As we continue to roll into 2022, I would like to thank all Department 48 employees and all the supporting staff from our corporate office in Las Vegas. In October, Chris Paris joined us to further enhance our business development efforts. He joins Darren Vanderford and Pete Fontano, as well as members of the Las Vegas Estimating Team in the pursuit of new projects for the Reno office.

It’s exciting for me to share with you some of our featured Reno projects completed in 2021. We’re so happy to have the opportunity to help and contribute with the housing crisis we continue to see within our community! I look forward to another outstanding year, appreciate our Helix family and the continued efforts by everybody to help us continue to be best electrical contractor in Reno.

SPRING 2022 HELIX ELECTRIC NORTHERN NV3

Project Manager: Jim Smalley Assistant Project Manager: Cameron Corson Superintendent: Ed Bock

EMORY AT PARK LANE

Park Lane, an iconic shopping center in Reno, is undergoing a revitalization to become a lifestyle resort property. The 46-acre redevelopment features luxury apartments, a 5-star hotel, dining, bars, and boutique shopping.

Emory - Design Assist- 7 story parking garage with 320 parking spots wrapped with 282 units. The Emory facility includes EV chargers in the parking garage, WIFI access throughout the complex, state of the art clubhouse, yoga center, fitness center, outdoor pool and spa, a courtyard which includes festoon lighting, seating areas, firepits, a barbeque island, and large LED screen. The project entailed coordinating (4) 1000Kva utility electrical services which feed the (8) 1000amp meter groups, (1) 2000amp switchboard for the house power system and (1) 1600amp commercial tenant spaces. The emergency power back up 150kw generator feeds the emergency power equipment, elevator, and lightings systems. The CCTV and access control systems assure the safety of the residents. Exterior at the entrance of the completed Emory at Park Lane

Interior tenant space with entertainment are and bar.

Project Executive: Jeff Olsen Superintendent: Nathan Dowdy

BASECAMP

Design Assist - is a 340-unit apartment complex encompassed in 2- 5 story and 1-4 story buildings. The developer heavily focuses on the amenity spaces throughout its projects to give the tenants a resort feel that includes a 5th floor heated outdoor deck, fitness center, indoor basketball court, yoga room, weight room, common room with kitchen/relaxing area/pool table, a very impressive pool/spa area that includes a large LED screen tv, BBQ/pizza oven, and outdoor fire pit. The entire project has an audio system throughout the common areas and a security system that includes CCTV cameras and an access control system.

The project consists of (2) 1200 amp main switchboards in building A, (1) 2000amp main switchboard and (2) 1200 amp main switchboards in building B , and (1) 2000amp main switchboard and (2) 1200 amp main switchboards in building C.

Basecamp exterior photo.

Project Manager: John Brodie Superintendent: Dustin Ayers

PARK PLACE STUDENT HOUSING

A 7 story, 359 fully furnished units with 762 beds for the students at University of Reno. A 7-story parking structure with 373 vehicle and 367 bicycle spaces. Park Place includes a rooftop pool, spa, basketball court, fitness area, private theatre, golf simulator along with soundproof study areas. There are two courtyards with lounge areas, grilling stations and its own dog park!

This project has a 4000-amp, 3000 amp and a 2500-amp service with a 225-kw backup generator. The project also incorporates a complete DAS, fire alarm, low voltage, security and card access control. Ariel above the Park Place student housing complex

Exterior Park Place basketball court