Portfolio YEAP HUEI SZE
Selected work from B.Arch Program at UCSI University 2019-2020
I started architecture from absolutely zero until today, having some basic understanding of architecture. Yet, still diving deeper into architecture and hope to explore more in architecture...
Selected works compilation along my Bachelor of Science (Hons) in Architecture. 2019-2020
YE A P H U E I S Z E 59, Nanyang Estate, Jinjang North , 52000 Kuala Lumpur. hueisze0123@gmail.com 012-6479871 ONLINE PORTFOLIO: https://issuu.com/hueisze0123 (full studio’s portfolio) https://hueisze0123.wixsite.com/portfolio (diploma’s works)
EDUCATION: UCSI University CURRENT Bsc of Science in Architectural (Hons) 2016-2018 Diploma In Architectural Studies SKILLS:
C ON T EN T 01
Filling the void between the real space
02
Tin Mining Cultural Park
Mixed development design proposal for Semporna’s Bajau Laut communities
Design proposal to appreciate the engineering aesthetic of tin mining structure and bring benefits for the local communities
03
Dive thru - Pasar Sungai Chua Design proposal to encourage people to go to wet market at Kg Sungai Chua
04
Centre for NGO - Damai Disabled Person Association
05
Impermenance Bus Shelter
06
Extracurricular Activities Involment
A community centre proposal for Damai Disabled Person Association at Kampung Bharu Bus shelter design
Some works/ involment of the extracurricular activities (Art installation/ poster design)
01 Filling the void between the real space Education | Housing | Public Square 3.5 acres master planning // 4000 sqm built up area
Bajau people are living in between the void(offing) of the real space (land). This proposal focused on a few issue happening in the void and path to fill in the void to let the bajau people living parallel with the people living on real space
FILLING THE VOID BETWEEN THE REAL SPACE |7
The site is a Bajau communities’ village sitting on water, and the access are mainly by bridge/ boat. There’s a few complex issue facing by the Bajau’s communities. The proposal will be focused on a few typology. First is the school which provide a space for them to learn as due to their stateless status, most of the children can’t get the chance to study. Besides, Also proposed hosing development, public square and services hub, a few path to slowly fill in the void. So they could living parallel with the people in real space.
Site location
Street Heirachy
Site analysis
Conceptual diagram
Existing
Human nodes
Intention and target group
Site Issue
Lack of infrastructure
Zoning
Victims of fire on 2015 remain homeless
Housing
Lack of education
Education
Conceptual model (section)
Public square
Services
Living parallel with real space
Local Kids to provide eduaction
Improve their economy / income
Local communities to provide home for them
Improve building services system
8|FILLING THE VOID BETWEEN THE REAL SPACE
(1)
(3) (1) Overall site isometric (2) Master plan (3) Site plan (2)
The choosen site is in between the existing village and the burnt up area. Proposed a 3.5 acres development with around 4000 sqm built up area
School for Bajau’s Children Bajau children’s lifestyle are quite different from normal children. They are not used to the fixed classroomwith table and chairs, sitting still to learn. Proposed the learning space of the school are more towards their living style, more like learning in the environment that they had used to .
FILLING THE VOID BETWEEN THE REAL SPACE |9 Bubble diagram
Learning courses:
Class on sea
Services
Canteen/ multipurpose area
Class on stilt Adminstration/ main building
Maths to let them able to carry out trading activities and improve their economy
Art to express themselves via art and visualisation
Language as tool for communication.
Science focus on marine studies like species of fisheries and coral reefs
jetty
linkage
Class in house
Building element
Massing development
2. 1. 3.
4. 1.
The site 5.
Waterway access
Bridge linkage
1. 4.
