Filling the void between the real space Education | Housing | Public Square
by Yeap Huei Sze
Works compilation along July 2020 semester
YEAP HUEI SZE
59, Nanyang Estate, Jinjang North , 52000 Kuala Lumpur. hueisze0123@gmail.com 012-6479871 ONLINE PORTFOLIO: https://hueisze0123.wixsite.com/portfolio
EDUCATION: UCSI University CURRENT Bsc of Science in Architectural (Hons) 2016-2018 Di ploma In Architectural Studies SKILLS:
CONTENT
Introduction Studio manifesto
11 Project 1: Imaginative Cartographty of Borneo Tales Unveiling the sea gypsies “Tales of Borneo” Documentation / Site Cartography mapping / Art work: Capsule of Semporna’s Bajau Laut / Specific site demacration
27
Project 2: Ideation, Narrative and Materialisation Void between the real space Litereture case study writing / Visual representation drawings / Cinematic video / Conceptual building design proposal model
45
Project 3: Design Realisation - Adaptive Architecture Fill in the void Site analysis / Schematic Building proposal
Reflection Self reflection throughout the project
Unit F THE TALES OF BORNEO
INTRODUCTION
The tales of Borneo investigates the lives of Sea Nomads and the Archeological Heritage of the prehistoric site along the southeastern coast of Sabah. The captivating wonders and alluring scenery of Semporna, its rich cultural heritage, traditions, customs and ethnic diversity reinforce Semporna City as a unique microcosm of society. There’s 3 predetermined theme or elements for us to test our design hypothesis. (Theme 1: Anthropocene ocean/ Theme 2: Socio culture and community empowerment/ Theme 3: Architecture of Earth and Materiality) Cutting through outstanding topographical feature of Sabah, the studio selectively picked the Sea Gypsy Village of Kampung Bangau-bangau for us to select our proposed proving ground. I choosen theme 2 as the main theme for my whole project. The Bajau Laut or ‘sea nomads’ ethnic community of Semporna are mostly boat dwellers (living in houseboats / stilt hut) that are dependent on the sea resources for their livelihoods. They make a living through sea- based activities( traditional fishing, pearl farming and seaweed farming) while bajau darat communities who settled on land, are skillful wood artisans, mat- makers, boat builders and producers of tortoiseshell ornaments. Despite the rich customs and traditions, the plight of the Bajau Laut people has remain immutable. Their stateless status is the main contributor to the multi ple setbacks faced througout the years in term of social deprvation, education underachievement, limited rights to medical healthcare, lack of job opportunities that eventually lead to criminal activiies, including inhalant abuse and drug trafficking.
Keywords: Cultural infrastructure, Underprevillage community, Bajau livelihoods, Community spirit Abstracted from project brief
Theme: Socio culture and community empowerment
Unveiling the Sea Gypsies
PROJECT 1 IMAGINATIVE CARTOGRAPHTY OF BORNEO TALES “Tales of Borneo” Documentation Site Cartography mapping Art work- Capsule of Semporna’s Bajau Laut Specific site demacration
12 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | TALES OF BORNEO
Borneo Borneo, island in the extreme southwestern part of the Pacific Ocean. It is the third largest island in the world, surpassed in size by only Greenland and New Guinea. Borneo is within Malaysia, the Northern region is divided into Sabah and Sarawak, with Brunei smack between the two, and Kalimantan in the East, below Indonesia.
Map of Borneo (Project 1 “Tales of Borneo” Documentation)
TALES OF BORNEO | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 13
Semporna Semporna is a small fishing village on the east coast of Sabah, Malaysia which is surrounded by ocean, with attached islands that are as beautiful as a dream world. In this gorgeous island, there are plenty amazing culture heritages. For instance, they still remain the pottery making techniques, mat making skills and not to forget, the traditional boat making process. The main economic factor in Semporna is came from the fishing industry. However, to maximize the income, the local started to use fishbombing and other modern technique that caused negative impact on the marine life. As time unfold, overfishing become a vast issue and it harms the balance of the aquatic ecosystem.
Location of Semporna in Malaysian state of Sabah. (Abstract from Map of Malaysian Parliament constituencies in Sabah, Sarawak and Labuan, derkommander0916, 2017,edited in project 1 “Tales of Borneo� Documentation)
14 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | TALES OF BORNEO
Coral Triangle The Coral Triangle is a roughly triangular area of the tropical marine waters of Indonesia, Malaysia, Papua New Guinea, Phili ppines, Solomon Islands and Timor-Leste that contain at least 500 species of reef-building corals in each ecoregion. The Coral Triangle is recognized as the global centre of marine biodiversity and a global priority for conservation. It is also called the “Amazon of the seas”.
Left: Coral reefs (sketches by Yeap Huei Sze) Right: Area of Coral Triangular (Gray A. (13 Sep 2018). The ‘Coral Triangle’ is the largest of its kind, and it’s dying, edited in Project 1 “Tales of Borneo” documentation)
TALES OF BORNEO | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 15
Bajau Laut The bajau laut people are sea gypsies. Due to their nomadic life and do not have proper documents to testify their identities, they are in stateless position and could not gain the benefits of the citizenshi ps. For instance, healthcare, education, job opportunity and welfare. These are the proceeding problems that the Bajau community could face owing to their stateless dire strait. Education become a tremendous issue that happened in the Bajau community. They are not undergo formal education so their knowledge of health and hgene. Besides, the living spaces of Bajau laut people are also in a poor condition because they have no adequate money to buy the amentities.
Collage of Cultural Heritage of Bajau Laut (skteches abstract from group works- Cartography mapping, rearranged by Yeap Huei Sze)
16 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | TALES OF BORNEO
Political issue and the stateless Bajau
1970 Since the late sixties, the Mindanao civil war resulting the refugee to flood into Sabah, including Bajau Laut Sabah recorded a 390% increase in population from 1970 to 2010(“Population Growth”,2012). There’s lots of temporary pass issue to the refugee like IMM13, Surat Burung-Burung and Census Certificate.
Ruote of Migration (Project 1 “Tales of Borneo” Documentation,Yeap Huei Sze)
1980-1990 The project IC, it is claimed, “systematically” granted citizenshi p to tens of thousands of illegal immigrants from the Phili ppines and Indonesia for political purposes.
2012 RCI formed to resolve the concerned about illegal immigrant but the report is inconclusive which leave the Sabah people feel that their state is full of unlawful citizen.
TALES OF BORNEO | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 17
2013 Feb 2013 Royal Sulu Army made an intrusion into a remote village on eastern coast of Sabah, Kampung Tanduo. Unlike previous piratetype intrusions from the southern Phili ppines into Sabah, this one was clearly a political act.
Collage of the intrusion of Royal Sulu Army into Southern coast of Sabah (Project 1 “Tales of Borneo� Documentation, Yeap Huei Sze)
Current Some of the Bajau Laut are undocumented/ illegal immigration. Certain village officials, however, in places like the traditional Bajau Laut village of Bangau Bangau seem to be following their own conscience with regards to whom they perceive to be legitimate residents. This situation makes the Bajau village especially the younger generation unable to enjoy the privillage and these lead them to more issue like lack of personal hygiene knowledge , drug abuse, child marriage and adolescent pregnancy.
18 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | SPECIFIC SITE DEMACRATION
Kampung Bangau- Bangau Kampung Bangau- bangau is one of the village in Semporna, Sabah. It’s one of the squatters settlement on sea which consist mostly Bajau Laut people living on stilt houses. There are limited land in Kampung Bangau Bangau and most of the houses are built on stilt at the low tight sea. Unlike the normal village with proper car access, Kampung Bangau-Bangau is linked with bridges. The spatial arrangment was like different group of clusters. There’s also a mangrove swampland right beside the stilt houses. New tuorist Jetty is where the carpark is. It is also where the car can finally accessed. In order to enter the village, you have to walk or by boat. The main access is via a long bridge walkway. Along the long main access , you may notice there’s a land is bare. It is due to as there’s a fire few years ago which burnt up that area’s houses.
Site Plan (Project 1 task 2 studio groupwork - site measured drawing)
SPECIFIC SITE DEMACRATION | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 19
Top: Site isometric Bottom; Site Perspective (Project 1 Task 2 groupwork - Site massing model)
20 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES
Cartography
Cartography mapping (Project 1 group work- Imaginative cartography mapping )
This cartography is about the materiality that exist in the land of Semporna, cultural infrastructure in semporna and the social activities of bajau laut communities focusing on Kampung Bangau-Bangau, one of the village of the bajau laut in Semporna.
CAPSULE OF SEMPORNA’S BAJAU LAUT | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 21
Original
In Between
Future
The land of Semporna is rich of materiality like the pottery from Bukit Tengkorak, timber for boat making. Besides, there’s an ethnic group called Bajau Laut, which they are living at the sea. They have very rich culture and special living skill. For example, the Regatta Festival, which they will decorate their boat for celebration. They have good diving skill and fishing is their livelihood. There’s also a stable ecology system in the ocean which allowed them to live nomadically on the sea.
Even they have rich culture and skill, they still living with lots of complex issue due to their history the social political issue. Some of the Bajau Laut are stateless and under privilege. Their living condition is poor as the living facilities and infrastructure is incomplete. Most of the children couldn’t get to school which led them didn’t have the basic living knowledge. Besides, overcutting mangrove for benefits, blast fishing, trawler fishing, coral reefs acidification which lead the whole eco-system become unstable where will indirectly affect the livelihood of Bajau Laut.
The unstable social culture and ecosystem should be tackled. We should support and work hand in hand to preserve the culture of Bajau Laut and respect each other. Not only Bajau Laut, the unstable eco-system also need to be considered and handle well. Hopefully in the future, the complex issue could be simplified and the special culture and skill could be kept and remain.
Capsule of Semporna’s Bajau Laut (Project 1 group work- the art work)
22 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | CAPSULE OF SEMPORNA’S BAJAU LAUT
Exploded axonometric of the Semporna’s Bajau Laut (Project 1 group work- the artwork)
CAPSULE OF SEMPORNA’S BAJAU LAUT | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 23
The pyramid is the most stable form. It represents the richness of the local cultural heritage of Semporna, such as pottery, mats and shi pbuilding skills. The pyramid also represents the balanced ecology of marine life in which humans and aquatic life maintain a relative balance
The wire mesh is to show the complex issues facing by the Bajau Laut. Their families structures are very messy. This is because the Bajau Laut people has a huge family which normally consists 7 children in a family. However, each of them might contains different nationalities. And this lead to the stateless problem.
Due to these problems, the stable pyramid began to tilt and gradually became unstable. After understanding all the research, we think it is necessary to support all the unstable parts to strengthen it. In addition, the pyramid is inverted to preserve all culture. When you look down from the top, we will no longer see the problem.
The upper level shows the cartography of semporna, which included the cultural infrastructure, livelihoods, and the current status of the area. If you view from the top part, you will notice that all thw cultural heritage in on the inverted triangle as if they had been kept into it. This is to show that the cultural heritage had been protect and inherit by the local.
24 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | IDEATION SKETCHES
The ideation sketches for the model (artwork) Ideas and sketches from different groupmates
MAKING PROCESS OF BAJAU CAPSULE | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 25
left: mock up model right: making process of the model
Void between the real space
PROJECT 2 IDEATION, NARRATIVE AND MATERIALISATION Litereture case study writing Visual representation drawings Conceptual building design proposal model
28 | IDEATION, NARRATIVE AND MATERIALISATION | CONCEPTUAL MODEL
The void After all the analysis, I feel that the Bajau people are living in the void and facing the following issue: Made of inequalities Social connection Economic exchange Living condition Political allegiance Could we redefine the offing deixis? Could we fill the void to make the perceptual orientation and social position in offing parallel with land?
top: Concept model plan view bottom: Concept model section
real space land/ terriority
void offing
real space land/ terriority
CONCEPTUAL MODEL | IDEATION, NARRATIVE AND MATERIALISATION | 29
Issue in the void
Improper building services and waste management
Lack of knowledge and education
Victims of the fire still remain homeless
existing housing burnt stilt polluted ocean top: image abstract from artwork bottom: concept model section collage
30 | IDEATION, NARRATIVE AND MATERIALISATION | ARTWORK NARRATIVE
Formation of void Who creates the void? Man, from the real space, creating the boundary between real space which affected Bajau people who are living in the void between the real space. The boundary in real space makes the Bajau’s nationality become complex. Some of them are stateless, yet, some of them are not, even they are in a same family.
Life of Bajau People in the void of the real space. Kampung Bangau- Bangau, 91308 Semporna, Sabah.
Artwork 1 Describing the political allegiances and social connection
ARTWORK NARRATIVE | IDEATION, NARRATIVE AND MATERIALISATION | 31
Void between the real space Land, the real space, a prosperous town. Full of cultural infrastructures, people living in privillage. Do you ever notice the people living in the void between the real space? They possess amazing surviving skill, strong inheritance and rich in cultural. Yet, they couldn’t enjoy the privillage like people in real space.
Life of Bajau People in the void of the real space. Kampung Bangau- Bangau, 91308 Semporna, Sabah.
