ARCHITECT:
8 WILCOX STREET SIMSBURY, CONNECTICUT 06070 PHONE: (860) 264-1624 FAX: (860) 264-1628 www.phasezerodesign.com CLIENT:
OWNER:
CONSULTANT:
3' - 4"
TEMP. HARD BARRIER (HT 8') W/ PLASTIC COVERING UP TO THE UNDERSIDE OF STRUCTURE ABOVE.
7' - 5 1/2"
HARD BARRIER (HT 8') W/ PLASTIC COVERING UP TO THE UNDERSIDE OF STRUCTURE ABOVE
6' - 0 1/4"
9' - 0"
2' - 10 1/4"
TEMP. CONSTRUCTION DOOR
2' - 11 1/8"
7' - 5"
61' - 2 9/16"
HARD BARRIER (HT 8') W/ PLASTIC COVERING UP TO THE UNDERSIDE OF STRUCTURE ABOVE
3' - 4"
TEMP. CONSTRUCTION DOOR
30' - 5 1/4"
FRESHENS
STARBUCKS PROJECT UNDER SEPERATE PERMIT
6' - 1 3/8"
6' - 4"
PLASTIC BARRIER @ ALL BALCONY LOCATIONS. FLOOR TO CEILING 19' - 9 1/2"
TEMP. CONSTRUCTION DOOR
CONDIMENTS
TEMP. HARD BARRIER (HT 8') W/ PLASTIC COVERING UP TO THE UNDERSIDE OF STRUCTURE ABOVE.
TEMP. HARD BARRIER TO UNDERSIDE OF DECK/CEILING
SUSHI & RAMEN
SUSHI & RAMEN STATION
50' - 0"
PIZZA STATION
STUDENT CENTER RENOVATION
HOFSTRA UNIVERSITY
15' - 0"
HOLD
1000 FULTON AVENUE, HEMPSTEAD, NY 11550
3' - 0"
PROJECT:
PIZZA
REVISIONS NO.
HARD BARRIER (HT 8') W/ PLASTIC COVERING UP TO THE UNDERSIDE OF STRUCTURE ABOVE.
DATE
DESCRIPTION
TEMP. HARD BARRIER (HT 8') W/ PLASTIC COVERING SLOPED BACK TO PLASTIC BARRIER AT BALCONY.
Dwg Filename: C:\Users\m_watt\Documents\Hofstra Student Center - VB_MWattPZD.rvt Plot Date: 4/16/2019 3:55:45 PM
6' - 8 1/2"
22' - 8 3/4"
PLASTIC BARRIER @ ALL BALCONY LOCATIONS. FLOOR TO CEILING
SEAL:
4' - 9 7/16"
PROGRESS DRAWING
16' - 0 1/4"
KOSHER STATION
THE LOUNGE
KOSHER
4/16/2019 3:55:45 PM EXISTING OFFICE TO REMAIN
EXISTING OFFICE TO REMAIN
NOT FOR CONSTRUCTION
ISSUED FOR:PERMIT DOCUMENTS ISSUED DATE:3.22.2019 DRAWN BY:MJW CHECKED BY: MG PROJECT NUMBER: 1518562 Copyright (c) by Phase Zero Design Corp. All Rights Reserved.
DRAWING NAME:
1
TEMP. CONSTRUCTION PARTITION PLAN 3/16" = 1'-0"
TEMP. CONSTRUCTION PLAN DRAWING NO.
A902