Skip to main content

Lanark, North Leeds & Grenville - Hometown News June 2026

Page 1


Smiths Falls’ Spirit of the Drum Pow Wow draws strong crowds despite rain

Smiths Falls - Laurie Weir

editorial@pdgmedia.ca

The Spirit of the Drum Pow Wow drew large crowds to Smiths Falls on June 13 and 14, bringing together dancers, drummers, vendors and community members for a weekend of cultural celebration and learning.

Saturday’s events took place under hot, sunny skies at Duck Island, while Sunday’s programming moved indoors to the Smiths Falls

Youth Arena because of rain.

The two-day gathering featured head dancers Awema Tendesi of Kitigan Zibi Algonquin First Nation and Josée Bourgeois of Pikwàkanagàn First Nation, along with Arena Director Gabe Whiteduck, emcee Mista Wasis and Elder David Jock.

Special performances included champion smoke dancer DJ White Smoke of Akwesasne and men’s fancy bustle dancer Scott Sinquah,

accompanied by the Drum Wild Band from Arizona.

Invited drums included host drum Eagle River, cohost drum Little Creek, as well as White Tail Cree, Ottawa River and Wild Band.

The annual event offered residents and visitors an opportunity to experience Indigenous culture through traditional dancing, drumming, teachings and community connections.

Earlier this month,

Smiths Falls council approved a one-time allocation of $40,000 from the town’s Tax Stabilization Reserve to address a funding shortfall and ensure the event could proceed. The additional support came after grant funding for the 2026 pow wow fell short of expectations. Council members voiced support for the event while also calling for a review of how it is funded in future years.

Smiths Falls - Laurie Weir editorial@pdgmedia.ca

A 60,000-pound caboose will become the centrepiece of a major fundraising push at the Railway Museum of Eastern Ontario later this month as Smiths Falls strongman Tim Norris attempts to pull the railcar during the museum’s Father’s Day celebrations on June 21.

The event is part of a broader campaign to help fund a new roof for the museum building, according to longtime volunteer and board member Dawn Quinn.

“We need to raise money,” Quinn said during an interview on Monday, June 1. “We do have some raised already, but we still need to raise a lot more.”

The museum estimates that the roof replacement could cost between $150,000 and $250,000, depending on the materials used and the extent of structural work required.

Quinn said she supports installing a steel roof despite the added expense because of the long-term protection it would provide for the

museum’s collection.

“If we’re going to do it, we want to do it right,” she said.

Norris is scheduled to attempt the caboose pull at 2:30 p.m. as part of a full day of activities planned at the museum grounds. This will be a world record-setting event if successful.

Continues on page 7

Smiths Falls strongman, Tim Norris. Facebook photo.
Kathy Botham photo.
Kathy Botham photo.
Kathy Botham photo.
Kathy Botham photo.
Kathy Botham photo.
Kathy Botham photo.
See Canada Day celebrations on page 6.

Page Two

Perth reviews Environmental Services garage ahead of tender

Perth - HEDDY SOROUR

editorial@pdgmedia.ca

At a special committee of the whole meeting June 9, Perth councillors received a detailed review of the proposed Environmental Services garage project as staff outlined other sites that had been considered and explained why the Sunset Boulevard location remains the preferred option.

Director of Community Services Cathy McNally walked council through the project’s history, alternative sites and environmental and operational concerns raised by residents.

The need for a new facility emerged after the second floor of the existing garage was deemed uninhabitable due to building code violations, forcing staff to relocate to temporary trailer offices serviced by a septic system, McNally explained. The aging garage, now more than 60 years old, also suffers from inadequate storage, poor ventilation, limited washroom facilities, insufficient fire separations and an outdoor vehicle wash area that creates winter operating challenges.

“Currently the 60-year-

old-plus building has had a limited lifespan,” McNally said, noting staff have been exploring replacement options for several years.

The building was originally constructed by the Public Utilities Authority in the mid1960s and reverted to the town nearly 40 years later.

McNally said the Sunset Boulevard property was selected because it is already home to Environmental Services operations, is municipally serviced and is owned by the town.

“It eliminates the need to relocate equipment, materials and staff to a new location,” she said.

The presentation also addressed concerns raised through public consultations, neighbourhood meetings and council discussions. Environmental safeguards, including source water protection, floodplain considerations, fuel storage and climate resilience measures, were reviewed. McNally noted the project remains subject to review by the Rideau Valley Conservation Authority, with engineering revisions currently being made in response to the authority’s comments.

Coun. Jim Boldt high-

Hometown News is available at Your Independent Grocers across Lanark County.

Anderson’s Carleton Place

Barnabe’s Perth

Jonsson’s Almonte & Smiths Falls

lighted some of those safeguards, noting fuel storage would be located farther from the floodplain and water source, while new concrete bunkers would be used to prevent seepage from stored aggregates.