Artwork 2 Describing the cultural herritage and infrastructure and social connection
32 | IDEATION, NARRATIVE AND MATERIALISATION | ARTWORK NARRATIVE
Happening in the void The gap between the real space, is not bare, yet , just lack of something. Clean water for drinking, clear water for living. Proper road in the void. Basic living and health knowledge especially for the children. A healthier living environment. Can these be supply to the void, just like how it’s supplying in the real space?
Life of Bajau People in the void of the real space. Kampung Bangau- Bangau, 91308 Semporna, Sabah.
Artwork 3 Describing the issue that happening in Kampung Bangau- bangau
ARTWORK NARRATIVE | IDEATION, NARRATIVE AND MATERIALISATION | 33
Suffering in the void Living in offing, Bajau people are wearing an ‘invalid’ cap. They were considered a socially inferior group. Made of inequalities especially in economic exchange, lack of social connection, poor living condition... Could we redefine the offing deixis? Could we fill the void to make the perceptual orientation and social position in offing parallel with land?
Life of Bajau People in the void of the real space. Kampung Bangau- Bangau, 91308 Semporna, Sabah.
Artwork 4 Describing the living condition and made of inequalities of Semporna’s Bajau Laut
34 | IDEATION, NARRATIVE AND MATERIALISATION | CONCEPTUAL MODEL
Look closer to the void
The house on stilt
Perspective view of the void the conceptual model
main access bridge
CONCEPTUAL MODEL | IDEATION, NARRATIVE AND MATERIALISATION | 35
The broken bridge
Perspective view of the void the conceptual model
Burnt stilt and the existing houses
36 | IDEATION, NARRATIVE AND MATERIALISATION | CONCEPTUAL MODEL
Filling the void To make them living parallel with the people in the real space, I proposed some path to fill the void.
Type of path : 1 Living space local community 2 Education local kids 3 Services Infrastructure 4 Economy Income
Conceptual model with the paths Overall conceptual model
CONCEPTUAL MODEL | IDEATION, NARRATIVE AND MATERIALISATION | 37
4.
2.
3. 1.
Section of conceptual model fill with path
38 | IDEATION, NARRATIVE AND MATERIALISATION | CONCEPTUAL MODEL
The existing site
Housing
Education
Like a void being marginlised by land people.
Proposed new housing on the burnt area to bring the communities back to their home
House school where suite the local context. The corridor, different platform could be a classroom.
Left to right: Type of path to fill in the void
CONCEPTUAL MODEL | IDEATION, NARRATIVE AND MATERIALISATION | 39
Public square
Proper services system
Parallel with real space
For local to have some trading activities or having interaction with land people
Minimised the pollution, at the same time improve their living quality in term of environment
Hopefully in the future they can slowly increase their social position to be parallel with the real space
40 | IDEATION, NARRATIVE AND MATERIALISATION | IDEATION SKETCHES
The ideation sketches of the void the idea of the poscard and A2 artwork sketches
IDEATION SKETCHES | IDEATION, NARRATIVE AND MATERIALISATION | 41
The ideation sketches of the conceptual model Idea sketches of the conceptual model - creating path for the people in the void to live parallel
42 | IDEATION, NARRATIVE AND MATERIALISATION | MOCK UP MODEL
The mock up model of the void the mock up to try to figure out the void
MAKING PROCESS | IDEATION, NARRATIVE AND MATERIALISATION | 43
The making process of the void the conceptual model
Fill in the void
PROJECT 3 DESIGN REALISATION - ADAPTIVE ARCHITECTURE Site analysis Schematic building proposal
46 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Kampung Bangau-Bangau One of the village of Bajau people, setting on stilt by the sea
Shallow area Chosen site is on sea, a shallower area , which the depth is <20m
Near to town Semporna town is only 1-2 km radius away from the site
Macro site analysis Analysis of the choosen site in a radius of 3km.
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 47
Site analysis diagram Analysis of the selected site location
48 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Micro site analysis Analysis on Kampung Bangau Bangau
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 49
Burnt up area
Village’s houses on stilt
Landmarks & Site surrounding Image abstract from Project 1 - site massing
Temporary Camp
New tuorist jetty
50 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Bajau’s ways of living Observing some living ways of Bajau people, their living culture are different with the people on land. Children will play in the water, on boat or on stilt. Ways of cooking, eating also differnet from us. They have fishing, woving , carving skill... From all the culture and analysis, I came out with some ideas ...
Left page: Ways of living of Bajau’s Laut Image collage of some daily activities of Bajau laut Right page: Ideation sketches
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 51
52 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Design Intention and Target Group
Local Kids
Local Communities
Economy inequality
Services Infrastructure
Basic living knowledge could let them have a better future
The victims of the fire in 2015 still remain homeless until today
Lack of social connection makes them facing inequalities especially in economy exchange.
Lack of proper sevices
Education
Living
Public square
Building services
Providing basic living and health knowledge
Provide home for the victims of fire
Provide a platform to link bajau people and the people on land
Provide better building services and self- sustain energy
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 53
Site selection The site selected is interlocking between the burnt area and the existing village., Intent to provide the space they need. Boundary line showing the site coverage around 3.5 acres.
DN
Resourse room
Master Plan 0m 0m
5m 30m
10m 60m
15m 90m
20m
25m
54 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Design Process I did try out a few layout before finalising the massing. From a big radius,i try to make it more concentrate into a point. What did’t change is the intention to have a waterway in between so that the building can approached by waterway and bridge. Also, the centre part could become a gathering space on water/ on stilt at the same time As for form I did try different kind of roof like double pitched, round, curve... In the end i feel the pitched roof is more suite the site context and provide better ventilation
Design process Left to right// top to bottom Master plan, roof plan, ground floor plan// stage 1-3
Form massing development process Left to right// top to bottom Different perspective of view// stage 1-4
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 55
56 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Phase 2 Future developement 4. Services
2. Housing Shared Square 3. Public Square
Overall Site Isometric Showing 3 main building typology and some future development
1. Main School Building
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 57
1.
DN
Resourse room
2. 3.
5. 4.
Site Plan overall site circulaion
Legend 1. Main School Building 2. Housing Unit 3. Public square 4. Services hub 5. Future development
0m 0m
5m 15m
10m 30m
15m 45m
20m
25m
58 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
to the existing village
Main school building
Site elevation 1
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 59
DN
Resourse room
to the land (real space)
Housing development
Public square
0m 0m
5m5m
10m 10m
15m 15m
20m
25
60 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Education is the movement from darkness to light Allan Bloom
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 61
2.
1. 3. 1.
1. 5. 4.
1. SCHOOL Building element: 1. Scatter class 2. Adminstration block 3. Canteen 4. Class on water 5. Water courtyard
62 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
School for Bajau’s children Bajau children’s lifestyle are quite different from normal children. They are not used to the fixed classroomwith table and chairs, sitting still to learn. Proposed the learning space of the school are more towards their living style, more like learning in the environment that they had used to . I also place some structure around the main building radius as leading structure to lead them towards the learning space. The building designed to be open plan . The spatial arrangement for the classes are in leveling/ cluster, scatter in between Kampung BangauBangau. Proposed program will be like tuition classes which is more focus on kids and teens of Kampung Bangau- bangau. Classes will be design more focus to the knowledge they needed in order to have a better living condition. top: Living space of Bajau’s children (image collage) bottom left: Bubble diagram for the main school building bottom right Type of courses that could be offers for Bajau’s children
Learning courses: Class on sea
Services Canteen/ multi purpose area
Class on stilt
Maths to let them able to carry out trading activities and improve their economy
Art to express themselves via art and visualisation
Language as tool for communication.
Science focus on marine studies like species of fisheries and coral reefs
Adminstration/ main building jetty
linkage
Class in house
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 63
A
DN
Resourse room
B
B
A
Level 1 Plan 0m 0m
5m5m
10m 10m
15m 15m
20m
64 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
A
A
DN
B
B
Resourse room
B
B
A
A
Level 2 Main school building floor plans Showing different level of the school building
Level 3
0m 0m
5m5m
10m 10m
15m 15m
20m
2
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 65
A
A
DN
B
B
Resourse room
B
B
A
A
Level 4
Roof Plan 0m 0m
5m5m
10m 10m
15m 15m
20m
2
66 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Building zoning
Quiet zone
Private zone
Section A-A
Public zone
Public zone
Section B-B
Quiet zone Private zone Public zone
Zoning diagram Showing different zoning of the building
Zoning Axonometric
0m
7m
14m
21m
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 67
Spatial quality of the learning space Class on water Providing a slightly curve structure scatter on water (like radius of school) for them to have a learning spaces on water
(2)
(1)
(3)
Refuse On water class
Kitchen
(4) (5) Class on water Showing spatial quality of one of the class on water by ground floor axonometric(1) , isometric(2), perspective(3) , key plan(4), plan (5), section(6)
(6)
Canteen
Floati
On water class
68 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Class on stilt Stilt is one of the characteristic of bajau cultural heritage. Providing some class on stilt so it’s feel like learning at the space they area familar with. it is open plan and like a platform for learning.
Floating deck
(2)
(1)
(3)
Class
(4)
Floating deck
(5)
Class on stilt Showing spatial quality of one of the class on stilt by ground floor axonometric(1) , isometric(2), perspective(3) , key plan(4), plan (5), section(6)
(6)
Class DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 69
Class in between village This classes is located in between the village to have a sense of learning at Floating home. This classes will have woven wall and properly roofed like the Bajau’s home. It is a more enclosed space compare to other classes
deck
Multipurpose area
(1)
Floating deck
(2)
(3)
On water class Class
Class On water class (4)
(5)
Class in between village Showing spatial quality of the class inbetween village by ground floor axonometric(1) , isometric(2), perspective(3) , key plan(4), plan (5), section(6)
(6)
70 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Massing development
Site Empty area between the existing houses and the burnt area
Waterway access Built on stilt with scaffolding structure to allow access from water
Bridge linkage Bridge to link the 2 blocks and the existing bridge
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 71
Breathable wall Timber louvers and woven wall
Hierarchy Higher volume for adminstration area to create hierarchy
Pitched roof Local context + ensure excellent ventilation
72 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Perspective rendering Access from water way / by boat
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 73
Perspective rendering Access from bridge to the main building
74 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
DN
Resourse room
Section A-A
0m 0m
3m5m
6m10m
9m15m
20m
25
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 75
DN
Resourse room
Section B-B
0m 0m
3m5m
6m10m
9m15m
20m
2
76 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Open plan/ Water Courtyard Open plan is to allowed them to have any kind of learning style or method that suite them. Level 1 and level 2 can also be the place for gathering if there’s any celebration or events. Hence intent to have railing that facing towards the water courtyard at every level which could see the centre point at different height/ platform.
Refuse On water class
Kitchen
Floating deck
Canteen
Class
Floating deck
Multipurpose area
Floating deck On water class
Class
Class On water class
Left: Ground floor plan To show the space using if there’s gathering right: Exploded Axonometric Showing the 2 levels when having events at water courtyard
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 77
Multipurpose area (level 1) Interior space rendering
78 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Building elements
Pitched roof
Suspended ceiling
Curtain timber louvers Internal woven wall Double volume space Bamboo stri ps partition Open plan
Floating deck
Sectional axonometric (Adminstration building) Labeling of the building elements of adminstration block
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 79
Ventilated roof space help to cold dpwn the building Suspended ceiling made of bamboo provide good acoustic and create warm and comfort
Curtain timber lovers, woven wall and bamboo strips internal wall provide better ventilation to the space
Double volume space give cooling effect and help to provide ample of light to enter the building Floating deck for access from waterway
Open interior spaces with minimal partition to allowed good ventilation.
Building elements diagram Explaination of the building elements
80 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Recycled poly aluminium roofing
Timber flooring
Breathable wall
Timber structure
Concrete piling
Walkway towards office (Level 3) interior space rendering
Construction exploded axonometric Showing buidling construction and materials
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 81
Construction materials The material selection is more towards recycled materials or local materials.
Woven wall Bajau’s have the skill to do woven. It also act as sun protection
Bamboo bio-panel wall Consist 2hr fire rating, Moisture resist and termite resistant
Timber construction system Mostly all the structure are using timber as it is the local material and some Bajau have good skill in handling wood
Bamboo strips internal partition It does not absorb humidity and provide better sound insulation
Recycled poly-aluminium roofing It’s a type of metal roofing produce by compressed the poly-aluminium from the recycled drink pack. The plastic and aluminium layers can be extracted and recycled into roofing tile.
82 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Canteen (level 1) interior space rendering
9° Fall
Level 3 FFL:7500
9° fall recycled polyaluminium metal roofing
G.I. gutter 89mmx 286mm timber rafter Timber column Timber louvers facade treament
1100mm (h) timber railing
Level 2 FFL:4000
50mmx 100mm timber floor joist
125mmx 50mm timber beam
89mmx 140mm slanted timber column
Level 1 FFL:0 Construction details Canteen space detailing with scale 1:50
Timber flooring 50mmx 75mm timber floor joist 125mmx 50mm timber beam
84 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
1
Canteen Facade- Perspective Scale: NTS
Building structure
Horizontal beam support
Building structure Timber framing Horizontal fixed louvers panel Horizontal beam support Vertical adjustable timber
2
REF
Timber framing louvers panel
Facade Assembly Detail- Exploded Axonometric Scale: NTS
DATE
Horizontal fixed louvers panel AMENDMENT
PROJECT TITLE:
CLIENTS:
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH ................................................
Facade assembly Building facade exploded axonometric
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
DRAWING NAME:
YHS ARCHITECT
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
CANTEEN FACADE PERSPECTIVE FACADE ASSEMBLY DETAIL- EXPLODED AXONOMETRIC
Vertical adjustable timber louvers panel SCALE :
AS SHOWN
DRAWN
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
20/007/CD/4000/410
REVISION:
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 85
9° fall recycled poly-aluminium roofing Roof coping to detail
Level 3
timber louvers wall
FFL:7500
140mmx 140mm timber column
timber louvers frame Level 2 FFL:4000
Thread= 280mm(w), riser=174mm (h), 1400mm width timber staircase
9° fall recycled poly-aluminium roofing Flashing Metal cap flashing with isolated layer Timber support cap
Fastener 150mmx 75mm timber batten 180mmx 180mm timber column
89mmx 186mm timber rafter with mortise& tenon joint c/w dowel pin lock to column
Level 1 FFL:0
125mmx 50mm timber beam
120mmx 10mm timber louvers panel
180mmx 180mm timber column Facade section (1:50) and connection details (1:15) Some specification for the louvers curtain wall facade
50mmx 25mm louver's timber frame
86 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
DN
Resourse room
Main building Elevation 1
0m 0m
5m5m
10m 10m
15m 15m
20m
25
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 87
DN
Resourse room
Main building Elevation 2
0m 0m
5m5m
10m 10m
15m 15m
20m
25
88 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
to the land (real space)
Public square
Site elevation 2
Housing development
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 89
DN
Resourse room
to the existing village
Main school building
0m 0m
5m5m
10m 10m
15m 15m
20m
2
90 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Rebuilt their home...
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 91
Future development
2.
3.
1.
4.
Single dwelling (Type A)
Building element: 1. Water courtyard 2. Bridge linkage 3. Platform to water 4. On stilt
1.
Shared room unit (blocks)
2. HOUSING DEVELOPMENT
Single dwelling (Type B)
92 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Housing Units for Bajau Community As the burnt on 2015, many of them didn’t have house and is forced to stay at the temporary camp. proposed to rebuilt their home so that they can have a better living quality. Refering to the space planning of Bajau House boat and traditional house, proposed some housing layout for local and the staff as well. Some of the houses can become shoplots as it near to the public square.
pentan (dry clothes / fishes)
Houseboat
Diom Luma ( Main hall) Bridge (link) Small boat
4ft width (roofed)
The characteristic of traditional Bajau living space They start from living on boat. Normally will have a house boat (lepa/ bayanan) follow by a few small boat (Gubang/ boggo-boggo/ Tempel) As the need of water and fuel from land, some of them will stop by the land to get the daily needs. They started to build houses on stilt. The plan of the stilt house contaning a big main hall spaces follow by the small activity spaces attached around the main hall. Main hall is where they sleep or having ceromony Design with some characteristic from their living culture, the space provided in housing development are mainly open plan with all the small activity spaces attached along the main space. top left: Bajau house boat characteristic collage top right: Typical space planning of Bajau stilt house bottom: Bubble diagram of proposed housing development layout
Kusih (cobbler/ kitchen)
Kitchen
Toilet Bridge linkage UNIT Services Boat laid by/ platform
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 93
Main school building
B
A
B
A DN
Resourse room
Future development
Public square
0m 0m
From real space (land) Housing development key plan Highlighted showing different type of housing development
5m 10m
10m 20m
15m 30m
Legend Shared room unit Single dwelling (Type A) Single dwelling (Type B)
20m
25m
94 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
unit A2-4
Shared room unit unit A2-1
Double storey with shared kitchen and living area. Also proposed a courtyard at the middle. Every unit have own 4ft walkway and balcony with attached bathroom. unit A2-3 unit A2-2 common space common space
Level 2
DN
Room
unit A1-4
Resourse room unit A1-1
Walkway Balcony
unit A1-3
Yard
unit A1-2
tap.
ft
Common space Yard
left: Unit layout plan top right: Block A (level 2) Plan bottom right: Block A (level 1) Plan
0m 0m
5m
10m 1.5m
15m
20m
Shared kitchen
Shared kitchen
Foyer
0m 0m
25m
Level 1
3m5m
6m10m
15m
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 95
left: Sapce axonometric of Block A top right: View of the courtyard bottom right: Exterior view of the shared room unit
96 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
4ft Platform
Room
Yard Single dwelling (Type A) tap.
Open plan dwelling house with private kitchen . Dual access one is from platform and another one is from yard which link to the bridge. This layout is come with double pitch roof
Kitchen
ft left: Unit layout plan right: Single dwelling type A exterior view
0m 0m
5m
10m 1.5m
15m
20m
25m
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 97
4ft Platform
Room
Yard Single dwelling (Type B) Open plan dwelling house with open kitchen . Dual access one is from platform and another one is from yard which link to the bridge. This layout come with single pitch roof
Open kitchen ft
left: Unit layout plan right: Single dwelling type B exterior view
0m 0m
5m
10m 1.5m
15m
20m
25m
98 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
DN
Resourse room
Single dwelling type A
Section A-A showing section of single dwelling unit
Bridge linkage
Single dwelling type B
0m 0m
3m5m
6m10m
9m15m
20m
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 99
DN
Resourse room
Single dwelling type B
Section B-B Showing section of shared room unit and the single dwelling unit type B
Shared room unit
0m 0m
3m5m
6m10m
9m15m
20m
100 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Linkage to the real space
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 101
housing development
1. 4. 2. 3.
3. PUBLIC SQUARE
Building element: 1.Services hub 2. Multi purpose bridge with pocket seating 3. Floating platform 4. Reading corner
102 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Public Square A multi purpose space aim to boost the economy and act as a place for recreation at the same time. Using one of the iconic element of their village, bridge as main element of the public square. The bridge is with multifunction attached with some services area. There’s a services hub attached with public toilet and storeroom. continue with a bridge with pocket seating connected to a floating platform at the outer area( near to the main access of boat) Pocket seating area allowed to have trading activities like weekend bazaar. During weekday, it was a place for recreational/ chit-chating. Floating platform is like jetty for gathering especially the annual regetta festival. Also proposed pocket reading corner which could be place around Kampung Bangau-bangau
top: Collage of possible activities at the public square bottom: Bubble diagram for the public square
Festival
Trading
Services area
Selling platform (on water/on bridge/ in front of houses)
Reading corner PUBLIC SQUARE
Self- sustain technology to generate energy
Floating platform jetty
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 103
Housing development
3.
DN
Resourse room
1.
2. 4.
From real space (land)
Public square layout plan
0m 0m
5m5m
10m 10m
Legend 1. Services hub 2. Bridge with pocket seating 3. Floating platform 4. Reading corner
15m 15m
20m
104 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Refuse
s
ge acces
Main brid
The services hub Consists of public toilet, storage area and services area. Services contain of M&E room and refuse chamber. It is placed near to the main bridge .
left: Perspective view of services hub top right: Plan of services hub bottom right: Isometric view of services hub
Public toilet
Store
M&E to the floating platform seatings
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 105
Pocket seating bridge The bridge with pocket seating area is proposed to be a recreational area for them to chit chat. It also could serve as a place for trading like weekend bazaar. It’s surrounded by water ways
left: Perspective view of the bridge top right: Layout plan of the bridge bottom right: Isometric view of the bridge
106 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Floating platform jetty This floating platform jetty is to allowed tourist/ local to hop on the boat more easier. As it could be one of the tourist spot to explore the Bajau’s culture. Besides, if there’s any festival or celebration, the whole public square could act as a stage.
left: Perspective view of floating platform top right: Layout plan of the floating platform bottom right: Isometric view of the floating platform
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 107
Class
Reading corner
Class
Proposed to have some reading corner around Kampung Bangau- Bangau. It could be a small area / platform along the bridge so that more children could get the source of knowledge.
top left: Perspective view of the reading corner top mid: Section of the reading corner top right: Layout plan of the reading corner bottom right: Isometric view of the reading corner
On water class
108 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Evaporation technology to generate electricity Timber column to engr's details
Proposed to have evaporation panel under the bridge to generate electricity to supply to the local. Via evaporation, the spinner at the panel will turn and via motion could generate electricity. All the cable are round under the bridge which linking into the village.
150 x 12 mm timber panel 75x 150 mm timber batten
Evaporation panel
Ev de
Bridge section
Dy
Timber column to engr's details 150 x 12 mm timber panel
Hollow section holder Connecting coil
75x 150 mm timber batten
Hinge to hold the panel dynamo Holding rod
Evaporation panel
Turbine with 'SPORES'
left: Exploded isometric of bridge to show the installation of the panel top right: Section of the bridge bottom right: Connection details of the panel to bridge
Evaporation
Cdy
DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 109
Overall development isometric view
110 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE
Check out the video of : video 1: mood and sense collection of on water village at Kuala Selangor and Kuala Sepetang https://www.youtube.com/watch?v=mjPCWmorV-I
video 2: with walkthrough of the proposed building https://www.youtube.com/watch?v=I4xQOVDGt24&feature=youtu.be
at the link attached to have more visual effects and impression about this project.
top: Project 2 video thumbnail- collection of mood and sense bottom: Project 3 video thumbnail - partly project 2 video with project 3 walkthrough
Redefine their deixis Let them living parallel with real space...
REFLECTION
The culture and way of living for Bajau people was really interesting. They posses different skill like diving, carving, woving... There’s a lot’s of tales about them and I really enjoy reading their story and know them more. Besides’ throughout the works, I learnt some new skill like compiling a documentation, framing an artwork, model making. I would like to thanks to everyone who guide me along the way of my project. Hopefully through my project, you may understand more about tales of Bajau Laut, appreciate and redifine their deixis so that they could live parallel with us, people from real space.
Yeap Huei Sze UCSI University Bachelor of Science (Hons) in architecture Year 3// Sem 6 Jul- Nov 2020 Intergrated architecture design project_ Unit F Filling the void between the real space
Filling the void between the real space Portfolio by Yeap Huei Sze Intergrated architecture design project_ Unit F UCSI University Bachelor of Science (Hons) in architecture Year 3// Sem 6 Jul- Nov 2020
Filling the void between the real space Education | Housing | Public Square
Technical report Planning and building guideline Heritage management strategy and consideration Building construction and technology Buidling environment design & sustainability strategy Building services
Prepared by, Yeap Huei Sze
2 | TECHNICAL REPORT | PLANNING AND BUILDING GUIDELINE
1.0 PLANNING AND BUILDING GUIDELINE 1.1 BUILDING SETBACK REQUIREMENT
A 3.5 acres development in between Kampung Bangau-Bangau. I choosen the site between the burnt up area and the existing village . Building typology was education, housing and public square. As for education, which is under institutional , the building setback require 10m from front and 4.5m from the sides and rear
refering to Kota Kinabalu Plan 2020- memorandom (draft)
1.2 UBBL SITE PLANNING REQUIREMENT 1.2.1 UBBL clause 134. designation of purpose group
SCHEDULE OF AREA
Refer to schedule 5 in UBBL, the proposed design is under:
MAIN SCHOOL BUILDING Level
Space
Ground Floor Multipurpose area
purpose group I: small residential purpose group II: Institutional purpose group: III: Other residential
Institution Shared room housing Single dwelling housing Public square
Space Foyer
Area (m² ) 9.23
Dwelling
Main room
26.45
Entrance deck
23.93
(Type A)
Bathroom
4.74
Open deck
12.45
No of unit: 4
Open kitchen
7.30
1.75
circulation
12.67
Kitchen
35.64
Toilet 2
23.57
Canteen
Yard
9.18
Total area per unit Total area for 4 units of Type A
56.90 227.60
Single
Foyer
9.14
251.24
Dwelling
Main room
26.4
Refuse Chamber
13.11
(Type B)
Kitchen
7.28
Scatter class 1
29.55
No of unit: 12
Bathroom
4.82
Scatter class 2
30.13
Yard
Scatter class 3
30.13
Total area per unit
729.96
9.18
Total area for 12 units of Type B
Class 1
87.29
Shared room
Room
Class 2
66.36
No of unit:24
Balcony
Class 3
47.13
Bath
Class 4
39.06
Total area per unit
Class 5
38.24
Walkway
39.74
Link bridge
28.47
Circulation
172.49
Sub-total
518.78
Second Floor Office
Master plan
Type Single
51.31
Sub-total
Third Floor
214.48
Toilet 1
Lift
First Floor
HOUSING DEVELOPMENT Area (m² )
73.40
56.82 681.84 21.55 4.82 4.35
Total area for 24 units of shared room Total housing developed area (m²)
30.72 737.28 1646.72
PUBLIC SQUARE Amenities Services hub
Space Store
Area (m² ) 19.18
Manager room 1
10.79
Toilet (F)
7.87
Manager room 2
10.52
Toilet (M)
7.93
Meeting room
21.21
OKU Toilet
4.55
Pantry
15.43
M&E
8.98
Toilet
15.98
Refuse Chamber Sub-total
8.12 56.63
Circulation
186.01
Sub-total
333.34
Bridge market Bridge
346.86
Resource room
103.47
Floating jetty
148.53
Circulation
29.92
Sub-total
133.39
Floating
Floating deck 1
46.54
Structure
Floating deck 2
21.23
Floating deck3
24.70
Sub-total Total school building area (m²)
Floating jetty
Total public square area (m²)
552.02
92.47 1807.94
Total developed area (m²)
Schedule of area of the whole development
4006.68
PLANNING AND BUILDING GUIDELINE | TECHNICAL REPORT | 3
1.3 PASSIVE BOMBA DESIGN 1.3.1 Compartmentation Clause 134,136,138, Fifth schedule 3.4m
As the area of building are still under limits of dimension, no compartmentation are needed.
