
1 minute read
Route the two hoses (14) along the right side the loader arm. Secure the two hoses (14) the loader arm means the two plates (9) , the two clamps (7) , the two washers (10) , and the two bolts .
from CNH Hydraulic provision Kit Z-Bar 221F STD 221F HS W70C W70C HS Installation Instructions Manual
12. Route the two hoses (14) along the right side the loader arm. Secure the two hoses (14) the loader arm means the two plates (9) , the two clamps (7) , the two washers (10) , and the two bolts . NOTE: align the clamps side shown the figures 11 (see arrows) mark hoses (14) . NOTE: the next step changes according the third fourth function configuration. 13. Connect the two hoses (14) the two ° elbows (E) . NOTE: apply the angle orientation the hoses (14) shown in figure 11.
LEIL20CWL1047FB 11 Third function configuration