
1 minute read
Barnwood Park and Arboretum 2022
This project required a set of technical drawings focusing on drainage and water management. The site is a large greenspace belonging to the Gloucester City Council which contains an arboretum and an orchard.
SECTION SMALL TOTAL
Advertisement



850mm heigh Geo hoop cycle stand
Barnwood Park And Arboretum
of mortar base
CONCRETE
Drexus slot drain duo with a 5/0 channel unit of concrete
BLACK WATER PIPE RUNNING UNDERGROUND WITH ELECTRIC PUMPS HELPING WATER FLOW IN UPHILL AREAS
GREEN SEDUM ROOF ON TOP OF CAFE AND TOILETS BUILDING TO SOAK UP RAIN WATER
PERMEABLE CONCRETE PATHWAYS TO REDUCE SURFACE WATER
SECTION A-B SHOWS THE PROPOSED FILL ALONG WITH THE SEATING AREA. SMALL SECTIONS OF FILL LIKE THIS ACCOMMODATE FOR 541M3 OF THE TOTAL FILL.
GREY WATER PIPE RUNNING UNDERGROUND INTO SEPTIC TANK BEFORE ENTERING REED BEDS IN THE POND AD5604 pins securing box planter
SIGNATURE:


DETAILS 2
ON TOP OF BIRD HIDES TO SOAK UP RAIN WATER
N