Harry Solie Professional Experience










105 West
Cape Cod CC Science Building
UNC Charlotte Science Building
121 Seaport
Middlesex School
Raffles City
2 Harbor
4 Harbor
6 Harbor
HARRY SOLIE

Master of Architecture
University of Michigan
Bachelor of Fine Arts in Architecture
University of Massachusetts Amherst
Professional Experience
Senior Associate
Present
- 2021
Currently co-managing Handel’s Boston office overseeing the day-to-day work of junior staff in both the Boston and New York offices as it relates to Boston-area project work. Serving as design team led for multiple projects across commercial, residential and industrial typologies. Actively engaged in business development efforts including new client outreach, preparing responses to RFPs and drafting project and fee proposals.
2 Harbor Innovation Campus
Master plan for (3) Commercial Life Science buildings situated within a 1-acre park. Assisted in construction administration efforts for Phase 01 while leading design efforts for Phase 02.
4 Harbor Life Science Building
New construction Commercial Life Science building at 410,000 GSF. Led concept design and permitting efforts through completion of the Article 80 process. Led all client and consultant meetings as well as prepared presentations to city and state agencies.
Project Architect
Project Architect and Designer for both Higher Education and Commercial Life Science Buildings. Specialized in communicating design concepts to clients and consultants.
105 West Lab Tower
New construction Commercial Life Science building at 400,000 GSF. Led coordination efforts with consultant and client teams during the design and documentation phases as well as served as lead architect during construction administration.
University of North Carolina Charlotte Integrated Science Building
State-of-the-art STEM education center designed to unify the universities lab and research disciplines by providing 142,000 GSF of lab, classroom and research space. Led the design and detailing of the building’s exterior envelope.
Cape Cod Community College Science Center
New construction STEM center situated at the heart of campus providing 40,000 GSF of flexible classrooms with a central “spine” of communal lab prep spaces. Led conceptual design efforts as well as participated in workshops with faculty, staff and students.
Architectural Designer
Worked on project typologies ranging from Commercial High-Rise to K-12 Academic buildings. Gained experience in coordinating with consultants, presenting design concepts to clients and developing construction documents.
121 Seaport Tower
New construction Class-A commercial office building providing 450,000 GSF across 17-stories through an innovative eliptical-shaped design. Led coordination efforts for the building’s structural core and related MEPFP areas.
Architectural Designer
Recruited out of graduate school to work on complex, large-scale projects. Worked directly with Moshe Safdie to develop design concepts based on his sketches. Raffles City
Mega Development including (8) high-rise towers of mixed residential and commercial spaces connected by a sky terrace spanning across the top of the inner (6) towers. As part of the facades team, my responsibilities included design studies and production for building envelope components.
Handel


2 Harbor Campus
Project Type: Commercial Life Science Campus
Architect: Handel Architects
Location: Boston, MA
Size: (3) Building Campus + (1) Acre Plaza


Project Type: Commercial Life Science
Architect: Handel Architects
Location: Boston, MA
Size: 480,000 GSF
Role: Campus Architect / PM
Phases: Construction Administration
Key Responsibilities:
Construction Administration
• Assisted PA/PM on various CA-related tasks as needed
• Reviewed Submittals and RFIs
• Attended weekly OAC meetings and coordinated w/ CM
• Responsible for all design-related changes and owner driven updates during the CA process including the relocation of the Bike Room, addition of a public market hall and the reorganization of the lower parking level
• Coordinated CA activities within the larger campus Master Plan



Innovation Campus Master Plan
The original Master Plan for the 4.2 Acre site called for (3) Life Science towers, an internal driveway and open space. Together the campus was to contain over 1 Million GSF of lab/office space. All buildings were to be designed targeting LEED Platinum and WELL Platinum as well as meet all requirements for future electrification.
2 Harbor
4 Harbor
6 Harbor

Market Hall Concept
During Construction Administration, the client asked that we incorporate a “Market Hall” concept into the first floor lobby included the relocation of the bike room and a full reimaging of the public lobby areas. The final design consisted of stations including a centralized “Har Bar” that served as a day/night coffee bar.