9.4m
level 4
12.5m
13.4m
4.4m
level 3
11.5m
Fifth schedule: Designation of purpose group 1.7m 0.6m
1.3.2 exits and evacuation UBBL Clause 165. Measurement of travel distance to exists UBBL Clause 168. Staircase UBBL Clause 172. Emergency exit signs UBBL Clause 177. Computing number of staircase and staircase width UBBL Clause 181. Width of means of engress Seventh schedule
8.3m
level 2 8.1m
9.3m
7.2m
Measurement of travel distance Dead end limit for : purpose group I : No requirement purpose group II- school : 6m purpose group III- flats : 10m Unsprinklered purpose group I : No requirement purpose group II- school : 45m purpose group III- flats : 30m (source: UBBL seventh schedule)
Calculation of exits width Purpose group II Ground floor exit width =[ floor area/ occupancy load/ capacity exit (door) ] x 0.55 =[ 729.96/ 2/100] x0.55 = 2.007m
level 1
Verticle exits ( staircases) of the main school building’s plan ( purpose group II)
50% of width of main exits is required, proposed : main exits (school): 3.5 m bridge exits and open space. main exits (canteen): 2.2m bridge exits, 2.4m bridge exits (at kitchen)
6.3m
Purpose group III Ground floor exit width =[ floor area/ occupancy load/ capacity exit (door) ] x 0.55 =[ 271/ 24/100] x0.55 = 0.062m 50% of width of main exits is required, min 700mm width of exit, proposed : main exits: 1.8 m bridge exits secondary exits: 1.8m bridge exits
13.5m
level 1 Verticle exits (staircases) of the housing unit shared room (purpose group III)
13.5m
6.3m
level 2
4 | TECHNICAL REPORT | PLANNING AND BUILDING GUIDELINE
Calculation of staircase exits width Purpose group II: Institutional Largest floor area (gross) = 518.78m2 Occupancy load (7th schedule ) for purpose group II institutional in occupancy load per square meter is 2 nett. Capacity exit for stairs is 22 person /unit. Net floor area = 87.29+66.36+47.13+39.06+38.24 = 278.08m2 Total exit width required = (floor area/occupancy load per sqm/ capacity exit) x550mm = (278.08/ 2/ 22) x 550 = 6.85 x 550mm = 3476mm 4 number of staircase proposed, the width of staircase will be as follow, total width 3476/3 = 1158.66mm width of one staircase... Staircase Staircase Staircase Staircase
1 = 1.6 m width 2 = 1.5 m width 3 = 1.6 m width 4 = 1.2 m width
Verticle accesss of main school building (purpose group II) Space exploded axonometric
Purpose group III: Flat Largest floor area (gross) = 107.46m2 Occupancy load (7th schedule ) for purpose group III other residential in occupancy load per square meter is 24 gross. Capacity exit for stairs is 45 person /unit. Total exit width required = (floor area/occupancy load per sqm/ capacity exit) x550mm = (107.46/ 24/ 45) x 550 = 54.72mm UBBL clause 194 Building with single staircase is permitted in any building if the top most floor doesn’t exceed 12m in height. 1 number of staircase proposed, the min width of staircase shall be 700mm , hence: Staircase provided = 1.45m width
Verticle accesss of main school building (purpose group III)
PLANNING AND BUILDING GUIDELINE | TECHNICAL REPORT | 5
1.4 ACTIVE M&E INTERTVENTION (UBBL PART VIII) 1.4.1 Fire extinguishment system UBBL Clause 225. Detecting and extinguishing fire, 10th schedule Extinguishing system, fire alarm system and emergency lighting requirement: purpose group I : No requirement purpose group II- school : Hosereel purpose group III- flats : No requirement level 4
level 3
level 2
UBBL 10th schedule
Hosereel calculation means of detection GFA/ 800m2 Ground floor = 729.96/800 = 0.9 (1 required)
Second floor = 333.34 /800 =0.41 (1 required)
First floor = 518.78 / 800 =0.65 (1 required)
Third floor = 133.39 / 800 = 0.16 (1 required)
1.4.2 other consideration in connected to active fire requirement UBBL Clause 247. Water storage level 1
Water storage capacity, Min quantity of water required for the first hosereel system is 2275 litres. For each additional hosereel, 1137.5 litres up to max 9100 litres
Hosereel Exit sign
number of hosereel= 4 2275 + (1137.5 x 3) = 5687.5 litres
Hosereel and exit sign indication of main school building (Purpose group II)
Proposed a 6000 litres water tank
Hosereel system
6 | TECHNICAL REPORT | HERITAGE MANAGEMENT STRATEGY & CONSIDERATION
2.0 HERITAGE MANAGEMENT STRATEGY & CONSIDERATION 2.1 Cultural Heritage There’s lots of cultural heritage on site which is significant to the site.
2.2 Proposed remain and preserve the culture and way of living Proposal preserved some characteristic of existing cultural heritage like woven wall,, stilt houses, platforms, water way access, likage bridge and so on...
BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 7
3.0 BUILDING CONSTRUCTION & TECHNOLOGY
3.1 Site strategy
3.2 Substructure
Locate the building in between the existing and burnt up area as my main intention is bring the local communities back to their place.
Proposed using concrete pile foundation as it can hold more load and more sustainable.
3.3 Superstructure As timber is widely used in Kampung Bangau- Bangau, proposed to used timber construction as it is more context towards the Bajau community. I did explore few types of traditional timber joinery and implied them and certain space of the building
3.4 Facade treatment Using timber louvers curtain wall as sun protection and act as breathable wall
3.5 Material and finishes Selected material is more local context and recycleable Woven wall panel Bajau have skill to make woven craft. Proposed to use the woven panel as some part of wall, so they could actually create their wall by themselves
Bamboo bio panel wall a laminated fibre wall
Insulated & resistant recycled poly- aluminium metal roof less heat absorb, can be made by aluminium abstract from milk carton
8 | TECHNICAL REPORT | BUILDING CONSTRUCTION AND TECHNOLOGY
Bamboo glass wool suspended ceiling provide better acoustic create warm and comfort.
H
90mmx 185 mm timber ridge board Recycled poly- aluminium roofing 75mmx 50mm tmber purlins 75mmx 150mm timber rafter Hanging rod to timber joist Hanging bar connected to king post 75mmx 150mm timber tie beam Suspended bamboo ceiling Roof beam level FFL:14500
2
2
402
Ceiling Scale 1 :
Timber louvers curtain wall 150mm timber round column 12mm thk timber flooring 50mm x75mm timber floor joist Resource room
3
Level 4
402
FFL:11000
Woven wall
1
REF
DATE
Wall to slab to ceiling detail
3
Scale 1 : 50
AMENDMENT
PROJECT TITLE:
CLIENTS:
Floor t Scale 1 :
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH Roof coating
YHS ARCHITECT
Timber Finish MENARA SENIBINA B25-01, ................................................ MENARA GADING, TAM Timber Finish is a translucent pigmented varnish based on Solaroof is specially formulated for roof tiles painting and JALAN CONNAUGHT, 56000 KUALA LUMPUR 6258 5888 Modified Flexible Long Oil Alkyd which provides colour to repainting, and with innovative Sunblock Technology helps F:T: 603 603 6258 8885 UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD BAJAU ADAPTIVE ARCHITECTURE SDN BHD E: yhsarch@gmail.com wood surfaces, highlighting the natural wood grains. It will to reflect heat and reduce surface temperature up to 5°C, W: yhsarch.com.my not crack, peel or blister by exposure to weather. which plays a role in helping heat resistance on roof tiles caused by UV rays, leaving energy saving and gives you a more comfortable indoor feeling. Product Features: • High Transparency Product Features: • Fungus Resistance • Heat resistance with So• UV Resistance lareflect technology • Weathering Resistance • Reduces surface tempera• Flexible ture up to 5°C • Prevent water penetration • Fungus & algae resistance • Dirt resistance • Long lasting • Low odour & low VOC CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 9
3.6 Construction Exploded Axonometric
Roof Insulated & resistant recycled poly- aluminium metal roof less heat absorb, can be made by aluminium abstract from milk carton. Apply the solaroof coating to improve the insulation of heat .
Ceiling Suspended bamboo ceiling provide acoustic and comfort Flooring Timber panel flooring to suite the context
Railing Timber railing
Wall -Bamboo Stri ps internal wall -Bamboo bio-panel wall -Woven wall Using recycle material / local woven skill to create the building elements
Timber louvers fixed louvers panel on top to ensure ventilation
Facade Timber louvers panel curtain wall act as breathable wall which ensure ventilation
Structure timber construction with some scalfolding framing arrangement to allowed water way access. Also, it is a local material and construction method
Sub- Structure Concrete piling which could sustain longer
10 | TECHNICAL REPORT | BUILDING CONSTRUCTION AND TECHNOLOGY
3.7 Construction Details
Canteen Facade- Perspective
1
Scale: NTS
Building structure
Horizontal beam support Timber framing Horizontal fixed louvers panel
2
REF
Vertical adjustable timber louvers panel
Facade Assembly Detail- Exploded Axonometric Scale: NTS
DATE
PROJECT TITLE:
AMENDMENT
CLIENTS:
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
YHS ARCHITECT MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
................................................
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
CC
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
CANTEEN FACADE PERSPECTIVE FACADE ASSEMBLY DETAIL- EXPLODED AXONOMETRIC
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
REVISION:
20/007/CD/4000/410
12
11 1 407
2 407 4655
9° Fall
Recycled poly-aluminium metal roofing 150mm x75mm timber batten 89mmx 286mm timber rafter
Level 3 FFL:7500
9° Fall
9° fall recycled polyaluminium metal roofing
G.I. gutter
Level 3 FFL:7500
89mmx 286mm timber rafter
140mmx 200mm roof beam
Timber column
200mm depth G.I. gutter
Timber louvers facade treament
140mmx 140mm timber column
1100mm (h) timber railing 89mmx 140mm slanted timber column
Level 2 FFL:4000
1100mm (h) timber railing
Level 2
50mmx 100mm timber floor joist
FFL:4000
125mmx 50mm timber beam
125mmx 50mm timber beam
125mmx 50mm timber beam with mortise and tenon joint c/w dowel lock to column
Timber flooring
Level 1
89mmx 140mm slanted timber column
Timber flooring
Level 1
50mmx 75mm timber floor joist
FFL:0
FFL:0
125mmx 50mm timber beam
1 REF
DATE
Floor slab to roof detail A-A
2
Scale 1 : 50 AMENDMENT
PROJECT TITLE:
Floor slab to roof detail B-B Scale 1 : 50
CLIENTS:
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
YHS ARCHITECT
................................................
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
FLOOR SLAB TO ROOF DETAIL A-A FLOOR SLAB TO ROOF DETAIL B-B
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
20/007/CD/4000/408
REVISION:
REF
BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 11
BB
AA 9° fall recycled poly-aluminium roofing Roof coping to detail
2 409
Level 3
AA
FFL:7500
140mmx 140mm timber column timber louvers wall 9° fall recycled poly-aluminium roofing
2094
Flashing Metal cap flashing with isolated layer Timber support cap Level 2 FFL:4000
Thread= 280mm(w), riser=174mm (h), 1400mm width timber staircase
Fastener
timber louvers frame
150mmx 75mm timber batten 89mmx 186mm timber rafter with mortise& tenon joint c/w dowel pin lock to column
180mmx 180mm timber column 50mmx 25mm louver's timber frame 120mmx 10mm timber louvers panel 180mmx 180mm timber column
Level 1
125mmx 50mm timber beam
FFL:0
1 REF
DATE
Floor slab to roof detail (facade)
2
Scale 1 : 50
AMENDMENT
PROJECT TITLE:
Roof coping detail Scale 1 : 10
CLIENTS:
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
YHS ARCHITECT MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
................................................ CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
ROOF TO WALL CONNECTION (FACADE) ROOF COPING DETAIL
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
REVISION:
20/007/CD/4000/409
Recycled poly-aluminium roofing
90mmx 285mm timber ridge board 75mmx 50mm timber purlins 114mmx 114mm timber king post 75mmx 150mm timber rafter 75mmx 150mm timber tie beam l4 Lev e 1000 :1 FFL
suspended bamboo ceiling to detail Resource room
Timber louvers curtain wall l3 Lev e 500 :7 L FF
Meeting room
75mm thk bamboo woven panel wall
Office
50mm thk bamboo strips internal partition
l2 Lev e 000 :4 L F F
Thread= 280mm, Riser=175mm timber staircase to details Class
Lev e
140mmx 140mm timber column 12mm thk timber panel flooring
l1
Thread= 280mm, Riser= 176mm timber staircase link to floating platform
FFL:0
el r Lev Wate 0 0 0 3 FFL:-
Timber floating platform
Concrete pile foundation with pile cap to engr's details
1 DATE
Overall Typical Detail- Sectional Axonometric Scale: NTS AMENDMENT
PROJECT TITLE:
CLIENTS:
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
YHS ARCHITECT
................................................
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
OVERALL TYPICAL DETAIL- SECTIONAL AXONOMETRIC
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
20/007/CD/4000/411
REVISION:
12 | TECHNICAL REPORT | BUILDING CONSTRUCTION AND TECHNOLOGY
2 3 4
5
13500
Timber flooring Timber column
14600
B Thread= 280mm, Riser=175mm timber staircase to details
UP
C 1100mm height timber railing to details
1 2 3
1702
4 5 6 7 8
16280
9
DN 20
D
19
18
15
16
17
13
14
12
11
10
1 405
20 19 18 17
1792
16 15 14 13 11
7 294
18050
E
12
1
2
9
8
7
6
5
4
3
10
2172
3641
Office
1
Staircase detail plan (Level 3) Scale 1 : 50
PROJECT TITLE:
DMENT
CLIENTS:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
PROJECT ARCHITECT:
YHS ARCHITECT
5
4
................................................
3
2
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com yhsarch.com.my W: 2791
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
7571
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
2764
2016
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
STAIRCASE DETAIL PLAN
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
REVISION:
20/007/CD/4000/404
Resource room
Level 4 FFL:11000
150mm dia timber round column
1 406
Office
Level 3
20
FFL:7500
75mmx 50mm timber floor joist
19 18 17
1738
16
Thread= 280mm, Riser=175mm timber staircase to details
15
1050
14 13 12 11 10 9
50mm thk bamboo wall internal partition
8 7
75mmx 150mm timber landing joist
1750
6 5 4
12mm thk timber flooring
3 2
Class
Level 2
1
FFL:4000
1 AMENDMENT
Staircase detail section Scale 1 : 50 PROJECT TITLE:
CLIENTS:
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
YHS ARCHITECT
................................................ CHEW JEN LYNN PENGARAH
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
STAIRCASE DETAIL SECTION
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI
CONSTRUCTION DRAWING
BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 13
Timber column Timber beam connect to column by mortise and tenon joint (tanggam) with wooden wedge lock
Timber linx connection with galvanised threaded rod w embedment secure using e-poxy to engr's details Concrete piling with concrete pile cap to engr's details
Timber wedge
Slanted beam
3-1
Mortise and tenon joint with timber dowel lock
3-1 50mm thk bamboo bio-panel wall c/w water resist finishes at exterior
Column to foundation connection details
1
Scale 1 : 10
HH REF
DATE
75mmx 25mm timber wall stud with horizonal rail CLIENTS:
PROJECT TITLE:
AMENDMENT
2
Typical column to beam connection details Scale 1 : 10
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
YHS ARCHITECT
50mm thk bamboo bio-panel wall ................................................ 12mmwater thk suspended timber c/w resist finishes at flooring UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE BHD floor joist 75mmx 50mmSDN timber BAJAU ADAPTIVE ARCHITECTURE SDN BHD exterior
Level 1
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
FFL:0
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
COLUMN TO FOUNDATION CONNECTION, TYPICAL COLUMN TO BEAM CONNECTION DETAIL
DATE
04/10/2020
CHECKED : AR HISHAM
Level 1 FFL:0
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
REVISION:
20/007/CD/4000/413
Bamboo Bamboostrips stripsceiling ceiling
25mm timber wall stud with 75mmx 125mmx 50mm timber beam 90mmx 185 timber ridge board 90mmx 185mm mm timber ridge board horizonal rail Wall polysill (bendul) withroofing mitered Recycled aluminium Recycled polyaluminium roofing double bridle joint at corner 75mmx 50mm 75mmx 50mm tmberpurlins purlins 12mm thk tmber suspended timber flooring 140mmx50mm 140mm timber column 75mmx timber floor joist 75mmx 75mmx150mm 150mmtimber timberrafter rafter
g
:
Suspended Suspendedceiling ceilingholder holder 50mm 50mmxx150mm 150mmtimber timberbeam beam 125mm 125mmxx50mm 50mmtimber timbermullion mullion 120mmx 120mmx10mm 10mm timber timberlouvers louverspanel panel
125mmx 50mm timber beam Hanging Hangingrod rodtototimber timberjoist joist Wall sill (bendul) with mitered double joint at Hanging bar connected totocorner king Hanging barbridle connected kingpost post
50mm 50mmxx50mm 50mmwood woodpiece piece
75mmx 150mm timber tie 75mmx 150mm timber tiebeam beam 140mmx 140mm timber column Suspended Suspendedbamboo bambooceiling ceiling
2
Floor to wall connection with wall sill details 22 Scale 1 : 10
22
402 402
Ceiling, Ceiling,beam beamand andwall wallconnection connection Scale Scale11: :10 10
Timber Timberlouvers louverscurtain curtainwall wall
2
150mm 150mmtimber timberround roundcolumn column
Scale 1 : 10
ROJECT ARCHITECT:
SCALE thk :thkAS SHOWN flooring DRAWN 12mm timber 12mm timber flooring
DRAWING NAME:
YHS ARCHITECT MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
om oom
OJECT ARCHITECT:
YHS ARCHITECT MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
HOUSING UNIT- SHARED ROOM SECTION, FLOOR TO WALL CONNECTION WITH WALL SILL DETAILS
DATE
:
04/10/2020
DRAWING NO.: 33 20/007/CD/4000/417 402 402 SCALE :
AS SHOWN
DRAWN
DATE
04/10/2020
CHECKED : AR HISHAM
:
Skirting Skirting
50x5050x50 mm square timbertimber handrail mm square handrail
REVISION:
HOUSING UNIT- SHARED ROOM SECTION, FLOOR TO WALL CONNECTION WITH WALL SILL DETAILS
50mmx 50mmx150mm 150mmtimber timberbeam beam
: YEAP HUEI SZE
50mm50mm thk timber stringer thk timber stringer
timbertimber balustrade balustrade
1100mm heightheight timbertimber 1100mm baluster to detail 2/4062/406 baluster to detail
CONSTRUCTION DRAWING
Woven Wovenwall wall 280mm(w) timber thread
CLIENTS: CLIENTS:
50mmx 50mmx75mm 75mmtimber timberfloor floorjoist joist
33
Floor Floortotowall wallconnection connection Scale Scale11: :10 10
PROJECT PROJECTARCHITECT: ARCHITECT:
175mm(h) riser riser boardboard 175mm(h) ................................................ ................................................ CHEW CHEWJEN JENLYNN LYNN PENGARAH PENGARAH NONOK/P K/P: 880123-00-0212 : 880123-00-0212
Carriage Carriage
BAJAU BAJAUADAPTIVE ADAPTIVEARCHITECTURE ARCHITECTURESDN SDNBHD BHD A-55-01, A-55-01,TAMAN TAMANPORNA, PORNA,JALAN JALANBANGAU BANGAU6/6/1, 1, KAMPUNG KAMPUNGBANGAU-BANGAU, BANGAU-BANGAU,91308 91308SEMPORNA, SEMPORNA,SABAH SABAH
Staircase connection to floor details Staircase connection to floor details 1 1Scale Scale : 10 1 : 10
Curtain Curtainwall walltimber timberframe frame Expansion Expansiongap gap
280mm(w) timber thread REVISION: 270mmx 80mm80mm timbertimber beam beam 270mmx 20/007/CD/4000/417 12mm 12mm thk timber flooring thk timber flooring
DRAWING NO.:
75mmx75mmx 50mm50mm timbertimber floor floor joist joist
KTETUAN TETUANBAJAU BAJAUADAPTIVE ADAPTIVEARCHITECTURE ARCHITECTURESDN SDNBHD BHD
Timber Timberfloor floorfinishes finishes
CONSTRUCTION DRAWING
GAN MEMBINA NGAN MEMBINA11UNIT UNITINSTITUSI INSTITUSI33TINGKAT TINGKATDI DIATAS ATASPT PT KAMPUNG KAMPUNGBANGAUBANGAU-BANGAU, BANGAU,91308, 91308,SEMPORNA SEMPORNASABAH SABAH
SZE
CHECKED : AR HISHAM
DRAWING NAME:
TITLE: TITLE:
120mm 120mmxx10mm 10mmtimber timberlouvers louverspanel panel
: YEAP HUEI SZE
50mm 50mmx75mm x75mmtimber timberfloor floorjoist joist
Level 3 Level 3 FFL:7500 FFL:7500
1
50mm 50mmthk thkbamboo bamboobio biopanel panelwall wall
Floor to wall connection with wall sill details
DRAWING DRAWINGNAME: NAME:
YHS YHSARCHITECT ARCHITECT MENARA MENARASENIBINA SENIBINAB25-01, B25-01, JALAN JALANMENARA MENARAGADING, GADING,TAMAN TAMAN CONNAUGHT, CONNAUGHT,56000 56000KUALA KUALA LUMPUR LUMPUR T:T:603 6036258 62585888 5888 F:F:603 6036258 62588885 8885 E:E:yhsarch@gmail.com yhsarch@gmail.com yhsarch.com.my W:W:yhsarch.com.my
2
50mm50mm thk timber stringer boardboard thk timber stringer Mortise and tenon connection to thread Mortise and tenon connection to thread
WALL WALLTO TOSLAB SLABTO TO CEILING CEILINGDETAILS DETAILS thread thread
SCALE SCALE: : AS ASSHOWN SHOWN
DRAWN DRAWN
DATE DATE : : 04/10/2020 04/10/2020
CHECKED CHECKED: :AR ARHISHAM HISHAM
CONSTRUCTION CONSTRUCTIONDRAWING DRAWING DRAWING DRAWINGNO.: NO.:
20/007/CD/4000/402 20/007/CD/4000/402
Baluster detail Baluster detail 2 1Scale Scale : 10 1 : 10
M
DATE
AMENDMENT AMENDMENT
PROJECT TITLE: PROJECT TITLE:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT
CLIENTS: CLIENTS:
PROJECT ARCHITECT: PROJECT ARCHITECT:
DRAWING NAME: DRAWING NAME:
STAIRCASE
: :YEAP YEAPHUEI HUEISZE SZE
SCALE : AS SHOWN DRAWN : YEAP HUEI SZE SCALE : AS SHOWN DRAWN : YEAP HUEI SZE
REVISION: REVISION:
14 | TECHNICAL REPORT | BUILDING CONSTRUCTION AND TECHNOLOGY
1-2
1-1 6000 3265
1800
935
Foyer 1560
9.23 m² [Timber]
140mmx 140mm timber column
1-A
2100(h) x 1800(w) double panel timber door 50mm thk bamboo bio-panel wall with finishes at exterior
12mm thk suspended timber flooring
26.45 m² [Timber]
4500
tap.
Main room ft
75mmx 25mm timber wall stud with horizonal rail
6600
P
tap.
ft
2100(h) x 900(w) single panel timber door
Yard
1-B
Double casement window with bamboo woven panel Open Kitchen
Bathroom
7.30 m² [Timber]
4.74 m² [Porcelein]
tap.
2100
wc
laid to fall
Coconut trunk timber panel flooring
sk.
Dashed line indicated sewer line connected to vacuum sewer system
basin
ft
1-C
key plan
Housing Unit- Single dwelling (Type A) layout plan
2
Scale 1 : 50
2-1
CT TITLE:
CLIENTS:
2-2 PROJECT ARCHITECT:
ANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 16, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
6000
YHS ARCHITECT
................................................
UK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
3600
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
HOUSING UNIT - SINGLE DWELLING (TYPE A) 2400 KEY PLAN & LAYOUT PLAN
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
REVISION:
20/007/CD/4000/414
2-A
ft
2100
sk.
laid to fall
Bathroom 4.82 m² [Porcelein]
Kitchen 7.28 m² [Timber]
tap.
Basin
Dashed line indicate sewer line connected to vacuum sewer system
WC
Coconut trunk timber panel flooring
2-B 75mmx 25mm timber wall stud with horizonal rail Main room
Yard
12mm thk suspended timber flooring 2100(h) x 900(w) single panel timber door
tap.