Staff also revisited a list of alternative locations, including a property on North Street, lands north of Highway 7, the industrial park, Craig Street, Darou Farm, Smith Drive and 16 Craig St. According to McNally, each of those sites presented significant challenges, including floodplain restrictions, contaminated soils, servicing costs estimated between $3 million and $5 million, the loss of future development lands, or conflicts with nearby residential and recreational uses.

McNally said staff believe the current site remains the most practical option, adding it would be “difficult to replicate elsewhere.”

Since 2023, the town has spent nearly $185,000 on trailer and septic rentals, along with about $80,000 for engineering work and needs

assessments. The design is approximately 90 per cent complete and tender documents are ready to go.

McNally said delaying or relocating the project could result in additional engineering costs, construction inflation and continued expenses of about $5,000 per month for temporary facilities.

Calling it “the most difficult decision I’ve had to make since becoming a councillor,” Coun. Gary Waterfield said he would prefer a different location if a viable alternative exist-

ed. However, after weighing costs, contamination concerns and site limitations, he said he “reluctantly” supports the current location and noted the town is complying with all Rideau Valley Conservation Authority requirements.

“I’ve done my analysis and research. I reluctantly support building the environmental services shop at its current location. I believe it is in the best interest of the public good of our town,” Waterfield said.

Boldt said he believes

the garage could be located in the industrial park, even if that meant using the last developable industrial lands. However, he said he would reserve judgment until cost projections are available following the tendering process.

Council unanimously received the review, allowing staff to proceed with tendering under authority granted by a 2025 council motion. Once bids are received, the project will return to council for cost approval before construction begins.

Carleton Place declines to reduce development charges under provincial housing program

Carleton Place will not pursue a new provincial program that would require the town to significantly reduce development charges in exchange for infrastructure funding tied to housing development.

The issue was discussed during the June 9 committee of the whole meeting after Chief Administrative Officer Diane Smithson presented a report outlining the recently announced Development Charge Reduction Program, part of the Canada-Ontario Partnership to Build More Homes.

The program is intended to encourage housing construction by offering municipalities funding in exchange for lowering development charges, the fees paid by developers to help cover the cost of infrastructure needed to support growth.

Smithson explained that municipalities wishing to participate must commit to reducing development charges across all residential development types by at least 30 per cent and maintaining those reductions for three years.

“So on June 1 of this year, the Development Charge

Reduction Program, which is an application-based program, was introduced to provide up to $8.8 billion in federal and provincial capital funding to enable Ontario municipalities to unlock more housing supply by providing partial relief to their builder community from development charges for a period of three years and prioritizing investments in housing-enabling infrastructure over 10 years,” Smithson told committee.

According to the report, funding would be distributed over a 10-year period, with municipalities required to contribute a minimum 10 per cent share toward approved projects. Eligible projects must be shovel-ready, with construction beginning before July 31, 2030, and completed by Oct. 31, 2035.

However, Smithson cautioned that participation comes with considerable uncertainty.

“The funding intake is a competitive process. Funding approval is not guaranteed,” she said. “The province reserves the right to deny any application regardless of whether all criteria have been met and to reduce or otherwise adjust the funding amount for ap-

proved applications.”

The report also noted that municipalities accepted into the program would be required to implement development charge reductions immediately after entering into a transfer payment agreement, regardless of whether a specific development application had been included in the original funding request.

Smithson said municipalities willing to offer larger reductions could improve their chances of receiving funding.

“Applications that provide for greater DC rate reductions, more than the 30 to 50 per cent, and higher municipal infrastructure project costs beyond the required 10 per cent contribution would be eligible to receive higher development charge funding to support more cost-shared municipal infrastructure projects,” she said.

She added that the program appears better suited to larger municipalities experiencing more substantial growth.

“Based on a review of all information readily available, the program is likely to favour municipalities with higher development charges and higher levels of

growth, as the DC reductions will have a larger impact,” Smithson said.

Coun. Linda Seccaspina voiced concerns about the potential impact on local taxpayers if growth-related infrastructure costs shifted away from developers.

“I’m totally against this. There’s nothing in it for Carleton Place. Reducing or even eliminating development charges wouldn’t solve the housing crisis facing Ontario. If the lost revenue is not fully covered, municipalities are forced to either borrow heavily or pass the tax burden for new infrastructure onto existing property owners,” she said.

Coun. Jeff Atkinson agreed, arguing the program fails to address affordable housing needs.

“It’s an opportunity that’s just not there for us to take. In fact, Carleton Place is already doing one better than this program offers because we’ve already reduced our development charges for affordable housing. This program offers zero incentive,” Atkinson said.

Committee members ultimately agreed that participating in the Development Charge Reduction Program would not be in the town’s best interest.

Photography: Kathy Botham Laurie Weir
Reporters: Kathy Botham Heddy Sorour Laurie Weir
Approximate overlay. Town of Perth photo.

Could ALTO repeat Canada’s past infrastructure mistakes?

