
1 minute read
LUBRICATION SYSTEM
WHAT’S NEW 0
This section indicates this year is major changes brought to this shop manual including 717 engine procedures applicable to the new Speedster SK model.
SERVICE TOOLS AND SERVICE PRODUCTS
• Revised tool part numbers. Tool are identical to last year, only part numbers have been modified. • The following tools are new: • Radio installation tool (P/N 295 100 106). • Tool board (P/N 295 500 608). • Tie-down (P/N 295 100 088). • Lift kit: –14 foot (P/N 295 000 160). –16 foot (P/N 295 100 085). –18 foot (P/N 295 100 045). • The following products are new: • Loctite Chisel (P/N 413 708 500) replaces Gasket stripper (P/N 295 000 110). • Parts cleaner (P/N 413 711 809) replaces Loctite safety solvent (P/N 293 800 019).
MAINTENANCE
• Revised periodic inspection chart with aluminum anode inspection. • Revised flushing procedure. • New photographs. • New flow chart.
ENGINE
• Revised engine cover removal procedure + photographs. • New main battery cut-off switch. • New wire color codes on generating and charging coils.
FUEL SYSTEM
• Revised procedure for clamp removal.
LUBRICATION SYSTEM
• Oil reservoir removal procedure.