lobby program. This of (3) new food
L1 LOBBY HARBAR ENLARGED REFLECTED CEILING PLAN
L1 LOBBY HARBAR BASE GEOMETRY
L1 LOBBY HARBAR ENLARGED PLAN

4 Harbor
Project Type: Commercial Life Science
Architect: Handel Architects
Location: Boston, MA
Size: 420,000 GSF
Role:
Phases:
Key Responsibilities:
Concept Design

Project Architect / Project Manager
Concept Design & Permitting
• Lead designer for both 4 Harbor and 6 Harbor (unrealized)
• Developed exterior envelope and approach to the public realm
• Designed and coordinated the building’s structural core.
• Primary designer for floor plans and building interior
• Established agendas and led consultant coordination
• Managed BOMA area calculations and spreadsheets
• Served as primary contact with client and prepared weekly meetings
• Managed a team of 2-3 junior staffers & staff from our collaborating architect
Permitting and Entitlements
• Prepared and coordinated all materials for initial Article 80 & MEPA submissions
• Prepared and led meetings with public and state agencies
• Participated in design presentations with BCDC and BPDA staff


Basis of Design
The original Basis of Design for Building 02 was a simple extrusion of the zoning envelope, wrapped in the same exterior facade system as Building 01.
By relocating Zoning Floor Area from Building to sculpt the main massing into a simple against a celebrated vertical glass volume. terraces facing out towards the water, amenity terrace which also serves to cover Fall 2021
Design Evolution


Spring 2024
Article 80 Submission
Building 02 to Building 03, we were able simple rectangle and then juxtapose this volume. This volume is articulated by culminating at an expanded Level 02 cover the main building entry.
The final design submission for Article 80 permitting reclaimed the Zoning Floor Area lost during previous iterations, but maintained the facade strategy of a celebrated glass volume punctuated with terraces. The Amenity Terrace was then moved up to the top of this volume to give better views towards the water.
PROJECT EVOLUTION
agencies including instead introduce order to be shared



6 Harbor
Project Type: Commercial Life Science
Architect: Handel Architects
Location: Boston, MA
Size: 280,000 GSF
Role: Project Architect / Project Manager
Phases:
Key Responsibilities:
Concept Design

Concept Design
• Developed exterior envelope and approach to the public realm
• Worked with structural consultant on complex structure system due to the building’s location directly over the Ted Williams Tunnel
• Primary designer for floor plans and building interior
• Established agendas and led consultant coordination
• Managed BOMA area calculations and spreadsheets
Permitting and Entitlements
• Prepared and coordinated all materials for initial Article 80 & MEPA submissions (6 Harbor eventually was omitted from final filing)
• Participated in design presentations with BCDC and BPDA staff
EL. +99'-6"
LEVEL 06
EL. +84'-6"
LEVEL 05
EL. +69'-6"
LEVEL 04
EL. +54'-6"
LEVEL 03
EL. +39'-6"
LEVEL 02
EL. +24'-6"
LEVEL 01
EL. +4'-0"
GRADE
EL. +0'-0"



6 Harbor Facade Studies
Due to its location over the Ted Williams Tunnel, Building 03 had to be smaller and lighter than the other buildings on the site. The structural system was changed from flat plate concrete to steel and the facade took on a more unique appearance. The concept was to move away from the grid of the other buildings and create a vertical expression using a simple folded-metal panel. The panels were then perforated, and potentially backlit to create visual interest.