The worst-case scenario for the ALTO highspeed rail line is not, as most people imagine, that hundreds of properties will be expropriated, and that a rail line will then be built through our communities. The worstcase scenario is that the expropriations will happen, and then the project will be abandoned, with billions spent and literally nothing to show for it—except the damage done to the communities where the expropriations have taken place.

This sounds outrageous, until you learn that expropriation in the service of poorly-conceived infrastructure programs that are subsequently abandoned has happened multiple times in Canada. Here are some examples.

In 1962, the federal government expropriated an entire Ottawa neighbourhood, Lebreton Flats. It was considered unsightly to have an industrial, workingclass neighbourhood within walking distance from Parliament Hill, and plans were developed to install a new National Defence Headquarters on the land—ideally in time for the Centennial in 1967. Every building in the neighbourhood was demolished, and nearly 3,000 families lost their homes. Then it turned out that the new headquarters would cost too much. A few more redevelopment ideas were proposed and then abandoned; over sixty years later, most of Lebreton Flats remains an empty field.

In 1963, Toronto’s municipal government began the task of expropriating houses along the proposed route for the Spadina Expressway— a highway running south from Highway 401. The route took it directly through a number of high-income neighbourhoods like Forest Hill. The residents fought back and made the project so politically costly that in

1971 the provincial government stepped in and halted the partially-completed expressway. But not before three hundred homes had been expropriated. Some were demolished, and in other cases the residents were allowed to stay on— as rent-paying tenants—in the homes they had once owned. It took a further two decades before the government began the process of selling some of these houses back to their former owners (at current market prices).

In 1969 the federal government began the process of assembling lands to create the land-base for Mirabel Airport. This project bears a strong resemblance to ALTO in that it was undertaken because of wildly optimistic projections about future passenger numbers. Annual air passenger numbers at Mirabel was projected by the airport’s promoters to eventually rise to around 50 million. In practice, the numbers capped out at three million per year in the late 1980s and early 1990s.

A total of 97,000 acres were expropriated at Mirabel, based on the erroneous assumption that supersonic jets like the Concorde— which require enormously long runways—were the

wave of the future. This kind of technological guesswork bears an uncomfortable resemblance to ALTO’s unproven assumption that the high-speed trains used in France will work in Canadian weather conditions.

Eventually, the airport was shut down, and some (but not all) of the property was returned to its owners.

Finally, there is Pickering Airport, just east of Toronto. Expropriations started in 1972, but plans to construct the airport came to an abrupt halt in 1975 when it became clear that the costs would be much higher than initially projected. Nonetheless, the expropriated property was never returned to its owners.

With so many parallel examples, there is reason to worry that after the expropriations have been completed, ALTO too will be aborted. Like Mirabel, the rail project is based on utopian ridership numbers and gee-whiz technology. Like Pickering, the costs remain vague and seem likely to spiral out of control. And like Lebreton Flats, the plans remain astonishingly vague. All of the symptoms of a public policy catastrophe are present—and everyone can see it, except the planners.

Perth development charge cuts hinge on funding approval

PERTH - HEDDY SOROUR

editorial@pdgmedia.ca

Despite previous concerns about reducing development charges, Perth is moving ahead with an application to a new federal-provincial funding program that could see those fees cut in half, but only if the town receives financial support to offset the loss.

At its June 9 committee of the whole meeting, council unanimously approved a recommendation directing staff to apply to Ontario’s new Development Charge Reduction Program, which is designed to encour-

age housing construction by incentivizing municipalities to lower development charges.

The program, announced this spring through the CanadaOntario Partnership to Build initiative, offers municipalities access to a share of up to $8.8 billion in funding for housing-related infrastructure projects over the next 10 years. To qualify, municipalities must agree to reduce development charges by between 30 and 50 per cent for at least three years.

Perth’s application will include all growth-related projects identified in its development charge study

through 2035, including a second water tower north of Highway 7, an arterial road, infrastructure beneath Hwy. 7, portions of a future recreation facility and potentially a new environmental services shop.

However, council made it clear that Perth is not committing to lower development charges unless funding is approved.

“The idea, through the chair, is that we apply for the program first, and if we’re successful, then we reduce development charges,” CAO Michael Touw explained. “If, like many other grant programs, we’re not success-

ful, then we just carry on.”

That reassurance appeared to address concerns raised by members of council about the financial impact of reducing a key source of growthrelated revenue.

Coun. Isabel McRae sought clarification on whether grant funding would replace revenue lost through lower development charges. Touw said the intent of the program is to provide municipalities with funding for housing-supporting infrastructure in exchange for reducing those charges.

Coun. David Bird expressed support for applying broadly rather

than targeting a single project, while Treasurer Nev Jande noted that any reduction would be temporary. Under the proposal, development charges would be reduced by 50 per cent for five years before returning to their current levels.

