LOGISTIC MILL 21
Via Raeka | 2 - 22 Weert | The Netherlands
Approx. 120.000 sq.m

![]()
Via Raeka | 2 - 22 Weert | The Netherlands
Approx. 120.000 sq.m



The Logistic Mill 21 campus is a state of the art DC at Kampershoek 2.0, Weert. It’s situated on a unique location on the A2-E35 turck road between Eindhoven and Maastricht and close to the Belgian border.
The large-scale logistic campus consists of a modern distribution and storage centre with in total 118.085 sq.m of warehouse space.
Unit 1 and 2 of approx. 23.000 sq.m in total are available for rent

Amsterdam 153 km
Rotterdam 146 km
Zeebrugge
207 km
Dunkirk
273 km
Lille
234 km
Valenciennes 251 km
Dourges 260 km
LOGISTIC MILL 21 CAMPUS
Antwerp 108 km
Brussels 154 km
The ‘blue banana’ is the centrally located European megalopolis that connects several European major cities.
Blue Banana: corridor of strong urbanisation in Europe
The site is situated at Kampershoek 2.0, Weert, a unique logistics location on the A2-E35 truck road between Eindhoven and Maastricht and close to the Belgian border.

SQM

TRUCK PARKING CAR PARKING: 43
ELECTRICAL CHARGING POINTS
AVAILABILITY
UNIT 6 AND 8: BY MUTUAL AGREEMENT


WAREHOUSE
• Clear height: 12.20 m
• 1 dock door per 1,000 m2
• 1 ground level access door (4.00 m x 4.70 m) per unit
• Floor load: 50 kN/m2
• Maximum point load pallet racking: 80 kN/leg
• Flatness tolerance according to DIN18202 Table 3, Zeile
• Certified automatic sprinkler installation (ESFR roof sprinklers)
• Fire hose and hydrants conform to local regulations and building code
• Fire alarm and evacuation system conform the rules and code
• Heating (12 °C) and ventilation system
• Lighting: energy efficient LED, 250 lux
• Offices on ground floor and mezzanine level with an open floor plan
• High-end VRF-system for cooling and heating
• LED lighting, 500 Lux at worktable level
• High-end finishing
• Mezzanine with a depth of 24 m above expedition area
• Floor load of 10kN/sqm
• Windows for natural light
• Perimeter fencing with automated entrance gate
• Reinforced concrete truck-court, designed for heavy loads
• Exterior lighting for loading area, circulation road and park yards
Deviations to be discussed.

Our online energy dashboard will help customers proactively to manage the consumption of their utilities.
Reduced maintenance costs thanks to the use of high quality and performing materials.
Sustainable and cost-efficient energy resulting in bottom-line savings.
Rainwater harvesting for use in toilet flushing and other non-potable applications (green keeping)
Assembled natural light solution that can save up to 10% a year on running costs.
By exceeding the basic principles, we make our buildings future-proof for further growth.
Our initiatives contribute to a greener world and offer distinct advantages to our customers and communities.

Logistic Mill 21 Campus Via Raeka 2-22 Weert
The Netherlands
NICK OUDE AARNINKHOF
+31 6 14 46 29 95 nick.oudeaarninkhof@heylenwarehouses.com
DAVID BATENS
+32 491 34 70 57 david.batens@heylenwarehouses.com
JORDY GRUNDEL
+31 6 82 72 40 78 jordy.grundel@heylenwarehouses.com

Disclaimer | This rental brochure has been carefully compiled to provide potential tenants with relevant information, but we emphasize that the provided data is of a general nature and may be subject to change without prior notice. Interested parties are kindly requested to understand that the landlord accepts no liability for possible inaccuracies or changes. It is explicitly stated that this information provision should not be considered an offer or quotation. By using this rental brochure, the reader agrees to the aforementioned terms. Please contact our representatives for the current information.
All images shown are for indicative purposes only and may be subject