6600
26.40 m² [Timber]
ft
4500
UP
tap.
ft
) key plan
50mm thk bamboo bio-panel wall with finishes at exterior 2100(h) x 1800(w) double panel timber door
140mmx 140mm timber column
2-C 1530
2
Timber frame double casement window with bamboo woven panel
Foyer 9.14 m² [Timber]
Housing Unit- Single dwelling (Type B) layout plan Scale 1 : 50
JECT TITLE:
DANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT
CLIENTS:
PROJECT ARCHITECT:
YHS ARCHITECT
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
HOUSING UNIT - SINGLE
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 15
3-1
3-2
3-3
3-4
6535 1475
3500
1560
3-A 184mmx 184mm timber column 75mmx 25mm timber wall stud with horizonal rail 3250
1 417
Timber frame double casement window with bamboo woven panel
Room 21.55 m² [Timber] 6500
50mm thk bamboo bio-panel wall c/w water resist finishes at exterior
1000mm (h) timber railing 2100(h) x 900(w) single panel timber door
1750
3-B
Balcony
2100(h) x 1800(w) bamboo woven panel sliding door
4.82 m² [Timber]
3-C 1500
Bathroom
basin
4.35 m² [Porcelein] laid to fall wc tap.
Walkway
Dashed line indicated sewer line connected to vacuum sewer system
ft
3-D
2
Housing unit- Shared room layout plan Scale 1 : 50
3-1
3-2
CLIENTS:
PROJECT ARCHITECT:
1475
INSTITUSI 3 TINGKAT DI ATAS PT ANGAU, 91308, SEMPORNA SABAH
3500 YHS ARCHITECT
651 651 ................................................
TIVE ARCHITECTURE SDN BHD HU level 2
3-3
1107
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
SENIBINA B25-01, 1095MENARA 1107 JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
3-4
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
HOUSING UNIT- SHARED ROOM KEY PLAN & LAYOUT PLAN
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING DRAWING NO.:
REVISION:
20/007/CD/4000/416 125mmx 125mm timber beam
FFL:3500
50mm thk bamboo bio-panel wall c/w water resist finishes at exterior 75mmx 25mm timber wall stud with horizonal rail
Room
Leve
2
FFL:0
417
184mmx 184mm timber column Walkway Level 1
12mm thk suspended timber flooring 50mmx 75mm timber floor joist
FFL:0
125mmx 50mm timber beam
1
Housing Unit- shared room section Scale 1 : 50
2
Fl
Sc
16 | TECHNICAL REPORT | BUILDING ENVIRONMENT DESIGN & SUSTAINABILITY STRATEGY
4.0 BUILDING ENVIRONMENT DESIGN & SUSTAINABILITY STRATEGY 4.1 Sustainable - Sustainable for building are about how to practice green building. Structures are designed to have a lower environmental impact over their entire lifetime, while providing a normal level of comfort, durability and functionality for occupants. In business situations, this allows companies to grow, without growing at the expense of the environment.
energy
water
material
A Green building focuses on increasing the efficiency of resource use – energy, water, and materials – while reducing building impact on human health and the environment during the building’s lifecycle, through better siting, design, construction, operation, maintenance, and removal. Green Buildings should be designed and operated to reduce the overall impact of the built environment on its surroundings.
Timber column to engr's details 150 x 12 mm timber panel
75x 150 mm timber batten 2 412
4.2 Renewable energy - the evaporation panel
Evaporation panel
As our site have large water body, there’s a technology that the “SPORES” could actually absorb the water and expand and when humidity low, the SPORES will contract. The repitition of this cell anable the structure to move
Bridge section
1
Evaporat
2
Scale 1 : 25
Scale 1 : 5
Evaporation detector spinner
Proposed to use this technology to generate electricity for the site in order to supplied electricity to the site . As bridge is widely used as access and connection in Kampung Banagu- Bangau, proTimber column to engr's details posed a evaporation technology energy generator panel attached 150 for x 12 mm timber panel to the bottom of bridge which could provide electricity the whole village. Detail drawings on right showing how it could be installed at the bridge 75x 150 mm timber batten
Dynamo C-channel wiring and dynamo holder
Timber column to engr's details 50mmx 150mm Hollow timber section frame holder 150 x 12 mm timber panel Connecting coil
2 412
How it works? 1. evaporation enable water to accumulate at the bottom of the Evaporation panel structure
75x 150Hinge mm timber to holdbatten the panel dynamo 2 412
2. When the “Spores” had absoarbed the water vapour will ake the structure open to release the vapour and the spore will conBridge section tract 1 Scale 1 : 25
Holding rod Evaporation panel Turbine with 'SPORES'
Evaporation panel- exploded axonometric
3
Scale: NTS REF
PROJECT TITLE:
DATE
AMENDMENT Evaporation Panel Connection
2
Evapora
4
Scale: NTS
CLIENTS:
P
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
Scale 1 : 5
................................................
Evaporation detector spinner
3. The continuous of expand and contract make the wheel to turn. In large scale, the kinetic movement could generate electricDynamo ity C-channel wiring and (retrive from a case study by University of Columbia)
Bridge section
1
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
BAJAU ADAPTIVE ARCHITECTURE SDN BHD
Evaporatio
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
2
Scale 1 : 25
Scale 1 : 5
Evaporation detector spinner
dynamo holder
Dynamo C-channel wiring and dynamo holder
Timber column to 150mm engr's details 50mmx timber frame 150 x 12 mm timber panel C-channel
2.
1.
50mmx 150mm section timber frameholder Evaporation detector spinnerHollow
75x 150 mm timber batten
Connecting coil
dynamo
2 412
Evaporation panel- exploded axonometric
3
Scale: NTS REF
DATE
AMENDMENT
PROJECT TITLE:
dynamo
Scale: NTS CLIENTS:
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
Bridge section
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
3 CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
REF DATE SDN BHD BAJAU ADAPTIVE ARCHITECTURE
AMENDMENT
Scale 1 : 25
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my
Evaporation Panel Connection
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
2
DRAWING NAME:
Evaporation panel-YHSexploded axonometric BRIDGE SECTION ARCHITECT
................................................ Scale: NTS
1
Hinge to hold the panel
Evaporation panel- section
4
Evaporation panel
Scale 1 : 5
SCALE :
AS SHOWN
DATE
04/10/2020
DRAWN
Holding rodCHECKED
:
: YEAP HUEI SZE : AR HISHAM
EVAPORATION PANEL CONNECTION, CONSTRUCTION Turbine withDRAWING 'SPORES' EXPLODED PROJECTAXONOMETRIC, TITLE: CLIENTS: DRAWING NO.: REVISION: CADANGAN MEMBINA 1 UNIT INSTITUSI 3 20/007/CD/4000/412 TINGKAT DI ATAS PT SECTION
4
Evaporati Scale: NTS
52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
................................................
Evaporation detector spinner
CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH
Dynamo C-channel wiring and dynamo holder
50mmx 150mm timber frame
C-channel Evaporation detector spinner dynamo
3. 3
Evaporation panel- exploded axonometric
4
REF
DATE
AMENDMENT
Evaporation panel- section Scale: NTS
Scale: NTS PROJECT TITLE:
CLIENTS:
PROJECT ARCHITECT:
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
YHS ARCHITECT
................................................ CHEW JEN LYNN
MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA
DRAWING NAME:
SCALE :
AS SHOWN
DRAWN
BRIDGE SECTION EVAPORATION PANEL CONNECTION,
DATE
04/10/2020
CHECKED : AR HISHAM
:
: YEAP HUEI SZE
CONSTRUCTION DRAWING
PRO
BUILDING ENVIRONMENT DESIGN & SUSTAINABILITY STRATEGY/ BUILDING SERVICES | TECHNICAL REPORT | 17
4.3 Sustainable materials and construction The material choosen is sustainable and easily to get from local. (refer more specs at 3.0)
4.4 Indoor quality consideration As the site is near to sea, it is consider hot and humid. Proposed some features like the louvers to ensure ventilation. Woven all or the bamboo stri ps wall make the wall breathable. Also the bamboo stri ps ceiling to ensure better acoustic. These could avoid the use of mechanical ventilation like Air-conditioning and reduce the use of energy at the same time provide best ventilation for the building.
5.0 BUILDING SERVICES 5.1 Sewerage system As the site is on water, proposed to use a vacuum sewerage system. This system allowed the pi ped to be construct with min gradient as it is using vacuum. It needs a vacuum station to store the large pi ping and machine. Proposed to construct the pi ping underneath the bridge and linked to the vacuum station which are then to be connected to nearest sewer plant.
Building section showing the use of bamboo suspended ceiling and the curtain timber louvers wall
5.2 Water supply system The site could tap water from the land. But the proper pi ping system is needed to construct. Proposed to plan a proper inlet water supply for the village via the bridge, it could also be a boxing up for all the services pi ping to be store underneath the bridge . Hierachy of pi pe within a vacuum sewer system and corresponding pi pe diameters (source: Fraunhofer IGB guideline: vacuum sewer system)
highlighted the bridge which connecting all the proposed building. Proposed all the services could be attached under the bridge
Overview of a vacuum sewer system involving the vacuum valve unit at the valve pits, vacuum main and the central vacuum station (source: Fraunhofer IGB guideline: vacuum sewer system)
18 | TECHNICAL REPORT | BUILDING SERVICES
5.3 Heating & Ventilation The proposed building are mostly natural ventilated. Proposed to use ceiling fan as mechanical ventilation to enhance the ventilation. Damp and wet ceiling fan Due to the humidity and as the site is on sea, proposed the damp and wet ceiling fan which can have better weather resist. Trimaran outdoor ceiling is Engineered for the Elements™. It’s wet rated as well as corrosion and salt-air resistant making it great for outdoor spaces like pergolas and patios. Easily control this ceiling fan without light with the included wall control. water tank location
5.4 Energy Consumption & artificial lighting strategy The proposed to use LED florescent light as general lighting for all the spaces as the building are mostly receiving daylight, it could served as supporting lighting whenever it is needed. Some task light are apply at the area like kitchen or study table at the resource room. LEDtube Mains T5 The new Phili ps Master LED tube Mains T5 brings simplicity to your lighting project. You don’t need to pay attention to the driver technology anymore. Thanks to a unique design, Phili ps MASTER LEDtube Mains T5 directly instals in luminaires operating on mains power connection. So simple to operate and no need to carry double stock of products! Perfectly safe, reliable & easy to install Phili ps MASTER LEDtube Mains T5 is the ideal alternative to standard fluorescent tubes to maximize value overlifetime with high energy saving and lower maintenance costs.
water tank location
Benefits • Reduced operational cost thanks to lower energy consumption • Lower maintenance cost thanks to longer lifetime than conventional lamps • Fastest and easiest way to upgrade existing luminaires to LEDtechnology; completely safe product and installation process Features • Replacement of existing T5 lamps to mains power connection installation • Energy savings compared wtih fluorescent tubes • Long lifetime • No mercury
Selected 2 area for further study on the lighting strategy : Canteen area -place for gathering , having meal Resource room - place for study and research
water tank location
water tank location
t | TECHNICAL REPORT | 19
Space 1: Canteen Ventilation study Calculation of natural ventilation required = total floor area x 5% = 251.24 x 5% = 12.56 m2 Natural ventilation provided = (19x4) + (12x4) + (20x4) = 76 + 48 + 80 = 204 m2
wall pack ceiling fan surface mounted florecent light w/ LED light tube sunlight/ opening
Comply to UBBL clause 39, natural ventilation minimum of 5% for ventilation Calculation for natural lighting required = total floor area x 10 % = 251.24 x 10% = 25.12 m2 Opening provided comply to ubbl 1894 clause 39 natural lighting minimum requirement of 10% of day light. Mechanical ventilation and lighting Proposed to use weather resisted ceiling fan as mechanical ventilation and surface mounted LED lighttube as artificial lighting when it is necessary. Wall pack light located at the entrance of canteen from bridge
Space 2: Resource room Ventilation study Calculation of natural ventilation required = total floor area x 5% = 103.47 x 5% = 5.17 m2 Natural ventilation provided = 86.34 + 42.19 = 128.53 m2 Comply to UBBL clause 39, natural ventilation minimum of 5% for ventilation Calculation for natural lighting required = total floor area x 10 % = 103.47 x 10% =10.34 m2 Opening provided comply to ubbl 1894 clause 39 natural lighting minimum requirement of 10% of day light. Mechanical ventilation and lighting Proposed to use weather resisted ceiling fan as mechanical ventilation and surface mounted LED light tube as artificial lighting(general lighting). Pendant light are added at the study table area as task lighting.
ceiling fan surface mounted florecent light w/ LED light tube pendant light Sunlight / opening
N 79 째
80.88
"E 0 7' 24
m
4500
CC
AA BB RA RB
10000
3000
7000
2267
18362 3295
5801
' 30" E S 8째 50
2 3000/01
ft
ta p .