The motion directs staff to proceed with the funding application immediately. If Perth is successful, council will be asked to pass a bylaw implementing the 50 per cent reduction in the town’s development charges. If the funding request is rejected, Perth’s current development charge rates will remain unchanged.

Smiths Falls library use grows as staff challenge outdated perceptions

Smiths Falls Public Library is seeing more people through its doors, more materials circulating and growing demand for programs, as staff say the modern library has become far more than a place to borrow books.

Library CEO Amanda Foster and Stephanie Clark, director of community services, presented an overview of the library’s role, services and challenges during the June 8 committee of the whole meeting.

Clark said the presentation came after council expressed interest in learning more about the library’s inner workings, community impact and funding.

She framed the library as one of the town’s key “third places,” a space outside of home, work or school where people can gather, connect and take part in community life without financial barriers or formal membership.

“The public library plays a critical role in our community and across the country,” Clark said, noting it supports early literacy, lifelong learning, access to information, social connection and community well-being.

Foster used the presentation to push back on common myths about the library, including the idea that it is only for readers, families with young children, or people who can easily access the historic Carnegie building.

“It’s not just a place to borrow books,” Foster said.

She said the library offers adult craft programs, children’s programming, museum and park passes, streaming music and films, digital resources, public computers, Wi-Fi, study rooms, photocopying, printing and faxing.

Recent statistics show use of the library has grown sharply since returning from its temporary location. In-person visits rose from 17,610 to 28,864 over a 10-month comparison period. Physical circulation increased from 20,316 to 24,858, while electronic circulation rose from 15,660 to 17,295.

Children’s summer program attendance increased

from 584 in 2024 to 857 in 2025. March Break program attendance rose from 43 in 2025 to 142 in 2026.

Foster said having proper space again has made a clear difference.

“You have the space, then suddenly you can let more kids come, and they will come,” she said.

She also addressed accessibility concerns, acknowledging the library’s historic building is not ideal and does not meet universal design standards. The library lift has worked for most users, she said, though there has been one case where a person could not fit into it.

Foster said the library is not fully accessible in the way staff would like, but she pushed back on the idea that it is inaccessible altogether. She also noted the library offers a visiting library service for residents who cannot physically come to the building.

“If you, for any reason, are unable to physically come to the library, we will bring books to your house,” she said.

Foster said the library’s collection has also changed over time. While the physical collection is smaller than it once was, she said staff focus on quality, currency, variety and condition. That includes offering different viewpoints on controversial subjects, large-print books, dementia-friendly books, Wonderbooks for children and digital materials.

One of the library’s biggest challenges is funding.

Foster said provincial core funding has remained unchanged for more than 30 years and now accounts for less than four per cent of library funding. About 90 per cent of the library’s budget comes from the town.

She said expectations are also changing, particularly as people move to Smiths Falls from larger centres and compare local services to libraries in places such as Ottawa, Toronto or Oakville.

The historic building also presents challenges, she said. While the Carnegie building is valued by the community, its three floors, columns, limited storage and lack of modern program space make service delivery difficult.

Council members had few questions following the presentation. Coun. Dawn Quinn praised library

staff for helping her find Tai Chi walking resources, while Coun. Jay Brennan asked about a possible Mahjong program.

Coun. Peter McKenna asked how the library plans to stay valuable as the community grows and expectations change.

Foster said the collection can continue to be adjusted, but storage and programming space remain major limitations. She said there appears to be more appetite for exploring other options for the library in the future, though any major change would likely be many years away.

Foster said the library remains a universal service, open to people of all ages and interests.

“You can stay there all day,” she said, as long as visitors follow the library’s code of conduct.

The new children’s area on the top floor of the Smiths Falls Public Library offers a welcoming environment designed to encourage early literacy, exploration and learning. Amanda Foster is pictured in the window. Laurie Weir photo.
The historic Carnegie building in Smiths Falls is home to the Smiths Falls Public Library, which continues to evolve to meet the changing needs of the community. Laurie Weir photo.

Council rejects funding review for Lower Beverley Lake Park

Rideau Lakes - Laurie Weir

Rideau Lakes council voted against seeking information on whether parkland reserve funds could be used to support future septic infrastructure work at Lower Beverley Lake Park after a debate over taxpayer responsibility, competition with private campgrounds and the role of municipal reserves.

During the June 8 committee of the whole meeting, Coun. Paula Banks introduced a motion asking staff to report back on whether any septic infrastructure identified in the Egis Sewage System Assessment Report could qualify for parkland reserve funding consideration.

An Egis engineering assessment found that 10 of the park’s 11 sewage systems required remedial work ranging from the installation of effluent filters to full leaching bed replacements. While no immediate operational failures were identified, several systems required replacement or significant upgrades to meet current regulatory expectations.

The Lower Beverley Lake Park board emphasized earlier this year that all existing sewage systems remained functional and that no system failures had occurred. The board described the work as targeted improvements to specific systems identified in the engineering review.

The motion on June 8 also asked staff to report on options for council to consider contributing up to $200,000 toward the issue through eligible parkland reserve funding, municipal contributions, donations or an interest-free municipal loan structure.

Banks stressed several times that the motion was intended to gather information rather than commit funds.

“We’re just asking staff to look at the septic system and what would be eligible for parkland funds,” she said. “We’re not committing to funds. We’re just asking staff to bring back a report.”

Coun. Dustin Bulloch, who seconded the motion, said the request would clarify what options might be available if funding discussions arise in the future.

“This doesn’t give direction to do anything,” Bullock said. “It’s merely to get information.”

The proposal drew opposition from some members of council, particularly over the possibility that municipal reserves could be used to support infrastructure at the park.

Deputy Mayor (DM) Jeff Banks questioned whether Lower Beverley Lake Park could continue to be described as self-sufficient if taxpayers were asked to help fund major capital expenses.

“What I have issue with is that I have heard that Lower Beverley Park is self-sufficient,” he said. “Well, it’s not self-sufficient if the taxpayers have to start sticking money into the infrastructure.”

He argued that park management should have planned for such costs by setting aside reserve funds generated through campground fees.

“If we do this once, then the request is going to continue to come back again, again and again,” DM Banks said.

Coun. Ron Pollard also voiced concerns about using parkland reserve funds for septic infrastructure at the park.

“Nothing against the park, but if we’re going to do that, then every campground in the (municipality) could apply for a piece of money from the parkland reserve,” Pollard said. “That’s not what it

was designed for. It’s for public recreation.”

Coun. Debbie Hutchings said she had heard concerns from residents about how private campgrounds could compete if municipal resources were used to support a township-owned operation.

“It’s either a business or it’s a park,” Hutchings said, adding that she did not support subsidizing something that “can’t handle itself.”

Paula Banks pushed back on comparisons to private businesses, arguing that Lower Beverley Lake Park is a township asset.

“It is a township-owned park, so it can’t be compared to a commercial operation,” she said. “We own it.”

She also noted that the township regularly invests in maintaining other municipal facilities.

“We need to maintain our assets,” Banks said. “I’m not asking for funding. I’m asking staff to do the work and see what is even eligible.”

Seeking a compromise, Coun. Linda Carr proposed removing the portion of the motion referencing contributions of up to $200,000 and other funding mechanisms.

The amendment passed by a recorded vote of 7-1. Hutchings abstained and DM Banks voted against it.

The revised motion would have directed staff only to determine whether septic infrastructure identified in the Egis report, including the main comfort station septic system and other systems servicing public recreation facilities, could qualify for parkland reserve funding consideration.

Even in its amended form, the motion failed by a recorded vote of 5-4. Voting in favour were Paula Banks, Bulloch, Carr and Mayor Arie Hoogenboom.

Residents pack public meeting on proposed Caivan subdivision

A standing-room-only crowd packed the Royal Canadian Legion Hall in Perth on June 11 as residents gathered to hear details of the proposed Caivan subdivision, a development that has sparked intense interest and strong feelings across the community.

Before the presentation began, Perth CAO Michael Touw acknowledged the charged atmosphere surrounding the proposal.

“I know that it’s an emotional and passionate topic for all of us,” Touw told the crowd. “I know there’s lots of feelings on all sides, both for and against. I ask that as we go through tonight, that we remain respectful of each other so we can have a positive night where we can learn and discuss this process.”

Mayor Judy Brown followed with a brief history of the project, explaining that discussions between the Town of Perth and Caivan date back to late 2022. She outlined how the proposal evolved through planning reviews, disagreements over conformity with Perth’s Official Plan, an appeal to the Ontario Land Tribunal and, ultimately, a lengthy mediation process.

Brown explained that provincial rules require mediation discussions to be held behind closed doors, which may have created the impres-

sion the process was being kept secret. She said that was not the municipality’s intent.

“It’s wonderful that so many have turned out tonight. It shows your interest in the town and its well-being,” Brown said.

Also in attendance were the town’s traffic and infrastructure consultants from Novatech, Director of Environmental Services Grant Machan, Director of Protective Services Trevor Choffe, and councillors Isabel McRae, David Bird and Gary Waterfield.

The main presentation was delivered by Director of Development Services Joanna Bowes, who walked residents through the planning process, the proposed layout, infrastructure requirements, transportation considerations and the regulatory approvals still required before construction could proceed.

Bowes emphasized that the evening was intended to provide information and answer questions.

“I know it’s been a long wait for everyone to learn about what this settlement has been after quite a few years,” Bowes said, noting that the process resulted in some wins for the municipality but was not perfect.

“What I’d like to say is that when nobody is happy with the decision, it’s usually a good decision.”

Seeking to reassure residents that information

would remain publicly available, Bowes added, “I am always open for anybody to call, and I can go through a file and do that sort of thing.”

Throughout the presentation, residents listened closely as details were provided on road connections, servicing, stormwater management, housing types and projected growth. While the presentation itself remained largely technical, the mood in the room reflected the broader debate surrounding growth in Perth.

Many attendees arrived with concerns about traffic, neighbourhood impacts, infrastructure capacity and the pace of development. Others voiced support for additional housing opportunities and the need to plan for Perth’s future growth. The presentation set the stage for an extensive question-and-answer session that followed, with residents lining up at microphones to challenge assumptions, seek clarification and express opinions on nearly every aspect of the proposal.

By the end of the evening, one thing was clear: whether residents support or oppose the Caivan subdivision, few are indifferent. The packed hall and passionate discussion underscored just how significant the proposal is to Perth residents and the future direction of their community.

Residents came out in droves to find out what was happening with the controversial Caivan subdivision in Perth on June 11. This was the first opportunity the town has had to communicate the agreement mediated by the Ontario Land Tribunal to the public. Emotions were high, a lot of questions, attacks and comments were made and in the end not everyone was satisfied with the information the town was able to share. Heddy Sorour photo.

community

Canada Day celebrations planned across the region

From pancake breakfasts and parades to live music, motorcycle rallies and fireworks, communities across the region are preparing to celebrate Canada Day with a full slate of family-friendly activities.

Whether you’re looking for small-town charm or an all-day festival atmosphere, there will be no shortage of ways to mark July 1 close to home.

Beckwith Township

Canada Day in Beckwith begins with a seniors’ buffet breakfast at Brunton Community Hall from 8 to 10 a.m., sponsored by Topps Environmental Solutions.

The Beckwith Hootenanny follows from 10 a.m. to noon at Brunton Community Hall, 2022 Beckwith Park Lane, featuring live entertainment by The Brownie Bunch.

Attendees are encouraged to bring lawn chairs, mingle with neighbours and enjoy the festivities. The event is open to all ages.

Residents planning to attend the breakfast are asked to RSVP by June 23 by contacting the township office at 613-257-1539, ext. 210, or by email at events@twp. beckwith.on.ca.

Carleton Place

Carleton Place will host its Canada Day celebration at Riverside Park from 1 to 10 p.m.

Despite ongoing construction work in the park, the town says visitors can still expect the same festive atmosphere.

New this year are two initiatives aimed at improving accessibility and reducing the event’s environmental footprint: bicycle valet parking, operated with support from the Carleton Place Environmental Advisory Committee, and a free shuttle bus service to help ease traffic congestion and parking pressures around Riverside Park.

Families can enjoy a variety of activities throughout the afternoon, including Airbounce inflatable games from 1 to

8 p.m., craft and activity areas from 1 to 7 p.m., FIFA World Cup-themed activities, live entertainment, food vendors and community activities.

Lanark Highlands

Lanark Highlands residents can celebrate Canada Day with a day of family fun centred around Clyde Memorial Ball Field.

Activities are expected to include a bicycle parade, face painting, a magic show, food vendors, live entertainment and fireworks to cap off the evening.

Merrickville-Wolford

Merrickville-Wolford’s Canada Day festivities begin at 11 a.m. with a parade departing from Hilltop Manor and travelling south along St. Lawrence Street to Blockhouse Park.

The schedule includes a cake-cutting ceremony at 11:45 a.m., followed by a Lions Club barbecue

North Grenville’s celebrations will take place at both Riverside Park in Kemptville and Maplewood Park in Oxford Mills.

Opening ceremonies begin at 11 a.m., followed by a full day of entertainment, family activities and fireworks.

Family activities include face painting, inflatable games, bouncy castles and balloon artists. The Kemptville Pool and splash pad will also be open free of charge.

Food vendors will offer everything from breakfast at the Legion

Live entertainment begins at 12:15 p.m. with Adeline & The Heathens, followed by Southbound at 2:15 p.m. Celebrations conclude at 4 p.m.

The municipality no longer hosts a fireworks display. The Merrickville and District Agricultural Society will host festivities in Eastons Corners.

kemptville – riverside park

Following opening ceremonies, musicians Derek McKinley, Arthur McGregor and Caitlin Thorne will perform during the afternoon.

Evening entertainment features Roxy’s Proxy, Ottawa Valley Hall of Famer Jamie McMunn and the

Mobile Support Unit.

Scheduled activities include:

• 3:30 p.m. – OPP Canine Unit demonstration

• 4 to 5 p.m. – Bicycle parade

• 5 to 9 p.m. – Face painting with Pixie Pie

• 5:30 p.m. – OPP Canine Unit demonstration

• 6 to 6:45 p.m. – Born to Amaze! magic show

• 7 to 10 p.m. – Live music featuring Linda Grenier and Dave Tilston performing as Smoke & Mirrors

• 10 p.m. – Fireworks display

Organizers encourage attendees to bring lawn chairs or blankets for the fireworks, along with sunscreen, water and swimsuits for the splash pad.

The Town of Perth is also encouraging residents to learn more about Indigenous history, residential schools and the Truth and Reconciliation Commission’s Calls to Action.

to poutine, BeaverTails, coffee and refreshments throughout the day.

oxford mills – maplewood park

The day begins with a performance by the Legion Pipe Band and a flag-raising ceremony. Local singer-songwriter Anya Perry will lead the national anthem.

Entertainment includes Jacob and Ben Matte, members of The Family Name, along with Jessica Pearson and the East Wind.

Visitors can also enjoy Dial-a-Chef crepes and a Lions Club barbecue.

Perth

Perth’s Canada Day festivities will take place at the Conlon Farm Recreation Complex before concluding with a fireworks display presented by the Perth Firefighters’ Association.

All-day activities include access to the splash pad and playground, a canteen offering a special dinner menu and the OPP

Rideau Lakes

newboro

Newboro’s Canada Day celebration will take place at the Newboro Community Hall from 3 to 7 p.m.

Organized by the Newboro Community Enhancement Committee in partnership with Rideau Lakes Township, the afternoon promises a mix of family fun and smalltown tradition.

Activities and games begin at 3 p.m., along with a petting zoo, displays by local artists and the Heritage Society, live music by Three 2 Go, a classic car display, and food and refreshments.

A community parade will start at 6 p.m., followed by a birthday cake cutting at 7 p.m. to wrap up the festivities.

The event is free to attend, with donations appreciated.

portland

Portland residents and visitors can enjoy the annual Cow Island fireworks display over Big Rideau Lake.

Supported by Len’s Cove Marina and the Big Rideau Lake Association, the event has become a Canada Day tradition for many local families.

Smiths Falls

In Smiths Falls, Canada Day celebrations will take on a two-wheeled twist as Downtown Bike Night rolls into the downtown core on July 1.

The monthly event, organized by the Downtown Smiths Falls Business Association, will feature motorcycles, vendors, live entertainment and extended shopping hours beginning at 3 p.m.

The event has become a popular summer gathering, drawing residents and visitors alike to the heart of the community.

From early-morning breakfasts and smalltown parades to lakeside fireworks and evening concerts, communities across the region are inviting residents and visitors to come together and celebrate Canada Day close to home.

Westport

Westport will mark Canada Day with festivities throughout the village, including a special Canada Day patio party at The Cove Inn.

Presented and sponsored by the Westport Canada Day Committee, the event will feature live music by SoulFire, with proceeds from a 50/50 raffle supporting future Canada Day celebrations.

The event is free to attend, although organizers recommend making reservations as the patio reached capacity last year.

A revised start time will allow attendees to make their way to the evening fireworks display.

For reservations, call The Cove Inn at 613-273-3636.

Editor’s note: Send your Canada Day events to ljweir@pdgmedia.ca to be included in the list online.

lunch at noon.
North Grenville
Canadian Cowboys ahead of the fireworks finale.
Kathy Botham photo.
Kathy Botham photo.
Kathy Botham photo.
Kathy Botham photo.

community

Strongman to pull 60,000-pound caboose during RMEO Father’s Day fundraiser

Laurie

Continued from page 1

“The challenge will be great,” Norris told Hometown News on Monday.

“The caboose will be 60,000 pounds with two brakemen on board, hopefully setting a world record. No one at my age or my weight has ever pulled such a heavy object.”

Norris, who turned 60 last week, recently returned from the 2026 World Strength Games in St. George, Utah,

where he placed fourth in the Masters under105-kilogram division for competitors aged 50 to 59.

He said the caboose pull would surpass his previous best of pulling a more than 40,000-pound garbage truck during competition.

“To practice for such a feat, I try to pull three or four cars linked together or push a car uphill,” Norris said. “I love doing things like that for my hometown.”

Norris said he enjoys participating in charity demonstrations and com-

munity fundraisers. He has previously deadlifted a car 16 times to raise money for spinal muscular atrophy initiatives and completed repeated bench press challenges supporting breakfast programs for children.

On June 21, RMEO event organizers will also host a fundraiser inviting visitors to guess how far Norris can pull the caboose, along with a silent auction and sponsorship opportunities for local businesses.

“We’re trying to keep it affordable because things

MRHA celebrates 2026 Long Service Award recipients

Regional - Submitted editorial@pdgmedia.ca

The Mississippi River Health Alliance (MRHA) recognized staff, medical staff and recent retirees during its 2026 Long Service Awards celebration on June 3 at Almonte General Hospital.

The event honoured staff and medical staff from Almonte General Hospital, Carleton Place & District Memorial Hospital, Fairview Manor and Lanark County Paramedic Service who have dedicated years — and, in many cases, decades — to serving local communities.

This year’s recipients marked service milestones ranging from five to 40

years, reflecting the commitment, compassion and professionalism that continue to strengthen health care across the region.