1. Scatter class 2. Adminstration block 3. Canteen 4. Class on water 5. Water courtyard Overall isometric
Breathable wall
Hierarchy
Pitched roof
10|FILLING THE VOID BETWEEN THE REAL SPACE
Level 1 plan
Section A-A
Level 2 plan
Level 3 plan
Section B-B
FILLING THE VOID BETWEEN THE REAL SPACE |11
Quiet zone
Private zone Public zone
Public zone
Level 4 plan
Roof plan
Space axonometric
Zoning section
B
to the existing village
to the land (real space) Main School Building
Housing development
Site elevation
Public square
12|FILLING THE VOID BETWEEN THE REAL SPACE
9° Fall
9° fall recycled polyaluminium metal roofing
G.I. gutter
Level 3 FFL:7500
89mmx 286mm timber rafter Timber column Timber louvers facade treament
1100mm (h) timber railing
Level 2
50mmx 100mm timber floor joist
FFL:4000
125mmx 50mm timber beam
89mmx 140mm slanted timber column
Timber flooring
Level 1
50mmx 75mm timber floor joist
FFL:0
125mmx 50mm timber beam Canteen detail section
FILLING THE VOID BETWEEN THE REAL SPACE |13
9° fall recycled poly-aluminium roofing Roof coping to detail Building structure Horizontal beam support Timber framing
timber louvers wall
Level 3
Horizontal fixed louvers panel
FFL:7500
140mmx 140mm timber column
Facade assembly exploded axonometric
timber louvers frame
Vertical adjustable timber louvers panel
9° fall recycled poly-aluminium roofing Flashing Metal cap flashing with isolated layer Timber support cap
Level 2 FFL:4000
Thread= 280mm(w), riser=174mm (h), 1400mm width timber staircase
Fastener 150mmx 75mm timber batten 180mmx 180mm timber column
89mmx 186mm timber rafter with mortise& tenon joint c/w dowel pin lock to column
Level 1
120mmx 10mm timber louvers panel
125mmx 50mm timber beam
FFL:0
180mmx 180mm timber column Facade section
Connection detail
50mmx 25mm louver's timber frame
14|FILLING THE VOID BETWEEN THE REAL SPACE
Recycled poly aluminium roofing
Timber flooring
Breathable wall Access from main bridge Pitched roof
Suspended ceiling Curtain timber louvers Internal woven wall Bamboo strips partition Double volume space Timber structure Open plan
Floating deck
Sectional Axonometric
Concrete piling
Construction material axonometric
FILLING THE VOID BETWEEN THE REAL SPACE |15
Canteen (level 1) interior space rendering
Multipurpose area (level 1) Interior space rendering
Walkway towards office (Level 3) interior space rendering
16|FILLING THE VOID BETWEEN THE REAL SPACE
Housing Units for Bajau Community As the burnt on 2015, many of them didn’t have house and is forced to stay at the temporary camp. proposed to rebuilt their home so that they can have a better living quality. Refering to the space planning of Bajau House boat and traditional house, proposed some housing layout for local and the staff as well. Some of the houses can become shoplots as it near to the public square. Space planning:
Main school building B
A
B
Building element:
pentan (dry clothes / fishes) Kusih (cobbler/ kitchen)
4ft width (roofed)
Single dwelling type B
A
2.
Diom Luma ( Main hall)
3.
Bridge (link)
1.
4.
Shared room unit Section A-A
1. 2. 3. 4.
Water courtyard Bridge linkage Platform to water On stilt
Housing development (Key Plan)
Single dwelling type A
Bridge linkage Section B-B
Single dwelling type B
FILLING THE VOID BETWEEN THE REAL SPACE |17
Shared room unit
Single dwelling (Type A)
Single dwelling (Type B)
Double storey with shared kitchen and living area. Also proposed a courtyard at the middle. Every unit have own 4ft walkway and balcony with attached bathroom.
Open plan dwelling house with private kitchen . Dual access one is from platform and another one is from yard which link to the bridge. This layout is come with double pitch roof
Open plan dwelling house with open kitchen . Dual access one is from platform and another one is from yard which link to the bridge. This layout come with single pitch roof
4ft platform
4ft platform
Room Room
Room Balcony Walkway tap.
Yard
ft
tap.