Refuse Chamber
2000/01
4500
R2
On water class
2
R1
46.17 m
ftft Toilet 2 FFL: 25 ft
Kitchen FFL: 50
ft
4660
9
UP
4655
10
Canteen FFL: 100
11
Floating deck
4655
23280
5626
4655
m
4655
13
37 . 04
DN
UP
12
11100 0 1350
8c
14
0 60 14 0 28 16
"W
8b
10 00 0
2000/01
1
18 21 050 85 0
3째 46 '
34
13274
S3
EE
DD
Floatin
8a
DN
Dashed line indicated the roof line above
Multi-purpose area
DN
8
61
Floating deck 13908
Dashed line indicated boat circulation ruote
On water class
7
2500
5
6 10000
72.50 m
S ACCES RIDGE MAIN B
E S 5 째 22' 46" 1
Site Plan Scale1 : 300
Lift
FFL: 100
3500
250mm dia main vacuum sewer line to be connected to nearest vacuum station
UP
15000
1 3000/01
2 3000/01
N
4500
Dashed line indicated roof line above
Dashed line indicated boat circulation
' 00" E S 9° 00
RC
5800
86.88 m
R4
R3
RD Scatter Class 1
B C
FFL: 50
D
8420
A
RE
UP
RF
69
E
51
1 3000/01
F
ng deck
FFL: 50
ft
G H I
ft ft
ftft
0' 00" W S 81° 0
18.42 m
4500
ft ft ft
8043
Toilet 1
6460
134
3
4
2
1 6025 4500
N 4° 00' 00" W
Scatter class 2
RG 5000
FFL: 50
RH
RI 5000
38.84 m
Scatter class 3 FFL: 50
On water class
RJ 4538
7616
R5
R6R7
tap.
ACCOMODATION DEVELOPMENT ft
EE
DD
CC AA BB RB
RA
18362 3000
2267
7000
2 3000/01
ap.
ft
t Refuse Chamber
13.11 m²
R2
5801
3295
2000/01
2 407
4500
1 401
2
On water class
150mm dia vacu connected to m 150mm dia vacu to valve chamb 100mm dia vacu to valve chamb
R1 ftft
9
-
23.57 m²
ft
35.64 m² BW
Toilet 2
TF FFL: 0.050
BB
-
ft dp
TT FFL: 0.025 dp
2465
4660
10
UP
4655
46.17 m
500 2035 1
' 30" E S 8° 50
Kitchen
Canteen
DN
251.24 m²
11
Floating deck
Thread= 280mm, Ri staircase to detail
Thread= 270mm, Ri staircase to engr's
2 nos of 140mmx 1 w/ a 90mmx140mm column in between
UP 4655 23280
TL TF - FFL: 0.100
Timber floating pla Thread= 280mm, Ri staircase to engr's 150mm thk timber c horizontal timber l details
12 4655
13 4655
8c
11100 0 1350
14
m
Dashed line ind
0
37 . 04
8b 14600 28 16
"W
8a 7
6
5 4 3 2
1
S3
3° 46 '
18 05 21 0 85 0
34
8
Floating deck
2000/01
1 1721
DN
2945
Toilet 1
dp
Thread= 280mm, Riser=175mm timber staircase to details UP
1 3000/01
214.48 m²
-
TF FFL: 100
ft ft ft
Multi-purpose area
250mm dia main vacuum sewer line to be connected to nearest vacuum station
51.31 m
DN
Floating deck
Timber floating platform
R5 R
Dashed line indicated boat circulation ruote
15
On water class 2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class
RG
5000
Thread= 280mm, Riser= 176mm timber staircase link to floating platform
RH
72.50 m
S ACCES RIDGE MAIN B
E S 5 ° 22' 46"
1
Ground floor plan - Sewerage system 1 : 250
RI
1 401
2 3000/01
R
N
FINISHES LEGEND Wall finishes
dicated roof line above Floor finishes
uum sewer pipe main vacuum sewer line uum sewer pipe connected ber uum sewer pipe connected ber
TL
150mm thk timber curtain wall with timber louvers panels to detail
BW
75mm thk bamboo woven panel wall with timber frame support
BB
50mm thk bamboo bio-panel wall with timber frame support
TT
12mm thk timber panel flooring with water-based polyurethane
TF
12mm thk timber panel flooring with satin varnish finishes
iser=175mm timber ls
iser= 175mm timber s details
' 00 S 9° 00
140mm timber column slanted timber to engr's details Dashed line indicated roof line above
R4 R3
2593
5800
RC 2290
29.55 m²
C D
TF FFL: 50
m²
BB
RF
1 3000/01
Thread= 280mm, Riser=175mm timber staircase to details
Thread= 280mm, Riser= 176mm timber staircase link to floating platform
2 317
-
RE
E F
1
UP
2600
-
RD
8420 3530
Scatter Class 1
A B
86.88 m
timber ladders connected to timber platform
" E
atform iser= 176mm timber s details curtain wall with louvers panel to
100mm dia vacuum sewer pipe connected to valve chamber
TT FFL: 50
ft
G
ft
H I
ft
ftft
150mm dia vacuum sewer pipe connected to valve chamber valve chamber
0' 00" W S 81° 0
18.42 m
Hydraulic lift to manuf's details
6460
150mm dia vacuum sewer pipe connected to main vacuum sewer line
R7
R6 6025
565
Dashed line indicated roof line above 75mm thk bamboo woven panel wall
Scatter class 2 BW
0
-
TF FFL: 0.050
N 4° 00' 00" W
12mm thk timber panel flooring
30.13 m²
184mmx 184mm timber column
4ft timber platorm 30.13 m² 5000
RJ
BW
-
38.84 m
timber ladders connected to timber platform
Scatter class 3 TF FFL: 0.050
6025
1470
On water class
4538
ACCOMODATION DEVELOPMENT ta p
GA Drawings
NOTES:
N
N
TAPAK CADANGAN
Village's jetty Cemetery
N 79 °
Bajau Community Settlement
0
80.88
E 7' 24"
m REF
4500
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
fffttt
AA BB Burnt up area
New tourist's jetty
RA RB
10000
Masjid Kampung Panji
3000
' 30 S 8° 50
18362 3295
R2
4500
CLIENT:
2000/01 On water class
2
" E
ftft Toilet 2 FFL: 25 ft
Kitchen FFL: 50
ft
Canteen
4655
m
11100 0 5 13 0
8c
14
"W 3° 46 '
Scatter Class 1
B C
18 21 050 85 0
34
A
FFL: 50
D
1 3000/01
YHS ARCHITECT MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com f: +603-62585888 w: yhsarch.com.my
DN
ffttfftftt
Multi-purpose area
Lift
FFL: 100
3500
Floating deck 13908
2
............................................................................. Mr. Ng Zi Guan
1
MECHANICAL AND ELECTRICAL ENGINEERING
6025 4500
On water class
N 4° 00' 00" W
Scatter class 2
RG
FFL: 50
5000
5
10000
RH
RI
38.84 m
Scatter class 3 5000
FFL: 50
On water class
RJ 7616
4538
S ACCES RIDGE MAIN B
New tourist's jetty
ftft
3
4
6
Temporary camp
G H I
ft ft
6134
7
MAIN ACCESS BRIDGE
ft
CONSULTANTS:
18.42 m
6460
DN
8
Dashed line indicated boat circulation ruote
Burnt up area
ft ft ft
' 00" W S 81° 00 4500
Dashed line indicated the roof line above
250mm dia main vacuum sewer line to be connected to nearest vacuum station
UP
15000
1 3000/01
8043
FFL: 50
2 3000/01
R5
R6R7
7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my
ZG
............................................................................. Mr. Thomas Lee
BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my
AS SHOWN 31/10/2020
NG ENGR
TL
CIVIL AND STRUCTURAL ENGINEERING
SCALE DATE
.co
C&S
DRWAN BY CHECKED BY
YEAP HUEI SZE AR HISHAM
DRAWING TITLE:
ACCOMODATION DEVELOPMENT tap.
E S 5° 22' 46"
N LA JA AU NG BA
72.50 m
AU NG BA
L PITA HOS AN JAL Scale: NTS
RF
F
Toilet 1
Location Plan
RE
UP
E
Floating deck
8a
fftt
2
8420
1
ARKITEK No. Pendaftaran LAM : AR724
"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
51
2000/01
..................................................... Ar. Yeap Huei Sze
RD
69
10 00 0
RC
5800
0 60 14 0 28 16
8b
R4
R3
LEMBAGA ARKITEK MALAYSIA
86.88 m
4655
13
37 . 04
Floating deck
4655
23280
12
S3
DN
UP
N
ARCHITECT:
' 00" E S 9° 00
11
Dashed line indicated boat circulation
UP FFL: 100
On-going Construction
BAJAU ADAPTIVE ARCHITECTURE SDN BHD
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"
4655
10
Scale: NTS
TAPAK CADANGAN
Dashed line indicated roof line above
4660
9
Key Plan
Bajau Community Settlement
......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )
R1
46.17 m
1
5801
ft
ta p .
Refuse Chamber
Pusat Kesihatan New Residence Taman Semporna
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
2 3000/01
4500
Mangrove swamp
7000
2267
EE
DD
CC
AMENDMENT
PROJECT TITLE:
ft
Taman Semporna Centre
DATE
ft
tapf.t
2 UP UP
N
° 53
10
2 '3
0 2.
5m
KEY PLAN LOCATION PLAN SITE PLAN
"E
DRAWING NUMBER:
20/007/CD/1000/01
REVISION
-
CONSTRUCTION DRAWING 3
Site plan
ALL RIGHTS RESERVED
Scale1 : 300
THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.
NOTES:
EE DD
CC AA
N
BB FINISHES LEGEND
RB
RA
2267
2 3000/01
ft
ta p .
Refuse Chamber
R2
3295
7000
3000
2000/01
13.11 m²
2400mm(h) 100mm dia round timber stilt with 150mm spacing c/c as wall for on water class
2 407
4500
1 401
Wall finishes
2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class
5801
18362
2
Floor finishes
TL
150mm thk timber curtain wall with timber louvers panels to detail
BW
75mm thk bamboo woven panel wall with timber frame support
BB
50mm thk bamboo bio-panel wall with timber frame support
TT
12mm thk timber panel flooring with water-based polyurethane
TF
12mm thk timber panel flooring with satin varnish finishes
ftft
Kitchen D1
BW
-
23.57 m² BB
-
ft
TF FFL: 0.050
D2
Toilet 2
FFL: 0.025
dp
dp
D4
AMENDMENT
PROJECT TITLE:
150mm dia connected line 150mm dia connected
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
vacuum sewer pipe to main vacuum sewer vacuum sewer pipe to valve chamber
100mm dia vacuum sewer pipe connected to valve chamber Thread= 280mm, Riser=175mm timber staircase to details
TT
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
2465
4660
2035
' 30" E S 8° 50
ft
35.64 m²
9
D2
DATE
Dashed line indicated roof line above
On water class
R1
REF
Floating deck
251.24 m²
UP
4655 23280
TL
-
2 nos of 140mmx 140mm timber column w/ a 90mmx140mm slanted timber column in between to engr's details 12mm thk timber panel flooring
TF FFL: 0.100
184mmx 184mm timber column Dashed line indicated roof line above
Timber floating platform
12
timber ladders connected to timber platform
150mm thk timber curtain wall with horizontal timber louvers panel to details 4655
8c
2593
2290
0 1350
14 m 37 . 04 "W
18 05 0
34
21 85 0
3° 46 '
5 4 3
2
C
1
TF FFL: 50
UP
D
1 403
S3
12mm thk timber panel flooring
2000/01
34
92 30
2705
40
250mm dia main vacuum sewer line to be connected to nearest vacuum station
4988
ft
214.48 m²
ft
D2
ft
D2 D2 D2
ft ft
G
ft
CONSULTANTS:
valve chamber
3500
............................................................................. Mr. Ng Zi Guan
Hydraulic lift to manuf's details
MECHANICAL AND ELECTRICAL ENGINEERING
150mm dia vacuum sewer pipe connected to main vacuum sewer line
R7
Floating deck Timber floating platform
R5 R6
Dashed line indicated boat circulation ruote
6025
On water class 1450
7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my
Dashed line indicated roof line above
1565
Scatter class 2
RG
-
N 4° 00' 00" W
TF
BW
184mmx 184mm timber column
FFL: 0.050 D4
RH
38.84 m
4ft timber platorm D4
S ACCES RIDGE MAIN B
timber ladders connected to timber platform
Scatter class 3
RI
30.13 m² BW
5000
1 401
NG ENGR
12mm thk timber panel flooring
30.13 m²
Thread= 280mm, Riser= 176mm timber staircase link to floating platform 12mm thk timber flooring open decking
ZG
75mm thk bamboo woven panel wall
2020
5000
2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class
18.42 m
I
6460
DN
0' 00" W S 81° 0
H
3300
3160
TF FFL: 100
150mm dia vacuum sewer pipe connected to valve chamber
D3
ft
Multi-purpose area -
FFL: 50
430 1430 1
ft
3141
30
29
51.31 m²
D3
UP
74
2149
1470 1830
47
88
1 403
4105
41
Toilet 1 -
100mm dia vacuum sewer pipe connected to valve chamber
TT
BB
dp
3130
41
DN
65
MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com w: yhsarch.com.my f: +603-62585888
Thread= 280mm, Riser= 176mm timber staircase link to floating platform
2945
1721
1 3000/01
12mm thk timber flooring open deck as bridge connected to main bridge access
21 33
Thread= 280mm, Riser=175mm timber staircase to details
YHS ARCHITECT
2 317
200mm dia round timber column to specialist details
1 3000/01
Thread= 280mm, Riser=175mm timber staircase to details
F
1
ARKITEK No. Pendaftaran LAM : AR724
RF
E
Floating deck
..................................................... Ar. Yeap Huei Sze
"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
RE 2600
6
3530
7
-
LEMBAGA ARKITEK MALAYSIA
RD
29.55 m²
B 8
ARCHITECT:
8420
Scatter Class 1
A
8a
bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"
RC
5800
0 60 14 0 28 16
BAJAU ADAPTIVE ARCHITECTURE SDN BHD
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH
R4 R3
11100
8b
......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )
86.88 m
4655
Thread= 280mm, Riser= 176mm timber staircase to engr's details
13
' 00" E S 9° 00
11
CLIENT:
DN
Canteen
1 407
Thread= 270mm, Riser= 175mm timber staircase to engr's details
1500
UP
4655
46.17 m
10
-
TF
TL
CIVIL AND STRUCTURAL ENGINEERING
BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my
SCALE DATE
AS SHOWN 31/10/2020
.co
C&S
DRWAN BY CHECKED BY
YEAP HUEI SZE AR HISHAM
DRAWING TITLE:
FFL: 0.050
GROUND FLOOR PLAN
On water class
RJ
............................................................................. Mr. Thomas Lee
6025
1470
4538
2 3000/01
DRAWING NUMBER:
1
tap.
