof Restroom

PUBLIC SAFETY COMMUNICATIONS

- French John Comm Site Upgrade

- Grizzly Hill Comm Site Tower Upgrade

- Flattop Butte Site Infrastructure Support Equipment Upgrade

- Albion Butte HVAC System Upgrade

STATE, SECRETARY OF

- Capitol E205 / E242 SOS Office Space Remodel

VETERANS SERVICES, DIVISION OF

- Boise Cemetery Expand Office Space & Secure Records Storage

- Blackfoot Cemetery Electrical Work

The Idaho Lottery launched on July 19, 1989.

Five-eighth’s of the Idaho Lottery’s annual dividend goes to the Department of Education to pay down voter-approved bonds and levies. Threeeighths of the dividend goes to the Department of Administration’s Permanent Building Fund for upgrades and improvements to projects. Dividend distribution occurs annually in July. The Department of Education handles distribution at the district level based on average daily attendance. Permanent Building Fund projects are approved by the Permanent Building Fund Advisory Committee and the Idaho Legislature.

The Idaho Lottery office is open from 8:00 AM to 5:00 PM MT, Monday through Friday, and closed all state and federal holidays.

For more information, please contact:

Idaho Lottery P.O. BOX 6537 Boise, ID 83707 208-334-2600

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.