Yeap Huei Sze | Integrated Architecture Design Project | Filling the void between the real space

Page 1

Filling the void between the real space Education | Housing | Public Square

by Yeap Huei Sze


Works compilation along July 2020 semester


YEAP HUEI SZE

59, Nanyang Estate, Jinjang North , 52000 Kuala Lumpur. hueisze0123@gmail.com 012-6479871 ONLINE PORTFOLIO: https://hueisze0123.wixsite.com/portfolio

EDUCATION: UCSI University CURRENT Bsc of Science in Architectural (Hons) 2016-2018 Di ploma In Architectural Studies SKILLS:


CONTENT

Introduction Studio manifesto

11 Project 1: Imaginative Cartographty of Borneo Tales Unveiling the sea gypsies “Tales of Borneo” Documentation / Site Cartography mapping / Art work: Capsule of Semporna’s Bajau Laut / Specific site demacration

27

Project 2: Ideation, Narrative and Materialisation Void between the real space Litereture case study writing / Visual representation drawings / Cinematic video / Conceptual building design proposal model

45

Project 3: Design Realisation - Adaptive Architecture Fill in the void Site analysis / Schematic Building proposal

Reflection Self reflection throughout the project


Unit F THE TALES OF BORNEO


INTRODUCTION

The tales of Borneo investigates the lives of Sea Nomads and the Archeological Heritage of the prehistoric site along the southeastern coast of Sabah. The captivating wonders and alluring scenery of Semporna, its rich cultural heritage, traditions, customs and ethnic diversity reinforce Semporna City as a unique microcosm of society. There’s 3 predetermined theme or elements for us to test our design hypothesis. (Theme 1: Anthropocene ocean/ Theme 2: Socio culture and community empowerment/ Theme 3: Architecture of Earth and Materiality) Cutting through outstanding topographical feature of Sabah, the studio selectively picked the Sea Gypsy Village of Kampung Bangau-bangau for us to select our proposed proving ground. I choosen theme 2 as the main theme for my whole project. The Bajau Laut or ‘sea nomads’ ethnic community of Semporna are mostly boat dwellers (living in houseboats / stilt hut) that are dependent on the sea resources for their livelihoods. They make a living through sea- based activities( traditional fishing, pearl farming and seaweed farming) while bajau darat communities who settled on land, are skillful wood artisans, mat- makers, boat builders and producers of tortoiseshell ornaments. Despite the rich customs and traditions, the plight of the Bajau Laut people has remain immutable. Their stateless status is the main contributor to the multi ple setbacks faced througout the years in term of social deprvation, education underachievement, limited rights to medical healthcare, lack of job opportunities that eventually lead to criminal activiies, including inhalant abuse and drug trafficking.

Keywords: Cultural infrastructure, Underprevillage community, Bajau livelihoods, Community spirit Abstracted from project brief


Theme: Socio culture and community empowerment


Unveiling the Sea Gypsies


PROJECT 1 IMAGINATIVE CARTOGRAPHTY OF BORNEO TALES “Tales of Borneo” Documentation Site Cartography mapping Art work- Capsule of Semporna’s Bajau Laut Specific site demacration


12 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | TALES OF BORNEO

Borneo Borneo, island in the extreme southwestern part of the Pacific Ocean. It is the third largest island in the world, surpassed in size by only Greenland and New Guinea. Borneo is within Malaysia, the Northern region is divided into Sabah and Sarawak, with Brunei smack between the two, and Kalimantan in the East, below Indonesia.

Map of Borneo (Project 1 “Tales of Borneo” Documentation)


TALES OF BORNEO | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 13

Semporna Semporna is a small fishing village on the east coast of Sabah, Malaysia which is surrounded by ocean, with attached islands that are as beautiful as a dream world. In this gorgeous island, there are plenty amazing culture heritages. For instance, they still remain the pottery making techniques, mat making skills and not to forget, the traditional boat making process. The main economic factor in Semporna is came from the fishing industry. However, to maximize the income, the local started to use fishbombing and other modern technique that caused negative impact on the marine life. As time unfold, overfishing become a vast issue and it harms the balance of the aquatic ecosystem.

Location of Semporna in Malaysian state of Sabah. (Abstract from Map of Malaysian Parliament constituencies in Sabah, Sarawak and Labuan, derkommander0916, 2017,edited in project 1 “Tales of Borneo� Documentation)


14 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | TALES OF BORNEO

Coral Triangle The Coral Triangle is a roughly triangular area of the tropical marine waters of Indonesia, Malaysia, Papua New Guinea, Phili ppines, Solomon Islands and Timor-Leste that contain at least 500 species of reef-building corals in each ecoregion. The Coral Triangle is recognized as the global centre of marine biodiversity and a global priority for conservation. It is also called the “Amazon of the seas”.

Left: Coral reefs (sketches by Yeap Huei Sze) Right: Area of Coral Triangular (Gray A. (13 Sep 2018). The ‘Coral Triangle’ is the largest of its kind, and it’s dying, edited in Project 1 “Tales of Borneo” documentation)


TALES OF BORNEO | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 15

Bajau Laut The bajau laut people are sea gypsies. Due to their nomadic life and do not have proper documents to testify their identities, they are in stateless position and could not gain the benefits of the citizenshi ps. For instance, healthcare, education, job opportunity and welfare. These are the proceeding problems that the Bajau community could face owing to their stateless dire strait. Education become a tremendous issue that happened in the Bajau community. They are not undergo formal education so their knowledge of health and hgene. Besides, the living spaces of Bajau laut people are also in a poor condition because they have no adequate money to buy the amentities.

Collage of Cultural Heritage of Bajau Laut (skteches abstract from group works- Cartography mapping, rearranged by Yeap Huei Sze)


16 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | TALES OF BORNEO

Political issue and the stateless Bajau

1970 Since the late sixties, the Mindanao civil war resulting the refugee to flood into Sabah, including Bajau Laut Sabah recorded a 390% increase in population from 1970 to 2010(“Population Growth”,2012). There’s lots of temporary pass issue to the refugee like IMM13, Surat Burung-Burung and Census Certificate.

Ruote of Migration (Project 1 “Tales of Borneo” Documentation,Yeap Huei Sze)

1980-1990 The project IC, it is claimed, “systematically” granted citizenshi p to tens of thousands of illegal immigrants from the Phili ppines and Indonesia for political purposes.

2012 RCI formed to resolve the concerned about illegal immigrant but the report is inconclusive which leave the Sabah people feel that their state is full of unlawful citizen.


TALES OF BORNEO | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 17

2013 Feb 2013 Royal Sulu Army made an intrusion into a remote village on eastern coast of Sabah, Kampung Tanduo. Unlike previous piratetype intrusions from the southern Phili ppines into Sabah, this one was clearly a political act.

Collage of the intrusion of Royal Sulu Army into Southern coast of Sabah (Project 1 “Tales of Borneo� Documentation, Yeap Huei Sze)

Current Some of the Bajau Laut are undocumented/ illegal immigration. Certain village officials, however, in places like the traditional Bajau Laut village of Bangau Bangau seem to be following their own conscience with regards to whom they perceive to be legitimate residents. This situation makes the Bajau village especially the younger generation unable to enjoy the privillage and these lead them to more issue like lack of personal hygiene knowledge , drug abuse, child marriage and adolescent pregnancy.


18 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | SPECIFIC SITE DEMACRATION

Kampung Bangau- Bangau Kampung Bangau- bangau is one of the village in Semporna, Sabah. It’s one of the squatters settlement on sea which consist mostly Bajau Laut people living on stilt houses. There are limited land in Kampung Bangau Bangau and most of the houses are built on stilt at the low tight sea. Unlike the normal village with proper car access, Kampung Bangau-Bangau is linked with bridges. The spatial arrangment was like different group of clusters. There’s also a mangrove swampland right beside the stilt houses. New tuorist Jetty is where the carpark is. It is also where the car can finally accessed. In order to enter the village, you have to walk or by boat. The main access is via a long bridge walkway. Along the long main access , you may notice there’s a land is bare. It is due to as there’s a fire few years ago which burnt up that area’s houses.

Site Plan (Project 1 task 2 studio groupwork - site measured drawing)


SPECIFIC SITE DEMACRATION | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 19

Top: Site isometric Bottom; Site Perspective (Project 1 Task 2 groupwork - Site massing model)


20 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES

Cartography

Cartography mapping (Project 1 group work- Imaginative cartography mapping )

This cartography is about the materiality that exist in the land of Semporna, cultural infrastructure in semporna and the social activities of bajau laut communities focusing on Kampung Bangau-Bangau, one of the village of the bajau laut in Semporna.


CAPSULE OF SEMPORNA’S BAJAU LAUT | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 21

Original

In Between

Future

The land of Semporna is rich of materiality like the pottery from Bukit Tengkorak, timber for boat making. Besides, there’s an ethnic group called Bajau Laut, which they are living at the sea. They have very rich culture and special living skill. For example, the Regatta Festival, which they will decorate their boat for celebration. They have good diving skill and fishing is their livelihood. There’s also a stable ecology system in the ocean which allowed them to live nomadically on the sea.

Even they have rich culture and skill, they still living with lots of complex issue due to their history the social political issue. Some of the Bajau Laut are stateless and under privilege. Their living condition is poor as the living facilities and infrastructure is incomplete. Most of the children couldn’t get to school which led them didn’t have the basic living knowledge. Besides, overcutting mangrove for benefits, blast fishing, trawler fishing, coral reefs acidification which lead the whole eco-system become unstable where will indirectly affect the livelihood of Bajau Laut.

The unstable social culture and ecosystem should be tackled. We should support and work hand in hand to preserve the culture of Bajau Laut and respect each other. Not only Bajau Laut, the unstable eco-system also need to be considered and handle well. Hopefully in the future, the complex issue could be simplified and the special culture and skill could be kept and remain.

Capsule of Semporna’s Bajau Laut (Project 1 group work- the art work)


22 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | CAPSULE OF SEMPORNA’S BAJAU LAUT

Exploded axonometric of the Semporna’s Bajau Laut (Project 1 group work- the artwork)


CAPSULE OF SEMPORNA’S BAJAU LAUT | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 23

The pyramid is the most stable form. It represents the richness of the local cultural heritage of Semporna, such as pottery, mats and shi pbuilding skills. The pyramid also represents the balanced ecology of marine life in which humans and aquatic life maintain a relative balance

The wire mesh is to show the complex issues facing by the Bajau Laut. Their families structures are very messy. This is because the Bajau Laut people has a huge family which normally consists 7 children in a family. However, each of them might contains different nationalities. And this lead to the stateless problem.

Due to these problems, the stable pyramid began to tilt and gradually became unstable. After understanding all the research, we think it is necessary to support all the unstable parts to strengthen it. In addition, the pyramid is inverted to preserve all culture. When you look down from the top, we will no longer see the problem.

The upper level shows the cartography of semporna, which included the cultural infrastructure, livelihoods, and the current status of the area. If you view from the top part, you will notice that all thw cultural heritage in on the inverted triangle as if they had been kept into it. This is to show that the cultural heritage had been protect and inherit by the local.


24 | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | IDEATION SKETCHES

The ideation sketches for the model (artwork) Ideas and sketches from different groupmates


MAKING PROCESS OF BAJAU CAPSULE | IMAGINATIVE CARTOGRAPHY OF BORNEO TALES | 25

left: mock up model right: making process of the model


Void between the real space


PROJECT 2 IDEATION, NARRATIVE AND MATERIALISATION Litereture case study writing Visual representation drawings Conceptual building design proposal model


28 | IDEATION, NARRATIVE AND MATERIALISATION | CONCEPTUAL MODEL

The void After all the analysis, I feel that the Bajau people are living in the void and facing the following issue: Made of inequalities Social connection Economic exchange Living condition Political allegiance Could we redefine the offing deixis? Could we fill the void to make the perceptual orientation and social position in offing parallel with land?

top: Concept model plan view bottom: Concept model section

real space land/ terriority

void offing

real space land/ terriority


CONCEPTUAL MODEL | IDEATION, NARRATIVE AND MATERIALISATION | 29

Issue in the void

Improper building services and waste management

Lack of knowledge and education

Victims of the fire still remain homeless

existing housing burnt stilt polluted ocean top: image abstract from artwork bottom: concept model section collage


30 | IDEATION, NARRATIVE AND MATERIALISATION | ARTWORK NARRATIVE

Formation of void Who creates the void? Man, from the real space, creating the boundary between real space which affected Bajau people who are living in the void between the real space. The boundary in real space makes the Bajau’s nationality become complex. Some of them are stateless, yet, some of them are not, even they are in a same family.

Life of Bajau People in the void of the real space. Kampung Bangau- Bangau, 91308 Semporna, Sabah.

Artwork 1 Describing the political allegiances and social connection


ARTWORK NARRATIVE | IDEATION, NARRATIVE AND MATERIALISATION | 31

Void between the real space Land, the real space, a prosperous town. Full of cultural infrastructures, people living in privillage. Do you ever notice the people living in the void between the real space? They possess amazing surviving skill, strong inheritance and rich in cultural. Yet, they couldn’t enjoy the privillage like people in real space.

Life of Bajau People in the void of the real space. Kampung Bangau- Bangau, 91308 Semporna, Sabah.

Artwork 2 Describing the cultural herritage and infrastructure and social connection


32 | IDEATION, NARRATIVE AND MATERIALISATION | ARTWORK NARRATIVE

Happening in the void The gap between the real space, is not bare, yet , just lack of something. Clean water for drinking, clear water for living. Proper road in the void. Basic living and health knowledge especially for the children. A healthier living environment. Can these be supply to the void, just like how it’s supplying in the real space?