ACCOMODATION DEVELOPMENT Ground Floor Plan
ft
Scale 1 : 200
20/007/CD/1000/02
REVISION
-
CONSTRUCTION DRAWING ALL RIGHTS RESERVED
tap.ft
THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.
NOTES:
EE DD
CC AA
BB
RB
RA
1308
3000
1167
2 3000/01
938
fall: 15°
R2
N
2000/01
4500
' 30" S 8° 50
2
2 407
1 401
19876
REF
1400
5800
AMENDMENT
PROJECT TITLE:
3295
rwdp
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
E
' 00 S 9° 00
15° pitched insulated and resistant recycled poly-aluminium roofing
9267
937
R1
DATE
" E
1484
46.17 m
fall: 15°
9
G.I. gutter
86.88 m
10000
Thread= 280mm, Riser=175mm timber staircase to details
10
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
CLIENT: fall: 8°
1 407
11
12mm thk timber panel flooring
23280
......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )
Timber floating platform
BAJAU ADAPTIVE ARCHITECTURE SDN BHD
12
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH
8 ° pitched insulated and resistant recycled poly-aluminium roofing
bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"
ARCHITECT:
rwdp
13
R4 8c
RC
823 2290
12102
1481
14
R3
RD
7730
8a
A
7360
m "W
37 . 04
E
rwdp rwdp
G.I. gutter
2000/01
1
1 3000/01
F
1 403
15 ° pitched insulated and resistant recycled poly-aluminium roofing
° fall: 30
ZG
NG ENGR
5000
N 4° 00' 00" W
749
749
RI
5000
fall: 15°
38.84 m
° fall: 30
1992
30 ° pitched insulated and resistant recycled poly-aluminium roofing
RH
0° fall: 3
15 ° pitched insulated and resistant recycled poly-aluminium roofing
7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my
RG
751
7
1992
10000
2
5
MECHANICAL AND ELECTRICAL ENGINEERING
1
5° fall: 1
S ACCES RIDGE MAIN B
4
............................................................................. Mr. Ng Zi Guan
4500
rwdp
3
CONSULTANTS:
4500
rwdp
rwdp
18.42 m
H rwdp
8
' 00" W S 81° 00
G
I
6
YHS ARCHITECT MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com f: +603-62585888 w: yhsarch.com.my
16 ° pitched insulated and resistant recycled poly-aluminium roofing
19500
° fall: 30
° fall: 30
1 403
RF
12mm thk timber panel flooring
19500
1 3000/01
18860
30° pitched insulated and resistant recycled poly-aluminium roofing
ARKITEK No. Pendaftaran LAM : AR724
857
D
° fall: 30
34
rwdp
° fall: 30
3° 46 '
° fall: 16
C
..................................................... Ar. Yeap Huei Sze
"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
RE
° fall: 15 2600
10963
Dashed line indicate boat circlation
° fall: 30
S3
B
rwdp 10 00 0
3530
° l: 7 fal
10100
8b 7 ° pitched poly- carbonate roofing
LEMBAGA ARKITEK MALAYSIA
............................................................................. Mr. Thomas Lee
TL
CIVIL AND STRUCTURAL ENGINEERING
BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my
SCALE DATE
AS SHOWN 31/10/2020
.co
C&S
DRWAN BY CHECKED BY
YEAP HUEI SZE AR HISHAM
DRAWING TITLE:
751
RJ
ROOF PLAN
E S 5° 22' 46"
7616
2 3000/01
R6 R7 R5
72.50 m
DRAWING NUMBER:
ACCOMODATION DEVELOPMENT 1
Roof Plan Scale 1 : 200
20/007/CD/1000/03
REVISION
-
CONSTRUCTION DRAWING ALL RIGHTS RESERVED THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.
NOTES:
R2
R1
9
10
11
12
13
14 8c
8b
35963 938
4500
5749
4660
4655
4655
6375
4655
4655
1496
1 3000/01
4135
26292
REF
PROJECT TITLE:
7 ° pitched poly- carbonate roofing
30° pitched insulated and resistant recycled poly-aluminium roofing
200mm dia round timber column to specialist details
75mmx 200mm timber tie beam
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
184mmx 184mm timber column
FFL:11000
Verticle adjustable timber louvers panel
3781
FFL:14500
Level 4
1 407
150mm thk timber curtain wall with horizontal timber louvers panel to details
114mm x 114mm timber column Timber louvers curtain wall 50mm thk bamboo bio-panel wall with finishes at exterior
Level 2 FFL:4000
Level 1 100 FFL:0
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
1000mm (h) timber railing
Level 3 FFL:7500
15° pitched insulated and resistant recycled poly-aluminium roofing
184mmx 184mm timber column LV1
LV1
LV1
LV1
LV1
1000mm (h) timber railing
200mm dia round timber column to specialist details
15 ° pitched insulated and resistant recycled poly-aluminium roofing
75mm thk bamboo woven panel wall D1
LV2
LV2
LV2
LV2
LV2
LV2
LV2
LV2
W1
1200mm (h) woven wall panel with fixed louvers on top up to roof height refuse chamber
W1
CLIENT:
......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )
Woven panel top hung window
BAJAU ADAPTIVE ARCHITECTURE SDN BHD
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH
140mmx 140mm timber column Water Level
main bridge access
bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"
2400mm(h) 100mm dia round timber stilt with 150mm spacing c/c as wall for on water class
ARCHITECT:
2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class
LEMBAGA ARKITEK MALAYSIA
1
..................................................... Ar. Yeap Huei Sze
Front Elevation Scale 1 : 200
ARKITEK No. Pendaftaran LAM : AR724
"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
YHS ARCHITECT MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com f: +603-62585888 w: yhsarch.com.my
EE
DD
CC
BB
AA
CONSULTANTS:
18362
3615
............................................................................. Mr. Ng Zi Guan
30° pitched insulated and resistant recycled poly-aluminium roofing fall: 30°
Level 4
200mm dia round timber column to specialist details 16 ° pitched insulated and resistant recycled poly-aluminium roofing
2267
2 407
fall: 30°
FFL:14500
7000
fall: 30°
Roof beam level
3153
1715
5948
8 ° pitched insulated and resistant recycled poly-aluminium roofing
FFL:11000
Level 3
Fixed louvers on top of timber woven wall
FFL:7500
184mmx 184mm timber column Woven panel top hung window
FFL:4000
Level 1 100 FFL:0
75mm thk bamboo woven panel wall
fixed louvers panel on top of timber woven wall
Thread= 280mm, Riser=175mm timber staircase to details
75mm thk bamboo woven panel wall 1941
2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class
W1
1200
Level 2
1000mm (h) timber railing 50mm thk bamboo bio-panel wall with finishes at exterior
W1
W1
W2
2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class
Water Level FFL:-3000
MECHANICAL AND ELECTRICAL ENGINEERING
7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my
ZG
NG ENGR
50mm thk bamboo strips internal partition Timber louvers curtain wall
1200
FFL:-3000
AMENDMENT
75mmx 150mm timber rafter
1900
Roof beam level
DATE
............................................................................. Mr. Thomas Lee
TL
CIVIL AND STRUCTURAL ENGINEERING
BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my
SCALE DATE
AS SHOWN 31/10/2020
.co
C&S
DRWAN BY CHECKED BY
YEAP HUEI SZE AR HISHAM
DRAWING TITLE:
FRONT ELEVATION RIGHT ELEVATION
Woven panel top hung window 12mm thk timber panel flooring Thread= 280mm, Riser=175mm timber staircase to details
DRAWING NUMBER:
20/007/CD/2000/01 2
Right Elevation Scale 1 : 200
REVISION
-
CONSTRUCTION DRAWING ALL RIGHTS RESERVED THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.
NOTES:
RA
RBAA
BB
CC
DD
EE
22373 3000
1010 2267
7000
3296
5800
8243
6417
REF 2 407
Roof beam level
Level 4 FFL:11000
Level 3 FFL:7500
Level 2 FFL:4000
50mm thk bamboo strips internal partition
FFL:0 100
CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH
75mmx 50mm timber purlins
Timber louvers curtain wall
Resource room
75mmx 150mm timber tie beam
75mm thk bamboo woven panel wall 75mmx 50mm timber floor joist 1000mm (h) timber railing 12mm thk timber panel flooring 200mm dia round timber column to specialist details 80mmx 300mm timber beam to engr's details
16 ° pitched insulated and resistant recycled poly-aluminium roofing Fixed louvers on top of timber woven wall 75mm thk bamboo woven panel wall
Office
Class
15 ° pitched insulated and resistant recycled poly-aluminium roofing
UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD
CLIENT:
184mmx 184mm timber column
Thread= 280mm, Riser=175mm timber staircase to details Level 1
AMENDMENT
PROJECT TITLE: 30° Insulated and resistant recycled poly-aluminium roofing
FFL:14500
DATE
Multipurpose area
Thread= 280mm, Riser=175mm timber staircase to details
Thread= 280mm, Riser=175mm timber staircase to details 1000mm (h) timber railing
Floating platform
Water Level
......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )
BAJAU ADAPTIVE ARCHITECTURE SDN BHD
A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH
Thread= 280mm, Riser= 176mm timber staircase link to floating platform
FFL:-3000
bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"
ARCHITECT:
LEMBAGA ARKITEK MALAYSIA
..................................................... Ar. Yeap Huei Sze
ARKITEK No. Pendaftaran LAM : AR724
"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
1
Section A - A Scale 1 : 200
YHS ARCHITECT MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com f: +603-62585888 w: yhsarch.com.my
CONSULTANTS:
9
10
11
12
13
14
H
I ............................................................................. Mr. Ng Zi Guan
18860
26258
1470 1554
FFL:14500
Level 4 FFL:11000
Level 3 FFL:7500
Level 2 FFL:4000
Level 1 100 FFL:0 Water Level
4654
4653
4653
4653
75mmx 150mm timber tie beam 200mm dia round timber column to specialist details
1
2 nos of 140mmx 140mm timber column w/ a 90mmx140mm slanted timber column in between to engr's details
402
Resource room
15° pitched insulated and resistant recycled poly-aluminium roofing 50mm thk bamboo bio-panel wall with finishes at exterior 75mm thk bamboo woven panel wall Water storage tank on timber stud
75mmx 25mm timber wall stud with horizonal rail Thread= 280mm, Riser=175mm timber staircase to details
MECHANICAL AND ELECTRICAL ENGINEERING
1433
30° pitched insulated and resistant recycled poly-aluminium roofing 75mmx 50mm timber purlins 20mm x 235mm fascia board Timber louvers curtain wall 75mm thk bamboo woven panel wall 1000mm (h) timber railing
Office
114mm x 114mm timber column 184mmx 184mm timber column
Class
Class
Linkage bridge
1100
Roof beam level
4705
Class
Thread= 280mm, Riser=175mm timber staircase to details 12mm thk timber panel flooring
D2
D2
Canteen
Multipurpose area
75mmx 50mm timber purlins Thread= 280mm, Riser= 176mm timber staircase link to floating platform
125mmx 50mm timber beam Timber ladder connected to floor
FFL:-3000
7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my
ZG
............................................................................. Mr. Thomas Lee
TL
CIVIL AND STRUCTURAL ENGINEERING
BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my
SCALE DATE
AS SHOWN 31/10/2020
NG ENGR
.co
C&S
DRWAN BY CHECKED BY
YEAP HUEI SZE AR HISHAM
DRAWING TITLE:
SECTION A-A SECTION B-B
Timber floating platform
DRAWING NUMBER:
20/007/CD/3000/01 2
Section B - B Scale 1 : 200
REVISION
-
CONSTRUCTION DRAWING ALL RIGHTS RESERVED THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.
Thank you