Horam & Vines Cross Village Diary

Page 1

HORAM & VINES CROSS VILLAGE DIARY August 2022

ANOTHER NEW ESTATE PLANNED NEXT TO ROSEMEAD: See inside for full details. CDM 2015 Health & Safety Information

Existing Public Right Of Way

This information relates only to 'Significant Hazards' identified on this drawing and is to be read in conjunction with the Designer's Hazard Register. 1

New site access to be constructed prior to any commencement on site to allow safe transit of construction vehicles Site to be adequately hoarded from all sides due to openess to boundaries Public Right Of Way to be suitably fenced or diverted prior to construction Precise locations of buried services, particularly sewers, should be established by hand digging Trees should be suitably protected from construction works

2 3 4

Pond

5

Drain Minimum 10m ecology offset from site boundaries adjacent to ponds

10m

Pedestrian links around site boundary

17

Open Space

m

Site Access via existing residential scheme

*

*

Indicative Residential Accommodation Schedule Open Market Provision - 30 Dwellings

10m

Dwellings kept clear of RPA

39

*

3B

2no. 1-Bed Apartments 7no. 2-Bed Houses 15no. 3-Bed Houses 6no. 4-Bed Houses

FPO

*

19

2B .9m 13

41

20

2B

38

4B

40

2B

37

3B

Sh

*

Drive

43

*

Private

44

*

36 2B

2B

3B

3B

Cauldebec

35

ce

3B

rfa

42

2x1BF

3B

Su

45-46

16

2x1BF

ared

17-18

6no. 1-Bed Apartments 6no. 2-Bed Houses 4no. 3-Bed Houses

2B

rcp

Open Space

34

.1m

3B 15

*

38% 1-bed 38% 2-bed 25% 3-bed

Total

46 Dwellings

Car Parking

1 space per apartment 2 spaces per house

Indicative visitors/unallocated spaces throughout the site

33

EP

Main

30% 1 & 2-bed 50% 3-bed 20% 4-bed

Affordable Provision - 16 Dwellings

Cycle Parking

4B

Road

*

2 spaces per House in rear garden stores or garages

MKR MKR

Gross Site Area: 2.15Ha

(excluding attenuation features and access road within Rosemead site)

Density: 21.4dw/Ha rface

26

3B

7-8

2B

21-22

2x1BF

3

64.7

2B

2B

G

64.5 3 8 64.4

06.04.22 14.03.22 25.02.22 10.03.21 25.02.21 18.02.21 08.02.21 25.01.21 21.01.21 19.01.21 03.12.20 18.03.20 19.02.20 14.02.20 20.01.20 14.01.20 06.01.20 20.11.19

Planning Submission Amended for vehicle tracking Scheme reduced to 46 dwellings Amended to match Bovis's comments Red Line extended and amended context Red line extended to area west of attenuation pond Kerbs and parking adjusted to engineers comments Affordable dwellings relocated from SW corner Flats reduced, eastern boundary amended Amended to suit latest drainage strategy Access from Rosemead, Cauldevon omitted Red line extended to road edge Amended following removal of 3no. trees Minor adjustment to car parking widths Amending for vehicle tracking Updated site plan Amended following meeting with LPA Ponds, access road and footpaths amended Revision Details

64.5

1 64.6 64.7 0

62.81

NP

64.7

Shipton

G

B

63.12

65.62 TW 65.88 65.61 TW 65.81

H

LA

NE

65.78 TW 65.91

E

65.77

Dewlyn

G 63.43

N

EC

TW 65.82 65.65

TP 65.67

L

G

Southoaks

B B

B

U

TW 67.69 TW 67.75

TW 67.75

A

B

TW 67.76

Scale

L

EP ST

TW 67.84 TW 67.87

B

EP

Land East of Rosemead, Horebeech Lane, Horam Drawing Title

N

ST

NP

Job Title

Illustrative Site Layout

D

B

www.ecearchitecture.com Client's Name

Welbeck Strategic Land IV LLP New screen planting to boundary with Shipton Brigg

Y

63.02

B

R

BE

TP

Brigg

64.41 B

63.07

EP

4

Cauldavon

EP

GS

RE

A

GS B

Ch

76 Great Suffolk Street London, SE1 0BL T 0207 928 2773 E london@ecearchitecture.com Sussex: Brooklyn Chambers, 11 Goring Road Worthing, West Sussex, BN12 4AP T 01903 248777 E sussex@ecearchitecture.com Bristol: Westworks, Colston Tower Colston Street, Bristol, BS1 4XE T 0117 214 1101 E bristol@ecewestworks.com

3

Public Right of Way retained through site within green corridor with PROW surfacing to be agreed

62.46

B

Dr

London:

62.20

HO

KE KE AK KE KE KE AK AK AK AK AK AK KE AK NF KE NF NF

4

Rev Date

Landscape buffer to Laundry Lane

EP EP

62.56

Surface water from western part of site to be discharge (via underground storage) to attenuation basin within Roasemead site

GP GP KE GP GP GP KE KE KE KE KE KE GP KE KE GP KE KE

1 64.5

13.9m

S R Q P O N M L K J H G F E D C B A

64.6

TW 62.63

64.52

64.5

12.6m

ch ee reb 61.93

TW 62.61

TP

Attenuation Basin

ene

Ho

erd

61.68

9.1m

6

3B

Alb

61.93 61.67

5

4B

2

*

62.18

*

62.33

*

G 62.49

m

62.45

.6

4

4B

62.77

62.64

rface

d Su

Share

3

3B

20

2

64.46

15

.8

m

rcp

3B

N

7

2B

30

31

TP

*

rface

* 64.8

2B

29

3B

d Su

28

2x1BF

Play Area

32 Share

1

4B

3B

64.5

3B

27

3B

3B

9

2B

*

*

3B

24

23

64.5

10

11

65.2

25

Open Space

2

15

7

3B

ILLUSTRATIVE LAYOUT ONLY

7

3B

14 2B

65.0

4B

12

4

d Su

13

Share

Adjacent scheme under construction

*

* *

Main Road

TW 67.86

1:500 @ A1 / 1:1000 @ A3

TW 67.84

NP 64.62

MKR

TK 64.71

metres

MKR 64.75 TK 64.85

B

TK 64.94

TP

64.88

TK 65.00

64.90

LE

kfie ld ttag e

Co

65.8m

65.28 TK 65.37

R

Bric

Dunmore

A

Willow Cottage

M

© ECE Architecture Limited. No dimensions to be scaled from drawing except for the purposes of Planning Applications. The contractor should check all dimensions on site. It is the contractors responsibility to ensure compliance with Building Regulations.

CAD Plot date:

40

50 Date

18.10.19

Drawing No

6728

Status

30

AK

Job No 65.08 TK 65.20

20 Checked

KE

64.86 G

10

Drawn

64.80 TK 64.93

PL-03

Rev

S

INFORMATION 6/04/2022 - 14:21:59

6728 - site.dwg

G R E E N

Female led modern funeral directors five star reviews.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Horam & Vines Cross Village Diary by hvcvillagediary - Issuu