Life of Bajau People in the void of the real space. Kampung Bangau- Bangau, 91308 Semporna, Sabah.

Artwork 3 Describing the issue that happening in Kampung Bangau- bangau


ARTWORK NARRATIVE | IDEATION, NARRATIVE AND MATERIALISATION | 33

Suffering in the void Living in offing, Bajau people are wearing an ‘invalid’ cap. They were considered a socially inferior group. Made of inequalities especially in economic exchange, lack of social connection, poor living condition... Could we redefine the offing deixis? Could we fill the void to make the perceptual orientation and social position in offing parallel with land?

Life of Bajau People in the void of the real space. Kampung Bangau- Bangau, 91308 Semporna, Sabah.

Artwork 4 Describing the living condition and made of inequalities of Semporna’s Bajau Laut


34 | IDEATION, NARRATIVE AND MATERIALISATION | CONCEPTUAL MODEL

Look closer to the void

The house on stilt

Perspective view of the void the conceptual model

main access bridge


CONCEPTUAL MODEL | IDEATION, NARRATIVE AND MATERIALISATION | 35

The broken bridge

Perspective view of the void the conceptual model

Burnt stilt and the existing houses


36 | IDEATION, NARRATIVE AND MATERIALISATION | CONCEPTUAL MODEL

Filling the void To make them living parallel with the people in the real space, I proposed some path to fill the void.

Type of path : 1 Living space local community 2 Education local kids 3 Services Infrastructure 4 Economy Income

Conceptual model with the paths Overall conceptual model


CONCEPTUAL MODEL | IDEATION, NARRATIVE AND MATERIALISATION | 37

4.

2.

3. 1.

Section of conceptual model fill with path


38 | IDEATION, NARRATIVE AND MATERIALISATION | CONCEPTUAL MODEL

The existing site

Housing

Education

Like a void being marginlised by land people.

Proposed new housing on the burnt area to bring the communities back to their home

House school where suite the local context. The corridor, different platform could be a classroom.

Left to right: Type of path to fill in the void


CONCEPTUAL MODEL | IDEATION, NARRATIVE AND MATERIALISATION | 39

Public square

Proper services system

Parallel with real space

For local to have some trading activities or having interaction with land people

Minimised the pollution, at the same time improve their living quality in term of environment

Hopefully in the future they can slowly increase their social position to be parallel with the real space


40 | IDEATION, NARRATIVE AND MATERIALISATION | IDEATION SKETCHES

The ideation sketches of the void the idea of the poscard and A2 artwork sketches


IDEATION SKETCHES | IDEATION, NARRATIVE AND MATERIALISATION | 41

The ideation sketches of the conceptual model Idea sketches of the conceptual model - creating path for the people in the void to live parallel


42 | IDEATION, NARRATIVE AND MATERIALISATION | MOCK UP MODEL

The mock up model of the void the mock up to try to figure out the void


MAKING PROCESS | IDEATION, NARRATIVE AND MATERIALISATION | 43

The making process of the void the conceptual model


Fill in the void


PROJECT 3 DESIGN REALISATION - ADAPTIVE ARCHITECTURE Site analysis Schematic building proposal


46 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Kampung Bangau-Bangau One of the village of Bajau people, setting on stilt by the sea

Shallow area Chosen site is on sea, a shallower area , which the depth is <20m

Near to town Semporna town is only 1-2 km radius away from the site

Macro site analysis Analysis of the choosen site in a radius of 3km.


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 47

Site analysis diagram Analysis of the selected site location


48 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Micro site analysis Analysis on Kampung Bangau Bangau


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 49

Burnt up area

Villageâ&#x20AC;&#x2122;s houses on stilt

Landmarks & Site surrounding Image abstract from Project 1 - site massing

Temporary Camp

New tuorist jetty


50 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Bajauâ&#x20AC;&#x2122;s ways of living Observing some living ways of Bajau people, their living culture are different with the people on land. Children will play in the water, on boat or on stilt. Ways of cooking, eating also differnet from us. They have fishing, woving , carving skill... From all the culture and analysis, I came out with some ideas ...

Left page: Ways of living of Bajauâ&#x20AC;&#x2122;s Laut Image collage of some daily activities of Bajau laut Right page: Ideation sketches


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 51


52 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Design Intention and Target Group

Local Kids

Local Communities

Economy inequality

Services Infrastructure

Basic living knowledge could let them have a better future

The victims of the fire in 2015 still remain homeless until today

Lack of social connection makes them facing inequalities especially in economy exchange.

Lack of proper sevices

Education

Living

Public square

Building services

Providing basic living and health knowledge

Provide home for the victims of fire

Provide a platform to link bajau people and the people on land

Provide better building services and self- sustain energy


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 53

Site selection The site selected is interlocking between the burnt area and the existing village., Intent to provide the space they need. Boundary line showing the site coverage around 3.5 acres.

DN

Resourse room

Master Plan 0m 0m

5m 30m

10m 60m

15m 90m

20m

25m


54 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Design Process I did try out a few layout before finalising the massing. From a big radius,i try to make it more concentrate into a point. What didâ&#x20AC;&#x2122;t change is the intention to have a waterway in between so that the building can approached by waterway and bridge. Also, the centre part could become a gathering space on water/ on stilt at the same time As for form I did try different kind of roof like double pitched, round, curve... In the end i feel the pitched roof is more suite the site context and provide better ventilation

Design process Left to right// top to bottom Master plan, roof plan, ground floor plan// stage 1-3

Form massing development process Left to right// top to bottom Different perspective of view// stage 1-4


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 55


56 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Phase 2 Future developement 4. Services

2. Housing Shared Square 3. Public Square

Overall Site Isometric Showing 3 main building typology and some future development

1. Main School Building


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 57

1.

DN

Resourse room

2. 3.

5. 4.

Site Plan overall site circulaion

Legend 1. Main School Building 2. Housing Unit 3. Public square 4. Services hub 5. Future development

0m 0m

5m 15m

10m 30m

15m 45m

20m

25m


58 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

to the existing village

Main school building

Site elevation 1


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 59

DN

Resourse room

to the land (real space)

Housing development

Public square

0m 0m

5m5m

10m 10m

15m 15m

20m

25


60 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Education is the movement from darkness to light Allan Bloom


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 61

2.

1. 3. 1.

1. 5. 4.

1. SCHOOL Building element: 1. Scatter class 2. Adminstration block 3. Canteen 4. Class on water 5. Water courtyard


62 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

School for Bajau’s children Bajau children’s lifestyle are quite different from normal children. They are not used to the fixed classroomwith table and chairs, sitting still to learn. Proposed the learning space of the school are more towards their living style, more like learning in the environment that they had used to . I also place some structure around the main building radius as leading structure to lead them towards the learning space. The building designed to be open plan . The spatial arrangement for the classes are in leveling/ cluster, scatter in between Kampung BangauBangau. Proposed program will be like tuition classes which is more focus on kids and teens of Kampung Bangau- bangau. Classes will be design more focus to the knowledge they needed in order to have a better living condition. top: Living space of Bajau’s children (image collage) bottom left: Bubble diagram for the main school building bottom right Type of courses that could be offers for Bajau’s children

Learning courses: Class on sea

Services Canteen/ multi purpose area

Class on stilt

Maths to let them able to carry out trading activities and improve their economy

Art to express themselves via art and visualisation

Language as tool for communication.

Science focus on marine studies like species of fisheries and coral reefs

Adminstration/ main building jetty

linkage

Class in house


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 63

A

DN

Resourse room

B

B

A

Level 1 Plan 0m 0m

5m5m

10m 10m

15m 15m

20m


64 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

A

A

DN

B

B

Resourse room

B

B

A

A

Level 2 Main school building floor plans Showing different level of the school building

Level 3

0m 0m

5m5m

10m 10m

15m 15m

20m

2


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 65

A

A

DN

B

B

Resourse room

B

B

A

A

Level 4

Roof Plan 0m 0m

5m5m

10m 10m

15m 15m

20m

2


66 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Building zoning

Quiet zone

Private zone

Section A-A

Public zone

Public zone

Section B-B

Quiet zone Private zone Public zone

Zoning diagram Showing different zoning of the building

Zoning Axonometric

0m

7m

14m

21m


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 67

Spatial quality of the learning space Class on water Providing a slightly curve structure scatter on water (like radius of school) for them to have a learning spaces on water

(2)

(1)

(3)

Refuse On water class

Kitchen

(4) (5) Class on water Showing spatial quality of one of the class on water by ground floor axonometric(1) , isometric(2), perspective(3) , key plan(4), plan (5), section(6)

(6)

Canteen

Floati


On water class

68 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Class on stilt Stilt is one of the characteristic of bajau cultural heritage. Providing some class on stilt so itâ&#x20AC;&#x2122;s feel like learning at the space they area familar with. it is open plan and like a platform for learning.

Floating deck

(2)

(1)

(3)

Class

(4)

Floating deck

(5)

Class on stilt Showing spatial quality of one of the class on stilt by ground floor axonometric(1) , isometric(2), perspective(3) , key plan(4), plan (5), section(6)

(6)


Class DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 69

Class in between village This classes is located in between the village to have a sense of learning at Floating home. This classes will have woven wall and properly roofed like the Bajauâ&#x20AC;&#x2122;s home. It is a more enclosed space compare to other classes

deck

Multipurpose area

(1)

Floating deck

(2)

(3)

On water class Class

Class On water class (4)

(5)

Class in between village Showing spatial quality of the class inbetween village by ground floor axonometric(1) , isometric(2), perspective(3) , key plan(4), plan (5), section(6)

(6)


70 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Massing development

Site Empty area between the existing houses and the burnt area

Waterway access Built on stilt with scaffolding structure to allow access from water

Bridge linkage Bridge to link the 2 blocks and the existing bridge


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 71

Breathable wall Timber louvers and woven wall

Hierarchy Higher volume for adminstration area to create hierarchy

Pitched roof Local context + ensure excellent ventilation


72 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Perspective rendering Access from water way / by boat


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 73

Perspective rendering Access from bridge to the main building


74 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

DN

Resourse room

Section A-A

0m 0m

3m5m

6m10m

9m15m

20m

25


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 75

DN

Resourse room

Section B-B

0m 0m

3m5m

6m10m

9m15m

20m

2


76 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Open plan/ Water Courtyard Open plan is to allowed them to have any kind of learning style or method that suite them. Level 1 and level 2 can also be the place for gathering if thereâ&#x20AC;&#x2122;s any celebration or events. Hence intent to have railing that facing towards the water courtyard at every level which could see the centre point at different height/ platform.

Refuse On water class

Kitchen

Floating deck

Canteen

Class

Floating deck

Multipurpose area

Floating deck On water class

Class

Class On water class

Left: Ground floor plan To show the space using if thereâ&#x20AC;&#x2122;s gathering right: Exploded Axonometric Showing the 2 levels when having events at water courtyard


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 77

Multipurpose area (level 1) Interior space rendering


78 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Building elements

Pitched roof

Suspended ceiling

Curtain timber louvers Internal woven wall Double volume space Bamboo stri ps partition Open plan

Floating deck

Sectional axonometric (Adminstration building) Labeling of the building elements of adminstration block


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 79

Ventilated roof space help to cold dpwn the building Suspended ceiling made of bamboo provide good acoustic and create warm and comfort

Curtain timber lovers, woven wall and bamboo strips internal wall provide better ventilation to the space

Double volume space give cooling effect and help to provide ample of light to enter the building Floating deck for access from waterway

Open interior spaces with minimal partition to allowed good ventilation.

Building elements diagram Explaination of the building elements


80 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Recycled poly aluminium roofing

Timber flooring

Breathable wall

Timber structure

Concrete piling

Walkway towards office (Level 3) interior space rendering

Construction exploded axonometric Showing buidling construction and materials


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 81

Construction materials The material selection is more towards recycled materials or local materials.

Woven wall Bajauâ&#x20AC;&#x2122;s have the skill to do woven. It also act as sun protection

Bamboo bio-panel wall Consist 2hr fire rating, Moisture resist and termite resistant

Timber construction system Mostly all the structure are using timber as it is the local material and some Bajau have good skill in handling wood

Bamboo strips internal partition It does not absorb humidity and provide better sound insulation

Recycled poly-aluminium roofing Itâ&#x20AC;&#x2122;s a type of metal roofing produce by compressed the poly-aluminium from the recycled drink pack. The plastic and aluminium layers can be extracted and recycled into roofing tile.


82 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Canteen (level 1) interior space rendering


9° Fall

Level 3 FFL:7500

9° fall recycled polyaluminium metal roofing

G.I. gutter 89mmx 286mm timber rafter Timber column Timber louvers facade treament

1100mm (h) timber railing

Level 2 FFL:4000

50mmx 100mm timber floor joist

125mmx 50mm timber beam

89mmx 140mm slanted timber column

Level 1 FFL:0 Construction details Canteen space detailing with scale 1:50

Timber flooring 50mmx 75mm timber floor joist 125mmx 50mm timber beam


84 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

1

Canteen Facade- Perspective Scale: NTS

Building structure

Horizontal beam support

Building structure Timber framing Horizontal fixed louvers panel Horizontal beam support Vertical adjustable timber

2

REF

Timber framing louvers panel

Facade Assembly Detail- Exploded Axonometric Scale: NTS

DATE

Horizontal fixed louvers panel AMENDMENT

PROJECT TITLE:

CLIENTS:

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH ................................................

