HORAM & VINES CROSS VILLAGE DIARY August 2022
ANOTHER NEW ESTATE PLANNED NEXT TO ROSEMEAD: See inside for full details. CDM 2015 Health & Safety Information
Existing Public Right Of Way
This information relates only to 'Significant Hazards' identified on this drawing and is to be read in conjunction with the Designer's Hazard Register. 1
New site access to be constructed prior to any commencement on site to allow safe transit of construction vehicles Site to be adequately hoarded from all sides due to openess to boundaries Public Right Of Way to be suitably fenced or diverted prior to construction Precise locations of buried services, particularly sewers, should be established by hand digging Trees should be suitably protected from construction works
2 3 4
Pond
5
Drain Minimum 10m ecology offset from site boundaries adjacent to ponds
10m
Pedestrian links around site boundary
17
Open Space
m
Site Access via existing residential scheme
*
*
Indicative Residential Accommodation Schedule Open Market Provision - 30 Dwellings
10m
Dwellings kept clear of RPA
39
*
3B
2no. 1-Bed Apartments 7no. 2-Bed Houses 15no. 3-Bed Houses 6no. 4-Bed Houses
FPO
*
19
2B .9m 13
41
20
2B
38
4B
40
2B
37
3B
Sh
*
Drive
43
*
Private
44
*
36 2B
2B
3B
3B
Cauldebec
35
ce
3B
rfa
42
2x1BF
3B
Su
45-46
16
2x1BF
ared
17-18
6no. 1-Bed Apartments 6no. 2-Bed Houses 4no. 3-Bed Houses
2B
rcp
Open Space
34
.1m
3B 15
*
38% 1-bed 38% 2-bed 25% 3-bed
Total
46 Dwellings
Car Parking
1 space per apartment 2 spaces per house
Indicative visitors/unallocated spaces throughout the site
33
EP
Main
30% 1 & 2-bed 50% 3-bed 20% 4-bed
Affordable Provision - 16 Dwellings
Cycle Parking
4B
Road
*
2 spaces per House in rear garden stores or garages
MKR MKR
Gross Site Area: 2.15Ha
(excluding attenuation features and access road within Rosemead site)
Density: 21.4dw/Ha rface
26
3B
7-8
2B
21-22
2x1BF
3
64.7
2B
2B
G
64.5 3 8 64.4
06.04.22 14.03.22 25.02.22 10.03.21 25.02.21 18.02.21 08.02.21 25.01.21 21.01.21 19.01.21 03.12.20 18.03.20 19.02.20 14.02.20 20.01.20 14.01.20 06.01.20 20.11.19
Planning Submission Amended for vehicle tracking Scheme reduced to 46 dwellings Amended to match Bovis's comments Red Line extended and amended context Red line extended to area west of attenuation pond Kerbs and parking adjusted to engineers comments Affordable dwellings relocated from SW corner Flats reduced, eastern boundary amended Amended to suit latest drainage strategy Access from Rosemead, Cauldevon omitted Red line extended to road edge Amended following removal of 3no. trees Minor adjustment to car parking widths Amending for vehicle tracking Updated site plan Amended following meeting with LPA Ponds, access road and footpaths amended Revision Details
64.5
1 64.6 64.7 0
62.81
NP
64.7
Shipton
G
B
63.12
65.62 TW 65.88 65.61 TW 65.81
H
LA
NE
65.78 TW 65.91
E
65.77
Dewlyn
G 63.43
N
EC
TW 65.82 65.65
TP 65.67
L
G
Southoaks
B B
B
U
TW 67.69 TW 67.75
TW 67.75
A
B
TW 67.76
Scale
L
EP ST
TW 67.84 TW 67.87
B
EP
Land East of Rosemead, Horebeech Lane, Horam Drawing Title
N
ST
NP
Job Title
Illustrative Site Layout
D
B
www.ecearchitecture.com Client's Name
Welbeck Strategic Land IV LLP New screen planting to boundary with Shipton Brigg
Y
63.02
B
R
BE
TP
Brigg
64.41 B
63.07
EP
4
Cauldavon
EP
GS
RE
A
GS B
Ch
76 Great Suffolk Street London, SE1 0BL T 0207 928 2773 E london@ecearchitecture.com Sussex: Brooklyn Chambers, 11 Goring Road Worthing, West Sussex, BN12 4AP T 01903 248777 E sussex@ecearchitecture.com Bristol: Westworks, Colston Tower Colston Street, Bristol, BS1 4XE T 0117 214 1101 E bristol@ecewestworks.com
3
Public Right of Way retained through site within green corridor with PROW surfacing to be agreed
62.46
B
Dr
London:
62.20
HO
KE KE AK KE KE KE AK AK AK AK AK AK KE AK NF KE NF NF
4
Rev Date
Landscape buffer to Laundry Lane
EP EP
62.56
Surface water from western part of site to be discharge (via underground storage) to attenuation basin within Roasemead site
GP GP KE GP GP GP KE KE KE KE KE KE GP KE KE GP KE KE
1 64.5
13.9m
S R Q P O N M L K J H G F E D C B A
64.6
TW 62.63
64.52
64.5
12.6m
ch ee reb 61.93
TW 62.61
TP
Attenuation Basin
ene
Ho
erd
61.68
9.1m
6
3B
Alb
61.93 61.67
5
4B
2
*
62.18
*
62.33
*
G 62.49
m
62.45
.6
4
4B
62.77
62.64
rface
d Su
Share
3
3B
20
2
64.46
15
.8
m
rcp
3B
N
7
2B
30
31
TP
*
rface
* 64.8
2B
29
3B
d Su
28
2x1BF
Play Area
32 Share
1
4B
3B
64.5
3B
27
3B
3B
9
2B
*
*
3B
24
23
64.5
10
11
65.2
25
Open Space
2
15
7
3B
ILLUSTRATIVE LAYOUT ONLY
7
3B
14 2B
65.0
4B
12
4
d Su
13
Share
Adjacent scheme under construction
*
* *
Main Road
TW 67.86
1:500 @ A1 / 1:1000 @ A3
TW 67.84
NP 64.62
MKR
TK 64.71
metres
MKR 64.75 TK 64.85
B
TK 64.94
TP
64.88
TK 65.00
64.90
LE
kfie ld ttag e
Co
65.8m
65.28 TK 65.37
R
Bric
Dunmore
A
Willow Cottage
M
© ECE Architecture Limited. No dimensions to be scaled from drawing except for the purposes of Planning Applications. The contractor should check all dimensions on site. It is the contractors responsibility to ensure compliance with Building Regulations.
CAD Plot date:
40
50 Date
18.10.19
Drawing No
6728
Status
30
AK
Job No 65.08 TK 65.20
20 Checked
KE
64.86 G
10
Drawn
64.80 TK 64.93
PL-03
Rev
S
INFORMATION 6/04/2022 - 14:21:59
6728 - site.dwg
G R E E N
Female led modern funeral directors five star reviews.