Kitchen ft
ft
Layout plan
Yard
Layout plan
Open Kitchen
Layout plan
18|FILLING THE VOID BETWEEN THE REAL SPACE
Public Square
A multipurpose space aim to boost the economy and act as a place for recreation at the same time. Using one of the iconic element of their village, bridge as main element of the public square. The bridge is with multifunction attached with some services area. Bubble diagram:
Reading corner
Services area PUBLIC SQUARE
Self- sustain technology to generate energy
Building element:
Selling platform
The services hub
Floating platform jetty
Consists of public toilet, storage area and services area. Services contain of M&E room and refuse chamber. It is placed near to the main bridge .
1.Services hub 2. Multipurpose bridge with pocket seating 3. Floating platform 4. Reading corner
Evaporationa panel Proposed to have evaporation panel under the bridge to generate electricity to supply to the local.
Public square plan
Services hub layout plan
FILLING THE VOID BETWEEN THE REAL SPACE |19
Class
k Pocket seating bridge
Floating platform jetty
Reading corner
The bridge with pocket seating area is proposed to be a recreational area for them to chit chat. It also could serve as a place for trading like weekend bazaar. It’s surrounded by water ways
This floating platform jetty is to allowed tourist/ local to hop on the boat more easier. As it could be one of the tourist spot to explore the Bajau’s culture. If there’s any festival or celebration, the whole public square could act as stage.
Proposed to have some reading corner around Kampung Bangau- Bangau. It could be a small area / platform along the bridge so that more children could get the source of knowledge.
Class
Pocket seating bridge layout plan
Floating jetty layout plan
Reading corner layout plan
02 Tin Mining Cultural Park
Leisure | Historical trail | Sustainable | Machinery park
I was impressed by the evolution of tin mining structure, and I found that there’s lots of possibilities for the structure and systems which could become part of architectural element. I hope via the visit through my proposed building, visitors will get to know the story of tin mining and also have the chance to experience the tin mining structure and machinery at the same time to understand the story better.
|TIN MINING CULTURAL PARK |21
This leads me to come out with a section which include the possibilities of tin mining structure to become an interactive structure or architectural elements. I also did some models of the structure to understand how it works. The site is used to be crowded with people to work inside, but now it is bare with huge amount of water bodies which is the effect of tin mining activity. This inspired me to propose evaporation technology, which to make the building at site self-sustain. Also, I hope to bring more people into the site, to explore the story which form today’s Perak. Not only to boost the tourism industry, local are also welcome to the site which I proposed some pavilions and jogging track around the site. So it could be also a place for local to have leisure activities or gathering.
Site photo- TT5 tin dredge
Architectonics of post anthropocene- narrative ideation section
Site are surrounded by housing area
Obviously clustered of different races village
The site is full of natural elements
Proposed to development the centre part of the site
22|TIN MINING CULTURAL PARK|
Exploration model (site context)
structure to be a pavilion?
building facade? steps?
Exploration model (tin mining structure)
Multi-level structure
pavilion to link the site?
Ideation collage using the model
Circulation
Views
Building zoning
Site zoning
Site analysis diagram
Site issue and design intention
Site Issue Cultural Infrastructure Signage not clear Old bus stop Wide and bare access Design Intention/strategy Directional lamp post Renovate the bus stop Proper access road
Mining Industry --> Cultural Herritage Used to be many people working --> no more ppl Used to be local leisure area --> After heritage conservation, site remain bare
Rural area Utilities not sustain Huge area of water body Overall sense is bare and empty
Local Recreational Park Bring local into the site
Sustainable technology as the site is a rural area, sustainable tecnology are introduced evaporation --> movement
Cultural infrastucture Dredge is unused Need proper conservation The structure is interesting Leisure recreational Park Bring the dredge to “work again� Bring people in to have activities
Tourist Attraction Bring visitor to appreciate the story and structure of the dredge via structure exploration. The machineries could become building elements or interactive structure
|TIN MINING CULTURAL PARK |23
Master planning strategy