Facade assembly Building facade exploded axonometric

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

DRAWING NAME:

YHS ARCHITECT

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

CANTEEN FACADE PERSPECTIVE FACADE ASSEMBLY DETAIL- EXPLODED AXONOMETRIC

Vertical adjustable timber louvers panel SCALE :

AS SHOWN

DRAWN

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

20/007/CD/4000/410

REVISION:


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 85

9° fall recycled poly-aluminium roofing Roof coping to detail

Level 3

timber louvers wall

FFL:7500

140mmx 140mm timber column

timber louvers frame Level 2 FFL:4000

Thread= 280mm(w), riser=174mm (h), 1400mm width timber staircase

9° fall recycled poly-aluminium roofing Flashing Metal cap flashing with isolated layer Timber support cap

Fastener 150mmx 75mm timber batten 180mmx 180mm timber column

89mmx 186mm timber rafter with mortise& tenon joint c/w dowel pin lock to column

Level 1 FFL:0

125mmx 50mm timber beam

120mmx 10mm timber louvers panel

180mmx 180mm timber column Facade section (1:50) and connection details (1:15) Some specification for the louvers curtain wall facade

50mmx 25mm louver's timber frame


86 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

DN

Resourse room

Main building Elevation 1

0m 0m

5m5m

10m 10m

15m 15m

20m

25


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 87

DN

Resourse room

Main building Elevation 2

0m 0m

5m5m

10m 10m

15m 15m

20m

25


88 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

to the land (real space)

Public square

Site elevation 2

Housing development


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 89

DN

Resourse room

to the existing village

Main school building

0m 0m

5m5m

10m 10m

15m 15m

20m

2


90 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Rebuilt their home...


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 91

Future development

2.

3.

1.

4.

Single dwelling (Type A)

Building element: 1. Water courtyard 2. Bridge linkage 3. Platform to water 4. On stilt

1.

Shared room unit (blocks)

2. HOUSING DEVELOPMENT

Single dwelling (Type B)


92 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Housing Units for Bajau Community As the burnt on 2015, many of them didnâ&#x20AC;&#x2122;t have house and is forced to stay at the temporary camp. proposed to rebuilt their home so that they can have a better living quality. Refering to the space planning of Bajau House boat and traditional house, proposed some housing layout for local and the staff as well. Some of the houses can become shoplots as it near to the public square.

pentan (dry clothes / fishes)

Houseboat

Diom Luma ( Main hall) Bridge (link) Small boat

4ft width (roofed)

The characteristic of traditional Bajau living space They start from living on boat. Normally will have a house boat (lepa/ bayanan) follow by a few small boat (Gubang/ boggo-boggo/ Tempel) As the need of water and fuel from land, some of them will stop by the land to get the daily needs. They started to build houses on stilt. The plan of the stilt house contaning a big main hall spaces follow by the small activity spaces attached around the main hall. Main hall is where they sleep or having ceromony Design with some characteristic from their living culture, the space provided in housing development are mainly open plan with all the small activity spaces attached along the main space. top left: Bajau house boat characteristic collage top right: Typical space planning of Bajau stilt house bottom: Bubble diagram of proposed housing development layout

Kusih (cobbler/ kitchen)

Kitchen

Toilet Bridge linkage UNIT Services Boat laid by/ platform


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 93

Main school building

B

A

B

A DN

Resourse room

Future development

Public square

0m 0m

From real space (land) Housing development key plan Highlighted showing different type of housing development

5m 10m

10m 20m

15m 30m

Legend Shared room unit Single dwelling (Type A) Single dwelling (Type B)

20m

25m


94 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

unit A2-4

Shared room unit unit A2-1

Double storey with shared kitchen and living area. Also proposed a courtyard at the middle. Every unit have own 4ft walkway and balcony with attached bathroom. unit A2-3 unit A2-2 common space common space

Level 2

DN

Room

unit A1-4

Resourse room unit A1-1

Walkway Balcony

unit A1-3

Yard

unit A1-2

tap.

ft

Common space Yard

left: Unit layout plan top right: Block A (level 2) Plan bottom right: Block A (level 1) Plan

0m 0m

5m

10m 1.5m

15m

20m

Shared kitchen

Shared kitchen

Foyer

0m 0m

25m

Level 1

3m5m

6m10m

15m


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 95

left: Sapce axonometric of Block A top right: View of the courtyard bottom right: Exterior view of the shared room unit


96 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

4ft Platform

Room

Yard Single dwelling (Type A) tap.

Open plan dwelling house with private kitchen . Dual access one is from platform and another one is from yard which link to the bridge. This layout is come with double pitch roof

Kitchen

ft left: Unit layout plan right: Single dwelling type A exterior view

0m 0m

5m

10m 1.5m

15m

20m

25m


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 97

4ft Platform

Room

Yard Single dwelling (Type B) Open plan dwelling house with open kitchen . Dual access one is from platform and another one is from yard which link to the bridge. This layout come with single pitch roof

Open kitchen ft

left: Unit layout plan right: Single dwelling type B exterior view

0m 0m

5m

10m 1.5m

15m

20m

25m


98 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

DN

Resourse room

Single dwelling type A

Section A-A showing section of single dwelling unit

Bridge linkage

Single dwelling type B

0m 0m

3m5m

6m10m

9m15m

20m


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 99

DN

Resourse room

Single dwelling type B

Section B-B Showing section of shared room unit and the single dwelling unit type B

Shared room unit

0m 0m

3m5m

6m10m

9m15m

20m


100 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Linkage to the real space


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 101

housing development

1. 4. 2. 3.

3. PUBLIC SQUARE

Building element: 1.Services hub 2. Multi purpose bridge with pocket seating 3. Floating platform 4. Reading corner


102 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Public Square A multi purpose space aim to boost the economy and act as a place for recreation at the same time. Using one of the iconic element of their village, bridge as main element of the public square. The bridge is with multifunction attached with some services area. Thereâ&#x20AC;&#x2122;s a services hub attached with public toilet and storeroom. continue with a bridge with pocket seating connected to a floating platform at the outer area( near to the main access of boat) Pocket seating area allowed to have trading activities like weekend bazaar. During weekday, it was a place for recreational/ chit-chating. Floating platform is like jetty for gathering especially the annual regetta festival. Also proposed pocket reading corner which could be place around Kampung Bangau-bangau

top: Collage of possible activities at the public square bottom: Bubble diagram for the public square

Festival

Trading

Services area

Selling platform (on water/on bridge/ in front of houses)

Reading corner PUBLIC SQUARE

Self- sustain technology to generate energy

Floating platform jetty


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 103

Housing development

3.

DN

Resourse room

1.

2. 4.

From real space (land)

Public square layout plan

0m 0m

5m5m

10m 10m

Legend 1. Services hub 2. Bridge with pocket seating 3. Floating platform 4. Reading corner

15m 15m

20m


104 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Refuse

s

ge acces

Main brid

The services hub Consists of public toilet, storage area and services area. Services contain of M&E room and refuse chamber. It is placed near to the main bridge .

left: Perspective view of services hub top right: Plan of services hub bottom right: Isometric view of services hub

Public toilet

Store

M&E to the floating platform seatings


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 105

Pocket seating bridge The bridge with pocket seating area is proposed to be a recreational area for them to chit chat. It also could serve as a place for trading like weekend bazaar. Itâ&#x20AC;&#x2122;s surrounded by water ways

left: Perspective view of the bridge top right: Layout plan of the bridge bottom right: Isometric view of the bridge


106 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Floating platform jetty This floating platform jetty is to allowed tourist/ local to hop on the boat more easier. As it could be one of the tourist spot to explore the Bajau’s culture. Besides, if there’s any festival or celebration, the whole public square could act as a stage.

left: Perspective view of floating platform top right: Layout plan of the floating platform bottom right: Isometric view of the floating platform


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 107

Class

Reading corner

Class

Proposed to have some reading corner around Kampung Bangau- Bangau. It could be a small area / platform along the bridge so that more children could get the source of knowledge.

top left: Perspective view of the reading corner top mid: Section of the reading corner top right: Layout plan of the reading corner bottom right: Isometric view of the reading corner

On water class


108 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Evaporation technology to generate electricity Timber column to engr's details

Proposed to have evaporation panel under the bridge to generate electricity to supply to the local. Via evaporation, the spinner at the panel will turn and via motion could generate electricity. All the cable are round under the bridge which linking into the village.

150 x 12 mm timber panel 75x 150 mm timber batten

Evaporation panel

Ev de

Bridge section

Dy

Timber column to engr's details 150 x 12 mm timber panel

Hollow section holder Connecting coil

75x 150 mm timber batten

Hinge to hold the panel dynamo Holding rod

Evaporation panel

Turbine with 'SPORES'

left: Exploded isometric of bridge to show the installation of the panel top right: Section of the bridge bottom right: Connection details of the panel to bridge

Evaporation

Cdy


DESIGN REALISATION - ADAPTIVE ARCHITECTURE | 109

Overall development isometric view


110 | DESIGN REALISATION - ADAPTIVE ARCHITECTURE

Check out the video of : video 1: mood and sense collection of on water village at Kuala Selangor and Kuala Sepetang https://www.youtube.com/watch?v=mjPCWmorV-I

video 2: with walkthrough of the proposed building https://www.youtube.com/watch?v=I4xQOVDGt24&feature=youtu.be

at the link attached to have more visual effects and impression about this project.

top: Project 2 video thumbnail- collection of mood and sense bottom: Project 3 video thumbnail - partly project 2 video with project 3 walkthrough


Redefine their deixis Let them living parallel with real space...


REFLECTION

The culture and way of living for Bajau people was really interesting. They posses different skill like diving, carving, woving... There’s a lot’s of tales about them and I really enjoy reading their story and know them more. Besides’ throughout the works, I learnt some new skill like compiling a documentation, framing an artwork, model making. I would like to thanks to everyone who guide me along the way of my project. Hopefully through my project, you may understand more about tales of Bajau Laut, appreciate and redifine their deixis so that they could live parallel with us, people from real space.

Yeap Huei Sze UCSI University Bachelor of Science (Hons) in architecture Year 3// Sem 6 Jul- Nov 2020 Intergrated architecture design project_ Unit F Filling the void between the real space


Filling the void between the real space Portfolio by Yeap Huei Sze Intergrated architecture design project_ Unit F UCSI University Bachelor of Science (Hons) in architecture Year 3// Sem 6 Jul- Nov 2020


Filling the void between the real space Education | Housing | Public Square

Technical report Planning and building guideline Heritage management strategy and consideration Building construction and technology Buidling environment design & sustainability strategy Building services

Prepared by, Yeap Huei Sze


2 | TECHNICAL REPORT | PLANNING AND BUILDING GUIDELINE

1.0 PLANNING AND BUILDING GUIDELINE 1.1 BUILDING SETBACK REQUIREMENT

A 3.5 acres development in between Kampung Bangau-Bangau. I choosen the site between the burnt up area and the existing village . Building typology was education, housing and public square. As for education, which is under institutional , the building setback require 10m from front and 4.5m from the sides and rear

refering to Kota Kinabalu Plan 2020- memorandom (draft)

1.2 UBBL SITE PLANNING REQUIREMENT 1.2.1 UBBL clause 134. designation of purpose group

SCHEDULE OF AREA

Refer to schedule 5 in UBBL, the proposed design is under:

MAIN SCHOOL BUILDING Level

Space

Ground Floor Multipurpose area

purpose group I: small residential purpose group II: Institutional purpose group: III: Other residential

Institution Shared room housing Single dwelling housing Public square

Space Foyer

Area (m² ) 9.23

Dwelling

Main room

26.45

Entrance deck

23.93

(Type A)

Bathroom

4.74

Open deck

12.45

No of unit: 4

Open kitchen

7.30

1.75

circulation

12.67

Kitchen

35.64

Toilet 2

23.57

Canteen

Yard

9.18

Total area per unit Total area for 4 units of Type A

56.90 227.60

Single

Foyer

9.14

251.24

Dwelling

Main room

26.4

Refuse Chamber

13.11

(Type B)

Kitchen

7.28

Scatter class 1

29.55

No of unit: 12

Bathroom

4.82

Scatter class 2

30.13

Yard

Scatter class 3

30.13

Total area per unit

729.96

9.18

Total area for 12 units of Type B

Class 1

87.29

Shared room

Room

Class 2

66.36

No of unit:24

Balcony

Class 3

47.13

Bath

Class 4

39.06

Total area per unit

Class 5

38.24

Walkway

39.74

Link bridge

28.47

Circulation

172.49

Sub-total

518.78

Second Floor Office

Master plan

Type Single

51.31

Sub-total

Third Floor

214.48

Toilet 1

Lift

First Floor

HOUSING DEVELOPMENT Area (m² )

73.40

56.82 681.84 21.55 4.82 4.35

Total area for 24 units of shared room Total housing developed area (m²)

30.72 737.28 1646.72

PUBLIC SQUARE Amenities Services hub

Space Store

Area (m² ) 19.18

Manager room 1

10.79

Toilet (F)

7.87

Manager room 2

10.52

Toilet (M)

7.93

Meeting room

21.21

OKU Toilet

4.55

Pantry

15.43

M&E

8.98

Toilet

15.98

Refuse Chamber Sub-total

8.12 56.63

Circulation

186.01

Sub-total

333.34

Bridge market Bridge

346.86

Resource room

103.47

Floating jetty

148.53

Circulation

29.92

Sub-total

133.39

Floating

Floating deck 1

46.54

Structure

Floating deck 2

21.23

Floating deck3

24.70

Sub-total Total school building area (m²)

Floating jetty

Total public square area (m²)

552.02

92.47 1807.94

Total developed area (m²)

Schedule of area of the whole development

4006.68


PLANNING AND BUILDING GUIDELINE | TECHNICAL REPORT | 3

1.3 PASSIVE BOMBA DESIGN 1.3.1 Compartmentation Clause 134,136,138, Fifth schedule 3.4m

As the area of building are still under limits of dimension, no compartmentation are needed.

