4 minute read

Swing motor assembly 23. Recoil spring

The description the models shown in this manual has been made in accordance with the technical specifications known the date design this document.

All data given in this manual is subject production variations. Dimensions and weights are provided with approximate values and the machine fitting shown in the illustrations may not correspond with standard models. For precise information specific machine models and versions, please consult your CASE CONSTRUCTION Dealer .

Reproduction translation, even partial, is prohibited without written authorization from CNH Industrial America LLC . Company .

Intended use

NOTICE: not use the excavator for operations which are foreign its specifications and not included in this manual in order prevent serious injury persons damage the machine. The manufacturer / dealer is not responsible for damage caused improper use.

The excavator has been designed carry out digging and earth moving operations through the use a bucket. Operations that involve the use hydraulic hammers are also possible. Other operations, such moving suspended loads, are only possible if the specific variant approved the manufacturer is present.

Using the excavator and its equipment for dif ferent operations, such towing, transporting and lifting people, is considered inappropriate and is prohibited.

Electro - Magnetic Compatibility (EMC)

Interference may arise a result add ‐ equipment that may not necessarily meet the required standards. As such interference can result in serious malfunction the unit and / create unsafe situations, you must observe the following: • The maximum power emission equipment (radio, telephones, etc.) must not exceed the limits imposed the national authorities the country where you use the machine • The electro ‐ magnetic field generated the add ‐ system should not exceed V/m any time and any location in the proximity electronic components • The add ‐ equipment must not interfere with the functioning the board electronics

Failure comply with these rules will render the CASE CONSTRUCTION warranty null and void.

T elematics

NOTE: the CASE CONSTRUCTION SiteW atch™ website (www .casesitewatch.com) will not accessible until the CASE CONSTRUCTION SiteW atch™ subscription for this machine is registred authorized CASE CONSTRUCTION dealer . Contact authorized CASE CONSTRUCTION for details.

This machine is equipped with a telematics system. This is asset - monitoring system that combines Internet,

cellular , and GPS technologies. A transponder unit is mounted the equipment that wirelessly communicates with the user interface CASE CONSTRUCTION SiteW atch™ www .casesitewatch.com. Using cellular technology , the transponder can send equipment data, including location, / f status, usage and production metrics, diagnostic data, movement alarms, and unauthorized usage the interface. The system will help cut costs and keep accurate records. See the furnished guide for operating your telematics system.

Manual scope and required training level

Introduction to this manual

This manual gives information about the use your CASE CONSTRUCTION machine intended and under the conditions foreseen CASE CONSTRUCTION during normal operation, routine service, and maintenance.

This manual does not contain all the information that relates periodic service, conversions, and repairs that only trained service personnel can perform. Some these activities may require appropriate facilities, technical skills, and / tools that CASE CONSTRUCTION does not supply with the machine.

The manual contains the chapters shown the Contents pages. See the Index the end this manual locate specific items about your CASE CONSTRUCTION machine.

Normal operation

Normal operation consists the use this machine for the purpose CASE CONSTRUCTION intends operator that: • familiar with the machine and any mounted equipment towed equipment • Complies with the information operation and safe practices specified CASE CONSTRUCTION in this manual and the signs the machine

Normal operation includes: • Preparation and storage the machine • Addition and removal ballast • Connection and disconnection mounted equipment and / towed equipment • Adjustment and configuration the machine and equipment for the specific conditions the job site, field, and / crop • Movement components into and out working positions

Routine service and maintenance

Routine service and maintenance consists the daily activities necessary maintain the proper machine function. The operator must: • Be familiar with the machine characteristics • Comply with the information routine service and safe practices specified CASE CONSTRUCTION in this manual and the signs the machine

Routine service can include: • Fueling • Cleaning • W ashing • T opping fluid levels • Greasing • Replacing consumable items such light bulbs

Periodic service, conversions, and repairs

Periodic service consists activities that are necessary maintain the expected life the CASE CONSTRUCTION machine. These activities have defined intervals.

T rained service personnel familiar with the machine characteristics must perform these activities the defined intervals. T rained service personnel must comply with the information periodic service and safe practices partly specified CASE CONSTRUCTION in this manual and / other company literature.

Periodic service includes: • Oil change service for the engine, hydraulic circuits, transmission • Periodic exchange other substances components required

Conversion activities rebuild the CASE CONSTRUCTION machine in a configuration that is appropriate for a specific job site, crop, and / soil conditions (e.g., installation dual wheels). Conversion activities must done: • By trained service personnel familiar with the machine characteristics • By trained service personnel that comply with the information conversion partly specified CASE

CONSTRUCTION in this manual, assembly instructions, and / other company literature

Repair activities restore proper function a CASE CONSTRUCTION machine after a failure degradation performance. Dismantling activities occur during the scrapping and / dismantling the machine.

T rained service personnel familiar with the machine characteristics must perform these activities. T rained service personnel must comply with the information for repair specified CASE CONSTRUCTION in the service manual.

Before you operate

Read this manual before you start the engine operate this CASE CONSTRUCTION machine. Contact your CASE CONSTRUCTION dealer if: • Y not understand any information in this manual • Y need more information • Y need assistance

This article is from: