
1 minute read
PREVENTIVE MAINTENANCE
Preventive maintenance is most important to assure long life of the system. The following maintenance procedures should be followed on a regular basis:
1) Flush entire system with water after use of suspension type chemicals. Failure to clean system can result in crystallization of chemicals which may plug the Flow Meter, lines, and/or tips.
2) Flush and drain sprayer before storing. FREEZING TEMPERATURES MAY DAMAGE FLOW METER IF WATER IS NOT DRAINED.
3) Remove Flow Meter at the end of each spraying season. Clean Flow Meter turbine and inlet hub. Clean off all metal filings and wettable powders which have hardened on the plastic and metal parts. Check the inlet hub and turbine assembly for worn or damaged turbine blades and bearings. Flush Flow Meter with clear water and drain.
KEEP FROM FREEZING
4) Remove Console when not in use for extended periods.