9.4m

level 4

12.5m

13.4m

4.4m

level 3

11.5m

Fifth schedule: Designation of purpose group 1.7m 0.6m

1.3.2 exits and evacuation UBBL Clause 165. Measurement of travel distance to exists UBBL Clause 168. Staircase UBBL Clause 172. Emergency exit signs UBBL Clause 177. Computing number of staircase and staircase width UBBL Clause 181. Width of means of engress Seventh schedule

8.3m

level 2 8.1m

9.3m

7.2m

Measurement of travel distance Dead end limit for : purpose group I : No requirement purpose group II- school : 6m purpose group III- flats : 10m Unsprinklered purpose group I : No requirement purpose group II- school : 45m purpose group III- flats : 30m (source: UBBL seventh schedule)

Calculation of exits width Purpose group II Ground floor exit width =[ floor area/ occupancy load/ capacity exit (door) ] x 0.55 =[ 729.96/ 2/100] x0.55 = 2.007m

level 1

Verticle exits ( staircases) of the main school buildingâ&#x20AC;&#x2122;s plan ( purpose group II)

50% of width of main exits is required, proposed : main exits (school): 3.5 m bridge exits and open space. main exits (canteen): 2.2m bridge exits, 2.4m bridge exits (at kitchen)

6.3m

Purpose group III Ground floor exit width =[ floor area/ occupancy load/ capacity exit (door) ] x 0.55 =[ 271/ 24/100] x0.55 = 0.062m 50% of width of main exits is required, min 700mm width of exit, proposed : main exits: 1.8 m bridge exits secondary exits: 1.8m bridge exits

13.5m

level 1 Verticle exits (staircases) of the housing unit shared room (purpose group III)

13.5m

6.3m

level 2


4 | TECHNICAL REPORT | PLANNING AND BUILDING GUIDELINE

Calculation of staircase exits width Purpose group II: Institutional Largest floor area (gross) = 518.78m2 Occupancy load (7th schedule ) for purpose group II institutional in occupancy load per square meter is 2 nett. Capacity exit for stairs is 22 person /unit. Net floor area = 87.29+66.36+47.13+39.06+38.24 = 278.08m2 Total exit width required = (floor area/occupancy load per sqm/ capacity exit) x550mm = (278.08/ 2/ 22) x 550 = 6.85 x 550mm = 3476mm 4 number of staircase proposed, the width of staircase will be as follow, total width 3476/3 = 1158.66mm width of one staircase... Staircase Staircase Staircase Staircase

1 = 1.6 m width 2 = 1.5 m width 3 = 1.6 m width 4 = 1.2 m width

Verticle accesss of main school building (purpose group II) Space exploded axonometric

Purpose group III: Flat Largest floor area (gross) = 107.46m2 Occupancy load (7th schedule ) for purpose group III other residential in occupancy load per square meter is 24 gross. Capacity exit for stairs is 45 person /unit. Total exit width required = (floor area/occupancy load per sqm/ capacity exit) x550mm = (107.46/ 24/ 45) x 550 = 54.72mm UBBL clause 194 Building with single staircase is permitted in any building if the top most floor doesnâ&#x20AC;&#x2122;t exceed 12m in height. 1 number of staircase proposed, the min width of staircase shall be 700mm , hence: Staircase provided = 1.45m width

Verticle accesss of main school building (purpose group III)


PLANNING AND BUILDING GUIDELINE | TECHNICAL REPORT | 5

1.4 ACTIVE M&E INTERTVENTION (UBBL PART VIII) 1.4.1 Fire extinguishment system UBBL Clause 225. Detecting and extinguishing fire, 10th schedule Extinguishing system, fire alarm system and emergency lighting requirement: purpose group I : No requirement purpose group II- school : Hosereel purpose group III- flats : No requirement level 4

level 3

level 2

UBBL 10th schedule

Hosereel calculation means of detection GFA/ 800m2 Ground floor = 729.96/800 = 0.9 (1 required)

Second floor = 333.34 /800 =0.41 (1 required)

First floor = 518.78 / 800 =0.65 (1 required)

Third floor = 133.39 / 800 = 0.16 (1 required)

1.4.2 other consideration in connected to active fire requirement UBBL Clause 247. Water storage level 1

Water storage capacity, Min quantity of water required for the first hosereel system is 2275 litres. For each additional hosereel, 1137.5 litres up to max 9100 litres

Hosereel Exit sign

number of hosereel= 4 2275 + (1137.5 x 3) = 5687.5 litres

Hosereel and exit sign indication of main school building (Purpose group II)

Proposed a 6000 litres water tank

Hosereel system


6 | TECHNICAL REPORT | HERITAGE MANAGEMENT STRATEGY & CONSIDERATION

2.0 HERITAGE MANAGEMENT STRATEGY & CONSIDERATION 2.1 Cultural Heritage Thereâ&#x20AC;&#x2122;s lots of cultural heritage on site which is significant to the site.

2.2 Proposed remain and preserve the culture and way of living Proposal preserved some characteristic of existing cultural heritage like woven wall,, stilt houses, platforms, water way access, likage bridge and so on...


BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 7

3.0 BUILDING CONSTRUCTION & TECHNOLOGY

3.1 Site strategy

3.2 Substructure

Locate the building in between the existing and burnt up area as my main intention is bring the local communities back to their place.

Proposed using concrete pile foundation as it can hold more load and more sustainable.

3.3 Superstructure As timber is widely used in Kampung Bangau- Bangau, proposed to used timber construction as it is more context towards the Bajau community. I did explore few types of traditional timber joinery and implied them and certain space of the building

3.4 Facade treatment Using timber louvers curtain wall as sun protection and act as breathable wall

3.5 Material and finishes Selected material is more local context and recycleable Woven wall panel Bajau have skill to make woven craft. Proposed to use the woven panel as some part of wall, so they could actually create their wall by themselves

Bamboo bio panel wall a laminated fibre wall

Insulated & resistant recycled poly- aluminium metal roof less heat absorb, can be made by aluminium abstract from milk carton


8 | TECHNICAL REPORT | BUILDING CONSTRUCTION AND TECHNOLOGY

Bamboo glass wool suspended ceiling provide better acoustic create warm and comfort.

H

90mmx 185 mm timber ridge board Recycled poly- aluminium roofing 75mmx 50mm tmber purlins 75mmx 150mm timber rafter Hanging rod to timber joist Hanging bar connected to king post 75mmx 150mm timber tie beam Suspended bamboo ceiling Roof beam level FFL:14500

2

2

402

Ceiling Scale 1 :

Timber louvers curtain wall 150mm timber round column 12mm thk timber flooring 50mm x75mm timber floor joist Resource room

3

Level 4

402

FFL:11000

Woven wall

1

REF

DATE

Wall to slab to ceiling detail

3

Scale 1 : 50

AMENDMENT

PROJECT TITLE:

CLIENTS:

Floor t Scale 1 :

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH Roof coating

YHS ARCHITECT

Timber Finish MENARA SENIBINA B25-01, ................................................ MENARA GADING, TAM Timber Finish is a translucent pigmented varnish based on Solaroof is specially formulated for roof tiles painting and JALAN CONNAUGHT, 56000 KUALA LUMPUR 6258 5888 Modified Flexible Long Oil Alkyd which provides colour to repainting, and with innovative Sunblock Technology helps F:T: 603 603 6258 8885 UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD BAJAU ADAPTIVE ARCHITECTURE SDN BHD E: yhsarch@gmail.com wood surfaces, highlighting the natural wood grains. It will to reflect heat and reduce surface temperature up to 5°C, W: yhsarch.com.my not crack, peel or blister by exposure to weather. which plays a role in helping heat resistance on roof tiles caused by UV rays, leaving energy saving and gives you a more comfortable indoor feeling. Product Features: • High Transparency Product Features: • Fungus Resistance • Heat resistance with So• UV Resistance lareflect technology • Weathering Resistance • Reduces surface tempera• Flexible ture up to 5°C • Prevent water penetration • Fungus & algae resistance • Dirt resistance • Long lasting • Low odour & low VOC CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH


BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 9

3.6 Construction Exploded Axonometric

Roof Insulated & resistant recycled poly- aluminium metal roof less heat absorb, can be made by aluminium abstract from milk carton. Apply the solaroof coating to improve the insulation of heat .

Ceiling Suspended bamboo ceiling provide acoustic and comfort Flooring Timber panel flooring to suite the context

Railing Timber railing

Wall -Bamboo Stri ps internal wall -Bamboo bio-panel wall -Woven wall Using recycle material / local woven skill to create the building elements

Timber louvers fixed louvers panel on top to ensure ventilation

Facade Timber louvers panel curtain wall act as breathable wall which ensure ventilation

Structure timber construction with some scalfolding framing arrangement to allowed water way access. Also, it is a local material and construction method

Sub- Structure Concrete piling which could sustain longer


10 | TECHNICAL REPORT | BUILDING CONSTRUCTION AND TECHNOLOGY

3.7 Construction Details

Canteen Facade- Perspective

1

Scale: NTS

Building structure

Horizontal beam support Timber framing Horizontal fixed louvers panel

2

REF

Vertical adjustable timber louvers panel

Facade Assembly Detail- Exploded Axonometric Scale: NTS

DATE

PROJECT TITLE:

AMENDMENT

CLIENTS:

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

YHS ARCHITECT MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

................................................

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

CC

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

CANTEEN FACADE PERSPECTIVE FACADE ASSEMBLY DETAIL- EXPLODED AXONOMETRIC

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

REVISION:

20/007/CD/4000/410

12

11 1 407

2 407 4655

9° Fall

Recycled poly-aluminium metal roofing 150mm x75mm timber batten 89mmx 286mm timber rafter

Level 3 FFL:7500

9° Fall

9° fall recycled polyaluminium metal roofing

G.I. gutter

Level 3 FFL:7500

89mmx 286mm timber rafter

140mmx 200mm roof beam

Timber column

200mm depth G.I. gutter

Timber louvers facade treament

140mmx 140mm timber column

1100mm (h) timber railing 89mmx 140mm slanted timber column

Level 2 FFL:4000

1100mm (h) timber railing

Level 2

50mmx 100mm timber floor joist

FFL:4000

125mmx 50mm timber beam

125mmx 50mm timber beam

125mmx 50mm timber beam with mortise and tenon joint c/w dowel lock to column

Timber flooring

Level 1

89mmx 140mm slanted timber column

Timber flooring

Level 1

50mmx 75mm timber floor joist

FFL:0

FFL:0

125mmx 50mm timber beam

1 REF

DATE

Floor slab to roof detail A-A

2

Scale 1 : 50 AMENDMENT

PROJECT TITLE:

Floor slab to roof detail B-B Scale 1 : 50

CLIENTS:

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

YHS ARCHITECT

................................................

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

FLOOR SLAB TO ROOF DETAIL A-A FLOOR SLAB TO ROOF DETAIL B-B

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

20/007/CD/4000/408

REVISION:

REF


BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 11

BB

AA 9° fall recycled poly-aluminium roofing Roof coping to detail

2 409

Level 3

AA

FFL:7500

140mmx 140mm timber column timber louvers wall 9° fall recycled poly-aluminium roofing

2094

Flashing Metal cap flashing with isolated layer Timber support cap Level 2 FFL:4000

Thread= 280mm(w), riser=174mm (h), 1400mm width timber staircase

Fastener

timber louvers frame

150mmx 75mm timber batten 89mmx 186mm timber rafter with mortise& tenon joint c/w dowel pin lock to column

180mmx 180mm timber column 50mmx 25mm louver's timber frame 120mmx 10mm timber louvers panel 180mmx 180mm timber column

Level 1

125mmx 50mm timber beam

FFL:0

1 REF

DATE

Floor slab to roof detail (facade)

2

Scale 1 : 50

AMENDMENT

PROJECT TITLE:

Roof coping detail Scale 1 : 10

CLIENTS:

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

YHS ARCHITECT MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

................................................ CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

ROOF TO WALL CONNECTION (FACADE) ROOF COPING DETAIL

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

REVISION:

20/007/CD/4000/409

Recycled poly-aluminium roofing

90mmx 285mm timber ridge board 75mmx 50mm timber purlins 114mmx 114mm timber king post 75mmx 150mm timber rafter 75mmx 150mm timber tie beam l4 Lev e 1000 :1 FFL

suspended bamboo ceiling to detail Resource room

Timber louvers curtain wall l3 Lev e 500 :7 L FF

Meeting room

75mm thk bamboo woven panel wall

Office

50mm thk bamboo strips internal partition

l2 Lev e 000 :4 L F F

Thread= 280mm, Riser=175mm timber staircase to details Class

Lev e

140mmx 140mm timber column 12mm thk timber panel flooring

l1

Thread= 280mm, Riser= 176mm timber staircase link to floating platform

FFL:0

el r Lev Wate 0 0 0 3 FFL:-

Timber floating platform

Concrete pile foundation with pile cap to engr's details

1 DATE

Overall Typical Detail- Sectional Axonometric Scale: NTS AMENDMENT

PROJECT TITLE:

CLIENTS:

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

YHS ARCHITECT

................................................