Project Type: Commercial Life Science
Architect: Payette Associates
Location: Boston, MA
Size: 400,000 GSF
Role: Job Captain
Phases: Concept - CA
Key Responsibilities:
Concept / Schematic Design
• Developed schematic floor plans and public way circulation.
• Designed and coordinated the building’s structural core.
Design Development
• Managed BOMA area calculations and spreadsheets
• Established agendas and led consultant coordination
• Primary designer for floor plans and building interior
Construction Documents
• Led documentation efforts
• Coordinated specifications and project manual
• Reviewed and red-lined work of others
• Served as the BIM manager for the project
Construction Administration
• Served as lead architect for all CA-related activities
• Primary contact between CM and Ownership
• Reviewed and approved Submittals and RFIs
• Weekly site walks and field reports
Building Core Logic
Below is an idealized core distribution diagram developed in response to an RFP for a new Commercial Life Science project.The goal was to demonstrate how to locate Supply/Return, tenant shafts and base building services efficiently to limit overlapping of ductwork and as a result allow for higher ceilings within tenant areas.



UNC Charlotte
Project Type: University Science Building
Architect: Payette Associates
Location: Charlotte, NC
Size: 142,000 SF
Role: Project Designer / Exterior Envelope
Phases: Concept - CD
Key Responsibilities:
Concept / Schematic Design
• Developed initial massing and facade strategies
• Participated in design presentations to faculty and staff
Design Development
• Led design studies on exterior envelope with a focus on materiality, proportion and brick rustication strategies
• Assembled presentations for university approvals
• Coordinated with local architects and consultants
Construction Documents
• Led all documentation efforts for the exterior envelope and key interior components including communicating stair and public spaces
• Reviewed and red-lined work of others
• Served as the BIM manager for the project
Detailing the Exterior Envelope
As part of the Construction Documents phase, I oversaw the detailing of the exterior envelope while maintaining a focused eye on thermal bridging, waterproofing layers and overall building proportion. The goal was to utilize modern detailing within UNCC’s preferred classical aesthetic.






















Cape Cod CC
Project Type: University Science Building
Architect: Payette Associates
Location: West Barnstable, MA
Size: 39,000 SF
Role: Project Architect
Phases: Concept Design
Key Responsibilities:
Planning & Concept Design
• Developed building siting and landscape strategy
• Conceptual massing design and initial facade studies
• Participated in design presentations to faculty, staff and students




121 Seaport
Project Type: Class-A Commercial Office Tower
Architect: CBT Architects
Location: Boston, MA
Size: 450,000 GSF
Role: Junior Designer / Core Design
Phases: Concept - CD
Key Responsibilities:
Concept / Schematic Design
• Assisted Project team to develop initial massing studies
• Prepared and participated in client presentations
Design Development
• Led design studies on main entry lobby including working with complex double-curved geometry for the lobby interior
• Responsible for the development of the building’s 3-story podium
• Led coordination efforts with consultant team focused on the building core, mechanical penthouse and 6-story underground parking garage
• Established and managed BOMA area calculations
Construction Documents
• Led all documentation efforts for interior building elements including floor plans, interior details and lobby finishes
• Documentation of building’s structural core incuding locating all shear wall penetrations


Core and Shear Walls
Due to the aerodynamic shape of the building wind loads were greatly reduced, allowing for cost savings in the building’s structural core through minimizing steel reinforcement. All MEPFP requirements and shear wall penetrations were coordinated with the core’s structural requirements.
Lobby Geometry
The main lobby features double-curved geometry which needed to be carefully planned and documented. This allowed for the space to bring sloped ceilings and soffit walls into harmony while maintaining constructability.



Communicating Stair
The construction of the stair is an adaptation of a simple steel pan stair system but with thick Terrazzo treads which are pulled back 4” from the stringers in order to give the treads an appearance and perception that they are “floating” above the stair construction. The 4” offset on either side of the treads is lined with a stainless steel band to accept the balusters and runs all the way up the stairs and around the opening of the soffit above.



Raffles City
Project Type: Mixed-us
Architect: Safdie Architects
Location: Chongqing, China
Size: 817,000 sq/m
Role: Junior Designer / Facades
Phases: SD-CD
Key Responsibilities:
• Worked directly with Moshe Safdie on developing facade language, residential balconies and mechanical penthouse enclosures
• Translated Moshe’s sketches of complex geometric forms into constructable drawings
• Assisted in documentation of the tower exteriors
North Elevation (Behind Sail) North Elevation

Residential Balconies