24|TIN MINING CULTURAL PARK| Space and design features Roof top
Water chain evaporation technology
SF
Auditorium
FF
Linkage bridge
Water channel path way
GF
Water front retail shop
LG
Walkway landscape and water feature Underground services road
Main gallery section
|TIN MINING CULTURAL PARK |25 Construction system axonometric
Roofing
Curtain wall system
Precast floor, wall and staircase system Auditorium interior rendering
Restaurant interior rendering
Steel/ portal frame structure
Walkway landscape and water pond
Foundation and basement
Tin dredge section
Waterfront chain lift
Underwater gallery section
Yard chain lift
Retail section
26|TIN MINING CULTURAL PARK| Construction details
plaster ceiling 150mm thk precast wall with decorative brick cladding 50mm thk timber panel partition wall LED pendant light to specs 4 way cassette unit to manuf’s details
Steel beam to engr’s details Low E glass glazing
LED recessed lamp trimless downlight to specs
Restaurant sectional isometric
150mm thk precast floor slab with timber vinyl tile finishes
plaster ceiling with specialist detail for acoustic treatment
4 way cassette unit to manuf’s details LED light on ceiling light through LED recessed lamp trimless downlight to specs Precast concrete wall with metal stud structure to support acoustic fabric panel and LED light strips as wall washer light RC steps floor slab to engr’s details, thread= 900mm Solid panel cladding facade
Precast floor slab to engr’s details with loop carpet finishes
Stage with timber finishes
Auditorium sectional isometric
|TIN MINING CULTURAL PARK |27
Drop-off area
Overall ariel view
the activity square
03 Dive Thru
Explore the new Pasar Sungai Chua
Pasar Sungai Chua has gone through rapid urbanization over the last two decades. We uncover its history, origins and evolution in order to envision the new architecture. Some architecture has barely changed but the appearance of something new is rare as most architecture inventions are reinventions.
|DIVE THRU- MARKET |29
Site analysis
Design Intention
Site analysis photo collage
The stall is full of goods during the trading hour, but nothing after trading hour. Beside, the user of the market is mostly older generation. Proposed a new style market which could attract more young people and multi-function stall Ideation sketches
Design development
Trading hour
30|DIVE THRU- MARKET |
|DIVE THRU- MARKET |31
32|DIVE THRU- MARKET |
Form massing
Hydraulic underground storage massing
|DIVE THRU- MARKET |33
04 Centre for NGO
Damai ∞ Kampung Bharu
Proposed a community centre for NGO (Damai Disabled Person Association) at Kampung Bharu.The new buildings will serve two main functions.One to be community space for various function depending on the community concern (multipurpose space). Second is to provide open-space like small urban park for interaction between communities.
|CENTRE FOR NGO |35
36|CENTRE FOR NGO |
|CENTRE FOR NGO |37
38|CENTRE FOR NGO |
|CENTRE FOR NGO |39 Model dedrive from concept: tree
Model to study the space planning and spatial quality
Model to study thestructure of sun shading roof
Final model
05 Impermenance bus shelter
modular bus shelter & individual extension
In group of 5, we are to design a modular bus shelter using an IBS system which allows for a customizable extension. With a modular design intent, it can be easily replicated at any site with quick and easy installation. Individually, I proposed an extension for the proposed modular bus stop.
Site Location
Design Intention
Design Development
Site Issue
Intention sketches
General Arrangement
Rendering
IMPERMENANCE BUS SHELTER |41
42|IMPERMENANCE BUS SHELTER Design Features
Layer roofing
Odour screening
Ramp and slab
Panel column
Ventilation and rain defence louvre
Modular seating
Assembly Method
Plaster model making (1:10 model)
Making formwork
Plaster casting
Concrete model making (1:5 Sectional model)
Making formwork
Concrete casting
Assembly the components
Removing formwork
Final model
Final model
IMPERMENANCE BUS SHELTER |43
06 Extracurricular activities involment Some works during the extra-curricular activities
Some works during the extra-curricular activities including timber model making, steel welding, poster design and so on...
EXTRACURRICULAR ACTIVITIES INVOLMENT |45
Jamboree BINA installation team 2019
AIC BINA Camp 2019
PAASWE 2019
Poster design / Publication
Deeply appreciate those who had guided me along my degree studies. It was a great time to learn from each other and explore architecture together. From now on, I will utilize and keep practicing what I had learnt along the years in the real industry...
YEAP HUEI SZE Portfolio Selected work from B.Arch Program at UCSI University 2019-2020 email: hueisze0123@gmail.com phone: +6012-6479871