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

OVERALL TYPICAL DETAIL- SECTIONAL AXONOMETRIC

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

20/007/CD/4000/411

REVISION:


12 | TECHNICAL REPORT | BUILDING CONSTRUCTION AND TECHNOLOGY

2 3 4

5

13500

Timber flooring Timber column

14600

B Thread= 280mm, Riser=175mm timber staircase to details

UP

C 1100mm height timber railing to details

1 2 3

1702

4 5 6 7 8

16280

9

DN 20

D

19

18

15

16

17

13

14

12

11

10

1 405

20 19 18 17

1792

16 15 14 13 11

7 294

18050

E

12

1

2

9

8

7

6

5

4

3

10

2172

3641

Office

1

Staircase detail plan (Level 3) Scale 1 : 50

PROJECT TITLE:

DMENT

CLIENTS:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

PROJECT ARCHITECT:

YHS ARCHITECT

5

4

................................................

3

2

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com yhsarch.com.my W: 2791

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

7571

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

2764

2016

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

STAIRCASE DETAIL PLAN

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

REVISION:

20/007/CD/4000/404

Resource room

Level 4 FFL:11000

150mm dia timber round column

1 406

Office

Level 3

20

FFL:7500

75mmx 50mm timber floor joist

19 18 17

1738

16

Thread= 280mm, Riser=175mm timber staircase to details

15

1050

14 13 12 11 10 9

50mm thk bamboo wall internal partition

8 7

75mmx 150mm timber landing joist

1750

6 5 4

12mm thk timber flooring

3 2

Class

Level 2

1

FFL:4000

1 AMENDMENT

Staircase detail section Scale 1 : 50 PROJECT TITLE:

CLIENTS:

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

YHS ARCHITECT

................................................ CHEW JEN LYNN PENGARAH

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

STAIRCASE DETAIL SECTION

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI

CONSTRUCTION DRAWING


BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 13

Timber column Timber beam connect to column by mortise and tenon joint (tanggam) with wooden wedge lock

Timber linx connection with galvanised threaded rod w embedment secure using e-poxy to engr's details Concrete piling with concrete pile cap to engr's details

Timber wedge

Slanted beam

3-1

Mortise and tenon joint with timber dowel lock

3-1 50mm thk bamboo bio-panel wall c/w water resist finishes at exterior

Column to foundation connection details

1

Scale 1 : 10

HH REF

DATE

75mmx 25mm timber wall stud with horizonal rail CLIENTS:

PROJECT TITLE:

AMENDMENT

2

Typical column to beam connection details Scale 1 : 10

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

YHS ARCHITECT

50mm thk bamboo bio-panel wall ................................................ 12mmwater thk suspended timber c/w resist finishes at flooring UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE BHD floor joist 75mmx 50mmSDN timber BAJAU ADAPTIVE ARCHITECTURE SDN BHD exterior

Level 1

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

FFL:0

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

COLUMN TO FOUNDATION CONNECTION, TYPICAL COLUMN TO BEAM CONNECTION DETAIL

DATE

04/10/2020

CHECKED : AR HISHAM

Level 1 FFL:0

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

REVISION:

20/007/CD/4000/413

Bamboo Bamboostrips stripsceiling ceiling

25mm timber wall stud with 75mmx 125mmx 50mm timber beam 90mmx 185 timber ridge board 90mmx 185mm mm timber ridge board horizonal rail Wall polysill (bendul) withroofing mitered Recycled aluminium Recycled polyaluminium roofing double bridle joint at corner 75mmx 50mm 75mmx 50mm tmberpurlins purlins 12mm thk tmber suspended timber flooring 140mmx50mm 140mm timber column 75mmx timber floor joist 75mmx 75mmx150mm 150mmtimber timberrafter rafter

g

:

Suspended Suspendedceiling ceilingholder holder 50mm 50mmxx150mm 150mmtimber timberbeam beam 125mm 125mmxx50mm 50mmtimber timbermullion mullion 120mmx 120mmx10mm 10mm timber timberlouvers louverspanel panel

125mmx 50mm timber beam Hanging Hangingrod rodtototimber timberjoist joist Wall sill (bendul) with mitered double joint at Hanging bar connected totocorner king Hanging barbridle connected kingpost post

50mm 50mmxx50mm 50mmwood woodpiece piece

75mmx 150mm timber tie 75mmx 150mm timber tiebeam beam 140mmx 140mm timber column Suspended Suspendedbamboo bambooceiling ceiling

2

Floor to wall connection with wall sill details 22 Scale 1 : 10

22

402 402

Ceiling, Ceiling,beam beamand andwall wallconnection connection Scale Scale11: :10 10

Timber Timberlouvers louverscurtain curtainwall wall

2

150mm 150mmtimber timberround roundcolumn column

Scale 1 : 10

ROJECT ARCHITECT:

SCALE thk :thkAS SHOWN flooring DRAWN 12mm timber 12mm timber flooring

DRAWING NAME:

YHS ARCHITECT MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

om oom

OJECT ARCHITECT:

YHS ARCHITECT MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

HOUSING UNIT- SHARED ROOM SECTION, FLOOR TO WALL CONNECTION WITH WALL SILL DETAILS

DATE

:

04/10/2020

DRAWING NO.: 33 20/007/CD/4000/417 402 402 SCALE :

AS SHOWN

DRAWN

DATE

04/10/2020

CHECKED : AR HISHAM

:

Skirting Skirting

50x5050x50 mm square timbertimber handrail mm square handrail

REVISION:

HOUSING UNIT- SHARED ROOM SECTION, FLOOR TO WALL CONNECTION WITH WALL SILL DETAILS

50mmx 50mmx150mm 150mmtimber timberbeam beam

: YEAP HUEI SZE

50mm50mm thk timber stringer thk timber stringer

timbertimber balustrade balustrade

1100mm heightheight timbertimber 1100mm baluster to detail 2/4062/406 baluster to detail

CONSTRUCTION DRAWING

Woven Wovenwall wall 280mm(w) timber thread

CLIENTS: CLIENTS:

50mmx 50mmx75mm 75mmtimber timberfloor floorjoist joist

33

Floor Floortotowall wallconnection connection Scale Scale11: :10 10

PROJECT PROJECTARCHITECT: ARCHITECT:

175mm(h) riser riser boardboard 175mm(h) ................................................ ................................................ CHEW CHEWJEN JENLYNN LYNN PENGARAH PENGARAH NONOK/P K/P: 880123-00-0212 : 880123-00-0212

Carriage Carriage

BAJAU BAJAUADAPTIVE ADAPTIVEARCHITECTURE ARCHITECTURESDN SDNBHD BHD A-55-01, A-55-01,TAMAN TAMANPORNA, PORNA,JALAN JALANBANGAU BANGAU6/6/1, 1, KAMPUNG KAMPUNGBANGAU-BANGAU, BANGAU-BANGAU,91308 91308SEMPORNA, SEMPORNA,SABAH SABAH

Staircase connection to floor details Staircase connection to floor details 1 1Scale Scale : 10 1 : 10

Curtain Curtainwall walltimber timberframe frame Expansion Expansiongap gap

280mm(w) timber thread REVISION: 270mmx 80mm80mm timbertimber beam beam 270mmx 20/007/CD/4000/417 12mm 12mm thk timber flooring thk timber flooring

DRAWING NO.:

75mmx75mmx 50mm50mm timbertimber floor floor joist joist

KTETUAN TETUANBAJAU BAJAUADAPTIVE ADAPTIVEARCHITECTURE ARCHITECTURESDN SDNBHD BHD

Timber Timberfloor floorfinishes finishes

CONSTRUCTION DRAWING

GAN MEMBINA NGAN MEMBINA11UNIT UNITINSTITUSI INSTITUSI33TINGKAT TINGKATDI DIATAS ATASPT PT KAMPUNG KAMPUNGBANGAUBANGAU-BANGAU, BANGAU,91308, 91308,SEMPORNA SEMPORNASABAH SABAH

SZE

CHECKED : AR HISHAM

DRAWING NAME:

TITLE: TITLE:

120mm 120mmxx10mm 10mmtimber timberlouvers louverspanel panel

: YEAP HUEI SZE

50mm 50mmx75mm x75mmtimber timberfloor floorjoist joist

Level 3 Level 3 FFL:7500 FFL:7500

1

50mm 50mmthk thkbamboo bamboobio biopanel panelwall wall

Floor to wall connection with wall sill details

DRAWING DRAWINGNAME: NAME:

YHS YHSARCHITECT ARCHITECT MENARA MENARASENIBINA SENIBINAB25-01, B25-01, JALAN JALANMENARA MENARAGADING, GADING,TAMAN TAMAN CONNAUGHT, CONNAUGHT,56000 56000KUALA KUALA LUMPUR LUMPUR T:T:603 6036258 62585888 5888 F:F:603 6036258 62588885 8885 E:E:yhsarch@gmail.com yhsarch@gmail.com yhsarch.com.my W:W:yhsarch.com.my

2

50mm50mm thk timber stringer boardboard thk timber stringer Mortise and tenon connection to thread Mortise and tenon connection to thread

WALL WALLTO TOSLAB SLABTO TO CEILING CEILINGDETAILS DETAILS thread thread

SCALE SCALE: : AS ASSHOWN SHOWN

DRAWN DRAWN

DATE DATE : : 04/10/2020 04/10/2020

CHECKED CHECKED: :AR ARHISHAM HISHAM

CONSTRUCTION CONSTRUCTIONDRAWING DRAWING DRAWING DRAWINGNO.: NO.:

20/007/CD/4000/402 20/007/CD/4000/402

Baluster detail Baluster detail 2 1Scale Scale : 10 1 : 10

M

DATE

AMENDMENT AMENDMENT

PROJECT TITLE: PROJECT TITLE:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT

CLIENTS: CLIENTS:

PROJECT ARCHITECT: PROJECT ARCHITECT:

DRAWING NAME: DRAWING NAME:

STAIRCASE

: :YEAP YEAPHUEI HUEISZE SZE

SCALE : AS SHOWN DRAWN : YEAP HUEI SZE SCALE : AS SHOWN DRAWN : YEAP HUEI SZE

REVISION: REVISION:


14 | TECHNICAL REPORT | BUILDING CONSTRUCTION AND TECHNOLOGY

1-2

1-1 6000 3265

1800

935

Foyer 1560

9.23 m² [Timber]

140mmx 140mm timber column

1-A

2100(h) x 1800(w) double panel timber door 50mm thk bamboo bio-panel wall with finishes at exterior

12mm thk suspended timber flooring

26.45 m² [Timber]

4500

tap.

Main room ft

75mmx 25mm timber wall stud with horizonal rail

6600

P

tap.

ft

2100(h) x 900(w) single panel timber door

Yard

1-B

Double casement window with bamboo woven panel Open Kitchen

Bathroom

7.30 m² [Timber]

4.74 m² [Porcelein]

tap.

2100

wc

laid to fall

Coconut trunk timber panel flooring

sk.

Dashed line indicated sewer line connected to vacuum sewer system

basin

ft

1-C

key plan

Housing Unit- Single dwelling (Type A) layout plan

2

Scale 1 : 50

2-1

CT TITLE:

CLIENTS:

2-2 PROJECT ARCHITECT:

ANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 16, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

6000

YHS ARCHITECT

................................................

UK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

3600

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

HOUSING UNIT - SINGLE DWELLING (TYPE A) 2400 KEY PLAN & LAYOUT PLAN

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

REVISION:

20/007/CD/4000/414

2-A

ft

2100

sk.

laid to fall

Bathroom 4.82 m² [Porcelein]

Kitchen 7.28 m² [Timber]

tap.

Basin

Dashed line indicate sewer line connected to vacuum sewer system

WC

Coconut trunk timber panel flooring

2-B 75mmx 25mm timber wall stud with horizonal rail Main room

Yard

12mm thk suspended timber flooring 2100(h) x 900(w) single panel timber door

tap.

6600

26.40 m² [Timber]

ft

4500

UP

tap.

ft

) key plan

50mm thk bamboo bio-panel wall with finishes at exterior 2100(h) x 1800(w) double panel timber door

140mmx 140mm timber column

2-C 1530

2

Timber frame double casement window with bamboo woven panel

Foyer 9.14 m² [Timber]

Housing Unit- Single dwelling (Type B) layout plan Scale 1 : 50

JECT TITLE:

DANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT

CLIENTS:

PROJECT ARCHITECT:

YHS ARCHITECT

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

HOUSING UNIT - SINGLE

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE


BUILDING CONSTRUCTION AND TECHNOLOGY | TECHNICAL REPORT | 15

3-1

3-2

3-3

3-4

6535 1475

3500

1560

3-A 184mmx 184mm timber column 75mmx 25mm timber wall stud with horizonal rail 3250

1 417

Timber frame double casement window with bamboo woven panel

Room 21.55 m² [Timber] 6500

50mm thk bamboo bio-panel wall c/w water resist finishes at exterior

1000mm (h) timber railing 2100(h) x 900(w) single panel timber door

1750

3-B

Balcony

2100(h) x 1800(w) bamboo woven panel sliding door

4.82 m² [Timber]

3-C 1500

Bathroom

basin

4.35 m² [Porcelein] laid to fall wc tap.