“Behind every year of service is a person who has made a difference in the lives of patients, residents, families and colleagues,” said Brad Harrington, president and CEO of the Mississippi River Health Alliance. “Today is an opportunity to recognize not only years of service, but the lasting impact these individuals have had on our organization and our communities.”

Special recognition was given to Heather White, who was honoured for 40 years of service in health care within the MRHA.

The MRHA also recognized recent retirees whose contributions helped shape the organization and the communities it serves.

The alliance extended its congratulations and gratitude to all 2026 Long Service Award recipients.

are tough,” Quinn said, noting sponsorships are being offered for $250.

The Father’s Day celebration will feature authentic Second World War-era military vehicles presented by the Swords and Ploughshares Museum, along with vintage cars, yard games, train rides, museum exhibits and food fresh off the grill.

According to the museum website, the Father’s Day high tea experience, held inside the museum’s century-old dining car, has already sold out. Their Mothers’ Day high-tea event sold out in 36 minutes, Quinn said.

Museum volunteers, some dressed in period clothing, will guide visitors through exhibits and railcars while sharing the history behind the collection.

“We’re hoping when Tim pulls the caboose, we’re going to ask who wants to ride the caboose as he’s pulling it,” Quinn said with a laugh. “Add some more weight to it.”

The museum is also celebrating the recent arrival of an Ottawa streetcar that was relocated to Smiths Falls for restoration and display after being spared from the scrapyard.

Quinn said restoration work on the streetcar is expected to take about a month before it can be fully showcased to visitors.

Quinn, who has volun-

teered with the museum for about two decades, said the attraction continues to evolve through the dedication of volunteers and ongoing preservation efforts.

“That building so easily could just be gone,” she said. “I’ve seen so many of the changes, and it’s just fantastic.” Admission to the museum is required for the Father’s Day event, with additional fees for train rides. Activities will run throughout the day, leading up to the caboose pull. More information is available on the museum’s website.

Tim Norris pulls a 40,000-pound garbage truck during the 2026 Strongman competition in Utah in May. In June, he will attempt a world record when he tries to pull a 60,000-pound caboose as a fundraising effort for the Railway Museum of Eastern Ontario. Tim Norris Facebook photo.
A Canadian National caboose at the Railway Museum of Eastern Ontario. Hometown News photo.
Photo submitted.
Photo submitted.
Photo submitted.

New ‘Tunes on the Tay’ music series to launch at Perth Terrace

Perth - Submitted editorial@pdgmedia.ca

There will be a new sound in the air this summer as musicians prepare to perform at the inaugural Tunes on the Tay music series, to be held Wednesday evenings from 6:30 to 8:30 p.m. at the Terrace on the Tay riverside landing on historic Mill Street.

Local music lovers and summer visitors alike are invited to enjoy the free, two-hour open-air performances featuring local solo artists, duos, trios and bands in a relaxed setting along the banks of the Tay River.

Co-organizer Brian Perkin, former owner of Lake 88.1, said the music series is intended to support local artists while providing entertainment at one of Perth’s more picturesque locations.

“The Terrace on Mill Street is a bit of a hidden gem,” Perkin said. “It’s right across from Stewart Park by the old swimming hole and features a modest stone amphitheatre. It’ll provide a great venue for artists and an attractive setting for audiences to enjoy the music. And, of course, the incredible drystack stone bridge there just adds to the ambience.”

The bridge was built as part of Perth’s 200th anniversary celebrations in 2016 with the help of local volunteers, Algonquin College students and master stone masons from Scotland, Ireland, the United States and Canada. It serves as a focal point of the Terrace, which the Town of Perth completed in 2019.

Co-organizer Andrew McIntyre, a longtime Perth

resident and sound technician for the project, said Perth Tourism is partnering with Tunes on the Tay by providing in-kind support for the 10-week series.

“For the musicians, we’ll be supplying the sound system, plus promotion and set-up,” McIntyre said. “And we’re working to attract local business support for the artists as well.”

Most shows will feature two acts showcasing a variety of musical genres. McIntyre hopes the series will also provide mentorship opportunities between experienced musicians and aspiring performers of all ages.

Tunes on the Tay kicks off Wednesday, June 24, featuring emerging local performer Julien Groulx at 6:30 p.m., followed by Perth favourite Matt Dickson at 7:30 p.m.

The 10-week series will continue each Wednesday through Aug. 26, with rain dates scheduled if needed.

The concerts are free to attend, and the Terrace is fully wheelchair accessible. For more information, or to inquire about performing, email tunesonthetay@ gmail.com.

Contact Brian Perkin or Andrew McIntyre for more information at tunesonthetay@gmail.com or call or text: 613-464-2881.

Matt Dickson [left] and Julien Groulx [right]. Photos submitted.

Turn static files into dynamic content formats.

Create a flipbook
Lanark, North Leeds & Grenville - Hometown News June 2026 by Hometown News - Lanark, North Leeds & Grenville - Issuu