Walkway

Dashed line indicated sewer line connected to vacuum sewer system

ft

3-D

2

Housing unit- Shared room layout plan Scale 1 : 50

3-1

3-2

CLIENTS:

PROJECT ARCHITECT:

1475

INSTITUSI 3 TINGKAT DI ATAS PT ANGAU, 91308, SEMPORNA SABAH

3500 YHS ARCHITECT

651 651 ................................................

TIVE ARCHITECTURE SDN BHD HU level 2

3-3

1107

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

SENIBINA B25-01, 1095MENARA 1107 JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

3-4

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

HOUSING UNIT- SHARED ROOM KEY PLAN & LAYOUT PLAN

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING DRAWING NO.:

REVISION:

20/007/CD/4000/416 125mmx 125mm timber beam

FFL:3500

50mm thk bamboo bio-panel wall c/w water resist finishes at exterior 75mmx 25mm timber wall stud with horizonal rail

Room

Leve

2

FFL:0

417

184mmx 184mm timber column Walkway Level 1

12mm thk suspended timber flooring 50mmx 75mm timber floor joist

FFL:0

125mmx 50mm timber beam

1

Housing Unit- shared room section Scale 1 : 50

2

Fl

Sc


16 | TECHNICAL REPORT | BUILDING ENVIRONMENT DESIGN & SUSTAINABILITY STRATEGY

4.0 BUILDING ENVIRONMENT DESIGN & SUSTAINABILITY STRATEGY 4.1 Sustainable - Sustainable for building are about how to practice green building. Structures are designed to have a lower environmental impact over their entire lifetime, while providing a normal level of comfort, durability and functionality for occupants. In business situations, this allows companies to grow, without growing at the expense of the environment.

energy

water

material

A Green building focuses on increasing the efficiency of resource use – energy, water, and materials – while reducing building impact on human health and the environment during the building’s lifecycle, through better siting, design, construction, operation, maintenance, and removal. Green Buildings should be designed and operated to reduce the overall impact of the built environment on its surroundings.

Timber column to engr's details 150 x 12 mm timber panel

75x 150 mm timber batten 2 412

4.2 Renewable energy - the evaporation panel

Evaporation panel

As our site have large water body, there’s a technology that the “SPORES” could actually absorb the water and expand and when humidity low, the SPORES will contract. The repitition of this cell anable the structure to move

Bridge section

1

Evaporat

2

Scale 1 : 25

Scale 1 : 5

Evaporation detector spinner

Proposed to use this technology to generate electricity for the site in order to supplied electricity to the site . As bridge is widely used as access and connection in Kampung Banagu- Bangau, proTimber column to engr's details posed a evaporation technology energy generator panel attached 150 for x 12 mm timber panel to the bottom of bridge which could provide electricity the whole village. Detail drawings on right showing how it could be installed at the bridge 75x 150 mm timber batten

Dynamo C-channel wiring and dynamo holder

Timber column to engr's details 50mmx 150mm Hollow timber section frame holder 150 x 12 mm timber panel Connecting coil

2 412

How it works? 1. evaporation enable water to accumulate at the bottom of the Evaporation panel structure

75x 150Hinge mm timber to holdbatten the panel dynamo 2 412

2. When the “Spores” had absoarbed the water vapour will ake the structure open to release the vapour and the spore will conBridge section tract 1 Scale 1 : 25

Holding rod Evaporation panel Turbine with 'SPORES'

Evaporation panel- exploded axonometric

3

Scale: NTS REF

PROJECT TITLE:

DATE

AMENDMENT Evaporation Panel Connection

2

Evapora

4

Scale: NTS

CLIENTS:

P

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

Scale 1 : 5

................................................

Evaporation detector spinner

3. The continuous of expand and contract make the wheel to turn. In large scale, the kinetic movement could generate electricDynamo ity C-channel wiring and (retrive from a case study by University of Columbia)

Bridge section

1

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

BAJAU ADAPTIVE ARCHITECTURE SDN BHD

Evaporatio

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

2

Scale 1 : 25

Scale 1 : 5

Evaporation detector spinner

dynamo holder

Dynamo C-channel wiring and dynamo holder

Timber column to 150mm engr's details 50mmx timber frame 150 x 12 mm timber panel C-channel

2.

1.

50mmx 150mm section timber frameholder Evaporation detector spinnerHollow

75x 150 mm timber batten

Connecting coil

dynamo

2 412

Evaporation panel- exploded axonometric

3

Scale: NTS REF

DATE

AMENDMENT

PROJECT TITLE:

dynamo

Scale: NTS CLIENTS:

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

Bridge section

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

3 CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

REF DATE SDN BHD BAJAU ADAPTIVE ARCHITECTURE

AMENDMENT

Scale 1 : 25

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR T: 603 6258 5888 F: 603 6258 8885 E: yhsarch@gmail.com W: yhsarch.com.my

Evaporation Panel Connection

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

2

DRAWING NAME:

Evaporation panel-YHSexploded axonometric BRIDGE SECTION ARCHITECT

................................................ Scale: NTS

1

Hinge to hold the panel

Evaporation panel- section

4

Evaporation panel

Scale 1 : 5

SCALE :

AS SHOWN

DATE

04/10/2020

DRAWN

Holding rodCHECKED

:

: YEAP HUEI SZE : AR HISHAM

EVAPORATION PANEL CONNECTION, CONSTRUCTION Turbine withDRAWING 'SPORES' EXPLODED PROJECTAXONOMETRIC, TITLE: CLIENTS: DRAWING NO.: REVISION: CADANGAN MEMBINA 1 UNIT INSTITUSI 3 20/007/CD/4000/412 TINGKAT DI ATAS PT SECTION

4

Evaporati Scale: NTS

52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

................................................

Evaporation detector spinner

CHEW JEN LYNN PENGARAH NO K/P : 880123-00-0212

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

BAJAU ADAPTIVE ARCHITECTURE SDN BHD A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, SABAH

Dynamo C-channel wiring and dynamo holder

50mmx 150mm timber frame

C-channel Evaporation detector spinner dynamo

3. 3

Evaporation panel- exploded axonometric

4

REF

DATE

AMENDMENT

Evaporation panel- section Scale: NTS

Scale: NTS PROJECT TITLE:

CLIENTS:

PROJECT ARCHITECT:

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

YHS ARCHITECT

................................................ CHEW JEN LYNN

MENARA SENIBINA B25-01, JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA

DRAWING NAME:

SCALE :

AS SHOWN

DRAWN

BRIDGE SECTION EVAPORATION PANEL CONNECTION,

DATE

04/10/2020

CHECKED : AR HISHAM

:

: YEAP HUEI SZE

CONSTRUCTION DRAWING

PRO


BUILDING ENVIRONMENT DESIGN & SUSTAINABILITY STRATEGY/ BUILDING SERVICES | TECHNICAL REPORT | 17

4.3 Sustainable materials and construction The material choosen is sustainable and easily to get from local. (refer more specs at 3.0)

4.4 Indoor quality consideration As the site is near to sea, it is consider hot and humid. Proposed some features like the louvers to ensure ventilation. Woven all or the bamboo stri ps wall make the wall breathable. Also the bamboo stri ps ceiling to ensure better acoustic. These could avoid the use of mechanical ventilation like Air-conditioning and reduce the use of energy at the same time provide best ventilation for the building.

5.0 BUILDING SERVICES 5.1 Sewerage system As the site is on water, proposed to use a vacuum sewerage system. This system allowed the pi ped to be construct with min gradient as it is using vacuum. It needs a vacuum station to store the large pi ping and machine. Proposed to construct the pi ping underneath the bridge and linked to the vacuum station which are then to be connected to nearest sewer plant.

Building section showing the use of bamboo suspended ceiling and the curtain timber louvers wall

5.2 Water supply system The site could tap water from the land. But the proper pi ping system is needed to construct. Proposed to plan a proper inlet water supply for the village via the bridge, it could also be a boxing up for all the services pi ping to be store underneath the bridge . Hierachy of pi pe within a vacuum sewer system and corresponding pi pe diameters (source: Fraunhofer IGB guideline: vacuum sewer system)

highlighted the bridge which connecting all the proposed building. Proposed all the services could be attached under the bridge

Overview of a vacuum sewer system involving the vacuum valve unit at the valve pits, vacuum main and the central vacuum station (source: Fraunhofer IGB guideline: vacuum sewer system)


18 | TECHNICAL REPORT | BUILDING SERVICES

5.3 Heating & Ventilation The proposed building are mostly natural ventilated. Proposed to use ceiling fan as mechanical ventilation to enhance the ventilation. Damp and wet ceiling fan Due to the humidity and as the site is on sea, proposed the damp and wet ceiling fan which can have better weather resist. Trimaran outdoor ceiling is Engineered for the Elements™. It’s wet rated as well as corrosion and salt-air resistant making it great for outdoor spaces like pergolas and patios. Easily control this ceiling fan without light with the included wall control. water tank location

5.4 Energy Consumption & artificial lighting strategy The proposed to use LED florescent light as general lighting for all the spaces as the building are mostly receiving daylight, it could served as supporting lighting whenever it is needed. Some task light are apply at the area like kitchen or study table at the resource room. LEDtube Mains T5 The new Phili ps Master LED tube Mains T5 brings simplicity to your lighting project. You don’t need to pay attention to the driver technology anymore. Thanks to a unique design, Phili ps MASTER LEDtube Mains T5 directly instals in luminaires operating on mains power connection. So simple to operate and no need to carry double stock of products! Perfectly safe, reliable & easy to install Phili ps MASTER LEDtube Mains T5 is the ideal alternative to standard fluorescent tubes to maximize value overlifetime with high energy saving and lower maintenance costs.

water tank location

Benefits • Reduced operational cost thanks to lower energy consumption • Lower maintenance cost thanks to longer lifetime than conventional lamps • Fastest and easiest way to upgrade existing luminaires to LEDtechnology; completely safe product and installation process Features • Replacement of existing T5 lamps to mains power connection installation • Energy savings compared wtih fluorescent tubes • Long lifetime • No mercury

Selected 2 area for further study on the lighting strategy : Canteen area -place for gathering , having meal Resource room - place for study and research

water tank location

water tank location


t | TECHNICAL REPORT | 19

Space 1: Canteen Ventilation study Calculation of natural ventilation required = total floor area x 5% = 251.24 x 5% = 12.56 m2 Natural ventilation provided = (19x4) + (12x4) + (20x4) = 76 + 48 + 80 = 204 m2

wall pack ceiling fan surface mounted florecent light w/ LED light tube sunlight/ opening

Comply to UBBL clause 39, natural ventilation minimum of 5% for ventilation Calculation for natural lighting required = total floor area x 10 % = 251.24 x 10% = 25.12 m2 Opening provided comply to ubbl 1894 clause 39 natural lighting minimum requirement of 10% of day light. Mechanical ventilation and lighting Proposed to use weather resisted ceiling fan as mechanical ventilation and surface mounted LED lighttube as artificial lighting when it is necessary. Wall pack light located at the entrance of canteen from bridge

Space 2: Resource room Ventilation study Calculation of natural ventilation required = total floor area x 5% = 103.47 x 5% = 5.17 m2 Natural ventilation provided = 86.34 + 42.19 = 128.53 m2 Comply to UBBL clause 39, natural ventilation minimum of 5% for ventilation Calculation for natural lighting required = total floor area x 10 % = 103.47 x 10% =10.34 m2 Opening provided comply to ubbl 1894 clause 39 natural lighting minimum requirement of 10% of day light. Mechanical ventilation and lighting Proposed to use weather resisted ceiling fan as mechanical ventilation and surface mounted LED light tube as artificial lighting(general lighting). Pendant light are added at the study table area as task lighting.

ceiling fan surface mounted florecent light w/ LED light tube pendant light Sunlight / opening


N 79 째

80.88

"E 0 7' 24

m

4500

CC

AA BB RA RB

10000

3000

7000

2267

18362 3295

5801

' 30" E S 8째 50

2 3000/01

ft

ta p .

Refuse Chamber

2000/01

4500

R2

On water class

2

R1

46.17 m

ftft Toilet 2 FFL: 25 ft

Kitchen FFL: 50

ft

4660

9

UP

4655

10

Canteen FFL: 100

11

Floating deck

4655

23280

5626

4655

m

4655

13

37 . 04

DN

UP

12

11100 0 1350

8c

14

0 60 14 0 28 16

"W

8b

10 00 0

2000/01

1

18 21 050 85 0

3째 46 '

34

13274

S3

EE

DD

Floatin

8a

DN

Dashed line indicated the roof line above

Multi-purpose area

DN

8

61

Floating deck 13908

Dashed line indicated boat circulation ruote

On water class

7

2500

5

6 10000

72.50 m

S ACCES RIDGE MAIN B

E S 5 째 22' 46" 1

Site Plan Scale1 : 300

Lift

FFL: 100

3500

250mm dia main vacuum sewer line to be connected to nearest vacuum station

UP

15000

1 3000/01

2 3000/01


N

4500

Dashed line indicated roof line above

Dashed line indicated boat circulation

' 00" E S 9° 00

RC

5800

86.88 m

R4

R3

RD Scatter Class 1

B C

FFL: 50

D

8420

A

RE

UP

RF

69

E

51

1 3000/01

F

ng deck

FFL: 50

ft

G H I

ft ft

ftft

0' 00" W S 81° 0

18.42 m

4500

ft ft ft

8043

Toilet 1

6460

134

3

4

2

1 6025 4500

N 4° 00' 00" W

Scatter class 2

RG 5000

FFL: 50

RH

RI 5000

38.84 m

Scatter class 3 FFL: 50

On water class

RJ 4538

7616

R5

R6R7

tap.

ACCOMODATION DEVELOPMENT ft


EE

DD

CC AA BB RB

RA

18362 3000

2267

7000

2 3000/01

ap.

ft

t Refuse Chamber

13.11 m²

R2

5801

3295

2000/01

2 407

4500

1 401

2

On water class

150mm dia vacu connected to m 150mm dia vacu to valve chamb 100mm dia vacu to valve chamb

R1 ftft

9

-

23.57 m²

ft

35.64 m² BW

Toilet 2

TF FFL: 0.050

BB

-

ft dp

TT FFL: 0.025 dp

2465

4660

10

UP

4655

46.17 m

500 2035 1

' 30" E S 8° 50

Kitchen

Canteen

DN

251.24 m²

11

Floating deck

Thread= 280mm, Ri staircase to detail

Thread= 270mm, Ri staircase to engr's

2 nos of 140mmx 1 w/ a 90mmx140mm column in between

UP 4655 23280

TL TF - FFL: 0.100

Timber floating pla Thread= 280mm, Ri staircase to engr's 150mm thk timber c horizontal timber l details

12 4655

13 4655

8c

11100 0 1350

14

m

Dashed line ind

0

37 . 04

8b 14600 28 16

"W

8a 7

6

5 4 3 2

1

S3

3° 46 '

18 05 21 0 85 0

34

8

Floating deck

2000/01

1 1721

DN

2945

Toilet 1

dp

Thread= 280mm, Riser=175mm timber staircase to details UP

1 3000/01

214.48 m²

-

TF FFL: 100

ft ft ft

Multi-purpose area

250mm dia main vacuum sewer line to be connected to nearest vacuum station

51.31 m

DN

Floating deck

Timber floating platform

R5 R

Dashed line indicated boat circulation ruote

15

On water class 2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class

RG

5000

Thread= 280mm, Riser= 176mm timber staircase link to floating platform

RH

72.50 m

S ACCES RIDGE MAIN B

E S 5 ° 22' 46"

1

Ground floor plan - Sewerage system 1 : 250

RI

1 401

2 3000/01

R


N

FINISHES LEGEND Wall finishes

dicated roof line above Floor finishes

uum sewer pipe main vacuum sewer line uum sewer pipe connected ber uum sewer pipe connected ber

TL

150mm thk timber curtain wall with timber louvers panels to detail

BW

75mm thk bamboo woven panel wall with timber frame support

BB

50mm thk bamboo bio-panel wall with timber frame support

TT

12mm thk timber panel flooring with water-based polyurethane

TF

12mm thk timber panel flooring with satin varnish finishes

iser=175mm timber ls

iser= 175mm timber s details

' 00 S 9° 00

140mm timber column slanted timber to engr's details Dashed line indicated roof line above

R4 R3

2593

5800

RC 2290

29.55 m²

C D

TF FFL: 50

m²

BB

RF

1 3000/01

Thread= 280mm, Riser=175mm timber staircase to details

Thread= 280mm, Riser= 176mm timber staircase link to floating platform

2 317

-

RE

E F

1

UP

2600

-

RD

8420 3530

Scatter Class 1

A B

86.88 m

timber ladders connected to timber platform

" E

atform iser= 176mm timber s details curtain wall with louvers panel to

100mm dia vacuum sewer pipe connected to valve chamber

TT FFL: 50

ft

G

ft

H I

ft

ftft

150mm dia vacuum sewer pipe connected to valve chamber valve chamber

0' 00" W S 81° 0

18.42 m

Hydraulic lift to manuf's details

6460

150mm dia vacuum sewer pipe connected to main vacuum sewer line

R7

R6 6025

565

Dashed line indicated roof line above 75mm thk bamboo woven panel wall

Scatter class 2 BW

0

-

TF FFL: 0.050

N 4° 00' 00" W

12mm thk timber panel flooring

30.13 m²

184mmx 184mm timber column

4ft timber platorm 30.13 m² 5000

RJ

BW

-

38.84 m

timber ladders connected to timber platform

Scatter class 3 TF FFL: 0.050

6025

1470

On water class

4538

ACCOMODATION DEVELOPMENT ta p


GA Drawings


NOTES:

N

N

TAPAK CADANGAN

Village's jetty Cemetery

N 79 °

Bajau Community Settlement

0

80.88

E 7' 24"

m REF

4500

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

fffttt

AA BB Burnt up area

New tourist's jetty

RA RB

10000

Masjid Kampung Panji

3000

' 30 S 8° 50

18362 3295

R2

4500

CLIENT:

2000/01 On water class

2

" E

ftft Toilet 2 FFL: 25 ft

Kitchen FFL: 50

ft

Canteen

4655

m

11100 0 5 13 0

8c

14

"W 3° 46 '

Scatter Class 1

B C

18 21 050 85 0

34

A

FFL: 50

D

1 3000/01

YHS ARCHITECT MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com f: +603-62585888 w: yhsarch.com.my

DN

ffttfftftt

Multi-purpose area

Lift

FFL: 100

3500

Floating deck 13908

2

............................................................................. Mr. Ng Zi Guan

1

MECHANICAL AND ELECTRICAL ENGINEERING

6025 4500

On water class

N 4° 00' 00" W

Scatter class 2

RG

FFL: 50

5000

5

10000

RH

RI

38.84 m

Scatter class 3 5000

FFL: 50

On water class

RJ 7616

4538

S ACCES RIDGE MAIN B

New tourist's jetty

ftft

3

4

6

Temporary camp

G H I

ft ft

6134

7

MAIN ACCESS BRIDGE

ft

CONSULTANTS:

18.42 m

6460

DN

8

Dashed line indicated boat circulation ruote

Burnt up area

ft ft ft

' 00" W S 81° 00 4500

Dashed line indicated the roof line above

250mm dia main vacuum sewer line to be connected to nearest vacuum station

UP

15000

1 3000/01

8043

FFL: 50

2 3000/01

R5

R6R7

7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my

ZG

............................................................................. Mr. Thomas Lee

BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my

AS SHOWN 31/10/2020

NG ENGR

TL

CIVIL AND STRUCTURAL ENGINEERING

SCALE DATE

.co

C&S

DRWAN BY CHECKED BY

YEAP HUEI SZE AR HISHAM

DRAWING TITLE:

ACCOMODATION DEVELOPMENT tap.

E S 5° 22' 46"

N LA JA AU NG BA

72.50 m

AU NG BA

L PITA HOS AN JAL Scale: NTS

RF

F

Toilet 1

Location Plan

RE

UP

E

Floating deck

8a

fftt

2

8420

1

ARKITEK No. Pendaftaran LAM : AR724

"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."

51

2000/01

..................................................... Ar. Yeap Huei Sze

RD

69

10 00 0

RC

5800

0 60 14 0 28 16

8b

R4

R3

LEMBAGA ARKITEK MALAYSIA

86.88 m

4655

13

37 . 04

Floating deck

4655

23280

12

S3

DN

UP

N

ARCHITECT:

' 00" E S 9° 00

11

Dashed line indicated boat circulation

UP FFL: 100

On-going Construction

BAJAU ADAPTIVE ARCHITECTURE SDN BHD

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"

4655

10

Scale: NTS

TAPAK CADANGAN

Dashed line indicated roof line above

4660

9

Key Plan

Bajau Community Settlement

......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )

R1

46.17 m

1

5801

ft

ta p .

Refuse Chamber

Pusat Kesihatan New Residence Taman Semporna

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

2 3000/01

4500

Mangrove swamp

7000

2267

EE

DD

CC

AMENDMENT

PROJECT TITLE:

ft

Taman Semporna Centre

DATE

ft

tapf.t

2 UP UP

N

° 53

10

2 '3

0 2.

5m

KEY PLAN LOCATION PLAN SITE PLAN

"E

DRAWING NUMBER:

20/007/CD/1000/01

REVISION

-

CONSTRUCTION DRAWING 3

Site plan

ALL RIGHTS RESERVED

Scale1 : 300

THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.


NOTES:

EE DD

CC AA

N

BB FINISHES LEGEND

RB

RA

2267

2 3000/01

ft

ta p .

Refuse Chamber

R2

3295

7000

3000

2000/01

13.11 m²

2400mm(h) 100mm dia round timber stilt with 150mm spacing c/c as wall for on water class

2 407

4500

1 401

Wall finishes

2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class

5801

18362

2

Floor finishes

TL

150mm thk timber curtain wall with timber louvers panels to detail

BW

75mm thk bamboo woven panel wall with timber frame support

BB

50mm thk bamboo bio-panel wall with timber frame support

TT

12mm thk timber panel flooring with water-based polyurethane

TF

12mm thk timber panel flooring with satin varnish finishes

ftft

Kitchen D1

BW

-

23.57 m² BB

-

ft

TF FFL: 0.050

D2

Toilet 2

FFL: 0.025

dp

dp

D4

AMENDMENT

PROJECT TITLE:

150mm dia connected line 150mm dia connected

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

vacuum sewer pipe to main vacuum sewer vacuum sewer pipe to valve chamber

100mm dia vacuum sewer pipe connected to valve chamber Thread= 280mm, Riser=175mm timber staircase to details

TT

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

2465

4660

2035

' 30" E S 8° 50

ft

35.64 m²

9

D2

DATE

Dashed line indicated roof line above

On water class

R1

REF

Floating deck

251.24 m²

UP

4655 23280

TL

-

2 nos of 140mmx 140mm timber column w/ a 90mmx140mm slanted timber column in between to engr's details 12mm thk timber panel flooring

TF FFL: 0.100

184mmx 184mm timber column Dashed line indicated roof line above

Timber floating platform

12

timber ladders connected to timber platform

150mm thk timber curtain wall with horizontal timber louvers panel to details 4655

8c

2593

2290

0 1350

14 m 37 . 04 "W

18 05 0

34

21 85 0

3° 46 '

5 4 3

2

C

1

TF FFL: 50

UP

D

1 403

S3

12mm thk timber panel flooring

2000/01

34

92 30

2705

40

250mm dia main vacuum sewer line to be connected to nearest vacuum station

4988

ft

214.48 m²

ft

D2

ft

D2 D2 D2

ft ft

G

ft

CONSULTANTS:

valve chamber

3500

............................................................................. Mr. Ng Zi Guan

Hydraulic lift to manuf's details

MECHANICAL AND ELECTRICAL ENGINEERING

150mm dia vacuum sewer pipe connected to main vacuum sewer line

R7

Floating deck Timber floating platform

R5 R6

Dashed line indicated boat circulation ruote

6025

On water class 1450

7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my

Dashed line indicated roof line above

1565

Scatter class 2

RG

-

N 4° 00' 00" W

TF

BW

184mmx 184mm timber column

FFL: 0.050 D4

RH

38.84 m

4ft timber platorm D4

S ACCES RIDGE MAIN B

timber ladders connected to timber platform

Scatter class 3

RI

30.13 m² BW

5000

1 401

NG ENGR

12mm thk timber panel flooring

30.13 m²

Thread= 280mm, Riser= 176mm timber staircase link to floating platform 12mm thk timber flooring open decking

ZG

75mm thk bamboo woven panel wall

2020

5000

2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class

18.42 m

I

6460

DN

0' 00" W S 81° 0

H

3300

3160

TF FFL: 100

150mm dia vacuum sewer pipe connected to valve chamber

D3

ft

Multi-purpose area -

FFL: 50

430 1430 1

ft

3141

30

29

51.31 m²

D3

UP

74

2149

1470 1830

47

88

1 403

4105

41

Toilet 1 -

100mm dia vacuum sewer pipe connected to valve chamber

TT

BB

dp

3130

41

DN

65

MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com w: yhsarch.com.my f: +603-62585888

Thread= 280mm, Riser= 176mm timber staircase link to floating platform

2945

1721

1 3000/01

12mm thk timber flooring open deck as bridge connected to main bridge access

21 33

Thread= 280mm, Riser=175mm timber staircase to details

YHS ARCHITECT

2 317

200mm dia round timber column to specialist details

1 3000/01

Thread= 280mm, Riser=175mm timber staircase to details

F

1

ARKITEK No. Pendaftaran LAM : AR724

RF

E

Floating deck

..................................................... Ar. Yeap Huei Sze

"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."

RE 2600

6

3530

7

-

LEMBAGA ARKITEK MALAYSIA

RD

29.55 m²

B 8

ARCHITECT:

8420

Scatter Class 1

A

8a

bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"

RC

5800

0 60 14 0 28 16

BAJAU ADAPTIVE ARCHITECTURE SDN BHD

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH

R4 R3

11100

8b

......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )

86.88 m

4655

Thread= 280mm, Riser= 176mm timber staircase to engr's details

13

' 00" E S 9° 00

11

CLIENT:

DN

Canteen

1 407

Thread= 270mm, Riser= 175mm timber staircase to engr's details

1500

UP

4655

46.17 m

10

-

TF

TL

CIVIL AND STRUCTURAL ENGINEERING

BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my

SCALE DATE

AS SHOWN 31/10/2020

.co

C&S

DRWAN BY CHECKED BY

YEAP HUEI SZE AR HISHAM

DRAWING TITLE:

FFL: 0.050

GROUND FLOOR PLAN

On water class

RJ

............................................................................. Mr. Thomas Lee

6025

1470

4538

2 3000/01

DRAWING NUMBER:

1

tap.

ACCOMODATION DEVELOPMENT Ground Floor Plan

ft

Scale 1 : 200

20/007/CD/1000/02

REVISION

-

CONSTRUCTION DRAWING ALL RIGHTS RESERVED

tap.ft

THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.


NOTES:

EE DD

CC AA

BB

RB

RA

1308

3000

1167

2 3000/01

938

fall: 15°

R2

N

2000/01

4500

' 30" S 8° 50

2

2 407

1 401

19876

REF

1400

5800

AMENDMENT

PROJECT TITLE:

3295

rwdp

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

E

' 00 S 9° 00

15° pitched insulated and resistant recycled poly-aluminium roofing

9267

937

R1

DATE

" E

1484

46.17 m

fall: 15°

9

G.I. gutter

86.88 m

10000

Thread= 280mm, Riser=175mm timber staircase to details

10

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

CLIENT: fall: 8°

1 407

11

12mm thk timber panel flooring

23280

......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )

Timber floating platform

BAJAU ADAPTIVE ARCHITECTURE SDN BHD

12

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH

8 ° pitched insulated and resistant recycled poly-aluminium roofing

bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"

ARCHITECT:

rwdp

13

R4 8c

RC

823 2290

12102

1481

14

R3

RD

7730

8a

A

7360

m "W

37 . 04

E

rwdp rwdp

G.I. gutter

2000/01

1

1 3000/01

F

1 403

15 ° pitched insulated and resistant recycled poly-aluminium roofing

° fall: 30

ZG

NG ENGR

5000

N 4° 00' 00" W

749

749

RI

5000

fall: 15°

38.84 m

° fall: 30

1992

30 ° pitched insulated and resistant recycled poly-aluminium roofing

RH

0° fall: 3

15 ° pitched insulated and resistant recycled poly-aluminium roofing

7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my

RG

751

7

1992

10000

2

5

MECHANICAL AND ELECTRICAL ENGINEERING

1

5° fall: 1

S ACCES RIDGE MAIN B

4

............................................................................. Mr. Ng Zi Guan

4500

rwdp

3

CONSULTANTS:

4500

rwdp

rwdp

18.42 m

H rwdp

8

' 00" W S 81° 00

G

I

6

YHS ARCHITECT MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com f: +603-62585888 w: yhsarch.com.my

16 ° pitched insulated and resistant recycled poly-aluminium roofing

19500

° fall: 30

° fall: 30

1 403

RF

12mm thk timber panel flooring

19500

1 3000/01

18860

30° pitched insulated and resistant recycled poly-aluminium roofing

ARKITEK No. Pendaftaran LAM : AR724

857

D

° fall: 30

34

rwdp

° fall: 30

3° 46 '

° fall: 16

C

..................................................... Ar. Yeap Huei Sze

"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."

RE

° fall: 15 2600

10963

Dashed line indicate boat circlation

° fall: 30

S3

B

rwdp 10 00 0

3530

° l: 7 fal

10100

8b 7 ° pitched poly- carbonate roofing

LEMBAGA ARKITEK MALAYSIA

............................................................................. Mr. Thomas Lee

TL

CIVIL AND STRUCTURAL ENGINEERING

BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my

SCALE DATE

AS SHOWN 31/10/2020

.co

C&S

DRWAN BY CHECKED BY

YEAP HUEI SZE AR HISHAM

DRAWING TITLE:

751

RJ

ROOF PLAN

E S 5° 22' 46"

7616

2 3000/01

R6 R7 R5

72.50 m

DRAWING NUMBER:

ACCOMODATION DEVELOPMENT 1

Roof Plan Scale 1 : 200

20/007/CD/1000/03

REVISION

-

CONSTRUCTION DRAWING ALL RIGHTS RESERVED THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.


NOTES:

R2

R1

9

10

11

12

13

14 8c

8b

35963 938

4500

5749

4660

4655

4655

6375

4655

4655

1496

1 3000/01

4135

26292

REF

PROJECT TITLE:

7 ° pitched poly- carbonate roofing

30° pitched insulated and resistant recycled poly-aluminium roofing

200mm dia round timber column to specialist details

75mmx 200mm timber tie beam

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

184mmx 184mm timber column

FFL:11000

Verticle adjustable timber louvers panel

3781

FFL:14500

Level 4

1 407

150mm thk timber curtain wall with horizontal timber louvers panel to details

114mm x 114mm timber column Timber louvers curtain wall 50mm thk bamboo bio-panel wall with finishes at exterior

Level 2 FFL:4000

Level 1 100 FFL:0

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

1000mm (h) timber railing

Level 3 FFL:7500

15° pitched insulated and resistant recycled poly-aluminium roofing

184mmx 184mm timber column LV1

LV1

LV1

LV1

LV1

1000mm (h) timber railing

200mm dia round timber column to specialist details

15 ° pitched insulated and resistant recycled poly-aluminium roofing

75mm thk bamboo woven panel wall D1

LV2

LV2

LV2

LV2

LV2

LV2

LV2

LV2

W1

1200mm (h) woven wall panel with fixed louvers on top up to roof height refuse chamber

W1

CLIENT:

......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )

Woven panel top hung window

BAJAU ADAPTIVE ARCHITECTURE SDN BHD

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH

140mmx 140mm timber column Water Level

main bridge access

bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"

2400mm(h) 100mm dia round timber stilt with 150mm spacing c/c as wall for on water class

ARCHITECT:

2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class

LEMBAGA ARKITEK MALAYSIA

1

..................................................... Ar. Yeap Huei Sze

Front Elevation Scale 1 : 200

ARKITEK No. Pendaftaran LAM : AR724

"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."

YHS ARCHITECT MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com f: +603-62585888 w: yhsarch.com.my

EE

DD

CC

BB

AA

CONSULTANTS:

18362

3615

............................................................................. Mr. Ng Zi Guan

30° pitched insulated and resistant recycled poly-aluminium roofing fall: 30°

Level 4

200mm dia round timber column to specialist details 16 ° pitched insulated and resistant recycled poly-aluminium roofing

2267

2 407

fall: 30°

FFL:14500

7000

fall: 30°

Roof beam level

3153

1715

5948

8 ° pitched insulated and resistant recycled poly-aluminium roofing

FFL:11000

Level 3

Fixed louvers on top of timber woven wall

FFL:7500

184mmx 184mm timber column Woven panel top hung window

FFL:4000

Level 1 100 FFL:0

75mm thk bamboo woven panel wall

fixed louvers panel on top of timber woven wall

Thread= 280mm, Riser=175mm timber staircase to details

75mm thk bamboo woven panel wall 1941

2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class

W1

1200

Level 2

1000mm (h) timber railing 50mm thk bamboo bio-panel wall with finishes at exterior

W1

W1

W2

2400mm(h) 100mm dia round timber stilt with 300mm spacing c/c as wall for on water class

Water Level FFL:-3000

MECHANICAL AND ELECTRICAL ENGINEERING

7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my

ZG

NG ENGR

50mm thk bamboo strips internal partition Timber louvers curtain wall

1200

FFL:-3000

AMENDMENT

75mmx 150mm timber rafter

1900

Roof beam level

DATE

............................................................................. Mr. Thomas Lee

TL

CIVIL AND STRUCTURAL ENGINEERING

BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my

SCALE DATE

AS SHOWN 31/10/2020

.co

C&S

DRWAN BY CHECKED BY

YEAP HUEI SZE AR HISHAM

DRAWING TITLE:

FRONT ELEVATION RIGHT ELEVATION

Woven panel top hung window 12mm thk timber panel flooring Thread= 280mm, Riser=175mm timber staircase to details

DRAWING NUMBER:

20/007/CD/2000/01 2

Right Elevation Scale 1 : 200

REVISION

-

CONSTRUCTION DRAWING ALL RIGHTS RESERVED THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.


NOTES:

RA

RBAA

BB

CC

DD

EE

22373 3000

1010 2267

7000

3296

5800

8243

6417

REF 2 407

Roof beam level

Level 4 FFL:11000

Level 3 FFL:7500

Level 2 FFL:4000

50mm thk bamboo strips internal partition

FFL:0 100

CADANGAN MEMBINA 1 UNIT INSTITUSI 3 TINGKAT DI ATAS PT 52016, KAMPUNG BANGAU- BANGAU, 91308, SEMPORNA SABAH

75mmx 50mm timber purlins

Timber louvers curtain wall

Resource room

75mmx 150mm timber tie beam

75mm thk bamboo woven panel wall 75mmx 50mm timber floor joist 1000mm (h) timber railing 12mm thk timber panel flooring 200mm dia round timber column to specialist details 80mmx 300mm timber beam to engr's details

16 ° pitched insulated and resistant recycled poly-aluminium roofing Fixed louvers on top of timber woven wall 75mm thk bamboo woven panel wall

Office

Class

15 ° pitched insulated and resistant recycled poly-aluminium roofing

UNTUK TETUAN BAJAU ADAPTIVE ARCHITECTURE SDN BHD

CLIENT:

184mmx 184mm timber column

Thread= 280mm, Riser=175mm timber staircase to details Level 1

AMENDMENT

PROJECT TITLE: 30° Insulated and resistant recycled poly-aluminium roofing

FFL:14500

DATE

Multipurpose area

Thread= 280mm, Riser=175mm timber staircase to details

Thread= 280mm, Riser=175mm timber staircase to details 1000mm (h) timber railing

Floating platform

Water Level

......................................................... Chew Jen Lynn PENGARAH ( No. 880123-00-0212 )

BAJAU ADAPTIVE ARCHITECTURE SDN BHD

A-55-01, TAMAN PORNA, JALAN BANGAU 6/ 1, KAMPUNG BANGAU-BANGAU, 91308 SEMPORNA, "Saya bersetuju untuk bertanggungjawab atas segala kerosakan pada SABAH

Thread= 280mm, Riser= 176mm timber staircase link to floating platform

FFL:-3000

bangunan di atas lot-lot bersebelahan akibat cadangan tersebut"

ARCHITECT:

LEMBAGA ARKITEK MALAYSIA

..................................................... Ar. Yeap Huei Sze

ARKITEK No. Pendaftaran LAM : AR724

"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur) 1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."

1

Section A - A Scale 1 : 200

YHS ARCHITECT MENARA SENIBINA, B25-01 ,JALAN MENARA GADING, TAMAN CONNAUGHT, 56000 KUALA LUMPUR t: +6012-6479871 e: yhsarch@gmail.com f: +603-62585888 w: yhsarch.com.my

CONSULTANTS:

9

10

11

12

13

14

H

I ............................................................................. Mr. Ng Zi Guan

18860

26258

1470 1554

FFL:14500

Level 4 FFL:11000

Level 3 FFL:7500

Level 2 FFL:4000

Level 1 100 FFL:0 Water Level

4654

4653

4653

4653

75mmx 150mm timber tie beam 200mm dia round timber column to specialist details

1

2 nos of 140mmx 140mm timber column w/ a 90mmx140mm slanted timber column in between to engr's details

402

Resource room

15° pitched insulated and resistant recycled poly-aluminium roofing 50mm thk bamboo bio-panel wall with finishes at exterior 75mm thk bamboo woven panel wall Water storage tank on timber stud

75mmx 25mm timber wall stud with horizonal rail Thread= 280mm, Riser=175mm timber staircase to details

MECHANICAL AND ELECTRICAL ENGINEERING

1433

30° pitched insulated and resistant recycled poly-aluminium roofing 75mmx 50mm timber purlins 20mm x 235mm fascia board Timber louvers curtain wall 75mm thk bamboo woven panel wall 1000mm (h) timber railing

Office

114mm x 114mm timber column 184mmx 184mm timber column

Class

Class

Linkage bridge

1100

Roof beam level

4705

Class

Thread= 280mm, Riser=175mm timber staircase to details 12mm thk timber panel flooring

D2

D2

Canteen

Multipurpose area

75mmx 50mm timber purlins Thread= 280mm, Riser= 176mm timber staircase link to floating platform

125mmx 50mm timber beam Timber ladder connected to floor

FFL:-3000

7/15, LORONG CEMPAKA 7, TAMAN CEMPAKA, 27000, KEPONG, DARUL EHSAN, SELANGOR. E: nzgengr@email.com T: 606 266 2307 F: 603 267 2207 W: nzgengr.com.my

ZG

............................................................................. Mr. Thomas Lee

TL

CIVIL AND STRUCTURAL ENGINEERING

BLOCK A-5-2, PUNCAK SETIA JAYA, JALAN 3/118, TAMAN BUKIT SETIA JAYA, AMPANG, 56100, KUALA LUMPUR E: robincnsengr@email.com T: 608 0226 1833 F: 608 0228 1333 W: robincnsengrcom.my

SCALE DATE

AS SHOWN 31/10/2020

NG ENGR

.co

C&S

DRWAN BY CHECKED BY

YEAP HUEI SZE AR HISHAM

DRAWING TITLE:

SECTION A-A SECTION B-B

Timber floating platform

DRAWING NUMBER:

20/007/CD/3000/01 2

Section B - B Scale 1 : 200

REVISION

-

CONSTRUCTION DRAWING ALL RIGHTS RESERVED THIS DRAWING AND ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE SOLELY FOR EDUCATIONAL PURPOSES. MUST NOT BE USED OR COPIED WITHOUT THE WRITTEN PERMISSION.


Thank you